Barrys RV-9A Project
Work Logs Found: 680
Category Work Time: 1646 Hours
 Date
Hours
Work Log Summary

Details

 05-11-2013
6.00
Calibrated fuel tanks on EFIS. First engine start.

 05-10-2013
1.80
Flew with Mike Seager for transition training.

 04-28-2013
2.50
Finished installing interior.

 04-27-2013
8.00
Finished installing the interior. Weighed the plan

 04-23-2013
2.50
Installed interior.

 04-19-2013
2.00
Modified cover panel around elevator trim cable. C

 04-15-2013
1.75
Installed more interior.

 04-14-2013
2.50
Started final assembly.

 04-13-2013
4.00
Misc. work.

 04-12-2013
2.00
Finished installing plenum and baffling.

 04-11-2013
1.50
Finished installing baffles around plenum.

 04-09-2013
2.75
Finished installing control sticks.

 04-07-2013
3.00
Installed control sticks and PTT wires.

 04-06-2013
4.50
Finished fixing servos. Cleaned up wiring.

 04-04-2013
1.50
Finialized autopilot wiring.

 04-03-2013
2.00
Finialized autopilot wiring.

 03-30-2013
7.00
Wiring work.

 03-28-2013
2.00
Reinstalled airbox after cleaning. Final hookup of

 03-25-2013
5.25
Troubleshooting wiring. Started fitting interior.

 03-24-2013
3.50
Misc. work

 03-23-2013
4.00
Aligned control surfaces. Final plenum fitting. Wo

 03-22-2013
7.75
Aligned all control surfaces. EAA tech adviser ins

 03-20-2013
2.25
Reinstalled roll servo after reversing wires to re

 03-18-2013
1.75
Wiring work.

 03-17-2013
2.50
Wiring work,. Final installation of the canopy

 03-16-2013
5.00
Diagnosing wiring issues. Installed luggage carpet

 03-12-2013
2.25
Misc. wiring.

 03-11-2013
2.50
Emergency bipass air, fresh air ducts.

 03-10-2013
3.00
Wiring, cleanup, air vent fitting.

 03-09-2013
5.00
Misc. wiring work.

 03-06-2013
2.75
Misc. wiring work.

 03-05-2013
2.75
Diagnosing servo wiring issue.

 03-04-2013
2.25
Misc. wiring.

 03-02-2013
7.25
Panel wiring with Isaac.

 03-01-2013
3.50
Panel wiring with Isaac.

 02-27-2013
1.00
Finished painting plenum

 02-24-2013
2.75
Painted horizontal stabilizer access panel.

 02-23-2013
3.00
Painted plenum, riveted side panels, started runni

 02-21-2013
1.00
Sanded and primed plenum.

 02-19-2013
2.75
Plenum work

 02-11-2013
3.50
Plenum fiberglass work..

 02-09-2013
8.00
Helped Isaac and Chad with wiring.

 02-08-2013
4.00
Misc wiring.

 02-06-2013
3.00
Misc. wiring

 02-05-2013
2.25
Installed Advanced Flight Systems GPS puck on glar

 02-02-2013
11.00
Worked on wiring with Isaac

 01-29-2013
1.50
Modified plenum.

 01-26-2013
1.00
Painted plenum.

 01-26-2013
5.00
Modifying plenum, installed data plate.

 01-24-2013
3.50
Finished installing elevator, and did some fibergl

 01-23-2013
1.00
Installed safety wire

 01-22-2013
2.00
Installed flaps

 01-21-2013
2.75
Installed aiteron control stops.

 01-20-2013
2.50
Installed wing tips, connected directional lights.

 01-19-2013
4.00
Installed antenna and ran PTT wires to the stick.

 01-18-2013
2.75
Installed ailerons.

 01-16-2013
3.00
Wiring work.

 01-15-2013
2.75
Misc. wiring work.

 01-14-2013
2.00
Installed replacement AHRS unit.

 01-13-2013
3.75
Misc work.

 01-12-2013
4.00
Misc. work.

 01-08-2013
2.50
Installed fuel vent lines.

 01-07-2013
2.50
Completed the wing installation including torquein

 01-06-2013
3.00
Continued installing tail parts.

 01-05-2013
5.00
Installed wings on the airplane.

 01-04-2013
4.00
Installed horizontal stabilizer and vert stabilize

 12-29-2012
1.50
Removed all plastic and masking from plane. prepar

 12-28-2012
4.50
Sprayed final clearcoat on fusalage

 12-26-2012
6.00
Prepped fusalage for clear coat

 12-24-2012
1.75
Clear coat on cowling

 12-23-2012
2.25
Clear coat on cowling

 12-20-2012
1.25
Painted lower cowl

 12-19-2012
1.00
Prepped and painted upper cowling

 12-18-2012
0.75
Prepped cowling for paint

 12-17-2012
3.50
Painted blue on fusalage

 12-16-2012
1.25
Prepped fusalage to paint accent stripe

 12-15-2012
4.00
Painted fusalage

 12-14-2012
1.00
Prepped fusalage for paint

 12-13-2012
3.00
Taped off paint design on fusalage.

 12-12-2012
1.00
Installed wing tip lights

 12-09-2012
3.75
Prepped and painted cowling base coat white.

 12-08-2012
3.25
Prepped and painted base coat white on fusalage.

 12-07-2012
2.75
Sanded fusalage

 12-06-2012
6.00
Prepped and primed fusalage.

 12-05-2012
4.50
Washed and etched fusalage for paint.

 12-03-2012
0.75
Installed tail light.

 12-02-2012
3.00
Prepped fusalage for paint.

 11-29-2012
2.75
Sanding and filling plenum.

 11-26-2012
1.00
Fiberglass work on plenum.

 11-25-2012
3.00
Fiberglass work on plenum.

 11-24-2012
1.00
Fiberglass work on plenum.

 11-23-2012
1.50
Fiberglass work on plenum.

 11-22-2012
2.00
Fiberglass work on plenum.

 11-20-2012
4.00
Wiring work with Joel.

 11-19-2012
3.00
Wiring work with Joel.

 11-18-2012
2.00
Fiberglass work on plenum.

 11-17-2012
3.00
Wiring panel with Joel.

 11-13-2012
1.25
Painted canopy.

 11-12-2012
1.00
Painted canopy.

 11-11-2012
1.25
Prepped and primed canopy.

 11-10-2012
4.00
Prepped canopy for paint.

 11-09-2012
1.00
Painting.

 11-04-2012
1.00
Painting.

 11-03-2012
1.75
Painting.

 11-02-2012
2.50
Painting.

 11-01-2012
1.00
Painting.

 10-30-2012
1.00
Painted.

 10-29-2012
1.50
Painted.

 10-28-2012
2.75
Painting.

 10-27-2012
3.25
Painted wing.

 10-24-2012
1.50
Painted.

 10-23-2012
2.25
Painted.

 10-22-2012
3.00
Prepped and painted.

 10-21-2012
3.00
Prepped and painted.

 10-20-2012
7.50
fitted cowling and taped off paintdesign with Denn

 10-19-2012
1.50
Painted

 10-17-2012
4.00
Primed cowling, and painted wing.

 10-16-2012
3.00
Primed and filled cowling.

 10-15-2012
2.00
Prepping and filling the upper cowl for paint.

 10-14-2012
2.50
Painted wing

 09-29-2012
7.00
Prepped wings for priming and painting.

 09-28-2012
1.25
Painted.

 09-27-2012
2.75
Painted.

 09-26-2012
3.25
Painted.

 09-25-2012
2.50
Painted.

 09-24-2012
2.50
Painted.

 09-20-2012
3.25
Painted.

 09-19-2012
2.25
Primed and painted.

 09-18-2012
2.00
Painted.

 09-17-2012
3.75
Primed and painted.

 09-16-2012
2.00
Primed and painted.

 09-15-2012
5.00
Primed and painted.

 09-14-2012
3.00
Primed and painted.

 09-12-2012
3.00
Primed and painted.

 09-11-2012
3.00
Primed and painted.

 09-10-2012
4.00
Primed and painted.

 09-09-2012
2.00
Primed parts.

 09-08-2012
5.00
Primed and painted.

 09-07-2012
4.00
Primed all of the tail pieces.

 09-06-2012
2.25
Cleaned and etched the tail parts.

 09-01-2012
6.50
Stripped all parts and control surfaces from the a

 08-29-2012
6.00
Went to Stewart Systems to pick up paint and suppl

 08-26-2012
3.75
Spent the afternoon building a paint booth under m

 08-24-2012
1.25
Riveted nut plates on lower cowling for front gear

 08-21-2012
2.00
Fitted fiberglass upper gear fairings.

 08-19-2012
1.50
Continued working on wing root fairing.

 08-18-2012
1.25
Worked on fitting wing to fuselage fairing.

 08-17-2012
1.75
Finished holes in fuselage for flap brackets.

 08-16-2012
3.25
Cut holes in fuselage for flap arms.

 08-14-2012
2.00
Finished tank attach brackets. drilled holes in ov

 08-13-2012
3.50
Worked on wing attach brackets.

 08-12-2012
4.00
Set and drilled the wing angle of incidence. fabri

 08-11-2012
5.00
Attached wings to the fusalage.

 08-10-2012
3.75
Finished filling and sanding front windscreen fibe

 08-08-2012
1.00
Sanding and filling front windscreen fiberglass.

 08-07-2012
1.50
Windscreen fiberglass work.

 08-06-2012
2.00
Worked on final filling of the windscreen fibergla

 08-05-2012
2.00
Installed the flap motor.

 08-04-2012
2.50
Installed the flap motor and related equipment.

 08-01-2012
2.00
Installed and hooked up the main control rod to th

 07-31-2012
2.25
Finished running and supporting the elevator trim

 07-29-2012
1.25
Finished running the elevator trim cable.

 07-28-2012
6.00
Finished forward firewall, attached baggage floor,

 07-24-2012
2.00
Finished supporting all the wiring runs in the for

 07-23-2012
1.00
Finished mounting the exhaust supports.

 07-22-2012
1.50
Finished forward firewall wiring, more work on the

 07-21-2012
4.00
Installed breather line, fuel pump overflow, and h

 07-19-2012
2.25
Installed exhaust and exhaust mounting supports.

 07-18-2012
2.00
Finished filling and priming the fiberglass wing t

 07-16-2012
2.25
Finished sanding and primed the wing tips.

 07-15-2012
1.00
Sanded the wing tips.

 07-14-2012
4.50
Ran the main EFIS wiring harness through the firew

 07-12-2012
1.00
Mounted main wheel pants and fairings.

 07-11-2012
1.00
Finished installing main wheel pants, and fairings

 07-10-2012
2.00
Sanded and primed main wheel pants

 07-09-2012
2.00
Sanded and primed main wheel pants

 07-08-2012
1.50
Sanded and filled main gear wheel pants.

 07-07-2012
5.00
Main gear fairings

 07-05-2012
1.25
Main gear fairings

 07-04-2012
3.00
Main gear fairings

 07-03-2012
2.00
Main gear fairings

 06-26-2012
1.00
Main landing gear fairings

 06-24-2012
3.00
Finished installing front gear fairing, started al

 06-23-2012
2.25
Primed front gear pant

 06-20-2012
1.50
Sanded and primed front gear pant and fairing.

 06-18-2012
1.75
Sanded and primed empennage fairing.

 06-16-2012
2.00
Misc wiring work

 06-15-2012
1.00
Finished installing rudder bottom fairing with str

 06-13-2012
2.00
Finished horizontal elevator fiberglass tips.

 06-10-2012
1.00
Horizontal stabilizer fiberglass tips

 06-05-2012
1.75
Worked on horizontal stabilizer fiberglass tips

 05-21-2012
1.75
Front landing gear fairing work, Hooked up main po

 05-20-2012
1.75
Final fitting of the front gear leg fairing. Start

 05-19-2012
5.50
fitted front gear leg fairing. Installed VPX unit,

 05-18-2012
2.00
Fitted the front landing gear leg fairing.

 05-14-2012
1.50
Installed wiring runs.

 05-13-2012
4.00
Ran final magnetometer wiring. Installed flexible

 05-11-2012
2.50
Continued with wiring. Removed panel and transport

 05-09-2012
1.75
Cut the radio/transponder into the subpanel.

 05-08-2012
1.75
fitted radio/transponder in the panel

 05-07-2012
1.25
Mounting the radio/transponder stack into the pane

 05-06-2012
2.00
Fitting the radio/transponder stack into the panel

 05-05-2012
2.00
Fitting radio/transponder stack

 05-04-2012
1.75
Started assembling the radio and avionics stack.

 04-30-2012
2.00
Finished running the servo wires in the fusalage

 04-28-2012
1.75
Finished installing the ADSB wiring

 04-27-2012
1.25
Started setting up the ADSB wires to run through t

 04-26-2012
1.75
Finished wiring the ADSB connector

 04-25-2012
1.75
Finished fabricating and installing the magnetomet

 04-24-2012
1.75
Fabricated the magnetometer bracket

 04-23-2012
2.00
Finished fitting and machining the empennage fairi

 04-21-2012
3.50
Shaping and fitting the empennage fairing.

 04-19-2012
1.50
Drilled and deburred in prepareation for nutplate

 04-18-2012
2.00
Fitted and drilled the empennage fairing.

 04-17-2012
2.00
Continued working on the lower empennage gap fairi

 04-16-2012
2.00
Continued work on the empennage fairing and lower

 04-15-2012
2.00
Continued fitting the empennage fairing.

 04-14-2012
4.00
Started working empennage fairing, started assembl

 04-12-2012
2.75
Fitted the rudder fiberglass bottom. Machined, deb

 04-11-2012
2.00
Continued work on the elevator fiberglass tips. St

 04-10-2012
1.00
Installed the fiberglass tip on the rudder. starte

 04-09-2012
2.00
Started fitting the fiberglass tips on the rudder.

 04-08-2012
2.00
Ran ELT antenna wires. Started the bracket for the

 04-07-2012
1.00
Doug Drees repaired the holes in the exhaust where

 04-06-2012
3.00
Interior wiring runs.

 04-05-2012
1.75
Installed the headphone jacks in the aft part of t

 04-04-2012
1.75
finished installing Adel clamps on the forward fir

 04-02-2012
1.50
Finished attaching the vertical stabilizer to the

 04-01-2012
2.50
Ran the staic air tubing from aft forward to under

 03-31-2012
3.50
Joel came by today and we worked on the forward fi

 03-28-2012
2.00
Worked on running wires in the forward firewall ar

 03-26-2012
2.25
Ran wiring harnesses in the wing and fusalage for

 03-25-2012
3.00
Assemble wiring harnesses for the auto pilot servo

 03-24-2012
3.00
Assembled wiring harnesses for the autopilot servo

 03-23-2012
2.00
Ran wires aft for the rear directional light on th

 03-21-2012
0.75
Cleaned up wire tie mounts in the fusalage

 03-20-2012
1.50
Installed plastic wire tie mounts in the fusalage

 03-19-2012
2.50
Drilled fusalage bulkheads to install plastic grom

 03-18-2012
3.00
Installed ADSB antenna wires

 03-17-2012
2.00
Installed wire tie mounts ADSB, and grommets to ru

 03-14-2012
1.50
Finished installing wing tip lights and wiring.

 03-13-2012
1.50
Finished priming and installing wing tip frames

 03-12-2012
1.50
Fitted, primed and epoxied final wing tip frames i

 03-11-2012
3.50
Fitted and installed wing tip frame, fitted other

 03-10-2012
2.00
Finished installing nut plates in the wing tips.

 03-09-2012
1.25
Machined wing tips

 03-07-2012
4.00
Worked with joel on main harness.
Details

 03-06-2012
1.50
Fitted and drilled right fiberglass wingtip to the

 03-05-2012
1.00
Fitted fiberglass wing tips to wings

 03-03-2012
1.25
Finished mpunting wingtip directional/strobe light

 03-01-2012
1.50
Mounted wingtip direction/strobe lights

 02-29-2012
1.50
Finished mounting wingtip lens covers

 02-28-2012
2.50
Fitted wingtip light lens covers

 02-27-2012
2.00
Finished rudder pedals and brake lines

 02-26-2012
1.00
Fitted rudder support

 02-12-2012
2.00
Installed the rudder pedals, fitted and primed the

 02-11-2012
3.00
Finished fuel lines, installed the emergency bipas

 02-10-2012
2.50
Routed fuel lines in the cockpit

 02-08-2012
2.00
Fabricated fuel lines for the cockpit around the f

 02-07-2012
2.50
Cockpit fuel lines

 02-06-2012
2.50
Finsished installing the brake lines, starting fab

 02-05-2012
1.75
primed and painted brake pedals in preparation for

 02-04-2012
3.00
Worked on heat vent control cable, drilled the bra

 01-31-2012
2.00
Final fitting of engine control cables to the subp

 01-30-2012
2.00
Secured primer lines, finished assembling engine f

 01-29-2012
5.00
Installed the primer system and the fuel line cont

 01-26-2012
2.00
Fitted cockpit side cover, primed and painted.

 01-24-2012
2.00
Finished antenna installation, Finished running en

 01-23-2012
2.50
Installed engine control cables, Installed antenna

 01-18-2012
2.75
Installed comm antenna doubler, made doubler for t

 01-17-2012
2.75
Made doubler for comm antenna

 01-16-2012
2.00
Installed ADSB GPS antenna, and the comm whip ante

 01-15-2012
3.00
Installed primer pump for fuel system

 01-12-2012
1.00
Installed ADSB antenna

 01-11-2012
1.50
Installed engine grounding cable

 01-10-2012
2.75
Installed diodes on solenoids, finished air box an

 01-09-2012
1.75
Installed flexible conduit and brackets under the

 01-08-2012
2.75
Fabricated brackets to hold wiring conduit under t

 01-07-2012
5.50
Mounted grounding strap, installed main firewall p

 01-04-2012
3.50
Sanding and finishing cowling

 01-03-2012
2.00
Installed the brake fluid reseviour and worked on

 01-02-2012
2.50
Primed and painted the small panel pieces that wil

 01-01-2012
5.00
Worked with Joel running Advanced Flight Systems e

 12-31-2011
6.50
Painted cowling, started prepping the panel.

 12-29-2011
2.00
Cowling priming

 12-28-2011
1.75
Cowling paint prep

 12-26-2011
4.00
Epoxy filling, sanding, made custom cowling pin co

 12-25-2011
1.75
Epoxy filling and sanding

 12-24-2011
1.25
Epoxy filled cowling imperfections.

 12-23-2011
1.25
Installed finished baffles

 12-21-2011
1.00
Painted baffles

 12-20-2011
1.00
Painted baffles

 12-19-2011
1.50
Painted plenum

 12-18-2011
0.50
Attaching wiring harness brackets to baffles

 12-16-2011
1.00
Priming baffles

 12-15-2011
2.00
Plenum sanding and priming

 12-14-2011
2.50
Plenum and baffles

 12-13-2011
2.00
Plenum and Baffles

 12-12-2011
2.00
Pleunum and baffles

 12-11-2011
4.00
Baffles and plenum installation

 12-10-2011
4.00
Baffles and plenum

 12-09-2011
1.50
Baffle and plenum

 12-06-2011
3.00
Plenum and cowling

 12-05-2011
1.50
Plenum and baffle work

 12-04-2011
2.00
Plenum baffle fabrication

 12-03-2011
2.25
Plenum baffle fabrication

 12-02-2011
1.75
Finished oil cooler plenum baffle

 12-01-2011
2.25
Oil cooler baffle fabrication

 11-30-2011
2.00
Plenum and cowling work

 11-29-2011
3.25
Plenum and baffle work

 11-28-2011
2.25
Plenum baffle fabrication and installation

 11-27-2011
2.25
Plenum baffle fabrication

 11-26-2011
3.75
Cowling, plenum

 11-25-2011
3.50
Cowling, started plenum installation

 11-24-2011
2.25
Cowling inlet ring installation

 11-22-2011
2.50
Cowling assembly

 11-20-2011
3.50
Final cowling assembly

 11-19-2011
3.50
Upper cowling work

 11-18-2011
2.75
Upper cowling work

 11-17-2011
1.00
Upper cowling work

 11-16-2011
3.00
Upper cowling work

 11-14-2011
2.25
Cowlijg work
Details

 11-01-2011
2.00
Cut cowling pins, continued working on mounting ne

 10-31-2011
1.50
Continued work on the cowling installation

 10-30-2011
2.00
Replacing hinges in cowling. Joel stopped to give

 10-29-2011
4.75
Finished spinner, worked on cowling
Details
       

 10-28-2011
1.75
Spinner assembly

 10-27-2011
2.25
Primed spinner backplate, fitting backplate

 10-25-2011
3.00
Spinner installation, back cover plate fabrication
       

 10-22-2011
5.75
Installing and fitting spinner.
Details
       

 10-21-2011
1.50
Machined and primed spinner backplates

 10-19-2011
1.50
Replacing cowling hinges
Details

 10-18-2011
2.00
Started working on side hinges between top and bot

 10-17-2011
2.25
Finished and installed the airbox
Details
       

 10-15-2011
8.00
Finished the air box
Details
       

 10-13-2011
2.00
Work on airbox

 10-12-2011
2.50
Finished the cowling oil door
       

 10-09-2011
1.00
Cowling oil door

 10-05-2011
1.75
Cowling oil door

 10-04-2011
1.50
Air box transition, fiberglass work on the oil doo

 10-03-2011
1.50
Cowling oil door, air box inlet
Details
       

 10-02-2011
2.00
Finish to oil door, fitted airbox transition

 10-01-2011
3.00
Oil door, airbox transition
Details
     

 09-28-2011
3.50
Fitting airbox and transition

 09-27-2011
2.75
Mounted inlet ring on cowling
Details

 09-26-2011
2.25
Fitting the airbox to the carb and lower cowling

 09-24-2011
4.75
Cowling work
Details

 09-23-2011
1.75
Riveted cowling hinges to cowling

 09-21-2011
2.00
Finished fitting upper cowling
Details
       

 09-20-2011
2.50
Fitting upper cowling

 09-19-2011
2.50
Fitting upper cowling

 09-18-2011
2.75
Cowling fitting
Details
     

 09-15-2011
2.00
Final fitting of lower cowling against firewall
       

 09-14-2011
2.00
Fitting hinges on the lower cowling

 09-12-2011
1.50
Cowling fitting

 09-11-2011
2.25
Cowling fitting

 09-05-2011
1.50
Initial fitting of cowling

 08-29-2011
1.75
Mounted the ADS-B antenna

 08-26-2011
0.75
Finished mounting the ADS-B unit
     

 08-24-2011
1.50
ELT bracket
Details

 08-20-2011
3.75
Vertical power unit
Details

 08-19-2011
1.50
Mounting bracket for the ELT antenna

 08-18-2011
2.00
ELT install
       

 08-17-2011
2.00
Pacific Coast Avionics, Vans
Details

 08-15-2011
0.50
Finished all wheel pant fitting

 08-14-2011
4.50
Wheel pants
Details
       

 08-08-2011
1.25
More fitting of front wheel pant

 08-03-2011
1.75
Fitting the front wheel pant
     

 08-02-2011
2.25
Wheel pants
Details
       

 08-01-2011
1.50
Fitting wheel pants, brake lines

 07-26-2011
1.00
Fitting wheel pants

 07-25-2011
1.50
Fitting wheel pants

 07-24-2011
2.75
Fiberglass work on wheel pants

 07-22-2011
0.50
Fiberglass work on wheel pants

 07-21-2011
1.00
Fiberglass work on wheel pants

 07-20-2011
0.75
Fiberglass work on wheel pants

 07-19-2011
1.50
Fiberglass work on wheel pants

 07-17-2011
2.75
Fitting wheel pants

 07-14-2011
1.50
Fitting wheel pants
       

 07-12-2011
8.00
Installed engine
Details
     

 07-11-2011
1.00
Fitting wheel pants

 07-09-2011
2.00
Misc
Details
     

 07-08-2011
0.75
Autopilot servo installation in the right wing
     

 07-07-2011
2.25
Maint landing gear, autopilot
Details
       

 07-05-2011
1.50
Landing gear
Details
       

 07-04-2011
3.00
Finished installing wheel pant brackets

 07-02-2011
2.00
Landing gear
Details

 06-25-2011
4.25
Misc landing gear work
Details

 06-22-2011
0.50
Moved plane out of the shop
Details
       

 06-20-2011
2.25
Landing gear, wheel pants

 06-18-2011
1.00
Framing carport

 06-17-2011
1.00
Framing carport for new airplane home

 06-16-2011
1.00


 06-15-2011
1.00
Firewall, landing gear

 06-14-2011
1.75
Finished firewall atttachments
     

 06-13-2011
2.25
Finished installing gascolator, heat selector box
       

 06-11-2011
5.00
Relays, Battery box, Gascolator
Details
       

 06-09-2011
2.50
Battery box, starter relay fitting and nutplates.
     

 06-08-2011
1.75
Started working on the battery box.

 06-07-2011
5.00
Started on forward firewall
Details

 06-06-2011
1.25
Riveted rudder stops to fusalage
     

 06-05-2011
3.25
Mounting and fitting rudder
     

 06-01-2011
1.00
Misc cleanup and planning

 05-31-2011
1.50
Primed, finished constructing manual aileron trim.
     

 05-30-2011
2.00
Manual aileron trim control
     

 05-24-2011
2.25
Mounting the vertical stabilizer

 05-23-2011
1.75
Mounting verical stabilizer
     

 05-22-2011
4.00
Finished adjusting horizontal stab to elevators

 05-21-2011
1.75
Adjusted Elevators, drilled elevator horns
     

 05-19-2011
2.25
Fitting Horz. stabilizer, Drilled mounting holes.

 05-18-2011
1.75
Fitting Horz. Stabilizer to the rear of the plane.

 05-17-2011
1.50
Riveting the rear skins
Details
     

 05-16-2011
1.25
Test fitting horizontal stabilizer
     

 05-14-2011
4.50
Landing gear

 05-13-2011
2.00
landing gear

 05-10-2011
1.25
Landing gear
       

 05-09-2011
1.25
Landing gear

 05-09-2011
2.00
Fitting and mounting the vertical stabilizer

 05-08-2011
2.00
Started working on landing gear preparation

 05-03-2011
2.00
Waiting for engine, started on wheels and brakes
       

 05-02-2011
1.50
Sanded cured fiberglass filler around windscreen

 05-02-2011
1.25
Fiberglass and engine mount
Details
     

 04-28-2011
2.25
Drilled holes in firewall for engine controls
     

 04-26-2011
2.00
Installed engine mount

 04-25-2011
2.00
Canopy fiberglass work
       

 04-24-2011
1.25
Canopy fiberglass work

 04-22-2011
2.25
Canopy fiberglass work

 04-20-2011
3.00
Installed fiberglass cloth and epoxy

 04-19-2011
2.25
First coat of fiberglass
       

 04-18-2011
1.25
Started working on the fiberglass, 1st layer
     

 04-17-2011
3.00
Final assembly of the canopy
       

 04-15-2011
4.50
Final assembly of the canopy

 04-13-2011
2.00
Assembling the canopy
Details
       

 04-12-2011
1.75
Painted windscreen edge to hide fiberglass
     

 04-11-2011
1.50
Priming and painting canopy parts

 04-10-2011
1.75
Priming and painting canopy parts

 04-07-2011
2.25
Primed, painted canopy assembly

 04-06-2011
1.50
Primed canopy parts

 04-05-2011
2.50
Dimantled canopy to prime and paint
Details

 04-04-2011
1.50
Finially finished fitting the canopy
       

 04-03-2011
2.25
Fitting rear skirts
Details

 04-02-2011
4.75
Fitting canopy rear skirts

 04-01-2011
2.00
Fitting side canopy side skirts

 03-30-2011
1.75
Fitted and drilled new side skins to the canopy fr

 03-27-2011
2.00
Drilled and fitted inside canopy skirt to new fram

 03-26-2011
4.25
Drilling and fitting canopy to new frame.

 03-21-2011
0.75
Fitting old canopy to new canopy frame.

 03-20-2011
1.00
Fitting new canopy frame

 03-19-2011
7.00
Fitting new canopy frame

 03-18-2011
3.00
Picked up new canopy frame from Vans.

 03-14-2011
1.75
Adjusted my new canopy frame

 03-13-2011
3.25
Continue adjusting the canopy for a good fit.

 03-12-2011
1.00
Drilling new anchor blocks

 03-10-2011
1.25
Refitting canopy after the frame weld.

 03-08-2011
0.75
Reinstalled the canopy after it was welded

 03-06-2011
1.25
Canopy fitting
Details

 03-05-2011
3.00
Fitting rear canopy skirts
       

 03-03-2011
2.25
Fitted rear skirts to canopy and side skirts
     

 03-02-2011
1.25
Started fitting the rear canopy skirts

 03-01-2011
1.75
Side skirts, rear skirts
Details

 02-24-2011
1.00
More time fitting side skirts

 02-23-2011
2.50
Side steps, side skirts
Details
     

 02-22-2011
2.50
Side steps
Details
       

 02-21-2011
0.75
Deburred side step rivet holes and mounting hole

 02-20-2011
3.50
External side step
       

 02-19-2011
2.25
Worked on the external side step
       

 02-18-2011
1.75
Machining side skirts

 02-17-2011
1.50
Machining side skirt assembly

 02-16-2011
1.50
Finished fitting the canopy side skirts

 02-15-2011
2.00
Continue to fit the canopy side skirts
     

 02-14-2011
1.00
Cut out the rear canopy skirts.

 02-13-2011
2.00
Fitted canopy skirts

 02-12-2011
3.00
Enlarged holes, canopy latch
Details
       

 01-25-2011
1.75
791 canopy skirt brace fitting
     

 01-24-2011
1.75
791 , 759, 660
Details
       

 01-23-2011
1.00
Finished attatching the rear canopy slide.
     

 01-22-2011
6.25
Rear pin blocks
Details
       

 01-20-2011
2.50
Canopy
Details
     

 01-18-2011
2.25
Canopy work
Details

 01-17-2011
2.00
Fittting canopy
Details
     

 01-16-2011
2.75
Fitting canopy to windshield
       

 01-15-2011
5.00
Drilled, clecoed, and fitted canopy
     

 01-14-2011
0.75
Windshield fitting and sanding

 01-13-2011
1.75
Trimming of front windshield
       

 01-12-2011
2.00
More canopy trimming
       

 01-11-2011
1.75
Fitting canopy frame to canopy
       

 01-11-2011
2.25
Canopy frame to canopy fitting
Details

 01-09-2011
2.50
Canopy frame

 01-06-2011
1.75
Fitting canopy frame

 01-04-2011
2.00
Additional fitting of the canopy frame.
     

 01-03-2011
1.50
Riveted the 762 canopy slide rail, fitted canopy
Details
       

 01-01-2011
3.75
C-762 canopy slide rail, C-661 slide block
Details
       

 12-31-2010
0.75
Roller assembly, canopy tracks
Details
       

 12-29-2010
1.50
Finished riveting the forward top skin
       

 12-27-2010
2.25
Riveting the forward top skin
Details
     

 12-26-2010
3.00
Fitted 643 canopy brace, fitted forward top skin

 12-25-2010
3.25
Fitted and installed WD-641 canopy roll bar

 12-23-2010
6.50
Finish kit,started fitting the WD-641
Details

 12-21-2010
1.25
Finished crotch strap installation
     

 12-20-2010
1.25
Drilled, dimpled, etched and primed crotch strap B

 12-19-2010
3.25
Fuel valve, started crotch strap bracket installat

 12-18-2010
4.00
Finish brake lines, fuel vent line installation

 12-15-2010
1.75
F793 vent brackets and SV-2 adaptor
       

 12-14-2010
1.50
721 C&D attach angles
Details
       

 12-04-2010
3.25
Forward fusalage assembly
Details

 12-02-2010
1.75
Installed nutplates on forward fusalage
Details

 12-01-2010
2.00
Forward Fusalage
Details

 11-30-2010
2.00
Forward skin, attach angles.
Details
       

 11-29-2010
1.50
Forward fusalage, fitting forward skin
       

 11-28-2010
0.75
Forward fusalage assembly

 11-27-2010
5.25
Forward fusalage
Details
       

 11-26-2010
4.25
Brakes, vent lines
Details
       

 11-25-2010
2.50
Installed control column pushrod, brakes.
Details

 11-22-2010
1.50
Installed control column and elevator pushrod
       

 11-21-2010
3.50
Control column/stick assembly
Details
       

 11-20-2010
2.50
Cleaned etched and primed Pushrods
Details

 11-18-2010
1.75
Pitch autopilot, SV-1 vent installation
Details
       

 11-17-2010
2.00
Autopilot servo installation
Details
       

 11-16-2010
1.25
Modified the bellcrank to accept the pitch servo
     

 11-15-2010
1.25
Painted, started autopilot
Details
     

 11-12-2010
2.50
Aft skin riveting. aft skin reinforcing rib
Details
       

 11-11-2010
1.00
6111 aft skin reinforcing rib
Details

 11-10-2010
1.75
6111 afte skin reinforcing rib, SV-1 vent
Details

 11-08-2010
1.75
Fit the vent inlet to the fusalage
     

 11-06-2010
4.50
7129 ELT bracket, Pitot static tube, rudder cables
Details
       

 11-05-2010
2.25
Landing gear mounts, 7129 ELT bracket
Details
       

 11-03-2010
2.00
Mounting landing gear mounts
Details

 10-31-2010
3.00
Interior paint
Details
       

 10-30-2010
2.50
Primed and painted
Details
       

 10-28-2010
2.00
Prepped plane for Int priming and painting
     

 10-26-2010
2.75
Prepped for interior prime/paint
Details
     

 10-25-2010
1.00
Watched George Orndoff video on fusalage const.

 10-24-2010
2.25
Finished landing gear
Details
       

 10-22-2010
1.75
Fitting landing gear bracket

 10-20-2010
2.25
Landing gear
Details
       

 10-19-2010
2.00
Fit landing gear bracket to landing gear
       

 10-18-2010
1.50
Primed and installed the flap actuator covers
     

 10-17-2010
2.00
Mounted the flap actuator motor
       

 10-16-2010
2.75
Flap actuator channel
Details
       

 10-15-2010
3.00
Mounted the flap actuator assembly
     

 10-13-2010
2.00
Manufactured misc. parts for the flap actuator
     

 10-12-2010
1.75
982, Electric flaps
Details
     

 10-11-2010
1.75
Primed and fitted 982 heat baffle assembly
       

 10-10-2010
2.00
Fit the 982 heat baffle assembly.
Details

 10-08-2010
2.50
Machined 982 heat baffle and assoc. parts

 10-07-2010
1.50
Assembled the seats
       

 10-06-2010
1.50
Primed all seat parts

 10-05-2010
1.50
Wash and etched seat parts

 10-04-2010
1.75
Drilling, deburring seats

 10-03-2010
1.50
Drilling, deburring seat parts
     

 10-02-2010
6.00
Machineing pieces for the seats
       

 09-30-2010
1.00
Finished the tunnel cover between the seats

 09-29-2010
1.00
Misc work on the inside of the fuselage

 09-28-2010
2.00
Deburred and dimpled 7112 top skin and frames
     

 09-25-2010
4.25
Seat bottoms
Details
     

 09-24-2010
1.00
Prepared seat bottoms for installation

 09-23-2010
2.00
Baggage area
Details
       

 09-22-2010
2.00
Baggage area
Details

 09-21-2010
2.00
Rear baggage compartment floor
     

 09-20-2010
2.25
F7112 top skin fitting
     

 09-19-2010
4.50
Rudder/brake assembly
Details
       

 09-16-2010
1.00
Fitting rudder/brake assembly

 09-12-2010
2.00
Rudder and brake assembly
       

 09-11-2010
3.50
Started fabricating the brake/rudder assembly
       

 09-10-2010
5.00
Visit to Vans to order the finishing kit

 09-09-2010
2.00
Started brake/rudder assembly
     

 09-07-2010
2.00
Finished installling and riveting the 712 bulkhead
     

 09-06-2010
6.50
F635 Bellcrank, 712 bulkhead
Details
       

 09-05-2010
2.00
Finished the 705 assembly
     

 09-02-2010
0.75
Primed 705 bulkhead parts

 09-01-2010
1.50
Misc fuselage work
Details
     

 08-31-2010
2.00
Misc work on the 905 bulkhead
 

 08-30-2010
2.00
Misc work on the 905 bulkhead
     

 08-28-2010
2.50
fuselage work
Details
       

 08-26-2010
3.50
Riveted on the firewall
Details

 08-25-2010
2.25
Started fuselage
Details
       

 08-24-2010
2.00
Finished the lower skin riveting
Details
       

 08-23-2010
0.50
Right wing, lower skin riveting

 08-22-2010
2.00
Right wing riveting
Details
       

 08-21-2010
1.50
Bottom skin, right wing riveting

 08-19-2010
2.00
Left wing bottom skin riveting
     

 08-18-2010
2.25
Left wing bottom skin riveting
     

 08-17-2010
0.75
Dimpled frames for bottom skin oin the left wing

 08-05-2010
1.50
Countersinking on upper wing spar

 08-04-2010
1.50
Wings
Details
     

 08-03-2010
3.25
Wings
Details
       

 08-02-2010
3.00
left wing skin
Details
     

 08-01-2010
4.00
Bottom skins
Details
     

 07-31-2010
3.00
Pitot tube
Details
     

 07-30-2010
2.00
Attached and adjusted right aileron
     

 07-29-2010
2.00
Left aileron installation

 07-23-2010
0.50
Aileron flaps

 07-21-2010
0.50
Attached inboard aileron brackets
     

 07-15-2010
2.00
Aileron mounting brackets
Details
       

 07-14-2010
2.00
Finished and installed last aileron pushrod

 07-13-2010
1.50
Interior wing work
Details

 07-12-2010
1.50
Left wing bellcrank assembly
Details
       

 07-11-2010
2.00
Assembled the pushrod bellcrank assembly
       

 07-10-2010
4.50
Pushrod bellcrank assembly
Details
       

 07-09-2010
2.00
Finished riviting the flap gap fairings
     

 07-08-2010
2.50
Riviting on flap and aileron gap fairings

 07-08-2010
4.50
Conduit, wiring
Details
       

 07-07-2010
3.00
Aileron and flap gap fairings.
Details
       

 07-06-2010
3.00
Machining aileron and flap gap fairings

 06-28-2010
1.50
Conduit bracket install
Details
       

 06-27-2010
2.50
Conduit brackets
Details
       

 06-26-2010
2.50
Conduit bracket
Details
     

 06-24-2010
2.50
AOA Sensor Installation
Details
       

 06-22-2010
1.50
Completed landing light
Details
       

 06-21-2010
2.00
Landing light
Details
       

 06-20-2010
4.00
Landing light
Details
       

 06-17-2010
3.00
Aileron brackets
Details
       

 06-15-2010
2.00
Aileron brackets
Details
       

 06-09-2010
2.00
Aileron mounting brackets
Details

 06-06-2010
2.00
Finished attaching fuel sender
Details
     

 06-05-2010
2.00
Installed the fuel pickup tube
Details

 06-04-2010
1.50
Assembled the fuel pickup tube
Details

 06-02-2010
2.00
Fuel sender
Details
     

 06-01-2010
1.00
Removed the fuel sender units from the boxes. Pour

 05-31-2010
6.00
Finished arranging the shop and inventoring the qu

 05-30-2010
0.50
Washed oil off of wings

 05-30-2010
0.50
Washed oil off of fuselage

 05-29-2010
3.00
Rearranged shop to store wings and fuselage

 05-27-2010
2.50
Built fuselage stand
       

 05-25-2010
10.00
Picked up quickbuild from Vans

 05-24-2010
2.00
Built a wing stand

 05-20-2010
1.00
Finished fiberglassing empennage tips

 05-19-2010
1.50
Made balsa ends for the fiberglass tips of the emp

 05-18-2010
1.25
Finished installing counterweights on elevators

 05-16-2010
2.00
Rivited the trim tab and attached counterweights
       

 05-10-2010
2.00
Rivited and assembled the trim tab.
     

 05-09-2010
1.25
Machined trim tab parts

 05-08-2010
1.50
Cut out foam and wood trim pieces, primed trim tab

 05-08-2010
1.00
Built and installed a storage shelf in the shop
     

 05-01-2010
2.00
attached the trailing edge W/tank sealant to LE

 04-30-2010
2.00
Finished riviting the left elevator

 04-29-2010
3.50
Assembled parts of the left elevator
     

 04-28-2010
2.00
Washed, etched, and primed the left elevator parts

 04-27-2010
3.00
Deburred and dimpled L. elevator skin and Misc par

 04-26-2010
2.00
Drilled fitted stiffeners to L, elevator

 04-25-2010
3.00
Started on L. Elevator. Fitted, drilled spar. tip

 04-24-2010
3.00
Finished R. elevator. started L. elevator
     

 04-21-2010
2.50
Finished riviting R. elevator skin

 04-20-2010
1.00
Rivited spar to R. elevator

 04-19-2010
2.00
Rivited R. elevator spar, frames to skin

 04-18-2010
2.00
Dimpled, washed, etched and primed R. elevator
     

 04-16-2010
2.00
Drilled, deburred r. elevator spar and tips

 04-15-2010
2.00
Dimpled elevator stiffiners. Drilled spar to tip s

 04-14-2010
1.50
Finished bending trailing edge of the rudder
       

 04-13-2010
2.00
Finished machining elevator stiffeners, deburred

 04-11-2010
1.50
Machined and started fitting stiffeners to R. elev

 04-10-2010
1.50
Finished riviting skins, glued trailing edge of ru
     

 04-10-2010
1.00
Cut out and machined right elevator stiffeners

 04-09-2010
3.50
Rivited rudder skins

 04-08-2010
2.00
washed, etched, primed. started assem. of rudder

 04-07-2010
2.00
Finished drilling and dimpling the rudder skins

 04-04-2010
2.00
finished machining and dimpling spars, frames of r

 04-03-2010
4.00
Primed, rivited rudders stiffeners, drilled, debur

 04-01-2010
1.00
Deburred and dimpled the rudder skins

 03-31-2010
2.00
Drilled and deburred rudder stiffeners to the skin
     

 03-29-2010
1.50
Cut out and machined rudder stiffeners.

 03-28-2010
2.50
Completed the vertical stabilizer
       

 03-27-2010
2.00
Rivited the rear spar on the vertical stabilizer

 03-25-2010
1.50
Primed the vertical stabilizer

 03-24-2010
1.50
Dimpled the vertical stabilizer skin, washed and e

 03-24-2010
1.00
Built a storage platform for parts storage in the

 03-23-2010
1.50
Drilled, and deburred the vertical stabilizer

 03-22-2010
2.00
Finished the horizontal stabilizer and assembled t
       

 03-21-2010
4.00
Finished riviting the spars and frames to the hori

 03-20-2010
4.00
Riveted the spars and frames to the horizontal sta

 03-16-2010
2.50
Rivited horizontal spars together. Started rivitin

 03-14-2010
4.00
Finished dimpling and prepping skins, cleaned and
     

 03-13-2010
1.00
Finished the paint table

 03-13-2010
5.00
Countersinking on spars and dimpling feames and sk

 03-11-2010
1.50
Constructed a paint table for priming parts
     

 03-06-2010
5.00
Assembled the horizontal stabilizer spars and ribs
       

 03-05-2010
2.00
debured and cleaned up the ribs

 03-04-2010
1.50
Fabricated the HS 908L and 908R attach angles

 02-22-2010
1.50
Empennage inventory
Details
       

 02-17-2010
6.00
Went to vans to order quick build and pick up empa
Details
       