Powered By Kitlog Pro v2.0
Marcus Web Site
RV12
All
Work Logs Found:
311
Category Work Time:
830 Hours
Date
Hours
Work Log Summary
Details
01-27-2012
8.50
Prep Control system components.
Details
01-20-2012
2.00
Assemble wiring system.
Details
01-19-2012
3.50
Assemble electrical system.
Details
01-15-2012
7.00
Assemble Spar pin switches.
Details
01-05-2012
7.50
Assemble Wing Spar Pins.
Details
01-03-2012
4.50
Assemble elecrtical wiring.
Details
12-27-2011
7.50
Assemble Electrical system.
Details
12-23-2011
1.00
Final canopy assy.
Details
12-23-2011
3.75
Assemble Electrical Wiring
Details
12-12-2011
2.50
Canopy Fiberglass
Details
12-09-2011
3.25
Canopy Assembly
Details
12-06-2011
6.50
Canopy Fiberglass layup.
Details
11-26-2011
1.00
Canopy Preparation.
Details
11-24-2011
2.50
Prep Canopy Fiberglass.
Details
11-22-2011
3.00
Fiberglass Canopy.
Details
11-21-2011
2.25
Final assemble of Cowlings.
Details
11-16-2011
2.00
Assemble cowlings.
Details
11-13-2011
1.00
Cowling Preparation.
Details
11-12-2011
1.50
Assemble cowlings.
Details
11-10-2011
3.00
Assemble cowlings
Details
11-01-2011
2.50
Assemble Cowlings.
Details
10-31-2011
2.25
Assemble cowling.
Details
10-30-2011
2.00
Assemble Cowling
Details
10-27-2011
3.25
Preparation of Cowlings.
Details
10-26-2011
1.25
Assemble Cowlings.
Details
10-24-2011
2.25
Preparation of Cowlings.
Details
10-24-2011
1.00
Assemble fuel tank.
Details
10-22-2011
2.00
Assemble fuel tank.
Details
10-15-2011
1.75
Preparation of Cowlings
Details
10-14-2011
1.25
Assemble fuel tank
Details
10-08-2011
6.50
Assemble Fuel Tank.
Details
10-04-2011
1.75
Preparation Of fuel tank components.
Details
10-02-2011
3.50
Assemble Fuel Tank
Details
10-01-2011
4.00
Assemble Fuel Tank.
Details
09-29-2011
1.75
Assemble Fuel tank.
Details
09-27-2011
3.00
Assemble Fuel Tank
Details
09-26-2011
2.25
Assemble fuel tank.
Details
09-25-2011
2.75
Preparation of Tank.
Details
09-23-2011
1.25
Assemble canopy.
Details
09-22-2011
1.00
Assemble Canopy.
Details
09-21-2011
3.50
Assemble canopy.
Details
09-18-2011
2.75
Canopy Prep.
Details
09-10-2011
4.00
Canopy Preparation.
Details
09-10-2011
4.00
Canopy Preparation
Details
09-08-2011
4.00
Canopy preparation.
Details
09-06-2011
1.75
Preparation of canopy.
Details
09-05-2011
1.00
Prep canopy
Details
09-04-2011
2.50
Prep Canopy
Details
09-01-2011
1.25
Prep canopy frame.
Details
08-30-2011
2.00
Prep Canopy.
Details
08-29-2011
1.50
Prep Canopy Frame.
Details
08-28-2011
2.00
Prep Canopy
Details
08-27-2011
3.25
Combine Hardware.
Details
08-19-2011
1.00
Hardware Inventory
Details
08-18-2011
2.50
Inventory Hardware
Details
08-13-2011
2.50
Unpack Finish Kit
Details
08-13-2011
3.00
Finish kit Inventory
Details
08-12-2011
1.50
Collect Finish Kit from Schenker Airfreight
Details
08-01-2011
2.50
Trial Fit tailcone.
Details
07-31-2011
1.50
Trial Fit Tailcone
Details
07-20-2011
1.75
Assemble belly skin access panels.
Details
07-19-2011
3.25
Sealing up
Details
07-18-2011
2.50
Assemble upper fuselage.
Details
07-16-2011
3.25
Assemble upper fuselage.
Details
07-14-2011
1.50
Assemble upper fuselage
Details
07-13-2011
2.50
Assemble upper fuslage.
Details
07-12-2011
2.50
Assemble rudder pedals.
Details
07-12-2011
0.25
Assemble instrument shelf.
Details
07-11-2011
1.00
Assemble rudder pedals.
Details
07-10-2011
2.75
Assemble upper fuselage.
Details
07-08-2011
1.00
Assembl upper Fuselage.
Details
07-07-2011
1.25
Assemble upper firewall.
Details
07-06-2011
1.25
Assemble upper Firewall.
Details
07-05-2011
2.00
Assemble upper Firewall
Details
07-03-2011
2.00
Prep Sect 29 Parts.
Details
07-02-2011
3.75
Prep Sect 29 parts.
Details
06-26-2011
2.25
Prep section 29 Parts.
Details
06-24-2011
1.50
Prep mapbox components.
Details
06-23-2011
3.25
Prep Upper Fuselage parts.
Details
06-20-2011
2.75
Prep Upper fuslage parts
Details
06-19-2011
3.00
Prep, Deburr Upper Firewall Parts.
Details
06-18-2011
1.50
Prep Upper Firewall parts
Details
06-15-2011
2.50
Prep Upper Firewall
Details
06-15-2011
2.50
Paint cockpit.
Details
06-11-2011
3.00
Prep Upper Firewall
Details
06-04-2011
3.50
Paint cockpit.
Details
06-01-2011
4.00
Assembly of Rudder pedals
Details
05-31-2011
2.00
Assemble seatbacks.
Details
05-30-2011
1.50
Prep Seatback components.
Details
05-30-2011
2.50
Assembly of seatbacks.
Details
05-24-2011
1.00
Prep Seatback components.
Details
05-18-2011
1.00
Prep seatback components.
Details
05-15-2011
2.50
Prep Seat Back Parts.
Details
04-05-2011
3.50
Prep Seat Components
Details
03-27-2011
2.00
Assemble Fuel System
Details
03-25-2011
2.50
Assemble Fuel System.
Details
03-24-2011
1.50
Assemble Fuel System.
Details
03-23-2011
2.00
Assemble Fuel system.
Details
03-22-2011
2.50
Assemble fuel system.
Details
03-21-2011
3.00
Assemble F1207 Bulkhead
Details
03-20-2011
3.50
Assemble F1207 Bulkhead.
Details
03-17-2011
2.50
Assemble side skins.
Details
03-16-2011
4.00
Assemble R/H sideskin.
Details
03-15-2011
4.25
Assemble L/H sideskin
Details
03-14-2011
2.50
Longeron preparation.
Details
03-12-2011
7.00
prep new longerons.
Details
03-09-2011
3.00
Assemble Fuel system.
Details
03-08-2011
5.00
Rollbar assy
Details
03-08-2011
1.00
Assemble fuel system.
Details
03-07-2011
1.00
Assemble rollbar
Details
03-06-2011
1.00
Assemble air vents.
Details
03-01-2011
3.50
Prep Section 23 and 24 parts.
Details
03-01-2011
2.00
Assemble Rollbar
Details
02-22-2011
2.00
Rollbar Prep
Details
02-20-2011
1.00
Assemble sideskins
Details
02-15-2011
0.75
Prep rollbar
Details
02-14-2011
1.00
Roll Bar Prep
Details
02-11-2011
2.00
Prep rollbar parts.
Details
02-06-2011
3.00
Prep Sect 24 parts.
Details
01-31-2011
2.50
Prep Fuse side skins.
Details
01-30-2011
3.00
Assemble Fuselage sidewalls
Details
01-28-2011
1.00
Assemble fuse sidewall frames
Details
01-27-2011
4.00
Prep fuselage sidewall parts
Details
01-26-2011
6.00
Prep sidewall parts.
Details
01-24-2011
1.00
Prep Fuse sidewall parts.
Details
01-13-2011
1.25
Sidewall trial assy.
Details
01-12-2011
1.25
Prep Longerons.
Details
01-09-2011
3.00
Bend Longerons.
Details
01-05-2011
4.50
Assemble fwd fuselage
Details
01-04-2011
4.50
Assembly lower forward Fuse.
Details
01-03-2011
4.00
Assy lwr fwd fuselage
Details
01-02-2011
4.00
Assy Fwd Lwr Fuselage.
Details
01-01-2011
5.00
Assembly of Fwd Lwr Fuse
Details
12-26-2010
6.00
Assemble F1207 Bulkhead
Details
12-21-2010
4.50
Assemble steps and floors
Details
12-20-2010
2.50
Assemble step attach angles.
Details
12-19-2010
3.50
Assemble belly skin
Details
12-18-2010
4.00
Assemble fuse corner skins
Details
12-18-2010
3.00
Assemble belly skin
Details
12-16-2010
1.00
Prep F1251 nutplates
Details
12-13-2010
2.50
Prep step rib components.
Details
12-12-2010
1.50
Prep step rib components
Details
12-11-2010
4.50
Assemble F1203 Bulkhead
Details
12-07-2010
4.50
Assemble F1230 bulkhead.
Details
12-04-2010
2.00
Assemble F1203 bulkhead
Details
12-02-2010
4.25
Prep F1203 bulkhead.
Details
11-30-2010
1.00
Assemble seat floors
Details
11-29-2010
3.50
Assemble seat floors.
Details
11-27-2010
2.50
Prep autopilot brackets.
Details
11-27-2010
5.50
Assemble seat ribs
Details
11-27-2010
1.00
Assemble pulley bracket/seat rib assy
Details
11-23-2010
3.50
Assemble seat ribs.
Details
11-22-2010
8.00
Prep seat ribs.
Details
11-17-2010
1.50
Cleanup Workshop
Details
11-06-2010
2.00
Assemble flaperon and pulley brackets.
Details
11-05-2010
2.50
Prep flaperon and pulley brackets.
Details
11-04-2010
2.00
Prep flaperon mixer and pulley bracket
Details
11-02-2010
2.00
Baggage floors assembly.
Details
11-01-2010
1.25
Assemble baggage floors
Details
10-30-2010
2.50
Baggage floors prep
Details
10-30-2010
3.50
Baggage floors assembly.
Details
10-29-2010
1.50
Baggage floors prep.
Details
10-26-2010
1.50
Baggage floors prep.
Details
10-25-2010
4.50
Baggage floor preparation
Details
10-24-2010
2.50
Centre section assembly.
Details
10-22-2010
3.50
Centre section prep.
Details
10-17-2010
3.00
Centre section prep.
Details
10-14-2010
4.00
Centre section prep
Details
10-13-2010
0.50
Cleanup workshop
Details
10-13-2010
1.00
Centre section prep.
Details
10-10-2010
2.00
Fuse kit Inventory.
Details
10-03-2010
2.50
Fuse Kit inventory
Details
10-02-2010
1.00
Inventory crate
Details
09-30-2010
2.00
Unpack crate.
Details
09-29-2010
2.00
Workshop
Details
09-29-2010
1.00
Finish Wings.
Details
09-28-2010
2.50
Flaperon assembly.
Details
09-27-2010
3.50
Flaperon assembly
Details
09-25-2010
1.00
Fuselage crate.
Details
09-25-2010
6.00
Flaperon assembly.
Details
09-25-2010
3.00
Flaperon assembly.
Details
09-24-2010
1.50
Fuselage crate.
Details
09-24-2010
1.00
Flaperon assembly
Details
09-23-2010
1.00
Flaperon assembly
Details
09-22-2010
1.00
Flaperon assembly
Details
09-19-2010
2.00
Flaperon assembly.
Details
09-18-2010
4.00
Flaperon assembly
Details
09-17-2010
2.25
Flaperon preparation.
Details
09-16-2010
1.50
Flaperon preparation.
Details
09-13-2010
2.50
Flaperon preparation.
09-12-2010
1.50
Flaperon preparation.
Details
09-10-2010
2.00
Flaperon component preparation.
Details
08-27-2010
2.50
Flaperon preparation.
Details
08-25-2010
5.50
R/H wing assembly.
Details
08-24-2010
3.00
R/H wing assembly
Details
08-22-2010
1.00
R/H wing assembly
Details
08-21-2010
4.50
R/H wing assembly.
Details
08-18-2010
1.00
R/H wing assembly
Details
08-16-2010
1.50
R/H wing assembly
Details
08-14-2010
7.00
R/H wing assembly.
Details
08-13-2010
2.25
R/H wing assembly.
Details
08-11-2010
2.50
Finish L/H wing
Details
08-08-2010
4.00
L/H wingtip assembly
Details
08-07-2010
3.50
Prep wing tip components.
Details
08-07-2010
2.50
L/H wingtip assy
Details
08-06-2010
2.00
Prep wingtip components.
Details
08-02-2010
1.00
Prep Wing tip components.
07-31-2010
2.50
Wing skin installation.
Details
07-30-2010
3.50
Wing skin installation.
Details
07-27-2010
2.00
Wing skin installation.
Details
07-22-2010
4.00
Wing skin installation.
Details
07-20-2010
1.50
Wing skin installation.
Details
07-19-2010
1.00
Wing skin installation
Details
07-18-2010
4.00
Wing skin installation
Details
07-15-2010
5.50
Wing skin preparation
Details
07-12-2010
1.00
Wing skin preparation.
Details
07-11-2010
1.00
Wing skin preparation
Details
07-05-2010
2.50
Wing skin preparation.
Details
06-21-2010
2.50
Wing skin preparation.
Details
06-06-2010
2.50
Wing skeleton assy.
Details
06-05-2010
3.25
Wing skeleton assy
Details
05-27-2010
4.00
Wing skeleton assembly
Details
05-22-2010
1.00
Wing skeleton assembly.
Details
05-21-2010
2.50
Wing skeleton assy
Details
05-20-2010
2.00
Wing skeleton assembly
Details
05-19-2010
3.50
Wing Skeleton assembly
Details
05-18-2010
3.50
Wing Ribs Preparation
Details
05-17-2010
3.00
Wing Ribs Preparation
Details
05-07-2010
1.75
Wing Rib Preparation
Details
05-06-2010
3.00
Wing Ribs Preparation
Details
05-05-2010
1.50
Wing Ribs preparation.
Details
05-04-2010
1.00
Wing Ribs preparation
Details
05-03-2010
1.50
Shop Cleanup
Details
05-02-2010
3.25
Wing Ribs preparation
Details
04-26-2010
3.00
Wing Ribs preparation
Details
04-21-2010
1.00
Wing Component Prep
Details
04-20-2010
1.00
Shop Clean.
Details
04-19-2010
3.00
Wing Component Assy
Details
04-17-2010
1.00
Wing Component Prep
Details
04-16-2010
2.00
Wing Component Assy.
Details
04-15-2010
2.00
Wing Component Prep.
Details
04-11-2010
1.50
Wing General
Details
04-11-2010
1.00
Wing Component Prep
Details
04-10-2010
3.00
Wing Components Prep
Details
04-06-2010
2.00
Wing Assembly
Details
04-02-2010
3.00
Wing component Assy.
Details
03-31-2010
2.50
Wing components Preparation
Details
03-31-2010
1.50
Wing Components Prep
Details
03-31-2010
1.00
Wing Component Prep
Details
02-16-2010
2.50
Assemble Empenage components.
Details
02-13-2010
3.00
Rebuild R/H AST
Details
11-19-2009
0.00
Kit build hiatis
Details
11-04-2009
1.00
Stabilator
Details
10-29-2009
3.00
Stabilator assembly.
Details
10-28-2009
2.00
Stabilator frame
Details
10-28-2009
7.00
Stabilator Assembly
Details
10-27-2009
4.00
Stabilator Frame
Details
10-26-2009
5.00
Stabilator frame preparation.
Details
10-25-2009
2.00
Stab spar box.
Details
10-24-2009
2.50
Prep Stab Sparbox
Details
10-24-2009
1.50
Details
10-23-2009
2.50
Wing Kit inventory
Details
10-22-2009
2.00
Wings Arrive
Details
08-28-2009
3.00
Bench
Details
07-28-2009
3.50
Fin and Rudder fairings
Details
07-23-2009
2.00
Stab Mechanisim
Details
07-22-2009
5.00
Trim Tab Mechanisim.
Details
07-18-2009
3.50
Tailcone assy
Details
07-17-2009
3.00
Tailcone assy
Details
07-15-2009
2.00
Tailcone assy
Details
07-14-2009
1.25
Tailcone assy
Details
07-13-2009
2.50
Tailcone assy
Details
07-12-2009
4.00
Tailcone assy
Details
07-07-2009
2.00
Tailcone skins
Details
07-06-2009
4.00
Tailcone skins
Details
06-28-2009
1.50
Tailcone assy
Details
06-27-2009
4.50
Empenage parts prep
Details
06-26-2009
3.50
Tailcone parts prep
Details
06-25-2009
3.00
Tailcone Parts
Details
06-24-2009
2.50
Tailcone parts
Details
06-21-2009
4.00
Tailcone parts.
Details
06-15-2009
2.00
Tail cone skins.
Details
06-14-2009
2.50
Tail cone skins
Details
06-09-2009
2.00
Rearrange workshop.
Details
05-29-2009
2.00
Stabilator assy.
Details
05-28-2009
3.00
Stabilator assy
Details
05-25-2009
4.00
Stabilator Assy.
Details
05-21-2009
5.50
Stabilator assy
Details
05-20-2009
5.00
Stabilator assy
Details
05-17-2009
4.00
Stabilator assy.
Details
05-16-2009
1.50
Stabilator Assy.
Details
05-15-2009
5.00
AST assy
Details
05-15-2009
4.00
AST assy
Details
05-07-2009
3.50
AST (anti servo tab) assy.
Details
05-05-2009
2.00
Rudder assy.
Details
05-04-2009
4.00
Rudder Assy
Details
05-04-2009
3.00
Rudder assy
Details
04-29-2009
0.50
Rudder assy
Details
04-28-2009
1.50
Start rudder assy.
Details
04-27-2009
3.50
Fit Vertical stab skin.
Details
04-26-2009
2.00
Vertical Stab assy
Details
04-25-2009
5.00
Vertical stab assy
Details
04-21-2009
3.00
Vertical stab prep
Details
04-19-2009
5.00
Vertical fin spar
Details
04-18-2009
1.00
Work starts at last.
Details
04-18-2009
3.00
Read sections 1 to 5 of the plans.
Details
04-17-2009
3.50
Inventory hardware and sort into storage boxes
Details
04-15-2009
3.50
Unpack Emp kit and inventory large items.
Details
04-15-2009
2.50
Picked up Empenage Kit
Details
04-04-2009
0.00
Empenage kit shipped from Van's.
04-01-2009
1.00
Empenage Kit ordered
Details
SITE NAVIGATION
Contact Builder
RV12 Home
Category
# Logs
# Hours
All
311
830
Empennage kit
58
172
Finish Kit
58
165
Fuselage Kit
116
305
Miscellaneous
7
11
Wings Kit
72
177
Copyright © 2001-2024 Matronics. All Rights Reserved.