KitLog pro

Powered By Kitlog Pro v2.0

Andrews Web Site
Work Logs Found: 541
Category Work Time: 2943 Hours
 Date
Hours
Work Log Summary

Details

 03-09-2024
0.00
Moving Log Website
Details

 01-05-2024
8.00
Rear seat floor
Details
       

 01-02-2024
8.00
Rear seatbelt anchors
Details
       

 12-30-2023
10.00
Riveting fore/aft splice lower skin & ribs
Details
       

 12-27-2023
6.00
Installed fuselage upper longerons
Details
       

 12-22-2023
8.00
Flap drive and bellcrank mount riveting
Details
       

 12-21-2023
12.00
Preparation for fuselage joining
Details
       

 12-17-2023
22.00
Splice skin fabrication
Details
       

 12-14-2023
16.00
Flap Drive Mounting
Details
       

 12-12-2023
16.00
Bellcrank and Elevator Autopilot Servo mount
Details
       

 12-07-2023
8.00
Elevator bellcrank revisions
Details
       

 11-28-2023
8.00
Fuselage longeron bending
Details
       

 11-26-2023
6.00
Lower intersection splice skin bend finalization
Details
       

 11-23-2023
15.00
Fuselage Mate
Details
       

 11-14-2023
8.00
Temporary Wing Installation
Details
       

 11-10-2023
8.00
Aft seat floor rib fabrication
Details
       

 11-09-2023
8.00
Final gear leg mounting
Details
       

 11-07-2023
20.00
Roll servo installation
Details
       

 11-03-2023
4.00
Moved forward fuselage to assembly fixture
Details
       

 11-02-2023
2.00
Riveted Lower aft skin
Details

 11-01-2023
7.00
Torque tube forward bulkhead fabrication
Details
       

 10-31-2023
6.00
Flight control torque tube fitting
Details
       

 10-30-2023
6.00
Inboard aileron pushrod finishing
Details
       

 10-26-2023
8.00
Mounting provisions for control torque tube
Details
       

 10-24-2023
15.00
Preparing for fuselage joining
Details
       

 10-17-2023
10.00
Final tail mounting details
Details
       

 10-16-2023
8.00
Horizontal tail final mounting provisions
Details
       

 10-12-2023
12.00
Empennage fairing fabrication
Details
       

 10-11-2023
8.00
Empennage fairing flanges
Details
       

 10-10-2023
6.00
Prepping for fuselage joining
Details
       

 10-05-2023
8.00
Prepping for roll servo installation
Details
       

 10-03-2023
16.00
Completed skinning the right wing
Details
       

 09-30-2023
2.00
Completing left lower wing skins
Details
       

 09-29-2023
6.00
Riveting the left wing lower skin
Details
       

 09-27-2023
8.00
Adjusting access cover location
Details
     

 09-25-2023
8.00
Riveted left lower stub sing skin
Details
       

 09-23-2023
6.00
Left stub wing aft skin riveting
Details
       

 09-22-2023
8.00
Stub wing routing details
Details
       

 09-21-2023
8.00
Left stub wing LE skin riveting
Details
       

 09-19-2023
8.00
Left wing wiring provisions
Details
       

 09-18-2023
20.00
Left wing gap seals (flap & aileron stiffeners)
Details
       

 09-13-2023
12.00
Moved left wing fuel tank pick-up
Details
       

 09-11-2023
6.00
Front to aft fuselage splice tabs
Details
       

 09-08-2023
4.00
Right stub skin riveting
Details
       

 09-05-2023
8.00
Inboard aileron pushrods
Details
       

 09-02-2023
4.00
Wing interface seals
Details
       

 09-01-2023
10.00
Riveting right wing top skin
Details
       

 08-30-2023
2.00
Planning for fuel tube routing, wiring, and riveti
Details
       

 08-30-2023
6.00
New fuel pick-up fabricated
Details
       

 08-25-2023
8.00
Flap & aileron reinforcement
Details
       

 08-21-2023
5.00
Fuel tank mistake
Details
       

 08-13-2023
10.00
Inboard to outboard wing access covers
Details
       

 08-07-2023
16.00
Fabricated access covers for lower wing
Details
       

 07-27-2023
16.00
Drilling bottom stub wing skins
Details
     

 07-26-2023
16.00
Fabricating left wing bottom stub wing skin
Details
       

 07-24-2023
6.00
Added control tube provision for roll trim
Details
     

 07-22-2023
12.00
Fabricating aft details for stub wing top skins
Details
       

 07-19-2023
10.00
Left wing walk fabrication
Details
       

 07-09-2023
10.00
Fabricating the root wing skins
Details
       

 07-06-2023
4.00
Drilling holes for the axles
Details
       

 07-05-2023
4.00
Painted Gear weldments
Details
       

 07-04-2023
4.00
Final welding the landing gear mounts
Details
       

 07-03-2023
10.00
Rigging the main landing gear
Details
       

 06-24-2023
8.00
Prepping landing gear legs
Details
       

 06-22-2023
10.00
Aileron bellcrank fabrication
Details
       

 05-18-2023
4.00
Welded aft landing gear mount
Details
       

 05-15-2023
8.00
Began work on landing gear mount
Details
       

 05-12-2023
6.00
Tank Pressure testing
Details
       

 05-07-2023
2.00
Left wing reinstalled
Details
       

 05-04-2023
8.00
Final sealing of left wing tank
Details
       

 05-03-2023
10.00
Continued sealing the left fuel tank
Details
       

 05-02-2023
6.00
Removal of Left tank skin
Details

 05-01-2023
6.00
Left fuel tank sealing day 1
Details
       

 04-24-2023
6.00
Final sealing of the right wing tank
Details
       

 04-23-2023
2.00
Rivets for the intermediate spar
Details
       

 04-22-2023
3.00
Wing removal and end rib rivets
Details
       

 04-21-2023
8.00
Day 3 of the riveting process
Details
       

 04-20-2023
8.00
Day 2 of Right Leading edge sealing
Details
       

 04-19-2023
8.00
Day 1 Right leading edge sealing
Details
       

 04-17-2023
4.00
Adjustments for capacitive probe fit
Details
       

 04-12-2023
6.00
Left wing stiffeners
Details
       

 04-10-2023
6.00
Stiffener Sealing on Right wing leading edge
Details
       

 04-06-2023
6.00
Additional sealing work
Details
       

 04-05-2023
6.00
Sealing the Left Wing Spar
Details
       

 04-04-2023
6.00
Right wing spar sealing
Details
       

 04-03-2023
10.00
Wing pre-sealing odds and ends
Details
       

 03-31-2023
8.00
Dimpling the wing Leading Edge Skins
Details
       

 03-21-2023
10.00
Wing outboard Access panels and LE cleaning
Details
       

 03-20-2023
8.00
Wing tip attachment flanges
Details
       

 03-13-2023
6.00
Wing stub skin and fuel probe details
Details
       

 03-09-2023
10.00
Stiffeners and access details for LH stub skin
Details
       

 03-07-2023
12.00
LH Stub Skin Preparations
Details
       

 02-22-2023
8.00
Mounting stub skins
Details
       

 02-21-2023
8.00
More fitting stub wing skins
Details
       

 02-14-2023
8.00
Inboard (stub) wing section
Details
       

 02-02-2023
8.00
Finishing replacement flap
Details
       

 01-28-2023
8.00
Forming nose skin for replacement left flap
Details
       

 01-25-2023
6.00
Fitting lower skin on replacement left flap
Details
       

 01-20-2023
10.00
Upper skin fitting on replacement left flap
Details
       

 01-19-2023
8.00
Replacement left flap upper skin preparation
Details
       

 01-17-2023
6.00
Replacment left flap upper skin forming
Details
       

 01-12-2023
12.00
Continued work on replacement left flap
Details
       

 01-10-2023
10.00
Left Flap Build #2
Details
       

 01-07-2023
10.00
Finishing the flaps
Details
       

 01-03-2023
6.00
More work on left flap
Details
       

 12-13-2022
6.00
Nose skin for right flap
Details
       

 12-12-2022
10.00
Continued work on right flap
Details
       

 12-06-2022
6.00
Fitting right flap top skin
Details
       

 12-01-2022
3.00
Initial Right Flap work
Details
       

 11-23-2022
6.00
Continued left flap work
Details
       

 11-21-2022
6.00
Initial work on left flap
Details
       

 11-18-2022
12.00
Right Aileron Completion
Details
       

 11-15-2022
12.00
Left Aileron Completion
Details
       

 11-05-2022
12.00
Forming Aileron Leading edge skins
Details
       

 10-29-2022
6.00
Left flap construction continued
Details
       

 10-29-2022
16.00
Aileron Nose Details
Details
       

 10-23-2022
16.00
Rigging ailerons
Details
       

 10-22-2022
22.00
Aileron Skins and Details
Details
       

 10-18-2022
16.00
Aileron detail part fabrication
Details
       

 10-14-2022
16.00
Flap substructure fabrication
Details
       

 09-29-2022
25.00
Building parts for Flaps and Ailerons
Details
       

 09-17-2022
6.00
Locating trailing edge for flaps and ailerons
Details
       

 09-16-2022
16.00
Wing Skin Drilling
Details
       

 09-10-2022
4.00
Start fitting Right wing lower skin
Details
       

 09-05-2022
8.00
Drilling Right wing top skin
Details
       

 09-02-2022
10.00
Left wing leading edge details
Details
       

 08-26-2022
12.00
Continued working leading edge drilling
Details
       

 08-19-2022
4.00
Continued drilling wing leading edge skins
Details
       

 08-16-2022
4.00
Trying alternative skin forming method
Details
       

 08-11-2022
4.00
Initial holes in Right wing leading edge skin
Details
       

 08-10-2022
6.00
Adjusting wing leading edge prebend
Details
       

 08-09-2022
8.00
Initial fitting of leading edge wing skins
Details
       

 08-07-2022
6.00
Prime and rivet wing rib substructure
Details
       

 08-06-2022
6.00
Fuel pick-up fabrication
Details
       

 08-05-2022
14.00
Seal and rivet forward wing ribs
Details
       

 07-19-2022
6.00
Fuel probe accomodations
Details
       

 07-09-2022
6.00
Fuel tank access cover fabrication
Details
     

 07-06-2022
16.00
Fitting and adjusting flap torque tube
Details
       

 07-05-2022
10.00
Finishing flap drive torque tube components
Details
       

 07-02-2022
10.00
Flap drive fitting fabrication
Details
       

 06-27-2022
16.00
Flap torque tube hinges
Details
       

 06-08-2022
10.00
Fitting Flap brackets to rear spar
Details
       

 06-07-2022
12.00
Fabricated Flap Hinge brackets
Details
       

 06-02-2022
12.00
Wing Tie-Down Points Added to Ribs
Details
       

 06-01-2022
4.00
Wing Rib Correction
Details
       

 05-29-2022
8.00
Right Outbd Aileron Bracket Installation
Details
       

 05-27-2022
6.00
Inbd Aileron Attach point Rigging
Details
       

 05-25-2022
6.00
Aileron Attach Bracket to Bellcrank Rib Interface
Details
       

 05-24-2022
8.00
Aileron Attach Bracket Fabrication
Details
       

 05-23-2022
2.00
Wing Leading Edge Rivet Pattern Work
Details
       

 05-20-2022
4.00
Wing Leading Edge Initial Fitting
Details
       

 05-18-2022
4.00
Improving Wing Leading Edge Bend
Details
       

 05-17-2022
4.00
Fuel Tank Acess Cover Back-up Flange
Details
       

 05-16-2022
4.00
Left Wing Inbd Trailing Edge Fit-up
Details
     

 05-14-2022
4.00
Fitting Right Wing Fwd 26.5 Rib
Details
       

 05-13-2022
8.00
Left Wing Auxiliary Spar
Details
       

 05-10-2022
15.00
Right wing details
Details
       

 05-03-2022
8.00
Wing Rib Fittings
Details
       

 04-27-2022
10.00
Right wing fittings
Details
       

 04-19-2022
10.00
Continued Rib fitting and stiffener additions
Details
       

 04-12-2022
15.00
Forward Wing Spar and Details
Details
       

 03-02-2022
8.00
Rib Stiffener additions
Details
       

 02-24-2022
6.00
Bl 79.5 Rib
Details
       

 02-23-2022
15.00
Forming Wing Ribs
Details
       

 02-09-2022
10.00
Forming Ribs
Details
       

 02-06-2022
8.00
Wing Rib Fabrication Preparation
Details
       

 02-01-2022
10.00
Spar work
Details
       

 01-23-2022
15.00
Prepped and painted copilot section details
Details
       

 01-14-2022
8.00
Starting Flap Torsion Bar Attachment Fittings
Details
       

 01-12-2022
12.00
Rear Spar Work and Assembly Prep
Details
       

 01-02-2022
12.00
Aileron Pushrod Clearance Corrections
Details
       

 12-28-2021
8.00
Rear seat Aft Floorboards
Details
       

 12-22-2021
12.00
Rear seat footwell skins
Details
       

 12-10-2021
8.00
Forward Left Side Skin Riveting
Details
       

 12-02-2021
8.00
Riveting various forward fuselage parts
Details
       

 12-01-2021
10.00
First Forward fuselage skin riveting
Details
       

 11-20-2021
10.00
Started assembly of the forward fuselage
Details
       

 11-16-2021
15.00
Prep Forward Fuselage for Assembly
Details
       

 11-10-2021
12.00
Cockpit Floor Boards
Details
       

 11-08-2021
12.00
Rear Rudder Pedal Provisions
Details
       

 10-27-2021
8.00
Aft Throttle Provisions
Details
       

 10-25-2021
6.00
Armrest Forming
Details
       

 10-24-2021
6.00
Arm rest fabrication
Details
     

 10-23-2021
8.00
More Control Stick Work
Details
       

 10-19-2021
6.00
More Control Stick Tube Assembly Work
Details
       

 09-20-2021
8.00
Control System Weldment Parts
Details
       

 09-16-2021
6.00
Belly Skin Access Cover
Details
       

 09-14-2021
8.00
Throttle Quadrant Fitting
Details
       

 09-08-2021
4.00
Begin Console Fitting
Details
       

 09-06-2021
8.00
Lower Belly Skin Initial Fitting
Details
       

 09-03-2021
8.00
Continued Fuselage Floor Work
Details
       

 08-21-2021
8.00
Continued working seat stiffeners and bulkheads af
Details
       

 08-20-2021
8.00
Fabricated and fitting 47.25 bulkhead
Details
       

 08-18-2021
4.00
Fabricated Rudder Cable guide pulley supports
Details
       

 08-17-2021
8.00
Fabricated and fit seat supports
Details
       

 08-15-2021
8.00
Fuselage Side Skin Fitting
Details
       

 08-07-2021
10.00
Fabricating the 16.5 Ribs
Details
       

 08-04-2021
3.00
BL:16.5 Rib
Details
       

 07-28-2021
6.00
Finished Baggage Door Work
Details
       

 07-24-2021
6.00
More baggage Door Work
Details
       

 07-23-2021
2.00
Baggage Door Stiffeners
Details
       

 07-22-2021
6.00
Continued Baggage Door
Details
       

 07-20-2021
10.00
Baggage Door Fabrication
Details
       

 07-11-2021
6.00
Forward Fuselage Skin Fitting
Details
       

 07-06-2021
6.00
Forward Baggage Cover Preperation
Details
       

 07-05-2021
4.00
Formed Forward Spar Support Angle
Details
       

 07-03-2021
6.00
Instrument panel initial fit and modification
Details
       

 07-02-2021
10.00
22.75 Bulkhead
Details
       

 06-28-2021
6.00
Fitting the 14.25 upper and lower bulkhead
Details
       

 06-25-2021
6.00
Rebuilt FS:14.25 Bulkheads
Details
     

 06-22-2021
16.00
Fitting Forward skin Longerons
Details
       

 06-07-2021
10.00
Forming Forward Fuselage Skins
Details
       

 06-04-2021
3.00
Forward Skin Prep
Details
       

 06-01-2021
6.00
Upper Longeron Channels
Details
       

 05-21-2021
8.00
Upper Engine Mount Fitting Modifications
Details
       

 05-18-2021
6.00
Lower Tunnel Pedal Installation
Details
       

 05-14-2021
8.00
More Rudder Pedal Work
Details
       

 05-12-2021
4.00
Rudder Pedal Anchors
Details
       

 05-10-2021
6.00
Modified Rudder Pedals
Details
       

 05-08-2021
15.00
Rudder Pedal Parts Fabrication
Details
       

 05-05-2021
8.00
Rudder pedal shaft brackets
Details
       

 04-30-2021
15.00
Riveting forward tunnel
Details
       

 04-26-2021
8.00
More Forward Lower Tunnel Work
Details
       

 04-16-2021
8.00
Continued Lower Tunnel Work
Details
       

 04-09-2021
8.00
Rebuilt Lower Engine Mount Fittings
Details
       

 04-08-2021
4.00
Lower Firewall Engine Mount Bracket Rework
Details
       

 04-07-2021
8.00
Bending Lower Forward Longerons
Details
       

 04-06-2021
4.00
Forward Tunnel Skin
Details
       

 03-29-2021
8.00
Lower Forward Tunnel Side Wall Rough Fit
Details
       

 03-19-2021
8.00
Tunnel Skin
Details
       

 03-17-2021
3.00
Modifying the Fuselage Fixture
Details
       

 03-15-2021
4.00
Bulkhead 22.125 Rough Fitting
Details
       

 03-11-2021
4.00
Bulkhead 33.125
Details
       

 03-09-2021
5.00
47.25 and 20.625 bulkheads
Details
     

 03-05-2021
8.00
Instrument Panel Bulkhead
Details
       

 02-26-2021
15.00
14.25 Bulkhead
Details
       

 02-07-2021
15.00
Finishing Engine Mount
Details
       

 01-27-2021
4.00
Forming upper forward fuselage longerons
Details
       

 01-26-2021
4.00
Firewall Bulkhead Spacer
Details
       

 01-23-2021
6.00
Firewall Flange Fabrication
Details
       

 01-19-2021
8.00
Aft Wing Spar Fittings & Rigging
Details
       

 01-15-2021
4.00
Started Aft Wing Spars and Ribs
Details
       

 01-07-2021
12.00
Aft Wing Spar and Bulkhead 59.375 Work
Details
       

 12-24-2020
8.00
Modified Bending Brake
Details
       

 12-12-2020
12.00
59.375 Bulkhead
Details
       

 11-07-2020
15.00
Fwd Fuselage Fixture Loading
Details
       

 10-25-2020
15.00
Firewall Assembly
Details
       

 10-16-2020
10.00
Forward Fuselage Fixture
Details
       

 10-01-2020
8.00
59.375 Bulkhead Forming
Details
       

 09-27-2020
8.00
Reaming Wing Attach Holes
Details
       

 09-24-2020
4.00
Spar Cap Spacers
Details
       

 09-09-2020
8.00
Riveting Outboard Spar Caps
Details
       

 09-02-2020
6.00
Left Spar Cap to Web Drilling
Details
       

 08-28-2020
2.00
Prep for Right Spar Set-up
Details
       

 08-24-2020
6.00
Drilling Cap Strips to Webs
Details
       

 08-06-2020
4.00
Outer Spar Preparation
Details
       

 08-03-2020
6.00
Finishing Spar Center Section
Details
       

 07-29-2020
2.00
Getting Spar Fittings Ready for Paint
Details
       

 07-28-2020
4.00
Center Section Flanges and Spacers
Details
     

 07-09-2020
6.00
Preparation of Spar Caps
Details
       

 07-04-2020
6.00
Bending Outer Spar Webs
Details
       

 07-02-2020
6.00
Spar Fitting Issues
Details
     

 06-16-2020
4.00
First Bottom (aft) Fittings Drilled
Details
       

 06-08-2020
2.00
More Spar Drilling
Details
       

 06-07-2020
4.00
First Attach Fitting Holes
Details
       

 05-17-2020
5.00
Landing Gear Fittings
Details
       

 05-10-2020
8.00
Built High load Press Brake
Details
       

 05-03-2020
5.00
Spar Drilling Tool
Details
       

 04-19-2020
2.00
Started Riveting Center Section
Details
       

 04-19-2020
3.00
Continued Center Section Preparation
Details
       

 03-07-2020
2.00
More Spar Center Section Holes
Details
       

 10-13-2019
6.00
Initial Spar Center Section Work
Details
       

 04-21-2019
2.00
Correcting Spar Extrusions
Details
       

 04-20-2019
0.50
Received Wing Spar Fittings
Details
     

 03-13-2019
0.50
Completed Empennage
Details
       

 02-09-2019
6.00
More Elevator trimming and Fitting
Details
       

 02-03-2019
5.00
Fitting and triming elevator installation
Details
       

 01-28-2019
1.00
Fitting the right Elevator
Details
       

 01-27-2019
3.00
Closed Right Elevator
Details
       

 01-20-2019
2.00
Left Elevator Check Fit
Details
       

 01-19-2019
3.00
Started Closing the left elevator
Details
       

 01-19-2019
2.00
Closed Trim Tab
Details
       

 01-09-2019
5.00
Trim Tab Parts
Details
       

 12-30-2018
5.00
Working the Elevator Trim Tab
Details
       

 11-30-2018
4.00
Left Elevator Spar Build and Rigging
Details
       

 11-25-2018
2.00
Rigging the Right Elevator
Details
       

 10-28-2018
5.00
Final Elevator Skin Bending
Details
       

 10-21-2018
0.00
Picked Up Wing Rib Blanks
Details
     

 09-15-2018
5.00
Elevator Trim Tab Cutout
Details
       

 09-08-2018
1.00
Elevator Nose Bend
Details
       

 09-03-2018
2.00
Elevator Skin Layout
Details
       

 07-29-2018
3.00
Elevator Alignment Fixture Construction
Details
       

 06-01-2018
5.00
Elevator Parts
Details
       

 05-20-2018
3.00
Shaping Horizontal Tail Tips
Details
       

 05-19-2018
6.00
Closing out the Horizontal Tail
Details
       

 05-18-2018
3.00
Horizontal Tail Riveting
Details
       

 05-13-2018
4.00
Horizontal Stabilizer Tips
Details
       

 05-05-2018
4.00
Initial riviting of horizontal tail skins
Details
       

 03-25-2018
4.00
Marking hoizontal stabilizer for drilling
Details
       

 12-22-2017
2.00
Alignment of horizontal tail
Details
       

 03-11-2017
2.00
Leading Edge Bender
Details
       

 01-08-2017
10.00
Building Leading Edge Bending Break
Details
       

 12-31-2016
15.00
Empannage Interface Rebuild
Details
       

 12-07-2015
10.00
Addressing Fin Stress Concentration
Details
       

 12-06-2015
10.00
Fuselage Aft Section Rebuild
Details
       

 12-05-2015
0.00
Restart Project in New Location
Details
       

 07-26-2012
1.50
Final riveting of fin skin
Details
       

 07-25-2012
2.00
Riveting Fin Skin
Details
       

 07-23-2012
1.00
Dimpled fin skin
Details
     

 07-22-2012
1.00
Primed fin internal parts
Details
       

 07-15-2012
2.00
Fin tip fairing rough in.
Details
       

 07-12-2012
1.50
Fin Tip Ribs
Details
       

 07-10-2012
1.50
Fin tip bulkheads
Details
       

 07-09-2012
0.50
Final rudder interface trim
Details
     

 07-02-2012
1.00
Fin Skin Trimming
Details
       

 07-01-2012
1.50
Drilling the fin skin substructure
Details
       

 06-30-2012
4.00
Marking fin skin hole locations
Details
       

 06-24-2012
2.50
Initial preparation of fin skin
Details
       

 06-23-2012
2.00
Fin tip support substructure
Details
       

 06-16-2012
2.00
Continued fitting fin ribs
Details

 06-13-2012
1.50
Fitting fin ribs
Details
       

 06-11-2012
1.00
Drilled Fin Fwd Spar Attach bolt holes
Details
       

 06-10-2012
3.00
Locating Fin Fwd Spar Anchor Points
Details
       

 06-09-2012
3.00
Fin Spar Rigging
Details
       

 06-05-2012
1.50
Trimming aft fuselage skins
Details
       

 06-04-2012
1.00
Set up rudder to help with fin structure layout
Details
     

 06-03-2012
1.50
Begain fin substructure
Details
     

 06-02-2012
2.00
Forming fin fwd spar
Details
       

 05-30-2012
1.50
Finished fin spar rebuild
Details
       

 05-29-2012
2.00
Rebuilt part of aft fin spar
Details
     

 05-25-2012
1.20
Finish riveting LH Skin
Details
       

 05-23-2012
2.00
Begin Riveting LH Skin
Details
       

 05-16-2012
2.00
Fiinished RH Skin Rivets
Details
       

 05-14-2012
1.00
Riveting RH Skin
Details
       

 05-13-2012
3.00
RH Side skin riveting
Details
       

 05-12-2012
2.00
Riveting lower skins to bulkheads
Details
       

 05-11-2012
2.00
Prep Lower Aft Skin
Details
       

 05-07-2012
1.50
More Aft Fuselage Assembly Preparation
Details
       

 05-06-2012
3.00
Prepping aft fuselage for assembly
Details
       

 05-05-2012
6.00
Prep for closing aft Fuselage
Details

 05-01-2012
1.50
Assembled Bulkheads
Details
       

 04-30-2012
2.00
Prepping aft fuselage bulkheads for assembly
Details
     

 04-29-2012
3.00
Fuselage longeron fit up
Details
       

 04-27-2012
1.00
Bellcrank longeron clean up
Details
       

 04-14-2012
2.00
Horizontal stabilizer rib assembly
Details
       

 04-13-2012
1.50
Assembled Horizontal stabilizer Forward Spar
Details
       

 04-08-2012
2.00
Prepping Horizontal stabilizer Forward Spar
Details
     

 03-28-2012
4.00
Assembled Horizontal Stabilizer Spar
Details
       

 03-13-2012
3.00
Elevator Bellcrank Interface
Details
       

 03-12-2012
2.00
Redesign of Elevator Control Linkage
Details
       

 03-04-2012
2.00
Elevator Component Fab
Details
       

 03-02-2012
6.00
Elevator Bellcrank/horn
Details
       

 02-26-2012
3.00
Final Weld of Control Horns
Details
       

 02-25-2012
3.00
Welding Elevator Horn
Details
       

 02-19-2012
3.00
Preping for elevator horn weld
Details
       

 02-18-2012
2.00
Elevator Horns
Details
     

 02-17-2012
6.00
Rudder Cable Routing Path and Elevator Horn
Details
       

 02-12-2012
2.00
Installed fiberglass rudder tips
Details
       

 02-11-2012
1.00
Potted Lead in Rudder Tip
Details
       

 02-10-2012
1.50
Rudder Riveting and Lead Prep
Details
       

 02-08-2012
1.50
Riveting Rudder spar to skin
Details
       

 02-07-2012
0.25
Dimpled Rudder spar and skin
Details
     

 02-06-2012
0.50
Added spacers to rudder weldment
Details
     

 02-04-2012
1.00
Massaging Rudder Counterbalance Weight to Fit
Details
       

 02-03-2012
2.00
Pouring lead counterweight
Details
       

 01-29-2012
3.00
Rudder steering arm and supports
Details
       

 01-22-2012
1.50
Adding splice plates for rudder fiberglass tips
Details
       

 01-21-2012
3.00
Roughing in the rudder counterbalance
Details
       

 01-20-2012
2.00
Started Rudder Counterbalance
Details
       

 01-15-2012
4.00
Rigging Rudder
Details
       

 01-10-2012
2.00
Prepping rudder skin for assembly
Details
       

 01-09-2012
1.50
Rudder Skin Rebuild
Details
       

 01-08-2012
8.00
Rebuilding rudder
Details
       

 01-07-2012
2.00
Rudder skin Stiffener Rivets and final bend
Details
       

 01-06-2012
2.00
Rudder Skin
Details
       

 01-05-2012
3.00
Building Rudder Skin
Details
       

 01-03-2012
1.50
Rivet Ribs to Rudder Spar
Details
       

 01-02-2012
2.00
Rudder Bottom Rib
Details
       

 01-01-2012
1.50
Assemble Rudder Spar
Details
       

 12-31-2011
1.50
Prepping Rudder Skin
Details
     

 12-29-2011
1.50
Rudder Skin Rough Bend
Details
       

 12-26-2011
3.00
Modified aft lower bulkhead
Details
       

 12-21-2011
1.50
Assembled aft bulkhead set
Details
       

 12-20-2011
1.00
Prep and Prime aft bulkheat parts
Details
     

 12-04-2011
3.00
Clean-up of tail spring mount bulkheads
Details
       

 12-03-2011
1.50
Finished Tail Wheel Spring Mount
Details
     

 11-30-2011
1.20
Drilled Fin Spar to Fuselage
Details
       

 11-27-2011
1.00
Finished Flanging dies
Details
       

 11-26-2011
4.00
Continued building Flanging dies
Details
       

 11-25-2011
5.00
Flanging Dies
Details
       

 11-12-2011
2.00
Fin Aft Spar Assembly
Details
       

 11-02-2011
1.00
Finished rudder bottom welding
Details
       

 10-30-2011
1.00
Welded First Flange to Rudder bottom
Details
       

 10-29-2011
3.00
Welded lower rudder fittings
Details
       

 10-28-2011
1.00
Welded rudder lower hinge bushing
Details
       

 10-25-2011
0.75
Rudder lower hinge prep
Details
       

 10-23-2011
3.20
Continued Rudder Spar Work
Details
       

 10-22-2011
1.00
Rudder Spar
Details
       

 10-17-2011
1.30
Rudder Steel Base Roughing
Details
       

 10-16-2011
4.00
Vertical Stabilizer Spar Hinges
Details
       

 10-09-2011
4.00
Vertical Tail Parts
Details
       

 10-04-2011
1.50
Fin aft spar hinge
Details
       

 10-03-2011
1.50
Started aft fin hinge fabrication
Details
       

 10-02-2011
1.50
Drilling aft fin spar
Details
       

 09-27-2011
1.20
Fin Aft Spar Doubler
Details
       

 09-25-2011
2.00
Fin Spar....Again
Details
       

 09-18-2011
3.00
Started Fabricating Fin Parts
Details
       

 09-04-2011
1.50
More prep of the leading edge press brake
Details
       

 08-31-2011
2.00
Built turn down nuts for bending brake
Details
       

 08-27-2011
1.00
Started Leading Edge Brake
Details
       

 07-31-2011
3.00
Finished Horizontal Substructure
Details
       

 07-30-2011
1.50
Skin shuffling
Details
       

 07-24-2011
2.00
More Rib Locations
Details
       

 07-18-2011
2.00
More Horizontal Tail Ribs
Details
       

 06-19-2011
2.00
Horizontal stab Ribs
Details
       

 06-18-2011
2.00
Mounting fwd spar
Details
       

 06-16-2011
1.00
Riveted aft bulkhead
Details
       

 06-14-2011
1.50
Preparing for Fwd Spar mounting
Details
       

 06-11-2011
4.00
Horizontal Tail Anchor
Details
       

 06-05-2011
2.00
Aligning Horiz tail aft spar
Details
       

 06-04-2011
1.00
Welded Aft Spar Anchors
Details
     

 06-01-2011
1.00
Horizontal tail prep
Details
       

 05-30-2011
1.00
First Rib fitting on Tail
Details
       

 05-22-2011
2.00
Forward Spar
Details
       

 05-18-2011
2.00
Picked up Wood Lathe
Details

 05-16-2011
1.00
Tail Supports
Details
       

 05-15-2011
4.00
Alignment of tail Spar
Details
       

 05-13-2011
2.00
Setting alignment tool hinge line
Details
       

 05-07-2011
3.00
Drilling aft spar hinges
Details
       

 05-02-2011
2.00
Drilled first tip hinges
Details
       

 05-01-2011
2.00
Aft Spar Hinges
Details
       

 04-30-2011
2.00
Aft Spar Components
Details
       

 04-29-2011
2.00
Aft Spar Components
Details
       

 04-25-2011
2.00
Formed Horizontal Stabilizer spars
Details
       

 04-24-2011
2.00
Built New Bending Brake Nose Piece
Details
       

 04-17-2011
1.00
Remake blanks for aft horizontal tail spars
Details

 04-16-2011
1.00
Fwd horizontal tail spar blanks roughed out
Details

 04-13-2011
2.00
Finished horiz tail aft spars
Details
       

 04-11-2011
1.50
Bent Aft Horiz Tail Spar
Details
       

 04-10-2011
6.00
Hinge brackets
Details
       

 04-04-2011
2.00
Center Horiz Stabilizer Hinge
Details
       

 03-26-2011
2.00
Upper seat belt anchor and skin doublers
Details
       

 03-22-2011
2.00
Adjusted Aft Lower Intercostal
Details
       

 03-20-2011
3.00
Aft Fuselage Intercostals
Details
       

 03-19-2011
2.00
Drilling lower holes in right hand skin
Details
       

 03-15-2011
2.00
Drilling Right Skin
Details
       

 03-07-2011
1.00
Tweeking the fit of the RH skin
Details
     

 03-06-2011
1.00
Clamping the RH skin
Details
       

 03-05-2011
4.00
Right skin fitting
Details
       

 03-04-2011
2.00
Prepping for Right Skin...Again
Details
       

 02-27-2011
3.00
Twist Recovery
Details
       

 02-19-2011
2.00
My Worst Possible Nightmare Came True
Details
       

 02-15-2011
1.75
Setting up for Tail Work
Details
       

 02-13-2011
1.00
Experimenting with Flanging Holes
Details
       

 02-12-2011
1.00
Flanged Intercostal
Details
       

 02-11-2011
1.00
Bent Intercostal
Details
       

 02-06-2011
3.00
Stabilizer Bulkhead Trim Work
Details
       

 02-04-2011
1.50
Why It Takes Me so Long to Build
Details
       

 02-01-2011
3.00
Remade Horizontal Stabilizer Anchor
Details
       

 01-27-2011
2.00
Elevator Bellcrank Brackets
Details
       

 01-22-2011
4.00
More Battery Mount work
Details
       

 01-16-2011
6.00
Battery Mounting Assembly
Details
       

 01-15-2011
3.00
Battery Support
Details
       

 01-09-2011
6.00
Organized Blue Prints and Built Elevator Bellcrank
Details
       

 01-01-2011
3.00
Finished Baggage Floor
Details
       

 12-31-2010
3.00
Baggage Floor
Details
     

 12-29-2010
0.20
Baggage Considerations
Details
       

 12-25-2010
2.00
Baggage Compartment side supports
Details
       

 12-22-2010
4.00
Baggage Door
Details
       

 12-19-2010
4.00
Continued building mini brake
Details
       

 12-18-2010
1.50
Building a Mini Brake
Details
       

 12-14-2010
9.00
Built Press Brake
Details
       

 11-29-2010
2.00
Drilled bottom of RH aft Skin
Details
       

 11-25-2010
2.00
Drilled RH Skin Bulkheads
Details
       

 11-22-2010
3.00
Bulkhead Details
Details
       

 11-19-2010
1.00
Prep for skinning
Details
       

 11-18-2010
1.50
RH Aft Skin Fitting
Details
       

 11-16-2010
1.50
Preliminary work on RH Aft Skin
Details
       

 11-14-2010
4.00
Removed Aft Fuselage From Fixture
Details
       

 11-13-2010
5.00
Rebuilt 159.625 Bulkhead
Details
       

 10-24-2010
7.00
Welded stabilizer attach fittings.
Details
       

 10-23-2010
2.00
Stabilizer Attach fitting and Bulkhead Doubler
Details
       

 10-19-2010
0.80
2nd 164.25 Bulkhead
Details
     

 10-17-2010
5.00
Rebuilt Left Aft Fuselage Skin
Details
       

 09-25-2010
4.00
Formed new 102.625 and 122.625 Bulkheads
Details
       

 09-19-2010
2.00
Cutting blanks for new bulkheads
Details
       

 09-15-2010
1.00
Tweeking new form blocks
Details
       

 09-11-2010
3.00
Building 102.625 and 122.625 Form Blocks
Details
       

 09-09-2010
1.20
Welded stabilizer attach brackets
Details
       

 09-07-2010
2.00
Welded Tailwheel Anchor
Details
       

 09-06-2010
6.00
Tailwheel attach weldment prep
Details
       

 07-23-2010
5.00
Checking Design Data
Details
     

 07-14-2010
5.00
Profile Error Discovered
Details
       

 07-09-2010
4.00
Fitting Left Aft Skin
Details
       

 07-07-2010
1.50
Skin Preparation
Details
       

 07-05-2010
1.50
Started rough out of side skin
Details
       

 07-03-2010
3.00
Bent flanges on lower skin and fit to fuselage
Details
       

 06-29-2010
1.50
Top longeron fitting
Details
       

 06-27-2010
1.50
Formed top longeron
Details
       

 06-26-2010
3.00
Finished drilling in Aft lower Fuselage skin
Details
       

 06-24-2010
2.00
Drilling aft lower skin
Details

 06-23-2010
2.00
Began final fit of lower aft skin
Details
       

 06-22-2010
4.00
Adjusted Bending Brake
Details
       

 06-20-2010
9.00
Finished Bending Brake
Details
       

 06-14-2010
3.00
More Brake work
Details
     

 06-13-2010
4.00
More work on sheet metal brake
Details
     

 06-04-2010
4.00
Lower aft skin forming
Details
       

 05-30-2010
4.00
Continued prep of bending brake
Details

 05-28-2010
2.00
Bending Brake Angle Prep
Details

 05-26-2010
1.50
Lower Aft Skin Forming
Details
       

 05-23-2010
6.50
Finished Aft fuselage bulkhead Alignment
Details
       

 05-17-2010
1.50
Bulkhead alignment
Details
       

 05-16-2010
3.00
Started building again
Details
       

 05-13-2010
2.00
Sorting out Blueprint Discrepancy
Details

 05-09-2010
3.00
Continuing alignement and initial bulkhead rigging
Details
       

 05-08-2010
4.00
Started Mounting parts in Fuselage Fixture
Details

 05-02-2010
3.00
More work on aft fuselage fixture
Details
       

 05-01-2010
4.00
Aft fuselage fixture support
Details
       

 04-30-2010
2.00
Drilled concrete and made floor mounts for fixture
Details

 04-28-2010
2.50
Building Aft Fuselage Fixture
Details
     

 04-27-2010
1.50
Started Aft fuselage fixture
Details
       

 04-25-2010
4.00
Gathered Aft Fuselage Fixture material and made St
Details
       

 04-24-2010
0.00
Steel for Fixture Construction
Details
       

 04-23-2010
4.00
Form Vertical Tail Ribs
Details
     

 04-22-2010
2.00
Empennage Ribs
Details
     

 04-21-2010
1.50
Formed Stab Inbd Ribs
Details
       

 04-20-2010
1.50
Form inner Stab Ribs (24.5)
     

 04-18-2010
5.00
Blanks for Horiz Stab Ribs
Details
       

 04-17-2010
8.00
Bulkheads 102.625 $ 89.626
Details
       

 04-16-2010
6.00
Formed 149.625 and LH 102.625 Bulkheads
Details
       

 04-14-2010
2.00
Debur and form of142.625 Bulkhead
Details
       

 04-13-2010
5.00
LH 122.625 & 142.625 Bulkheads
Details
       

 04-12-2010
2.50
Bulkhead 122.625
Details
       

 04-11-2010
6.00
Aft Fuselage Bulkhead Forming
Details
       

 04-10-2010
4.00
Bulkhead Rough Shape
Details
       

 04-07-2010
1.00
Receive and unpack Aluminum
Details
     

 04-07-2010
0.00
Initial Form Blocks
Details
     

 04-04-2010
0.00
Fiberglass Arrives
Details
       

 01-30-2010
0.00
Landing gear research
Details
       

 10-24-2009
15.00
Engine Mount Welded Assembly
Details
       

 10-23-2009
10.00
Engine Mount Construction
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.