Powered By Kitlog Pro v2.0
Waynes RV8 Project
RV8
All
Work Logs Found:
242
Category Work Time:
313 Hours
Date
Hours
Work Log Summary
Details
10-28-2010
5.00
Acid etched and alodine ribs 8 - 14. Primed all.
10-27-2010
3.50
Acid etched and alodined ribs 1-7
10-22-2010
1.20
Removed ribs from right wing and deburred.
10-22-2010
1.40
Drilled holes in ribs for wiring
10-21-2010
0.70
Used Goof-Off to remove sticker residue
10-21-2010
2.25
Put ribs and skins on right spar and final dirlled
Details
10-18-2010
2.40
Final drilled ribs to spar and deburred.
Details
10-15-2010
1.75
Put skins on wing to check straightness of flutes.
Details
10-14-2010
2.50
Fluted left wing ribs
10-14-2010
1.20
Finished straightening flanges
10-01-2010
2.10
Finished deburring lightening holes of main ribs
09-27-2010
3.10
Deburred inside of ribs
09-25-2010
0.70
Marked ribs and removed stickers
09-22-2010
1.75
Continued to scotchbrite edges of ribs
09-21-2010
1.30
Continued to scotchbrite edges of ribs
09-20-2010
0.40
Riveted end of elevator had not been riveted.
Details
09-20-2010
0.80
Finished riveting rear spars
Details
09-20-2010
0.30
Finished filing fiberglass tip.
09-19-2010
0.90
Riveted reinforcement fork to rear spar
09-19-2010
0.20
Continued to file fiberglass tip
09-14-2010
2.00
Prekote and Primed rear spar
09-14-2010
1.30
Continued work on fiberglass tips.
Details
09-13-2010
0.25
Shaped fiberglass tips
09-13-2010
1.90
Continued work on rear spar
Details
09-12-2010
0.75
Match drilled W-712 ribs to rear spar before primi
Details
09-12-2010
0.40
Drilled top of rear spar and deburred
09-12-2010
0.40
Attached W-711
04-01-2010
1.30
Fiberglass tips
Details
03-17-2010
0.50
Shaped lead weight cont.
Details
03-17-2010
1.00
Reinstalled elevators and checked movement
03-16-2010
1.60
Repeated procedure from right elevator
03-15-2010
1.20
Drill bushing
Details
03-05-2010
2.60
Preliminary check of elevator travel
Details
03-04-2010
1.25
Installed rod end bearings
03-02-2010
1.80
Rolled and riveted leading edge
03-01-2010
2.20
Rolled and riveted the leading edges
02-22-2010
0.20
Trimmed inboard edge of E-721. Clecoed to elev.
02-22-2010
2.10
Made final adjustments to trim tab.
Details
02-18-2010
0.30
Match drilled and clecoed forward portion of E-721
02-18-2010
0.10
Marked the inboard edge of E-701-L on E-721
02-18-2010
0.20
Hinge
Details
02-18-2010
0.30
Adjusted hinge line of trim tab and elevator
02-17-2010
2.75
Riveted E-701-L and E-713 to the understructure
02-17-2010
0.50
Riveted E-606PP to E-701-L along bottom flange
Details
02-17-2010
0.25
Finished attaching E-714
02-16-2010
0.10
Placed skin over skeleton
02-10-2010
2.00
Prepped trim parts including etching and primining
01-29-2010
0.70
Riveted bottom part of trim tab
Details
01-29-2010
0.20
Clecoed trim tab back together
01-27-2010
1.75
Prepped trim tab parts including priming
01-25-2010
0.10
Trimmed E-721 trim tab hinge
01-25-2010
0.30
Trimmed E-717 and E-718
01-25-2010
0.10
Disassembled trim tab
01-25-2010
0.20
Dimpled top of the E-607PP trim tab spar
01-25-2010
0.80
Continued work of trim tab.
Details
01-24-2010
1.20
Continued work on trim tab.
Details
01-24-2010
1.00
Completed trailing edge bend of the trim tab
01-21-2010
2.00
Worked on trim tab.
Details
01-21-2010
0.30
Bent left elevator tabs.
Details
01-21-2010
0.25
Bent elevator trim tab openings.
01-19-2010
2.30
Riveted elevator skin to skeleton. Torqued E-714.
01-16-2010
0.30
Riveted E-713 to E-701. Placed E-714 inside E-713.
01-16-2010
1.70
Continued to rivet right elevator
Details
01-14-2010
0.80
Riveted skeleton parts.
Details
01-14-2010
1.00
Continued riveting right elevator
Details
01-13-2010
0.70
Started to rivet right rudder
Details
01-13-2010
0.30
Riveted E-705 to E-702.
01-13-2010
0.75
Prepped and riveted parts.
Details
01-12-2010
0.40
Primed parts at Mark's house.
01-06-2010
3.50
Acid etch, alodine skeleton parts.
01-05-2010
1.00
Skeleton parts prep.
Details
01-05-2010
0.15
Drilled E-701-L to the understructure. Disassemble
01-05-2010
0.10
Countersunk (Dimpled) for rivets
Details
12-30-2009
0.50
Riveted platenuts to trim access panel
12-30-2009
1.25
Primed inside of (L) elevator skin
Details
12-29-2009
0.60
Trim access panel plate nut preps.
Details
12-21-2009
1.30
Smoothed edges of (L) elev. skin.
12-21-2009
1.00
Deburred spar and ribs
12-14-2009
0.20
Disassembled elevator
12-14-2009
1.00
Dimpled and smoothed stiffeners
12-14-2009
1.10
Devinyled top of skin
12-14-2009
0.75
Deburred inside of skin
12-14-2009
0.30
Clecoed and final drilled E-606PP to E-705
12-14-2009
0.25
Clecoed and drilled WD-605-1 to E-702 & E-705
12-11-2009
0.70
Drilled stiffeners to skin
12-08-2009
1.50
Fabricated D, E & F stiffeners
12-08-2009
0.50
Continued to fabricate stiffeners
12-08-2009
0.20
Bent trailing edge
12-07-2009
1.00
Fabricated stiffeners
12-07-2009
0.40
Clecoed E-701-L to the understructure
12-07-2009
1.80
Back riveted stiffeners
12-01-2009
5.90
Acid etched, alodined and primed.
Details
11-30-2009
0.25
Smoothed edges and clecoed E-615PP to skin
11-30-2009
0.70
Fabricated "H" stiffeners
11-30-2009
2.75
Dimpled and smoothed edges
Details
11-29-2009
0.25
Deburred skin
11-25-2009
0.40
Devinyled right elevator
11-25-2009
1.90
Deburred, trimmed and clecoed
Details
11-24-2009
1.10
Trimmed and marked stiffeners
11-24-2009
0.25
Reinstalled E-614-020 counterweight
Details
11-24-2009
0.40
Drilled bottom stiffeners to skin
11-24-2009
1.20
Blind riveted leading edge of rudder
11-23-2009
2.75
Formed leading edge of rudder
11-23-2009
0.75
Finished riveting narrow edges of rudder
Details
11-19-2009
2.70
Riveted all rivets I could reach with 2.5 inch yok
11-18-2009
1.50
Tried to straighten out top part of rudder
11-18-2009
0.40
Put silicon at trailing edge of stiffeners
Details
11-18-2009
0.20
Clecoed rudder skin to skeleton
Details
11-17-2009
1.50
Built wood brake
Details
11-17-2009
2.50
Attempted to bend trailing edge of rudder.
Details
11-14-2009
4.70
Riveted all rivets I could reach with 2.5 yoke
11-13-2009
0.25
riveted R-710 to R-405PD then R-704
11-13-2009
0.20
Countersunk E-614-020
11-13-2009
0.75
Continued riveting rudder skeleton
Details
11-12-2009
4.75
Riveted rudder skeleton
Details
11-10-2009
0.30
Riveted R-713 to R-703
11-09-2009
6.50
Primed all rudder skeleton parts.
Details
11-08-2009
0.40
Elevator skeleton prep.
Details
11-08-2009
0.40
Elevator skeleton prep.
Details
11-08-2009
0.10
Dimpled holes in R-703 for E-614-020 "c"weight
11-07-2009
0.40
Drilled holes in E-714 for screws
11-07-2009
0.20
Drilled holes in E-714 for screws
11-06-2009
0.70
Fitted E-714 counterweight
Details
11-06-2009
0.25
Fitted E-714 counterweight
Details
11-06-2009
3.75
Back riveted skin and stiffeners together
11-02-2009
1.00
Prepared tip ribs
Details
11-02-2009
1.00
Prepared tip ribs
Details
11-02-2009
2.25
Prekoted and primed inside of rudder skin
11-02-2009
0.20
Match drilled reinforcement plates to spar
Details
11-02-2009
0.20
Match drilled reinforcement plates to spar
Details
11-01-2009
0.70
Put bolts thru horizontal stab. hinges
Details
11-01-2009
0.30
Clecoed reinforcing plates to spar
Details
11-01-2009
0.30
Clecoed reinforcing plates to spar
Details
10-31-2009
0.70
Snipped stiffeners and designated left and right
10-30-2009
4.25
Riveted rear spar to horizontal stab skin
10-28-2009
2.70
Dimpled skin rudder.
10-28-2009
1.40
Continured working on rudder skeleton
Details
10-27-2009
1.40
Continued finishing edges
10-26-2009
1.60
Continue preparing skin and skeleton
Details
10-25-2009
0.30
Dimple tips of upper and lower ribs.
Details
10-22-2009
3.10
Parts prep and priming
Details
10-21-2009
4.00
Prepared stiffeners for primining
Details
10-20-2009
0.60
Hung vertical stabilizer from ceiling in garage
10-20-2009
0.30
Deburred and smoothed edges - top side of skin
10-20-2009
0.50
Clecoed skin to rear spar
Details
10-19-2009
2.90
Riveted forward spar of horizontal stabilizer to s
10-19-2009
0.90
De-vinyled and dimpled rudder skins and ribs
Details
10-16-2009
5.10
Finished riveting rear spar to skin
Details
10-13-2009
1.30
Finished preliminary work on rudder skeleton
Details
10-12-2009
1.60
Riveted on vertical stabilizer skin except rear sp
10-12-2009
2.10
Match drilled rudder skeleton
Details
10-09-2009
4.40
Began work on rudder skeleton
Details
10-05-2009
2.50
Fabricated R-717and (1) R-716
10-03-2009
0.80
Clecoed vertical stabilizer skin to skeleton
10-01-2009
3.50
Riveted right horizontal skin onto skeleton
09-30-2009
0.50
Primed skins
Details
09-30-2009
0.25
Primed skin
04-02-2009
1.50
Riveted vertical stabilizer spar
Details
04-01-2009
0.80
Riveted HS-404 & HS-405 to HS-702
04-01-2009
1.00
Continued to inventory wing kit skins box
03-31-2009
1.00
Primed VS-704, VS705, VS-706 & VS-707
03-31-2009
1.80
Primed horizontal stabilizer parts
Details
03-31-2009
0.30
Open wing kit box containing the skins
03-30-2009
0.40
Alumiprep & alodine VS-704
03-23-2009
1.30
Alumiprep & alodiine HS and VS
Details
03-22-2009
0.75
Deburred holes
03-22-2009
1.30
Alumiprep & alodine horizontal stabilizer parts
Details
03-21-2009
0.25
Finished de-vinyling
03-20-2009
0.75
Continued de-vinyling (inside)
03-19-2009
2.60
Continued work on stiffeners
Details
03-18-2009
0.60
Finished riveting the vertical stabilizer
03-18-2009
0.70
Drilled rudder stiffeners to skin
03-17-2009
1.75
Riveted vetical stabilizer spar
03-17-2009
4.00
Continued riveting HS-814-1 & HS-810-1 to HS-702
03-16-2009
1.50
Riveted HS-814-1 & HS-810-1 to HS-702.
03-16-2009
0.70
Additional riveting on rear spar due to underdrive
Details
03-14-2009
2.75
Worked on horizontal stabilizer rear spar
Details
03-12-2009
0.70
Clecoed together vertical stabilizer
Details
03-12-2009
0.20
Clecoed HS-810-1 & HS-814-1 to HS-702 front spar
03-10-2009
2.25
Riveting of rear spar
Details
03-09-2009
0.75
Touched up some areas with primer
03-09-2009
0.15
Prepared rear spar for riveting
Details
03-09-2009
0.85
Finished trimming rudder stiffeners. Clecoed to sk
03-09-2009
0.25
Began tapering rudder stiffeners
03-06-2009
5.00
Primed vertical stabilizer spar
Details
03-05-2009
7.00
Primed Horizontal stabilizer ribs and spars
Details
03-05-2009
0.70
Continued to trim stiffeners
03-03-2009
1.30
Rudder stiffener fabrication
03-01-2009
0.75
Started rudder - began with stiffeners
Details
03-01-2009
0.60
Dimpled VS-702 & VS-704
02-26-2009
3.00
Dimple, countersink and scotchbrite VS parts
Details
02-01-2009
1.00
Deburred and dimpled vert. stab. ribs
Details
01-27-2009
0.25
Deburred and dimpled VS-705
01-26-2009
2.00
Unclecoed and deburred vertical stabilizer skin
01-15-2009
1.50
Match drilled VS-801PP skin
01-15-2009
0.50
Continued to redimple horizontal stabilizer skin
01-13-2009
0.50
Redimpled horizontal stabilizer skins
Details
01-09-2009
2.00
Built C-frame table
01-04-2009
0.40
Continued to dimple (L) horizontal stabilizer
01-03-2009
0.40
Dimpled (L) horizontal skin
01-02-2009
0.20
Continued to dimple (R) horizontal skin
Details
01-01-2009
0.50
Continued to dimple (R) horizontal stabilizer
12-28-2008
0.50
Dimpled (R) horizontal stabilizer skin
12-23-2008
0.30
Continued to dimple (R) side skeleton
12-15-2008
0.30
Dimpled (R) side skeleton
12-12-2008
0.35
Continued to dimple (L) skin
12-11-2008
0.40
Dimpled (L) skins
12-09-2008
0.90
Deburred skins
12-08-2008
1.00
Deburred skins
12-07-2008
4.90
Continued skin and spar preparation
Details
12-06-2008
4.30
Drilled spars and skins
Details
12-06-2008
0.10
Clecoed HS-810/814-1 to HS-702
11-26-2008
0.20
Received new HS-810. Marked appropriate holes
11-26-2008
4.20
Marked taper line on HS-810/814
Details
11-26-2008
2.25
De-vinyled VS-801PP and clecoed skin to ribs
11-25-2008
2.30
Prepared ribs and skins
Details
11-24-2008
0.60
Clecoed ribs to spar
Details
11-24-2008
1.30
Clecoed and drilled ribs to spars
Details
11-23-2008
1.95
Rib preparation
Details
11-22-2008
2.80
Continued vinyl prep
Details
11-20-2008
1.80
Preped vinyl covering
Details
11-20-2008
1.30
Match drilled ribs to spar
Details
11-19-2008
0.70
More rib prep
Details
11-18-2008
1.80
Rib prep
Details
11-15-2008
0.40
HS-702 prep
Details
11-15-2008
0.30
Dimpled and C/S HS-810 & HS-814
Details
11-15-2008
0.70
Bent HS-801-1, HS-814-1 & HS-702
11-14-2008
4.00
Tapered HS-810-1 and HS-814-1
Details
11-08-2008
0.30
VA-146
Details
11-07-2008
0.70
Started assembly of front spar
Details
11-07-2008
0.70
Drilling and priming
Details
11-01-2008
0.60
Match drilled HS-603PP to HS-609PP
10-31-2008
0.80
Finished polishing second HS-609PP
Details
10-25-2008
1.00
Finished polishing one of the HS-609PPs
Details
10-19-2008
0.50
Continued polishing of HS-609PP
10-11-2008
0.30
Continued polishing of HS-609PP
10-07-2008
2.50
Finished radiusing tips of HS-609PP
Details
10-06-2008
2.00
Continued prep of HS-609PP
Details
10-04-2008
0.20
Marked outline of HS-609PP tip radius
Details
10-03-2008
1.50
Continued inventory process
Details
10-02-2008
1.00
Empennage kit arrives - began inventory process
Details
09-25-2008
0.50
Ordered empennage kit
Details
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
242
315
Empennage
3
3
Empennage - Elev.
4
6
Empennage - H Stab
60
84
Empennage - L Elev.
64
48
Empennage - R Elev.
24
37
Empennage - Rudder
40
60
Empennage - V Stab
21
33
Miscellaneous
2
4
Wings
16
19
Wings - L
6
16
Wings - Right
2
5
Copyright © 2001-2024 Matronics. All Rights Reserved.