Powered By Kitlog Pro v2.0
Craigs RV-8 Web Site
RV-8
All
Work Logs Found:
553
Category Work Time:
1476 Hours
Date
Hours
Work Log Summary
Details
01-14-2019
1.50
Torqued the propeller bolts
Details
01-14-2019
2.00
Installed OAT sensor in right wing
Details
01-12-2019
3.00
Calibrated the fuel senders
Details
01-10-2019
5.00
Fuel lines
Details
11-17-2018
6.00
Wing/Fuselage assembly
Details
11-12-2018
2.00
Wing/Fuselage Assembly
Details
11-11-2018
1.00
Drill Guides
Details
11-05-2018
1.00
Wing Height Spacer
Details
11-04-2018
4.00
Wing/Fuselage Assembly
Details
11-02-2018
4.00
Tail Stand
Details
10-19-2018
3.50
Installed Garmin GAP 26 Air Data Probe Control Box
Details
10-10-2018
2.00
Empennage Faring
Details
10-09-2018
1.00
Moved the aircraft to the airport (part 2)
Details
10-08-2018
5.00
Moved aircraft to the airport
Details
10-05-2018
4.00
Control Yoke Wiring
Details
10-04-2018
2.00
Canopy Latch
Details
07-22-2018
2.75
Lables
Details
07-20-2018
1.00
Installed ductwork
Details
07-13-2018
0.50
Induction
Details
06-09-2018
1.00
Windscreen Fillet
Details
06-08-2018
2.50
prepped the windscreen and forward fuselage
Details
06-05-2018
3.00
Induction
Details
06-01-2018
2.00
Painted the forward fuselage skin
Details
05-27-2018
1.00
Attached the windscreen
Details
05-19-2018
20.00
Intake with Alternate air door
Details
04-22-2018
10.00
Induction
Details
03-08-2018
5.00
Installing the Inlet Ducts
Details
03-07-2018
3.00
Installing the Inlet Ducts
Details
02-21-2018
4.00
Trimming the baffle for the cowl
Details
02-14-2018
2.00
Induction System
Details
01-18-2018
4.00
Engine baffle
Details
01-16-2018
3.00
Cowl, Right side
Details
01-08-2018
3.00
Cowl
Details
01-07-2018
4.00
Cowl
Details
01-05-2018
2.50
Cowl
Details
01-04-2018
5.00
Cowl
Details
01-02-2018
2.00
Cowl
Details
01-01-2018
6.50
Cowl
Details
12-30-2017
3.00
Cowl
Details
12-26-2017
10.00
Cowl
Details
12-16-2017
8.00
Cowl
Details
11-30-2017
4.00
Upper Cowl
Details
11-29-2017
2.00
Baggage Door
Details
11-22-2017
4.00
Baggage Door
Details
11-16-2017
0.50
Baggage Door
Details
11-14-2017
2.00
Baggage Door
Details
11-05-2017
6.00
Baggage Door
Details
11-05-2017
0.50
Baggage Door
Details
10-31-2017
3.00
Forward Top Skin
Details
10-31-2017
4.00
F8104 L and R forward skin support ribs
Details
10-29-2017
5.00
Top Forward Skin - Gear Towers
Details
10-24-2017
4.00
Top Forward Skin
Details
10-16-2017
2.00
ASA Air Oil Separator
Details
10-15-2017
0.50
Oil cooler lines
Details
10-15-2017
0.50
Front and rear throttle linkage
Details
10-12-2017
0.50
Alternate air door push pull control cable
Details
10-09-2017
5.00
SCAT tubing for environmental air
Details
10-08-2017
4.00
Alternate Air Door push pull control cable
Details
09-11-2017
2.00
Alternate Air Door
Details
09-04-2017
3.00
Spinner
Details
09-02-2017
8.00
Spinner
08-14-2017
6.00
Spinner
Details
08-12-2017
2.00
Installing the Propeller
Details
08-04-2017
4.50
Propeller Spinner Bulkheads
Details
08-03-2017
2.00
Avionics Cooling / Defroster Part 3
Details
08-03-2017
3.00
Avionice Cooling / Defroster Part 2
Details
08-02-2017
1.00
Avionics Cooling/Defroster Part 1
Details
08-01-2017
4.00
Spinner bulkheads
Details
07-31-2017
6.00
Spinner Bulkheasds
07-30-2017
3.00
Engine Baffling
07-29-2017
6.50
Engine Baffling
Details
07-28-2017
3.00
Propeller Govenor Oil Line
Details
07-26-2017
1.50
Engine Baffling
Details
07-22-2017
1.00
Engine Baffle
Details
07-15-2017
18.00
Fuel Flow Sensor Mounting
Details
07-12-2017
20.00
Oil Cooler
Details
04-25-2017
3.00
Control System
Details
04-24-2017
4.00
GPS Antenna Mount Shelf
Details
04-23-2017
0.50
Showplanes Oil Cooler Mount
Details
04-23-2017
2.00
GPS Antenna Shelf
Details
04-21-2017
2.00
Showplanes Oil Cooler Mount
Details
04-20-2017
3.00
Showplanes Oil Cooler Mount
Details
04-19-2017
2.00
Showplanes Oil Cooler Mount
Details
04-16-2017
1.00
Installed rudder pedals
Details
04-15-2017
1.00
Environmental controls continued
Details
04-14-2017
6.00
Environmental controls
Details
04-12-2017
5.00
Mixture control Re-Do
Details
04-04-2017
1.75
Wired the starter switch, Flap switch and master s
Details
04-03-2017
2.00
Installed F-803B-C and D Assembly
Details
04-02-2017
6.00
Painted instrument panel
Details
03-25-2017
3.50
Engine Baffling
Details
03-24-2017
1.00
Hartzell Propeller arrived
Details
03-21-2017
1.00
Wire organization
Details
03-20-2017
4.00
Propeller governor
Details
03-16-2017
2.00
Antennas
Details
03-15-2017
2.00
Engine Baffle
Details
03-10-2017
4.00
Fuel flow interfaces
Details
01-19-2017
3.00
Wiring engine sensors
Details
01-19-2017
4.00
Fuel Flow Sensor Bracket
Details
01-16-2017
7.00
Throttle Quadrant
Details
01-16-2017
2.00
Engine Sensors
Details
01-11-2017
3.00
Throttle cable bracket
Details
12-25-2016
9.00
Mixture control bracket
Details
12-15-2016
3.50
Installed EGT and CHT sensors
Details
12-07-2016
6.00
Firewall pass through for control cables
Details
11-30-2016
2.50
Exhaust System
Details
11-28-2016
2.00
Installed main battery cable
Details
11-12-2016
3.00
Installed wheels and brakes
Details
11-10-2016
1.00
checking toe-in/toe-out
Details
11-08-2016
6.00
Main Gear Installation
Details
11-04-2016
1.00
Tires and Wheels
Details
11-04-2016
8.00
Landing Gear Leg install
Details
11-01-2016
12.00
Moved the fuselage out of the basement
Details
10-09-2016
3.50
Parking Brake Control
Details
10-05-2016
2.50
Cabin Heat box
Details
10-04-2016
3.00
Fuselage Lighting
Details
09-28-2016
5.00
Installed flap positioner sensor
Details
09-27-2016
2.00
Mounted circuit breaker for IBBS trickle charge
Details
09-23-2016
3.00
Flap Positioner Mounting
Details
09-08-2016
1.50
Wiring Pitch Trim
Details
08-24-2016
3.50
General Fuselage wiring
Details
08-21-2016
4.00
Integrated Battery Backup System
Details
08-14-2016
1.50
Installed ELT antenna
Details
08-13-2016
3.00
ELT Antenna doubler
Details
07-31-2016
2.00
Tailcone wiring
Details
07-29-2016
2.00
Aileron Trim Wiring
Details
07-21-2016
1.00
Riveted the ADS-B antenna and mounted antenna
Details
07-20-2016
2.50
ADB-B Antenna doubler
Details
07-16-2016
4.00
Transponder Antenna
Details
06-25-2016
4.00
Comm Antenna Doublers
Details
06-21-2016
6.00
Comm Antenna Doublers
Details
06-21-2016
2.00
Comm Antenna Doublers
Details
06-13-2016
2.00
Battery Ground Connection
Details
06-08-2016
4.00
Change to Instrument panel
Details
06-08-2016
3.00
Change to avionics wiring
Details
05-31-2016
2.00
Fuel Sender Mounting
Details
05-21-2016
1.50
Engine Mount
Details
05-15-2016
5.00
Canopy assembly
Details
05-14-2016
1.00
Fuel Lines
Details
05-12-2016
2.00
Canopy Frame re-paint
Details
05-10-2016
5.00
Canopy Skirt Painting
Details
05-09-2016
5.00
Canopy skirt painting
Details
04-30-2016
2.00
Trimmed top skin
Details
04-26-2016
0.10
Engine data
Details
04-20-2016
1.00
Picked up the engine
Details
03-04-2016
4.00
Fitting left canopy skirt
Details
03-03-2016
4.00
Fitting right canopy skirt
Details
03-01-2016
3.00
Fitting canopy skirts
Details
02-29-2016
1.00
Fitting the canopy skirts
Details
02-28-2016
2.00
Fitting the Canopy Skirt
Details
02-27-2016
5.00
Fitting the C-801 plexiglas bubble
Details
02-26-2016
6.00
Drilling the canopy and frame
Details
01-30-2016
2.00
Fitting the C-801 canopy bubble
Details
11-22-2015
4.00
Installed switch indicator plate
Details
09-10-2015
12.00
Fitting the C-801 Canopy bubble
Details
09-08-2015
2.00
Fitting theC801 Plexiglass bubble
Details
08-17-2015
2.00
New Canopy
Details
08-11-2015
0.10
Drilling the Canopy
Details
07-31-2015
2.00
Cutting the windscreen from the canopy
Details
04-13-2015
15.00
Fitting the C801 bubble
Details
01-01-2015
3.00
Installing slide rails
Details
03-20-2014
12.00
Power up
Details
02-18-2014
25.00
instrument mounting
Details
12-28-2013
6.00
instrument panel
Details
12-20-2013
6.00
Fuel Vents
Details
12-20-2013
5.00
Brake lines
Details
12-11-2013
2.50
Starter Relay Mounting
Details
12-07-2013
10.00
Brake lines
Details
11-05-2013
1.50
Starter Relay
Details
10-17-2013
10.00
Brake Lines
Details
10-07-2013
3.00
Installed parking brake
Details
09-15-2013
1.00
Test fit avionics
Details
09-15-2013
5.00
Magnetometer mounting
Details
09-14-2013
5.00
Magnetometer mount
Details
09-13-2013
1.50
Panel from SteinAir
Details
07-10-2013
5.00
Painting the inside of the Fuselage
Details
05-01-2013
1.00
Upper fuselage skin
Details
04-29-2013
1.00
Upper fuselage skin
Details
04-28-2013
1.00
Upper fuselage skin
Details
04-25-2013
0.50
Upper skin
Details
04-21-2013
1.00
Riveting upper skin
Details
04-18-2013
2.50
Aft upper skin
Details
03-21-2013
5.00
Magnetometer mount
Details
03-19-2013
2.00
Magnetometer mount
Details
02-21-2013
2.10
Forward top skin
Details
01-21-2013
0.75
Instrument Panel
Details
01-14-2013
1.00
Fwd Upper Fuselage
Details
01-12-2013
3.50
Parking Brake Mount
Details
12-27-2012
1.50
Fwd upper fuselage
Details
12-24-2012
2.00
Windscreen Support
Details
07-23-2012
3.00
Aft upper skin and bulkheads
Details
07-22-2012
3.50
Aft upper skins and bulkheads
Details
07-21-2012
3.00
Aft Upper Skin and Bulkheads
Details
07-19-2012
1.50
Aft upper skins and bulkheads
Details
07-18-2012
2.00
Aft upper skin and bulkheads
Details
07-16-2012
2.00
Aft Upper Skin and Bulkheds
Details
07-15-2012
2.00
Fuselage NACA Vent
Details
05-08-2012
2.00
Finish Kit arrived
Details
03-27-2012
3.00
Painting
Details
02-11-2012
6.00
Fuel Lines and Rudder tip
Details
02-06-2012
1.00
Tail Light
Details
02-06-2012
0.50
Brake System Reservoirs
Details
02-03-2012
1.20
Static system
Details
01-29-2012
1.00
Andiar Fuel Valve
Details
01-28-2012
3.00
Rear seat rudder pedals
Details
01-26-2012
1.00
Flap Motor
Details
01-22-2012
4.00
Rudder Pedals
Details
01-21-2012
1.00
Rudder Control Cables
Details
01-18-2012
4.00
Elevator Servo and Strobe Power Supply Mount
Details
10-25-2011
1.00
Elevator Control System
Details
10-24-2011
2.00
Elevator Control System
Details
10-23-2011
2.00
Elevator Control System
Details
10-22-2011
1.00
Elevator Control System
Details
10-21-2011
2.00
Elevators
Details
10-16-2011
1.00
Vertical Stabilizer
Details
09-25-2011
2.00
Vertical Stabilizer
Details
09-22-2011
3.50
Horizontal and Vertical Stabilizer
Details
09-17-2011
2.00
Horizontal Stabilizer
Details
09-13-2011
2.00
Horizontal Stabilizer
Details
08-26-2011
2.00
Consoles and seat Ramp
Details
08-24-2011
2.00
Consoles and Seat Ramp
Details
08-07-2011
2.00
Seat Floors
Details
08-05-2011
1.00
Seat Floors
Details
08-04-2011
1.00
Seat Floors
Details
08-02-2011
1.00
Seat Floors
Details
08-01-2011
3.00
Seat Floors
Details
07-31-2011
3.00
Seat floors
Details
07-29-2011
1.00
Seat floors
Details
07-28-2011
4.00
Rear Seatback
Details
07-27-2011
1.00
Rear Seatback
Details
07-26-2011
2.00
Front Seatback
Details
07-25-2011
2.00
Front Seatback
Details
07-24-2011
3.00
Forward bottom skins
Details
07-23-2011
2.00
Forward floor skins
Details
06-17-2011
2.00
Bottom Skins
Details
06-13-2011
1.00
Bottom Skins
Details
06-12-2011
4.00
Landing Gear
Details
05-26-2011
3.00
Landing Gear
Details
05-18-2011
4.00
Forward Bottom Skins
Details
05-14-2011
2.00
Front Seatback support
Details
05-07-2011
3.00
Arm rests and Cockpit rails
Details
05-04-2011
2.00
Battery Tray
Details
05-03-2011
1.00
Battery Tray
Details
05-02-2011
2.50
Skin Riveting
Details
05-01-2011
2.00
Skin Riveting
Details
04-30-2011
1.50
Skin Riveting
Details
04-29-2011
1.00
Skin Riveting
Details
04-28-2011
2.00
Skin Riveting
Details
04-27-2011
2.50
Skin Riveting
Details
04-26-2011
1.50
Skin Riveting
Details
04-24-2011
2.00
Skin Riveting
Details
02-13-2011
1.00
Elevator Control System
Details
02-12-2011
1.00
Skin Riveting
Details
02-07-2011
1.00
Skin Riveting
Details
02-03-2011
0.50
Skin Riveting
Details
02-02-2011
0.50
Skin Riveting
Details
12-21-2010
1.50
Skin Riveting
Details
12-17-2010
1.00
Skin Riveting
Details
12-15-2010
1.00
Skin Riveting
Details
12-13-2010
1.10
Skin Riveting
Details
12-12-2010
3.00
Skin Riveting
Details
12-08-2010
1.00
Fuselage Final Assembly
Details
11-27-2010
2.00
Fuselage Final Assembly
Details
11-26-2010
6.00
Fuselage Final Assembly
Details
11-25-2010
3.00
Fuselage Final Assembly
Details
11-24-2010
2.00
Fuselage Final Assembly
Details
11-23-2010
2.00
Fuselage Final Assembly
Details
11-22-2010
1.00
Fuselage Final Assembly
Details
11-21-2010
3.00
Fuselage Final assembly
Details
11-20-2010
4.00
Prepairing fuselage parts for final assembly
Details
11-19-2010
1.00
Preparing fuselage parts for final assembly
Details
11-18-2010
2.00
Prepairing fuselage parts for final assembly
Details
11-17-2010
1.00
Prepairing fuselage parts for final assembly
Details
11-14-2010
3.00
Preparing fuselage parts for final assembly
Details
11-13-2010
3.00
Preparing fuselage parts for final assembly
Details
11-12-2010
2.00
Preparing fuselage parts for final assembly
Details
11-06-2010
2.00
Prepairing fiuselage parts for final assembly
Details
10-31-2010
3.00
Preparing fuselage parts for final assembly
Details
10-30-2010
2.00
Preparing fuselage parts for final assembly
Details
10-29-2010
2.50
Drilling Fuselage Skins
Details
10-28-2010
1.00
Drilling Fuselage Skins
Details
10-27-2010
4.50
Drilling fuselage skins
Details
10-26-2010
3.00
Drilling Fuselage Skins
Details
10-22-2010
3.00
Drilling fuselage skins
Details
10-21-2010
1.50
Drilling fuselage skins
Details
10-17-2010
1.00
Aft deck
Details
10-08-2010
4.00
Drilling fuselage skins
Details
10-03-2010
3.00
Drilling fuselage skins
Details
10-02-2010
4.00
Drilling Fuselage skins
Details
09-29-2010
2.50
Drilling fuselage skins
Details
09-28-2010
3.00
Drilling the fuselage skins
Details
09-25-2010
4.00
Adding tailcone to fwd fuselage
Details
09-19-2010
2.00
Adding tailcone to fwd fuselage
Details
09-18-2010
6.00
Adding tailcone to fwd fuselage
Details
09-16-2010
1.00
Adding tailcone to fwd fuselage
Details
09-12-2010
3.00
Aft Fuselage Assembly
Details
08-30-2010
1.50
Tailcone bulkheads
Details
08-29-2010
5.00
Tailcone Bulkheads
Details
08-25-2010
1.25
Tailcone Bulkheads
Details
08-23-2010
1.00
Tailcone Bulkheads
Details
08-22-2010
2.00
Joining the FWD and Mid Fuselage Subassemblies
Details
08-19-2010
0.50
Cut slot for rear throttle
Details
08-18-2010
2.50
Mid fuselage skins and structure
Details
08-11-2010
0.75
Mid Fuselage Skins and Structure
Details
08-10-2010
1.00
Mid fuselage skins and structure
Details
08-09-2010
1.50
Fwd Fuselage Structure
Details
08-08-2010
2.00
Fwd fuselage structure
Details
08-07-2010
2.50
Fwd Fuselage structure
Details
08-06-2010
1.75
RV-8 Fwd Fuselage Structure
Details
08-05-2010
1.00
Longeron bending
Details
08-03-2010
1.00
Longeron Bending
Details
08-02-2010
3.50
Seat Rib Subassembly
Details
08-01-2010
2.00
Center Section
Details
07-31-2010
2.00
Center Section
Details
07-29-2010
2.00
Seat Rib Assembly
Details
07-26-2010
5.00
Seat Rib Subassembly
Details
07-25-2010
4.00
Seat Rib Sub Assembly
Details
07-20-2010
2.50
Center Section
Details
07-19-2010
2.50
Center Section
Details
07-18-2010
2.00
Center Section
Details
07-15-2010
1.00
Center Section
Details
07-14-2010
2.00
Center Section - Fwd control mount
Details
07-13-2010
2.00
Center Section
Details
07-12-2010
3.00
Forward Fuselage Sub-Structure
Details
07-11-2010
1.50
L.G. Box Assemblies
Details
07-10-2010
0.50
L.G. Box assemblies
Details
07-09-2010
3.50
Landing Gear Box Assembly
Details
07-08-2010
2.00
Landing Gear Box Assembly
Details
07-07-2010
2.75
Landing Gear Box Assembly
Details
06-30-2010
0.50
Landing Gear box assembly
Details
06-30-2010
2.00
Completed Firewall
Details
06-27-2010
3.00
Cooling Ramp Assembly
Details
06-25-2010
4.00
Forward fuselage subfloor assembly
Details
06-24-2010
2.00
Forward fuselage floor
Details
06-22-2010
3.00
Firewall prep
Details
06-18-2010
1.00
Firewall preparation
Details
06-17-2010
4.00
Inventory complete
Details
06-17-2010
2.00
Firewall
Details
06-14-2010
1.00
Fuselage Kit arrived
Details
05-27-2010
3.00
Wing tip finish up
Details
05-25-2010
3.00
Wing tips
Details
05-24-2010
2.00
Wing tips
Details
05-23-2010
2.00
Wing tips
Details
05-22-2010
2.00
Wing Tips
Details
05-22-2010
1.00
Moved wings out of the basement
Details
05-21-2010
2.00
Riveted piano hinge for flap
Details
05-20-2010
3.50
Completed riveting bottom outboard skin
Details
05-19-2010
4.50
Riveted outboard bottom skin to right wing
Details
05-12-2010
1.00
Completed right wing inboard bottom skin
Details
05-11-2010
1.50
Riveting outboard bottom skin on right wing
Details
05-09-2010
1.00
Riveting bottom inboard skin, right wing
Details
05-08-2010
2.00
Right wing prep
Details
05-07-2010
0.75
Installed Trio Roll Servo into right wing
Details
05-05-2010
2.50
Riveted flap to the left wing
Details
05-04-2010
5.00
installing aileron (left wing)
Details
05-03-2010
3.50
riveting bottom skins
Details
05-02-2010
0.50
riveting bottom outboard skin
Details
05-01-2010
1.00
Riveting bottom outboard skin
Details
12-06-2009
3.00
Completed riveting the inboard bottom skin
Details
12-02-2009
2.00
Left Wing Botton Inboard skin
Details
12-01-2009
1.00
Final preparation on inboard bottom left skin
Details
11-30-2009
2.00
Final preparation of left outboard bottom skin
Details
11-29-2009
2.00
Pitot Tube mount
Details
11-28-2009
6.00
Pitot Tube Mount
Details
11-08-2009
2.50
EAA Tech Counselor visit
Details
11-01-2009
2.00
Installed Ductworks light in left wing
Details
10-31-2009
3.00
Installed Advanced Flight AOA kit in the left wing
Details
09-26-2009
4.00
Flaps
Details
09-25-2009
8.00
Flaps
Details
09-23-2009
2.00
Flap brackets
Details
09-22-2009
2.00
Flap hinge
Details
09-20-2009
1.00
Ailerons and flaps
Details
09-19-2009
2.00
W818 pushrods
Details
09-18-2009
2.00
Pushrods
Details
09-15-2009
1.00
Aileron
Details
09-13-2009
1.00
Left Aileron Spar
Details
09-13-2009
0.50
Aileron skins
Details
09-13-2009
2.00
Aileron skeleton
Details
09-11-2009
1.00
Riveted the aileron stiffeners
Details
09-10-2009
1.00
Left Aileron
Details
09-09-2009
1.00
Ailerons
Details
09-08-2009
1.50
Aileron stiffeners
Details
09-07-2009
1.00
Flap Brace
Details
09-06-2009
2.00
Flap Brace
Details
09-05-2009
3.00
Flap brace and Aileron gap seal
Details
09-04-2009
1.00
Aileron gap seal and flap brace
Details
09-04-2009
0.50
Aileron gap fairing
Details
09-03-2009
2.00
Flap brace
Details
09-01-2009
2.00
Finished riveting the top skins
Details
09-01-2009
1.50
Aileron Brackets
Details
08-30-2009
6.00
Wing stand
Details
08-29-2009
3.00
Aileron Brackets
Details
08-24-2009
2.00
Top Skins - Right wing
Details
08-23-2009
6.00
Top Skins - Right Wing
Details
08-22-2009
3.50
Leading edge
Details
08-18-2009
0.50
Leading edge ribs -Right Wing
Details
06-29-2009
1.00
Riveting the leading edge ribs
Details
05-16-2009
3.00
left wing top skin
Details
05-14-2009
1.00
Left wing top skin
Details
05-12-2009
1.00
Left Wing top skin
Details
05-06-2009
2.00
Left Leading edge
Details
05-05-2009
3.00
Left Wing Leading edge riveting
Details
04-27-2009
2.00
Right Leading Edge
Details
04-26-2009
1.50
Riveted the top leading edge skin
Details
04-25-2009
6.00
Right wing leading edge
Details
04-24-2009
1.00
Left landing light
Details
04-23-2009
3.00
Left Leading Edge Skin
Details
04-22-2009
5.00
Left Leading edge
Details
04-20-2009
1.00
Left wing leading edge
Details
04-18-2009
2.25
Taxi and Landing lights
Details
04-17-2009
4.00
Taxi and Landing lights
Details
04-16-2009
1.00
Landing and taxi lights
Details
04-13-2009
1.50
Pitot Mast
Details
04-10-2009
0.50
Pressure tested the left tank
Details
04-07-2009
3.00
Closed the left fuel tank
Details
04-06-2009
3.00
Riveted ribs in left fuel tank
Details
04-04-2009
1.00
Installed the fuel tank capacitive senders
Details
03-29-2009
2.00
Assembling and sealing the left tank
Details
03-27-2009
2.50
Completed preparation for left fuel tank
Details
03-26-2009
4.00
Prepped the left fuel tank
Details
03-24-2009
0.50
Pressure tested the right fuel tank
Details
03-21-2009
4.50
closed up right fuel tank
Details
03-08-2009
3.00
fuel tank anti hang up for flop tube
Details
03-07-2009
2.00
Right tank fuel gauge work
Details
03-06-2009
2.50
riveted right fuel tank
Details
03-05-2009
2.50
Riveting ribs into right fuel tank
Details
03-02-2009
1.00
Right fuel tank - Stiffeners
Details
03-01-2009
2.00
Right Fuel Tank
Details
02-27-2009
2.00
Dimpled the fuel tank skins
Details
02-22-2009
2.00
Fuel cap flange and drain
Details
02-20-2009
3.00
Access cover
Details
02-15-2009
3.50
Fabricated the T-405 attach angle
Details
02-14-2009
6.00
Capacitive fuel gauge senders
Details
02-12-2009
3.00
Fuel tank ribs and rear baffle
Details
02-11-2009
3.00
Fuel tank Ribs
Details
02-07-2009
4.00
Fuel tank baffles
Details
01-24-2009
2.00
wing leading edges
Details
01-24-2009
3.00
Tank attach brackets
Details
01-24-2009
1.00
Started the right wing fuel tanks
Details
01-24-2009
4.00
Right wing leading edge
Details
01-23-2009
2.00
Riveted rear spar to ribs right wing
Details
01-20-2009
3.00
Riveted ribs on right main spar
Details
01-01-2009
0.50
Deburred holes right wing ribs
Details
11-04-2008
2.00
Leading edge
Details
11-04-2008
2.00
deburred dimpled and primed the outboard skin
Details
11-02-2008
3.00
Prepped the inboard top skin and doubler
Details
11-01-2008
1.50
Riveted the left wing rear spar
Details
10-30-2008
3.00
Riveted ribs to main spar
Details
10-25-2008
5.00
Matchdrilled disasembled, deburred and primed
Details
10-21-2008
1.50
Match drilled the bottom right skin
Details
10-19-2008
1.00
Checked the wing structure for warp or twist
Details
09-29-2008
2.00
Right wing, wing walk doubler
Details
09-29-2008
2.00
More ribs
Details
09-29-2008
1.00
Final drill the spar to ribs holes for the right w
Details
09-28-2008
2.00
Making the wing walk doubler
Details
09-16-2008
1.00
straightened ribs
Details
09-16-2008
1.00
deburred ribs
Details
09-16-2008
1.00
Clecoed the ribs to the right wing front and rear
Details
09-15-2008
2.00
Straightened Ribs
Details
09-07-2008
2.00
Drilled the hole for the electrical conduit
Details
09-06-2008
3.00
Assembling the rear spar - Riveted the rear spar t
Details
08-27-2008
4.00
Preparing the Wing Ribs - Straightened the W-710,
Details
07-15-2008
3.00
wing construction stands
Details
06-16-2008
2.50
Fabricated the tie downs
Details
06-15-2008
2.00
Finished countersinking for screws
Details
06-14-2008
0.50
Left Wing Countersinking
Details
06-13-2008
0.50
Right Spar Countersinking
Details
06-12-2008
1.75
Left Wing Spar
Details
06-11-2008
1.50
Completed nut plates on right spar
Details
06-09-2008
0.50
Attach Tank platenuts
Details
06-03-2008
1.50
Countersink Main Spar (right)
Details
06-02-2008
1.00
Main Spar Preparation -countersinking
Details
05-31-2008
2.00
Started machine countersinking Left Main Spar
Details
05-03-2008
6.00
Fiberglass
Details
02-23-2008
1.00
Riveted the tip to the Vertical Stab.
Details
02-22-2008
1.00
riveting the tips Rudder
Details
02-08-2008
1.00
Fitting the fiberglass tips on the horizontal stab
Details
02-07-2008
4.00
Fiberglass tips
Details
02-03-2008
1.00
Fiberglass tips
Details
01-31-2008
3.00
Fiberglass tips - Elevator
Details
01-27-2008
2.00
Fitting the elevators
Details
01-27-2008
1.00
Fitting the elevators
Details
01-26-2008
3.00
Rolled right elevator leading edge
Details
01-26-2008
3.00
Rolled and Riveted Left Rudder leading edge
Details
01-23-2008
1.00
Riveted the leading edge of the rudder
Details
01-23-2008
1.00
Completing the leading edge of the Rudder
Details
01-20-2008
3.00
Riveting the Rudder
Details
01-20-2008
4.00
Building the rudder skeleton
Details
01-20-2008
2.00
Building the rudder skeleton
Details
01-19-2008
0.50
Folding the rudder trailing edge
Details
01-19-2008
3.00
Building the rudder skeleton
Details
01-19-2008
2.00
Building the rudder skeleton
Details
01-18-2008
1.50
Riveting Stiffeners to the skin
Details
01-18-2008
2.00
Completed riveting the Left Elevator
Details
01-17-2008
0.20
Trim tab rib
Details
01-16-2008
1.00
Trim Tab
Details
01-14-2008
0.50
Riveting the left elevator
Details
01-13-2008
5.00
Bending the left elevator tabs
Details
01-12-2008
3.00
Left elevator
Details
01-05-2008
5.00
Building the trim tab
Details
01-01-2008
4.00
Left elevator
Details
12-30-2007
2.00
Preparing the left elevator skin
Details
12-28-2007
3.00
Riveting the elevator skeleton
Details
12-27-2007
0.50
Debur the E-702 spar
Details
12-26-2007
1.00
Right Elevator
Details
12-23-2007
1.00
Riveting the Right Elevator
Details
12-23-2007
2.00
Drilling the E-702 Spar
Details
12-23-2007
2.00
Building the Right Elevator
Details
12-22-2007
3.00
Riveted Vertical Stabilizer skin
Details
12-22-2007
0.50
Finishing the Vertical Stabilizer
Details
12-16-2007
2.00
Riveting Vertical stabilizer front spar
Details
12-16-2007
1.50
Finishing the Vertical Stabilizer
Details
12-01-2007
4.00
Riveting the Horizontal Stabilizer
Details
11-27-2007
0.50
Riveting Horizontal Stabilizer
Details
11-23-2007
2.00
Riveting the Horizontal Stabilizer
Details
11-23-2007
1.70
Drilling the Vertical Stabilizer
Details
11-21-2007
0.75
Riveted HS-707
Details
11-18-2007
0.50
First Tech Counselor visit
Details
11-15-2007
2.00
Riveting the Horizontal Stabilizer Skin
Details
11-14-2007
1.50
Riveting the Front Spar of Horizontal Stabilizer
Details
11-14-2007
1.50
Riveted HS-404 and 405 to the front spar
Details
11-13-2007
2.50
Riveting the Horizontal Stabilizer
Details
11-10-2007
1.00
Started riveting the rear spar
Details
11-08-2007
3.00
Built a spray booth
Details
11-03-2007
3.00
Cleaned and conversion coated
Details
11-02-2007
0.50
conversion coated and Primed HS609-pp
Details
10-28-2007
2.00
Conversion coating
Details
10-27-2007
1.00
dimpling
Details
10-27-2007
2.00
Deburring, and dimpling the Horizontal Stabilizer
Details
10-26-2007
1.00
Horizontal Stabilizer
Details
10-25-2007
1.00
Drilling the left horizontal stabilizer
Details
10-25-2007
2.00
Drilling the horizontal stabilizer
Details
10-25-2007
1.00
Drilling the horizontal stabilizer
Details
10-24-2007
0.50
setting up the 404 ribs
Details
10-24-2007
1.00
Preparing the ribs
Details
10-24-2007
0.50
Preparing the ribs
Details
10-24-2007
1.00
Drilling the horizontal stabilizer
Details
10-24-2007
1.50
drilling the horizontal stabilizer
Details
10-20-2007
1.00
HS-810-1 and HS-814-1
Details
10-20-2007
0.50
Front spar assembly
Details
10-20-2007
1.00
Front Spar
Details
10-19-2007
0.50
Riveting HS411 - Rear Spar assembly
Details
10-19-2007
1.50
Drilled HS-411 and conversion coated VA-146
Details
10-18-2007
2.00
Rear Spar Assembly Elevator Hinge Brackets
Details
10-18-2007
1.00
Rear Spar Assembly
Details
10-17-2007
2.00
Rear Spar Assembly
Details
10-14-2007
2.00
Started working again
Details
08-06-2007
1.00
More 720 stiffener work
Details
08-02-2007
1.50
E-720
Details
08-01-2007
4.00
Preparation
Details
07-19-2007
0.00
Received the Empennage kit
Details
07-19-2007
1.50
Inventory of the empennage kit
Details
07-08-2007
0.00
Took first flight in RV-8
Details
SITE NAVIGATION
RV-8 Home
Category
# Logs
# Hours
All
553
1476
Avionics
24
108
Canopy
20
81
Cowl
13
59
Electrical
3
5
Empennage
79
141
Engine
13
58
Engine Baffle
1
4
Firewall Forward
20
90
Fuel System
2
8
Fuel Tank
23
60
Fuselage
213
532
Fuselage Wiring
6
12
Induction system
4
16
Miscellaneous
3
12
None
1
Prop
6
27
Shop Supplies
1
3
Tools
5
11
Windscreen
2
2
Wings
114
247
Copyright © 2001-2025 Matronics. All Rights Reserved.