Date
|
Hours
|
Work Log Summary
|
Details
|
09-03-2018
|
8.00
|
Modifying the Catto Prop
|
Details
|
|
|
10-10-2016
|
4.00
|
Some minor adjustments & improvements
|
Details
|
|
|
08-08-2015
|
6.00
|
More flight testing & Air to Air pics
|
Details
|
|
|
07-21-2015
|
5.00
|
The big day has finally arrived.
|
Details
|
|
|
07-21-2015
|
2.00
|
More pics of the first flight day
|
Details
|
|
|
07-16-2015
|
15.00
|
Final inspection for C of A
|
Details
|
|
|
07-10-2015
|
6.00
|
Fully Assembled
|
Details
|
|
|
07-09-2015
|
18.00
|
Very lucky to have some great help during the rigg
|
Details
|
|
|
07-04-2015
|
8.00
|
Final fitting of the wings
|
Details
|
|
|
06-23-2015
|
6.00
|
Now at the new Home
|
Details
|
|
|
06-22-2015
|
7.00
|
Relocation of the Fuselage to the Hangar
|
Details
|
|
|
06-21-2015
|
4.00
|
Moving the Fuselage
|
Details
|
|
|
06-09-2015
|
6.00
|
Taking wings & other parts to the Hangar
|
Details
|
|
|
06-08-2015
|
4.00
|
Getting ready to take to the airfield.
|
Details
|
|
|
06-07-2015
|
6.00
|
The finish is getting closer
|
Details
|
|
|
06-06-2015
|
6.00
|
The final Paint scheme revealed
|
Details
|
|
|
06-05-2015
|
6.00
|
Final Paint stripes.
|
Details
|
|
|
06-04-2015
|
7.00
|
Applying Pin Stripes & Registration markings.
|
Details
|
|
|
06-03-2015
|
8.00
|
Applying the pin stripes to the Fuselage
|
Details
|
|
|
05-20-2015
|
9.00
|
Top coat to the fuselage
|
Details
|
|
|
05-18-2015
|
5.00
|
Painting the fuselage
|
Details
|
|
|
05-17-2015
|
8.00
|
Applying the primer to the fuselage
|
Details
|
|
|
05-15-2015
|
10.00
|
Preparing the fuselage for painting
|
Details
|
|
|
05-11-2015
|
3.00
|
Moving the Fuselage to the paint shop
|
Details
|
|
|
05-10-2015
|
4.00
|
First Engine Start
|
Details
|
|
|
05-09-2015
|
6.00
|
Painting the Engine Cowls
|
Details
|
|
|
05-06-2015
|
9.00
|
Painting numerous parts
|
Details
|
|
|
05-03-2015
|
8.00
|
Mounting the G meter / clock
|
Details
|
|
|
05-02-2015
|
10.00
|
Painting the Left Wing
|
Details
|
|
|
04-20-2015
|
8.00
|
Painting the Left wing
|
Details
|
|
|
04-17-2015
|
6.00
|
Right wing paint
|
Details
|
|
|
04-16-2015
|
8.00
|
Painting the wings
|
Details
|
|
|
04-11-2015
|
8.00
|
Making the wing rotissaries
|
Details
|
|
|
04-10-2015
|
7.00
|
Painting the fuel tank tops
|
Details
|
|
|
04-09-2015
|
6.00
|
Painting the struts
|
Details
|
|
|
04-08-2015
|
6.00
|
Some colour at last
|
Details
|
|
|
04-07-2015
|
15.00
|
Moving on with the paint
|
Details
|
|
|
03-14-2015
|
10.00
|
Learning all about paint & spray guns
|
Details
|
|
|
03-07-2015
|
8.00
|
Painting all the bits
|
Details
|
|
|
02-15-2015
|
6.00
|
Into the paint shop at long last
|
Details
|
|
|
02-11-2015
|
5.00
|
Exhaust pipe extensions
|
Details
|
|
|
02-08-2015
|
7.00
|
Leg Fairings and Nose cone fitting
|
Details
|
|
|
02-07-2015
|
7.00
|
Left side gear leg fairings.
|
Details
|
|
|
02-06-2015
|
7.00
|
Undercarriage Fairings
|
Details
|
|
|
02-02-2015
|
6.00
|
Oil Cooler ducting & sealing engine baffles
|
Details
|
|
|
02-01-2015
|
4.00
|
Scat air cooling tubing & Oil Cooler ducting.
|
Details
|
|
|
01-31-2015
|
4.00
|
Still working on engine install.
|
Details
|
|
|
01-25-2015
|
6.00
|
Final install of engine air filter and snorkle
|
Details
|
|
|
01-24-2015
|
7.00
|
Engine connections
|
Details
|
|
|
01-11-2015
|
7.00
|
Final install of baffles & Ehaust stays
|
Details
|
|
|
01-10-2015
|
6.00
|
Started on the Baffle seal
|
Details
|
|
|
01-09-2015
|
5.00
|
Engine instrument connections
|
Details
|
|
|
01-07-2015
|
4.00
|
Connecting wires to Starter, Alternator, Magneto e
|
|
|
|
01-05-2015
|
6.00
|
Engine connections
|
Details
|
|
|
01-04-2015
|
14.00
|
Checking clearance between baffle plates and Cowls
|
Details
|
|
|
12-31-2014
|
9.00
|
Matching cowls & baffles
|
Details
|
|
|
12-30-2014
|
8.00
|
Fitting Snorkle & air filter
|
Details
|
|
|
12-29-2014
|
4.00
|
Still battling with baffles, & its not over yet!
|
Details
|
|
|
12-28-2014
|
9.00
|
Fitting Air Filter Snorkle & Alt Air port/plate.
|
Details
|
|
|
12-27-2014
|
8.00
|
Fitting the Snorkle duct
|
Details
|
|
|
12-24-2014
|
8.00
|
Forming the baffles into 4 quadrants.
|
Details
|
|
|
12-23-2014
|
7.00
|
Continuing with the baffles
|
Details
|
|
|
12-16-2014
|
7.00
|
More battling with Baffles
|
Details
|
|
|
12-14-2014
|
6.00
|
Battling with Baffles
|
Details
|
|
|
12-09-2014
|
4.00
|
Finishing cowl latches & Oil cooler air box
|
Details
|
|
|
12-08-2014
|
8.00
|
Fabricating the Oil Cooler duct.
|
Details
|
|
|
12-05-2014
|
5.00
|
Mounting the Oil Cooler.
|
Details
|
|
|
12-04-2014
|
6.00
|
Fitting the High Pressure Gascolator
|
Details
|
|
|
12-01-2014
|
4.00
|
Final install of closure latches
|
Details
|
|
|
11-30-2014
|
9.00
|
Forming the upper cowls into one piece.
|
Details
|
|
|
11-27-2014
|
9.00
|
Fitting the CamlocS
|
Details
|
|
|
11-25-2014
|
9.00
|
Marking and fitting Latches
|
Details
|
|
|
11-19-2014
|
8.00
|
Searching for cowl locking parts
|
Details
|
|
|
11-16-2014
|
6.00
|
Top cowls both sides
|
Details
|
|
|
11-14-2014
|
7.00
|
Top left & right side cowls
|
Details
|
|
|
11-13-2014
|
8.00
|
Top left cowl
|
Details
|
|
|
11-12-2014
|
14.00
|
Exhaust area opening
|
Details
|
|
|
08-10-2014
|
6.00
|
Fitting the top centre Cowl plate & hinges
|
Details
|
|
|
08-09-2014
|
4.00
|
Fitting the lower left cowl cheek
|
Details
|
|
|
08-07-2014
|
5.00
|
Making the side cowl template from pasteboard
|
Details
|
|
|
08-06-2014
|
7.00
|
Lower Cowl supports & Plate
|
Details
|
|
|
08-04-2014
|
6.00
|
Fitting the Nose Bowl
|
Details
|
|
|
07-29-2014
|
6.00
|
Fitting Engine Baffles
|
Details
|
|
|
07-28-2014
|
7.00
|
Throtle control, Engine end, Bracket
|
Details
|
|
|
07-24-2014
|
6.00
|
Mixture control final arrangement.
|
Details
|
|
|
07-23-2014
|
7.00
|
Engine Baffles & FWF connections.
|
Details
|
|
|
07-22-2014
|
8.00
|
Engine on & brakes now working.
|
Details
|
|
|
07-20-2014
|
12.00
|
Fuel Flow tests completed
|
Details
|
|
|
07-16-2014
|
7.00
|
Jury struts Right Wing
|
Details
|
|
|
07-14-2014
|
7.00
|
Jury struts left wing
|
Details
|
|
|
07-13-2014
|
9.00
|
Left wing gap seal cover
|
Details
|
|
|
07-09-2014
|
8.00
|
Fuel level sight guages & flap control
|
Details
|
|
|
07-07-2014
|
7.00
|
Wing to Fuse Gap Seal
|
Details
|
|
|
07-06-2014
|
7.00
|
Wing to fuselage gap fairing
|
Details
|
|
|
07-05-2014
|
3.00
|
Wing root attachment bolts
|
Details
|
|
|
07-05-2014
|
6.00
|
Fitting push rods in Cabin
|
Details
|
|
|
07-04-2014
|
8.00
|
Fitting the Struts
|
Details
|
|
|
06-29-2014
|
9.00
|
Fitting the Struts
|
Details
|
|
|
06-28-2014
|
8.00
|
Fitting wings
|
Details
|
|
|
06-27-2014
|
8.00
|
Fitting wings to the Fuselage
|
Details
|
|
|
06-25-2014
|
9.00
|
Repositioning of the Fuselarge ready for wing asse
|
Details
|
|
|
06-23-2014
|
6.00
|
Left wing tip fairing
|
Details
|
|
|
06-09-2014
|
6.00
|
Wing tip fairing
|
Details
|
|
|
06-08-2014
|
7.00
|
Fitting the Flap & Aileron to the right wing
|
Details
|
|
|
06-03-2014
|
8.00
|
Flaps & Ailerons completed
|
Details
|
|
|
06-01-2014
|
8.00
|
Final prep of Aileron for riveting
|
Details
|
|
|
05-31-2014
|
8.00
|
Flap assembly
|
Details
|
|
|
05-30-2014
|
6.00
|
Aileron assembly
|
Details
|
|
|
05-29-2014
|
4.00
|
Flap & Aileron assembly
|
Details
|
|
|
05-28-2014
|
4.00
|
Making the Strobe mount blocks
|
Details
|
|
|
05-22-2014
|
2.00
|
Assembly of right wing Flap & Aileron
|
Details
|
|
|
05-21-2014
|
3.00
|
Fitting pick up tubes to right wing fuel tank
|
Details
|
|
|
05-20-2014
|
5.00
|
Preparing the Right wing Aileron & Flap parts
|
Details
|
|
|
05-19-2014
|
6.00
|
Right wing fuel tank
|
Details
|
|
|
05-18-2014
|
3.00
|
Mounting blocks for the Position & strobe lights
|
Details
|
|
|
05-16-2014
|
5.00
|
Final riveting of the right wing
|
Details
|
|
|
05-15-2014
|
7.00
|
Installing rivets
|
Details
|
|
|
05-14-2014
|
6.00
|
Final install of right wing leading edge & bottom
|
Details
|
|
|
03-18-2014
|
5.00
|
Priming the inside surface of the bottom skins
|
Details
|
|
|
03-17-2014
|
7.00
|
Fitting flap & aileron opening fairings
|
Details
|
|
|
03-16-2014
|
5.00
|
Right wing aileron opening fairing
|
Details
|
|
|
03-15-2014
|
8.00
|
Fitting Right wing Flap area fairings
|
Details
|
|
|
03-14-2014
|
11.00
|
Fitting Flap & Aileron push rods and inspection ac
|
Details
|
|
|
03-11-2014
|
4.00
|
Right wing
|
Details
|
|
|
03-09-2014
|
9.00
|
Getting ready to close up the right wing.
|
Details
|
|
|
03-07-2014
|
6.00
|
Fairings in the flap and aileron areas
|
Details
|
|
|
03-06-2014
|
4.00
|
Bottom inboard Skin, Right Wing
|
Details
|
|
|
03-04-2014
|
7.00
|
Fitting right wing bottom skin
|
Details
|
|
|
03-03-2014
|
7.00
|
Final fitting of leading & trailing edges.
|
Details
|
|
|
03-02-2014
|
5.00
|
Pre drilling bottom skin Right wing.
|
Details
|
|
|
03-01-2014
|
6.00
|
Fitting trailing & leading edge skins.
|
Details
|
|
|
02-28-2014
|
5.00
|
Wiring for the right wing lighting
|
Details
|
|
|
02-27-2014
|
4.00
|
Right wing Landing light
|
Details
|
|
|
02-22-2014
|
4.00
|
Fitting leading edge skins, right wing
|
Details
|
|
|
02-19-2014
|
6.00
|
Fitting leading edge skins
|
Details
|
|
|
02-18-2014
|
8.00
|
Leading edge ribs installation
|
Details
|
|
|
02-17-2014
|
6.00
|
Right side wing.
|
Details
|
|
|
02-15-2014
|
2.00
|
Positioned the right wing fuel tank for the first
|
Details
|
|
|
02-14-2014
|
9.00
|
Drilling wing skin pilot holes
|
Details
|
|
|
02-12-2014
|
2.00
|
Marking rivet lines onto skins
|
Details
|
|
|
02-11-2014
|
6.00
|
Marking the rib & stringer framework onto the skin
|
Details
|
|
|
02-10-2014
|
6.00
|
Installing stringers to bottom of right wing.
|
Details
|
|
|
02-09-2014
|
7.00
|
Fitting wing stringers.
|
Details
|
|
|
02-08-2014
|
8.00
|
Assembling wing framework
|
Details
|
|
|
02-07-2014
|
5.00
|
Right wing assembly
|
Details
|
|
|
02-06-2014
|
9.00
|
Assembling the spar reinforing plates , right wing
|
Details
|
|
|
02-04-2014
|
8.00
|
Starting on the right wing
|
Details
|
|
|
01-24-2014
|
7.00
|
Final assembly of left aileron.
|
Details
|
|
|
01-23-2014
|
6.00
|
Left wing aileron assembly
|
Details
|
|
|
01-22-2014
|
4.00
|
Assembly of the left wing Aileron
|
Details
|
|
|
01-18-2014
|
8.00
|
Assembly of the first Aileron.
|
Details
|
|
|
01-16-2014
|
7.00
|
Final riveting of the first flap.
|
Details
|
|
|
01-14-2014
|
8.00
|
Flap alignment with the wing.
|
Details
|
|
|
01-13-2014
|
7.00
|
First Flap Assembly.
|
Details
|
|
|
01-12-2014
|
7.00
|
Got the wing off the table at last.
|
Details
|
|
|
01-11-2014
|
4.00
|
Still fidling with the left wing.
|
Details
|
|
|
12-26-2013
|
4.00
|
Priming the right wing parts
|
Details
|
|
|
12-02-2013
|
5.00
|
Wing tip fairing.
|
Details
|
|
|
11-30-2013
|
2.00
|
Re-installed the leftwing fuel tank.
|
Details
|
|
|
11-29-2013
|
6.00
|
Final rivets of left wing.
|
Details
|
|
|
11-28-2013
|
12.00
|
Final Riveting of top skin, left wing.
|
Details
|
|
|
11-24-2013
|
4.00
|
Pre closure inspection of the left wing.
|
Details
|
|
|
11-23-2013
|
7.00
|
Assembly of the flap for the Left Wing.
|
Details
|
|
|
11-21-2013
|
5.00
|
Flap & Aileron push tube fitting in left wing.
|
Details
|
|
|
11-20-2013
|
6.00
|
Wing access panels
|
Details
|
|
|
11-18-2013
|
2.00
|
Pitot tubing & AOA tubing.
|
Details
|
|
|
11-17-2013
|
6.00
|
Fitting the Pitot
|
Details
|
|
|
11-15-2013
|
8.00
|
Drilling holes, deburring & priming parts.
|
Details
|
|
|
11-09-2013
|
4.00
|
Fitting Aileron & Flap opening fairings.
|
Details
|
|
|
11-07-2013
|
6.00
|
Fitting the reinforcing fairings in the flap openi
|
Details
|
|
|
11-04-2013
|
7.00
|
Fitting the inboard bottom skin
|
Details
|
|
|
11-03-2013
|
8.00
|
Fitting bottom skin
|
Details
|
|
|
11-02-2013
|
4.00
|
Fitting bottom skin
|
Details
|
|
|
10-19-2013
|
6.00
|
Final fixing of the Strut attachment straps to the
|
Details
|
|
|
09-30-2013
|
8.00
|
Access panel supports to underside of left wing.
|
Details
|
|
|
09-29-2013
|
9.00
|
Fitting the aileron & flap hinge brackets etc.
|
Details
|
|
|
09-27-2013
|
9.00
|
Drilling pilot holes to bottom skin, left wing
|
Details
|
|
|
09-26-2013
|
4.00
|
Running Pitot lines and wiring, left wing.
|
Details
|
|
|
09-24-2013
|
6.00
|
Landing light cut out in leading edge.
|
Details
|
|
|
09-20-2013
|
15.00
|
Fitting the landing spot lights , left wing
|
Details
|
|
|
09-15-2013
|
6.00
|
Riveting top skin left wing
|
Details
|
|
|
09-14-2013
|
5.00
|
Riveting top skin on left wing.
|
Details
|
|
|
08-27-2013
|
5.00
|
Fitting the Leading edge skins, left wing
|
Details
|
|
|
08-26-2013
|
8.00
|
Fitting the leading edge skins.
|
Details
|
|
|
08-25-2013
|
6.00
|
Leading edge ribs, left wing
|
Details
|
|
|
08-24-2013
|
7.00
|
Left wing leading edge rib bracing
|
Details
|
|
|
08-21-2013
|
8.00
|
Left wing fuel tank securing anchor nut locations
|
Details
|
|
|
08-19-2013
|
5.00
|
Left wing skin, trailing edge.
|
Details
|
|
|
08-15-2013
|
0.00
|
Birdsville & the Cooper Creek
|
Details
|
|
|
08-13-2013
|
0.00
|
Heading back North via the Birdsville Track.
|
Details
|
|
|
08-12-2013
|
0.00
|
Clare Valley & Oysters
|
Details
|
|
|
08-08-2013
|
0.00
|
Flinders Ranges
|
Details
|
|
|
07-28-2013
|
0.00
|
South Western Queensland and the Strzelecki Desert
|
Details
|
|
|
07-25-2013
|
0.00
|
Outback Camping
|
Details
|
|
|
07-14-2013
|
7.00
|
Fitting top kin & Fuel tank ,left wing
|
Details
|
|
|
07-13-2013
|
9.00
|
Left wing, top skin, drilling for rivets.
|
Details
|
|
|
07-11-2013
|
5.00
|
Marking wing skins for rivet lines.
|
Details
|
|
|
07-10-2013
|
6.00
|
Marking wing skins for rivet lines
|
Details
|
|
|
07-09-2013
|
6.00
|
Left wing, fuel tank area bottom skin support.
|
Details
|
|
|
07-07-2013
|
5.00
|
Left wing bottom side stringers
|
Details
|
|
|
07-06-2013
|
8.00
|
Left wing front spar fitting for final time.
|
Details
|
|
|
07-06-2013
|
1.00
|
Fixing bottom stringers in left wing.
|
Details
|
|
|
07-05-2013
|
5.00
|
Attaching the cut back ribs to the front spar
|
Details
|
|
|
07-04-2013
|
6.00
|
Riveting forward spar reinforcing plates
|
Details
|
|
|
07-03-2013
|
12.00
|
Stringers & Front Spar re-inforcement.
|
Details
|
|
|
06-30-2013
|
6.00
|
Running & fixing stringers
|
Details
|
|
|
06-29-2013
|
6.00
|
Additional rivets to the splice & re-inforcing pla
|
Details
|
|
|
06-28-2013
|
2.00
|
Fitting rear spar to wing ribs
|
Details
|
|
|
06-27-2013
|
8.00
|
Riveting Spar backing plates
|
Details
|
|
|
06-17-2013
|
2.00
|
Pre & Painting rear spar re-inforcing backing plat
|
Details
|
|
|
06-16-2013
|
9.00
|
Strengthening the rear spar left wing.
|
Details
|
|
|
06-08-2013
|
8.00
|
Spar Strengthening ??
|
Details
|
|
|
05-22-2013
|
10.00
|
Wing Spar strengthening !!!
|
Details
|
|
|
02-10-2013
|
4.00
|
Still looking at wing loading issues
|
Details
|
|
|
02-09-2013
|
10.00
|
Still waiting on an Engineering verdict.
|
Details
|
|
|
01-29-2013
|
7.00
|
Attaching the leading & trailing edge ribs.
|
Details
|
|
|
01-28-2013
|
8.00
|
|
Details
|
|
|
01-26-2013
|
4.00
|
Pondering methods of strengthening the wings
|
Details
|
|
|
01-23-2013
|
6.00
|
Left Wing assembly
|
Details
|
|
|
01-22-2013
|
6.00
|
Fuel tank issues
|
Details
|
|
|
01-21-2013
|
9.00
|
Assembly of wing parts
|
Details
|
|
|
01-13-2013
|
12.00
|
Assembly of the flap & aileron hinge brackets to r
|
Details
|
|
|
01-08-2013
|
5.00
|
The Minister for Finance & Travel
|
Details
|
|
|
01-06-2013
|
8.00
|
Assembly of the spars
|
Details
|
|
|
01-02-2013
|
6.00
|
Assembly of the root ends of the spars
|
Details
|
|
|
12-31-2012
|
5.00
|
Sorting out the bits
|
Details
|
|
|
12-30-2012
|
9.00
|
Antenna to top of Vert. Stab.
|
Details
|
|
|
12-28-2012
|
4.00
|
Control Cable swagging
|
Details
|
|
|
12-27-2012
|
6.00
|
It is bigger than I was expecting
|
Details
|
|
|
12-26-2012
|
4.00
|
The Bungees continued.
|
Details
|
|
|
12-25-2012
|
4.00
|
Installing the Bungees
|
Details
|
|
|
12-24-2012
|
2.00
|
Small modification to gear legs
|
Details
|
|
|
12-23-2012
|
5.00
|
Getting her onto the Wheels
|
Details
|
|
|
12-12-2012
|
8.00
|
Running Aileron & Flap Control Cables
|
Details
|
|
|
12-09-2012
|
6.00
|
Windsheild fairing
|
Details
|
|
|
11-25-2012
|
9.00
|
Fairing to Vert. Stab.
|
Details
|
|
|
11-24-2012
|
8.00
|
Windsheild Fairing
|
Details
|
|
|
11-23-2012
|
6.00
|
Vert. Stab Faring continued
|
Details
|
|
|
11-22-2012
|
6.00
|
Making the Fairing to the Vert. Stab.
|
Details
|
|
|
11-21-2012
|
10.00
|
Getting the Paint Shop ready
|
Details
|
|
|
11-20-2012
|
4.00
|
Windsheild
|
Details
|
|
|
11-19-2012
|
4.00
|
Final Install of Cabin Braces & Turtle Deck
|
Details
|
|
|
11-18-2012
|
8.00
|
Access behind the Instrument Panel
|
Details
|
|
|
11-17-2012
|
5.00
|
Cockpit overhead light
|
Details
|
|
|
11-14-2012
|
6.00
|
Fitting Interior Linings to Cabin ceiling area.
|
Details
|
|
|
11-13-2012
|
6.00
|
No leaks in the Static System
|
Details
|
|
|
11-12-2012
|
7.00
|
Pilot o/head cockpit lighting
|
Details
|
|
|
11-11-2012
|
4.00
|
Tail Wheel spring attachment
|
Details
|
|
|
11-10-2012
|
4.00
|
26 inch Tundra type tires & Axle assemblies
|
Details
|
|
|
11-06-2012
|
5.00
|
Passenger door locks
|
Details
|
|
|
11-05-2012
|
6.00
|
Cargo Door, Lock & Hinges
|
Details
|
|
|
10-17-2012
|
9.00
|
Fitting gas struts & window closure latches
|
Details
|
|
|
10-16-2012
|
7.00
|
Left side door handle
|
Details
|
|
|
10-15-2012
|
8.00
|
Fitting the door handles
|
Details
|
|
|
09-08-2012
|
8.00
|
Right side opening window components
|
Details
|
|
|
09-06-2012
|
9.00
|
Internal lining to the opening window.
|
Details
|
|
|
09-05-2012
|
4.00
|
Priming the frames & Skins
|
Details
|
|
|
09-04-2012
|
8.00
|
Making them easily removeable
|
Details
|
|
|
09-03-2012
|
9.00
|
Fitting door & window skins
|
Details
|
|
|
09-01-2012
|
8.00
|
Door assemblies
|
Details
|
|
|
08-31-2012
|
6.00
|
Refuelling steps and side skin rivets.
|
Details
|
|
|
08-29-2012
|
12.00
|
Cutting the vent inlets and install of forward cab
|
Details
|
|
|
08-23-2012
|
2.00
|
Final install of elevator pushrods in Fuselage
|
Details
|
|
|
08-21-2012
|
1.00
|
Left side lining & riveting side skins
|
Details
|
|
|
08-21-2012
|
6.00
|
Joining Cabin & Fuse
|
Details
|
|
|
08-20-2012
|
9.00
|
Final joining together of Cabin & Fuselage
|
Details
|
|
|
08-19-2012
|
7.00
|
Getting things done while access permits.
|
Details
|
|
|
08-18-2012
|
6.00
|
Cargo bay internal lining.
|
Details
|
|
|
08-16-2012
|
8.00
|
Last of the antenna mounting plates made up & inst
|
Details
|
|
|
07-29-2012
|
6.00
|
Dynon Remote Compass mounting
|
Details
|
|
|
07-26-2012
|
6.00
|
Pulling it apart again.
|
Details
|
|
|
07-20-2012
|
6.00
|
Deburring & priming
|
Details
|
|
|
07-18-2012
|
6.00
|
Cargo door opening and splice plate covering strip
|
Details
|
|
|
07-16-2012
|
10.00
|
Side skins to Fuse & Cabin
|
Details
|
|
|
07-12-2012
|
4.00
|
Drilling holes
|
Details
|
|
|
07-11-2012
|
8.00
|
Joining cabin & Fuselage
|
Details
|
|
|
07-10-2012
|
6.00
|
Aux Fuel Tank breather
|
Details
|
|
|
07-09-2012
|
6.00
|
Aux Fuel tank final install and fuel lines complet
|
Details
|
|
|
07-08-2012
|
4.00
|
Final fitting of fuel lines and internal linings
|
Details
|
|
|
07-07-2012
|
3.00
|
Fitting the internal linings to the left rear cabi
|
Details
|
|
|
07-06-2012
|
7.00
|
Final install of fuel lines
|
Details
|
|
|
07-05-2012
|
2.00
|
Cabin interior linings right side.
|
Details
|
|
|
07-04-2012
|
2.00
|
Cabin lower left side aileron & flap cable arrang
|
Details
|
|
|
07-03-2012
|
8.00
|
Aileron & flap cable rigging arrangements
|
Details
|
|
|
07-02-2012
|
5.00
|
Lining cabin interior
|
Details
|
|
|
06-29-2012
|
8.00
|
Forward Cabin area linings
|
Details
|
|
|
06-28-2012
|
8.00
|
Fitting internal linings to left side of cabin
|
Details
|
|
|
06-27-2012
|
6.00
|
Cabin internal linings.
|
Details
|
|
|
06-26-2012
|
8.00
|
Fuel lines final install
|
Details
|
|
|
06-25-2012
|
6.00
|
Installing the Main gear Bungee Attach Bracket
|
Details
|
|
|
06-25-2012
|
8.00
|
Final mounting of fuel pump & selector valve
|
Details
|
|
|
05-16-2012
|
0.00
|
Keeping the RV alive & my flying skills
|
Details
|
|
|
05-13-2012
|
8.00
|
Fuel selector valve and Mounting Support
|
Details
|
|
|
05-10-2012
|
6.00
|
Auxillary Fuel Tank Filler Cap and pipe
|
Details
|
|
|
05-09-2012
|
10.00
|
Passenger Window installation
|
Details
|
|
|
05-05-2012
|
6.00
|
Passenger window fitting.
|
Details
|
|
|
05-01-2012
|
6.00
|
The NAT Audio Panel.
|
Details
|
|
|
04-13-2012
|
0.00
|
Looking at the construction of a Tundra
|
Details
|
|
|
04-10-2012
|
6.00
|
Firewall insulation.
|
Details
|
|
|
04-09-2012
|
10.00
|
Battery Bracket
|
Details
|
|
|
04-07-2012
|
10.00
|
Battery Bracket
|
Details
|
|
|
04-05-2012
|
0.00
|
Where is my mate?
|
Details
|
|
|
04-05-2012
|
4.00
|
Marking position of the Battery mount btracket.
|
Details
|
|
|
04-02-2012
|
4.00
|
Magnetic compass mount
|
Details
|
|
|
03-31-2012
|
7.00
|
Powering up the panel
|
Details
|
|
|
03-30-2012
|
8.00
|
Power to the Cargo Bay & Firewall penetrations
|
Details
|
|
|
03-26-2012
|
4.00
|
Engine bay wires
|
Details
|
|
|
03-23-2012
|
5.00
|
Wires through the firewall
|
Details
|
|
|
03-22-2012
|
6.00
|
Moving into the engine bay
|
Details
|
|
|
03-21-2012
|
6.00
|
Completed all the wire connections to the Panel
|
Details
|
|
|
03-20-2012
|
7.00
|
Wiring nearly finished
|
Details
|
|
|
03-17-2012
|
4.00
|
Firewall fittings and Parkbrake
|
Details
|
|
|
03-16-2012
|
12.00
|
Fittings on the firewall
|
Details
|
|
|
03-11-2012
|
10.00
|
Cable ties everywhere.
|
Details
|
|
|
03-09-2012
|
15.00
|
Plenty of circuit & wiring protection with fuses e
|
Details
|
|
|
03-04-2012
|
8.00
|
Connecting wires
|
Details
|
|
|
02-29-2012
|
10.00
|
Ignitian system wiring
|
Details
|
|
|
02-25-2012
|
7.00
|
Master & Alternator switch and Alternator CB
|
Details
|
|
|
02-24-2012
|
6.00
|
Installing the Pitot, AOA & Static lines
|
Details
|
|
|
02-22-2012
|
8.00
|
Instruments mounted to assist in behind the panel
|
Details
|
|
|
02-19-2012
|
8.00
|
Aerial Cables & BNC connectors
|
Details
|
|
|
02-16-2012
|
9.00
|
Fuel & Manifold pressure gages
|
Details
|
|
|
02-11-2012
|
20.00
|
Planning & fitting wiring cables.
|
Details
|
|
|
02-05-2012
|
12.00
|
4 Place Sterio Intercom wiring
|
Details
|
|
|
02-01-2012
|
16.00
|
Trim control relays, UHF interface, dimmer control
|
Details
|
|
|
01-28-2012
|
8.00
|
Making the trim priority relay
|
Details
|
|
|
01-27-2012
|
7.00
|
Control yoke wiring.
|
Details
|
|
|
01-25-2012
|
6.00
|
Stick grip PTT & Trim control wiring
|
Details
|
|
|
01-22-2012
|
8.00
|
Mounting various components behind the panel
|
Details
|
|
|
01-16-2012
|
6.00
|
Getting stuff done before the final skins placemen
|
Details
|
|
|
01-14-2012
|
4.00
|
Windscreen and assoiciated trims and mouldings.
|
Details
|
|
|
01-13-2012
|
7.00
|
Fitting the windscreen
|
Details
|
|
|
01-12-2012
|
4.00
|
Finishing the turtledeck /cabin front skin .
|
Details
|
|
|
01-11-2012
|
6.00
|
Turtle deck fitting
|
Details
|
|
|
01-05-2012
|
4.00
|
First play with the screen.
|
Details
|
|
|
01-04-2012
|
3.00
|
Firewall gussets
|
Details
|
|
|
01-03-2012
|
3.00
|
Instrument panel securing fasteners
|
Details
|
|
|
12-25-2011
|
3.00
|
Forward cabin area
|
Details
|
|
|
12-24-2011
|
8.00
|
More rivets
|
Details
|
|
|
12-21-2011
|
6.00
|
Cabin Roof
|
Details
|
|
|
12-18-2011
|
12.00
|
Cabin rear roof &sky lights
|
Details
|
|
|
12-16-2011
|
8.00
|
Rear cabin Roof skin
|
Details
|
|
|
12-15-2011
|
6.00
|
Cabin rear roof & corner skins
|
Details
|
|
|
12-14-2011
|
4.00
|
False rib assembly, cabin sides.
|
Details
|
|
|
12-12-2011
|
4.00
|
Trying to think well ahead!!!
|
Details
|
|
|
12-10-2011
|
6.00
|
Cabin Roof & skylight installation.
|
Details
|
|
|
12-09-2011
|
8.00
|
Cabin Roof Skylights
|
Details
|
|
|
12-08-2011
|
8.00
|
Cabin Roof structure
|
Details
|
|
|
12-06-2011
|
10.00
|
Cabin roof structure
|
Details
|
|
|
12-03-2011
|
7.00
|
Cabin side skins
|
Details
|
|
|
12-02-2011
|
4.00
|
Cabin skins
|
Details
|
|
|
12-01-2011
|
4.00
|
Forward right side cabin skin
|
Details
|
|
|
11-30-2011
|
8.00
|
Cabin side skins
|
Details
|
|
|
11-29-2011
|
6.00
|
Linings and cabin lockers.
|
Details
|
|
|
11-27-2011
|
4.00
|
Auxillary fuel tank
|
Details
|
|
|
11-26-2011
|
8.00
|
Sealing the auxillary fuel tank
|
Details
|
|
|
11-23-2011
|
5.00
|
Elevator & Horizontal Stab tips
|
Details
|
|
|
11-21-2011
|
4.00
|
Skinning the left side elevator
|
Details
|
|
|
11-21-2011
|
3.00
|
Forming tips to elevator & horizontal stab.
|
Details
|
|
|
11-19-2011
|
6.00
|
A stich in time saves ............
|
Details
|
|
|
11-18-2011
|
3.00
|
Prep of right side elevator for riveting.
|
Details
|
|
|
11-17-2011
|
4.00
|
Skinning right elevator
|
Details
|
|
|
11-16-2011
|
4.00
|
Elevator frames fully assembled.
|
Details
|
|
|
11-15-2011
|
5.00
|
Set out of the elevator spar and ribs
|
Details
|
|
|
11-12-2011
|
3.00
|
Elevator framework
|
Details
|
|
|
11-11-2011
|
3.00
|
Moulded half round fairing to top of Rudder
|
Details
|
|
|
10-01-2011
|
4.00
|
Rudder bottom fairing and control cable attach bra
|
Details
|
|
|
09-27-2011
|
6.00
|
Rudder skin riveted
|
Details
|
|
|
09-24-2011
|
6.00
|
Tail light in rudder
|
Details
|
|
|
09-23-2011
|
10.00
|
Rudder frame & Skin
|
Details
|
|
|
09-18-2011
|
6.00
|
Started on the rudder assembly
|
Details
|
|
|
09-17-2011
|
9.00
|
Completing bottom skins and inspection covers
|
Details
|
|
|
09-15-2011
|
10.00
|
Final riveting of bottom skin
|
Details
|
|
|
09-13-2011
|
6.00
|
Final priming of bottom skin
|
Details
|
|
|
09-08-2011
|
8.00
|
Tail cone and rear end corner skins
|
Details
|
|
|
09-07-2011
|
4.00
|
Bottom skin & corners
|
Details
|
|
|
09-05-2011
|
6.00
|
Fitting bottom skin & corners
|
Details
|
|
|
09-04-2011
|
7.00
|
Drilling bottom skin
|
Details
|
|
|
09-03-2011
|
8.00
|
Bottom skin and Access panels
|
Details
|
|
|
08-31-2011
|
4.00
|
Bottom Skin
|
Details
|
|
|
08-30-2011
|
6.00
|
Bottom Skins
|
Details
|
|
|
08-14-2011
|
5.00
|
Fuselage bottom corner skins
|
Details
|
|
|
08-13-2011
|
6.00
|
Fuselage bottom skins
|
Details
|
|
|
08-12-2011
|
6.00
|
Elevator trim
|
Details
|
|
|
08-10-2011
|
6.00
|
First of the avionics aerials.
|
Details
|
|
|
08-09-2011
|
7.00
|
Releasing the fuselage from the jig table
|
Details
|
|
|
08-07-2011
|
8.00
|
Cargo bay linings and right side skin riveted
|
Details
|
|
|
08-06-2011
|
9.00
|
Cargo bay area linings
|
Details
|
|
|
08-05-2011
|
15.00
|
Left side
|
Details
|
|
|
08-01-2011
|
8.00
|
Horizontal stab leading edge skin fitting
|
Details
|
|
|
07-31-2011
|
18.00
|
Preparing the skins
|
Details
|
|
|
07-26-2011
|
9.00
|
Top skins on Horizontal stabiliser
|
Details
|
|
|
07-25-2011
|
8.00
|
Horizontal Stab Skins.
|
Details
|
|
|
07-24-2011
|
9.00
|
Final riveting of Vstab skins.
|
Details
|
|
|
07-23-2011
|
4.00
|
Vertical Stabilser leading edge
|
Details
|
|
|
07-23-2011
|
3.00
|
|
Details
|
|
|
07-19-2011
|
9.00
|
Vstab Skins
|
Details
|
|
|
07-18-2011
|
8.00
|
Fuselage rear end rivets
|
Details
|
|
|
07-17-2011
|
16.00
|
Rear end access panels
|
Details
|
|
|
07-06-2011
|
7.00
|
Stabiliser attachment and tail end skins.
|
Details
|
|
|
07-05-2011
|
7.00
|
Fuselage Tail end
|
Details
|
|
|
07-04-2011
|
12.00
|
Fitting tail area skins
|
Details
|
|
|
07-02-2011
|
8.00
|
The first SAAA AP Inspection.
|
Details
|
|
|
07-01-2011
|
6.00
|
Cargo Bay rear Bulkhead and bellcrank cover
|
Details
|
|
|
06-28-2011
|
8.00
|
Cargo Bay light
|
Details
|
|
|
06-27-2011
|
9.00
|
Cargo bay tie down restraint points.
|
Details
|
|
|
06-26-2011
|
6.00
|
Cargo Bay floor skins
|
Details
|
|
|
06-25-2011
|
8.00
|
Cargo bay floors
|
Details
|
|
|
06-23-2011
|
6.00
|
Static ports and tubing.
|
Details
|
|
|
06-21-2011
|
5.00
|
Rear fuselage port side .
|
Details
|
|
|
06-20-2011
|
6.00
|
Rear Fuse side skins
|
Details
|
|
|
06-18-2011
|
5.00
|
Rear fuselage skins
|
Details
|
|
|
06-12-2011
|
0.00
|
4500 kilometre road trip Brisbane to Adelaide retu
|
Details
|
|
|
06-02-2011
|
8.00
|
Fitting skins to Fuselage
|
Details
|
|
|
06-01-2011
|
10.00
|
Final fixing of the Vertical Stabiliser Spar.
|
Details
|
|
|
05-20-2011
|
0.00
|
Transponder & Instrument check & then the flying
|
Details
|
|
|
05-19-2011
|
0.00
|
Keeping the RV operational
|
Details
|
|
|
05-14-2011
|
12.00
|
Assembly of the forward horizontal Stabiliser Spar
|
Details
|
|
|
05-10-2011
|
8.00
|
Main Spar, Horizontal Stabiliser
|
Details
|
|
|
05-08-2011
|
10.00
|
Assembly of the rear horizontal Stabiliser spar.
|
Details
|
|
|
05-07-2011
|
10.00
|
V-Stab assembly
|
Details
|
|
|
05-05-2011
|
10.00
|
Mounting Frame PA07
|
Details
|
|
|
05-03-2011
|
10.00
|
Rear Fuselage upper external corner skins
|
Details
|
|
|
05-01-2011
|
10.00
|
Fuselage skins
|
Details
|
|
|
04-29-2011
|
8.00
|
Completed rear fuselage bellcrank support arrangem
|
Details
|
|
|
04-27-2011
|
6.00
|
Bellcrank support in rear fuselage
|
Details
|
|
|
04-26-2011
|
3.00
|
Mounting Bellcrank & Supports in aft Fuselage
|
Details
|
|
|
04-25-2011
|
8.00
|
Bellcrank cover in lower rear Cabin area
|
Details
|
|
|
04-24-2011
|
22.00
|
Elevator pushrod step down through the carga bay
|
Details
|
|
|
04-19-2011
|
8.00
|
Fabrication of two bellcranks of same dimensions.
|
Details
|
|
|
04-17-2011
|
10.00
|
Rear Fuselage frames & stringers.
|
Details
|
|
|
04-13-2011
|
8.00
|
Rear fuselage assembly
|
Details
|
|
|
04-12-2011
|
10.00
|
Preparing the internal corners
|
Details
|
|
|
04-06-2011
|
10.00
|
Fuselage frames and stringers
|
Details
|
|
|
04-02-2011
|
6.00
|
Setting up frames and etch priming parts
|
Details
|
|
|
03-16-2011
|
9.00
|
Preparation of the rear fuselage frames.
|
Details
|
|
|
02-28-2011
|
5.00
|
Construction table
|
Details
|
|
|
02-09-2011
|
1.00
|
Preparing to start on the rear fuselage
|
Details
|
|
|
02-09-2011
|
8.00
|
PA-01 Fuselage Frame
|
Details
|
|
|
01-25-2011
|
4.00
|
Unpacked the Engine
|
Details
|
|
|
12-22-2010
|
8.00
|
Aux Fuel Tank
|
Details
|
|
|
12-20-2010
|
8.00
|
Aux Fuel Tank
|
Details
|
|
|
12-07-2010
|
22.00
|
Aileron Trim arrangement.
|
Details
|
|
|
11-30-2010
|
9.00
|
Rear seat attachment points
|
Details
|
|
|
11-29-2010
|
8.00
|
Seat belt attachment points
|
Details
|
|
|
11-28-2010
|
18.00
|
Seat belt attachment points.
|
Details
|
|
|
11-26-2010
|
8.00
|
Raising level of rear seats
|
Details
|
|
|
11-25-2010
|
6.00
|
Fitting the aileron and Flap control pulleys
|
Details
|
|
|
11-24-2010
|
10.00
|
Flap control cable pully bracket.
|
Details
|
|
|
11-21-2010
|
15.00
|
Flap Handle Position
|
Details
|
|
|
11-10-2010
|
15.00
|
Seat frames and Upholstery .
|
Details
|
|
|
11-03-2010
|
6.00
|
Positioning of the rear seats.
|
Details
|
|
|
11-02-2010
|
15.00
|
Assembly of the front seat frame.
|
Details
|
|
|
10-25-2010
|
6.00
|
Rear Seat frame assembly
|
Details
|
|
|
10-04-2010
|
0.00
|
The Cargo Pod Cargo
|
Details
|
|
|
09-30-2010
|
0.00
|
The cargo pod Plan
|
Details
|
|
|
08-23-2010
|
0.00
|
Zebra Finches
|
Details
|
|
|
08-22-2010
|
4.00
|
Fuel line non return valve
|
Details
|
|
|
08-22-2010
|
5.00
|
|
Details
|
|
|
08-21-2010
|
5.00
|
In line fuel filter & fuel transducer
|
Details
|
|
|
08-20-2010
|
0.00
|
Arkaroola and Cooper Creek
|
Details
|
|
|
08-19-2010
|
0.00
|
Flood waters & Lake Eyre
|
Details
|
|
|
08-18-2010
|
0.00
|
Birdsville to Oodnadatta
|
Details
|
|
|
08-16-2010
|
0.00
|
Keeping the flying skills current
|
Details
|
|
|
08-09-2010
|
6.00
|
Engine arrival
|
Details
|
|
|
07-15-2010
|
6.00
|
Running fuel lines
|
Details
|
|
|
07-14-2010
|
10.00
|
Fuel lines
|
Details
|
|
|
07-10-2010
|
12.00
|
Fuel Valve & Fuel Pump layout & install
|
Details
|
|
|
07-02-2010
|
8.00
|
Seat rails
|
Details
|
|
|
06-23-2010
|
4.00
|
Positioning and attaching the engine mount.
|
Details
|
|
|
06-23-2010
|
3.00
|
Hydraulic brake tubing.
|
Details
|
|
|
06-22-2010
|
2.00
|
Looking ahead!
|
Details
|
|
|
06-22-2010
|
3.00
|
Hydraulic brake lines
|
Details
|
|
|
06-21-2010
|
8.00
|
Running Hydraulic brake lines
|
Details
|
|
|
06-20-2010
|
5.00
|
Park Brake valve installation
|
Details
|
|
|
06-18-2010
|
8.00
|
Final installation of the Brake Cylinders
|
Details
|
|
|
06-16-2010
|
3.00
|
Debur, Etch prime and prepare for final fixing.
|
Details
|
|
|
06-15-2010
|
2.00
|
|
|
|
|
06-14-2010
|
6.00
|
Brake master cylinders
|
Details
|
|
|
05-29-2010
|
6.00
|
Rudder pedals
|
Details
|
|
|
05-28-2010
|
5.00
|
Rudder pedals.
|
Details
|
|
|
05-25-2010
|
6.00
|
Cabin structure turned over.
|
Details
|
|
|
05-24-2010
|
9.00
|
Riveting the bottom skins
|
Details
|
|
|
05-23-2010
|
15.00
|
Deburring & painting bottom skins
|
Details
|
|
|
05-20-2010
|
18.00
|
Cabin bottom skins
|
Details
|
|
|
05-18-2010
|
6.00
|
More pics of the undercarriage mounting brackets.
|
Details
|
|
|
05-17-2010
|
20.00
|
Landing gear mounting brackets
|
Details
|
|
|
05-13-2010
|
6.00
|
Fitting the lower corner skins first.
|
Details
|
|
|
05-12-2010
|
2.00
|
Cabin bottom skins
|
Details
|
|
|
05-05-2010
|
25.00
|
More instrument panel stuff
|
Details
|
|
|
04-29-2010
|
30.00
|
Instrument Panel assembly
|
Details
|
|
|
04-15-2010
|
6.00
|
Instrument fitting
|
Details
|
|
|
04-12-2010
|
3.00
|
Cabin bottom skins
|
Details
|
|
|
04-09-2010
|
2.00
|
Turned Cabin structure over ready for bottom skins
|
Details
|
|
|
04-08-2010
|
3.00
|
Fire wall installation
|
Details
|
|
|
04-06-2010
|
6.00
|
Firewall
|
Details
|
|
|
04-05-2010
|
4.00
|
Final assembly of cabin structure
|
Details
|
|
|
04-04-2010
|
6.00
|
Final assembly
|
Details
|
|
|
04-03-2010
|
8.00
|
Painting
|
Details
|
|
|
03-28-2010
|
6.00
|
Preparing cabin structure for painting
|
Details
|
|
|
03-15-2010
|
4.00
|
Float Mount Brackets
|
Details
|
|
|
03-14-2010
|
6.00
|
Upper rear cabin structure
|
Details
|
|
|
03-13-2010
|
5.00
|
Rear upper cabin area
|
Details
|
|
|
03-09-2010
|
8.00
|
Procurement of instruments etc.
|
Details
|
|
|
03-06-2010
|
4.00
|
Layout
|
Details
|
|
|
03-04-2010
|
6.00
|
Rear of cabin framework
|
Details
|
|
|
03-03-2010
|
4.50
|
Cabin frame work assembly
|
Details
|
|
|
03-02-2010
|
6.00
|
Fitting the Cabin Top gusset plates PF-128
|
Details
|
|
|
03-01-2010
|
8.00
|
Fitting Cabin front Framework
|
Details
|
|
|
02-28-2010
|
13.00
|
Upper Cabin framework assembly
|
Details
|
|
|
02-26-2010
|
9.00
|
Cabin sides onto base frame
|
Details
|
|
|
02-22-2010
|
9.00
|
Cabin sides assembly
|
Details
|
|
|
02-20-2010
|
20.00
|
Assembly of Cabin sides
|
Details
|
|
|
02-12-2010
|
0.00
|
More busted parts
|
|
|
|
02-11-2010
|
10.00
|
The damaged crates
|
Details
|
|