Air O Enterprises
Work Logs Found: 92
Category Work Time: 1196 Hours
 Date
Hours
Work Log Summary

Details

 09-19-2006
1.00
finished paint, clean up
Details
       

 09-17-2006
1.00
Wing tips, elevators, wheel pants
Details
       

 09-12-2006
1.00
Surfaces paint
       

 09-08-2006
1.00
Fuselage paint
       

 09-07-2006
200.00
Primer sealer fuselage
Details
       

 09-07-2006
1.00
Paint wings
       

 08-28-2006
8.00
Veriprime wings
Details
       

 08-21-2006
6.00
Aileron Repair
Details
       

 08-18-2006
3.00
Wing paint jigs
Details
       

 08-18-2006
2.50
Canopy paint jig
Details
       

 08-16-2006
1.00
GPS Antenna mount
Details
     

 06-05-2006
5.00
Wing intersection ferrings
Details
       

 06-01-2006
15.00
Flap and flap ferring installation
Details
       

 05-29-2006
7.00
Oil Cooler installation
Details
     

 05-28-2006
8.00
Final baffle installation
Details
     

 05-07-2006
8.00
Main wing fitting
Details
     

 05-02-2006
1.00
Rear seat cool air intake
Details
     

 05-01-2006
10.00
Installed wing tip assembly
Details
       

 04-30-2006
8.00
Tail intersection ferring
Details
       

 03-20-2006
36.00
Elevator & Rudder tip assembly
Details
       

 03-18-2006
20.00
Horizontal / Vertical stab tips
Details
       

 03-15-2006
36.00
Canopy Skirt
Details
     

 02-05-2006
4.50
Modified oil door
Details
       

 02-05-2006
9.00
Cowl preparation for paint
Details
     

 01-31-2006
23.00
Crazy baffle #3
Details
       

 01-20-2006
24.00
Canopy skirt
Details
     

 01-19-2006
15.00
Windscreen and glareshield
Details
       

 01-18-2006
15.00
Canopy installation
Details
     

 01-09-2006
65.00
Crazy baffle #2
Details
       

 01-08-2006
18.00
Crazy baffle
Details
       

 12-30-2005
25.00
Engine air intake / bypass valve
Details
       

 12-28-2005
1.50
Installed panel labels
Details
       

 12-28-2005
2.50
Final panel installation
Details
     

 12-26-2005
2.50
Installed cabin heater inlet.
Details
     

 12-24-2005
16.00
Installed engine baffling walls and inlets.
Details
     

 12-21-2005
24.00
Installed front cargo door
Details
       

 12-16-2005
2.00
Installed oil dip-stick door
Details
     

 12-09-2005
45.00
Engine cowl installation
Details
       

 12-08-2005
9.00
Top deck installation
Details
       

 11-29-2005
7.25
Pilot and co-pilot yokes
       

 11-28-2005
6.50
ELT box and strobe power supply
       

 11-20-2005
65.00
Installed cabin interior side walls
       

 11-13-2005
9.75
Installed panel quick release connectors
       

 11-12-2005
1.50
Installed smoke system switch
     

 11-12-2005
8.00
Installed heater control cables
       

 11-06-2005
8.50
Installed panel trim indicators
     

 11-05-2005
1.50
ELT antenna installation
     

 11-04-2005
2.00
Oil pressure lines
     

 11-04-2005
2.50
Installed headphone jacks
     

 11-03-2005
12.50
Installed propeller and spinner
     

 11-03-2005
7.50
Autopilot and roll trim
     

 11-02-2005
1.00
Installed heater box
     

 11-01-2005
3.50
Installed prop governor
     

 11-01-2005
6.50
Installed alternator
     

 10-22-2005
10.00
Installed static and pitot lines
     

 10-20-2005
3.50
Installed engine control cables
     

 10-20-2005
5.00
Engine pressure senders
     

 07-28-2005
15.00
Installed AOA Indicator & hardware
       

 07-26-2005
8.50
Fuel lines & mixture bellcrank
       

 07-25-2005
2.50
Installed engine / engine mount
Details
     

 07-18-2005
6.00
Installed panel lighting control
       

 07-18-2005
75.00
Install avionics into panel
Details
       

 06-27-2005
85.00
Finish wheel pants and strut ferrings
Details
       

 06-26-2005
5.00
Wheel pants and strut ferrings
Details
       

 06-25-2005
3.00
main wiring harness
Details
     

 06-24-2005
5.00
Firewall components
Details
     

 06-17-2005
8.00
install landing gear ferrings, wheels pants
Details
       

 06-12-2005
3.00
wheels and brakes
Details
     

 06-11-2005
5.00
Install rear canopy rail
Details
     

 06-09-2005
2.00
throttle quad and cables
Details
 

 04-20-2005
6.00
Paint Interior
Details
       

 03-22-2005
3.25
Added instrument panel access hole.
Details
       

 03-21-2005
1.75
Allign and fit front windscreen weldment.
Details
     

 03-17-2005
14.50
Install forward top fuselage skin.
Details
     

 03-11-2005
2.25
Attached forward belly skin.
Details
     

 03-10-2005
6.00
Install front seatback weldment.
Details
     

 03-10-2005
3.00
Assembled wheels / tubes / tires.
Details
     

 03-09-2005
5.50
Added rear-seat rudder pedal kit.
Details
     

 03-07-2005
12.50
Install main landing gear weldments.
       

 03-06-2005
6.40
Install Rudder pedals, brakes and brake lines
Details
       

 03-06-2005
3.25
Install Aft Bulkhead
Details
     

 02-21-2005
9.00
Install elevator control linkages and bell crank.
Details
       

 02-21-2005
3.25
Assemble and install control yokes.
Details
     

 02-21-2005
8.75
Allign and mount elevator control horn.
Details
       

 02-19-2005
4.50
Fabricate and install rudder endstops.
Details
     

 02-19-2005
8.00
Allign and attach Vertical stab Leading Edge.
Details
       

 02-18-2005
7.50
Allign and install Vertical Stablizer.
Details
       

 02-17-2005
6.50
Install horizontal stabalizer.
Details
     

 02-10-2005
8.25
Install rudder pedals
Details
     

 02-09-2005
4.40
Fit and temp install side cabin covers
Details
       

 02-08-2005
1.50
Install fuel valve selector bracket
Details
     

 01-02-2005
4.00
Installed canopy frame
Details
     