Steve Zelenys RV-7
RV-7
All
Work Logs Found:
23
Category Work Time:
68 Hours
Date
Hours
Work Log Summary
Details
06-30-2010
4.00
Riveting the Elevator
Details
06-27-2010
5.00
Preparing the R/H elevator parts
Details
06-19-2010
2.50
Riveting the rudder.
Details
06-13-2010
6.00
Riveting the stiffeners
Details
06-05-2010
3.50
Details
06-02-2010
2.50
Preparing the rudder skin stiffeners
Details
06-01-2010
2.00
Dimpling tool
Details
05-30-2010
3.00
Vertical Stabilizer rear spar
Details
05-25-2010
1.00
De-burring
Details
05-09-2010
2.25
Beginning the horizontal stabilizer.
Details
05-02-2010
2.50
Dimpling the skins for the horizontal stabilizer.
Details
04-25-2010
2.50
Riveting the forward spar.
Details
04-23-2010
1.50
De-burring
Details
04-18-2010
2.50
Match drilling
Details
04-17-2010
4.00
Rib fluting
Details
04-14-2010
3.00
Horizontal Stab. Fwd Spar
Details
04-13-2010
1.75
Horizontal Stab. Fwd spar
Details
04-11-2010
3.50
Horizontal Stab. Rear Spar
Details
04-10-2010
2.00
Horizontal Stab. Rear Spar
Details
04-07-2010
3.00
Inventory
Details
04-06-2010
1.50
Empennage Arrives
Details
03-27-2010
6.00
Work Benches
Details
03-06-2010
2.50
Air Compressor
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
27
81
Emp. R/H Elevator
2
9
Emp. Rudder
4
14
Horizontal Stab.
9
23
Preparation
4
13
Rudder
4
14
Vertical Stabilizer
4
8