KitLog pro

Powered By Kitlog Pro v2.0

PETER'S WEB SITE
Work Logs Found: 45
Category Work Time: 138 Hours
 Date
Hours
Work Log Summary

Details

 09-22-2010
1.50
installed wheel spacers
Details
       

 09-20-2010
1.00
Mounted gear legs
Details

 09-12-2010
3.00
Fited up horz. stab & elevators
Details
       

 09-11-2010
3.00
Installed gear legs.
Details
       

 09-11-2010
2.00
Fitted floor boards.
Details
       

 09-11-2010
2.00
Contiuned on gear fit up.
Details
       

 09-05-2010
3.00
Fitted up wheels
Details
       

 08-30-2010
3.00
Flaps & ailerons
Details
       

 08-29-2010
3.00
Finished wings
Details

 08-25-2010
4.00
Tank covers & leading edge wrap
Details
       

 08-16-2010
2.00
Left Wing (con't)
Details

 08-15-2010
7.00
left wing
Details

 05-11-2010
3.00
Epoxy leading edge wrap
       

 05-09-2010
6.00
Leading edge wrap
Details
       

 05-09-2010
0.50
Leading edge wrap
Details
       

 04-18-2010
8.00
Install wing tanks
Details
       

 04-18-2010
4.00
Install wing tanks
Details
       

 04-18-2010
1.00
Install aileron cables
Details
       

 04-18-2010
1.00
Fabricate aileron push tubes
Details
       

 03-14-2010
2.00
Installed bell cranks
Details
       

 03-14-2010
1.00
Finished aileron bell cranks
Details
       

 03-07-2010
0.50
Con't with fuel tanks
Details
       

 03-07-2010
2.00
Assembled Fuel tank fittings
Details
       

 03-02-2010
1.00
Aileron Belcrank
Details
       

 03-02-2010
1.00
Aileron Belcrank
Details
       

 02-28-2010
3.00
Assembled left wing
Details

 02-27-2010
1.00
Trimming cable guide
Details
       

 02-27-2010
3.00
Installed ribs into left wing
Details

 02-14-2010
4.00
Fastening Ribs to RH Wing frame(con't)
Details
       

 02-14-2010
1.00
Fastening Ribs to RH Wing frame(con't)
Details
     

 02-14-2010
4.00
Fastening Ribs to RH Wing frame
Details
       

 02-13-2010
8.00
Drilling ribs for fabric attacment.
Details
       

 02-08-2010
20.00
All ribs finished...
Details
       

 01-13-2010
1.00
building wing ribs
Details
       

 01-07-2010
0.50
continued assembling wing rib
Details
       

 01-07-2010
3.50
build one wing rib
Details
       

 01-02-2010
3.00
Assembled right wing frame
Details

 01-01-2010
1.00
Installed wing tip bow
Details
       

 01-01-2010
5.00
Continued left wing frame assembly
Details
       

 12-27-2009
3.00
assembling wings frames
Details
       

 12-26-2009
2.00
Installed nut plates.
Details

 12-21-2009
1.00

Details
       

 12-19-2009
5.00
Wing Frames
Details
       

 12-19-2009
2.00
Marking Spars
Details
       

 12-04-2009
2.00
Big Box Arrives!
       










Copyright © 2001-2024 Matronics. All Rights Reserved.