Date
|
Hours
|
Work Log Summary
|
Details
|
05-11-2013
|
6.00
|
Calibrated fuel tanks on EFIS. First engine start.
|
|
|
|
05-10-2013
|
1.80
|
Flew with Mike Seager for transition training.
|
|
|
|
04-28-2013
|
2.50
|
Finished installing interior.
|
|
|
|
04-27-2013
|
8.00
|
Finished installing the interior. Weighed the plan
|
|
|
|
04-23-2013
|
2.50
|
Installed interior.
|
|
|
|
04-19-2013
|
2.00
|
Modified cover panel around elevator trim cable. C
|
|
|
|
04-15-2013
|
1.75
|
Installed more interior.
|
|
|
|
04-14-2013
|
2.50
|
Started final assembly.
|
|
|
|
04-13-2013
|
4.00
|
Misc. work.
|
|
|
|
04-12-2013
|
2.00
|
Finished installing plenum and baffling.
|
|
|
|
04-11-2013
|
1.50
|
Finished installing baffles around plenum.
|
|
|
|
04-09-2013
|
2.75
|
Finished installing control sticks.
|
|
|
|
04-07-2013
|
3.00
|
Installed control sticks and PTT wires.
|
|
|
|
04-06-2013
|
4.50
|
Finished fixing servos. Cleaned up wiring.
|
|
|
|
04-04-2013
|
1.50
|
Finialized autopilot wiring.
|
|
|
|
04-03-2013
|
2.00
|
Finialized autopilot wiring.
|
|
|
|
03-30-2013
|
7.00
|
Wiring work.
|
|
|
|
03-28-2013
|
2.00
|
Reinstalled airbox after cleaning. Final hookup of
|
|
|
|
03-25-2013
|
5.25
|
Troubleshooting wiring. Started fitting interior.
|
|
|
|
03-24-2013
|
3.50
|
Misc. work
|
|
|
|
03-23-2013
|
4.00
|
Aligned control surfaces. Final plenum fitting. Wo
|
|
|
|
03-22-2013
|
7.75
|
Aligned all control surfaces. EAA tech adviser ins
|
|
|
|
03-20-2013
|
2.25
|
Reinstalled roll servo after reversing wires to re
|
|
|
|
03-18-2013
|
1.75
|
Wiring work.
|
|
|
|
03-17-2013
|
2.50
|
Wiring work,. Final installation of the canopy
|
|
|
|
03-16-2013
|
5.00
|
Diagnosing wiring issues. Installed luggage carpet
|
|
|
|
03-12-2013
|
2.25
|
Misc. wiring.
|
|
|
|
03-11-2013
|
2.50
|
Emergency bipass air, fresh air ducts.
|
|
|
|
03-10-2013
|
3.00
|
Wiring, cleanup, air vent fitting.
|
|
|
|
03-09-2013
|
5.00
|
Misc. wiring work.
|
|
|
|
03-06-2013
|
2.75
|
Misc. wiring work.
|
|
|
|
03-05-2013
|
2.75
|
Diagnosing servo wiring issue.
|
|
|
|
03-04-2013
|
2.25
|
Misc. wiring.
|
|
|
|
03-02-2013
|
7.25
|
Panel wiring with Isaac.
|
|
|
|
03-01-2013
|
3.50
|
Panel wiring with Isaac.
|
|
|
|
02-27-2013
|
1.00
|
Finished painting plenum
|
|
|
|
02-24-2013
|
2.75
|
Painted horizontal stabilizer access panel.
|
|
|
|
02-23-2013
|
3.00
|
Painted plenum, riveted side panels, started runni
|
|
|
|
02-21-2013
|
1.00
|
Sanded and primed plenum.
|
|
|
|
02-19-2013
|
2.75
|
Plenum work
|
|
|
|
02-11-2013
|
3.50
|
Plenum fiberglass work..
|
|
|
|
02-09-2013
|
8.00
|
Helped Isaac and Chad with wiring.
|
|
|
|
02-08-2013
|
4.00
|
Misc wiring.
|
|
|
|
02-06-2013
|
3.00
|
Misc. wiring
|
|
|
|
02-05-2013
|
2.25
|
Installed Advanced Flight Systems GPS puck on glar
|
|
|
|
02-02-2013
|
11.00
|
Worked on wiring with Isaac
|
|
|
|
01-29-2013
|
1.50
|
Modified plenum.
|
|
|
|
01-26-2013
|
1.00
|
Painted plenum.
|
|
|
|
01-26-2013
|
5.00
|
Modifying plenum, installed data plate.
|
|
|
|
01-24-2013
|
3.50
|
Finished installing elevator, and did some fibergl
|
|
|
|
01-23-2013
|
1.00
|
Installed safety wire
|
|
|
|
01-22-2013
|
2.00
|
Installed flaps
|
|
|
|
01-21-2013
|
2.75
|
Installed aiteron control stops.
|
|
|
|
01-20-2013
|
2.50
|
Installed wing tips, connected directional lights.
|
|
|
|
01-19-2013
|
4.00
|
Installed antenna and ran PTT wires to the stick.
|
|
|
|
01-18-2013
|
2.75
|
Installed ailerons.
|
|
|
|
01-16-2013
|
3.00
|
Wiring work.
|
|
|
|
01-15-2013
|
2.75
|
Misc. wiring work.
|
|
|
|
01-14-2013
|
2.00
|
Installed replacement AHRS unit.
|
|
|
|
01-13-2013
|
3.75
|
Misc work.
|
|
|
|
01-12-2013
|
4.00
|
Misc. work.
|
|
|
|
01-08-2013
|
2.50
|
Installed fuel vent lines.
|
|
|
|
01-07-2013
|
2.50
|
Completed the wing installation including torquein
|
|
|
|
01-06-2013
|
3.00
|
Continued installing tail parts.
|
|
|
|
01-05-2013
|
5.00
|
Installed wings on the airplane.
|
|
|
|
01-04-2013
|
4.00
|
Installed horizontal stabilizer and vert stabilize
|
|
|
|
12-29-2012
|
1.50
|
Removed all plastic and masking from plane. prepar
|
|
|
|
12-28-2012
|
4.50
|
Sprayed final clearcoat on fusalage
|
|
|
|
12-26-2012
|
6.00
|
Prepped fusalage for clear coat
|
|
|
|
12-24-2012
|
1.75
|
Clear coat on cowling
|
|
|
|
12-23-2012
|
2.25
|
Clear coat on cowling
|
|
|
|
12-20-2012
|
1.25
|
Painted lower cowl
|
|
|
|
12-19-2012
|
1.00
|
Prepped and painted upper cowling
|
|
|
|
12-18-2012
|
0.75
|
Prepped cowling for paint
|
|
|
|
12-17-2012
|
3.50
|
Painted blue on fusalage
|
|
|
|
12-16-2012
|
1.25
|
Prepped fusalage to paint accent stripe
|
|
|
|
12-15-2012
|
4.00
|
Painted fusalage
|
|
|
|
12-14-2012
|
1.00
|
Prepped fusalage for paint
|
|
|
|
12-13-2012
|
3.00
|
Taped off paint design on fusalage.
|
|
|
|
12-12-2012
|
1.00
|
Installed wing tip lights
|
|
|
|
12-09-2012
|
3.75
|
Prepped and painted cowling base coat white.
|
|
|
|
12-08-2012
|
3.25
|
Prepped and painted base coat white on fusalage.
|
|
|
|
12-07-2012
|
2.75
|
Sanded fusalage
|
|
|
|
12-06-2012
|
6.00
|
Prepped and primed fusalage.
|
|
|
|
12-05-2012
|
4.50
|
Washed and etched fusalage for paint.
|
|
|
|
12-03-2012
|
0.75
|
Installed tail light.
|
|
|
|
12-02-2012
|
3.00
|
Prepped fusalage for paint.
|
|
|
|
11-29-2012
|
2.75
|
Sanding and filling plenum.
|
|
|
|
11-26-2012
|
1.00
|
Fiberglass work on plenum.
|
|
|
|
11-25-2012
|
3.00
|
Fiberglass work on plenum.
|
|
|
|
11-24-2012
|
1.00
|
Fiberglass work on plenum.
|
|
|
|
11-23-2012
|
1.50
|
Fiberglass work on plenum.
|
|
|
|
11-22-2012
|
2.00
|
Fiberglass work on plenum.
|
|
|
|
11-20-2012
|
4.00
|
Wiring work with Joel.
|
|
|
|
11-19-2012
|
3.00
|
Wiring work with Joel.
|
|
|
|
11-18-2012
|
2.00
|
Fiberglass work on plenum.
|
|
|
|
11-17-2012
|
3.00
|
Wiring panel with Joel.
|
|
|
|
11-13-2012
|
1.25
|
Painted canopy.
|
|
|
|
11-12-2012
|
1.00
|
Painted canopy.
|
|
|
|
11-11-2012
|
1.25
|
Prepped and primed canopy.
|
|
|
|
11-10-2012
|
4.00
|
Prepped canopy for paint.
|
|
|
|
11-09-2012
|
1.00
|
Painting.
|
|
|
|
11-04-2012
|
1.00
|
Painting.
|
|
|
|
11-03-2012
|
1.75
|
Painting.
|
|
|
|
11-02-2012
|
2.50
|
Painting.
|
|
|
|
11-01-2012
|
1.00
|
Painting.
|
|
|
|
10-30-2012
|
1.00
|
Painted.
|
|
|
|
10-29-2012
|
1.50
|
Painted.
|
|
|
|
10-28-2012
|
2.75
|
Painting.
|
|
|
|
10-27-2012
|
3.25
|
Painted wing.
|
|
|
|
10-24-2012
|
1.50
|
Painted.
|
|
|
|
10-23-2012
|
2.25
|
Painted.
|
|
|
|
10-22-2012
|
3.00
|
Prepped and painted.
|
|
|
|
10-21-2012
|
3.00
|
Prepped and painted.
|
|
|
|
10-20-2012
|
7.50
|
fitted cowling and taped off paintdesign with Denn
|
|
|
|
10-19-2012
|
1.50
|
Painted
|
|
|
|
10-17-2012
|
4.00
|
Primed cowling, and painted wing.
|
|
|
|
10-16-2012
|
3.00
|
Primed and filled cowling.
|
|
|
|
10-15-2012
|
2.00
|
Prepping and filling the upper cowl for paint.
|
|
|
|
10-14-2012
|
2.50
|
Painted wing
|
|
|
|
09-29-2012
|
7.00
|
Prepped wings for priming and painting.
|
|
|
|
09-28-2012
|
1.25
|
Painted.
|
|
|
|
09-27-2012
|
2.75
|
Painted.
|
|
|
|
09-26-2012
|
3.25
|
Painted.
|
|
|
|
09-25-2012
|
2.50
|
Painted.
|
|
|
|
09-24-2012
|
2.50
|
Painted.
|
|
|
|
09-20-2012
|
3.25
|
Painted.
|
|
|
|
09-19-2012
|
2.25
|
Primed and painted.
|
|
|
|
09-18-2012
|
2.00
|
Painted.
|
|
|
|
09-17-2012
|
3.75
|
Primed and painted.
|
|
|
|
09-16-2012
|
2.00
|
Primed and painted.
|
|
|
|
09-15-2012
|
5.00
|
Primed and painted.
|
|
|
|
09-14-2012
|
3.00
|
Primed and painted.
|
|
|
|
09-12-2012
|
3.00
|
Primed and painted.
|
|
|
|
09-11-2012
|
3.00
|
Primed and painted.
|
|
|
|
09-10-2012
|
4.00
|
Primed and painted.
|
|
|
|
09-09-2012
|
2.00
|
Primed parts.
|
|
|
|
09-08-2012
|
5.00
|
Primed and painted.
|
|
|
|
09-07-2012
|
4.00
|
Primed all of the tail pieces.
|
|
|
|
09-06-2012
|
2.25
|
Cleaned and etched the tail parts.
|
|
|
|
09-01-2012
|
6.50
|
Stripped all parts and control surfaces from the a
|
|
|
|
08-29-2012
|
6.00
|
Went to Stewart Systems to pick up paint and suppl
|
|
|
|
08-26-2012
|
3.75
|
Spent the afternoon building a paint booth under m
|
|
|
|
08-24-2012
|
1.25
|
Riveted nut plates on lower cowling for front gear
|
|
|
|
08-21-2012
|
2.00
|
Fitted fiberglass upper gear fairings.
|
|
|
|
08-19-2012
|
1.50
|
Continued working on wing root fairing.
|
|
|
|
08-18-2012
|
1.25
|
Worked on fitting wing to fuselage fairing.
|
|
|
|
08-17-2012
|
1.75
|
Finished holes in fuselage for flap brackets.
|
|
|
|
08-16-2012
|
3.25
|
Cut holes in fuselage for flap arms.
|
|
|
|
08-14-2012
|
2.00
|
Finished tank attach brackets. drilled holes in ov
|
|
|
|
08-13-2012
|
3.50
|
Worked on wing attach brackets.
|
|
|
|
08-12-2012
|
4.00
|
Set and drilled the wing angle of incidence. fabri
|
|
|
|
08-11-2012
|
5.00
|
Attached wings to the fusalage.
|
|
|
|
08-10-2012
|
3.75
|
Finished filling and sanding front windscreen fibe
|
|
|
|
08-08-2012
|
1.00
|
Sanding and filling front windscreen fiberglass.
|
|
|
|
08-07-2012
|
1.50
|
Windscreen fiberglass work.
|
|
|
|
08-06-2012
|
2.00
|
Worked on final filling of the windscreen fibergla
|
|
|
|
08-05-2012
|
2.00
|
Installed the flap motor.
|
|
|
|
08-04-2012
|
2.50
|
Installed the flap motor and related equipment.
|
|
|
|
08-01-2012
|
2.00
|
Installed and hooked up the main control rod to th
|
|
|
|
07-31-2012
|
2.25
|
Finished running and supporting the elevator trim
|
|
|
|
07-29-2012
|
1.25
|
Finished running the elevator trim cable.
|
|
|
|
07-28-2012
|
6.00
|
Finished forward firewall, attached baggage floor,
|
|
|
|
07-24-2012
|
2.00
|
Finished supporting all the wiring runs in the for
|
|
|
|
07-23-2012
|
1.00
|
Finished mounting the exhaust supports.
|
|
|
|
07-22-2012
|
1.50
|
Finished forward firewall wiring, more work on the
|
|
|
|
07-21-2012
|
4.00
|
Installed breather line, fuel pump overflow, and h
|
|
|
|
07-19-2012
|
2.25
|
Installed exhaust and exhaust mounting supports.
|
|
|
|
07-18-2012
|
2.00
|
Finished filling and priming the fiberglass wing t
|
|
|
|
07-16-2012
|
2.25
|
Finished sanding and primed the wing tips.
|
|
|
|
07-15-2012
|
1.00
|
Sanded the wing tips.
|
|
|
|
07-14-2012
|
4.50
|
Ran the main EFIS wiring harness through the firew
|
|
|
|
07-12-2012
|
1.00
|
Mounted main wheel pants and fairings.
|
|
|
|
07-11-2012
|
1.00
|
Finished installing main wheel pants, and fairings
|
|
|
|
07-10-2012
|
2.00
|
Sanded and primed main wheel pants
|
|
|
|
07-09-2012
|
2.00
|
Sanded and primed main wheel pants
|
|
|
|
07-08-2012
|
1.50
|
Sanded and filled main gear wheel pants.
|
|
|
|
07-07-2012
|
5.00
|
Main gear fairings
|
|
|
|
07-05-2012
|
1.25
|
Main gear fairings
|
|
|
|
07-04-2012
|
3.00
|
Main gear fairings
|
|
|
|
07-03-2012
|
2.00
|
Main gear fairings
|
|
|
|
06-26-2012
|
1.00
|
Main landing gear fairings
|
|
|
|
06-24-2012
|
3.00
|
Finished installing front gear fairing, started al
|
|
|
|
06-23-2012
|
2.25
|
Primed front gear pant
|
|
|
|
06-20-2012
|
1.50
|
Sanded and primed front gear pant and fairing.
|
|
|
|
06-18-2012
|
1.75
|
Sanded and primed empennage fairing.
|
|
|
|
06-16-2012
|
2.00
|
Misc wiring work
|
|
|
|
06-15-2012
|
1.00
|
Finished installing rudder bottom fairing with str
|
|
|
|
06-13-2012
|
2.00
|
Finished horizontal elevator fiberglass tips.
|
|
|
|
06-10-2012
|
1.00
|
Horizontal stabilizer fiberglass tips
|
|
|
|
06-05-2012
|
1.75
|
Worked on horizontal stabilizer fiberglass tips
|
|
|
|
05-21-2012
|
1.75
|
Front landing gear fairing work, Hooked up main po
|
|
|
|
05-20-2012
|
1.75
|
Final fitting of the front gear leg fairing. Start
|
|
|
|
05-19-2012
|
5.50
|
fitted front gear leg fairing. Installed VPX unit,
|
|
|
|
05-18-2012
|
2.00
|
Fitted the front landing gear leg fairing.
|
|
|
|
05-14-2012
|
1.50
|
Installed wiring runs.
|
|
|
|
05-13-2012
|
4.00
|
Ran final magnetometer wiring. Installed flexible
|
|
|
|
05-11-2012
|
2.50
|
Continued with wiring. Removed panel and transport
|
|
|
|
05-09-2012
|
1.75
|
Cut the radio/transponder into the subpanel.
|
|
|
|
05-08-2012
|
1.75
|
fitted radio/transponder in the panel
|
|
|
|
05-07-2012
|
1.25
|
Mounting the radio/transponder stack into the pane
|
|
|
|
05-06-2012
|
2.00
|
Fitting the radio/transponder stack into the panel
|
|
|
|
05-05-2012
|
2.00
|
Fitting radio/transponder stack
|
|
|
|
05-04-2012
|
1.75
|
Started assembling the radio and avionics stack.
|
|
|
|
04-30-2012
|
2.00
|
Finished running the servo wires in the fusalage
|
|
|
|
04-28-2012
|
1.75
|
Finished installing the ADSB wiring
|
|
|
|
04-27-2012
|
1.25
|
Started setting up the ADSB wires to run through t
|
|
|
|
04-26-2012
|
1.75
|
Finished wiring the ADSB connector
|
|
|
|
04-25-2012
|
1.75
|
Finished fabricating and installing the magnetomet
|
|
|
|
04-24-2012
|
1.75
|
Fabricated the magnetometer bracket
|
|
|
|
04-23-2012
|
2.00
|
Finished fitting and machining the empennage fairi
|
|
|
|
04-21-2012
|
3.50
|
Shaping and fitting the empennage fairing.
|
|
|
|
04-19-2012
|
1.50
|
Drilled and deburred in prepareation for nutplate
|
|
|
|
04-18-2012
|
2.00
|
Fitted and drilled the empennage fairing.
|
|
|
|
04-17-2012
|
2.00
|
Continued working on the lower empennage gap fairi
|
|
|
|
04-16-2012
|
2.00
|
Continued work on the empennage fairing and lower
|
|
|
|
04-15-2012
|
2.00
|
Continued fitting the empennage fairing.
|
|
|
|
04-14-2012
|
4.00
|
Started working empennage fairing, started assembl
|
|
|
|
04-12-2012
|
2.75
|
Fitted the rudder fiberglass bottom. Machined, deb
|
|
|
|
04-11-2012
|
2.00
|
Continued work on the elevator fiberglass tips. St
|
|
|
|
04-10-2012
|
1.00
|
Installed the fiberglass tip on the rudder. starte
|
|
|
|
04-09-2012
|
2.00
|
Started fitting the fiberglass tips on the rudder.
|
|
|
|
04-08-2012
|
2.00
|
Ran ELT antenna wires. Started the bracket for the
|
|
|
|
04-07-2012
|
1.00
|
Doug Drees repaired the holes in the exhaust where
|
|
|
|
04-06-2012
|
3.00
|
Interior wiring runs.
|
|
|
|
04-05-2012
|
1.75
|
Installed the headphone jacks in the aft part of t
|
|
|
|
04-04-2012
|
1.75
|
finished installing Adel clamps on the forward fir
|
|
|
|
04-02-2012
|
1.50
|
Finished attaching the vertical stabilizer to the
|
|
|
|
04-01-2012
|
2.50
|
Ran the staic air tubing from aft forward to under
|
|
|
|
03-31-2012
|
3.50
|
Joel came by today and we worked on the forward fi
|
|
|
|
03-28-2012
|
2.00
|
Worked on running wires in the forward firewall ar
|
|
|
|
03-26-2012
|
2.25
|
Ran wiring harnesses in the wing and fusalage for
|
|
|
|
03-25-2012
|
3.00
|
Assemble wiring harnesses for the auto pilot servo
|
|
|
|
03-24-2012
|
3.00
|
Assembled wiring harnesses for the autopilot servo
|
|
|
|
03-23-2012
|
2.00
|
Ran wires aft for the rear directional light on th
|
|
|
|
03-21-2012
|
0.75
|
Cleaned up wire tie mounts in the fusalage
|
|
|
|
03-20-2012
|
1.50
|
Installed plastic wire tie mounts in the fusalage
|
|
|
|
03-19-2012
|
2.50
|
Drilled fusalage bulkheads to install plastic grom
|
|
|
|
03-18-2012
|
3.00
|
Installed ADSB antenna wires
|
|
|
|
03-17-2012
|
2.00
|
Installed wire tie mounts ADSB, and grommets to ru
|
|
|
|
03-14-2012
|
1.50
|
Finished installing wing tip lights and wiring.
|
|
|
|
03-13-2012
|
1.50
|
Finished priming and installing wing tip frames
|
|
|
|
03-12-2012
|
1.50
|
Fitted, primed and epoxied final wing tip frames i
|
|
|
|
03-11-2012
|
3.50
|
Fitted and installed wing tip frame, fitted other
|
|
|
|
03-10-2012
|
2.00
|
Finished installing nut plates in the wing tips.
|
|
|
|
03-09-2012
|
1.25
|
Machined wing tips
|
|
|
|
03-07-2012
|
4.00
|
Worked with joel on main harness.
|
Details
|
|
|
03-06-2012
|
1.50
|
Fitted and drilled right fiberglass wingtip to the
|
|
|
|
03-05-2012
|
1.00
|
Fitted fiberglass wing tips to wings
|
|
|
|
03-03-2012
|
1.25
|
Finished mpunting wingtip directional/strobe light
|
|
|
|
03-01-2012
|
1.50
|
Mounted wingtip direction/strobe lights
|
|
|
|
02-29-2012
|
1.50
|
Finished mounting wingtip lens covers
|
|
|
|
02-28-2012
|
2.50
|
Fitted wingtip light lens covers
|
|
|
|
02-27-2012
|
2.00
|
Finished rudder pedals and brake lines
|
|
|
|
02-26-2012
|
1.00
|
Fitted rudder support
|
|
|
|
02-12-2012
|
2.00
|
Installed the rudder pedals, fitted and primed the
|
|
|
|
02-11-2012
|
3.00
|
Finished fuel lines, installed the emergency bipas
|
|
|
|
02-10-2012
|
2.50
|
Routed fuel lines in the cockpit
|
|
|
|
02-08-2012
|
2.00
|
Fabricated fuel lines for the cockpit around the f
|
|
|
|
02-07-2012
|
2.50
|
Cockpit fuel lines
|
|
|
|
02-06-2012
|
2.50
|
Finsished installing the brake lines, starting fab
|
|
|
|
02-05-2012
|
1.75
|
primed and painted brake pedals in preparation for
|
|
|
|
02-04-2012
|
3.00
|
Worked on heat vent control cable, drilled the bra
|
|
|
|
01-31-2012
|
2.00
|
Final fitting of engine control cables to the subp
|
|
|
|
01-30-2012
|
2.00
|
Secured primer lines, finished assembling engine f
|
|
|
|
01-29-2012
|
5.00
|
Installed the primer system and the fuel line cont
|
|
|
|
01-26-2012
|
2.00
|
Fitted cockpit side cover, primed and painted.
|
|
|
|
01-24-2012
|
2.00
|
Finished antenna installation, Finished running en
|
|
|
|
01-23-2012
|
2.50
|
Installed engine control cables, Installed antenna
|
|
|
|
01-18-2012
|
2.75
|
Installed comm antenna doubler, made doubler for t
|
|
|
|
01-17-2012
|
2.75
|
Made doubler for comm antenna
|
|
|
|
01-16-2012
|
2.00
|
Installed ADSB GPS antenna, and the comm whip ante
|
|
|
|
01-15-2012
|
3.00
|
Installed primer pump for fuel system
|
|
|
|
01-12-2012
|
1.00
|
Installed ADSB antenna
|
|
|
|
01-11-2012
|
1.50
|
Installed engine grounding cable
|
|
|
|
01-10-2012
|
2.75
|
Installed diodes on solenoids, finished air box an
|
|
|
|
01-09-2012
|
1.75
|
Installed flexible conduit and brackets under the
|
|
|
|
01-08-2012
|
2.75
|
Fabricated brackets to hold wiring conduit under t
|
|
|
|
01-07-2012
|
5.50
|
Mounted grounding strap, installed main firewall p
|
|
|
|
01-04-2012
|
3.50
|
Sanding and finishing cowling
|
|
|
|
01-03-2012
|
2.00
|
Installed the brake fluid reseviour and worked on
|
|
|
|
01-02-2012
|
2.50
|
Primed and painted the small panel pieces that wil
|
|
|
|
01-01-2012
|
5.00
|
Worked with Joel running Advanced Flight Systems e
|
|
|
|
12-31-2011
|
6.50
|
Painted cowling, started prepping the panel.
|
|
|
|
12-29-2011
|
2.00
|
Cowling priming
|
|
|
|
12-28-2011
|
1.75
|
Cowling paint prep
|
|
|
|
12-26-2011
|
4.00
|
Epoxy filling, sanding, made custom cowling pin co
|
|
|
|
12-25-2011
|
1.75
|
Epoxy filling and sanding
|
|
|
|
12-24-2011
|
1.25
|
Epoxy filled cowling imperfections.
|
|
|
|
12-23-2011
|
1.25
|
Installed finished baffles
|
|
|
|
12-21-2011
|
1.00
|
Painted baffles
|
|
|
|
12-20-2011
|
1.00
|
Painted baffles
|
|
|
|
12-19-2011
|
1.50
|
Painted plenum
|
|
|
|
12-18-2011
|
0.50
|
Attaching wiring harness brackets to baffles
|
|
|
|
12-16-2011
|
1.00
|
Priming baffles
|
|
|
|
12-15-2011
|
2.00
|
Plenum sanding and priming
|
|
|
|
12-14-2011
|
2.50
|
Plenum and baffles
|
|
|
|
12-13-2011
|
2.00
|
Plenum and Baffles
|
|
|
|
12-12-2011
|
2.00
|
Pleunum and baffles
|
|
|
|
12-11-2011
|
4.00
|
Baffles and plenum installation
|
|
|
|
12-10-2011
|
4.00
|
Baffles and plenum
|
|
|
|
12-09-2011
|
1.50
|
Baffle and plenum
|
|
|
|
12-06-2011
|
3.00
|
Plenum and cowling
|
|
|
|
12-05-2011
|
1.50
|
Plenum and baffle work
|
|
|
|
12-04-2011
|
2.00
|
Plenum baffle fabrication
|
|
|
|
12-03-2011
|
2.25
|
Plenum baffle fabrication
|
|
|
|
12-02-2011
|
1.75
|
Finished oil cooler plenum baffle
|
|
|
|
12-01-2011
|
2.25
|
Oil cooler baffle fabrication
|
|
|
|
11-30-2011
|
2.00
|
Plenum and cowling work
|
|
|
|
11-29-2011
|
3.25
|
Plenum and baffle work
|
|
|
|
11-28-2011
|
2.25
|
Plenum baffle fabrication and installation
|
|
|
|
11-27-2011
|
2.25
|
Plenum baffle fabrication
|
|
|
|
11-26-2011
|
3.75
|
Cowling, plenum
|
|
|
|
11-25-2011
|
3.50
|
Cowling, started plenum installation
|
|
|
|
11-24-2011
|
2.25
|
Cowling inlet ring installation
|
|
|
|
11-22-2011
|
2.50
|
Cowling assembly
|
|
|
|
11-20-2011
|
3.50
|
Final cowling assembly
|
|
|
|
11-19-2011
|
3.50
|
Upper cowling work
|
|
|
|
11-18-2011
|
2.75
|
Upper cowling work
|
|
|
|
11-17-2011
|
1.00
|
Upper cowling work
|
|
|
|
11-16-2011
|
3.00
|
Upper cowling work
|
|
|
|
11-14-2011
|
2.25
|
Cowlijg work
|
Details
|
|
|
11-01-2011
|
2.00
|
Cut cowling pins, continued working on mounting ne
|
|
|
|
10-31-2011
|
1.50
|
Continued work on the cowling installation
|
|
|
|
10-30-2011
|
2.00
|
Replacing hinges in cowling. Joel stopped to give
|
|
|
|
10-29-2011
|
4.75
|
Finished spinner, worked on cowling
|
Details
|
|
|
10-28-2011
|
1.75
|
Spinner assembly
|
|
|
|
10-27-2011
|
2.25
|
Primed spinner backplate, fitting backplate
|
|
|
|
10-25-2011
|
3.00
|
Spinner installation, back cover plate fabrication
|
|
|
|
10-22-2011
|
5.75
|
Installing and fitting spinner.
|
Details
|
|
|
10-21-2011
|
1.50
|
Machined and primed spinner backplates
|
|
|
|
10-19-2011
|
1.50
|
Replacing cowling hinges
|
Details
|
|
|
10-18-2011
|
2.00
|
Started working on side hinges between top and bot
|
|
|
|
10-17-2011
|
2.25
|
Finished and installed the airbox
|
Details
|
|
|
10-15-2011
|
8.00
|
Finished the air box
|
Details
|
|
|
10-13-2011
|
2.00
|
Work on airbox
|
|
|
|
10-12-2011
|
2.50
|
Finished the cowling oil door
|
|
|
|
10-09-2011
|
1.00
|
Cowling oil door
|
|
|
|
10-05-2011
|
1.75
|
Cowling oil door
|
|
|
|
10-04-2011
|
1.50
|
Air box transition, fiberglass work on the oil doo
|
|
|
|
10-03-2011
|
1.50
|
Cowling oil door, air box inlet
|
Details
|
|
|
10-02-2011
|
2.00
|
Finish to oil door, fitted airbox transition
|
|
|
|
10-01-2011
|
3.00
|
Oil door, airbox transition
|
Details
|
|
|
09-28-2011
|
3.50
|
Fitting airbox and transition
|
|
|
|
09-27-2011
|
2.75
|
Mounted inlet ring on cowling
|
Details
|
|
|
09-26-2011
|
2.25
|
Fitting the airbox to the carb and lower cowling
|
|
|
|
09-24-2011
|
4.75
|
Cowling work
|
Details
|
|
|
09-23-2011
|
1.75
|
Riveted cowling hinges to cowling
|
|
|
|
09-21-2011
|
2.00
|
Finished fitting upper cowling
|
Details
|
|
|
09-20-2011
|
2.50
|
Fitting upper cowling
|
|
|
|
09-19-2011
|
2.50
|
Fitting upper cowling
|
|
|
|
09-18-2011
|
2.75
|
Cowling fitting
|
Details
|
|
|
09-15-2011
|
2.00
|
Final fitting of lower cowling against firewall
|
|
|
|
09-14-2011
|
2.00
|
Fitting hinges on the lower cowling
|
|
|
|
09-12-2011
|
1.50
|
Cowling fitting
|
|
|
|
09-11-2011
|
2.25
|
Cowling fitting
|
|
|
|
09-05-2011
|
1.50
|
Initial fitting of cowling
|
|
|
|
08-29-2011
|
1.75
|
Mounted the ADS-B antenna
|
|
|
|
08-26-2011
|
0.75
|
Finished mounting the ADS-B unit
|
|
|
|
08-24-2011
|
1.50
|
ELT bracket
|
Details
|
|
|
08-20-2011
|
3.75
|
Vertical power unit
|
Details
|
|
|
08-19-2011
|
1.50
|
Mounting bracket for the ELT antenna
|
|
|
|
08-18-2011
|
2.00
|
ELT install
|
|
|
|
08-17-2011
|
2.00
|
Pacific Coast Avionics, Vans
|
Details
|
|
|
08-15-2011
|
0.50
|
Finished all wheel pant fitting
|
|
|
|
08-14-2011
|
4.50
|
Wheel pants
|
Details
|
|
|
08-08-2011
|
1.25
|
More fitting of front wheel pant
|
|
|
|
08-03-2011
|
1.75
|
Fitting the front wheel pant
|
|
|
|
08-02-2011
|
2.25
|
Wheel pants
|
Details
|
|
|
08-01-2011
|
1.50
|
Fitting wheel pants, brake lines
|
|
|
|
07-26-2011
|
1.00
|
Fitting wheel pants
|
|
|
|
07-25-2011
|
1.50
|
Fitting wheel pants
|
|
|
|
07-24-2011
|
2.75
|
Fiberglass work on wheel pants
|
|
|
|
07-22-2011
|
0.50
|
Fiberglass work on wheel pants
|
|
|
|
07-21-2011
|
1.00
|
Fiberglass work on wheel pants
|
|
|
|
07-20-2011
|
0.75
|
Fiberglass work on wheel pants
|
|
|
|
07-19-2011
|
1.50
|
Fiberglass work on wheel pants
|
|
|
|
07-17-2011
|
2.75
|
Fitting wheel pants
|
|
|
|
07-14-2011
|
1.50
|
Fitting wheel pants
|
|
|
|
07-12-2011
|
8.00
|
Installed engine
|
Details
|
|
|
07-11-2011
|
1.00
|
Fitting wheel pants
|
|
|
|
07-09-2011
|
2.00
|
Misc
|
Details
|
|
|
07-08-2011
|
0.75
|
Autopilot servo installation in the right wing
|
|
|
|
07-07-2011
|
2.25
|
Maint landing gear, autopilot
|
Details
|
|
|
07-05-2011
|
1.50
|
Landing gear
|
Details
|
|
|
07-04-2011
|
3.00
|
Finished installing wheel pant brackets
|
|
|
|
07-02-2011
|
2.00
|
Landing gear
|
Details
|
|
|
06-25-2011
|
4.25
|
Misc landing gear work
|
Details
|
|
|
06-22-2011
|
0.50
|
Moved plane out of the shop
|
Details
|
|
|
06-20-2011
|
2.25
|
Landing gear, wheel pants
|
|
|
|
06-18-2011
|
1.00
|
Framing carport
|
|
|
|
06-17-2011
|
1.00
|
Framing carport for new airplane home
|
|
|
|
06-16-2011
|
1.00
|
|
|
|
|
06-15-2011
|
1.00
|
Firewall, landing gear
|
|
|
|
06-14-2011
|
1.75
|
Finished firewall atttachments
|
|
|
|
06-13-2011
|
2.25
|
Finished installing gascolator, heat selector box
|
|
|
|
06-11-2011
|
5.00
|
Relays, Battery box, Gascolator
|
Details
|
|
|
06-09-2011
|
2.50
|
Battery box, starter relay fitting and nutplates.
|
|
|
|
06-08-2011
|
1.75
|
Started working on the battery box.
|
|
|
|
06-07-2011
|
5.00
|
Started on forward firewall
|
Details
|
|
|
06-06-2011
|
1.25
|
Riveted rudder stops to fusalage
|
|
|
|
06-05-2011
|
3.25
|
Mounting and fitting rudder
|
|
|
|
06-01-2011
|
1.00
|
Misc cleanup and planning
|
|
|
|
05-31-2011
|
1.50
|
Primed, finished constructing manual aileron trim.
|
|
|
|
05-30-2011
|
2.00
|
Manual aileron trim control
|
|
|
|
05-24-2011
|
2.25
|
Mounting the vertical stabilizer
|
|
|
|
05-23-2011
|
1.75
|
Mounting verical stabilizer
|
|
|
|
05-22-2011
|
4.00
|
Finished adjusting horizontal stab to elevators
|
|
|
|
05-21-2011
|
1.75
|
Adjusted Elevators, drilled elevator horns
|
|
|
|
05-19-2011
|
2.25
|
Fitting Horz. stabilizer, Drilled mounting holes.
|
|
|
|
05-18-2011
|
1.75
|
Fitting Horz. Stabilizer to the rear of the plane.
|
|
|
|
05-17-2011
|
1.50
|
Riveting the rear skins
|
Details
|
|
|
05-16-2011
|
1.25
|
Test fitting horizontal stabilizer
|
|
|
|
05-14-2011
|
4.50
|
Landing gear
|
|
|
|
05-13-2011
|
2.00
|
landing gear
|
|
|
|
05-10-2011
|
1.25
|
Landing gear
|
|
|
|
05-09-2011
|
1.25
|
Landing gear
|
|
|
|
05-09-2011
|
2.00
|
Fitting and mounting the vertical stabilizer
|
|
|
|
05-08-2011
|
2.00
|
Started working on landing gear preparation
|
|
|
|
05-03-2011
|
2.00
|
Waiting for engine, started on wheels and brakes
|
|
|
|
05-02-2011
|
1.50
|
Sanded cured fiberglass filler around windscreen
|
|
|
|
05-02-2011
|
1.25
|
Fiberglass and engine mount
|
Details
|
|
|
04-28-2011
|
2.25
|
Drilled holes in firewall for engine controls
|
|
|
|
04-26-2011
|
2.00
|
Installed engine mount
|
|
|
|
04-25-2011
|
2.00
|
Canopy fiberglass work
|
|
|
|
04-24-2011
|
1.25
|
Canopy fiberglass work
|
|
|
|
04-22-2011
|
2.25
|
Canopy fiberglass work
|
|
|
|
04-20-2011
|
3.00
|
Installed fiberglass cloth and epoxy
|
|
|
|
04-19-2011
|
2.25
|
First coat of fiberglass
|
|
|
|
04-18-2011
|
1.25
|
Started working on the fiberglass, 1st layer
|
|
|
|
04-17-2011
|
3.00
|
Final assembly of the canopy
|
|
|
|
04-15-2011
|
4.50
|
Final assembly of the canopy
|
|
|
|
04-13-2011
|
2.00
|
Assembling the canopy
|
Details
|
|
|
04-12-2011
|
1.75
|
Painted windscreen edge to hide fiberglass
|
|
|
|
04-11-2011
|
1.50
|
Priming and painting canopy parts
|
|
|
|
04-10-2011
|
1.75
|
Priming and painting canopy parts
|
|
|
|
04-07-2011
|
2.25
|
Primed, painted canopy assembly
|
|
|
|
04-06-2011
|
1.50
|
Primed canopy parts
|
|
|
|
04-05-2011
|
2.50
|
Dimantled canopy to prime and paint
|
Details
|
|
|
04-04-2011
|
1.50
|
Finially finished fitting the canopy
|
|
|
|
04-03-2011
|
2.25
|
Fitting rear skirts
|
Details
|
|
|
04-02-2011
|
4.75
|
Fitting canopy rear skirts
|
|
|
|
04-01-2011
|
2.00
|
Fitting side canopy side skirts
|
|
|
|
03-30-2011
|
1.75
|
Fitted and drilled new side skins to the canopy fr
|
|
|
|
03-27-2011
|
2.00
|
Drilled and fitted inside canopy skirt to new fram
|
|
|
|
03-26-2011
|
4.25
|
Drilling and fitting canopy to new frame.
|
|
|
|
03-21-2011
|
0.75
|
Fitting old canopy to new canopy frame.
|
|
|
|
03-20-2011
|
1.00
|
Fitting new canopy frame
|
|
|
|
03-19-2011
|
7.00
|
Fitting new canopy frame
|
|
|
|
03-18-2011
|
3.00
|
Picked up new canopy frame from Vans.
|
|
|
|
03-14-2011
|
1.75
|
Adjusted my new canopy frame
|
|
|
|
03-13-2011
|
3.25
|
Continue adjusting the canopy for a good fit.
|
|
|
|
03-12-2011
|
1.00
|
Drilling new anchor blocks
|
|
|
|
03-10-2011
|
1.25
|
Refitting canopy after the frame weld.
|
|
|
|
03-08-2011
|
0.75
|
Reinstalled the canopy after it was welded
|
|
|
|
03-06-2011
|
1.25
|
Canopy fitting
|
Details
|
|
|
03-05-2011
|
3.00
|
Fitting rear canopy skirts
|
|
|
|
03-03-2011
|
2.25
|
Fitted rear skirts to canopy and side skirts
|
|
|
|
03-02-2011
|
1.25
|
Started fitting the rear canopy skirts
|
|
|
|
03-01-2011
|
1.75
|
Side skirts, rear skirts
|
Details
|
|
|
02-24-2011
|
1.00
|
More time fitting side skirts
|
|
|
|
02-23-2011
|
2.50
|
Side steps, side skirts
|
Details
|
|
|
02-22-2011
|
2.50
|
Side steps
|
Details
|
|
|
02-21-2011
|
0.75
|
Deburred side step rivet holes and mounting hole
|
|
|
|
02-20-2011
|
3.50
|
External side step
|
|
|
|
02-19-2011
|
2.25
|
Worked on the external side step
|
|
|
|
02-18-2011
|
1.75
|
Machining side skirts
|
|
|
|
02-17-2011
|
1.50
|
Machining side skirt assembly
|
|
|
|
02-16-2011
|
1.50
|
Finished fitting the canopy side skirts
|
|
|
|
02-15-2011
|
2.00
|
Continue to fit the canopy side skirts
|
|
|
|
02-14-2011
|
1.00
|
Cut out the rear canopy skirts.
|
|
|
|
02-13-2011
|
2.00
|
Fitted canopy skirts
|
|
|
|
02-12-2011
|
3.00
|
Enlarged holes, canopy latch
|
Details
|
|
|
01-25-2011
|
1.75
|
791 canopy skirt brace fitting
|
|
|
|
01-24-2011
|
1.75
|
791 , 759, 660
|
Details
|
|
|
01-23-2011
|
1.00
|
Finished attatching the rear canopy slide.
|
|
|
|
01-22-2011
|
6.25
|
Rear pin blocks
|
Details
|
|
|
01-20-2011
|
2.50
|
Canopy
|
Details
|
|
|
01-18-2011
|
2.25
|
Canopy work
|
Details
|
|
|
01-17-2011
|
2.00
|
Fittting canopy
|
Details
|
|
|
01-16-2011
|
2.75
|
Fitting canopy to windshield
|
|
|
|
01-15-2011
|
5.00
|
Drilled, clecoed, and fitted canopy
|
|
|
|
01-14-2011
|
0.75
|
Windshield fitting and sanding
|
|
|
|
01-13-2011
|
1.75
|
Trimming of front windshield
|
|
|
|
01-12-2011
|
2.00
|
More canopy trimming
|
|
|
|
01-11-2011
|
1.75
|
Fitting canopy frame to canopy
|
|
|
|
01-11-2011
|
2.25
|
Canopy frame to canopy fitting
|
Details
|
|
|
01-09-2011
|
2.50
|
Canopy frame
|
|
|
|
01-06-2011
|
1.75
|
Fitting canopy frame
|
|
|
|
01-04-2011
|
2.00
|
Additional fitting of the canopy frame.
|
|
|
|
01-03-2011
|
1.50
|
Riveted the 762 canopy slide rail, fitted canopy
|
Details
|
|
|
01-01-2011
|
3.75
|
C-762 canopy slide rail, C-661 slide block
|
Details
|
|
|
12-31-2010
|
0.75
|
Roller assembly, canopy tracks
|
Details
|
|
|
12-29-2010
|
1.50
|
Finished riveting the forward top skin
|
|
|
|
12-27-2010
|
2.25
|
Riveting the forward top skin
|
Details
|
|
|
12-26-2010
|
3.00
|
Fitted 643 canopy brace, fitted forward top skin
|
|
|
|
12-25-2010
|
3.25
|
Fitted and installed WD-641 canopy roll bar
|
|
|
|
12-23-2010
|
6.50
|
Finish kit,started fitting the WD-641
|
Details
|
|
|
12-21-2010
|
1.25
|
Finished crotch strap installation
|
|
|
|
12-20-2010
|
1.25
|
Drilled, dimpled, etched and primed crotch strap B
|
|
|
|
12-19-2010
|
3.25
|
Fuel valve, started crotch strap bracket installat
|
|
|
|
12-18-2010
|
4.00
|
Finish brake lines, fuel vent line installation
|
|
|
|
12-15-2010
|
1.75
|
F793 vent brackets and SV-2 adaptor
|
|
|
|
12-14-2010
|
1.50
|
721 C&D attach angles
|
Details
|
|
|
12-04-2010
|
3.25
|
Forward fusalage assembly
|
Details
|
|
|
12-02-2010
|
1.75
|
Installed nutplates on forward fusalage
|
Details
|
|
|
12-01-2010
|
2.00
|
Forward Fusalage
|
Details
|
|
|
11-30-2010
|
2.00
|
Forward skin, attach angles.
|
Details
|
|
|
11-29-2010
|
1.50
|
Forward fusalage, fitting forward skin
|
|
|
|
11-28-2010
|
0.75
|
Forward fusalage assembly
|
|
|
|
11-27-2010
|
5.25
|
Forward fusalage
|
Details
|
|
|
11-26-2010
|
4.25
|
Brakes, vent lines
|
Details
|
|
|
11-25-2010
|
2.50
|
Installed control column pushrod, brakes.
|
Details
|
|
|
11-22-2010
|
1.50
|
Installed control column and elevator pushrod
|
|
|
|
11-21-2010
|
3.50
|
Control column/stick assembly
|
Details
|
|
|
11-20-2010
|
2.50
|
Cleaned etched and primed Pushrods
|
Details
|
|
|
11-18-2010
|
1.75
|
Pitch autopilot, SV-1 vent installation
|
Details
|
|
|
11-17-2010
|
2.00
|
Autopilot servo installation
|
Details
|
|
|
11-16-2010
|
1.25
|
Modified the bellcrank to accept the pitch servo
|
|
|
|
11-15-2010
|
1.25
|
Painted, started autopilot
|
Details
|
|
|
11-12-2010
|
2.50
|
Aft skin riveting. aft skin reinforcing rib
|
Details
|
|
|
11-11-2010
|
1.00
|
6111 aft skin reinforcing rib
|
Details
|
|
|
11-10-2010
|
1.75
|
6111 afte skin reinforcing rib, SV-1 vent
|
Details
|
|
|
11-08-2010
|
1.75
|
Fit the vent inlet to the fusalage
|
|
|
|
11-06-2010
|
4.50
|
7129 ELT bracket, Pitot static tube, rudder cables
|
Details
|
|
|
11-05-2010
|
2.25
|
Landing gear mounts, 7129 ELT bracket
|
Details
|
|
|
11-03-2010
|
2.00
|
Mounting landing gear mounts
|
Details
|
|
|
10-31-2010
|
3.00
|
Interior paint
|
Details
|
|
|
10-30-2010
|
2.50
|
Primed and painted
|
Details
|
|
|
10-28-2010
|
2.00
|
Prepped plane for Int priming and painting
|
|
|
|
10-26-2010
|
2.75
|
Prepped for interior prime/paint
|
Details
|
|
|
10-25-2010
|
1.00
|
Watched George Orndoff video on fusalage const.
|
|
|
|
10-24-2010
|
2.25
|
Finished landing gear
|
Details
|
|
|
10-22-2010
|
1.75
|
Fitting landing gear bracket
|
|
|
|
10-20-2010
|
2.25
|
Landing gear
|
Details
|
|
|
10-19-2010
|
2.00
|
Fit landing gear bracket to landing gear
|
|
|
|
10-18-2010
|
1.50
|
Primed and installed the flap actuator covers
|
|
|
|
10-17-2010
|
2.00
|
Mounted the flap actuator motor
|
|
|
|
10-16-2010
|
2.75
|
Flap actuator channel
|
Details
|
|
|
10-15-2010
|
3.00
|
Mounted the flap actuator assembly
|
|
|
|
10-13-2010
|
2.00
|
Manufactured misc. parts for the flap actuator
|
|
|
|
10-12-2010
|
1.75
|
982, Electric flaps
|
Details
|
|
|
10-11-2010
|
1.75
|
Primed and fitted 982 heat baffle assembly
|
|
|
|
10-10-2010
|
2.00
|
Fit the 982 heat baffle assembly.
|
Details
|
|
|
10-08-2010
|
2.50
|
Machined 982 heat baffle and assoc. parts
|
|
|
|
10-07-2010
|
1.50
|
Assembled the seats
|
|
|
|
10-06-2010
|
1.50
|
Primed all seat parts
|
|
|
|
10-05-2010
|
1.50
|
Wash and etched seat parts
|
|
|
|
10-04-2010
|
1.75
|
Drilling, deburring seats
|
|
|
|
10-03-2010
|
1.50
|
Drilling, deburring seat parts
|
|
|
|
10-02-2010
|
6.00
|
Machineing pieces for the seats
|
|
|
|
09-30-2010
|
1.00
|
Finished the tunnel cover between the seats
|
|
|
|
09-29-2010
|
1.00
|
Misc work on the inside of the fuselage
|
|
|
|
09-28-2010
|
2.00
|
Deburred and dimpled 7112 top skin and frames
|
|
|
|
09-25-2010
|
4.25
|
Seat bottoms
|
Details
|
|
|
09-24-2010
|
1.00
|
Prepared seat bottoms for installation
|
|
|
|
09-23-2010
|
2.00
|
Baggage area
|
Details
|
|
|
09-22-2010
|
2.00
|
Baggage area
|
Details
|
|
|
09-21-2010
|
2.00
|
Rear baggage compartment floor
|
|
|
|
09-20-2010
|
2.25
|
F7112 top skin fitting
|
|
|
|
09-19-2010
|
4.50
|
Rudder/brake assembly
|
Details
|
|
|
09-16-2010
|
1.00
|
Fitting rudder/brake assembly
|
|
|
|
09-12-2010
|
2.00
|
Rudder and brake assembly
|
|
|
|
09-11-2010
|
3.50
|
Started fabricating the brake/rudder assembly
|
|
|
|
09-10-2010
|
5.00
|
Visit to Vans to order the finishing kit
|
|
|
|
09-09-2010
|
2.00
|
Started brake/rudder assembly
|
|
|
|
09-07-2010
|
2.00
|
Finished installling and riveting the 712 bulkhead
|
|
|
|
09-06-2010
|
6.50
|
F635 Bellcrank, 712 bulkhead
|
Details
|
|
|
09-05-2010
|
2.00
|
Finished the 705 assembly
|
|
|
|
09-02-2010
|
0.75
|
Primed 705 bulkhead parts
|
|
|
|
09-01-2010
|
1.50
|
Misc fuselage work
|
Details
|
|
|
08-31-2010
|
2.00
|
Misc work on the 905 bulkhead
|
|
|
|
08-30-2010
|
2.00
|
Misc work on the 905 bulkhead
|
|
|
|
08-28-2010
|
2.50
|
fuselage work
|
Details
|
|
|
08-26-2010
|
3.50
|
Riveted on the firewall
|
Details
|
|
|
08-25-2010
|
2.25
|
Started fuselage
|
Details
|
|
|
08-24-2010
|
2.00
|
Finished the lower skin riveting
|
Details
|
|
|
08-23-2010
|
0.50
|
Right wing, lower skin riveting
|
|
|
|
08-22-2010
|
2.00
|
Right wing riveting
|
Details
|
|
|
08-21-2010
|
1.50
|
Bottom skin, right wing riveting
|
|
|
|
08-19-2010
|
2.00
|
Left wing bottom skin riveting
|
|
|
|
08-18-2010
|
2.25
|
Left wing bottom skin riveting
|
|
|
|
08-17-2010
|
0.75
|
Dimpled frames for bottom skin oin the left wing
|
|
|
|
08-05-2010
|
1.50
|
Countersinking on upper wing spar
|
|
|
|
08-04-2010
|
1.50
|
Wings
|
Details
|
|
|
08-03-2010
|
3.25
|
Wings
|
Details
|
|
|
08-02-2010
|
3.00
|
left wing skin
|
Details
|
|
|
08-01-2010
|
4.00
|
Bottom skins
|
Details
|
|
|
07-31-2010
|
3.00
|
Pitot tube
|
Details
|
|
|
07-30-2010
|
2.00
|
Attached and adjusted right aileron
|
|
|
|
07-29-2010
|
2.00
|
Left aileron installation
|
|
|
|
07-23-2010
|
0.50
|
Aileron flaps
|
|
|
|
07-21-2010
|
0.50
|
Attached inboard aileron brackets
|
|
|
|
07-15-2010
|
2.00
|
Aileron mounting brackets
|
Details
|
|
|
07-14-2010
|
2.00
|
Finished and installed last aileron pushrod
|
|
|
|
07-13-2010
|
1.50
|
Interior wing work
|
Details
|
|
|
07-12-2010
|
1.50
|
Left wing bellcrank assembly
|
Details
|
|
|
07-11-2010
|
2.00
|
Assembled the pushrod bellcrank assembly
|
|
|
|
07-10-2010
|
4.50
|
Pushrod bellcrank assembly
|
Details
|
|
|
07-09-2010
|
2.00
|
Finished riviting the flap gap fairings
|
|
|
|
07-08-2010
|
2.50
|
Riviting on flap and aileron gap fairings
|
|
|
|
07-08-2010
|
4.50
|
Conduit, wiring
|
Details
|
|
|
07-07-2010
|
3.00
|
Aileron and flap gap fairings.
|
Details
|
|
|
07-06-2010
|
3.00
|
Machining aileron and flap gap fairings
|
|
|
|
06-28-2010
|
1.50
|
Conduit bracket install
|
Details
|
|
|
06-27-2010
|
2.50
|
Conduit brackets
|
Details
|
|
|
06-26-2010
|
2.50
|
Conduit bracket
|
Details
|
|
|
06-24-2010
|
2.50
|
AOA Sensor Installation
|
Details
|
|
|
06-22-2010
|
1.50
|
Completed landing light
|
Details
|
|
|
06-21-2010
|
2.00
|
Landing light
|
Details
|
|
|
06-20-2010
|
4.00
|
Landing light
|
Details
|
|
|
06-17-2010
|
3.00
|
Aileron brackets
|
Details
|
|
|
06-15-2010
|
2.00
|
Aileron brackets
|
Details
|
|
|
06-09-2010
|
2.00
|
Aileron mounting brackets
|
Details
|
|
|
06-06-2010
|
2.00
|
Finished attaching fuel sender
|
Details
|
|
|
06-05-2010
|
2.00
|
Installed the fuel pickup tube
|
Details
|
|
|
06-04-2010
|
1.50
|
Assembled the fuel pickup tube
|
Details
|
|
|
06-02-2010
|
2.00
|
Fuel sender
|
Details
|
|
|
06-01-2010
|
1.00
|
Removed the fuel sender units from the boxes. Pour
|
|
|
|
05-31-2010
|
6.00
|
Finished arranging the shop and inventoring the qu
|
|
|
|
05-30-2010
|
0.50
|
Washed oil off of wings
|
|
|
|
05-30-2010
|
0.50
|
Washed oil off of fuselage
|
|
|
|
05-29-2010
|
3.00
|
Rearranged shop to store wings and fuselage
|
|
|
|
05-27-2010
|
2.50
|
Built fuselage stand
|
|
|
|
05-25-2010
|
10.00
|
Picked up quickbuild from Vans
|
|
|
|
05-24-2010
|
2.00
|
Built a wing stand
|
|
|
|
05-20-2010
|
1.00
|
Finished fiberglassing empennage tips
|
|
|
|
05-19-2010
|
1.50
|
Made balsa ends for the fiberglass tips of the emp
|
|
|
|
05-18-2010
|
1.25
|
Finished installing counterweights on elevators
|
|
|
|
05-16-2010
|
2.00
|
Rivited the trim tab and attached counterweights
|
|
|
|
05-10-2010
|
2.00
|
Rivited and assembled the trim tab.
|
|
|
|
05-09-2010
|
1.25
|
Machined trim tab parts
|
|
|
|
05-08-2010
|
1.50
|
Cut out foam and wood trim pieces, primed trim tab
|
|
|
|
05-08-2010
|
1.00
|
Built and installed a storage shelf in the shop
|
|
|
|
05-01-2010
|
2.00
|
attached the trailing edge W/tank sealant to LE
|
|
|
|
04-30-2010
|
2.00
|
Finished riviting the left elevator
|
|
|
|
04-29-2010
|
3.50
|
Assembled parts of the left elevator
|
|
|
|
04-28-2010
|
2.00
|
Washed, etched, and primed the left elevator parts
|
|
|
|
04-27-2010
|
3.00
|
Deburred and dimpled L. elevator skin and Misc par
|
|
|
|
04-26-2010
|
2.00
|
Drilled fitted stiffeners to L, elevator
|
|
|
|
04-25-2010
|
3.00
|
Started on L. Elevator. Fitted, drilled spar. tip
|
|
|
|
04-24-2010
|
3.00
|
Finished R. elevator. started L. elevator
|
|
|
|
04-21-2010
|
2.50
|
Finished riviting R. elevator skin
|
|
|
|
04-20-2010
|
1.00
|
Rivited spar to R. elevator
|
|
|
|
04-19-2010
|
2.00
|
Rivited R. elevator spar, frames to skin
|
|
|
|
04-18-2010
|
2.00
|
Dimpled, washed, etched and primed R. elevator
|
|
|
|
04-16-2010
|
2.00
|
Drilled, deburred r. elevator spar and tips
|
|
|
|
04-15-2010
|
2.00
|
Dimpled elevator stiffiners. Drilled spar to tip s
|
|
|
|
04-14-2010
|
1.50
|
Finished bending trailing edge of the rudder
|
|
|
|
04-13-2010
|
2.00
|
Finished machining elevator stiffeners, deburred
|
|
|
|
04-11-2010
|
1.50
|
Machined and started fitting stiffeners to R. elev
|
|
|
|
04-10-2010
|
1.50
|
Finished riviting skins, glued trailing edge of ru
|
|
|
|
04-10-2010
|
1.00
|
Cut out and machined right elevator stiffeners
|
|
|
|
04-09-2010
|
3.50
|
Rivited rudder skins
|
|
|
|
04-08-2010
|
2.00
|
washed, etched, primed. started assem. of rudder
|
|
|
|
04-07-2010
|
2.00
|
Finished drilling and dimpling the rudder skins
|
|
|
|
04-04-2010
|
2.00
|
finished machining and dimpling spars, frames of r
|
|
|
|
04-03-2010
|
4.00
|
Primed, rivited rudders stiffeners, drilled, debur
|
|
|
|
04-01-2010
|
1.00
|
Deburred and dimpled the rudder skins
|
|
|
|
03-31-2010
|
2.00
|
Drilled and deburred rudder stiffeners to the skin
|
|
|
|
03-29-2010
|
1.50
|
Cut out and machined rudder stiffeners.
|
|
|
|
03-28-2010
|
2.50
|
Completed the vertical stabilizer
|
|
|
|
03-27-2010
|
2.00
|
Rivited the rear spar on the vertical stabilizer
|
|
|
|
03-25-2010
|
1.50
|
Primed the vertical stabilizer
|
|
|
|
03-24-2010
|
1.50
|
Dimpled the vertical stabilizer skin, washed and e
|
|
|
|
03-24-2010
|
1.00
|
Built a storage platform for parts storage in the
|
|
|
|
03-23-2010
|
1.50
|
Drilled, and deburred the vertical stabilizer
|
|
|
|
03-22-2010
|
2.00
|
Finished the horizontal stabilizer and assembled t
|
|
|
|
03-21-2010
|
4.00
|
Finished riviting the spars and frames to the hori
|
|
|
|
03-20-2010
|
4.00
|
Riveted the spars and frames to the horizontal sta
|
|
|
|
03-16-2010
|
2.50
|
Rivited horizontal spars together. Started rivitin
|
|
|
|
03-14-2010
|
4.00
|
Finished dimpling and prepping skins, cleaned and
|
|
|
|
03-13-2010
|
1.00
|
Finished the paint table
|
|
|
|
03-13-2010
|
5.00
|
Countersinking on spars and dimpling feames and sk
|
|
|
|
03-11-2010
|
1.50
|
Constructed a paint table for priming parts
|
|
|
|
03-06-2010
|
5.00
|
Assembled the horizontal stabilizer spars and ribs
|
|
|
|
03-05-2010
|
2.00
|
debured and cleaned up the ribs
|
|
|
|
03-04-2010
|
1.50
|
Fabricated the HS 908L and 908R attach angles
|
|
|
|
02-22-2010
|
1.50
|
Empennage inventory
|
Details
|
|
|
02-17-2010
|
6.00
|
Went to vans to order quick build and pick up empa
|
Details
|
|