HB-YAK GS-2 Sportsman 2+2 kit
Work Logs Found: 331
Category Work Time: 1710 Hours
 Date
Hours
Work Log Summary

Details

 04-19-2024
4.00
Oil cooler temperature agustment
       

 04-19-2024
4.00
+2 back bench - final
       

 04-15-2024
4.00
Front bracket for floats :-)
       

 04-11-2024
4.00
Windshield installation
       

 04-11-2024
4.00
Rear seat bench preparation
       

 04-09-2024
4.00
Automotive plugs installation
       

 03-28-2024
8.00
Turtle Deck ajustment
       

 03-20-2024
10.00
Turtle deck gap closed
       

 03-18-2024
4.00
Various Engine
       

 03-18-2024
4.00
Turtle deck adjustment
       

 03-18-2024
4.00
Temp probes installation
       

 03-15-2024
1.00
Tube to fuel pressure sensor
       

 03-15-2024
1.00
Starter torqued and marked
       

 03-15-2024
2.00
Red Cube Flowmeter installation
       

 03-15-2024
2.00
From FuelMeter to FCU
       

 03-14-2024
4.00
Wing fold hatch midification
       

 03-14-2024
4.00
Wing fold hatch - how to close the gap
Details
       

 03-11-2024
4.00
Wing fold hatch installation
       

 03-11-2024
4.00
Fuselage to Strut fairing installation
       

 03-08-2024
4.00
Right wing fold hatch ajustment
       

 03-08-2024
4.00
Installing the wings again
       

 03-08-2024
4.00
Installing the Faps
Details
       

 03-08-2024
2.00
Fuselage to Strut fairing installation
       

 03-06-2024
6.00
Windshield preparation
       

 03-06-2024
6.00
Installing the fuletank caps
       

 02-26-2024
4.00
Wings paintaid in Yellow, mobile parts in red
       

 02-15-2024
4.00
preparing the landing light window in the cowling
       

 02-15-2024
6.00
Installing wingtips to wing
       

 02-15-2024
4.00
Install mag cooling ducts
       

 02-15-2024
4.00
ajusting the wingtip landing light cavity
     

 02-12-2024
6.00
preparing the landing light cavity in the cowling
     

 02-12-2024
4.00
P-Mag gear installed and installed in motor
       

 02-12-2024
4.00
Fuel pump shroud and oil filter support torqued an
       

 02-09-2024
16.00
Baffling seal installation
       

 02-08-2024
6.00
Bonding the window in the left door
       

 02-05-2024
4.00
Bonding the overhead window in the fuselage
       

 02-05-2024
4.00
Bonding the aft window in the fuselage
       

 02-02-2024
10.00
Preparing the aft window in the fuselage
       

 02-01-2024
6.00
Bonding window in aft door
       

 02-01-2024
6.00
Baffling seal
       

 01-26-2024
2.00
Received fresh SILPRUF and cured stand-offs
       

 01-25-2024
2.00
Wing tip lights with anchor nuts
       

 01-25-2024
2.00
Taxi lights in wingtip installed
     

 01-25-2024
6.00
Still working on baffling seal
       

 01-25-2024
4.00
Prep for paint: Remove everything that is not pain
       

 01-24-2024
4.00
Wingtip landinglight
       

 01-24-2024
4.00
Wing Tip landing light ajustment
       

 01-24-2024
8.00
Windshield adjustment
       

 01-24-2024
1.00
Received Regisration HB-YAK
     

 01-24-2024
4.00
Baffling seal installation
       

 01-24-2024
4.00
Baffling ajustment
       

 01-19-2024
4.00
Windshield ajustment
     

 01-19-2024
4.00
Glove compartment
       

 01-17-2024
6.00
Windows ajustment
     

 01-17-2024
2.00
Tail linting handle - final sanding
       

 01-17-2024
3.00
Landing light in wing tip
     

 01-17-2024
4.00
Engine cowling - camloc installation done
       

 01-12-2024
4.00
Tail lifting handle installation
       

 01-12-2024
6.00
Ajusting the windows
       

 01-09-2024
4.00
Wing Tip Landing lights
       

 01-09-2024
4.00
Windows installation
       

 01-05-2024
6.00
Windows installation
       

 01-05-2024
3.00
Tail Pull Handle drilling
       

 01-05-2024
6.00
Baffle Seal installation
       

 01-04-2024
3.00
RH - FUSELAGE FAIRING INSTALLATION
Details
       

 01-04-2024
3.00
LH - FUSELAGE FAIRING INSTALLATION
       

 01-02-2024
6.00
Cowling - installing CamLoc
       

 01-02-2024
6.00
Baffling - long fiddling
       

 12-29-2023
6.00
More work on the baffling
     

 12-29-2023
4.00
Cowling lights installation
Details
       

 12-29-2023
6.00
Cowling installation
       

 12-14-2023
4.00
Torquing and securing the upper disc
       

 12-14-2023
2.00
Temporarily installing the prop
       

 12-14-2023
4.00
Pinner Base plate drilling & riveting
       

 12-14-2023
6.00
ajuaring the spinner
       

 12-13-2023
4.00
Unpacking the prop and spinner
       

 12-13-2023
8.00
Last rivets on the wing
       

 11-29-2023
10.00
Riventing
       

 11-29-2023
10.00
Cove skins installation
       

 11-29-2023
2.00
Aux fuel tank support installation
       

 11-23-2023
16.00
Riveting of wing
       

 11-20-2023
8.00
More riveting on wing
     

 11-20-2023
8.00
Installation of fin reinforcement
       

 09-28-2023
4.00
Prep and corrosion proof of inspection covers
       

 08-17-2023
10.00
More protective film removal
       

 08-08-2023
16.00
More protective film removing
       

 06-19-2023
20.00
More riveting
       

 06-13-2023
10.00
More riveting on the wing
       

 06-07-2023
20.00
Riveting wing skins
       

 05-26-2023
16.00
Riveting wing skins in place
       

 05-16-2023
16.00
Riveting wing skins in place
       

 05-11-2023
16.00
Peeling off the old and fragile protective film of
       

 04-08-2023
6.00
Riveting hat section stiffners in place
       

 04-08-2023
6.00
Cutting wing skins fuel access
       

 04-08-2023
3.00
Baffeling installation
       

 03-31-2023
4.00
Transponder antenna installation
Details
       

 03-27-2023
2.00
Relais installation
       

 03-27-2023
14.00
Exhaust pipe fixation
       

 03-20-2023
16.00
Baffling and cowling ajustmennts
       

 03-15-2023
8.00
Engine cowling ajustments
       

 03-15-2023
8.00
Cables from taol and Fw deflector
       

 03-14-2023
8.00
Oil cooler duct installation
       

 03-14-2023
4.00
FW deflector
       

 02-28-2023
16.00
FWF and engine alignement
Details
       

 02-22-2023
14.00
Oil cooler duct & battery rack
       

 02-22-2023
2.00
Clamping heat duct
       

 02-17-2023
6.00
Oil cooler and heating tubing install
       

 02-17-2023
6.00
FWF Still working on the Baffling
       

 02-09-2023
8.00
Installing the firewall
       

 02-09-2023
4.00
FWF fuel strainer
       

 02-09-2023
8.00
Boost pump and heat valve install
       

 02-06-2023
4.00
put the engine off the plane
       

 01-20-2023
2.00
Working on the landing light
       

 01-19-2023
8.00
Multiple versions of throttle bracket
       

 01-19-2023
8.00
Avionics tray installed
       

 01-13-2023
4.00
Still on the Baffling
       

 01-13-2023
4.00
Re doing the throttle bracket
       

 01-05-2023
6.00
Still working on the baffling
       

 01-05-2023
4.00
Placing and fixing the different units
       

 01-05-2023
1.00
Mounting the GSU 25C on the back of the GDU 470 di
       

 01-05-2023
1.00
Fixing the beacket for the GMU
       

 12-08-2022
6.00
Still working on the baffling
       

 12-08-2022
6.00
Building the instrument rack
       

 12-03-2022
8.00
Still more work on the baffling
       

 12-03-2022
4.00
FWF ; gacolator, and other stuff
       

 12-03-2022
4.00
Co-pilots grip wiring
       

 12-01-2022
4.00
More work on the baffling

 12-01-2022
2.00
Mixture Control adaptation
Details
       

 12-01-2022
2.00
Further testing of fuel system with real fuel
       

 11-26-2022
8.00
Working on the Baffling
       

 11-26-2022
8.00
Pilots grip switch wiring
       

 11-22-2022
4.00
Working on the baffling
       

 11-22-2022
1.00
Wing Tip LED Landing Lights
       

 11-22-2022
2.00
Roiveting Baffling parts
       

 11-22-2022
4.00
Installing the AVSTAR fuel controller
       

 11-14-2022
2.00
Instrument Panel in place
       

 11-14-2022
1.00
Governor control seems OK
     

 11-14-2022
4.00
Gaining wheight on the pedals
Details
       

 11-14-2022
2.00
Control bracket does not fit my engine :-(
Details
       

 11-14-2022
2.00
Clamped down the fuel line on both sides
       

 11-14-2022
4.00
Checking fuel tanks
Details
       

 10-27-2022
2.00
Temporarily installed the exhaust
       

 10-26-2022
2.00
More parts from Glasair aviation
       

 10-25-2022
2.00
Received a big parcel from Glasairaviation
       

 10-10-2022
4.00
The pedals are quite heavy, we want to remove some
       

 10-10-2022
4.00
Instrument panel
       

 10-10-2022
4.00
Checking engine alignment
Details
       

 09-15-2022
2.00
Painting of panel parts with 2K paint
       

 09-15-2022
3.00
Cutting the acces holes for the tank filler neck.
       

 09-15-2022
4.00
Assembly of the two cowling parts.
       

 08-19-2022
1.00
Priming of panel boards
     

 08-19-2022
3.00
Ajusting the top cowling, using a 3D printed jig
     

 08-06-2022
4.00
Modify wrenches -> special tools
       

 08-06-2022
2.00
Instument panel ready for painting
       

 08-06-2022
8.00
Instument panel is progressing
       

 08-06-2022
3.00
Cowling acess door
       

 07-23-2022
2.00
Drilled and pre installed the engine controls
       

 07-16-2022
10.00
take wings of fuselage
Details
       

 07-09-2022
6.00
Unboxing of the engine
       

 07-09-2022
6.00
Installing engine on fuselage
Details
       

 06-30-2022
2.00
Engine arrived from Lycoming
       

 05-21-2022
8.00
Flap cables installation and nicopress
       

 05-21-2022
8.00
Adjusting the laser cut aluminium boards
       

 05-07-2022
8.00
Aileron cables installation
       

 05-07-2022
8.00
Aileron Cable nicopress installation
       

 05-06-2022
6.00
Adjusting the wing folding mechanism
       

 04-23-2022
4.00
The arm of the servo is touching the seat pan
       

 04-23-2022
4.00
Parking brake installation
       

 04-09-2022
8.00
Fuel lines routing to Andair fuel selector
       

 04-09-2022
8.00
Autopilot Servo installation
Details

 04-02-2022
6.00
Routing of fuel lines
     

 04-02-2022
10.00
Installation of servos for the autopilot
       

 03-26-2022
4.00
Wings installation, to finish the control cables
       

 03-26-2022
1.00
Wings folded - fits in the box :-)
       

 03-26-2022
4.00
Pitot tube in place
       

 03-26-2022
2.00
Fuel line from Gascolator FWD (left)
     

 03-26-2022
6.00
Autopilot servo tray is progressing
       

 03-19-2022
4.00
Centre Console with Fuel selector
       

 03-12-2022
2.00
Making pulleys lighter
Details
       

 03-12-2022
8.00
Cable guides in wings
Details
       

 03-12-2022
6.00
Autopilot servo tray is progressing
       

 03-05-2022
8.00
Working on the Autopilot servo installation
     

 03-05-2022
2.00
Tension the Elevator cable
     

 03-05-2022
2.00
Static Port installation
       

 03-05-2022
2.00
Aileron trim servo complete
       

 02-26-2022
8.00
Install Flaps and connecting rods
       

 02-19-2022
4.00
Rework all inspection hole covers for countersunk
       

 02-19-2022
4.00
Control Cable Safety Guides SB67
       

 02-19-2022
2.00
Aileron trim servo slot with sufficiant clearance
       

 02-19-2022
2.00
Aileron Trim Servo and cable connector
       

 02-19-2022
2.00
Aileron servo tab riveted in place
       

 02-12-2022
2.00
some more Control Cable Safety Guides
Details
       

 02-12-2022
2.00
Ailorin Trim servo rod slot
       

 02-05-2022
2.00
Left wing venting
       

 02-05-2022
4.00
Floorboards installation
       

 02-05-2022
8.00
Cable guards installed, according to Service Bulle
Details
       

 02-05-2022
1.00
Aileron trim servo service hole doubler
       

 02-05-2022
6.00
Aileron Trim and Servo Tab
       

 02-05-2022
2.00
Access hole for trim servo
       

 01-22-2022
6.00
Left wing prep for fuel tanks
       

 01-15-2022
6.00
Right wing transfer line installation
       

 01-15-2022
6.00
Glareshield cover
Details
       

 01-08-2022
3.00
Install the Strake Ribs
Details
       

 01-08-2022
2.00
Finishing the glareshied
       

 01-08-2022
3.00
Cut Out the Strake Ribs
Details
       

 01-08-2022
4.00
Bulkhead A closeout detailing
Details
       

 12-30-2021
4.00
Step 17: Fit the Floorboards
Details
       

 12-30-2021
2.00
Seam the Strake Halves Together
Details
       

 12-30-2021
2.00
Mark the Centerlines of the Horizontal
Details
       

 12-28-2021
4.00
Re-installed the TT gear, all nuts secured
     

 12-28-2021
2.00
Drill the Close-Out and Install the Mounting
Details
     

 12-28-2021
4.00
Decorating the Bulkhead A Closeout
Details
       

 12-18-2021
4.00
Tough Terrain Landing Gear
Details
       

 12-18-2021
4.00
Fuel tube connecting header tant to gascolator
Details
       

 12-18-2021
4.00
Firewall insulation installation - done
       

 12-18-2021
6.00
Brake lines installed
     

 12-17-2021
4.00
Tough Terrain Landing Gear
Details
       

 12-17-2021
2.00
Gascolators scrwed and support primed
       

 12-11-2021
8.00
Tough Terrain Landing Gear
Details
       

 12-10-2021
8.00
Tough Terrain Landing Gear
Details
       

 12-10-2021
4.00
Tough Terrain Landing Gear
Details
       

 12-04-2021
4.00
Tough Terrain Landing Gear
       

 12-04-2021
4.00
Tough Terrain Landing Gear
       

 12-04-2021
8.00
Tough Terrain Landing Gear
       

 11-27-2021
8.00
Tough Terrain Landing Gear
       

 11-27-2021
8.00
Tough Terrain Landing Gear
       

 11-20-2021
4.00
Tailwheel steering cables routing and nicopress
       

 11-20-2021
4.00
Gascolator temporary install
     

 11-20-2021
2.00
Engine mount install
       

 11-20-2021
2.00
cable guard installation
     

 11-20-2021
2.00
Aft seatbelt top attach point
       

 11-20-2021
2.00
Aft Center seatbelt installed
       

 11-13-2021
3.00
Rivet the Firewall Assembly Together
Details
       

 11-13-2021
1.00
Aft Center seatbelt attach points laminated/screwd
     

 11-11-2021
8.00
Fabricate the Firewall Components
       

 11-11-2021
2.00
Aft cable cover install
       

 11-06-2021
2.00
Mount the Header Tanks
Details
       

 11-06-2021
2.00
Laminating the tabs for the aft contol cable cover
Details
     

 11-06-2021
2.00
Glare Shield heat nozel install
     

 11-06-2021
8.00
Fire wall
Details
       

 11-06-2021
2.00
Checking the Nicopress swage with a caliper
       

 10-30-2021
2.00
Seat Belt Anchor Points moved aft
Details
       

 10-30-2021
2.00
Seat Belt Anchor Point moved aft
Details
       

 10-30-2021
2.00
Install Fittings in the Master Cylinders
Details
       

 10-30-2021
2.00
Check Glareshild tabs
Details
       

 10-23-2021
2.00
Rudder Control Spring Installation
       

 10-23-2021
4.00
Glue the Glare Shield Mounting tabs
Details
       

 10-23-2021
10.00
Fabricate the upper and lower firewall flange
Details
       

 10-16-2021
4.00
Installing the contol Sticks
Details
       

 10-16-2021
8.00
Complete the Rudder and elevator Cable Installatio
Details
       

 09-04-2021
8.00
Instrument panel installation
Details
       

 09-04-2021
8.00
Installing instrument panel
Details
       

 08-22-2021
4.00
Finish Aft Searweb
Details
       

 08-21-2021
2.00
Install the Steering Cables
Details
       

 08-21-2021
4.00
Fabricate and Install the Panel Braces
Details
       

 08-21-2021
2.00
Adjust tank sending units
       

 07-31-2021
4.00
Installelevator and rudder cables
       

 07-31-2021
4.00
Install the Elevator Control and Rudder
       

 07-30-2021
4.00
Cover for the Lower Aft Fuselage Inspection Hole
Details
       

 07-10-2021
2.00
Mount connectors with sealant
       

 07-10-2021
2.00
Laminating aft sher web
     

 07-10-2021
4.00
Install the Forward Pulleys
Details
       

 07-10-2021
2.00
Install Fuel line fittings
Details
       

 07-10-2021
4.00
Fuel tank installation in wing
Details
       

 07-06-2021
2.00
Laminate the Side Attach Flanges for the Forward S
Details
       

 07-03-2021
2.00
Laminate Attach Flanges for the Aft Inter-Bulkhead
Details
       

 07-03-2021
6.00
Build a caddy for moving the fuselage level
     

 06-26-2021
4.00
Route the Aileron Control Cables
Details
     

 06-26-2021
2.00
preparing the two layers of DBM cloth
Details
       

 06-26-2021
4.00
Added two layers of DBM cloth on all wrongly lamin
Details
       

 06-14-2021
6.00
Visit of our EAS Superviser
Details
     

 06-09-2021
2.00
Rivet the Rudder Stop to the Rudder Yoke
Details
       

 06-09-2021
4.00
Right wing; Fuel transfer pump installation
Details
       

 06-07-2021
4.00
Position and Drill the Aux Tank Mounting Channels
Details
       

 06-07-2021
4.00
Laminate the Side Attach Flanges for the Forward S
Details
       

 06-07-2021
4.00
Divers details
       

 05-31-2021
2.00
Inspect the Control System
Details
       

 05-31-2021
4.00
Fabricate and Install the Elevator Control Stop
Details
     

 05-22-2021
1.00
InstalltheVerticalFinRib
Details
     

 05-22-2021
2.00
Fabricate and Install the Elevato rControl Stop
Details
     

 05-22-2021
2.00
AdjusttheRudderTravel
Details
       

 05-22-2021
2.00
:Cut Out the Forward Shearweb
Details
     

 05-08-2021
2.00
Rough-Cut the Foam Core for the vertical fin rib
Details
       

 05-08-2021
3.00
Rivet the Vertical Fin Spar to the Fin Shells
Details
       

 05-08-2021
2.00
Install the Vertical Fin Rib, Secure the rib with
Details
       

 05-08-2021
2.00
Fabricate the Rudder Stop Plate
Details
       

 05-08-2021
2.00
Cut an Inspection Hole in the Lower Aft Fuselage
Details
       

 05-08-2021
1.00
Bolt the Upper Rudder Hinge to the Vertical Fin
Details
       

 05-01-2021
2.00
Trim, Position and Drill the Elevator Bellcrank Br
       

 05-01-2021
2.00
Secure the Tip Fairing to the Rudder
Details
       

 05-01-2021
2.00
Sand the covers
     

 05-01-2021
2.00
Laminate the Aft Attach Flange for the Forward Int
Details
       

 05-01-2021
2.00
Install the Stabilizer Mounting Nutplates
Details
       

 05-01-2021
2.00
Elevator Pushrod
Details
       

 04-23-2021
2.00
Position and Drill the H Stabilizer Attach Bracke
Details
     

 04-23-2021
1.00
Nutplates vertical fin spar
Details
     

 04-23-2021
1.00
Finish the Trailing Edges of the Fin
Details
     

 04-23-2021
2.00
Drill the Horizontal Stabilizer Aft Attach Bracket
Details
       

 04-17-2021
0.50
Riveting the Elevator Bellcrank Assembly
Details
       

 04-17-2021
2.00
Finish the Trailing Edges of the Fin
Details
       

 04-17-2021
4.00
Drilling the Vertical Spar holes
Details
       

 04-14-2021
2.00
Temporalily mount the upper hinge on the fin spar
       

 04-14-2021
2.00
Sand the tops of the vertical Fin
Details
       

 04-14-2021
1.00
Mount the hinges on the rudder
Details
       

 04-14-2021
3.00
Hang the Rudder assembly from the fin
       

 04-14-2021
3.00
Drill the index holes Vertical fin spar
Details
       

 04-14-2021
2.00
Drill and corrosion proof the Elavator Bellcarnk A
       

 04-14-2021
2.00
Airframes Alaska T3-Tailwheel-Suspension-System ar
Details
       

 03-29-2021
1.00
Wing tip fairing preparation
Details
       

 03-29-2021
2.00
Seam the Rudder Tip Fairing Together
Details
       

 03-29-2021
2.00
Install the Fairing Close-Outs
Details
       

 03-29-2021
1.00
Fuel tank tightness testing - preparation of the m
Details
       

 03-29-2021
4.00
Fuel tank tightness testing - 4 tanks
Details
       

 03-29-2021
3.00
Fuel tank testing - rinsing
Details
       

 03-20-2021
2.00
Installing nutplates on inspection hole doublers
       

 03-20-2021
4.00
Fuel transfer pump installation
Details
       

 03-20-2021
6.00
Camera window finishing
Details
       

 03-20-2021
4.00
Camera window cut out
Details
       

 03-13-2021
2.00
Test Fit the Main Fuel Tank
     

 03-13-2021
2.00
Routing of the wingtip lights
     

 03-13-2021
4.00
Position and Dril lthe Aux Tank Mounting Channels
Details
       

 03-13-2021
8.00
Inspection hole doublers
Details
       

 03-06-2021
10.00
Pitot mast installation
Details
       

 02-18-2021
6.00
Installing the nutplates for the cover
       

 02-06-2021
6.00
Working on the elevator hinge
Details
       

 02-06-2021
6.00
Riveting hinge on stabilizer
       

 01-30-2021
12.00
Position and drill the elevator hinge
Details
       

 12-05-2020
8.00
Build wing suspension on the wall
Details
       

 11-07-2020
4.00
Move the wings
Details
       

 08-19-2020
4.00
Moved fuselage out of storage
Details
       

 03-20-2012
195.00
Previous Log