BEZJet Build
BEZJet
All
Work Logs Found:
284
Category Work Time:
1429 Hours
Date
Hours
Work Log Summary
Details
01-26-2019
10.00
Glassing pieces together
Details
01-19-2019
5.00
Assembling and fitting Intake to fuselage
Details
01-12-2019
10.00
Completed 2nd Intake runner
Details
06-12-2018
5.00
Final close out of Intake turning vane runner
Details
06-12-2018
10.00
Completed all of the Intake Runner part
Details
06-12-2018
10.00
Assembling Turning Vanes into Intake
Details
01-20-2018
4.00
Laid up the first Intake runner
Details
01-10-2018
6.00
Inlets
Details
01-06-2018
10.00
Plug for the Intake Tunnel
Details
01-06-2018
4.00
Intake Diffuser Plug
Details
12-04-2017
6.00
Turning Vanes for one side
Details
12-01-2017
4.00
CNC Routeed Inlat plug for Molds
Details
11-15-2017
15.00
Completed Intake CAD Model
Details
05-06-2017
5.00
Worked out the 24V Electrical System
Details
04-01-2017
2.00
Installed New Tire, Wheel and Bearings
Details
06-04-2016
50.00
Motor Mount Construction
Details
04-01-2016
5.00
Changed to an EZ Jet
Details
11-30-2015
6.00
Moving to our New Home
Details
09-07-2015
10.00
Finishing the AP Bottom
Details
11-08-2014
4.00
NLG Door
Details
11-08-2014
3.00
Main Landing Gear door
Details
11-01-2014
4.00
Grass Cutter bracket
Details
10-18-2014
6.00
Finishing the bottom Left Strake
Details
09-27-2014
8.00
Hell hole cover
Details
09-13-2014
10.00
Finishing the Right Bottom Strake
Details
09-06-2014
12.00
Finishing the Bottom
Details
06-07-2014
12.00
Filling the Right side of the airplane
Details
05-31-2014
10.00
Finishing the Bottom of the plane
Details
05-17-2014
4.00
Finishing the Bottom
Details
05-10-2014
2.00
Installed Fuel Out and Return Lines
Details
05-03-2014
4.00
Plumbing the Hell Hole
Details
04-26-2014
2.00
Installed Fuel Pumps
Details
04-11-2014
1.00
Installed Fuel Selector Valve
Details
04-05-2014
2.00
Farring in Motor Mount hard points
Details
04-05-2014
6.00
Fairing in Hell hole
Details
03-01-2014
2.00
Stop cables for Rudder Pedals
Details
03-01-2014
3.00
Flipping the plane
Details
03-01-2014
3.00
Completed the T-Bar Installation
Details
02-23-2014
4.00
Installed T-Bar for Left Strake
Details
02-01-2014
10.00
Installed Left Strake Baffels and Bulkheads
Details
01-12-2014
1.00
Trail Fitting the Strake tops
Details
01-12-2014
8.00
Left Strake Baffles and Bulkheads
Details
12-14-2013
3.00
Installing Bulkheads in Left Strake
Details
12-14-2013
6.00
Installation of the Right Fuel Blister
Details
11-24-2013
4.00
Lower Left Strake Installation
Details
11-24-2013
3.00
Installing Fuel Lines
Details
11-23-2013
4.00
Right Strake almost ready to close
Details
11-16-2013
6.00
Top Right and Bottom Left Strake Install
Details
11-12-2013
6.00
Fitting Gear Door
Details
11-11-2013
4.00
Installed Left Wheel Well Tub and Gear Door
Details
10-20-2013
3.00
Speed Break Actuator Pass through hole closure
Details
10-19-2013
3.00
Ran Rudder cable conduit
Details
10-13-2013
2.00
Installed Fuel Vent Lines
Details
10-12-2013
8.00
Prepairing the Top Right Strake for close out
Details
10-09-2013
2.00
BEZR-RG Fuel System
Details
10-06-2013
3.00
Installing Hyd Tubes
Details
10-05-2013
2.00
Fuel Vent Manifold
Details
10-04-2013
6.00
Completed Baffel fitting
Details
09-29-2013
6.00
Installation of Baffles and wiring conduit
Details
09-28-2013
2.00
Installing Baffles
Details
09-28-2013
8.00
Installed Hyd/Brake Lines and Bulkhead
Details
09-15-2013
3.00
Installed MLG Hyd Tubes in Tank
Details
09-14-2013
3.00
Installed Hyd Bulk head fittings
Details
09-07-2013
3.00
Fitting Top Strake Shell
Details
09-01-2013
8.00
Installing Fuel Barrier Ribs in Right Strake
Details
07-21-2013
5.00
Top Left Strake Construction
Details
07-16-2013
1.00
Marker Becon antenna installed
Details
07-16-2013
3.00
Baffles glassed
Details
07-11-2013
2.00
Right Strake Baffels
Details
07-09-2013
2.00
Strake Baffels
Details
07-02-2013
2.00
Recessed area for wheel well in top right strake
Details
06-30-2013
6.00
Layed up Top Right Strake
Details
06-30-2013
3.00
Attaching Lower Right Strake
Details
06-27-2013
0.50
Trial Fitting Top Right Strake
Details
06-23-2013
2.00
Fitted Right Strake
Details
06-19-2013
2.00
MLG Tub inside layup
Details
06-11-2013
2.00
MLG Colseout of Door
Details
06-09-2013
3.00
Fitting MLG Door
Details
06-08-2013
1.00
Rear Cockpit console and conduit cover
Details
06-08-2013
3.00
Bonded Wheel well onto lower strake
Details
06-03-2013
4.00
Cut out Right MLG Door
Details
06-01-2013
2.00
Rear Cockpit consol
Details
06-01-2013
2.00
Installed Rear throttle quadrant
Details
06-01-2013
2.00
Installed Left Winglet Cap
Details
06-01-2013
2.00
Fitting the Bottom Right Strake
Details
05-08-2013
2.00
Left Strake Delamination
Details
05-08-2013
2.00
Installed Right Wing Aileron Flight Controls
Details
05-05-2013
8.00
Layed up Both Lower Strakes
Details
04-28-2013
2.00
Right Aileron Torque Tube
Details
04-28-2013
2.00
Modified Right Wing to accomodate Aileron Controls
Details
04-28-2013
2.00
Completed fabricating and Installing Left Aileron
Details
04-28-2013
2.00
Ballanced Left Aileron
Details
04-27-2013
2.00
Making Winglet Cap for Pitot Tube
Details
04-26-2013
2.00
Bagging the Lower Left Strake
Details
04-21-2013
2.00
Glassed the Rear Cockpit Seat
Details
04-20-2013
2.00
Installed both Wings
Details
04-20-2013
2.00
Installed Aileron Berring in Fire Wall
Details
04-15-2013
2.00
Layed up Bottom Right Strake
Details
04-13-2013
3.00
Left Rudder Hinge and Hidden Bell Horn Installed
Details
04-07-2013
6.00
Right Rudder Modification for Carbon Hinge
Details
03-30-2013
2.00
Installed Rudder Stop and Hook for Return Spring
Details
03-30-2013
2.00
Closed in Winglet end
Details
03-23-2013
1.00
Mounting Pitch Tim Actuator
Details
03-23-2013
2.00
Installing Right Hidden Rudder Bell Horn
Details
03-23-2013
3.00
Glassed Hidden Bell crank in place
Details
03-16-2013
3.00
Right Rudder Hinge Pin Stay Installed
Details
03-16-2013
3.00
Right Rudder Bell crank
Details
03-10-2013
0.50
Picture of the Progress
Details
03-10-2013
4.00
Completed the Installation of the Carbon Hinges
Details
03-09-2013
2.00
Installed the Right Rudder return spring
Details
03-09-2013
4.00
Bonded the Rudder Hinge to the Rudder and Winglet
Details
03-03-2013
3.00
Prepairing to Install Carbon Right Rudder Hinge
Details
03-03-2013
2.00
Completed Right Rudder Spar Layup
Details
03-01-2013
4.00
Right Winglet Trailing edge Spar
Details
02-24-2013
0.50
Removed Peel Ply from Top Structural Layup of Righ
Details
02-24-2013
2.50
Embedded the Pitot Conduit into Right Rudder
Details
02-24-2013
1.00
Cut out Right Rudder
Details
02-23-2013
4.00
Completed Right Wing Top Structural Layup
Details
02-22-2013
0.50
Composit Rudder Hinges from Carbinge.com
Details
02-17-2013
1.00
Foamed in Transponder Antenna and Ground Plane
Details
02-17-2013
1.00
Attached Rear Flight Control Bearing
Details
02-16-2013
2.00
Installing Flight Controls
Details
02-16-2013
3.00
Installed Transponder Antenna
Details
02-15-2013
2.00
Designed New Fuel System
Details
02-09-2013
2.00
Installed End on Fuel Vent Manifold
Details
02-08-2013
1.00
3rd Outside layup Complete
Details
02-01-2013
4.00
Completed Layup #3 Outside Layup
Details
01-06-2013
4.00
Completed Inside Layup
Details
01-05-2013
3.00
Prepared Right Winglet/wing for Inside Layup
Details
01-02-2013
2.00
Bondowed Right Winglet in Place
Details
12-31-2012
2.00
Winglet Internal Bell Horn Ferring
Details
12-31-2012
2.00
Installed 2 fittings on the Fuel Vent Manifold
Details
12-30-2012
1.00
Winglet Ferring for Internal Rudder Bell Horn
Details
12-30-2012
1.00
Installed AN Fittings in Fuel Vent Manifold
Details
12-29-2012
2.00
Fuel Vent Manifold
Details
12-29-2012
2.00
Building Ferring for Left Rudder Internal Bell Hor
Details
12-28-2012
4.00
Installed the Left Rudder Internal Bell Horn
Details
12-27-2012
2.00
Installed rudder Stop
Details
12-27-2012
2.00
Installed Internal Rudder Return Spring
Details
12-16-2012
4.00
Rudder Internal Bell Horn
Details
12-15-2012
1.00
Rudder Return Spring
Details
12-15-2012
6.00
Completed and Attached the Rudder
Details
12-02-2012
1.00
Trimmed Left Winglet Rudder Channel
Details
12-01-2012
3.00
Cut out Left Rudder
Details
11-25-2012
4.00
Completed Left Wing Top Structural Layup
Details
11-24-2012
2.00
Winglet ready for top Layup
Details
11-23-2012
4.00
Completed the Outside Structural Winglet Layup
Details
11-23-2012
3.00
Completed Layup of Right Winglet Skin
Details
11-13-2012
2.00
Trimmed and Sanded Left Inside Winglet Attachment
Details
11-11-2012
4.00
Completed Inside Layup of Left WInglet
Details
11-10-2012
5.00
Prepaired Left Winglet for Inside Layup
Details
11-05-2012
2.00
Trial Fittting new Sump Design
Details
11-04-2012
2.00
Forming rear cockpit seat
Details
11-04-2012
3.00
Attached Left Winglet with Bondo
Details
11-03-2012
3.00
Right Winglet Skinning
Details
11-03-2012
2.00
Diagram of Fuel Sump
Details
10-30-2012
2.00
Fuel Sump Trial Fit
Details
10-30-2012
2.00
Firewall Coweling Attachment Flange
Details
10-29-2012
1.50
Prepping Wing for Winglet for Attchment
Details
10-25-2012
1.00
Firewall Cowleing Attachment F;amge
Details
10-21-2012
2.00
Added Cowling Lip to firewall
Details
10-20-2012
4.00
Completed Outboard Layup on Left Winglet
Details
10-19-2012
3.00
Fuel System Layout
Details
10-07-2012
4.00
Glassed Left Outboard Winglet
Details
09-23-2012
4.00
Completed the installation of Comm Antenna into Le
Details
09-23-2012
2.00
Completed fuel sump top cover
Details
09-22-2012
5.00
Rear Fuel Sump
Details
09-22-2012
4.00
Installed Comm Antenna into Left Winglet
Details
09-08-2012
5.00
Installed Comm Antenna into Right Winglet
Details
08-25-2012
5.00
Fitting Front Canopy Deck
Details
08-18-2012
1.00
Flight Controls
Details
08-04-2012
5.00
Farring Front canopy deck
Details
06-24-2012
30.00
90% Complete with the Installation of MLG controll
Details
04-28-2012
8.00
Installed Relays 1 through 5
Details
04-28-2012
3.00
Installed Circuit Breakers and Switches
Details
04-07-2012
2.00
Wired and Installed R6 Relay
Details
04-01-2012
4.00
Installed Nose Gear Actuator
Details
03-31-2012
4.00
Installed Pivot Assembly
Details
03-11-2012
3.00
Wired Hyd PSI Gages
Details
03-10-2012
2.00
Installed NG2 Foot
Details
03-04-2012
1.00
Installed Strut Extension PSI sensor
Details
03-04-2012
4.00
Installed NL2 and prepaired strut for NG2, 3 &4
Details
02-26-2012
4.00
Replaced Instrument Pannel
Details
02-26-2012
2.00
New bracket for Hyd Emergency Extend Valve
Details
02-25-2012
2.00
Installed the 3rd Hyd Pressure Guage
Details
02-12-2012
2.00
Installed Hyd PSI Switches
Details
02-12-2012
2.00
Hyd Pressure Guage installed
Details
02-11-2012
1.50
Painted and Installed the Master Switch Relay
Details
02-05-2012
2.00
Installed Click bond to mount Master switch Relay
Details
01-28-2012
4.00
Continued Wiring for MLG
Details
01-22-2012
4.00
Installed Relays and Started Wiring
Details
01-21-2012
2.00
Installed Clickbond fasteners for MLG Controller R
Details
01-15-2012
2.00
Installed Hydraulic Lines from Switching Valve
Details
01-14-2012
1.00
Installed Rear Canopy Prox Sensor
Details
01-14-2012
4.00
Installed Hyd Switching Valve
Details
01-07-2012
2.00
Installed Brake Lines
Details
01-02-2012
1.50
Tightened all the Swegelok Fittings and installed
Details
01-02-2012
2.00
Fabricated Canopy Lock Prox Switch Brackets
Details
12-29-2011
6.00
Installed Hydraulic Tubing
Details
12-28-2011
2.00
Installed Emergency Blow down Valve
Details
12-27-2011
2.00
Wired Jumpers On to MLG Controller
Details
12-27-2011
2.00
Installed Grounding Black and Power Block
Details
12-18-2011
6.00
Installed Hydraulic pump bracing, Relays and Paint
Details
12-11-2011
2.00
Installed Hydralic Pump supports
Details
11-25-2011
5.00
Installed Thigh Support Ribs
Details
11-20-2011
2.00
Aft Cockpit Thigh Support Fuel Sump
Details
11-11-2011
3.00
Installed Right Front Console
Details
11-06-2011
3.00
Right Console
Details
11-06-2011
2.00
Finished Top Left Console Deck
Details
10-23-2011
3.00
Glassed Top Console Deck
Details
10-22-2011
4.00
Cansole Construction
Details
10-16-2011
9.00
Front Left Cockpit Console
Details
09-19-2011
3.00
Installed Rear Canopy and Strake Opening Modified
Details
09-18-2011
10.00
Fabricated Upper Rear Canopy Latch Assembly
Details
09-11-2011
8.00
Completed Lower Rear Canopy Barrel Latch Assemboly
Details
09-05-2011
3.00
Roll Over Structure
Details
09-05-2011
8.00
Completed Front Canopy Latch Attachments
Details
09-05-2011
1.00
A look at a Cool Airplane
09-02-2011
2.00
Front Canopy Rail Pin instalation
Details
09-02-2011
5.00
Front Canopy Latch Installation
Details
08-27-2011
5.00
Inserted Hood Pins to act as Canopy Bow Guides
Details
08-26-2011
4.00
Completed Fuselage Cut out for Strakes
Details
08-21-2011
2.00
Mounted Throttle and Relays
Details
08-21-2011
5.00
Attached Rollover Structure
Details
12-11-2010
13.00
Completed Rear Canopy Front Bow
Details
08-29-2010
1.00
Assembled Canopy Locking Mechanism
Details
08-21-2010
6.00
Filling gap between Roll over Structure and Rear F
Details
07-26-2010
2.00
Installed Rear Canopy pneumatic shocks onto Longer
Details
07-25-2010
5.00
Installed Longeron Hardpoint Mounts for pneumatic
Details
07-24-2010
4.00
Installed Pneumatic Shock Hard Points
Details
07-13-2010
5.00
Mounting Rear Canopy on Hinge
Details
07-13-2010
2.00
Mounted EC2 to Firewall
Details
06-03-2010
4.00
Inside Layup forRear Canopy Bow
Details
05-30-2010
12.00
Installing Rear Canopy Hinge
Details
03-27-2010
8.00
Installed Pheumatic Actuators on Front Canopy
03-20-2010
12.00
Completed the Rear Canopy Fire Wall Rollover struc
Details
03-08-2010
15.00
Final Fit and installation of Front Canopy and Sho
Details
02-28-2010
10.00
Installing Front Canopy Hinge
Details
01-31-2010
10.00
Completed the Installation of P-Port
Details
01-09-2010
3.00
Potted the P-Port Water Jacket
Details
01-08-2010
3.00
Preperation ofRotor Housing for potting
Details
12-13-2009
6.00
P-Porting Contouring of Welds
Details
12-11-2009
10.00
P-Porting Rotor Housings
Details
08-09-2009
6.00
Tear Down of Engine to P-Port Rotor Housings
Details
06-13-2009
8.00
Adding Roving and sealing Canopy Bow
Details
05-23-2009
6.00
Cut Canopy front and Rear
Details
05-16-2009
10.00
Completeding Ouside Rollover Structure Layup
Details
05-09-2009
5.00
Cutting and Removing Plexiglass
Details
04-25-2009
10.00
Final inside Layp for the Canopy Roll Over Structu
Details
04-11-2009
10.00
Vaccume Bagging the Canopy Roll Over structure
Details
03-21-2009
10.00
Installation of Adjustable Rudder Peddles
Details
02-14-2009
6.00
Installed Breaks Wheels and Tires
Details
10-05-2008
10.00
Installation of MLG
Details
09-21-2008
4.00
Prepairing Canopy Rails for Glassing
Details
12-10-2007
6.00
Long EZ prepaired for Storage
Details
10-27-2007
10.00
Mounting Thrust Vector Control Unit
Details
10-20-2007
8.00
Conduit Run for Wires and controls
Details
09-27-2007
5.00
Installed Nose Door Hinge
Details
09-09-2007
10.00
Completion of outside glassing and Canopy Removl f
Details
09-02-2007
2.00
Trial Fitting of Engine/MM to Firewall
Details
08-01-2007
5.00
Installed Hydralic Pump for Retractable MLG System
Details
07-26-2007
15.00
Jigging canopy and preparing foam for glassing
Details
07-05-2007
1.00
Mock Up of Variable Thrust Controler and Throttle
Details
06-06-2007
8.00
Installing Bracked and Pulleys on Firewall
Details
06-01-2007
10.00
Installation of Firewall
Details
05-01-2007
10.00
Modification of Lower Motor Mount Hard Points
Details
04-29-2007
40.00
Integrated Oil Pan & Thrust Vectoring Motor Mount
Details
04-14-2007
15.00
Modification of Upper Motor Mount Hard Points
Details
04-07-2007
40.00
Modification of C-Spar to Accomodate Infinity Retr
Details
04-01-2007
3.00
Removal of Old Firewall
Details
06-15-2001
10.00
Closed out wing Ends
Details
06-03-2001
8.00
Skinning Wing
01-20-2001
10.00
Attached Canard Ferring
Details
01-18-2001
20.00
Installed Bearkut Nose
Details
08-05-1998
6.00
Bottom Spar Cap Lay up
05-07-1998
12.00
Engine Hard Point Mount Fabrication
04-08-1998
2.00
Wing Spar Cap Lay up
Details
04-08-1998
5.00
Installation of Electrict Speed Brake Actuator
Details
04-07-1998
8.00
Fire Wall Mounted 1
Details
04-07-1998
6.00
Center Section Spar Floxed to Fusalage Left
Details
04-24-1984
5.00
Carving Depression in fuselage floor
04-20-1984
6.00
Continued assymboly of fuselage sides
03-10-1984
40.00
Building and assymboling the fuslage
Details
03-01-1984
6.00
Laying up the Inside Face of the LH Fuselage side
Details
SITE NAVIGATION
Contact Builder
BEZJet Home
Category
# Logs
# Hours
All
284
1426
Aileron
4
8
Antenna
2
4
Brakes
3
18
Canopy
29
211
Cockpit
15
46
Electrical
11
64
Engine
9
85
Firewall
3
5
Flight Controls
6
9
Fuel Sump
1
2
Fuel System
18
41
Fuselage
40
340
Intake
13
99
Miscellaneous
3
17
MLG
17
50
Motor Mount
2
52
Nose
2
8
Nose Landing Gear
5
16
Rudder
16
44
Speed Brake
1
3
Strakes
42
168
Winglet
38
110
Wings
4
26