KitLog pro

Powered By Kitlog Pro v2.0

RON'S WEB SITE
Work Logs Found: 1322
Category Work Time: 2904 Hours
 Date
Hours
Work Log Summary

Details

 08-14-2014
2.00
Removing MT wires, SDS wires...
Details
       

 08-13-2014
3.00
Access panel & MT prop removal
Details
       

 04-24-2014
2.50
Began removing cylinders....
Details
       

 04-22-2014
2.00
Put engine on rotary mount
Details
       

 04-05-2014
1.00
Unloaded engine into hangar
Details
       

 04-01-2014
3.00
Pick up engine for RV-6A
Details
       

 12-02-2013
2.50
Removed R head to expose piston...
Details
       

 10-22-2013
2.00
Diagnosing engine problem...
Details
       

 06-21-2012
3.00
Final paint over nose& canopy rail...
Details
       

 06-20-2012
1.00
Dennis and Bryan preparing for final paint...
Details
       

 06-19-2012
2.50
Preparing for final paint ...
Details
       

 06-04-2012
2.00
More glass for engine air, oil cooler...
Details
       

 05-29-2012
1.00
Completed radiator prep for engine start...
Details
       

 05-25-2012
1.50
More work on eng. air plenum...
Details
       

 05-24-2012
2.00
Realigned air intake plennum and glassed...
Details
       

 05-23-2012
2.00
More fitting for cowl and rads and air plenum...
Details
     

 05-22-2012
3.00
Final layers for radiator air diffusers...
Details
       

 05-17-2012
2.50
Adding more glass for engine air intake...
Details
       

 05-16-2012
1.50
Final cutting and fitting for air intake...
Details
       

 05-15-2012
2.50
Final layers for air intakes...
Details
       

 05-08-2012
1.50
Reinstalling nose wheel pant...
Details
       

 05-07-2012
3.50
Reinstalling painted wheel pants on R & L gear...
Details
     

 04-26-2012
1.00
Installing painted canopy & pick up parts...
Details
       

 04-25-2012
3.00
Cutting NACA duct for engine air in lower cowling.
Details
       

 04-24-2012
3.00
Positioning NACA intake;plenum intake...
Details
       

 04-17-2012
1.00
Preparing fiberglass for intakes...
Details
       

 04-10-2012
1.50
Added more layers of glass to intakes...
Details
     

 04-09-2012
2.50
Layering radiator intakes...
Details
       

 03-30-2012
3.00
Attaching upper fairings....
Details
       

 03-29-2012
1.50
Finished riveting ELT bracket in new location...
Details
     

 03-28-2012
1.50
Moving ELT aft-remaking bracket...
Details

 03-28-2012
3.00
More sanding wheel pants...
Details
       

 03-27-2012
2.50
Sanded inlet molds and replaced cowl...
Details
     

 03-27-2012
2.50
Moving ELT closer to tail to help move cg aft...
Details
       

 03-26-2012
2.50
Building up R wheel pant for mounting...
Details
       

 03-25-2012
1.50
Making fiberglass NACA duct for inlet air...
Details
     

 03-24-2012
1.00
Completed L rad installation...
Details
       

 03-22-2012
3.00
Installing new rads...
Details
       

 03-21-2012
3.00
Mounting new radiators on engine plate...
Details
       

 03-20-2012
2.00
More wheel pant work...
Details
       

 03-19-2012
2.00
Installed rads with clamps for duct fitting...
Details
       

 03-16-2012
2.50
More fitting/filing wheel pants/air access door...
Details
       

 03-12-2012
2.50
Positioning new rads & modifying for fit...
Details
       

 03-10-2012
1.50
Working on L main wheel pant...
Details
       

 03-10-2012
0.50
Radiators arrived...
Details
       

 03-09-2012
2.50
Fitting L wheel Pant fairing...
Details
     

 03-03-2012
1.50
More sanding on fiberfill on oil cooler inlet...
Details
     

 02-10-2012
1.50
Working on cowling oil inlet & fuel pump cover...
Details
       

 02-07-2012
2.00
Pulled seat pans for access below...
Details
       

 02-03-2012
1.50
Batteries tested & cables made...
Details
     

 02-02-2012
2.50
Finalizing radiator mockups and adding brackets...
Details
       

 02-01-2012
3.00
Fitting mock radiators...
Details
       

 01-31-2012
1.50
Removed batteries from firewall...
Details
       

 01-27-2012
1.00
Met Techweld Ed for radiator order...
Details
       

 01-20-2012
1.00
Lay ups for fuel pump cover...
Details
     

 01-12-2012
2.00
New oil cooler inlet...
Details
       

 01-09-2012
1.00
Assembled air chuck for wheel pants...
Details
       

 12-28-2011
2.00
Rerouted R brake line, molded R fairing...
Details
       

 12-12-2011
1.50
Calibrating fuel stick...
Details
       

 12-01-2011
1.20
Installed main wheel pants for testing...
Details
       

 11-23-2011
0.50
Test flight with fairings installed...
Details
       

 11-18-2011
5.00
Aligning gear fairings...
Details
       

 11-15-2011
2.50
Fitting & drilling R wheel pant to bracket...
Details
       

 11-10-2011
2.00
Trimming wheel pants for wheel clearance...
Details
       

 11-08-2011
1.50
Made brackets to install mirror...
Details
       

 11-02-2011
3.50
Tested aircraft and completed L airbox...
Details
       

 11-01-2011
3.00
Modifying L inlet for smoother airflow...
Details
       

 10-07-2011
1.50
Added glass and sanded canopy area, fairings.....
Details

 09-29-2011
2.50
Drilled pressure access in nosepant...
Details
       

 09-28-2011
2.00
More sanding and filling on roll bar...
Details
       

 08-26-2011
1.50
More fitting and filing for wheel pant...
Details
       

 08-25-2011
2.00
More fitting of L & R wheelpant...
Details
       

 08-24-2011
1.00
Drilled L wheel pant to bracket...
Details
       

 08-10-2011
1.50
Installed drilled bolts/wheel pant fitting...
Details
       

 07-09-2011
0.50
Received newer larger radiatiors...
Details
       

 07-01-2011
2.00
Fitting L wheel pant & added nutplates...
Details

 06-30-2011
3.00
Flew to KCPS for prop balance...
Details
       

 06-18-2011
2.00
Sanding various parts & fitting R wheelpant...
Details

 06-16-2011
2.50
Fitting R gear wheelpant...
Details
     

 06-15-2011
3.00
Final fit for NG wheelpant...
Details
       

 06-14-2011
2.50
Fitting NG wheelpant to tire...
Details
       

 06-09-2011
2.00
Added additional cooling vent ...
Details
       

 06-08-2011
2.00
installed R cooling vent...
Details
       

 06-03-2011
2.50
Installed fittings for Manometer on R radiator...
Details
       

 05-26-2011
2.00
Adding more glass to windscreen overlay...
Details
       

 05-16-2011
1.00
Took my bride for a ride...
Details
       

 05-03-2011
1.00
Used compass rose for mag. compass adjust...
Details
       

 04-28-2011
3.50
Correctly mounted wheelpant brackets...
Details
       

 04-27-2011
4.00
Fabricating NG/cowl fairing...
Details
       

 04-26-2011
2.50
More NG wheelpant fitting..
Details
       

 04-25-2011
1.00
Trimming NG wheelpant ...
Details
       

 04-19-2011
2.00
Fitting NG fairings/wheelpant...
Details
       

 04-11-2011
1.50
Trimming cowl for better cooling...
Details
       

 03-08-2011
2.00
Adjusted AFR for engine power SDS meter...
Details

 03-05-2011
2.00
Adding velcro to carpet & sidepanels...
Details
       

 03-02-2011
1.50
Landing and celebration of first flight...
Details
       

 03-02-2011
2.00
First flight...
Details
       

 03-01-2011
1.50
Final preparation for flight...
Details
       

 02-28-2011
3.00
Cutting carpet & alum. kickplates for floor...
Details
       

 02-25-2011
2.50
Gluing fabric to bunting for trim pieces...
Details
       

 02-24-2011
2.00
Fabricating & calibrating fuel quantity...
Details
       

 02-22-2011
3.00
Final tech. inspection & seats installed...
Details
     

 02-21-2011
3.00
Securing wires & clamps for flight...
Details
       

 02-19-2011
2.00
Adding Adel clamps for hose support...
Details
       

 02-18-2011
3.50
Interior/engine preparation for flight...
Details
       

 02-17-2011
4.00
Preparing interior for flight...
Details
     

 02-16-2011
3.00
Readying plane for final inspection for certifying
Details
       

 02-16-2011
1.00
Frank Baldwin did the final certification inspecti
Details
     

 02-15-2011
4.00
Final adjustment of aileron controls...
Details
       

 02-14-2011
4.00
More adjusting flight control system...
Details
     

 02-11-2011
2.50
Installed aileron control stops...
Details
       

 02-07-2011
1.50
Installing muffler & WB sensor after welding...
Details
     

 02-03-2011
2.00
kitlog reconstruction from Matt's data base...
Details

 02-02-2011
3.00
kitlog reconstruction from Matt's data base...
Details

 02-01-2011
3.00
Kitlog reconstruction efforts...
Details

 01-28-2011
2.00
Disconnected flaps/ailerons for adjustment...
Details
     

 01-28-2011
1.50
Canopy latch re-alignment...
Details
     

 01-25-2011
1.50
Writing systems operational summaries...
Details

 01-17-2011
2.00
Paperwork preparation for certification req....
Details

 01-15-2011
1.50
More organizing..tow bar hung up...
Details
     

 01-14-2011
2.00
Spent another 2 hours organizing tools...
Details
       

 01-07-2011
2.00
More wire tying & placard making...
Details
       

 01-05-2011
2.00
Removed cowl to polish behind it...
Details
       

 12-30-2010
2.50
Completed seat boots & primed canopy fiberglass..
Details
       

 12-15-2010
1.00
Fabricating extra set of boot covers...
Details
     

 12-14-2010
1.00
Photos for Christmas...
Details
       

 12-11-2010
2.00
Attached Chevy orange muffler brace...
Details
       

 12-10-2010
2.00
Fabrication muffler template to weld actual....
Details

 12-08-2010
1.50
Installing seat cushions velcro...
Details
     

 12-03-2010
2.00
Fitting/cutting muffler pipes for alignment...
Details
       

 12-02-2010
3.00
Rehanging and aligning internal muffler...
Details
       

 12-01-2010
3.00
Velcro seat attachments: panel lights...
Details
     

 11-09-2010
2.00
Transponder/altimeter pitot-static test...
Details
       

 11-09-2010
2.00
Repositioned internal muffler further aft...
Details
       

 11-04-2010
2.50
Sealing firewall...
Details
       

 11-03-2010
3.50
Completing GTX-327 transponder/EFIS set up...
Details
     

 11-02-2010
1.50
Completed brakes/safety wires...
Details
     

 10-29-2010
1.50
Completed installion of cotter pin in L wheel...
Details
     

 10-23-2010
3.00
Drilled L main axle for 1/8 cotter pin...
Details

 10-22-2010
2.50
Completed drilling R main axle for 1/8 cotter pin.
Details
     

 10-21-2010
2.50
Drilling mains for cotterpins...
Details
       

 10-20-2010
3.50
Weighed aircraft for weight and balance...
Details
       

 10-19-2010
3.00
Taking measurements for empty c.g.
Details
       

 10-18-2010
3.50
Setting up for Weight & balance...
Details

 10-16-2010
4.00
Preparing L fin for N524RB and MARINES...
Details

 10-15-2010
4.00
Installing N524RB on L side...
Details
     

 10-14-2010
2.00
More polishing R VS for decorations...
Details
       

 10-13-2010
4.00
More sanding, buildup and glass added...
Details
     

 10-12-2010
4.50
More sanding, retaping of windscreen glass...
Details
       

 10-11-2010
1.50
Polishing in prep for N Number...
Details
     

 10-11-2010
4.00
Laying more glass around windscreen...
Details
       

 10-07-2010
1.50
Opened canopy & polished tail...
Details
       

 10-06-2010
3.50
Laying glass around windscreen...
Details
       

 10-05-2010
2.50
Taping and building up windscreen...
Details
       

 10-04-2010
1.50
Build up in front of windscreen...
Details
       

 10-01-2010
3.00
Windscreen installation...
Details
       

 09-30-2010
3.50
Preparing windscreen for final attachment...
Details
       

 09-29-2010
5.00
Finalizing rivets & wiring...
Details
       

 09-28-2010
3.00
More riveting top skin...
Details
       

 09-27-2010
3.00
Riveting top skin...
Details
       

 09-23-2010
2.50
Riveting top skin...
Details
       

 09-22-2010
2.00
Preparing top skin for riveting...
Details

 09-22-2010
2.00
Finalizing wing root fairings...
Details
     

 09-21-2010
3.00
Top skin/windscreen placement preparation...
Details
       

 09-21-2010
2.00
Preparing dimmer for compass...
Details
       

 09-20-2010
3.00
Preparing for top skin installation...
Details
       

 09-18-2010
1.50
Moved transponder antenna, installed plate...
Details
       

 09-16-2010
2.50
Repaired R Nav GRD, vac line,tested A/P...
Details
     

 09-15-2010
2.50
More wire tying, reconnect L strobe...
Details
       

 09-14-2010
2.00
Preparing top skin for flat black paint...
Details
       

 09-14-2010
3.00
Mailed FAA N# request...
Details
       

 09-13-2010
2.50
Removed panel for final routing...
Details
     

 09-11-2010
1.00
Installed MT prop spinner...
Details
     

 09-10-2010
2.50
Tying electrical lines for ease of panel removal..
Details
       

 09-09-2010
3.00
Removed panel for finalization of wiring...
Details
     

 09-08-2010
2.50
More engine fuel/air ratio testing...
Details
     

 09-07-2010
1.00
Inserted co-pilot lock pin per Van S.B.07-2-6...
Details
       

 09-03-2010
2.00
Finalized L wing gap fairing...
Details
     

 09-03-2010
1.50
Finalized cotterpins on control stick mounts...
Details
       

 09-02-2010
2.50
More programming SDS fuel/air...
Details
       

 09-01-2010
4.00
Setting air/fuel on engine...
Details
       

 09-01-2010
3.00
Filing to get full freedom of all flight controls.
Details
     

 08-31-2010
2.50
Setting timing schedule on SDS system...
Details
       

 08-30-2010
3.50
Painted wingtips installed...
Details
       

 08-27-2010
3.00
Installed Protek Bus Manager, HS fairings...
Details
     

 08-26-2010
3.00
Finalizing panel wiring, D-sub covers...
Details
       

 08-24-2010
2.50
Modified SL-40 antenna/D-sub access...
Details
     

 08-11-2010
1.00
Removed wingtips & took fiberglass to paint...
Details

 08-10-2010
2.50
Returned Bus MGR for repair, heat shield..
Details
     

 08-07-2010
1.00
Polishing ailerons...
Details

 08-06-2010
1.50
Added glass to empennage fairings...
Details

 08-05-2010
1.50
Engine start and first taxi of aircraft...
Details
       

 07-30-2010
3.00
Set 2 siderail rivets, polishing flaps/side...
Details
       

 07-29-2010
2.50
Removed canopy for cleaning....
Details
       

 07-28-2010
3.00
Filing canopy latch for better fit...
Details

 07-27-2010
1.00
Spliced in new bulb for L fuel Qty gage...
Details

 07-27-2010
3.00
Installed last bulkhead fitting, grommets...
Details
       

 07-23-2010
1.50
Modified AOA display for maintainence...
Details

 07-23-2010
2.00
Finalizing canopy lock...
Details
       

 07-22-2010
2.50
Rerouting panel wires for finalization...
Details

 07-21-2010
3.50
Installed overflow canister to firewall...
Details
     

 07-20-2010
1.50
Reinstalled canopy...
Details
     

 07-19-2010
2.00
Trimming L wing gap fairing...
Details

 07-19-2010
3.50
Polishing V/S & H/S to reinstall fairing...
Details

 07-16-2010
3.00
Removed empennage fairing for polishing...
Details

 07-16-2010
3.00
Remaking R fairing using old fairing as template..
Details
     

 07-15-2010
4.50
Installed R/L radiator shrouds with pop rivets...
Details
       

 07-14-2010
1.50
Installed L aileron AN3-14A bolt/nyloc...
Details

 07-14-2010
2.00
Completed radiator flow shields...
Details

 07-13-2010
1.50
Tested MT prop for proper manual/auto control...
Details
       

 07-13-2010
1.00
Realigned L aileron pushrod ...
Details

 07-13-2010
1.50
Fabricated L radiator flow shroud, inner pieces...
Details

 07-12-2010
1.50
Pulled plane outside to test prop...
Details
     

 07-08-2010
4.00
Installed MT prop brush....
Details
       

 07-08-2010
2.00
Bled brake system and added fluid...
Details

 07-07-2010
3.00
Attached A/P blue serial 232 wire to EFIS...
Details

 07-06-2010
1.00
Installed newly painted fairing...
Details
       

 06-29-2010
2.50
Torqued MT prop bolts to 65 ft/lbs...
Details

 06-26-2010
1.80
Sanding empennage, cowling & more flox added...
Details
     

 06-26-2010
2.50
Installed cowl to check fit & make templates...
Details
       

 06-25-2010
1.50
Installed MT prop....
Details
       

 06-24-2010
2.50
Sanding and adding resin/flox to fill areas...
Details
       

 06-23-2010
3.00
More sanding on empennage fairing...
Details
     

 06-22-2010
4.00
Rewiring fuel relay, firewall passthru installed..
Details
       

 06-10-2010
1.00
Sanding skirt area that was shrunk...
Details

 06-09-2010
3.00
Wiring MT propeller...
Details
       

 06-07-2010
3.00
Tank installation complete...
Details

 06-05-2010
3.50
Attached /tightened fuel lines & test ran engine..
Details
       

 06-03-2010
1.50
Completed installation of MT brush bracket...
Details

 06-02-2010
2.50
Mounting R fuel tank...
Details

 06-01-2010
3.50
Removed stripped fuel tank screw...
Details
     

 05-28-2010
2.50
Added fuel vent on fuselage...
Details
     

 05-27-2010
1.00
More sanding on empennage fairing...
Details

 05-26-2010
3.00
Sanding on Empennage fairing & more added,..
Details
       

 05-25-2010
3.50
Added fire extinguisher, controls, sanding...
Details
     

 05-24-2010
1.00
More sanding on Empennage fairing...
Details

 05-18-2010
1.00
Sanding on Empennage fairing...
Details

 05-17-2010
3.50
Getting gearbox changeover complete...
Details
       

 05-14-2010
3.50
Adding washers behind spacers for clearance...
Details
       

 05-13-2010
4.00
Adding glass layers to tips/fairings...
Details
       

 05-12-2010
2.00
Preparing engine plate for spacers...
Details

 05-11-2010
4.50
Installed Gen3 gearbox...
Details
       

 05-10-2010
3.50
Preparing engine for geearbox upgrade...
Details
       

 05-05-2010
1.00
Completed cargo cover installation...
Details
     

 05-04-2010
1.00
Testing and reworking fuel pump relay...
Details

 05-04-2010
2.50
Attaching fabric cover to cargo wall...
Details

 05-03-2010
3.00
Fitting covering over cargo bin...
Details

 04-29-2010
3.00
Assembling cargo area interior...
Details
       

 04-28-2010
2.50
Replacing interior parts...
Details
     

 04-27-2010
4.00
Working off inspection improvements...
Details
       

 04-27-2010
1.00
Tidying wiring/pitot/static aft for closure...
Details

 04-26-2010
3.00
Tying/routing wires
Details

 04-24-2010
1.50
Replacing labels to updated status...
Details
       

 04-23-2010
3.00
Finalizing panel wiring...
Details

 04-22-2010
2.00
ELT remote panel operational...
Details
     

 04-20-2010
2.00
RPM tach mod completed...
Details
       

 04-17-2010
1.50
Adding more split loom ...
Details
       

 04-16-2010
1.50
Shortened WB sensor wires...
Details
     

 04-14-2010
3.50
Setting fuel pressure auto-changeover...
Details

 04-13-2010
2.50
Rewired auto-changeover wires on switch...
Details

 04-12-2010
3.00
Routing/shortening & securing SDS wires ...
Details
       

 04-10-2010
1.00
Spliced fuel flow wires/ran engine for test...
Details
     

 04-08-2010
3.50
Ran Subaru for the first time...A MILESTONE DAY!
Details
       

 04-07-2010
4.00
Connecting more SDS wires for operation...
Details
     

 04-06-2010
2.50
Tested SDS CRT after hookup....
Details
     

 04-01-2010
4.00
Routing SDS wires thru firewall...
Details

 03-31-2010
3.50
Routing wires for SDS system...
Details
       

 03-31-2010
1.00
Drilled 3/8" hole for mixture knob
Details
       

 03-30-2010
3.00
Completed pitot/satatic lines to alt/airspeed...
Details
       

 03-29-2010
2.50
Supplied static/pitot to AHARS....
Details
       

 03-29-2010
1.00
Added 75-60 special washers to aileron...
Details

 03-26-2010
2.00
Adding jumper for MT Prop-Ess. PWR...
Details
     

 03-25-2010
1.50
Installed grommets for pitot line in F604-F606...
Details

 03-24-2010
1.50
Drilling 5/8" holes thru side ribs...
Details

 03-23-2010
1.00
Drilled 5/8" hole thru both webs of F604...
Details

 03-22-2010
1.50
Installed AFR gage in panel...
Details
     

 03-10-2010
2.00
Drilled 2" hole for AFR in panel, SS firewall piec
Details
       

 03-09-2010
1.50
Fabricating SS overlay for F/W...
Details

 03-05-2010
1.50
SDS ECU wiring...
Details

 03-04-2010
2.00
Installed nutplates for PLEX panel on subpanel...
Details
     

 03-02-2010
2.50
Drilled mounting holes for 31/8" SDS CRT...
Details

 03-01-2010
3.00
Reinstalling flywheel, alternator, intake manifold
Details
       

 03-01-2010
2.00
Hole for SDS drilled in panel, mounting bracket..
Details

 02-22-2010
1.50
Installed SDS timing magnets in pulley....
Details
       

 02-19-2010
1.00
Removed old timing sensor, installed new...
Details
       

 02-18-2010
1.00
Used template to mark pulley..drilled for magnets.
Details
     

 02-09-2010
1.50
Airtemp sensor modified for SDS...
Details
       

 02-03-2010
1.00
Installed 5/16 lower GRD bolt...
Details

 02-02-2010
2.00
Installed nylon insert for alt feed...
Details
       

 02-01-2010
3.50
Rebuilding kitlog entries...
Details

 01-29-2010
2.00
Studying SDS install videos by Pete Krok...
Details

 01-27-2010
2.00
Fabricating bushings for alt/firewall...
Details

 01-26-2010
1.00
Took intake assembly for modification...
Details
       

 01-23-2010
2.50
Kitlog restoration til June 2008, before loss
Details

 01-22-2010
2.20
Removed alt. pulley for rework for SDS...
Details
       

 01-21-2010
2.00
Attempted removal of alt/timing pulley...
Details
       

 01-19-2010
2.00
Removed intake manifold, fuel rails, alt...
Details
       

 01-18-2010
2.00
Finalized SDS mounting bracket...
Details
     

 01-13-2010
1.50
Reworking attachment brackets for SDS
Details
       

 11-24-2009
1.50
Removed old ECU harness from cockpit...
Details

 11-11-2009
1.50
Gentlemen:Start your engine(s)...
Details

 11-10-2009
1.00
USMC 234th birthday..Bushing for trim wires..
Details

 11-06-2009
0.80
Clipped fuel injectors & coil fittings...
Details

 11-05-2009
2.00
Removed Subaru ECU & wires from inside...
Details
       

 10-30-2009
3.00
Icom & wiring progress...
Details

 10-28-2009
2.00
Wired LED dimmer to light switch...
Details

 10-26-2009
1.50
GTX-327 antenna installed...
Details
       

 10-23-2009
2.50
R seat pan installed,
Details
     

 10-22-2009
2.50
Left seat riveted in, some wires finalized...
Details
       

 10-21-2009
2.50
Programming EFIS/GPS...
Details
       

 10-20-2009
2.00
Elev. trim attachments, light wires reworked...
Details

 10-19-2009
1.50
Trim tab adjustment...
Details
     

 10-19-2009
2.50
More wires shortened and tied...
Details
     

 10-15-2009
1.50
Working on stick trim system...
Details
       

 10-14-2009
3.50
More wiring on stick trim, panel lights...
Details
       

 10-13-2009
3.50
Powered trim/LED, soldered ORG/GRN/BLU...
Details

 10-12-2009
3.00
Stick control prep, PWR to trim system...
Details
       

 10-10-2009
1.00
Bushing for trim wires...
Details
     

 10-09-2009
3.00
Soldered LED wires, GRD LED to panel...
Details

 10-08-2009
1.00
Diagrammed trim system for understanding...
Details
     

 10-07-2009
3.00
Crimped eyes on relay deck, plan for wiring trim..
Details

 10-06-2009
3.50
Heater wires routed, A/P & dimmer power to fuse...
Details
     

 10-05-2009
2.00
Fuel gage current wire, R fuel gage grd...
Details
     

 09-30-2009
4.00
Fuel gage lights, AOA powered, Volt/Amp works...
Details
       

 09-29-2009
3.50
Added GRD Bus...
Details
       

 09-28-2009
3.00
Assembling wiring to light dimmer...
Details
     

 09-21-2009
2.00
Soldering ICOM jacks...
Details

 09-18-2009
3.50
More tying & wiring shortening...
Details

 09-17-2009
2.50
Modified R air vent to ease removal...
Details
     

 09-16-2009
4.50
More wire routing,AOA flap wire, ICOM, SL40...
Details
     

 09-15-2009
4.00
Loaded EFIS updates to EFIS/AHARS/Nav Data...
Details
     

 09-14-2009
3.00
Drilled AOA dimmer adj. hole & Icom batt..
Details
     

 09-11-2009
2.00
Tying, shortening, rerouting behind panel...
Details
       

 09-11-2009
3.00
Soldered more phone/mic jacks, AOA...
Details

 09-10-2009
3.00
Installed both air vents & GTX-327...
Details

 09-09-2009
2.00
Some Comm wires hooked up...
Details
     

 09-09-2009
4.00
Rerouting wires & organizing behind panel...
Details
     

 09-08-2009
3.50
Rerouting panel wires &EFIS settings...
Details
       

 09-04-2009
2.00
Fired up EFIS panel...
Details
       

 09-04-2009
2.50
Completed rewiring of some BUS MGR wires...
Details
     

 09-03-2009
4.50
Glove box GRD, Batt hold downs taped...
Details
       

 09-02-2009
4.50
Diagrammed some of elect. system...
Details
     

 09-01-2009
5.00
Flap wiring, EFIS clock pwr, EFIS/AHARS pwr...
Details
     

 08-28-2009
2.50
Ran GRD wires from fuel pumps to firewall...
Details

 08-28-2009
2.50
Aligning & planning panel old fashioned way...
Details

 08-27-2009
1.00
EIS fired up, tested fuel pumps, not yet...
Details
     

 08-26-2009
1.50
Labeled fuel pump lights & modified Bus Mgr...
Details

 08-26-2009
2.00
Finalizing flap wires...
Details

 08-25-2009
2.00
Installed PAX side canopy support skin...
Details

 08-13-2009
2.00
Polishing wings, installed R wing walk...
Details
       

 08-11-2009
3.50
Polishing, L wing walk installed...
Details
       

 08-10-2009
3.50
Wired clock, VA-1A, Avionics bus switch...
Details

 08-08-2009
3.00
EIS GRD, R fuel sender, ECU warning...
Details
     

 08-07-2009
4.00
EIS power, NAV lights, charged Main batt...
Details

 08-06-2009
5.00
Wig wags finished, strobes, L fuel sender...
Details

 08-05-2009
4.00
Eng GRD bolt secured, wired ECU temp sensor...
Details
       

 08-04-2009
3.50
GRD wire for panel to firewall GRD, wigwag...
Details

 08-03-2009
3.50
More labels, wires to switches & circuit breakers.
Details
       

 08-01-2009
1.00
Inspection by EAA tech. counselor Gale Derosier
Details

 07-30-2009
2.50
Made & applied panel labels...
Details
       

 07-24-2009
0.50
Reworked fuel rail fuel press. reg...
Details

 07-23-2009
3.00
Main /Aux fuel pump panel lights, grds, ECU CB...
Details
     

 07-22-2009
4.00
ALT wire to CB, wired fuel pumps, labels...
Details

 07-21-2009
1.50
Reworked fuel press. reg, #2 Bat Grd established..
Details

 07-21-2009
2.50
Completed Grd Bus, some Grd wires...
Details
       

 07-20-2009
2.00
Rewired #8 wires to Bus MGR...
Details

 07-20-2009
1.50
Established another GRD Bus, radio tray improved..
Details

 07-17-2009
2.50
More wiring on Bus manager...
Details
     

 07-16-2009
1.00
Realigned fuel hoses for better routing...
Details
     

 07-16-2009
4.50
Protek rewired, wires connected to Main Bus...
Details
       

 07-16-2009
1.50
Painting and constructing sides of trailer...
Details

 07-15-2009
3.50
Wired fuel relay, added GRD BUS, ESS BUS work.
Details
       

 07-14-2009
3.50
Bundling & sorting wires, MAP sensor, Main Bus ...
Details
     

 07-13-2009
3.50
Completed Main bus tray, throttle, vacuum secured.
Details
       

 07-10-2009
3.50
Completed removeable throttle insert, wiring...
Details

 07-08-2009
3.00
Soldered Keep alive, installed more CB, latch...
Details
       

 07-07-2009
3.00
Fabricating Main bus tray for panel...
Details
     

 07-06-2009
0.70
Fabricated balsa end plates for HS tips...
Details
       

 07-06-2009
2.00
Drilled subpanel for tray, nutplates for GPS tray.
Details
       

 07-04-2009
3.50
Added nutplates,ECU cb bypass sw, more labels...
Details
       

 07-03-2009
2.50
Instrument panel planning...
Details
     

 07-02-2009
4.00
Ess. Bus bar installed, CB, labels, GPS tray mod .
Details
       

 07-01-2009
3.50
Fabricated dimmer bracket, drilled for dimmer...
Details
       

 06-30-2009
3.00
drilled panel for 6 more switches...
Details
     

 06-27-2009
2.50
Ran #10 wire from Alt thru firewall...
Details

 06-23-2009
1.50
Drilled more cb/switches...
Details
     

 06-23-2009
2.00
Added width to ELT bracket to avoid rudder...
Details
     

 06-22-2009
3.00
Panel planning session...
Details
     

 06-18-2009
2.00
Finalized elevator control at cargo wall...
Details

 06-17-2009
2.00
Fabricated switch template...
Details
       

 06-16-2009
3.00
Fabricated mold for fuel pump cover...
Details
       

 06-15-2009
1.00
Drilled for AOA & PTT panel pushbuttons...
Details
     

 06-04-2009
1.50
Ordered parts from Steinair & traced injector wire
Details

 06-03-2009
2.00
Ran manifold line to engine & drilled ignition key
Details
     

 06-02-2009
2.00
Spliced Alt field wire and ran thru grommet...
Details
     

 06-01-2009
1.50
Reinstalled L fuel tank & all fuel lines except ..
Details

 05-31-2009
2.00
Polished L fuel tank with MetAll...
Details

 05-28-2009
2.00
Completed nutplates for RT HS tip...
Details

 05-27-2009
2.50
Ran #10 wire from ALT thru firewall...
Details
       

 05-26-2009
1.50
Shortened EMER Power wires & re-installed...
Details
     

 05-20-2009
2.50
Routed EIS wires to temp/press. on engine...
Details
       

 05-11-2009
1.00
Picked up painted instrument panel...
Details
       

 04-29-2009
2.50
Riveted the glovebox to the instrument panel...
Details

 04-28-2009
3.00
Completed pilot infinity stick grip installation..
Details
       

 04-27-2009
2.00
Shortened pilot control stick...
Details
     

 04-24-2009
3.50
Wired Protek to solenoids, starter cable...
Details
       

 04-23-2009
3.00
Spliced solenoid wires, picked up pilot stick...
Details
       

 04-22-2009
2.50
Labeled batts, spliced wires...
Details
     

 04-21-2009
2.50
Removed pilot control stick for infinity install..
Details
       

 04-20-2009
3.00
Tagging & routing wires for lights & intercom...
Details

 04-16-2009
3.50
Added ALT CB, nutplates for trim ind...
Details
       

 04-15-2009
4.50
Attached wires to Protek manager...
Details
     

 04-14-2009
4.00
Fabricating mounting bracket -Protek Bsu Mgr...
Details
       

 04-14-2009
2.50
Completing flap sensor & firewall nutplates...
Details
     

 04-13-2009
2.50
Filled panel holes with rivets..
Details

 04-08-2009
2.50
Completed wires to A/P roll & pitch channels...
Details
       

 04-07-2009
2.50
Routing wiring for a/p to pitch servo...
Details
       

 04-07-2009
1.00
Drilled out fwd. elev. trim fairings...
Details

 03-30-2009
2.50
Routing autopilot wiring harness...
Details

 03-26-2009
1.50
Fabricating AOA sensor mounting bracket...
Details

 03-25-2009
3.00
Reinstalled flap motor & adjusted arms...
Details

 03-24-2009
2.50
Installed UHMW protective tape & flap motor...
Details
       

 03-24-2009
1.00
Added leftover UHMW tape on crossbar...
Details
     

 03-21-2009
1.50
Untaping interior for more finishing...
Details
       

 03-20-2009
4.00
Painting interior & steps
Details
       

 03-19-2009
3.50
fabricated mount for AOA display...
Details
       

 03-19-2009
3.50
Fabricated alum. fence guard for alt. belt...
Details
     

 03-18-2009
1.50
Routing wires forward ro panel from OAT...
Details
       

 03-18-2009
2.00
Paint prep inside & out...
Details
       

 03-17-2009
2.00
Tagging/routing EFIS wires...
Details

 03-17-2009
1.50
Preparing aircraft for interior/step painting
Details
       

 03-16-2009
3.00
Tying wires for AHARS to Magnetometer...
Details
     

 03-16-2009
1.00
Complied with Van's flap SB 04-11-07...
Details
       

 03-13-2009
2.00
Wiring flap switch & EFIS...
Details
     

 03-12-2009
1.30
Cutout panel for Hobbs meter...
Details
       

 03-12-2009
1.00
Added ground wire to OAT with crimper...
Details
       

 03-10-2009
2.50
Routing AHARS wires for EFIS...
Details

 03-09-2009
2.50
Fabricated engine bracket & drilled OAT probe...
Details
     

 03-06-2009
2.50
Drilled snap bushing holes for magnatometer...
Details
       

 03-05-2009
2.00
Drilled more access holes for intercomm...
Details
       

 03-05-2009
2.50
Cut slots for ELT/Intercomm in panel...
Details
     

 03-04-2009
1.00
Secured magnatometer to rear deck...
Details

 03-04-2009
1.50
Replaced four contersink bolts in gear weldments..
Details
       

 03-02-2009
1.50
Trimming excell wires off Softcomm Intercom...
Details

 02-26-2009
2.50
Securing antenna for ELT& EIS wires...
Details
       

 02-25-2009
1.50
Installed ELT antenna under VS/HS fairing...
Details
       

 02-25-2009
2.50
Drilling 3/8 hole thru F604 for panel access...
Details
       

 02-24-2009
2.50
Installing ELT bracket behind cargo bay....
Details
       

 02-20-2009
2.00
Shrinkwrapping labels on wires...
Details

 02-18-2009
1.00
Activated wigwag system for test...
Details
     

 02-11-2009
2.50
Tied & routed L wing wires into panel...
Details

 02-11-2009
2.50
Installed Aeroflash units on wingtips...
Details
       

 02-10-2009
2.50
Testing aeroflash units and running wing wires...
Details
     

 02-10-2009
1.00
Reworked countersink area for proper depth...
Details

 02-09-2009
2.00
Running wing wires forward...
Details
     

 02-09-2009
1.00
Removed front two gear weldment bolts......
Details

 02-07-2009
1.50
Tested warning light...
Details

 02-06-2009
2.50
Tested aeroflash units & discovered rework plan...
Details

 02-05-2009
1.50
Planning session for EXPBUS & panel wiring...
Details

 01-23-2009
1.50
Reinstalling remaining screws in R fuel tank...
Details
     

 01-23-2009
2.00
Reinstalling fuel tank selector...
Details
     

 01-22-2009
1.00
Commenced fabrication an alum. ring for controls..
Details

 01-21-2009
2.50
Installed MAP sensor on subpanel...
Details
     

 12-09-2008
1.50
Photo ops for Christmas newsletter
Details
       

 11-24-2008
1.50
Drilling grommet holes under PAX seatpan...
Details

 11-17-2008
6.00
Installed oil access door on upper cowling...
Details
       

 11-04-2008
2.50
Making mounting brackets for AOA box...
Details
     

 11-03-2008
1.50
Finished sub panel fittings for glove box...
Details
       

 10-29-2008
3.00
AHARS deck painted, ready to rivet in...
Details

 10-28-2008
1.50
Fabricated mounting bracket for trim....
Details

 10-27-2008
1.50
Oil access door sizing...
Details

 10-27-2008
1.00
crotch strap attachment installation...
Details

 10-25-2008
1.00
Cut angle alum. supports for glove box...
Details
     

 10-23-2008
2.50
Fuel pump labels, wire, AHARS deck riveted...
Details
       

 10-21-2008
3.00
More fairing work & underside cowling treated...
Details
     

 10-20-2008
1.50
Removed fairing from empennage...
Details
       

 10-14-2008
2.50
Trimming and more glass/microbaloons...
Details
     

 10-13-2008
0.50
Riveted glove box together...
Details

 10-13-2008
3.00
Repairing botched empennage fairing...
Details
       

 10-13-2008
0.70
Finalizing L wing root fuel fittings...
Details
     

 10-10-2008
2.00
Installed internal muffler...
Details
     

 10-10-2008
1.50
Finalized fuel vents underneath aircraft...
Details
     

 10-09-2008
1.50
Fitting internal muffler; trim ind. cut out...
Details

 10-03-2008
2.00
Riveted glove box door, drilled for latch...
Details

 10-02-2008
1.50
More work on glove box...
Details

 10-01-2008
3.00
Cut opening in panel for glove box...
Details
       

 10-01-2008
2.50
Assembling AHARS deck....
Details
     

 09-30-2008
1.50
Added fluid, bled & tested brakes...
Details

 09-25-2008
1.50
Fitting glove box to sub-panel...
Details

 09-25-2008
1.50
Brake fittings were finalized...
Details

 09-17-2008
2.50
Cut hole in sub panel for glove box...
Details
     

 09-16-2008
2.00
Drilled inst. panel screws using template...
Details
       

 09-11-2008
2.00
More brake pedal work & rudder cables ....
Details

 09-11-2008
2.50
Cutting instrument holes for panel...
Details

 09-10-2008
2.00
Removed brake master cylinders...
Details
     

 09-09-2008
1.50
Practice cut for alt/airspeed...
Details

 09-08-2008
2.00
Glove box layout & planning, EFIS ...
Details

 09-05-2008
3.50
Cut EFIS hole,planning for next cut...
Details
     

 09-04-2008
1.00
Measured & drilled starter holes for EFIS...
Details

 09-04-2008
2.50
Installed rudder & rudder cables at rudder...
Details

 08-30-2008
2.50
applying decals & more polishing
Details
       

 08-28-2008
3.50
Received DD Gen III transmission, wiring advice...
Details

 08-27-2008
3.00
Installed EXPBUS, polished some...
Details
     

 08-20-2008
1.50
Polished top of R/L aileron...
Details
       

 08-07-2008
4.00
Spent day making radio racks fit & secure...
Details
       

 08-05-2008
3.00
Installed EXPBUS nutplates, polished L-HS...
Details

 07-23-2008
1.50
More reworking for proper rigging...
Details

 07-22-2008
1.50
Torquing more flight control bolts...
Details

 07-22-2008
3.50
Cut SL-40 opening above transponder...
Details
       

 07-21-2008
3.50
Cut transponder opening & attached supports...
Details
       

 07-16-2008
2.50
Redid D-subs for elev. trim & ran wires forward...
Details
       

 07-15-2008
3.00
Installed EXPBUS on subpanel...
Details
       

 07-15-2008
1.50
D-subbing elevator trim & fishing wire....
Details
       

 07-14-2008
3.00
Cut control stick to use CH stick....
Details

 07-12-2008
0.50
Filed EIS opening to size....
Details
       

 07-11-2008
2.00
Measuring & cut EIS slot in panel...
Details

 07-08-2008
3.00
Installed A/P roll servo ...
Details
       

 07-08-2008
3.00
Engine/panel planning for wiring...
Details

 07-06-2008
3.00
Installed EXPBUS on subpanel...
Details

 07-01-2008
2.00
More filling/sanding pinholes...
Details

 06-25-2008
2.00
Filling and sanding pinholes on lower cowl...
Details

 06-24-2008
2.50
More pinhole filling & sanding on cowls...
Details

 06-23-2008
3.00
Measured and drilled brackets for a/p pitch servo.
Details
       

 06-23-2008
2.00
added 2 batches to fill pinholes on lower cowl...
Details

 06-21-2008
4.50
More back breaking pinhole filling & sanding...
Details
       

 06-20-2008
4.00
Filling/sanding cowl pinholes...
Details
       

 06-19-2008
2.50
Applied more pinhole filler on lower cowling...
Details
       

 06-18-2008
1.00
Added brake fluid and bled system...
Details

 06-12-2008
1.00
Drilled another hole for screw in L lower fairing.
Details

 06-10-2008
3.00
Installed firewall labels & making batt. cable...
Details
       

 06-05-2008
2.50
Installed Aux Batt Boost on firewall...
Details
       

 06-04-2008
2.00
Drilled firewall for nutplate installation...
Details
       

 06-03-2008
0.50
Removed exhaust system for muffler upgrade...
Details
     

 06-03-2008
2.00
More trimming on fairing & screws tapped...
Details

 06-02-2008
2.00
Drilling & fitting empennage fairing...
Details
       

 05-31-2008
3.50
Still taping under HS...
Details

 05-30-2008
3.00
Still taping under HS...
Details

 05-29-2008
2.00
Tapping L HS longeron for screws
Details

 05-27-2008
1.50
Fitting L Horiz. stab. fairing...
Details
     

 05-26-2008
2.50
Tightened brake lines and added fluid...
Details
     

 05-24-2008
2.00
Glassing in another vane...
Details
       

 05-23-2008
3.00
Lower radiator air access...
Details
       

 05-22-2008
2.50
Finalizing center cowl pins and fastener...
Details

 05-20-2008
2.50
Installed nutplates for cowl inlets & more trimmin
Details
     

 05-19-2008
3.50
More cowling fitting and piano hinge fitting...
Details

 05-19-2008
2.50
Fabricated cowl guides for top...
Details

 05-16-2008
2.50
RV-6A ride & filing fitting more for L shroud...
Details

 05-15-2008
3.50
Riveted top R piano hinge & fitted L radiator...
Details

 05-13-2008
2.00
Drilled top R cowl hinge using hole finder...
Details

 05-12-2008
2.00
Drilled & riveted L center cowl hinge
Details

 05-09-2008
2.50
Drilled L side piano hinge, deburred
Details

 05-08-2008
3.00
Drilled R bottom cowl lower piano hinge...
Details
     

 05-03-2008
4.50
Fitting lower cowling & L side piano hinge...
Details
       

 05-02-2008
3.00
Filing bottom cowl for hinge alignment...
Details
       

 05-01-2008
4.00
Drilled sides & riveted bottom cowl...
Details
       

 04-29-2008
4.00
Trimming & fitting bottom cowl...
Details
     

 04-25-2008
3.00
Drilled top cowl fasteners, made bracket...
Details
       

 04-24-2008
2.50
Drilling top cowl...
Details
       

 04-23-2008
2.50
More sanding on cowl, moving oil cooler up...
Details
     

 04-22-2008
2.00
Riveting piano hinge to fuselage.
Details
       

 04-13-2008
2.00
More fitting of cowling...
Details

 04-08-2008
2.00
Fitting and sanding cowl.
Details
     

 04-07-2008
0.50
Prop-new style available...
Details
       

 03-19-2008
3.50
More cowl fitting and piano hinge fitting...
Details
     

 03-18-2008
2.50
First fitting of cowling & more fitting of lower H
Details
       

 03-13-2008
2.00
More fitting of cowling...
Details
       

 03-12-2008
2.50
More fitting of cowl...
Details
       

 03-11-2008
3.50
More placeing of cowl for fitting...
Details
       

 02-29-2008
1.50
Installed R wing light & completed wiring...
Details
       

 02-16-2008
1.00
Installed cotter pin in NG fork retention nut...
Details
     

 02-14-2008
1.50
More trimming & installing wing lights...
Details
       

 02-14-2008
1.00
Final adjusting of NG breakaway ...
Details
       

 02-12-2008
2.00
Working on panel planner...
Details

 02-09-2008
2.50
Installing L wing light & wiring....
Details
       

 02-08-2008
1.00
Measuered & adjusted NG breakaway....
Details

 02-08-2008
1.50
Fabricated ground wires for wing bulbs....
Details
     

 02-06-2008
1.00
New plan for wing wires forward...
Details

 02-04-2008
1.00
Planning & marking for empennage fairing...
Details
       

 02-04-2008
1.00
...Drilled for snap bushing entering R cockpit...
Details

 01-29-2008
1.30
Fit all alum. fuel lines to Andair valve...
Details
     

 01-29-2008
1.50
Drilled for snap bushing entering R cockpit...
Details
     

 01-28-2008
1.00
Working on L return line in cockpit...
Details
     

 01-28-2008
1.80
Safety wired AN4H-6A wing tank attachment bolt...
Details
       

 01-26-2008
1.50
Remade 5/16 fuel return line for L wing...
Details
     

 01-25-2008
2.00
Making tracing under HS for trim piece...
Details
     

 01-21-2008
1.00
Making tracing under HS for trim piece...
Details

 01-18-2008
1.00
Mounting magnetometer on aft tail deck...
Details
       

 01-16-2008
1.00
Drilling hub for 7/16 bolts...
Details
     

 01-15-2008
1.00
Reinstalled NG on aircraftper SB 07-11-09...
Details
       

 01-12-2008
1.00
Expanding exit holes in wingtips for strobes...
Details

 01-09-2008
0.50
Assembling new throttle firewall hardware...
Details

 01-04-2008
0.50
Gathering projects to work on in basement...
Details

 01-03-2008
1.80
Researched and purchased labelmaker...
Details

 11-15-2007
1.50
Pulled NG off aircraft-VansSB07-11-09& ordered new
Details
       

 11-15-2007
1.80
Fabricated wooden crate for NG shipping...
Details
       

 11-14-2007
1.50
Making new firewall exit point ...
Details

 10-17-2007
1.00
Drilling firewall for new throttle exit...
Details
       

 10-09-2007
2.50
Rerigged ailerons to get limits....
Details
     

 09-25-2007
1.50
Installed flap control rods...
Details

 09-24-2007
2.00
Torquing wing/gear bolts...
Details
       

 09-20-2007
2.00
More adjusting flight controls...
Details

 09-20-2007
1.50
Installed elevator...
Details

 09-11-2007
2.50
Ailerons installed, adjusting control rods...
Details
     

 09-10-2007
2.50
Torqued remainder of wing/gear weldments...
Details
     

 09-10-2007
2.50
Adjusting ailerons for proper deflection...
Details
       

 08-09-2007
3.50
Torqued remainder of wing/gear weldments...
Details
     

 08-08-2007
3.50
Torquing wing/gear weldment bolts...
Details
     

 08-07-2007
2.50
Licensing &wiring trailer & truck...
Details
     

 08-07-2007
1.00
Inserting more wing spar bolts/nuts....
Details

 08-06-2007
2.00
Repositioned plane on adjustable sawhorse...
Details
     

 08-02-2007
2.00
Inserting spar/gear weldment bolts and nuts...
Details

 07-31-2007
2.50
Running wires for trailer lights...
Details

 07-31-2007
1.00
Inserting spar bolts in spars/gear weldments ...
Details

 07-30-2007
1.50
Finished 20 main spar bolts & some others...
Details

 07-28-2007
0.50
Installed wing tank flange bolts....
Details

 07-27-2007
3.00
Trailer installation project...
Details

 07-16-2007
1.50
Painting and constructing sides of trailer...
Details
       

 07-12-2007
2.50
Painting & constructing side rails for the trailer
Details

 07-11-2007
1.50
Trailer construction on sides and tank...
Details
       

 07-10-2007
2.50
Made plywood floor for trailer, modified tank...
Details
     

 07-10-2007
2.00
Inserted more bolts into weldments & gear...
Details
     

 07-09-2007
2.50
Inserted both wings & some major bolts
Details
     

 07-06-2007
3.00
Assembling fuel trailer...
Details

 07-05-2007
2.00
Repacked wheel bearings & tightened wheelskirt...
Details
     

 07-05-2007
1.50
Began assembling fuel trailer...
Details
     

 07-04-2007
2.00
Pulled wheels & wooden spars...
Details
       

 07-02-2007
2.30
Hung engine hoist from I-beam, plane off gear...
Details
       

 07-01-2007
1.50
Put up hanging light, sorting parts...
Details
     

 06-29-2007
3.50
Tidying new hangar...
Details
       

 06-27-2007
4.00
sorting tools & unpacking supplies...
Details

 06-25-2007
2.00
Cleco pliars finally found...
Details

 06-22-2007
2.00
Finding places for tools in chests...
Details
       

 06-08-2007
2.50
Readying hangar for use & decorating...
Details

 06-07-2007
2.00
Putting tools away
Details
       

 06-06-2007
3.00
More sorting and organizing with professional help
Details

 06-04-2007
2.00
Took load of tools & supplies to M71...
Details
     

 06-03-2007
2.50
Decorating and arranging tools in hangar...
Details
       

 06-02-2007
3.50
Moved plane from SUS to M71...
Details
       

 06-01-2007
3.50
Moving wings and desk to M71...
Details
       

 05-31-2007
4.50
Readying plane for travel, loaded truck for M71...
Details

 05-30-2007
3.00
Readying plane for move & packing/moving gear...
Details

 05-28-2007
4.00
Removed final bolts, pulled wings...
Details
       

 05-23-2007
3.00
Removed tail feathers for move...
Details
     

 05-22-2007
1.50
Moved some stuff from the hangar to home...
Details

 05-18-2007
2.50
Removing wing nuts/bolts...
Details

 05-10-2007
1.00
Removing wing spar bolts in prep. for move...
Details

 05-10-2007
1.50
Completed ECM mount
Details

 05-09-2007
2.50
Son Mark rented a hangar big enough for us...
Details
       

 05-08-2007
3.00
Fabricating shock mount for ECM...
Details
       

 05-07-2007
2.00
Removed remainder of steel ECM brackets...
Details

 04-27-2007
2.00
making mounting brackets for ECM...
Details
     

 04-26-2007
3.00
Wrapped O2 sensors, fuel hose, made eng. grd...
Details
       

 04-25-2007
2.50
Completed batt. tie downs and fastened ECM ...
Details
     

 04-24-2007
1.00
Torqued 24 NAS1304/1306 bolts...
Details
     

 04-24-2007
2.00
Finishing reorganizing shop and desk...
Details
       

 04-23-2007
4.00
Reorganizing tools and posters...
Details
     

 04-20-2007
4.00
Labeling parts & reorganizing tools & pegboards...
Details
     

 04-16-2007
1.00
Priming inside and out of aileron tubes...
Details
     

 04-16-2007
0.50
Ordered control boots for aileron tubes ...
Details

 04-16-2007
2.00
Installing nutplates for firewall bolts for batts.
Details

 04-14-2007
1.50
Installed stiffener on firewall Andair filter...
Details
     

 04-14-2007
1.00
Exchanged bolts in step retainers, firewall ...
Details

 04-13-2007
2.00
Fabricating 063 alum. firewall stiffener for andai
Details

 04-12-2007
1.00
Safety wired flap pins to prevent movement...
Details

 04-11-2007
1.00
Removed Andair fuel filter from firewall...
Details

 04-10-2007
1.20
Finalized L fuel inlet line, flared and secured...
Details

 04-06-2007
1.30
Fabricating another L tank 3/8" fuel inlet line...
Details

 04-06-2007
1.20
...When I was unable to flare the previous inlet l
Details
       

 03-19-2007
2.50
Fabricating R fuel return line...
Details
       

 03-16-2007
1.50
Plumbled fuel tank ends of R tanks...
Details
       

 03-16-2007
2.00
Completed fuel valve housing braces...
Details
       

 03-13-2007
3.50
Assembling fuel pump cabin support, Andair...
Details
       

 03-12-2007
1.00
Ordered parts from Wicks for Andair valve...
Details
     

 03-07-2007
2.00
Expanded fuel inlet holes in fuselage...
Details
     

 03-06-2007
2.00
Drilled R fuel inlet line hole thru fuselage ...
Details
     

 03-02-2007
2.50
Flared R inside brake fitting, drilled L fuel inle
Details

 03-02-2007
0.50
Fabricated a rudder lock and drilled to install...
Details
       

 03-01-2007
2.50
Fabricating brake line...Batt hold downs...
Details
     

 02-28-2007
2.50
Fabricated Batt to GRD terminals, Batt tray spacer
Details

 02-27-2007
1.50
Ran L brake line down back of gear leg...
Details

 02-22-2007
2.00
Completed fuel vent lines for L/R tanks...
Details

 02-21-2007
1.50
Removed L/Rwing tips ...
Details

 02-21-2007
2.00
More filing for final rudder fit into web of VS...
Details

 02-21-2007
1.50
Final fitting L/R flaps for retraction...
Details

 02-20-2007
2.00
More filing to fit rudder inside VS web...
Details

 02-20-2007
2.00
More filing to fit rudder inside VS web...
Details

 02-20-2007
0.70
Drilled and placed ground bus on firewall...
Details
     

 02-19-2007
0.50
Threaded ECM cable thru firewall...
Details
     

 02-19-2007
1.50
Rudder is contacting VS skin preventing full ops..
Details

 02-06-2007
1.30
More filing on area that is hitting rudder
Details
     

 02-06-2007
2.00
Built workbench for basement for electric work...
Details

 01-29-2007
1.50
Trimming more off bottom area for rudder clearance
Details
     

 01-25-2007
2.00
Plumbed coolant lines and filled with fluid...
Details
       

 01-24-2007
1.00
Picked up painted rudder from Dennis...
Details
       

 01-24-2007
1.20
Made new entry for ECM cable in firewall...
Details
       

 01-23-2007
1.00
Trimmed res. bracket & reinstalled...
Details

 01-22-2007
1.00
Helped lay out flag stripes on rudder....
Details
     

 01-20-2007
2.00
Installed Moresco radiators overflow tank...
Details
       

 01-20-2007
1.50
Installed heater to firewall...
Details
     

 01-19-2007
2.50
Made fuel return line entry into cabin...
Details

 01-19-2007
1.20
Added plastic covers over fuel lines...
Details
     

 01-18-2007
1.00
Fabricated balsa end cap for top VS...
Details

 01-15-2007
1.50
Ordered decals, electric supplies...
Details

 01-12-2007
3.50
Subaru pressure relief & exhaust installed...
Details
       

 01-11-2007
1.00
Trimmed seat pans to fit over gear weldments...
Details
       

 01-11-2007
1.00
Drilled lightening holes in elevator horns...
Details
       

 01-11-2007
1.00
Drained coolant & removed thermostat housing...
Details
       

 01-10-2007
2.00
Installing Andair fuel filter in firewall...
Details
       

 01-09-2007
2.50
Rudder delivered to paint shop, engine planning...
Details

 01-08-2007
2.00
Purchased paint for flag rudder...
Details

 01-08-2007
1.00
Installed engine computer cable thru firewall...
Details
     

 01-05-2007
3.00
Installed new hinge on trim tab and safety wired..
Details
     

 01-04-2007
2.00
Riveted fiberglass tips on horizontal stabilizer..
Details
     

 01-03-2007
2.00
Trimming L. side of fuselage for flap retraction..
Details
       

 12-22-2006
2.00
Organizing tools, parts and hangar space...
Details
       

 12-21-2006
1.50
More sanding/buildup on rudder/wingtip layups...
Details

 12-20-2006
1.50
Trimmed 1/8" off engine mounts, retorqued...
Details
       

 12-20-2006
2.00
Completed counterweights for elevators...
Details
     

 12-19-2006
2.00
Installed battery bracket, engine mount prep...
Details

 12-19-2006
2.00
Balancing elevators....
Details
       

 12-18-2006
2.00
More sanding on rudder and wing light area...
Details

 12-14-2006
1.00
Finished bolting VS in place, installed tail tie d
Details

 12-14-2006
3.00
Added fiberglass flox on rudder for paint prep...
Details
     

 12-13-2006
2.00
Fine sanding rudder/fiberglass joints
Details

 12-13-2006
2.00
Final attachment/installation of VS...
Details
     

 12-12-2006
0.70
Prepare/prime elevator push rod...
Details

 12-12-2006
2.50
Bolting HS in place and filing aft elev. stop...
Details
       

 12-05-2006
2.00
Refabricating F-611E fwd elevator stop...
Details

 12-05-2006
1.50
Added washers/nuts for remaining L gear area...
Details
     

 11-28-2006
1.50
Torqued 16 center spar bolts to 175 in/lbs ...
Details

 11-28-2006
2.00
Replaced stripped AN5-21A bolt in R gear...
Details

 11-28-2006
2.00
Replaced stripped AN5-21A bolt in R gear...
Details

 11-27-2006
3.50
Inserting AN3-16A/17A bolts in spars...
Details

 11-22-2006
1.00
Tightened bolts thru fuselage sides/gear weldments
Details

 11-22-2006
1.00
Tightened bolts thru fuselage sides/gear weldments
Details

 11-22-2006
2.00
Finished fabricating 12" stand for working ease...
Details

 11-20-2006
2.00
Disassembling fuselage cradle & building workstand
Details
     

 11-19-2006
1.00
Clecoed tail on for photo op...
Details
       

 11-17-2006
4.00
Mounted Subaru engine to firewall....
Details
       

 11-17-2006
2.00
Mounted both main gear & nose gear after eng. ...
Details
     

 11-15-2006
1.50
Built up fuselage stand & modified Pete's stand...
Details

 11-14-2006
2.00
Assembled brake flanges, spacers for bolts....
Details
     

 11-11-2006
1.00
Inserted more bolts through wing spar...
Details
     

 11-11-2006
1.50
Attempting to figure out brake assembly...
Details
       

 11-10-2006
3.00
Inserting bolts through spar/gear/etc...
Details

 11-03-2006
3.00
Inserted R wing and fastened most center bolts...
Details
       

 11-02-2006
2.00
Inserted bolts in gear weldments in prep for wings
Details

 11-01-2006
3.00
Sealed tank access covers with proseal...
Details
     

 10-31-2006
2.50
Tested fuel tank ops, prosealed lines...
Details
       

 10-26-2006
1.50
Riveted remaining 9 rivets on side skirts...
Details
     

 10-26-2006
1.00
Completed nutplates for fuselage gap fairings...
Details

 10-24-2006
2.00
Prosealed alum. patch under future gear fairing..
Details

 10-23-2006
1.50
Prosealed and riveted firewall plate ...
Details
     

 10-23-2006
1.30
Installing bottom nutplates on R wing...
Details
       

 10-17-2006
4.00
Removed wings again after drilling for nutplates..
Details

 10-16-2006
3.50
Installed L & R wings and bolted steel attachemnts
Details
     

 10-13-2006
3.50
Mounted nosewheel, main gear wheel...
Details
       

 10-09-2006
1.50
Sanded L wingtip & installed on wing...
Details
     

 10-09-2006
1.50
Cut hole in side skirt for lock...
Details
     

 09-20-2006
2.00
Completed most of L wing nutplates...
Details

 09-19-2006
3.50
Installed 18 nutplates on bottom L wing...
Details

 09-18-2006
2.00
Drilled bottom row of L wing for nutplates...
Details

 09-15-2006
3.00
Fitting L. wingtip to wing...
Details
       

 09-13-2006
2.50
Completed R wingtip & installed on Wing...
Details

 09-12-2006
3.00
Finished nutplates on R. wing...
Details
     

 09-11-2006
3.50
Installing #4 nutplates for R wingtip
Details

 09-06-2006
3.20
Drilled wings for wingtip fairings...
Details

 09-05-2006
3.00
Fitting R wing fairing to wing...
Details

 08-31-2006
3.50
Squeezed L wing aft rivet line...
Details

 08-30-2006
4.00
Riveted L top wing skin ...
Details
       

 08-29-2006
2.00
Drilled canopy bows for rollers...
Details
       

 08-28-2006
3.00
Riveted rear line of spar rivets ...
Details
     

 08-26-2006
4.00
Riveted top R wing skin on...
Details
       

 08-25-2006
2.50
Prep for riveting R top wing skin...
Details

 08-24-2006
2.00
Working on canopy tip up mechanism...
Details
       

 08-23-2006
2.00
More installation of control sticks...
Details

 08-21-2006
2.00
Began reinstalling flt. controls and taped rudder.
Details
     

 08-07-2006
2.50
Inspection by EAA tech. counselor Gale Derosier
Details
     

 08-01-2006
1.00
Completed riveting panel brace
Details

 07-28-2006
2.50
Worked on tip up canopy additions & panel braces
Details

 07-13-2006
3.50
Reinstalled flap actuator; clecoed R NACA vent...
Details

 07-12-2006
1.00
Ordered shockmounts and NPG + from Wickes...
Details

 07-12-2006
3.00
Drilled and enlarged 2 firewall holes....
Details
       

 07-10-2006
1.00
Removed brainbox from engine for placement...
Details

 07-10-2006
1.00
Fabricated throttle bracket for lower inst. panel.
Details
     

 07-06-2006
3.50
Drilled HS and elev. for fiberglass tips...
Details
       

 07-05-2006
2.50
Drilled R wing underside for wingnuts...
Details

 07-04-2006
1.00
drilled rollers for fwd canopy supports...
Details
     

 07-03-2006
2.00
Replaced broken A-507 & planned L wing ...
Details
       

 07-01-2006
1.00
Attached HS for fiberglass fitting of tips...
Details

 06-30-2006
0.50
Broke ceramic tail light insulator during reassemb
Details

 06-29-2006
0.80
Sanded rudder fiberglass built up area...
Details

 06-29-2006
1.50
Ordered Batt. ground unit with 24 tabs...
Details

 06-28-2006
1.50
Glassed L fiberglass strobe attachment ...
Details
     

 06-28-2006
1.00
Filled rudder spaces with fiberglass/flox...
Details
     

 06-27-2006
1.00
Riveted bottom fairing to Rudder, fiberglassed...
Details
     

 06-27-2006
1.50
Attached strobe light fiberglass housing R wing...
Details
     

 06-26-2006
2.50
Installed Aeroflash power units on wings...
Details
     

 06-24-2006
0.80
Cut off 7/16 of L canopy roller attachment...
Details

 06-23-2006
1.20
Riveted stiffener to L rudder and redrilled hole..
Details

 06-22-2006
1.20
Fabricated stiffener for L rudder hole realignment
Details
     

 06-12-2006
0.80
Squeezed a few more side skirt rivets...
Details
       

 06-10-2006
1.00
Fabricated delhrin flap switch...
Details

 06-08-2006
2.50
Rivet both side rails with CS4-4...
Details
     

 06-06-2006
2.50
More pop rivets on aft bar & side rails...
Details
       

 06-05-2006
1.30
Installed screws/nuts thru canopy...
Details
       

 06-01-2006
2.00
Riveted remaining front frame to plexi...
Details
       

 06-01-2006
1.50
Ordered parts for wiring engine from Wickes...
Details
     

 05-31-2006
3.00
Finishing for riveting top strip on canopy...
Details
       

 05-27-2006
1.00
Drilled aft canopy skirts to 30, trimmed
Details

 05-26-2006
3.00
Removed canopy and trimmed aft skirts...
Details

 05-20-2006
1.00
Moving the Subaru to the airport...
Details
       

 05-17-2006
1.00
Removed canopy & rail and trimmed for tip up...
Details

 05-17-2006
2.00
Ordering parts for the engine installation...
Details

 05-16-2006
1.00
Smoothing out canopy parts for tip up kit...
Details

 05-15-2006
0.50
Placed R wing on rack...
Details
     

 05-12-2006
1.50
Prosealed more alum strips on fiberglass...
Details

 05-04-2006
2.00
Prosealed alum. strips inside wingtips...
Details
       

 05-02-2006
1.50
Cut 1/2" alum .025 strips for fiberglass...
Details

 04-28-2006
1.00
Drilled spacing for top fiberglass for vertical fi
Details
     

 04-26-2006
2.50
Riveted top fiberglass to rudder...
Details
     

 04-25-2006
1.00
Drilling bottom Rudder fairing/end cap...
Details
       

 04-24-2006
2.00
Canopy countersink for W/S attachment
Details

 04-22-2006
1.50
Moved MT propeller to hangar...
Details
     

 04-18-2006
2.00
Drilled top canopy rail to 30 and countersink...
Details

 04-17-2006
2.50
Sliding canopy prep. for riveting...
Details
     

 04-14-2006
4.00
...Drilled front bow of sliding canopy to 30 ...
Details
       

 04-13-2006
2.50
Shaping windscreen for fit...
Details
       

 04-12-2006
2.00
More sanding and filing and shaping windscreen...
Details
     

 04-11-2006
1.50
More sanding on canopy with beltsander....
Details
       

 04-10-2006
3.00
Measured canopy and made angle marks and cut...
Details
       

 04-05-2006
2.50
Trimming front windscreen closer to final cut...
Details
       

 04-03-2006
1.50
Moved larger compressor to hangar from house...
Details
     

 03-30-2006
2.50
Assembled main gear tubes/tires..
Details
       

 03-29-2006
3.50
Greased nose gear bearings, assembled tire...
Details
     

 03-28-2006
1.00
Purchased Aeroshell 5 grease and fuel testing...
Details

 03-27-2006
1.50
Trimmed bottom of L canopy skirt...
Details

 03-11-2006
1.00
Replaced top FWD skin in prep. for windscreen...
Details

 03-09-2006
2.00
Fabricated R fuel return line...
Details

 03-08-2006
2.50
Refabricated L tank internal fuel return line...
Details

 03-06-2006
2.50
Drilled L fuel tank for return line & fabricated .
Details

 03-03-2006
2.50
Drilling tanks for return line fittings...
Details
     

 03-01-2006
3.00
Finished installing nutplates, air vents to panel.
Details
       

 02-28-2006
3.00
Added 16 nutplates to attach panel to top skin
Details
     

 02-27-2006
2.50
Fabricated vent brackets & inst. panel layout...
Details
       

 02-23-2006
1.00
Added 2 countersink screws to batt. box to center.
Details

 02-22-2006
2.00
Removed inst. panel, primed some area...
Details
     

 02-21-2006
2.00
Drilled battery holder to firewall, clecoed on...
Details
     

 02-17-2006
1.00
Cut 2 more lightening holes on battery bracket...
Details
     

 02-16-2006
2.50
Cut holes thru stainless firewall for heater...
Details
       

 02-15-2006
2.50
Cut out NACA vent air entry ducts...
Details
       

 02-14-2006
3.50
Mated Andair fuel valve to flate & seat bottom...
Details

 02-13-2006
1.50
Removed top FWD skin and elongated brace...
Details
     

 02-10-2006
1.00
More bending on L side skirt-no discernible help.
Details

 02-09-2006
2.80
Removed R side skirt & aft 5 or 6 times to bend...
Details
     

 02-06-2006
2.50
Installed L canopy brace handle, drilled R aft ...
Details
       

 02-02-2006
2.70
Installed handle on PAX side of roll bar...
Details

 02-01-2006
3.00
Bending L aft skirt for better fit...
Details
     

 01-31-2006
4.00
Dimpled L C-660, drilled aft rivet holes for C-666
Details
     

 01-30-2006
3.00
Removed both C-660, dimpled for #6 screws...
Details

 01-27-2006
2.50
Made aft R canopy block of wood...
Details

 01-26-2006
3.50
Reamed L aft canopy block to 15/64 for pin...
Details
     

 01-25-2006
2.00
Secured aft L block, tested opening, closing...
Details
     

 01-24-2006
1.00
Prime seat bottoms and L floor pan...
Details
       

 01-23-2006
3.00
Adding more nutplates to R/L wing...
Details
     

 01-22-2006
1.00
Cutting aft canopy skirts after tracing outline...
Details
       

 01-20-2006
3.50
Redrilling and installing L aft canopy support...
Details
       

 01-19-2006
2.00
Installing nutplates on L wing...
Details
     

 01-18-2006
0.70
Hung new light to ceiling of hangar...
Details
     

 01-18-2006
2.50
Drilled L plexi, both side braces...
Details
       

 01-17-2006
2.00
Drilled L plexi, drilled L C-660 to frame..
Details
     

 01-16-2006
1.00
Fabricated doubler for L flap mount...
Details

 01-16-2006
2.00
Drilling R. C-660 side skirt to frame...
Details
       

 01-13-2006
1.70
Reworked flap actuator assembly...
Details

 01-12-2006
1.50
Troubleshooting aft left sideskirt...
Details
     

 01-11-2006
4.00
Drilling C-660 L side skirt/C-759 to plexi...
Details
       

 01-10-2006
1.00
Moved drill stand to hangar, new carpet for ...
Details
     

 01-10-2006
2.00
Drilled R. C-660 side skirt to canopy frame...
Details
     

 01-09-2006
1.50
Drilled L nylon aft canopy block...
Details
     

 01-05-2006
1.50
Drilled L C-661 alum bracket & nylon block...
Details

 12-29-2005
1.60
Drilled L rear canopy latch (C-657) to side rail..
Details

 12-13-2005
0.50
Marking rivet spacing on R canopy side skirt
Details
     

 12-07-2005
3.00
Drilled top canopy handle & tapped for screw...
Details
       

 12-06-2005
2.50
Installed spring on canopy latching...
Details

 12-05-2005
2.00
Drilled L aft canopy mockup attach block...
Details

 12-02-2005
1.30
Fabricated cardboard mockup of side skirt...
Details

 12-01-2005
2.00
Drilled F-791s to canopy rails and clecoed...
Details
     

 11-29-2005
2.00
More shop preparation, storage shelves, sorting.
Details
       

 11-29-2005
0.50
Deburring C971 lightening holes
Details

 11-23-2005
4.20
Drilled lightening holes in C-791s, sanded bottom
Details
       

 11-21-2005
2.00
Trimmed bottom edges of canopy...
Details
     

 11-17-2005
2.00
Hangar door adjustment & tool rack addition...
Details
     

 11-17-2005
1.00
Cut 1/8" off bottom of frame for alignment...
Details
     

 11-16-2005
2.00
Set up tools, put plastic sheet over shop door...
Details
     

 11-15-2005
2.50
Getting tools organized in hangar...
Details
     

 10-28-2005
2.00
...Wiring lights in hangar...
Details

 10-21-2005
2.50
Wiring lights in hangar...
Details
     

 10-18-2005
5.00
Moved fuselage and wings to hangar...
Details
       

 10-17-2005
1.50
Back drilled C-653 canopy cover...
Details

 10-14-2005
2.00
Moved flap to hangar, assembled light...
Details

 10-14-2005
2.00
Drilled aft portion of canopy to aft slider...
Details

 10-13-2005
2.00
Moved flight controls and emppenage to hangar...
Details

 10-11-2005
2.00
Fitting C759s, trimming, sanding...
Details

 10-10-2005
1.00
Trimmed bottom edge of nylon rudder cable...
Details

 10-10-2005
3.00
Cut 1/8" off frame for canopy handle...
Details

 10-08-2005
1.50
Retaped and trimmed plastic protective cover...
Details

 10-06-2005
2.00
More drilling of canopy/sanding edges

 10-05-2005
4.00
Drilling slider to canopy frame
Details

 09-29-2005
3.50
Installing nutplates on R wing top aft...
Details

 09-14-2005
2.00
Trimmed aft end of sliding canopy and sanded...
Details

 09-12-2005
1.00
Belt sanded canopy edge more...
Details

 09-10-2005
1.00
Sanded canopy area and filed top front edge...
Details

 09-09-2005
4.00
Split canopy in half...
Details
       

 09-09-2005
1.00
Filed HS to allow free movement of elevator

 09-08-2005
3.50
Trimming Fwd windscreen in prep for splitting
Details
     

 09-07-2005
4.00
Trimming Fwd windscreen for proper fit...
Details

 09-06-2005
2.50
Trimming and measuring front Windscreen...
Details
     

 09-05-2005
2.00
Cutting front windscreen...
Details
     

 09-01-2005
1.00
Met Jamie the painter at CC airport...
Details

 08-31-2005
2.00
Installed threaded rod and finished canopy rail...
Details

 08-30-2005
2.00
Installed nutplates using pop rivets, installed..
Details

 08-29-2005
2.00
Drilled rail holes to size, began nutplate install
Details

 08-23-2005
1.30
Installed canopy rails drilling all 6 holes in eac
Details

 08-16-2005
1.00
Refabing new fuel vent attachment...
Details
     

 08-15-2005
2.00
Finalized R fuel vent line..
Details

 08-12-2005
3.50
Fabricating vent line to connect fuse. to wing...
Details

 08-10-2005
4.00
Removed wings...
Details
       

 08-09-2005
4.00
Installed L brake line between firewall and AN833-
Details
     

 08-08-2005
1.00
Bending fuel vent lines...
Details
       

 07-19-2005
2.50
More hangar prep-peg boards & organizing...
Details

 07-08-2005
3.00
More painting hangar 24 at SUS...
Details
       

 07-06-2005
3.00
Hangar prep. at SUS for painting floor...
Details
       

 07-02-2005
1.00
Closed on SUS hangar & moved some gear...
Details

 06-16-2005
1.50
Trimming, drilling L wing root fairing...
Details

 06-15-2005
1.50
Fitting R/Lwing fairing...
Details

 06-14-2005
1.00
Fitting R wing fairing...
Details

 06-13-2005
1.50
Drilling R wing root fairing...
Details

 06-09-2005
0.70
Fitting R wing root fairing...
Details

 05-18-2005
1.00
Riveted trim motor to cover plate....
Details
     

 05-15-2005
2.00
Remounted engine on stand...
Details
     

 05-03-2005
1.00
Purchased DD's SUS hangar...
Details

 04-27-2005
0.80
Marked flutes on wing...
Details

 04-26-2005
2.50
Drilled FWD wing attachments...
Details
     

 04-22-2005
1.50
Drilled lightening holes in gear welds...
Details
     

 04-21-2005
3.00
Installed (2)F699...
Details

 04-11-2005
1.50
Finished L F696...
Details
       

 04-10-2005
3.50
Finished R F696 installation...
Details
     

 04-09-2005
2.50
Drilled R F696 to fuselage...
Details

 04-08-2005
3.50
Finalizing (2) F696...
Details

 04-07-2005
1.50
Am studying/ understanding F699/F696...
Details

 04-05-2005
4.50
Fabricating F-699;F696; fitting L flap..
Details

 03-31-2005
2.50
Drilled, expanding L flap rod access..
Details

 03-30-2005
3.50
Fitting R flap rod thru fuselage...
Details

 03-29-2005
4.50
Trimming L flap; drill R flap hole...
Details
     

 03-28-2005
4.00
Installed L aileron; trimming L flap ...
Details
     

 03-27-2005
3.00
Trimming R flap to fit...
Details
       

 03-26-2005
2.00
Fitting R wing flap to fuselage...
Details
     

 03-25-2005
1.80
Fitting R flap to fuselage...
Details
       

 03-24-2005
4.00
Drilled wing incidence...
Details
       

 03-23-2005
2.00
Drilled brake support to firewall...
Details

 03-22-2005
1.50
Cut overlap off R wingskin...
Details
     

 03-21-2005
2.50
Riveted outboard aileron brackets..
Details
       

 03-18-2005
1.50
Removed R gear weldment...
Details

 03-17-2005
1.00
Removing R gear weldment...
Details

 03-16-2005
3.50
R wing prep. for setting incidence...
Details

 03-16-2005
0.50
Countersunk one gear weldment...
Details

 03-15-2005
1.50
Installed bolts/nuts for R gear ...
Details

 03-14-2005
3.00
R wing prep. for incidence...
Details
       

 03-11-2005
1.50
countersunk gear weldments...
Details

 03-10-2005
4.00
Attempt at setting wing incidence...
Details

 03-09-2005
4.00
Angle of incidence preparation...
Details

 03-08-2005
1.00
Trimmed 1/4" off fwd R aft spar..
Details
       

 03-08-2005
1.50
Primed bracket and riveted assembly...
Details

 03-08-2005
4.50
Drilled stringers for top fwd skin...
Details

 03-08-2005
2.50
Dimpled top fwd skin using C rivet tool...
Details

 03-07-2005
3.00
Removed left wing fasteners...
Details

 03-06-2005
1.00
Drilled out remaining rounded...
Details

 03-04-2005
1.50
Priming nose gear, nose mounts...
Details

 03-03-2005
1.50
Wing incidence inspection...
Details

 03-03-2005
1.00
Replaced 4 driftpins with bolts/nuts...
Details

 03-02-2005
1.50
Measured wing/tail distance...
Details
     

 03-01-2005
8.00
Mounted wings in fuselage...
Details

 03-01-2005
1.00
Builder manual update...
Details

 02-28-2005
5.00
Dimpled top skin...Drilled firewall...
Details

 02-24-2005
4.00
Brakes and rudder work...
Details

 02-21-2005
1.00
Marked firewall for battery placement...
Details
     

 02-14-2005
0.50
Riveted angle on aileron brace
Details

 02-11-2005
5.80
Riveted EF603 to underside of F605C...
Details

 02-10-2005
2.00
Installed AOA in right wing..
Details
       

 02-09-2005
1.00
Trimmed brackets for elect. trim...
Details

 02-08-2005
2.00
Removed engine from mount...
Details

 02-03-2005
0.50
Marked, drilled holes ...
Details

 02-02-2005
1.00
Angle of attack ports...
Details

 01-31-2005
3.00
Drilled gap seal & dinpled spars...
Details

 01-30-2005
1.20
Cleaned remainder of duct tape from wing...
Details

 01-29-2005
0.60
Trimmed top canopy skin so nylon...
Details

 01-29-2005
1.00
Cleaning duct tape off wings...
Details

 01-28-2005
0.50
Primed panel angle attachments...
Details

 01-28-2005
1.00
Cleaning old duct tape off wing...
Details

 01-27-2005
2.50
Rt wing aileron gap seal...
Details

 01-27-2005
2.50
Brake assembly...
Details
     

 01-26-2005
4.50
Drilled W603 skin for right wing...
Details

 01-25-2005
2.50
Drilled top rivet line of right W603...
Details

 01-24-2005
6.00
Aileron gap seal, start right wing skin...
Details

 01-21-2005
1.50
Dimple left wing spars...
Details

 01-19-2005
2.00
Dimpled top left wing skin...
Details

 01-18-2005
8.00
finished drilling top left wing skin
Details
     

 01-17-2005
8.00
Drilled top skin to ribs...
Details

 01-14-2005
0.70
Drilled more holes for top left wing...
Details

 01-13-2005
1.50
Marked rivet pattern...
Details

 01-12-2005
1.50
Preparing left rib ends for riveting...
Details

 01-08-2005
2.00
Front deck skin prep...
Details

 01-07-2005
1.50
Mounted brake res. on fwd. firewall...
Details
       

 01-06-2005
2.00
Riveted both WD657 steps...
Details
       

 01-06-2005
1.50
Installing float wire senders...
Details
     

 01-05-2005
1.50
Step preparation...
Details

 01-05-2005
1.00
Riveting F6111l/R...
Details

 01-04-2005
6.00
Primed, riveted F671 aft canopy skin...
Details

 12-28-2004
0.50
Fitting left step...
Details

 12-19-2004
1.00
Drilled F690 pushrod & VA101 with 8 holes....
Details

 12-06-2004
1.00
Used propane torch to bend step face...
Details

 11-30-2004
1.00
Enlarged fuselage holes for better fit...
Details

 10-18-2004
0.50
Called Van's to order new windscreen....
Details

 10-17-2004
0.50
stop drilled canopy split with 1/8" drill...
Details

 10-16-2004
1.00
Cut canopy and split the windscreen...Devastating.
Details
     

 10-13-2004
2.00
Positioned canopy bubble over frame on A/C...
Details
     

 10-12-2004
1.00
Assembled handle to open canopy & bent up...
Details

 10-11-2004
0.50
marked visible CL on top of fuselage using laser..
Details

 10-07-2004
0.50
Bending canopy frame...
Details

 09-21-2004
0.50
Filed more off L canopy rail deck to even it...
Details

 09-18-2004
0.50
Filed more off L side of FWD top skin; Drilled...
Details

 09-16-2004
2.50
Used cargo straps to bend frame & 2X4 & it fits...
Details

 09-13-2004
1.50
Tried bending roll bar using jack; Drilled hole...
Details

 09-12-2004
0.50
Reefed on frame but achieved no noted change...
Details

 09-09-2004
1.00
Made measurements & checked fit of frame...
Details

 09-07-2004
3.00
Repositioned aft frame in plexi upside down...
Details

 09-06-2004
1.00
Cut corners off plexi bubble using die grinder...
Details

 09-05-2004
0.50
Positioned canopy bubble upside down ...
Details

 09-03-2004
2.50
Drilled C-661 aft canopy slide block & installed..
Details

 08-29-2004
2.30
Installed top aft canopy turtle deck skin...
Details

 08-25-2004
0.70
Drilled aftmost bottom rivets on F-6106 on each ..
Details
     

 08-24-2004
2.50
Trimmed edges of F-6106 top skin, trimmed panel...
Details
     

 08-23-2004
3.50
Drilled R angle alum bracket to panel...
Details

 08-22-2004
1.00
Drilled 2 center & L angle brace to panel...
Details

 08-21-2004
3.50
More filing, fitting, C-clamped alum angle to file
Details
       

 08-20-2004
1.50
Removed top skin & filed on top of Inst. panel...
Details

 08-19-2004
1.00
Removed top skin & filed on top of Inst. panel...
Details

 08-19-2004
1.50
Built frame to engine to allow engine to sit level
Details

 08-18-2004
3.00
More trimming, filing of Inst. panel...
Details

 08-17-2004
2.00
Cutting, trimming & fitting F-6103 Instrument pane
Details

 08-16-2004
2.00
Planning & video time for canopy installation...
Details

 08-12-2004
1.00
Unpacked MT prop, measuring possible NACA...
Details
     

 08-04-2004
0.50
Planning & measuring panel mockup using template.
Details

 07-23-2004
2.00
Getting RV-6A ride;selecting interior...
Details
       

 07-13-2004
2.50
Placed R wooden spar in place-not drilled...
Details

 07-01-2004
0.50
Glued template to cardboard mockup...
Details

 06-30-2004
1.00
Printed full size panel mock up from Affordable...
Details

 06-29-2004
3.50
Installed static line T-fitting which is 1/4" poly
Details

 06-28-2004
2.50
Removed top aft skin, drilled static pitot ports..
Details

 06-25-2004
0.50
Inserted bolts in rudder & noted scraping sound...
Details

 06-23-2004
4.00
Drilled L/R elev. horns for AN-3 after checking...
Details

 06-22-2004
1.50
Attached F-690 elevator control rod in position...
Details

 06-10-2004
2.00
Trimmed top FWD skin F-671 and drilled 040 holes..
Details

 05-04-2004
1.00
Backriveted nutplates to cowl strip...
Details

 05-01-2004
1.50
Drilled #12 holes for screws on cowl strip...
Details

 04-28-2004
2.00
Drilled holes and countersink top cowl strip...
Details

 03-26-2004
1.00
Viewed Subaru maintenance video.

 03-26-2004
1.00
Viewed Subaru installation video...
Details

 03-23-2004
1.00
Viewed Subaru installation video....
Details

 03-22-2004
1.00
Unloaded Eggenfellner firewall forward Subaru...
Details
       

 03-11-2004
2.50
Replaced top FWD F-671 skin and backdrilled ...
Details

 03-09-2004
3.00
Smoothed edge of top cowling inner attach piece...
Details

 03-04-2004
1.20
Attached rudder cables; replaced offending rivet..
Details

 03-02-2004
0.80
Riveted pitot tube to inside of wing spar...
Details

 02-28-2004
2.00
Redrilled rudder cable holes behind rudder pedals
Details

 02-05-2004
1.00
Expanded hole in bottom of fuselage for tiedown...
Details

 02-03-2004
0.50
Removed vert. stab., drilled hole for tail tiedown
Details

 02-02-2004
0.50
Set angle of R elev. stop to achieve 29 degrees up
Details

 01-30-2004
2.00
Removed tail tie-down assembly, drilled to...
Details

 01-29-2004
5.00
Completed trim assembly, tested for travel...
Details

 01-28-2004
5.00
Installed Gretz trim kit...
Details

 01-25-2004
1.00
More trimming on elev. stop with scotchbrite...
Details

 01-22-2004
0.50
Photographed Collide cat in cockpit...
Details

 01-14-2004
2.00
Trimmed elevator stop for more up...
Details

 01-12-2004
1.00
Cut 6" .063 1"x1" alum for mounting trim...
Details

 01-11-2004
4.00
Aeroelectric Bob Seminar on wiring principles...
Details

 01-10-2004
8.00
Drilled F-690 pushrod & VA101 with 8 holes...
Details

 12-19-2003
1.00
Drilled F-690 pushrod & VA101 with 8 holes...
Details

 12-16-2003
6.00
Drilled L/R elevators for installation...
Details

 12-11-2003
1.00
Installed pitot line in L wing...
Details

 12-10-2003
2.00
Drilled and expanded hole in L wing Sta. 76.5...
Details

 12-07-2003
1.00
Drilled F6118 using F6115 as guide, AN3-22A...
Details

 12-05-2003
0.50
Attached brake/rudder assembly...
Details

 12-04-2003
2.00
Drilled brake/rudder pedals to longerons...

 12-03-2003
2.00
Drilled master cylinders, installed AN3-11 bolts..
Details

 12-02-2003
2.00
Clamped rudder pedals to master cylinders with C..
Details

 11-23-2003
1.00
Drilled rudder stops to fuselage..
Details

 11-18-2003
3.00
Fabricated rudder stops, temporary cable fairleads
Details

 10-28-2003
1.00
Fabricated R rudder stop of wood allowing 35 deg..
Details

 10-25-2003
0.50
Installed elevators with pins...
Details

 10-17-2003
1.50
Drilled out rivets holding trim tab horn...
Details

 10-16-2003
2.00
Prosealed fire wall openings, rudder cable...
Details

 10-16-2003
1.50
Drilled & fitted L adel clamp bracket to F-610...
Details

 10-11-2003
1.50
Fitted & drilled adel clamp bracket to F610...
Details

 09-18-2003
2.00
Finalized, primed rudder cable brackets...
Details

 09-17-2003
2.00
Fabricated upper cowling mount from .050 2X48...
Details

 09-14-2003
1.00
Fabricating attachments for rudder cable...
Details

 09-10-2003
0.50
Riveted top canopy rail together...
Details

 09-08-2003
1.00
Reduced height of plane cradle to 12"...
Details

 09-08-2003
1.00
Installed Elevator counterweights...
Details

 09-08-2003
1.00
Completed shaping FWD canopy spacers...
Details

 09-05-2003
0.50
Drilled out holes in elevator & counterweights to.
Details

 09-04-2003
0.50
Hung L elev. with pins, it rubs the counterweights
Details

 09-03-2003
4.00
Tweaking roll bar attachments...
Details

 09-02-2003
2.00
Trimmed top aft canopy skin (turtle deck)...
Details

 09-01-2003
0.50
Completed drilling top canopy rail...
Details

 08-30-2003
0.50
Drilled out part of rivet pattern on canopy slide.
Details

 08-29-2003
1.50
Filed rudder bracket to receive cables...
Details

 08-28-2003
3.00
Made cable exit hole on R fuselage...
Details

 08-27-2003
6.00
Riveted/bolted F681 plate to VS...
Details

 08-27-2003
1.00
Drilled canopy track for 5 top bolts to 40...
Details

 08-26-2003
7.00
Drilling F681 to VS...
Details

 08-25-2003
0.50
Reinstalled center post brace, drilled to 30...
Details

 08-22-2003
1.50
Attached F681 to HS with .40 clecoes...
Details

 08-21-2003
2.00
Fabricated new F681 attachment...
Details

 08-20-2003
5.50
Drilled, bolted HS to fuselage...
Details

 08-18-2003
1.50
Trimmed inst. panel-prelim cut...
Details
     

 08-16-2003
1.00
Cut center post slot...
Details

 08-15-2003
1.50
Canopy prep, tail work...
Details

 08-14-2003
4.50
Horiz. stab install prep...
Details
     

 08-13-2003
1.70
Fabricated F612B/F611E elev. stop...
Details

 08-12-2003
3.30
Stab. preparation...
Details

 08-11-2003
4.00
Deburred, dimpled FWD top skin...
Details
       

 08-10-2003
1.00
Drilled brace to F6109 to F6108...
Details

 08-09-2003
4.00
Canopy brace installation...
Details

 08-08-2003
7.50
Canopy brace prep, roll bar prep...
Details

 08-07-2003
0.50
Retrieved roll bar...
Details

 08-07-2003
2.00
Canopy rail, canopy brace...
Details

 08-06-2003
2.00
Canopy rail preparation...
Details

 08-05-2003
0.50
Fabricated 2 shim spacers...
Details

 08-03-2003
1.70
Canopy rail parts work, install prep...
Details

 07-27-2003
0.50
Attempted to spread roll bar 3/16 wider...
Details

 07-26-2003
1.00
Moved R fwd hole slightly outboard...
Details

 07-25-2003
1.00
Ground R fwd C668 spacer...
Details

 07-24-2003
1.00
Attempt to stretch roll bar 3/16"...
Details

 07-23-2003
4.00
Roll bar measurement and preparation...
Details

 07-22-2003
1.30
Finished drilling F6111R brace to...
Details

 07-21-2003
0.50
Drilled bottom of F6111R brace...
Details

 07-20-2003
2.00
Fitting, drilled F6111R to top skin...
Details

 07-19-2003
1.50
Fitting F6116R canopy brace...
Details

 07-16-2003
3.00
Fitting aft deck skin...
Details

 07-08-2003
1.70
Trimmed aft deck canopy skin, polished...
Details
     

 06-17-2003
2.00
Rebuilt stand to hold plane...
Details

 05-27-2003
4.00
Installed rudder pedal cables...
Details

 05-23-2003
5.00
Fitted & backdrilled fwd canopy skin...
Details
     

 05-22-2003
1.30
Rebuilt pilots left brake pedal, riveted...
Details

 05-10-2003
1.00
Completed & installed rear access panel...
Details

 05-09-2003
2.00
Fitted rear access panel...
Details
     

 05-08-2003
0.40
Primed rear access panel backplate...
Details

 05-01-2003
2.00
Trimming top fwd skin...
Details

 04-23-2003
3.00
Fabricated angle alum for inst. panel...
Details

 04-22-2003
1.60
Marked ribs for F674 skin...
Details
       

 04-21-2003
1.50
Fabricating rear access panel...
Details
     

 04-19-2003
2.00
More inventory of finish/access...
Details

 04-18-2003
3.00
Unloaded finish kit to basement...
Details
     

 04-16-2003
1.50
Made another inner panel/template...
Details

 04-15-2003
1.50
Fashioned 2 more pieces...
Details

 04-12-2003
1.50
Made inner piece for access panel...
Details

 04-11-2003
1.00
Polished edges; made template for ...
Details

 04-10-2003
3.00
Cut access hole on R aft fuselage...
Details
     

 03-19-2003
2.00
Fashioned mock inst. panel...
Details
     

 03-18-2003
3.00
Fitting top forward skin to fuselage...
Details
       

 03-05-2003
4.00
Ran copper lines to basement...
Details

 02-10-2003
2.00
Built workbench over compressor...
Details

 12-28-2002
2.50
Moved airplane from storage to 327...
Details
       

 12-28-2002
1.50
Getting basement set up for building...
       

 11-22-2002
3.00
Move plane and wings to storage ...
Details

 11-02-2002
3.00
Built rack for storage of both wings...
Details

 08-20-2002
3.50
Marked R wing landing light...
Details

 05-23-2002
4.50
Drilled 6 holes for landing light...
Details

 05-22-2002
2.00
Fabricated a wing rack using lower...
Details

 04-09-2002
1.50
Riveted R flap brace to wing...
Details

 04-09-2002
2.50
Installed elevator bell crank assembly..
Details

 04-08-2002
2.00
Fitted right flap brace...
Details

 03-25-2002
3.50
Mounted flap actuator on R flap...
Details

 03-14-2002
1.50
Right aileron travel...
Details

 03-05-2002
7.00
Fitting right aileron...
Details

 03-04-2002
4.00
Riveted leading edge of flap brace...
Details

 02-27-2002
5.00
Trimmed left wing flap brace...
Details

 02-26-2002
3.50
Aligned flap to wing, drilled hinge...
Details

 02-20-2002
1.50
First technical inspection...
Details

 02-14-2002
4.50
Riveted R ail. bracket in place...
Details

 02-07-2002
2.00
Cut lightening holes in flap braces...
Details

 02-06-2002
3.00
Installed nutplates in stringers ...
Details

 02-06-2002
3.00
Fabricated FL606A/B/C...
Details

 02-05-2002
4.00
Fabricated aileron control rod...
Details

 02-05-2002
2.00
Enlarged holes in wings for conduit...
Details

 02-04-2002
3.50
Fitted left aileron...
Details
     

 01-30-2002
3.50
Drilled 4 aileron brackets...
Details

 01-28-2002
2.50
Complete elev. trim tab...
Details

 01-21-2002
4.00
Fabricate trim tab for left elevator..
Details

 01-11-2002
7.50
Cut 3 holes for rudder bushings...
Details

 01-09-2002
0.50
More curving of rudder skin...
Details

 01-08-2002
6.00
Rudder fabrication...
Details
       

 12-27-2001
3.50
Riveted rudder skin to spar...
Details

 12-15-2001
1.50
Dimpled rudder skin with C clamp tool...
Details

 12-07-2001
1.50
Riveted rudder spar to R408/404...
Details

 12-06-2001
1.00
Sanded wing braces to fit wings...
Details

 11-25-2001
1.00
Drilled brakes for AN3 bolts...
Details

 11-24-2001
1.50
Fabricated other 3 brake pedals...
Details

 11-20-2001
3.00
Fabricated one brake pedal assembly...
Details

 11-09-2001
2.00
Trimmed top of rudder 21/2",seats...
Details

 11-01-2001
4.00
Remade R408, drilled in assembly..
Details

 09-19-2001
7.50
Fitted and connected control sticks...
Details
     

 09-08-2001
0.80
Reamed out one brass control bushing...
Details

 09-05-2001
2.20
Cut, polished left control stick opening...
Details
       

 08-21-2001
4.50
Resizing holes on F639/640 to fit...
Details

 08-14-2001
2.50
Installed nutplates for F639/640...
Details

 08-11-2001
1.50
Riveted R405/406 to rudder spar...
Details
     

 08-02-2001
2.00
Assembled R402 spar to vert. stab...
Details

 07-28-2001
2.00
Moved shoulder harness attachments..
Details

 07-23-2001
1.00
Fabricated second wing jig from pattern...
Details

 07-16-2001
4.00
Reworking nutplates for seat bottoms...
Details

 06-19-2001
4.00
Built 2 wing stands and hung wing from..
Details

 06-18-2001
4.00
Riveted aft top skin..
Details

 05-04-2001
2.00
Installed more nutplates on floor ribs..
Details

 05-02-2001
1.50
Installed 4 nutplates on F640...
Details

 04-16-2001
2.00
Attached shoulder harness brackets...
Details

 04-14-2001
1.50
Riveted piano hinge halves of L F642...
Details

 04-05-2001
2.50
Installed nutplates on top of F639 ...
Details

 04-04-2001
1.50
Back drilled bottom ribs on F639...
Details

 04-03-2001
4.00
Installed 4 nutplates under top edge...
Details

 03-23-2001
9.00
Interior floor work, electric flaps...
Details

 03-21-2001
1.20
Drilled F642 and piano hinge and seat...
Details

 03-17-2001
2.50
Work on right F642 seat bottom...
Details

 03-15-2001
4.00
Work on electric flaps...
Details

 03-14-2001
2.10
Fitted new F639 and new F642...
Details

 03-08-2001
1.00
Drilled 1/4 inch holes in EF605/606...
Details

 03-07-2001
1.50
Cut,trimmed ,polished EF604/606...
Details

 03-06-2001
2.50
Drilled flap F681's, installed flap ...
Details

 03-05-2001
2.50
Installed K-8 nutplates on center consol...
Details

 03-03-2001
2.80
Fitted baggage floors, side panels ...
Details

 03-01-2001
3.00
Riveted VS410 to vert. stab. ...
Details

 02-28-2001
0.50
Primed various pieces & bellcranks...
Details

 02-27-2001
1.00
Completed riveting F609,drilled VS410...
Details

 02-15-2001
0.20
Drilled F609 for 5/8" trim cable...
Details

 02-15-2001
3.00
Dimpled stringers for F675...
Details

 02-09-2001
3.30
Completed riveting F6113/F620..
Details

 02-05-2001
1.00
Completed riveting F620 left armrest...
Details

 02-02-2001
2.50
Riveted F6113 canopy rail...
Details

 01-22-2001
3.00
More fitting for F657 left step..
Details

 01-19-2001
2.00
Commenced drilling for F657...
Details

 01-18-2001
0.50
Squeezed rudder trailing edge...
Details

 12-07-2000
3.00
Backdrilled F675 into F620...
Details

 11-30-2000
2.00
Final fitting of F620, bending flanges...
Details

 11-30-2000
1.00
Drilled F6113 into fuselage and dimpled...
Details

 11-29-2000
2.50
Fabricating F620 top left canopy rail...
Details

 11-28-2000
1.50
Drilled, primed right F6113...
Details

 11-27-2000
2.00
Fabricated and riveted F635...
Details

 11-21-2000
2.00
Installed nutplates for cargo bin floors...
Details

 11-20-2000
2.50
Installed F6116 temporarily...
Details

 11-18-2000
0.50
Trimmed and filed R410PP...
Details

 11-18-2000
0.50
Placed rudder pedal assembly...
Details

 11-17-2000
1.00
filed and completed R405/VS412...
Details

 11-16-2000
2.50
Remade R405, fabricated VS412...
Details

 11-14-2000
1.00
Drilled R406/7/8, R402...
Details

 11-13-2000
1.00
Measured and center punched rudder..
Details

 11-12-2000
1.00
Clecoed F675 on to adjust fit of F609...
Details

 11-11-2000
1.50
Removed and trimmed F675 top skin...
Details

 11-05-2000
0.50
More filing and fitting of F639/40...
Details

 11-04-2000
2.00
Work on F639/F640 for better fit...
Details

 11-03-2000
4.50
Back drilled F675 and fabricated F609...
Details

 11-02-2000
3.50
Preparing F675 top skin...
Details
     

 11-02-2000
3.00
Installed F638 on right seat...
Details

 11-01-2000
1.50
Riveted F638 seat brace on left seat...
Details

 10-30-2000
1.00
Made edge roller tool...
Details

 10-23-2000
1.50
Fitting F6113 on left side...
Details

 10-18-2000
2.00
Left seat bottom completed...
Details
       

 10-17-2000
1.00
Top aft fuselage skin positioned...
Details

 10-17-2000
3.00
Drilled and dimples and riveted piano...
Details

 10-12-2000
2.00
Trimmed seat bottoms, braced floor...
Details

 10-06-2000
2.70
Fabricated alum F620 left armrest...
Details

 10-05-2000
2.50
Refabricated wooden F620...
Details

 09-22-2000
2.00
Cut lightening holes...
Details

 09-21-2000
2.00
Trimmed seat bottoms and cut seatbelt...
Details

 09-19-2000
2.00
Remade form for F620 armrest...
Details

 09-02-2000
1.00
Riveted oil cutout on firewall...
Details
       

 09-02-2000
4.00
Made left F620 armrest...
Details

 08-29-2000
2.00
Drilled and dimpled firewall insert...
Details

 08-16-2000
1.00
Cut and polished R405...
Details

 08-11-2000
1.00
Riveted seat back-passenger side...
Details
     

 08-11-2000
2.00
Fabricated end ribs and riveted practice...
Details

 08-10-2000
1.50
Fabricating seat back...
Details

 08-10-2000
2.50
Fabricated R404 form and part...
Details

 08-04-2000
1.00
Bent trailing edge of pract. airfoil...
Details

 08-03-2000
0.30
Improved plane stand...
Details

 07-28-2000
4.00
Backrivet practice airfoil...
Details

 07-21-2000
4.00
Practice airfoil...
Details
     

 07-13-2000
1.50
fabricated stiffeners -practice airfoil...
Details

 07-08-2000
1.00
Drilled R407 center hole, polished...
Details
     

 02-01-2000
2.00
More work on right W603 skin...
Details

 01-14-2000
1.00
Measuring and planning rudder skin...
Details

 01-13-2000
1.00
Measure, marking rudder skin...
Details
     

 01-08-2000
1.50
Fabricate, drill, polish R408, cut R407...
Details

 01-05-2000
1.00
Make templates for rudder stiffeners...
Details

 12-30-1999
2.00
Label and sort hardware...
Details

 12-29-1999
1.50
More sorting into bins...
Details

 12-28-1999
1.50
Sort accessoriy bags to labeled bins...
Details

 12-23-1999
0.50
Partially clean fuselage with acetone...
Details

 12-18-1999
1.50
Build fuselage rolling stand...
Details

 12-13-1999
1.50
Finalize plane inventory...
Details

 12-10-1999
2.00
..Assemble table/start workbench...
Details

 12-07-1999
3.00
Assemble table/start workbench...
Details

 12-05-1999
0.50
Inventory/store parts...
Details

 12-04-1999
3.00
Inventory/store parts...
Details

 12-03-1999
1.50
Build plans holder...
Details
     

 11-28-1999
1.50
Inventory boxes...
Details

 11-27-1999
2.00
Inventory boxes...
Details

 11-20-1999
2.00
Assembled drill press...
Details

 11-10-1999
2.00
New band saw and bench grinder...
Details

 11-06-1999
8.00
Towing aircraft turned disaster...
Details
       

 06-17-1999
2.00
Demo flight and RV-6A order...
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.