Powered By Kitlog Pro v2.0
BRANDEN'S WEB SITE
RV-8
All
Work Logs Found:
67
Category Work Time:
92 Hours
Date
Hours
Work Log Summary
Details
03-27-2011
0.50
Match drilled right top skin and elevator horn
Details
03-23-2011
0.50
Trailing edge bending for Right Skin
Details
03-23-2011
2.50
Right counterballance weight drilling problem
Details
03-18-2011
1.00
Prepaired the left/right Elevator spars
Details
03-18-2011
2.00
Fitting the right counterballance weight
Details
03-12-2011
1.50
Finished E-615pp Trim reinforcement plate
Details
03-12-2011
1.50
Back Riveted Elevator stiffiners to skins
Details
03-11-2011
1.00
Primed HS skins
Details
03-08-2011
1.50
Prime inside of elevator skins
Details
03-07-2011
0.50
Dimpled left elevator skin
Details
03-06-2011
0.50
Fixed the extra hole in the right skin
Details
11-22-2010
1.00
Right skin dimple and oops extra hole
Details
11-19-2010
2.50
Worked on Left Skin and Started priming
Details
11-08-2010
0.50
Debur and dimple stiffeners
Details
11-07-2010
0.50
Match drilled right stiffeners with #41 reamer
11-06-2010
1.00
Finished Fabrication of Right Stiffeners
Details
09-17-2010
2.00
Continued fabrication of elevator stiffeners
Details
09-12-2010
1.00
Started Right Elevator Stiffener Fabrication
Details
08-05-2010
1.00
Finished Riveting Rudder Skin to Skeleton
Details
08-03-2010
0.50
Riveted Rudder skin to Spar
Details
07-26-2010
1.00
Riveting the Rudder skeleton assembly
Details
07-26-2010
1.00
Counterballance skin and lead weight
Details
07-25-2010
2.00
Prepaired and Primed Left HS skeleton
Details
07-23-2010
1.00
Primed the skeleton with SS primer
Details
07-22-2010
1.00
Prepaired the rudder parts for primer
Details
07-22-2010
1.00
Deburr holes and edges of skeleton/skin
Details
07-10-2010
0.10
New Baby Boy Arrives!
Details
07-08-2010
1.00
Matched Drilled Rudder Skin with #41 Reamer
Details
07-08-2010
0.50
Match Drilled #30 holes in Rudder Skeleton
Details
07-07-2010
2.50
3) Fabricated R-717/R-716 and clecoed skeleton
Details
07-07-2010
1.00
2) Bending Rudder trailing edge
Details
07-07-2010
3.50
1) Dimpled and primed skin then riveted stiffener
Details
07-06-2010
2.00
Removed plastic from rivet lines/Deburr skin
Details
07-06-2010
3.50
Drilled Rudder stiffeners, deburr/dimple/prime
Details
07-05-2010
4.00
Fabricated rudder skin stiffeners
Details
07-05-2010
0.50
Dimpled the HS spars with a Pneumatic sqeezer
Details
07-05-2010
0.50
Deburred HS skin edges with die grinder
Details
07-05-2010
0.50
Botched attempt at Alodine
Details
07-04-2010
2.00
Dimpled HS skins with C-Frame/squeezer
Details
07-03-2010
0.50
Deburred the right HS spars/ribs
Details
07-03-2010
2.00
Deburred HS skins
Details
07-01-2010
3.00
Prepaired HS-404/405 Right side
Details
07-01-2010
1.00
Match drilled Right skin with #41 reamer
Details
06-30-2010
2.00
Riveted VS skin except rear spar
Details
06-30-2010
1.00
Riveted the VS skeleton
Details
06-30-2010
3.00
Modified bottom nose rib/skin for Fastback
Details
06-22-2010
2.00
Match Drilled Right HS skeleton #30
Details
06-14-2010
1.00
Drilled Left HS-405 to skin
Details
06-13-2010
3.00
Prep'd the HS ribs
Details
06-12-2010
2.00
Started on the front spar assembly
Details
06-12-2010
0.50
Drilled HS-411 assembly to #12
Details
06-11-2010
0.50
Riveted the HS-411/VA-146 assembly
Details
06-11-2010
0.50
Match drilled hinge brackets
Details
06-11-2010
0.50
Match drill HS-411PP/VA-146 bearing
Details
06-11-2010
0.50
Front spar-match drill splice/reinforcement angels
Details
06-08-2010
2.00
Smoothed surface of HS-609PP and match drilled
Details
06-07-2010
0.50
Prep'd HS-609PP reinforcement bars
Details
06-06-2010
2.00
Riveted rear spar assembly
Details
06-06-2010
0.50
Primed the VS skin
Details
06-06-2010
2.00
Hole/Edge Deburred VS skin and dimpled
Details
06-05-2010
2.00
Primer WARS....No just my take on it
Details
06-05-2010
3.00
Match-drilled the Spars/ribs/skins
Details
06-05-2010
1.00
Finished Hardware Inventory
Details
06-05-2010
3.00
Debured holes and edges of Spars/Ribs, dimpled and
Details
06-04-2010
1.00
RV-8 Empennage Arrives/Kit Inventory
Details
05-29-2010
0.25
Shop Preperation for kit arrival
Details
05-27-2010
0.25
Why I am Building an RV-8
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
67
91
Empennage - Elevator
17
20
Empennage - Horiz. Stab
21
26
Empennage - Rudder
15
24
Empennage - Vertical Stab
9
18
Miscellaneous
2
2
Non-Building Events
3
1
Copyright © 2001-2024 Matronics. All Rights Reserved.