Powered By Kitlog Pro v2.0
Demoted Priority
RV-8
All
Work Logs Found:
75
Category Work Time:
588 Hours
Date
Hours
Work Log Summary
Details
09-18-2010
8.00
Worked on Right Aileron Brackets and wing
09-10-2010
200.00
Instrument Panel Current Status
08-31-2009
2.00
Installed the new alternator
Details
08-22-2009
3.00
Hung the motor
Details
08-18-2009
3.00
Exhaust
Details
07-18-2009
0.00
First time out of the garage
Details
07-17-2009
15.00
Landing Gear
Details
06-14-2009
3.00
Aileron Trim Assembly
Details
06-13-2009
2.00
Aileron trim assembly
Details
06-12-2009
4.00
Flap motor and mechanism
Details
06-08-2009
10.00
Canopy slide rails & frame
Details
05-30-2009
6.00
Brakes and brake lines
Details
05-28-2009
0.00
Engine came in!!!
Details
05-24-2009
12.00
Fuel System
Details
05-06-2009
4.00
Fuel Filter and fuel lines
Details
04-27-2009
8.00
Andair Fuel Valve
Details
04-22-2009
6.00
Aux Fuel Pump
Details
04-17-2009
2.00
tail wheel
Details
04-15-2009
3.00
Seats
Details
04-14-2009
8.00
Push rods and Elevators
Details
04-08-2009
5.00
Fabricated Elevator Push Rods
Details
04-01-2009
2.00
Empennage attach 3
Details
04-01-2009
5.00
Empennage attach 2
Details
03-29-2009
4.00
Empennage attach
Details
03-24-2009
5.00
Right console and begin empenage attach
Details
03-19-2009
10.00
Mixed Bag
Details
03-18-2009
10.00
Bulkhead cap
Details
03-01-2009
8.00
Front Seat Back
Details
02-25-2009
2.00
Throttle console
Details
02-24-2009
10.00
Details
02-15-2009
12.00
Floor/interior
Details
02-07-2009
8.00
Floors
Details
02-06-2009
8.00
Control column and sticks
Details
02-02-2009
0.00
Stick grips
Details
02-02-2009
2.00
Stick control assembly
Details
01-30-2009
0.00
Engine
Details
01-28-2009
5.00
Rear Rudder Panels and floor skins
Details
01-22-2009
7.50
Rudder Pedal Assembly
Details
01-17-2009
8.00
Interior paint.
Details
01-10-2009
6.00
Fitting Landing Gear part Deux
Details
01-07-2009
2.00
Panel planning
Details
01-04-2009
8.00
Fitting landing gear legs
Details
12-29-2008
8.00
Elevators
Details
12-25-2008
0.00
Inventory
Details
12-11-2008
0.00
Recived QB kit remainder!
Details
12-08-2008
2.00
Trim Tab
Details
11-29-2008
8.00
Left Elevator
Details
11-20-2008
8.00
Elevators
Details
11-13-2008
2.00
Drilled both elevators.
11-11-2008
4.00
Elevator work
Details
11-09-2008
7.00
More elevator work
Details
11-08-2008
8.00
Elevators , getting started
Details
11-04-2008
4.00
Rudder mostly done
Details
11-03-2008
4.00
Rudder final assembly.
Details
11-02-2008
11.00
Rudder/prepping the innards & skins
Details
10-30-2008
4.00
Back riveting RULES!
Details
10-28-2008
3.00
Elevator Stiffiners
Details
10-28-2008
0.00
Details
10-26-2008
4.00
Rudder work
Details
10-24-2008
6.00
Rudder work
Details
10-22-2008
3.00
Rudder work
Details
10-20-2008
3.00
Finished Vertical Stabilizer
Details
10-16-2008
3.50
Vertical Stab Final Assembly
Details
10-15-2008
3.00
Priming and sniping
Details
10-14-2008
5.00
Preparing VS parts
Details
09-28-2008
3.00
Vertical Stabilizer
Details
09-27-2008
4.50
Started Vertical Stabilizer
Details
09-25-2008
3.00
First major sub assembly complete!
Details
09-24-2008
3.00
Still riveting for final assy of Hori Stab
Details
09-22-2008
4.00
More final assembly of Hori Stab
Details
09-18-2008
2.50
First skin riveting
Details
09-16-2008
3.50
Horizontal Stab Final Assembly 1
Details
09-15-2008
2.00
First rivets!
Details
09-14-2008
5.00
Deburring, dimpling and priming, oh my!
Details
08-28-2008
30.00
Getting Started
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
75
588
Empennage
31
161
Engine
1
Firewall Forward
3
8
Fuselage
32
206
Goodies
2
Instrument Panel
2
202
Interior
1
3
Quick Build Kit
2
Wings
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.