Date
|
Hours
|
Work Log Summary
|
Details
|
12-08-2016
|
2.00
|
DAR Inspection
|
Details
|
|
|
12-01-2016
|
6.00
|
W&B and DAR prep
|
Details
|
|
|
11-30-2016
|
5.00
|
Official Weight and Balance
|
Details
|
|
|
11-29-2016
|
3.00
|
Testing begins
|
Details
|
|
|
11-20-2016
|
2.50
|
Cowling Day #82 and more
|
Details
|
|
|
11-18-2016
|
2.00
|
Cowling Day #81 and other work
|
Details
|
|
|
11-17-2016
|
3.00
|
Fairings
|
Details
|
|
|
11-16-2016
|
6.00
|
Cowling Day #80
|
Details
|
|
|
11-15-2016
|
6.00
|
Cowling Day #79 and other work
|
Details
|
|
|
11-14-2016
|
4.00
|
Tanis Preheat complete
|
Details
|
|
|
11-13-2016
|
3.00
|
Tanis Preheat
|
Details
|
|
|
11-12-2016
|
3.00
|
Cowling Day #78
|
Details
|
|
|
11-11-2016
|
6.00
|
Cowling Day #77
|
Details
|
|
|
11-10-2016
|
6.50
|
Cooling Ducts Day #31 and Cowling Day #76
|
Details
|
|
|
11-09-2016
|
4.50
|
Cooling Ducts Day #30
|
Details
|
|
|
11-08-2016
|
5.00
|
Cooling Ducts Day #29
|
Details
|
|
|
11-02-2016
|
1.50
|
Cooling Ducts Day #28
|
Details
|
|
|
11-01-2016
|
6.00
|
Cooling Ducts Day #27
|
Details
|
|
|
10-29-2016
|
1.00
|
Cooling Ducts Day #26
|
Details
|
|
|
10-28-2016
|
6.00
|
Cooling Ducts Day #25
|
Details
|
|
|
10-27-2016
|
6.00
|
Cooling Ducts Day #24
|
Details
|
|
|
10-26-2016
|
5.00
|
Cooling Ducts Day #23
|
Details
|
|
|
10-25-2016
|
5.00
|
Cooling Ducts Day #22
|
Details
|
|
|
10-24-2016
|
8.00
|
Cowling Day #75
|
Details
|
|
|
10-23-2016
|
4.00
|
Cowling Day #74 and Cooling Ducts Day #21
|
Details
|
|
|
10-22-2016
|
7.00
|
Cowling Day #73 and Cooling Ducts Day #20
|
Details
|
|
|
10-21-2016
|
6.00
|
Cowling Day #72 and Cooling Ducts Day #19
|
Details
|
|
|
10-13-2016
|
3.50
|
Cowling Day #71 and Cooling Ducts Day #18
|
Details
|
|
|
10-12-2016
|
8.00
|
Cowling Day #70 and Cooling Ducts Day #17
|
Details
|
|
|
10-11-2016
|
8.00
|
Cowling Day #69 and Cooling Ducts Day #16
|
Details
|
|
|
10-10-2016
|
3.00
|
Cowling Day #68
|
Details
|
|
|
10-08-2016
|
3.00
|
Cooling Ducts Day #15 and baffles
|
Details
|
|
|
10-07-2016
|
6.00
|
Cowling Day #67 ,Air Intake and Baffles
|
Details
|
|
|
10-06-2016
|
5.00
|
Cowling Day #66
|
Details
|
|
|
10-04-2016
|
6.00
|
Cowling Day #65
|
Details
|
|
|
10-03-2016
|
6.00
|
Air Intake Day #6 and Cowling Day #64
|
Details
|
|
|
10-02-2016
|
3.00
|
Misc work
|
Details
|
|
|
09-29-2016
|
3.00
|
Air Intake Day #5
|
Details
|
|
|
09-28-2016
|
5.00
|
Air Intake Day #4
|
Details
|
|
|
09-27-2016
|
5.00
|
Air Intake Day #3
|
Details
|
|
|
09-26-2016
|
6.00
|
Air Intake Day #2
|
Details
|
|
|
09-23-2016
|
4.00
|
Air Intake Day #1
|
Details
|
|
|
09-22-2016
|
6.50
|
Cooling Ducts Day #14
|
Details
|
|
|
09-21-2016
|
5.00
|
Cooling Ducts Day #13
|
Details
|
|
|
09-20-2016
|
6.00
|
Cooling Ducts Day #12
|
Details
|
|
|
09-19-2016
|
4.50
|
Cooling Ducts Day #11
|
Details
|
|
|
09-16-2016
|
2.50
|
Cooling Ducts Day #10
|
Details
|
|
|
09-15-2016
|
6.00
|
Cooling Ducts Day #9
|
Details
|
|
|
09-14-2016
|
6.00
|
Cooling Ducts Day #8
|
Details
|
|
|
09-09-2016
|
4.00
|
Cooling Ducts Day #7
|
Details
|
|
|
09-08-2016
|
5.00
|
Cooling Ducts Day #6 and air filter
|
Details
|
|
|
09-07-2016
|
6.00
|
Cooling Ducts Day #5
|
Details
|
|
|
09-06-2016
|
4.50
|
Engine Run #2 and Cowling Day #63
|
Details
|
|
|
09-05-2016
|
4.50
|
FWF work and Cowling Day #62
|
Details
|
|
|
09-03-2016
|
6.00
|
Intake system and cowling Day #61
|
Details
|
|
|
08-31-2016
|
2.00
|
Cowling Day #60
|
Details
|
|
|
08-25-2016
|
2.50
|
Cowling Day #59
|
Details
|
|
|
08-23-2016
|
5.00
|
Cowling Day #58 and Cooling Ducts Day #4
|
Details
|
|
|
08-22-2016
|
6.00
|
Cowling Day #57 and Cooling Ducts Day #3
|
Details
|
|
|
08-21-2016
|
4.00
|
Cowling Day #56
|
Details
|
|
|
08-20-2016
|
3.50
|
Cowling Day #55
|
Details
|
|
|
08-19-2016
|
6.00
|
Cooling ducts Day #2 and new turbo work
|
Details
|
|
|
08-18-2016
|
6.00
|
Cooling Ducts Day #1
|
Details
|
|
|
08-17-2016
|
6.00
|
Cowling Day #54
|
Details
|
|
|
08-16-2016
|
5.00
|
Cowling Day #53
|
Details
|
|
|
08-15-2016
|
4.00
|
Cowling Day #52 and Turbo--sort of
|
Details
|
|
|
08-11-2016
|
6.00
|
Cowling Day #51
|
Details
|
|
|
08-10-2016
|
5.00
|
Cowling Day #50 amd more
|
Details
|
|
|
08-05-2016
|
4.00
|
Cowling Day #49 and exhaust support
|
Details
|
|
|
08-04-2016
|
4.00
|
Cowling Day #48
|
Details
|
|
|
08-01-2016
|
4.00
|
Cowling Day #47
|
Details
|
|
|
07-31-2016
|
2.00
|
Cowling Day #46
|
Details
|
|
|
07-13-2016
|
4.00
|
Cowling Day #45
|
Details
|
|
|
07-12-2016
|
3.00
|
Cowling Day #44
|
Details
|
|
|
07-10-2016
|
3.00
|
Cowling Day #43
|
Details
|
|
|
07-08-2016
|
8.00
|
Cowling Day#42 and other
|
Details
|
|
|
07-07-2016
|
6.00
|
Cowling Day #41 and seatbelts
|
Details
|
|
|
07-06-2016
|
5.00
|
FWF day #18 air seals
|
Details
|
|
|
07-01-2016
|
7.00
|
Cowling Day #40 and interior
|
Details
|
|
|
06-30-2016
|
7.00
|
Cowling Day #39 and more
|
Details
|
|
|
06-29-2016
|
8.00
|
Cowling Day #38 and punch list cont.
|
Details
|
|
|
06-28-2016
|
6.00
|
Cowling Day #37 and punch list
|
Details
|
|
|
06-27-2016
|
3.00
|
Cowling Day #36 and punch list
|
Details
|
|
|
06-22-2016
|
3.00
|
Post run work
|
Details
|
|
|
06-21-2016
|
6.00
|
CMI Inspection and Engine Start!
|
Details
|
|
|
06-17-2016
|
6.00
|
Cowling Day #35 and Seat belts
|
Details
|
|
|
06-16-2016
|
4.00
|
Cowling Day #34 and FWF Day #18
|
Details
|
|
|
06-15-2016
|
6.00
|
Cowling Day #33 and more
|
Details
|
|
|
06-14-2016
|
6.00
|
Pitot static fixed
|
Details
|
|
|
06-13-2016
|
8.00
|
Pitot static testing and more
|
Details
|
|
|
06-11-2016
|
3.00
|
FWF Day #17 and Cowling Day # 32
|
Details
|
|
|
06-10-2016
|
7.00
|
FWF Day #16 and avionics
|
Details
|
|
|
06-09-2016
|
6.00
|
FWF Day #15 and cowling
|
Details
|
|
|
06-08-2016
|
5.00
|
FWF Day #14 and Alternator mount
|
Details
|
|
|
06-07-2016
|
6.00
|
FWF Day #13 and cowling
|
Details
|
|
|
06-06-2016
|
6.00
|
FWF Day #12 and interior
|
Details
|
|
|
06-05-2016
|
3.00
|
FWF Day #11
|
Details
|
|
|
06-04-2016
|
4.00
|
FWF Day #10
|
Details
|
|
|
06-01-2016
|
5.00
|
FWF Day #9 and Cowling
|
Details
|
|
|
05-31-2016
|
4.00
|
FWF Day #8
|
Details
|
|
|
05-26-2016
|
4.00
|
FWF Day #7 and more
|
Details
|
|
|
05-25-2016
|
3.00
|
FWF Day #6
|
Details
|
|
|
05-24-2016
|
1.00
|
FWF Day #5
|
Details
|
|
|
05-19-2016
|
6.00
|
FWF Day #4
|
Details
|
|
|
05-18-2016
|
7.00
|
FWF Day #3 plus more
|
Details
|
|
|
05-17-2016
|
5.00
|
FWF- more wiring
|
Details
|
|
|
05-16-2016
|
6.00
|
FWF-wiring
|
Details
|
|
|
05-15-2016
|
3.50
|
Baffles Day #49
|
Details
|
|
|
05-14-2016
|
7.00
|
FWF
|
Details
|
|
|
05-13-2016
|
7.00
|
Road trip to AWI--exhaust work.
|
Details
|
|
|
05-12-2016
|
6.00
|
Cowling Day #31 and misc.
|
Details
|
|
|
05-11-2016
|
7.00
|
Cowling Day #30/ Baffles Day #48
|
Details
|
|
|
05-10-2016
|
6.50
|
Cowling Day #29/ Baffles Day #47
|
Details
|
|
|
05-09-2016
|
6.00
|
Cowling Day #28/ Baffles Day #46/ FWF
|
Details
|
|
|
05-06-2016
|
4.50
|
Cowling Day #27 and Baffles Day #45
|
Details
|
|
|
05-05-2016
|
7.00
|
Cowling Day #26 and FWF
|
Details
|
|
|
05-04-2016
|
4.50
|
Cowling Day #25 and FWF
|
Details
|
|
|
05-03-2016
|
6.00
|
Cowling Day #24 and Baffles Day #44
|
Details
|
|
|
05-02-2016
|
2.00
|
Cowling Day #23 and FWF
|
Details
|
|
|
04-28-2016
|
5.00
|
Cowling Day #22
|
Details
|
|
|
04-27-2016
|
6.00
|
Cowling Day #21
|
Details
|
|
|
04-26-2016
|
5.50
|
Cowling Day #20 and Intake system
|
Details
|
|
|
04-25-2016
|
7.00
|
Cowling Day #19
|
Details
|
|
|
04-24-2016
|
3.50
|
Cowling Day #18 and Baffles Day #43
|
Details
|
|
|
04-23-2016
|
2.50
|
Oil and Fuel lines
|
Details
|
|
|
04-22-2016
|
5.00
|
Baffles Day #42 and FWF
|
Details
|
|
|
04-21-2016
|
8.00
|
Baffles Day #41 and Throttle cable
|
Details
|
|
|
04-20-2016
|
6.00
|
FWF
|
Details
|
|
|
04-19-2016
|
9.00
|
Remount
|
Details
|
|
|
04-18-2016
|
5.00
|
Firewall work
|
Details
|
|
|
04-17-2016
|
2.00
|
Baffles Day #40 and wash
|
Details
|
|
|
04-16-2016
|
8.00
|
Cowling Day #17 and Baffles Day #39
|
Details
|
|
|
04-15-2016
|
8.00
|
Baffles Day #38
|
Details
|
|
|
04-14-2016
|
6.50
|
Baffles Day #37
|
Details
|
|
|
04-13-2016
|
3.50
|
Cowling Day #16 and Baffles Day #36
|
Details
|
|
|
04-12-2016
|
4.00
|
Cowling Day #15 and Baffles Day #35
|
Details
|
|
|
04-11-2016
|
5.00
|
Cowling Day #14 and Baffles Day #34
|
Details
|
|
|
04-10-2016
|
4.00
|
Cowling Day #13 and Baffles Day #33
|
Details
|
|
|
04-09-2016
|
5.00
|
Cowling Day #12 and Baffles Day #32
|
Details
|
|
|
04-08-2016
|
3.00
|
Cowling Day #11 and Baffles day #31
|
Details
|
|
|
04-07-2016
|
4.00
|
Cowling Day #10 and Baffles Day #30
|
Details
|
|
|
04-02-2016
|
2.50
|
Baffles Day #29
|
Details
|
|
|
03-30-2016
|
3.00
|
Cowling Day #9 and Baffles Day#28
|
Details
|
|
|
03-28-2016
|
3.00
|
Cowling Day #8 and Oil lines
|
Details
|
|
|
03-26-2016
|
1.00
|
Cowling Day #7
|
Details
|
|
|
03-24-2016
|
2.00
|
Baffles Day #27
|
Details
|
|
|
03-23-2016
|
2.50
|
Cowling Day #6 and Baffles Day #26
|
Details
|
|
|
03-22-2016
|
4.00
|
Cowling Day #5 and Baffles Day #25
|
Details
|
|
|
03-20-2016
|
6.00
|
Cowling Day #4 and Baffles Day #24
|
Details
|
|
|
03-19-2016
|
2.00
|
Baffles Day #23
|
Details
|
|
|
03-18-2016
|
7.00
|
Cowling Day #3 and Baffles day #22
|
Details
|
|
|
03-17-2016
|
5.00
|
Cabin Heat and Cowling Day #2
|
Details
|
|
|
03-16-2016
|
5.00
|
Cabin heat mount
|
Details
|
|
|
03-14-2016
|
6.00
|
New Fuel cooler
|
Details
|
|
|
03-10-2016
|
5.00
|
FWF
|
Details
|
|
|
03-09-2016
|
5.00
|
Cabin Heat exchanger and more
|
Details
|
|
|
03-08-2016
|
5.00
|
Misc FWF
|
Details
|
|
|
03-04-2016
|
4.00
|
Induction system
|
Details
|
|
|
03-02-2016
|
2.00
|
Fuel lines and cabin cooler
|
Details
|
|
|
02-29-2016
|
2.00
|
Baffles Day #21 and Cabin heat
|
Details
|
|
|
02-28-2016
|
2.00
|
Cabin heat work
|
Details
|
|
|
02-27-2016
|
5.50
|
Baffles Day #20 and cabin heat
|
Details
|
|
|
02-25-2016
|
3.00
|
Baffles Day #19
|
Details
|
|
|
02-24-2016
|
4.00
|
Baffles Day #18
|
Details
|
|
|
02-23-2016
|
5.00
|
Baffles Day #17 and more
|
Details
|
|
|
02-19-2016
|
5.00
|
Baffles Day #16
|
Details
|
|
|
02-16-2016
|
4.00
|
Baffles Day #15
|
Details
|
|
|
02-13-2016
|
2.00
|
Baffles Day #14 and more
|
Details
|
|
|
02-12-2016
|
3.00
|
Intercooler Mount and oil lines
|
Details
|
|
|
02-11-2016
|
5.00
|
Cooler work continues
|
Details
|
|
|
02-10-2016
|
4.00
|
Oil cooler + intercooler mount
|
Details
|
|
|
02-09-2016
|
3.50
|
Cooler mounts
|
Details
|
|
|
02-04-2016
|
5.00
|
Preheat and cooler work
|
Details
|
|
|
02-03-2016
|
4.00
|
Baffles Day #13
|
Details
|
|
|
02-02-2016
|
4.50
|
Baffles Day #12
|
Details
|
|
|
02-01-2016
|
4.50
|
Baffles Day #11
|
Details
|
|
|
01-31-2016
|
3.00
|
Baffles Day #10
|
Details
|
|
|
01-30-2016
|
3.00
|
Baffles Day #9
|
Details
|
|
|
01-29-2016
|
4.00
|
Baffles Day #8
|
Details
|
|
|
01-28-2016
|
6.00
|
Baffles Day #7
|
Details
|
|
|
01-27-2016
|
4.00
|
Baffles Day #6
|
Details
|
|
|
01-26-2016
|
7.00
|
Baffles Day #5
|
Details
|
|
|
01-25-2016
|
7.00
|
Baffles Day #4
|
Details
|
|
|
01-24-2016
|
3.00
|
Baffles Day #3
|
Details
|
|
|
01-23-2016
|
3.00
|
Baffles Day #2
|
Details
|
|
|
01-22-2016
|
3.00
|
Baffles Day #1
|
Details
|
|
|
01-19-2016
|
4.00
|
Misc work
|
Details
|
|
|
01-16-2016
|
2.00
|
FWF misc items
|
Details
|
|
|
01-15-2016
|
1.50
|
Sender lines
|
Details
|
|
|
01-14-2016
|
2.00
|
Pickled cylinders and other things
|
Details
|
|
|
01-11-2016
|
3.00
|
Prop and throttle cable work
|
Details
|
|
|
01-10-2016
|
3.00
|
Throttle work Day#3
|
Details
|
|
|
01-09-2016
|
3.00
|
Throttle work continues
|
Details
|
|
|
01-08-2016
|
3.00
|
Throttle connection
|
Details
|
|
|
01-07-2016
|
3.00
|
FWF fuel lines and accumulator
|
Details
|
|
|
01-06-2016
|
4.00
|
Oil cooler and fuel lines day #2
|
Details
|
|
|
01-05-2016
|
3.00
|
Oil cooler and fuel lines
|
Details
|
|
|
01-04-2016
|
3.50
|
Intercooler
|
Details
|
|
|
01-03-2016
|
3.50
|
Cowl and Intercooler
|
Details
|
|
|
12-29-2015
|
2.50
|
Tach Sensor mount
|
Details
|
|
|
12-28-2015
|
3.00
|
Cowling Day 1
|
Details
|
|
|
12-24-2015
|
2.50
|
Prop SB and more
|
Details
|
|
|
12-23-2015
|
3.00
|
Hung Prop
|
Details
|
|
|
12-22-2015
|
3.00
|
Isolators and accessories
|
Details
|
|
|
12-18-2015
|
3.00
|
Hung engine
|
Details
|
|
|
12-17-2015
|
8.00
|
Picked up powerplant
|
Details
|
|
|
12-11-2015
|
3.00
|
Cabin Punch list #2
|
Details
|
|
|
12-10-2015
|
2.00
|
Cabin Punch list
|
Details
|
|
|
12-09-2015
|
2.00
|
More finish work and fuel system
|
Details
|
|
|
12-01-2015
|
4.00
|
Misc cabin and FWF systems
|
Details
|
|
|
11-28-2015
|
2.00
|
Tunnel closure and more
|
Details
|
|
|
11-27-2015
|
1.50
|
Fuel system and tunnel work
|
Details
|
|
|
11-17-2015
|
1.50
|
Tunnel work
|
Details
|
|
|
11-12-2015
|
3.00
|
Fuel system and cowling work
|
Details
|
|
|
11-10-2015
|
2.00
|
Engine sensors and cooler valve
|
Details
|
|
|
11-09-2015
|
4.50
|
More fuel system
|
Details
|
|
|
11-08-2015
|
3.00
|
Fuel system work
|
Details
|
|
|
11-05-2015
|
1.50
|
FWF fuel system
|
Details
|
|
|
11-02-2015
|
4.00
|
Root Fairing done, Propeller Arrival
|
Details
|
|
|
10-27-2015
|
3.00
|
Fuel system work
|
Details
|
|
|
10-24-2015
|
5.00
|
Fairing Pin hole filling
|
Details
|
|
|
10-23-2015
|
3.00
|
Fairngs punch list completed
|
Details
|
|
|
10-22-2015
|
4.50
|
Wheel Pants and Farings Compete
|
Details
|
|
|
10-21-2015
|
4.50
|
Fuel system and nose tire fairing
|
Details
|
|
|
10-19-2015
|
4.00
|
Fuel system- Part Deux
|
Details
|
|
|
10-17-2015
|
2.00
|
Right wheel pant
|
Details
|
|
|
10-16-2015
|
2.50
|
Wheelpants and wingwalk
|
Details
|
|
|
10-15-2015
|
2.50
|
Interior side panel install
|
Details
|
|
|
10-14-2015
|
2.00
|
Wingtips and flying
|
Details
|
|
|
10-06-2015
|
2.50
|
Interior work
|
Details
|
|
|
10-04-2015
|
1.50
|
Oil Pressure switch
|
Details
|
|
|
09-25-2015
|
2.50
|
Fuel Cooler valve
|
Details
|
|
|
09-23-2015
|
4.00
|
Altn Flap UP power
|
Details
|
|
|
09-21-2015
|
3.00
|
Fuel cooler mount and control
|
Details
|
|
|
09-19-2015
|
3.50
|
Fuel cooler mount cont.
|
Details
|
|
|
09-18-2015
|
4.00
|
Fuel cooler mount Fab.
|
Details
|
|
|
09-17-2015
|
3.00
|
Wiring clean-up and msc
|
Details
|
|
|
09-12-2015
|
4.00
|
Throttle/fuel cooler/ sensor block
|
Details
|
|
|
09-11-2015
|
2.00
|
Engine Sensor mounts and wiring
|
Details
|
|
|
09-04-2015
|
3.00
|
Rewire complete and sub-panel install
|
Details
|
|
|
09-03-2015
|
1.50
|
Sensor wiring
|
Details
|
|
|
09-02-2015
|
3.00
|
Fuel Pres/ Temp mount
|
Details
|
|
|
09-01-2015
|
2.50
|
Access covers/ fairings
|
Details
|
|
|
08-24-2015
|
6.00
|
Misc Multiple Items
|
Details
|
|
|
08-18-2015
|
3.50
|
More Fairing work
|
Details
|
|
|
08-17-2015
|
5.00
|
Wheel pants and fairings
|
Details
|
|
|
08-16-2015
|
4.00
|
Wing root fairng and right wheel pant
|
Details
|
|
|
08-15-2015
|
4.00
|
Emp/ wingtip fairings and wheel pants
|
Details
|
|
|
08-14-2015
|
3.00
|
fairing work
|
Details
|
|
|
07-31-2015
|
3.00
|
Fairings
|
Details
|
|
|
07-24-2015
|
3.00
|
Throttle sub panel and fairings
|
Details
|
|
|
07-14-2015
|
6.00
|
Fuel system and Throttle quad.
|
Details
|
|
|
07-13-2015
|
4.00
|
Fuel leak
|
Details
|
|
|
07-05-2015
|
2.00
|
Fuel leak and wingtips
|
Details
|
|
|
06-26-2015
|
5.00
|
Fuel system/ seat heat/ annunciator
|
Details
|
|
|
06-25-2015
|
2.50
|
Fuel leak and lighting test
|
Details
|
|
|
06-19-2015
|
2.50
|
Farings and misc
|
Details
|
|
|
06-18-2015
|
3.00
|
Fairings
|
Details
|
|
|
06-16-2015
|
3.00
|
Fairings
|
Details
|
|
|
06-15-2015
|
3.50
|
Rt. Fuel tank calibration
|
Details
|
|
|
06-13-2015
|
5.00
|
Pitot/AoA and Throttle sub-panel
|
Details
|
|
|
06-12-2015
|
2.50
|
Parking Brake Control Mount
|
Details
|
|
|
06-11-2015
|
2.50
|
Parking Brake Control
|
Details
|
|
|
06-10-2015
|
5.00
|
Throttle mount/ wiring/ heater testing
|
Details
|
|
|
06-09-2015
|
6.00
|
Throttle mod and more
|
Details
|
|
|
06-08-2015
|
6.00
|
Fuel tank, Control Sticks, Throttle work
|
Details
|
|
|
06-06-2015
|
5.50
|
Rudder Trim and Fuel Float
|
Details
|
|
|
06-05-2015
|
8.00
|
Elevator trim/Flaps/ Fuel calibration
|
Details
|
|
|
06-04-2015
|
6.00
|
G3X Rudder Trim and Flap indications
|
Details
|
|
|
05-30-2015
|
2.00
|
Panel Work Day #7
|
Details
|
|
|
05-15-2015
|
4.00
|
Panel work day #6
|
Details
|
|
|
05-14-2015
|
3.00
|
Panel work day #5
|
Details
|
|
|
05-13-2015
|
6.00
|
Panel Work Day #4
|
Details
|
|
|
05-12-2015
|
3.00
|
Panel Work Day#3
|
Details
|
|
|
05-11-2015
|
3.00
|
Panel work Day #2
|
Details
|
|
|
05-06-2015
|
3.00
|
Panel work Day #1
|
Details
|
|
|
05-04-2015
|
2.50
|
Panel install Day #4
|
Details
|
|
|
05-03-2015
|
1.50
|
Panel Install Day#3
|
Details
|
|
|
05-02-2015
|
6.00
|
Fly-in
|
|
|
|
04-29-2015
|
2.00
|
Misc work
|
Details
|
|
|
04-26-2015
|
2.50
|
Lemo complete and misc
|
Details
|
|
|
04-25-2015
|
2.50
|
Lemo plug install
|
Details
|
|
|
04-22-2015
|
3.00
|
Panel install day #2
|
Details
|
|
|
04-19-2015
|
3.50
|
Headset wiring
|
Details
|
|
|
04-13-2015
|
2.00
|
Panel install day #1
|
Details
|
|
|
04-12-2015
|
3.00
|
Panel and cabin harness
|
Details
|
|
|
04-11-2015
|
3.00
|
Cabin Harness
|
Details
|
|
|
04-09-2015
|
1.00
|
Panel update
|
Details
|
|
|
03-29-2015
|
1.50
|
Throttle Quad testing
|
Details
|
|
|
03-19-2015
|
3.00
|
Throttle Quadrant
|
Details
|
|
|
03-18-2015
|
1.50
|
FW doubler
|
Details
|
|
|
03-16-2015
|
3.00
|
FW penetrations
|
Details
|
|
|
03-14-2015
|
3.00
|
Cabin Harness
|
Details
|
|
|
02-25-2015
|
2.00
|
Panel work
|
Details
|
|
|
02-23-2015
|
3.00
|
Throttle Quadrant and panel work
|
Details
|
|
|
02-22-2015
|
2.50
|
Panel work
|
Details
|
|
|
02-10-2015
|
2.00
|
More wiring
|
Details
|
|
|
02-04-2015
|
2.00
|
Still wiring day ?
|
Details
|
|
|
01-31-2015
|
3.50
|
Section 46 Complete.
|
Details
|
|
|
01-30-2015
|
5.00
|
Mount and FWF work
|
Details
|
|
|
01-23-2015
|
6.00
|
Mount and more wiring
|
Details
|
|
|
01-21-2015
|
6.00
|
EMS Harness Cont. #3
|
Details
|
|
|
01-20-2015
|
2.00
|
EMS install cont. #2
|
Details
|
|
|
01-18-2015
|
3.00
|
EMS Harness install
|
Details
|
|
|
01-17-2015
|
3.00
|
EMS and FW pass thru
|
Details
|
|
|
01-15-2015
|
3.00
|
Electrical work
|
Details
|
|
|
01-14-2015
|
3.00
|
Panel lighting and Engine Mount
|
Details
|
|
|
01-13-2015
|
1.00
|
Engine Mount Pickup
|
Details
|
|
|
01-12-2015
|
4.00
|
Pitot/Static connections
|
Details
|
|
|
01-11-2015
|
2.50
|
Lighting controls
|
Details
|
|
|
01-10-2015
|
1.50
|
Another switch and AHARS
|
Details
|
|
|
01-09-2015
|
4.00
|
Lights and switches
|
Details
|
|
|
01-07-2015
|
8.00
|
Serial bus troubleshooting
|
Details
|
|
|
01-05-2015
|
3.00
|
Avionics Config
|
Details
|
|
|
01-02-2015
|
4.00
|
GDL39 and FS210
|
Details
|
|
|
12-17-2014
|
3.00
|
More Wiring
|
Details
|
|
|
12-16-2014
|
3.00
|
More Wiring updates
|
Details
|
|
|
12-15-2014
|
3.00
|
Wiring
|
Details
|
|
|
12-13-2014
|
4.00
|
CAN Bus rework complete
|
Details
|
|
|
12-11-2014
|
3.00
|
CAN bus rework
|
Details
|
|
|
12-09-2014
|
2.00
|
Garmin Pitot
|
Details
|
|
|
11-24-2014
|
2.50
|
Fitting Leak and Door warning switch
|
Details
|
|
|
11-13-2014
|
3.00
|
Fuel System- testing
|
Details
|
|
|
11-12-2014
|
4.00
|
Fuel System cont.
|
Details
|
|
|
11-07-2014
|
1.00
|
Fuel System
|
Details
|
|
|
11-06-2014
|
3.00
|
Wingtips
|
Details
|
|
|
11-05-2014
|
3.00
|
Aux tank and wingtips
|
Details
|
|
|
10-31-2014
|
5.00
|
Flaps, aux tanks, fuel system
|
Details
|
|
|
10-28-2014
|
4.00
|
Aux Fuel Tank and electrical sys
|
Details
|
|
|
10-27-2014
|
4.00
|
Engine mount returned
|
Details
|
|
|
10-26-2014
|
4.00
|
Wingtips and Engine mount
|
Details
|
|
|
10-23-2014
|
2.00
|
Flight Controls- complete
|
Details
|
|
|
10-22-2014
|
6.00
|
Flight Controls--rigged.
|
Details
|
|
|
10-21-2014
|
2.00
|
Fuel system
|
Details
|
|
|
10-16-2014
|
3.00
|
Left tank install
|
Details
|
|
|
10-15-2014
|
3.00
|
Right tank install
|
Details
|
|
|
10-10-2014
|
3.00
|
Leak testing in progress and right tip.
|
Details
|
|
|
10-07-2014
|
1.50
|
Fairings
|
Details
|
|
|
10-06-2014
|
3.00
|
Tips and Tires
|
Details
|
|
|
10-04-2014
|
2.00
|
Left tire
|
Details
|
|
|
10-03-2014
|
4.00
|
RightTire and Mount work
|
Details
|
|
|
09-30-2014
|
3.00
|
Wingtip repair and more
|
Details
|
|
|
09-19-2014
|
2.50
|
Fairings
|
Details
|
|
|
09-05-2014
|
2.50
|
Light switch wiring
|
Details
|
|
|
09-04-2014
|
3.00
|
Section 12 complete
|
Details
|
|
|
09-03-2014
|
4.00
|
Emp. fairing nutplates
|
Details
|
|
|
09-02-2014
|
3.00
|
Empennage Fairing work
|
Details
|
|
|
08-28-2014
|
4.00
|
Empennage Fairing
|
Details
|
|
|
08-27-2014
|
4.00
|
Trim and Rudder install work
|
Details
|
|
|
08-22-2014
|
5.50
|
VS/ rudder install
|
Details
|
|
|
08-21-2014
|
3.50
|
Tip priming and turnoff lights
|
Details
|
|
|
08-20-2014
|
4.00
|
Wingtip lights and priming prep
|
Details
|
|
|
08-19-2014
|
3.00
|
HS install, Wingtips and lights
|
Details
|
|
|
08-14-2014
|
3.00
|
Elevator horn- take deux
|
Details
|
|
|
08-13-2014
|
3.00
|
Misc work
|
Details
|
|
|
08-12-2014
|
3.00
|
Fuel system and tail wiring
|
Details
|
|
|
08-09-2014
|
1.50
|
Pitot heat wiring
|
Details
|
|
|
08-05-2014
|
3.00
|
More avionics wiring
|
Details
|
|
|
08-01-2014
|
2.00
|
Avionics wiring
|
Details
|
|
|
07-23-2014
|
3.00
|
Strobe wiring
|
Details
|
|
|
07-22-2014
|
5.00
|
Still wiring
|
Details
|
|
|
07-21-2014
|
2.00
|
Wiring continues
|
Details
|
|
|
07-15-2014
|
3.00
|
Wing wiring, wingtip, and step assists
|
Details
|
|
|
07-14-2014
|
6.00
|
Pitot and OAT probe wiring + more
|
Details
|
|
|
07-12-2014
|
3.00
|
Wing Install Day #3
|
Details
|
|
|
07-11-2014
|
6.00
|
Wing install cont.--wiring, flaps
|
Details
|
|
|
07-10-2014
|
6.50
|
Prep and FINAL wing install
|
Details
|
|
|
07-06-2014
|
5.00
|
Tank nutplates and final mate prep work
|
Details
|
|
|
07-05-2014
|
7.00
|
Wing roots and HS/elevator
|
Details
|
|
|
07-04-2014
|
8.50
|
Wing Assembly prep
|
Details
|
|
|
06-23-2014
|
5.00
|
Aux Pump Pwr and Wing Mating
|
Details
|
|
|
06-05-2014
|
10.00
|
Moving Day!!!!!
|
Details
|
|
|
05-29-2014
|
2.50
|
Doors, Pins, and more
|
Details
|
|
|
05-22-2014
|
2.50
|
interior work
|
Details
|
|
|
05-21-2014
|
3.50
|
Section 45 Completed
|
Details
|
|
|
05-20-2014
|
2.50
|
Door struts and locks
|
Details
|
|
|
05-14-2014
|
2.00
|
Left door work
|
Details
|
|
|
05-13-2014
|
4.00
|
Wingtips, Wing attach prep, Doors
|
Details
|
|
|
05-11-2014
|
3.00
|
Interior and wingtip lens
|
Details
|
|
|
05-07-2014
|
3.00
|
Wingtips and interior work
|
Details
|
|
|
05-02-2014
|
4.00
|
Door prep and window work
|
Details
|
|
|
04-30-2014
|
2.00
|
Interior work
|
Details
|
|
|
04-14-2014
|
4.50
|
Cleanup, interior, and other
|
Details
|
|
|
04-13-2014
|
2.50
|
Painting do over and more
|
Details
|
|
|
04-12-2014
|
2.50
|
Interior Paint and Misc
|
Details
|
|
|
04-11-2014
|
3.00
|
Final Sanding Surfacer
|
Details
|
|
|
03-24-2014
|
3.00
|
Int. Paint prep and part priming
|
Details
|
|
|
03-23-2014
|
3.00
|
Wingtip Aux Fuel Doors
|
Details
|
|
|
03-22-2014
|
4.00
|
Body work Day #2
|
Details
|
|
|
03-21-2014
|
2.00
|
Body Work
|
Details
|
|
|
03-16-2014
|
2.00
|
Wingtips- ribs and misc
|
Details
|
|
|
03-15-2014
|
4.00
|
Body and Wingtips day #2
|
Details
|
|
|
03-14-2014
|
4.00
|
Doors and Wingtips
|
Details
|
|
|
03-11-2014
|
3.00
|
Body Finish work
|
Details
|
|
|
03-10-2014
|
3.00
|
Wingtips and Body work Day#2
|
Details
|
|
|
03-09-2014
|
3.00
|
Body work
|
Details
|
|
|
03-07-2014
|
3.00
|
Wingtips and body work
|
Details
|
|
|
03-02-2014
|
2.50
|
Wingtips cont.
|
Details
|
|
|
02-24-2014
|
1.50
|
Left wingtip
|
Details
|
|
|
02-23-2014
|
2.50
|
Right wingtip
|
Details
|
|
|
02-22-2014
|
2.50
|
Aileron Trim and wingtips
|
Details
|
|
|
02-20-2014
|
3.50
|
AOA, aux tanks, body works
|
Details
|
|
|
02-07-2014
|
2.50
|
Fuel tanks and tip fairings
|
Details
|
|
|
02-05-2014
|
4.00
|
Wingtips and AOA line
|
Details
|
|
|
02-04-2014
|
1.50
|
HS fairings
|
Details
|
|
|
02-01-2014
|
4.50
|
Body and fairing work
|
Details
|
|
|
01-31-2014
|
2.00
|
Fuel tanks
|
Details
|
|
|
01-23-2014
|
5.00
|
Fairings and tanks
|
Details
|
|
|
01-22-2014
|
4.00
|
Wingtips and Body work
|
Details
|
|
|
01-20-2014
|
1.50
|
Wingtips Day #7
|
Details
|
|
|
01-19-2014
|
3.50
|
Wingtips Day #6
|
Details
|
|
|
01-18-2014
|
2.50
|
Wingtips Day #5
|
Details
|
|
|
01-17-2014
|
2.00
|
Wingtips Day #4
|
Details
|
|
|
01-13-2014
|
2.00
|
Wingips Day#3
|
Details
|
|
|
01-09-2014
|
1.50
|
Wingtips Day #2
|
Details
|
|
|
01-08-2014
|
4.50
|
Wingtip fairings
|
Details
|
|
|
01-06-2014
|
4.00
|
Body work and misc work
|
Details
|
|
|
01-05-2014
|
2.00
|
Cabin Heat and cleanup
|
Details
|
|
|
12-29-2013
|
2.00
|
Vent fans
|
Details
|
|
|
12-28-2013
|
1.50
|
Interior lights
|
Details
|
|
|
12-25-2013
|
2.00
|
Tanks and body work
|
Details
|
|
|
12-19-2013
|
2.50
|
Tunnel clean up work
|
Details
|
|
|
12-18-2013
|
3.50
|
Fuel system/Lights/ wing tips
|
Details
|
|
|
12-17-2013
|
2.00
|
Tank Work #3
|
Details
|
|
|
12-16-2013
|
2.00
|
Tank work #2
|
Details
|
|
|
12-15-2013
|
2.50
|
Fuel System #10
|
Details
|
|
|
12-14-2013
|
2.00
|
Fuel Tank Repairs
|
Details
|
|
|
12-13-2013
|
3.00
|
Fuel system #9 and Tank work
|
Details
|
|
|
12-12-2013
|
3.00
|
Fuel system day #8 and servo install
|
Details
|
|
|
12-09-2013
|
2.50
|
Tank Test and Body work
|
Details
|
|
|
12-07-2013
|
3.00
|
Fuel System #7 and Avionics
|
Details
|
|
|
12-04-2013
|
3.50
|
Fuel system #6
|
Details
|
|
|
11-27-2013
|
3.00
|
Fuel system #5
|
Details
|
|
|
11-26-2013
|
3.00
|
Fuel system and door repair
|
Details
|
|
|
11-25-2013
|
2.00
|
Moving Day #1
|
Details
|
|
|
11-19-2013
|
1.50
|
Bag door tray
|
Details
|
|
|
11-14-2013
|
3.00
|
Fuel system #4
|
Details
|
|
|
11-03-2013
|
2.00
|
Fuel system #3
|
Details
|
|
|
11-02-2013
|
5.00
|
Mid seat support rail repair
|
Details
|
|
|
11-01-2013
|
2.00
|
Mid seat support rail fix + fuel system
|
Details
|
|
|
10-29-2013
|
3.50
|
Body Work #4 and Fuel System #2
|
Details
|
|
|
10-21-2013
|
3.00
|
Body work #3 and Fuel System
|
Details
|
|
|
10-20-2013
|
2.00
|
Body work cont. #2
|
Details
|
|
|
10-17-2013
|
3.00
|
Body work continues
|
Details
|
|
|
10-15-2013
|
2.00
|
Air vents and body work
|
Details
|
|
|
10-14-2013
|
3.00
|
Door and Body work
|
Details
|
|
|
10-05-2013
|
1.50
|
Finished Section 43
|
Details
|
|
|
10-04-2013
|
2.00
|
More Door work and aft skin install
|
Details
|
|
|
09-27-2013
|
3.50
|
Door frames and Aft top skin install
|
Details
|
|
|
09-26-2013
|
4.00
|
Rudder, Fuselage, and interior
|
Details
|
|
|
09-25-2013
|
3.00
|
Misc Work Day #2
|
Details
|
|
|
09-17-2013
|
1.50
|
Misc work
|
Details
|
|
|
09-16-2013
|
4.50
|
Body Work- aka door rework
|
Details
|
|
|
09-04-2013
|
3.00
|
Fairings Day#4
|
Details
|
|
|
09-03-2013
|
3.00
|
Windows
|
Details
|
|
|
09-02-2013
|
3.50
|
Fairings Day #3
|
Details
|
|
|
08-30-2013
|
2.50
|
Fairings- Day #2
|
Details
|
|
|
08-29-2013
|
2.00
|
Fairings - Windshield and Rudder
|
Details
|
|
|
08-28-2013
|
3.50
|
Windshield fairing
|
Details
|
|
|
08-27-2013
|
2.50
|
Windows completed and strobes
|
Details
|
|
|
08-26-2013
|
3.00
|
Windows cont.
|
Details
|
|
|
08-25-2013
|
3.50
|
Window install
|
Details
|
|
|
08-24-2013
|
3.50
|
Rudder Trim work
|
Details
|
|
|
08-23-2013
|
4.00
|
Rudder Trim and window prep
|
Details
|
|
|
08-16-2013
|
2.00
|
More Rudder Trim
|
Details
|
|
|
08-15-2013
|
3.50
|
Window prep, rudder trim, Interior lights
|
Details
|
|
|
08-14-2013
|
4.50
|
Windows and wingtips
|
Details
|
|
|
08-13-2013
|
4.00
|
Door, windows, seats
|
Details
|
|
|
08-06-2013
|
3.00
|
Doors and rudder trim cont.
|
Details
|
|
|
08-05-2013
|
4.50
|
Doors and rudder trim
|
Details
|
|
|
08-02-2013
|
4.50
|
Doors and vents
|
Details
|
|
|
07-22-2013
|
1.50
|
CO Detector and GPS Antennas
|
Details
|
|
|
07-20-2013
|
1.50
|
Compass mount, vent fans
|
Details
|
|
|
07-17-2013
|
8.00
|
Secton 41 completed, panel vents
|
Details
|
|
|
07-16-2013
|
4.50
|
Fuel system, cowl hinges, brake repair, vent fans
|
Details
|
|
|
06-29-2013
|
3.00
|
Cowling mount
|
Details
|
|
|
06-28-2013
|
3.00
|
Misc plumbing
|
Details
|
|
|
06-27-2013
|
3.50
|
Antennas and cable mounts, and more
|
Details
|
|
|
06-26-2013
|
3.50
|
Switches/ side panels
|
Details
|
|
|
06-25-2013
|
4.00
|
Stick blocks/ primed parts
|
Details
|
|
|
06-24-2013
|
4.50
|
Air vent/ windscreen/ tunnel work
|
Details
|
|
|
06-23-2013
|
3.50
|
GD-40 mount. air vent, beacon
|
Details
|
|
|
06-22-2013
|
1.50
|
Beacon mount
|
Details
|
|
|
06-21-2013
|
4.50
|
CO Detector and Windows
|
Details
|
|
|
06-20-2013
|
4.00
|
Autopilot
|
Details
|
|
|
06-19-2013
|
5.50
|
GMC305+ Door Warning
|
Details
|
|
|
06-15-2013
|
2.50
|
D10 repair and Window work
|
Details
|
|
|
06-14-2013
|
2.50
|
Flap sensors and GPS antennas
|
Details
|
|
|
06-13-2013
|
3.00
|
No Smoking Please!!!
|
Details
|
|
|
06-12-2013
|
3.00
|
Flap sensors and other stuff
|
Details
|
|
|
06-11-2013
|
3.00
|
Avionics ground and flap sensors
|
Details
|
|
|
06-09-2013
|
3.00
|
An-21 and USB power
|
Details
|
|
|
06-08-2013
|
2.50
|
More Wire Clean up
|
Details
|
|
|
06-06-2013
|
4.00
|
Wire clean-up
|
Details
|
|
|
06-05-2013
|
2.50
|
Door Warning Light install and AN-21 work
|
Details
|
|
|
06-04-2013
|
4.00
|
Panel Wiring Day #7
|
Details
|
|
|
05-30-2013
|
2.50
|
Panel Wiring Day #6
|
Details
|
|
|
05-23-2013
|
1.50
|
Annuciator wiring
|
Details
|
|
|
05-22-2013
|
5.00
|
Panel wiring Day #5
|
Details
|
|
|
05-21-2013
|
2.50
|
Panel work Day #4
|
Details
|
|
|
05-20-2013
|
3.50
|
Panel work Day #3
|
Details
|
|
|
05-19-2013
|
4.00
|
Vent Controllers
|
Details
|
|
|
05-18-2013
|
4.50
|
Panel work Day #2
|
Details
|
|
|
05-14-2013
|
2.50
|
Panel work
|
Details
|
|
|
05-06-2013
|
2.50
|
Panel wiring prep cont.
|
Details
|
|
|
05-05-2013
|
2.50
|
Panel and power bus integration
|
Details
|
|
|
05-04-2013
|
3.00
|
Hot batt bus and more wires
|
Details
|
|
|
05-02-2013
|
3.00
|
Ground wires
|
Details
|
|
|
05-01-2013
|
3.50
|
Headset Wires and supports
|
Details
|
|
|
04-27-2013
|
2.50
|
Trim fix and TCW cable routing
|
Details
|
|
|
04-26-2013
|
2.50
|
Wire routing continues
|
Details
|
|
|
04-25-2013
|
4.00
|
Auto trim wiring and TCW extension
|
Details
|
|
|
04-18-2013
|
5.00
|
Aft Shelves Installed
|
Details
|
|
|
04-17-2013
|
2.50
|
Remote Compasses mounted
|
Details
|
|
|
04-14-2013
|
0.50
|
A little more wiring
|
Details
|
|
|
04-13-2013
|
3.00
|
GTX23 installed
|
Details
|
|
|
04-12-2013
|
5.00
|
Wiring Day #6
|
Details
|
|
|
04-11-2013
|
4.00
|
Wiring Day #5
|
Details
|
|
|
04-10-2013
|
4.00
|
Sun and Fun
|
Details
|
|
|
04-09-2013
|
3.00
|
Wiring Day #4
|
Details
|
|
|
04-08-2013
|
5.00
|
Wiring Day #3
|
Details
|
|
|
04-07-2013
|
2.50
|
Wiring day #2
|
Details
|
|
|
04-06-2013
|
6.00
|
Wiring
|
Details
|
|
|
03-30-2013
|
5.00
|
Center Brace and Wiring Harness
|
Details
|
|
|
03-28-2013
|
1.50
|
Center Brace install
|
Details
|
|
|
03-27-2013
|
1.50
|
Fwd Fuselage Cleanup and Center post
|
Details
|
|
|
03-26-2013
|
2.50
|
Fwd Fuselage Installed
|
Details
|
|
|
03-20-2013
|
2.00
|
Firewall insulation
|
Details
|
|
|
03-19-2013
|
2.00
|
Side panels and door frames
|
Details
|
|
|
03-18-2013
|
3.00
|
Fwd Fuse. Paint and body work
|
Details
|
|
|
03-15-2013
|
2.50
|
Misc. Cleanup day
|
Details
|
|
|
03-14-2013
|
3.50
|
Fwd Fuselage Install Prep work
|
Details
|
|
|
03-13-2013
|
2.00
|
Avionics boxes cont.
|
Details
|
|
|
03-12-2013
|
2.50
|
Avionics boxes and more power cables
|
Details
|
|
|
03-11-2013
|
2.00
|
Electrical rework
|
Details
|
|
|
03-10-2013
|
2.00
|
Electrical install cont.
|
Details
|
|
|
03-08-2013
|
2.50
|
Electrical planning and install
|
Details
|
|
|
03-06-2013
|
3.00
|
Door Frames and other misc
|
Details
|
|
|
03-03-2013
|
2.00
|
GPU Doubler redo and Body work
|
Details
|
|
|
03-01-2013
|
2.00
|
Cabin Body Blending
|
Details
|
|
|
02-28-2013
|
5.50
|
Pin Block and Gas Strut Install
|
Details
|
|
|
02-27-2013
|
4.00
|
Right Door Lock
|
Details
|
|
|
02-27-2013
|
2.00
|
More door frame work
|
Details
|
|
|
02-26-2013
|
4.50
|
Left Door Lock and other misc
|
Details
|
|
|
02-25-2013
|
2.50
|
Elevator Tim and Aileron pushrods
|
Details
|
|
|
02-24-2013
|
3.00
|
Avionics shelf and Fuel valve mount
|
Details
|
|
|
02-15-2013
|
1.00
|
Antenna install
|
Details
|
|
|
02-14-2013
|
1.50
|
Static system
|
Details
|
|
|
02-13-2013
|
0.50
|
GDL 39 cable
|
Details
|
|
|
02-12-2013
|
1.50
|
Avionics work
|
Details
|
|
|
02-11-2013
|
3.00
|
Tailcone work and misc other
|
Details
|
|
|
02-09-2013
|
3.00
|
Electronics work
|
Details
|
|
|
02-08-2013
|
2.50
|
Fuel valve #3
|
Details
|
|
|
02-07-2013
|
3.50
|
Fuel valve #2
|
Details
|
|
|
02-06-2013
|
1.50
|
Fuel valve
|
Details
|
|
|
02-05-2013
|
1.00
|
GTX 23 extension cable
|
Details
|
|
|
01-24-2013
|
2.50
|
Right Door
|
Details
|
|
|
01-23-2013
|
3.50
|
Aux battery and aft shelf
|
Details
|
|
|
01-22-2013
|
3.50
|
Aft shelf and Aux Battery
|
Details
|
|
|
01-19-2013
|
1.00
|
Interior and Aft Shelf work
|
Details
|
|
|
01-18-2013
|
1.00
|
D10a install work
|
Details
|
|
|
01-17-2013
|
3.00
|
Right Door
|
Details
|
|
|
01-16-2013
|
4.00
|
More left door and electrical
|
Details
|
|
|
01-15-2013
|
4.00
|
Left Door Fit and more electrical
|
Details
|
|
|
01-14-2013
|
3.00
|
Elev. trim plug and New ELT mount
|
Details
|
|
|
01-13-2013
|
2.50
|
Door Locks installed
|
Details
|
|
|
01-12-2013
|
3.50
|
Instrument Panel and misc work
|
Details
|
|
|
01-11-2013
|
3.00
|
Right cabin door
|
Details
|
|
|
01-10-2013
|
3.00
|
Left cabin door
|
Details
|
|
|
12-31-2012
|
1.50
|
Ground cables
|
Details
|
|
|
12-30-2012
|
1.50
|
Electrical power cables
|
Details
|
|
|
12-20-2012
|
1.50
|
Flaps and Shelf complete
|
Details
|
|
|
12-19-2012
|
2.00
|
Primed Shelf parts
|
Details
|
|
|
12-18-2012
|
2.00
|
Equipment Box shelves
|
Details
|
|
|
12-13-2012
|
3.50
|
Electrical work
|
Details
|
|
|
12-12-2012
|
5.00
|
Cabin Cover installed
|
Details
|
|
|
12-10-2012
|
3.00
|
Cabin Cover prep and lights finished
|
Details
|
|
|
12-09-2012
|
2.00
|
Priming and Prep work
|
Details
|
|
|
12-08-2012
|
2.50
|
Battery Box and Lights
|
Details
|
|
|
12-05-2012
|
4.00
|
Interior and Electrical
|
Details
|
|
|
12-04-2012
|
2.50
|
Overhead Lights
|
Details
|
|
|
11-07-2012
|
2.50
|
Brakes and Contols
|
Details
|
|
|
10-25-2012
|
3.50
|
Cabin Heat and Center Console
|
Details
|
|
|
10-24-2012
|
2.50
|
Control system install
|
Details
|
|
|
10-23-2012
|
3.00
|
Completed brake system install
|
Details
|
|
|
10-22-2012
|
1.50
|
New Internal Brake Lines
|
Details
|
|
|
10-11-2012
|
3.00
|
Interior and windows
|
Details
|
|
|
10-10-2012
|
3.50
|
Interior work
|
Details
|
|
|
09-28-2012
|
1.50
|
Doors and Console again
|
Details
|
|
|
09-27-2012
|
1.50
|
Door and Center Console
|
Details
|
|
|
09-26-2012
|
1.50
|
Misc work
|
Details
|
|
|
08-28-2012
|
2.50
|
Vents/ Controller/ Grd Power plug
|
Details
|
|
|
08-25-2012
|
2.00
|
Still interior panels
|
Details
|
|
|
08-24-2012
|
2.50
|
More interior panels
|
Details
|
|
|
08-23-2012
|
5.00
|
Hinge covers and Interior panels cont.
|
Details
|
|
|
08-22-2012
|
4.00
|
Interior panels cont.
|
Details
|
|
|
08-21-2012
|
4.00
|
Continued fitting Aerosport Panel
|
Details
|
|
|
08-20-2012
|
3.00
|
Fitting Aerosport Panels
|
Details
|
|
|
08-19-2012
|
2.00
|
Installed newly painted parts
|
Details
|
|
|
08-18-2012
|
6.00
|
Aux Batt mount/ Doors/ Grd. Pwr plug + painting
|
Details
|
|
|
08-17-2012
|
4.00
|
Aux Battery Mount and center console
|
Details
|
|
|
08-15-2012
|
3.50
|
Door Locks cont. with Misc other
|
Details
|
|
|
08-13-2012
|
4.00
|
Door Locks
|
Details
|
|
|
08-10-2012
|
4.00
|
Prime and install mounts
|
Details
|
|
|
08-07-2012
|
1.50
|
Rosen/ Elt/ Vent valve mounts
|
Details
|
|
|
08-01-2012
|
4.00
|
Visor Mounts and Wheel Pants
|
Details
|
|
|
07-26-2012
|
4.00
|
ELT, Vent controller, and misc
|
Details
|
|
|
07-20-2012
|
2.50
|
Headliner Day #3
|
Details
|
|
|
07-19-2012
|
2.50
|
Headliner day #2 and main wheel fairnings
|
Details
|
|
|
07-18-2012
|
2.50
|
Overhead liner
|
Details
|
|
|
07-16-2012
|
1.50
|
Main Wheel Fairings
|
Details
|
|
|
06-25-2012
|
4.50
|
Primed Cabin cover and GMU mount install
|
Details
|
|
|
06-15-2012
|
4.00
|
GPU, GMU and more sanding
|
Details
|
|
|
06-14-2012
|
5.50
|
Cabin cover, Doors and Main Fairings
|
Details
|
|
|
06-13-2012
|
4.50
|
Yes, more sanding and other stuff
|
Details
|
|
|
06-12-2012
|
4.50
|
Sanding Resumes and V/L antenna
|
Details
|
|
|
06-11-2012
|
3.50
|
Misc items and GMU mount
|
Details
|
|
|
06-06-2012
|
2.50
|
Sanding continues- UGH!
|
Details
|
|
|
06-02-2012
|
3.50
|
Never ending sanding continues
|
Details
|
|
|
06-01-2012
|
6.00
|
Cabin Cover Day #33, Doors Day #20, Fairings
|
Details
|
|
|
05-31-2012
|
5.00
|
Cabin Cover Day #32, Doors Day #19, Tires
|
Details
|
|
|
05-29-2012
|
5.00
|
Cabin Cover Day #31 , Doors Day #18
|
Details
|
|
|
05-25-2012
|
4.00
|
Brakes/Nose gear/Wheel Pants
|
Details
|
|
|
05-24-2012
|
2.50
|
Wheel Pants Day #7
|
Details
|
|
|
05-23-2012
|
7.30
|
Wheel Pants Day #6
|
Details
|
|
|
05-22-2012
|
2.00
|
Doors Day #17 and Nose wheel pant
|
Details
|
|
|
05-19-2012
|
1.00
|
Doors Day #16
|
Details
|
|
|
05-18-2012
|
6.00
|
Doors Day #15 , Wheel Pants Day #5
|
Details
|
|
|
05-17-2012
|
5.00
|
Doors Day #14 and Wheel Pants Day #4
|
Details
|
|
|
05-16-2012
|
6.00
|
Main wheel pants day #3
|
Details
|
|
|
05-15-2012
|
1.00
|
Doors Day #13
|
Details
|
|
|
05-12-2012
|
1.00
|
Doors Day #12
|
Details
|
|
|
05-11-2012
|
5.00
|
Wheel Pants Day #2
|
Details
|
|
|
05-10-2012
|
3.00
|
Main Wheel Pants
|
Details
|
|
|
05-09-2012
|
2.50
|
Right Main/ Brakes/ Mid seat rails
|
Details
|
|
|
05-03-2012
|
3.50
|
Flap Drive and Landing Gear
|
Details
|
|
|
05-02-2012
|
3.00
|
Wheel install
|
Details
|
|
|
05-01-2012
|
3.50
|
Flaps and Gear install
|
Details
|
|
|
04-27-2012
|
2.00
|
Avionics and Electrical
|
Details
|
|
|
04-26-2012
|
2.50
|
Fuel System Fabriaction Cont.
|
Details
|
|
|
04-25-2012
|
1.50
|
Fuel system and Transponder mount
|
Details
|
|
|
04-23-2012
|
2.00
|
Cabin Cover Day #30 and Fuel system design
|
Details
|
|
|
04-21-2012
|
5.00
|
System Install begins.
|
Details
|
|
|
04-20-2012
|
2.00
|
Interior Painting
|
Details
|
|
|
04-04-2012
|
4.50
|
Cabin Cover Day #29 and brake mounts.
|
Details
|
|
|
04-03-2012
|
4.50
|
Cabin Cover Day #28 and misc additional work
|
Details
|
|
|
03-30-2012
|
1.50
|
Cabin Cover Day #27
|
Details
|
|
|
03-29-2012
|
4.50
|
Interior Paint attempt #2
|
Details
|
|
|
03-28-2012
|
5.00
|
Fwd Fuselage parts priming
|
Details
|
|
|
03-27-2012
|
3.50
|
Cabin Cover Day #26
|
Details
|
|
|
03-20-2012
|
1.50
|
Console Bonding and misc elect.
|
Details
|
|
|
03-19-2012
|
2.50
|
Cabin cover day #25 and Doors
|
Details
|
|
|
03-09-2012
|
2.50
|
Cabin Cover Day #24 and Doors
|
Details
|
|
|
03-06-2012
|
3.00
|
Under panel work and cabin cover Day #23
|
Details
|
|
|
03-05-2012
|
3.00
|
Gsu 73 Harness cut-out
|
Details
|
|
|
03-02-2012
|
2.50
|
GSU73 mount compete
|
Details
|
|
|
02-29-2012
|
2.00
|
GSU 73 mount cont.
|
Details
|
|
|
02-28-2012
|
2.50
|
GSU73 Mount
|
Details
|
|
|
02-26-2012
|
1.50
|
Fuse block mounts
|
Details
|
|
|
02-17-2012
|
2.00
|
System mounts and Doors
|
Details
|
|
|
02-02-2012
|
2.50
|
Remote Transponder mount
|
Details
|
|
|
02-01-2012
|
3.50
|
Cabin Cover Day #22 and Panel work
|
Details
|
|
|
01-31-2012
|
4.00
|
Cabin Cover Day #21 and Panel cont.
|
Details
|
|
|
01-30-2012
|
3.50
|
Panel support and Alternate Door attachment
|
Details
|
|
|
01-26-2012
|
3.00
|
Forward fuselage and overhead console
|
Details
|
|
|
01-25-2012
|
2.50
|
Cabin cover Day #20
|
Details
|
|
|
01-24-2012
|
2.00
|
Forward Fuselage Day #3
|
Details
|
|
|
01-23-2012
|
2.00
|
Forward Fuselage Day #2
|
Details
|
|
|
01-21-2012
|
3.50
|
Forward Fuselage/ Panel install
|
Details
|
|
|
01-20-2012
|
4.00
|
More doors day #7 and panel work
|
Details
|
|
|
01-19-2012
|
4.50
|
Door Locks Day #6
|
Details
|
|
|
01-18-2012
|
2.50
|
Primed door parts
|
Details
|
|
|
01-17-2012
|
4.50
|
Locks, Door Frames and Panel supports
|
Details
|
|
|
01-09-2012
|
2.50
|
Door Locks Day #4 and Panel work
|
Details
|
|
|
12-23-2011
|
2.50
|
Door Locks Day #3
|
Details
|
|
|
12-22-2011
|
2.50
|
Door Locks Day #2
|
Details
|
|
|
12-21-2011
|
3.50
|
Continued Door Locks
|
Details
|
|
|
12-14-2011
|
2.50
|
Doors Day #11 - removed and started lock
|
Details
|
|
|
12-13-2011
|
2.00
|
Doors Day #10 - Hinges and Fitting
|
Details
|
|
|
12-12-2011
|
4.00
|
Doors Day #9 and Hinges
|
Details
|
|
|
12-09-2011
|
2.00
|
Doors Day #8
|
Details
|
|
|
12-08-2011
|
3.50
|
Doors Day #7
|
Details
|
|
|
12-07-2011
|
4.00
|
Door Day #6 - Hinges and Door fitting
|
Details
|
|
|
11-30-2011
|
1.50
|
Door Day #5 --Hinges
|
Details
|
|
|
11-29-2011
|
2.00
|
Door Day #4 -- Bonding
|
Details
|
|
|
11-10-2011
|
3.50
|
Doors #3 and VS antenna
|
Details
|
|
|
11-09-2011
|
0.75
|
Axle spacers
|
Details
|
|
|
11-08-2011
|
3.00
|
Primed gear parts
|
Details
|
|
|
11-07-2011
|
3.50
|
Doors #2 and Misc other items
|
Details
|
|
|
11-06-2011
|
0.50
|
Main Tires
|
Details
|
|
|
11-02-2011
|
1.50
|
Trimming door parts
|
Details
|
|
|
11-01-2011
|
1.20
|
Doors #1
|
Details
|
|
|
10-31-2011
|
2.00
|
Finish Kit Inventory
|
Details
|
|
|
10-30-2011
|
1.00
|
Finsih Kit arrived
|
Details
|
|
|
10-24-2011
|
1.50
|
Interior Paint
|
Details
|
|
|
09-27-2011
|
1.50
|
Brake Pedals and Panel design
|
Details
|
|
|
09-21-2011
|
2.50
|
Paint Prep and Panel work
|
Details
|
|
|
09-09-2011
|
3.50
|
Insulation Complete and Paint Prep Begins
|
Details
|
|
|
09-07-2011
|
3.00
|
Overhead Console and nose tire
|
Details
|
|
|
08-29-2011
|
2.50
|
Priming parts and Controls
|
Details
|
|
|
08-28-2011
|
2.50
|
Vents installed and panel layout
|
Details
|
|
|
08-27-2011
|
2.00
|
Cabin Cover #19 and Overhead Console
|
Details
|
|
|
08-25-2011
|
3.50
|
Cabin Cover day 18 + Misc.
|
Details
|
|
|
08-23-2011
|
2.50
|
Brakes, Controls, Cabin Cover cont.
|
Details
|
|
|
08-22-2011
|
4.50
|
Brakes, Controls, and Cabin Cover
|
Details
|
|
|
08-20-2011
|
2.50
|
Brake lines
|
Details
|
|
|
08-19-2011
|
4.50
|
Systems Installation
|
Details
|
|
|
08-12-2011
|
2.00
|
Cabin Cover (still cont.)
|
Details
|
|
|
08-11-2011
|
3.50
|
Section Clean-up and Cabin Cover cont.
|
Details
|
|
|
08-08-2011
|
4.50
|
Cont, Cabin Cover Prep work
|
Details
|
|
|
08-05-2011
|
1.50
|
Still Drilling Cabin Cover
|
Details
|
|
|
08-04-2011
|
3.50
|
Drilling Cabin Cover cont.
|
Details
|
|
|
08-03-2011
|
2.50
|
Fwd Fuselage and Cabin Cover cont.
|
Details
|
|
|
08-02-2011
|
2.50
|
Cabin Cover and Insulation
|
Details
|
|
|
08-01-2011
|
4.00
|
Access Covers, Rudder pedals, Flap actuators
|
Details
|
|
|
07-25-2011
|
0.75
|
Control Rods
|
Details
|
|
|
07-07-2011
|
2.00
|
Riveting Fwd Fuselage and Seat Backs
|
Details
|
|
|
06-28-2011
|
0.50
|
Wing fairing stiffeners
|
Details
|
|
|
06-27-2011
|
1.00
|
Dimpled+ Riveted primed parts
|
Details
|
|
|
06-21-2011
|
3.50
|
Priming completed
|
Details
|
|
|
06-20-2011
|
5.50
|
Priming parts for Sect.31/35/38/39/42/44
|
Details
|
|
|
06-15-2011
|
3.50
|
Fwd Fuselage and deburring complete
|
Details
|
|
|
06-14-2011
|
1.00
|
Still Deburring
|
Details
|
|
|
06-13-2011
|
3.50
|
Cabin Cover Timming and Deburring
|
Details
|
|
|
06-12-2011
|
1.50
|
More Deburring
|
Details
|
|
|
06-11-2011
|
2.50
|
Rear Seat Cover and Deburring Begins
|
Details
|
|
|
06-10-2011
|
0.75
|
Fairings
|
Details
|
|
|
06-09-2011
|
2.50
|
Cabin Cover/ Controls/ Priming Prep
|
Details
|
|
|
06-07-2011
|
3.00
|
Controls/ Brakes/ Cabin Cover cont.
|
Details
|
|
|
06-06-2011
|
0.75
|
Control rods
|
Details
|
|
|
06-05-2011
|
2.50
|
Fitting Cabin Cover
|
Details
|
|
|
06-04-2011
|
2.50
|
Seat Backs Complete and Cutting Cabin Cover
|
Details
|
|
|
06-03-2011
|
3.00
|
Seat Backs and Cabin Cover
|
Details
|
|
|
05-26-2011
|
3.00
|
Finished Baggage Door and Cont. Access panels
|
Details
|
|
|
05-19-2011
|
3.00
|
Baggage Areas Complete- Door Mounting Cont.
|
Details
|
|
|
05-18-2011
|
3.00
|
Baggage area assembly
|
Details
|
|
|
05-17-2011
|
3.00
|
Cont. Floor install
|
Details
|
|
|
05-16-2011
|
3.00
|
More Floor install
|
Details
|
|
|
05-15-2011
|
1.00
|
Riveting Doors and Floors
|
Details
|
|
|
05-14-2011
|
3.00
|
Floor closeout prep
|
Details
|
|
|
05-13-2011
|
0.50
|
Fwd top skin
|
Details
|
|
|
05-12-2011
|
4.50
|
Primed conduit mounts and installed
|
Details
|
|
|
05-11-2011
|
2.50
|
Forward fuselage work and conduits complete
|
Details
|
|
|
05-10-2011
|
2.00
|
Conduit and Antenna Doublers work
|
Details
|
|
|
05-08-2011
|
1.50
|
More insulation installed
|
Details
|
|
|
05-06-2011
|
1.50
|
Wiring Conduit Installation
|
Details
|
|
|
05-05-2011
|
2.00
|
Baggage Floor Access Complete
|
Details
|
|
|
04-27-2011
|
2.00
|
More baggage access work
|
Details
|
|
|
04-18-2011
|
1.50
|
Riveting more structures
|
Details
|
|
|
04-10-2011
|
1.50
|
Doublers and step work
|
Details
|
|
|
03-30-2011
|
2.00
|
Antenna doublers
|
Details
|
|
|
03-21-2011
|
2.50
|
Floor Work
|
Details
|
|
|
03-20-2011
|
2.50
|
Dimpling and nutplate install
|
Details
|
|
|
03-19-2011
|
3.50
|
Fwd Fuselage riveting and more dimpling
|
Details
|
|
|
03-18-2011
|
3.50
|
Priming Complete+ building resumes
|
Details
|
|
|
03-17-2011
|
4.00
|
Priming Parts
|
Details
|
|
|
03-16-2011
|
3.50
|
Completed Deburring+ Misc items
|
Details
|
|
|
03-14-2011
|
2.00
|
Resumed Deburring
|
Details
|
|
|
01-27-2011
|
1.00
|
More Deburring
|
Details
|
|
|
01-24-2011
|
2.00
|
Deburring and Baggage Door work
|
Details
|
|
|
01-21-2011
|
2.00
|
More Baggage Area work
|
Details
|
|
|
01-20-2011
|
1.50
|
Baggage floors started
|
Details
|
|
|
01-11-2011
|
3.50
|
Tailcone Joined!
|
Details
|
|
|
01-10-2011
|
3.00
|
Final Tailcone Attachment Prep
|
Details
|
|
|
01-07-2011
|
1.50
|
Upper Fwd Fuselage Assembly
|
Details
|
|
|
01-04-2011
|
0.75
|
Match drill upper fwd fuselage
|
Details
|
|
|
01-03-2011
|
1.00
|
Upper Fuselage Assembly Prep
|
Details
|
|
|
01-02-2011
|
2.00
|
Tailcone attachment continued
|
Details
|
|
|
12-24-2010
|
1.50
|
More Match Drilling Tailcone
|
Details
|
|
|
12-23-2010
|
1.50
|
Match Drilling Tailcone
|
Details
|
|
|
12-22-2010
|
2.50
|
Tailcone Attachment
|
Details
|
|
|
12-21-2010
|
3.00
|
Riveted Fuselage rib and step work
|
Details
|
|
|
12-19-2010
|
1.50
|
Misc Gear work and Step installation
|
Details
|
|
|
12-18-2010
|
2.00
|
Gear Mounts Finished
|
Details
|
|
|
12-17-2010
|
4.00
|
Fwd Floor and Gear Mounts
|
Details
|
|
|
12-16-2010
|
2.00
|
Fwd floor prep
|
Details
|
|
|
12-15-2010
|
1.00
|
Misc. finish items
|
Details
|
|
|
12-13-2010
|
2.00
|
Finished Riveting Skins
|
Details
|
|
|
12-06-2010
|
2.00
|
Riveted More Fwd Skins
|
Details
|
|
|
12-04-2010
|
1.50
|
Riveted Fwd Skins
|
Details
|
|
|
12-03-2010
|
2.00
|
Aft Skins Completed
|
Details
|
|
|
12-02-2010
|
2.25
|
Riveted Right Skins
|
Details
|
|
|
12-01-2010
|
2.00
|
Riveted Left Aft Skin
|
Details
|
|
|
11-30-2010
|
2.00
|
Riveted Left Skins
|
Details
|
|
|
11-29-2010
|
1.50
|
Clecoed skins in place
|
Details
|
|
|
11-20-2010
|
2.50
|
Skin Dimpled
|
Details
|
|
|
11-19-2010
|
2.00
|
More Structure Riveting
|
Details
|
|
|
11-18-2010
|
2.00
|
Riveting Fwd Fuselage Channels
|
Details
|
|
|
11-11-2010
|
3.00
|
Riveting fuselage structure
|
Details
|
|
|
11-10-2010
|
4.00
|
Primed parts
|
Details
|
|
|
11-09-2010
|
3.00
|
C-sink and deburr complete
|
Details
|
|
|
11-08-2010
|
1.00
|
Even more C-sinking
|
Details
|
|
|
11-05-2010
|
1.00
|
More C-sinking
|
Details
|
|
|
11-04-2010
|
3.50
|
Deburr and C-Sink understructure
|
Details
|
|
|
11-01-2010
|
1.00
|
More match drilling
|
Details
|
|
|
10-25-2010
|
3.50
|
Match drilling Fwd Fuselage
|
Details
|
|
|
10-24-2010
|
2.00
|
Forward Side Skins
|
Details
|
|
|
10-22-2010
|
5.00
|
Left Mid Skin and Forward Structure
|
Details
|
|
|
10-21-2010
|
3.00
|
Right Mid Fuselage Skin
|
Details
|
|
|
10-20-2010
|
3.50
|
Longeron and baggage door seal
|
Details
|
|
|
10-19-2010
|
6.50
|
Completed Section 28
|
Details
|
|
|
10-08-2010
|
1.00
|
Longerons complete
|
Details
|
|
|
10-07-2010
|
4.50
|
Fabricate Longerons
|
Details
|
|
|
10-06-2010
|
2.50
|
More forward structure
|
Details
|
|
|
10-05-2010
|
3.50
|
Riveted Fwd and Aft sections together
|
Details
|
|
|
10-01-2010
|
3.00
|
Riveted Fwd Floor Structure
|
Details
|
|
|
09-30-2010
|
4.50
|
Riveting fwd fuselage
|
Details
|
|
|
09-29-2010
|
4.50
|
Fwd Fuselage priming complete
|
Details
|
|
|
09-28-2010
|
4.00
|
Priming begins
|
Details
|
|
|
09-20-2010
|
2.50
|
More Deburring
|
Details
|
|
|
09-13-2010
|
4.50
|
C-sink and Deburr forward floor structure
|
Details
|
|
|
09-12-2010
|
1.00
|
Disassembled fwd fuselage
|
Details
|
|
|
09-11-2010
|
2.50
|
Joined Fwd and Aft sections
|
Details
|
|
|
09-03-2010
|
3.50
|
Finished Sect 27 and More Fwd Fuselage
|
Details
|
|
|
09-02-2010
|
5.00
|
Bottom skin work-- Front and Rear
|
Details
|
|
|
09-01-2010
|
5.50
|
Firewall riveting and Fwd Fuse Bulkheads
|
Details
|
|
|
08-31-2010
|
2.50
|
Fwd Fuselage Bulkhead Assembly
|
Details
|
|
|
08-30-2010
|
2.00
|
Final prep for riveting Sect 26 + 27
|
Details
|
|
|
08-29-2010
|
1.00
|
Rib riveting finished
|
Details
|
|
|
08-28-2010
|
1.50
|
More Rib Riveting
|
Details
|
|
|
08-27-2010
|
4.00
|
Cont. Mid Fuse Riveting and started Firewall
|
Details
|
|
|
08-26-2010
|
5.00
|
More Mid Fuselage Riveting
|
Details
|
|
|
08-25-2010
|
3.50
|
Mid Fusealge Riveting
|
Details
|
|
|
08-24-2010
|
8.50
|
Mid Fuse Ribs and Firewall Priming Complete
|
Details
|
|
|
08-23-2010
|
5.00
|
Priming Mid Fuse Ribs and Firewall parts
|
Details
|
|
|
08-17-2010
|
0.50
|
Deburring complete
|
Details
|
|
|
08-16-2010
|
5.00
|
Drilled and Deburred Firewall
|
Details
|
|
|
08-15-2010
|
2.00
|
Deburring ribs and Started Firewall
|
Details
|
|
|
08-14-2010
|
5.50
|
Mid Fuselage Ribs
|
Details
|
|
|
08-13-2010
|
3.00
|
Disassembled Mid Fuselage ribs
|
Details
|
|
|
08-12-2010
|
2.25
|
More Mid Fuse Ribs
|
Details
|
|
|
08-11-2010
|
4.50
|
Bulkheads and Mid Fuselage Ribs
|
Details
|
|
|
08-04-2010
|
2.50
|
Bulkhead riveting
|
Details
|
|
|
08-03-2010
|
4.00
|
Bulkheads primed, assembly begins
|
Details
|
|
|
08-02-2010
|
3.00
|
Priming Fuselage bulkheads
|
Details
|
|
|
08-01-2010
|
2.00
|
Fuselage bulkhead deburring
|
Details
|
|
|
07-31-2010
|
4.50
|
Match drilling and deburring fuselage bulkheads
|
Details
|
|
|
07-20-2010
|
1.50
|
Aft Center Section and Rear Spar Bulkhead
|
Details
|
|
|
07-14-2010
|
1.00
|
Fwd Center Section Assembly
|
Details
|
|
|
07-13-2010
|
2.50
|
Aux Tanks and Aileron Actuation Complete
|
Details
|
|
|
07-12-2010
|
1.50
|
Installed Flaps and Ailerons, Actuators finsihed
|
Details
|
|
|
07-03-2010
|
3.50
|
More Aux tank install
|
Details
|
|
|
07-01-2010
|
3.50
|
Left Aux Tank Install and Fuel Tank Repair
|
Details
|
|
|
06-30-2010
|
3.50
|
Tested Lt Main Tank and More Aux Tank Install
|
Details
|
|
|
06-29-2010
|
3.00
|
Ailerons Complete, Tested Rt Main Tank
|
Details
|
|
|
06-26-2010
|
2.50
|
EAA Tech Visit/ Ailerons and Aux tanks
|
Details
|
|
|
06-25-2010
|
4.00
|
Ailerons and Aux Tanks
|
Details
|
|
|
06-17-2010
|
1.50
|
More aileron riveting
|
Details
|
|
|
06-16-2010
|
4.50
|
Riveting Ailerons
|
Details
|
|
|
06-15-2010
|
5.00
|
Primed ailerons and aux tank mounts
|
Details
|
|
|
06-14-2010
|
3.50
|
Aileron prep
|
Details
|
|
|
06-13-2010
|
3.00
|
More Aux Tank mounts and Aileron prep work
|
Details
|
|
|
06-12-2010
|
3.00
|
Aux tank mounts
|
Details
|
|
|
06-11-2010
|
3.50
|
Aux Tank Installation
|
Details
|
|
|
06-10-2010
|
4.00
|
Bottom Skins Finished
|
Details
|
|
|
06-03-2010
|
3.50
|
Flaps Completed
|
Details
|
|
|
05-27-2010
|
0.75
|
Flap trailing edge
|
Details
|
|
|
05-26-2010
|
3.00
|
Riveting Flaps
|
Details
|
|
|
05-25-2010
|
3.50
|
Aileron and Flap work
|
Details
|
|
|
05-24-2010
|
3.00
|
More misc catch-up work
|
Details
|
|
|
05-23-2010
|
1.50
|
Pitot Heat and Torque tubes
|
Details
|
|
|
05-22-2010
|
2.50
|
Misc catch-up work
|
Details
|
|
|
05-13-2010
|
3.00
|
Inventory
|
Details
|
|
|
05-12-2010
|
1.00
|
Unpacking fuselage crate
|
Details
|
|
|
05-07-2010
|
0.50
|
Fuselage Kit arrives!
|
Details
|
|
|
05-06-2010
|
1.50
|
Flaps and Pushrods
|
Details
|
|
|
05-05-2010
|
3.00
|
Priming parts
|
Details
|
|
|
05-04-2010
|
1.50
|
Flap Skin prep
|
Details
|
|
|
04-29-2010
|
3.50
|
Even more riveting
|
Details
|
|
|
04-28-2010
|
0.75
|
Wing wiring
|
Details
|
|
|
04-27-2010
|
3.50
|
Right Outboard Bottom Skin Finished
|
Details
|
|
|
04-25-2010
|
0.75
|
More bottom skin riveting
|
Details
|
|
|
04-23-2010
|
2.50
|
More Riveting again
|
Details
|
|
|
04-22-2010
|
2.00
|
Riveting again
|
Details
|
|
|
04-10-2010
|
3.00
|
And More Riveting
|
Details
|
|
|
04-09-2010
|
1.50
|
More Riveting
|
Details
|
|
|
04-08-2010
|
2.00
|
Bottom skin riveting
|
Details
|
|
|
03-26-2010
|
3.00
|
Riveting Bottom Skin
|
Details
|
|
|
03-24-2010
|
2.50
|
Finished Dimpling bottom skins
|
Details
|
|
|
03-23-2010
|
2.25
|
Cont. riveting flaps and dimpled skins
|
Details
|
|
|
03-22-2010
|
1.50
|
Riveted flap skeletons
|
Details
|
|
|
03-20-2010
|
3.00
|
Riveted Flap sub assemblies
|
Details
|
|
|
03-19-2010
|
4.50
|
Priming Completed
|
Details
|
|
|
03-18-2010
|
4.00
|
More priming
|
Details
|
|
|
03-17-2010
|
4.00
|
Priming wing skins and flaps
|
Details
|
|
|
03-16-2010
|
2.00
|
Final Priming Prep
|
Details
|
|
|
03-11-2010
|
4.00
|
Final Aileron Match drill and Pushrod fabrication
|
Details
|
|
|
03-10-2010
|
3.50
|
Finished Flap deburring and more aileron work
|
Details
|
|
|
03-09-2010
|
4.00
|
More Wiring and a lot more deburring
|
Details
|
|
|
03-01-2010
|
1.50
|
Wired wings
|
Details
|
|
|
02-22-2010
|
3.00
|
Riveted Aileron skins and Aileron trim mount
|
Details
|
|
|
02-20-2010
|
1.50
|
Priming Aileron skins and stiffeners
|
Details
|
|
|
02-19-2010
|
3.00
|
Priming Ailerons and Flap deburring cont.
|
Details
|
|
|
02-18-2010
|
1.00
|
Flap deburring cont.
|
Details
|
|
|
02-12-2010
|
3.50
|
C-sink and deburring Flap parts
|
Details
|
|
|
02-11-2010
|
3.00
|
Flap match drilled
|
Details
|
|
|
02-10-2010
|
3.00
|
Flap assembled
|
Details
|
|
|
02-03-2010
|
3.50
|
Flap Ribs and Hinge Brackets
|
Details
|
|
|
02-02-2010
|
2.00
|
Wing plumbing and wiring
|
Details
|
|
|
01-29-2010
|
1.50
|
More deburring and other misc items
|
Details
|
|
|
01-28-2010
|
3.00
|
Aileron stiffeners and aileron trim started
|
Details
|
|
|
01-27-2010
|
2.00
|
Drilled hinge brackets -- ER Tanks arrived
|
Details
|
|
|
01-26-2010
|
1.50
|
Ailerons
|
Details
|
|
|
01-25-2010
|
1.00
|
Wiring Wings
|
Details
|
|
|
01-25-2010
|
1.00
|
Ailerons
|
Details
|
|
|
01-21-2010
|
0.75
|
Finished deburring bottom skins
|
Details
|
|
|
01-20-2010
|
3.00
|
Wing deburring and wiring
|
Details
|
|
|
01-19-2010
|
2.00
|
Tanks compeleted and more skin deburring
|
Details
|
|
|
01-16-2010
|
2.50
|
Closed Left Fuel Tank
|
Details
|
|
|
01-14-2010
|
2.50
|
Closed Right Fuel Tank
|
Details
|
|
|
01-13-2010
|
3.00
|
Tank inspection and wing deburring
|
Details
|
|
|
01-12-2010
|
2.00
|
Fuel level senders
|
Details
|
|
|
01-05-2010
|
2.50
|
Tank Inboard Rib installed
|
Details
|
|
|
01-04-2010
|
2.50
|
More Proseal and vent parts
|
Details
|
|
|
12-31-2009
|
3.50
|
Tank assembly work
|
Details
|
|
|
12-30-2009
|
1.50
|
Deburring wing parts
|
Details
|
|
|
12-29-2009
|
2.00
|
Tank stiffeners
|
Details
|
|
|
12-28-2009
|
1.00
|
More Pitot Tube Mount
|
Details
|
|
|
12-21-2009
|
1.50
|
Pitot Mount
|
Details
|
|
|
12-19-2009
|
1.00
|
Left tank J-channel
|
Details
|
|
|
12-09-2009
|
2.50
|
Prosealed Ribs
|
Details
|
|
|
12-07-2009
|
2.50
|
Finished Riveting Fuel tank ribs
|
Details
|
|
|
12-03-2009
|
4.00
|
Riveting tank ribs
|
Details
|
|
|
12-02-2009
|
3.00
|
More tank ribs and finished match drilling skins
|
Details
|
|
|
12-01-2009
|
2.75
|
Tank rib install and match drilling
|
Details
|
|
|
11-30-2009
|
3.25
|
Tank rib install and match drill skins
|
Details
|
|
|
11-29-2009
|
0.75
|
More bottom wing skins
|
Details
|
|
|
11-28-2009
|
0.75
|
Cleocoed wing bottom skins
|
Details
|
|
|
11-26-2009
|
4.25
|
Riveting stiffeners and fairings complete
|
Details
|
|
|
11-25-2009
|
2.75
|
More tank stiffeners and gap seals
|
Details
|
|
|
11-18-2009
|
2.50
|
Fuel tank stiffeners and gap seals
|
Details
|
|
|
11-17-2009
|
1.50
|
Misc. Tank Parts sealed
|
Details
|
|
|
11-16-2009
|
1.00
|
Riveting Fairings
|
Details
|
|
|
11-13-2009
|
3.00
|
Primed Gap Fairings
|
Details
|
|
|
11-12-2009
|
1.20
|
Gap fairings
|
Details
|
|
|
11-11-2009
|
2.50
|
Tank mods and wing gap seals
|
Details
|
|
|
11-04-2009
|
1.00
|
Tank modifications
|
Details
|
|
|
11-03-2009
|
1.00
|
Misc Fuel tank prep and modifications
|
Details
|
|
|
10-31-2009
|
1.50
|
Finished Dimpling Skins
|
Details
|
|
|
10-30-2009
|
3.00
|
Let the Dimpling Begin!
|
Details
|
|
|
10-29-2009
|
6.00
|
Primed tank parts
|
Details
|
|
|
10-28-2009
|
4.50
|
Deburring of tanks complete
|
Details
|
|
|
10-27-2009
|
3.00
|
Match drilled Fuel cap and Dissambled tank
|
Details
|
|
|
10-26-2009
|
2.00
|
Match drill/C-sink tank skins
|
Details
|
|
|
10-19-2009
|
1.50
|
Attach Zees and Aft tank baffle
|
Details
|
|
|
10-15-2009
|
2.25
|
Match drilling skins to ribs
|
Details
|
|
|
10-14-2009
|
1.00
|
Tank Rib Install
|
Details
|
|
|
10-13-2009
|
1.00
|
More tank rib installation
|
Details
|
|
|
09-28-2009
|
1.50
|
Completed Outboard Leading Edges
|
Details
|
|
|
09-22-2009
|
1.50
|
Fuel tank assembly
|
Details
|
|
|
09-21-2009
|
3.00
|
Left LE Riveting and Fuel tank assembly
|
Details
|
|
|
09-20-2009
|
1.40
|
Finished Left light lens and cut j-channels
|
Details
|
|
|
09-19-2009
|
2.00
|
Fuel tank parts prep
|
Details
|
|
|
09-17-2009
|
2.00
|
Installed AOA sensors and attached right LE
|
Details
|
|
|
09-16-2009
|
1.50
|
Match drilled left leading edge
|
Details
|
|
|
09-15-2009
|
1.50
|
Clecoed both leading edges
|
Details
|
|
|
09-08-2009
|
1.00
|
RIght Light complete- Left light almost done
|
Details
|
|
|
09-07-2009
|
1.00
|
Fitting left and ring lens
|
Details
|
|
|
09-06-2009
|
0.40
|
Trimming left wing lens
|
Details
|
|
|
09-05-2009
|
2.25
|
Priming complete- More DW light install work
|
Details
|
|
|
09-04-2009
|
1.75
|
Finished lens mounts and priming prep
|
Details
|
|
|
09-03-2009
|
3.00
|
More light installation work
|
Details
|
|
|
09-02-2009
|
2.00
|
Landing light assembly
|
Details
|
|
|
09-01-2009
|
2.50
|
Finished Riveting LE and started landing light ins
|
Details
|
|
|
08-31-2009
|
3.00
|
More leading edge riveting
|
Details
|
|
|
08-19-2009
|
1.50
|
Rivet leading edges
|
Details
|
|
|
08-17-2009
|
1.50
|
Reassembled leading edges
|
Details
|
|
|
08-10-2009
|
2.00
|
Dimpled leading edges
|
Details
|
|
|
08-08-2009
|
2.50
|
Primed leading edge parts
|
Details
|
|
|
08-07-2009
|
4.00
|
Prime leading edge
|
Details
|
|
|
08-06-2009
|
1.25
|
Finished leading edge prep
|
Details
|
|
|
08-05-2009
|
2.00
|
Leading edge work
|
Details
|
|
|
08-05-2009
|
1.50
|
Deburring leading edges
|
Details
|
|
|
07-04-2009
|
2.50
|
Match drilled both leading edges
|
Details
|
|
|
06-26-2009
|
2.75
|
Leading Edge Assembled
|
Details
|
|
|
06-24-2009
|
0.50
|
Riveted right aileron bracket
|
Details
|
|
|
06-13-2009
|
2.00
|
Finished riveting right wing top skins
|
Details
|
|
|
06-10-2009
|
3.00
|
Right wing top skin riveting
|
Details
|
|
|
06-01-2009
|
0.50
|
Rivet outboard aileron bracket
|
Details
|
|
|
05-31-2009
|
1.75
|
Finished Left wing top skin
|
Details
|
|
|
05-30-2009
|
1.50
|
Top skin riveting
|
Details
|
|
|
05-29-2009
|
1.50
|
Top Skin Riveting
|
Details
|
|
|
05-27-2009
|
1.00
|
Riveting Top skins
|
Details
|
|
|
05-17-2009
|
1.50
|
Outboard leading edge
|
Details
|
|
|
05-15-2009
|
2.50
|
Finished dimpling skins and assembled parts
|
Details
|
|
|
05-14-2009
|
3.50
|
Finished Priming and more Dimpling
|
Details
|
|
|
05-11-2009
|
5.00
|
Finished deburring skins and began priming
|
Details
|
|
|
05-05-2009
|
1.50
|
More deburring wing skins
|
Details
|
|
|
05-03-2009
|
1.25
|
Deburr and dimple wing ribs
|
Details
|
|
|
04-30-2009
|
3.00
|
Dissasemble/ deburr/ C-sink Top Skin
|
Details
|
|
|
04-29-2009
|
2.50
|
Match drilling top skins
|
Details
|
|
|
04-27-2009
|
2.50
|
Finished rear spar riveting and began top skin pre
|
Details
|
|
|
04-26-2009
|
2.00
|
Riveting rear spar
|
Details
|
|
|
04-25-2009
|
3.50
|
Prime rear spar and assemble
|
Details
|
|
|
04-15-2009
|
1.50
|
Rear spar final prep
|
Details
|
|
|
04-11-2009
|
2.25
|
Rear spars match drilled
|
Details
|
|
|
04-06-2009
|
2.50
|
Completed Right Rib Install and clecoed rear spar
|
Details
|
|
|
04-05-2009
|
2.00
|
Flap Hinge and Aileron Bracket Riveted
|
Details
|
|
|
04-04-2009
|
3.00
|
Prime time
|
Details
|
|
|
03-27-2009
|
2.50
|
Priming parts
|
Details
|
|
|
03-26-2009
|
3.50
|
Right Ribs and Aft spar doublers
|
Details
|
|
|
03-25-2009
|
1.50
|
Deburring right wing ribs and aileron hinges
|
Details
|
|
|
03-23-2009
|
2.00
|
Riveted ribs to spar and started aileron hinges
|
Details
|
|
|
03-22-2009
|
2.00
|
Assebled flap hinges and ribs to wing
|
Details
|
|
|
03-21-2009
|
4.50
|
Priming complete
|
Details
|
|
|
03-20-2009
|
2.50
|
Priming Left Wing ribs
|
Details
|
|
|
03-17-2009
|
0.60
|
Right wing spar/rib match drill complete
|
Details
|
|
|
03-16-2009
|
1.50
|
Flap hinge assembly and wing rib match drilling
|
Details
|
|
|
03-16-2009
|
1.00
|
Finished rudder tip and started right wing ribs
|
Details
|
|
|
03-08-2009
|
1.00
|
Deburring wing ribs
|
Details
|
|
|
03-04-2009
|
1.00
|
Disassemble and deburr left wing ribs
|
Details
|
|
|
03-03-2009
|
1.00
|
Match Drilled Ribs to Spar
|
Details
|
|
|
03-02-2009
|
1.50
|
Torgue Tube and Flap Hinge Assemblies
|
Details
|
|
|
03-01-2009
|
1.00
|
Fluting complete
|
Details
|
|
|
02-28-2009
|
2.00
|
More Rib preparation
|
Details
|
|
|
02-27-2009
|
1.00
|
Fluting Ribs
|
Details
|
|
|
02-26-2009
|
1.75
|
Primed parts and assembled attached tie downs
|
Details
|
|
|
02-22-2009
|
0.75
|
Tie down fabrication
|
Details
|
|
|
02-14-2009
|
2.00
|
Tip fairings installed
|
Details
|
|
|
02-13-2009
|
0.75
|
Completed spar nutplates
|
Details
|
|
|
02-12-2009
|
2.50
|
More wing spar preparation
|
Details
|
|
|
02-11-2009
|
1.00
|
Fuel tank screw countersinks+ tip fairings
|
Details
|
|
|
02-10-2009
|
2.00
|
Countersinking and Fuel tank nutplates
|
Details
|
|
|
02-09-2009
|
2.00
|
More C-sinking spars
|
Details
|
|
|
02-07-2009
|
2.00
|
Countersinking spars
|
Details
|
|
|
02-03-2009
|
0.75
|
Tip fairing work
|
Details
|
|
|
02-03-2009
|
3.15
|
Match drilling J-Channels and C-sink spars
|
Details
|
|
|
02-02-2009
|
1.20
|
Match drilling stiffeners
|
Details
|
|
|
02-01-2009
|
0.40
|
Tip fairings again.
|
Details
|
|
|
01-31-2009
|
0.40
|
Tip Fairings
|
Details
|
|
|
01-30-2009
|
0.25
|
Tip fairings
|
Details
|
|
|
01-29-2009
|
1.25
|
Wing stiffeners
|
Details
|
|
|
01-29-2009
|
0.75
|
Tail fairing work
|
Details
|
|
|
01-28-2009
|
1.50
|
Riveted wing spar extensions
|
Details
|
|
|
01-27-2009
|
0.50
|
Finsihed priming spar extension
|
Details
|
|
|
01-26-2009
|
0.75
|
Wingtip extension prime step 1+2
|
Details
|
|
|
01-25-2009
|
1.00
|
Fairing work and Wing spar extension
|
Details
|
|
|
01-25-2009
|
1.00
|
Elevator stop final adjustment
|
Details
|
|
|
01-24-2009
|
1.00
|
HS Fwd attach bolts redrilled
|
Details
|
|
|
01-23-2009
|
0.50
|
Wing spar extension
|
Details
|
|
|
01-18-2009
|
2.50
|
Wing stand
|
Details
|
|
|
12-18-2008
|
0.40
|
Prime and riveted spacer
|
Details
|
|
|
11-20-2008
|
2.00
|
Tip fairings match drilled
|
Details
|
|
|
11-13-2008
|
0.50
|
Spacer/shim remake
|
Details
|
|
|
11-07-2008
|
0.45
|
Drilling Wingtip fairings
|
Details
|
|
|
11-06-2008
|
1.50
|
Tail dissamebly and wing kit unpack
|
Details
|
|
|
11-04-2008
|
1.50
|
Elevator trim assembly and Fairing rough cuts.
|
Details
|
|
|
11-03-2008
|
2.00
|
Pushrod adjustment and trim servo mount assembly
|
Details
|
|
|
11-02-2008
|
0.40
|
VS and Rudder removal
|
Details
|
|
|
11-01-2008
|
2.50
|
VS, Rudder, and pushrod installation
|
Details
|
|
|
10-31-2008
|
1.00
|
HS and VS attachment
|
Details
|
|
|
10-28-2008
|
0.75
|
Pushrod fabrication
|
Details
|
|
|
10-21-2008
|
0.70
|
Trim mount assmebly and servo link prep
|
Details
|
|
|
10-17-2008
|
1.50
|
Trim assembly construction
|
Details
|
|
|
10-16-2008
|
0.60
|
Drilled HS Fwd attach holes
|
Details
|
|
|
10-15-2008
|
2.00
|
HS to tail cone attachment
|
Details
|
|
|
10-14-2008
|
3.00
|
Match drilling elevator horns
|
Details
|
|
|
10-13-2008
|
1.50
|
Elevator fitting to HS
|
Details
|
|
|
10-12-2008
|
0.25
|
Tailcone complete.
|
Details
|
|
|
10-11-2008
|
1.50
|
Complete riveting skins.
|
Details
|
|
|
10-05-2008
|
1.00
|
Cont. riveting top stiffeners and frames to skin
|
Details
|
|
|
10-03-2008
|
0.75
|
Riveting top stiffeners to skin
|
Details
|
|
|
10-01-2008
|
1.50
|
Aft deck hardware and top skin install
|
Details
|
|
|
09-30-2008
|
1.50
|
Riveted Aft Deck
|
Details
|
|
|
09-29-2008
|
4.50
|
Lower skin and bellcrank rib riveting complete
|
Details
|
|
|
09-28-2008
|
1.25
|
Riveting side skins to bottom skin
|
Details
|
|
|
09-27-2008
|
1.00
|
More riveting
|
Details
|
|
|
09-24-2008
|
2.50
|
Stiffener riveting complete/ frames to skin begins
|
Details
|
|
|
09-19-2008
|
2.50
|
And more riveting
|
Details
|
|
|
09-17-2008
|
1.00
|
More Riveting
|
Details
|
|
|
09-16-2008
|
1.00
|
Riveting stiffeners
|
Details
|
|
|
09-15-2008
|
6.50
|
Riveting Frames and tailcone assembly
|
Details
|
|
|
09-11-2008
|
1.00
|
Frame and bulkhead assembly begins.
|
Details
|
|
|
09-10-2008
|
5.50
|
Priming Complete
|
Details
|
|
|
09-09-2008
|
4.50
|
Still Priming
|
Details
|
|
|
09-08-2008
|
5.00
|
Priming begins
|
Details
|
|
|
09-04-2008
|
2.00
|
Dimpling complete. Battery mount and bellcrank as
|
Details
|
|
|
09-03-2008
|
4.50
|
Deburring complete, Dimpling begins
|
Details
|
|
|
09-02-2008
|
2.50
|
Deburring complete
|
Details
|
|
|
08-29-2008
|
0.40
|
Deburring cont.
|
Details
|
|
|
08-26-2008
|
1.50
|
Deburring skins cont.
|
Details
|
|
|
08-25-2008
|
3.00
|
Drilling complete and Tailcone deburring begins
|
Details
|
|
|
08-19-2008
|
1.50
|
Shoulder harness anchor and cover plates
|
Details
|
|
|
08-18-2008
|
4.50
|
Top skin installed
|
Details
|
|
|
08-18-2008
|
1.25
|
Drilling aft deck
|
Details
|
|
|
08-17-2008
|
1.00
|
Match drilling empenage cont.
|
Details
|
|
|
08-16-2008
|
3.50
|
Aft deck and longeron installation
|
Details
|
|
|
08-15-2008
|
2.50
|
Rudder stop brace+ stiffeners/ Bellcrank angles
|
Details
|
|
|
08-15-2008
|
1.00
|
Bellcrank angles and Longeron redo
|
Details
|
|
|
08-14-2008
|
2.00
|
More match drilling
|
Details
|
|
|
08-13-2008
|
3.00
|
Frames/stiffeners/longerons
|
Details
|
|
|
08-13-2008
|
2.50
|
Assembled frames, bulkheads, and skins
|
Details
|
|
|
08-12-2008
|
3.50
|
Bulkhead and Frame preparation
|
Details
|
|
|
08-09-2008
|
1.40
|
Rudder cable angle and HS attachment bars
|
Details
|
|
|
08-07-2008
|
1.00
|
Tie down and aft bulkhead
|
Details
|
|
|
07-29-2008
|
0.05
|
Elevators Complete
|
|
|
|
07-28-2008
|
3.50
|
Trim Tab Completeion
|
Details
|
|
|
07-27-2008
|
2.00
|
C'balance wts. and Trim tab hinge
|
Details
|
|
|
07-23-2008
|
1.50
|
Rolled leading edges
|
Details
|
|
|
07-22-2008
|
1.50
|
Riveted Trailing Edge
|
Details
|
|
|
07-19-2008
|
2.50
|
Bonded elevator and trim tab ribs and edge
|
Details
|
|
|
07-15-2008
|
3.50
|
Riveted Front spar, Root ribs, and tip ribs
|
Details
|
|
|
07-14-2008
|
5.00
|
Riveting- Cleanup/ Rear spar / Front spar to skin
|
Details
|
|
|
07-12-2008
|
2.00
|
Assembled parts to elevator skins
|
Details
|
|
|
07-10-2008
|
1.50
|
Rivetd Dbler plates and control horns
|
Details
|
|
|
07-09-2008
|
0.50
|
Rivet tip ribs
|
Details
|
|
|
07-09-2008
|
6.00
|
Priming Part 2
|
Details
|
|
|
07-08-2008
|
7.00
|
Prime elevator parts
|
Details
|
|
|
07-07-2008
|
6.00
|
Elevator Trim Tabs
|
Details
|
|
|
07-06-2008
|
1.30
|
C'sink elevator wedge and cut out ribs
|
Details
|
|
|
07-05-2008
|
0.75
|
Checked elevator spar flanges
|
Details
|
|
|
06-26-2008
|
2.75
|
Dimpling and C'sinking
|
Details
|
|
|
06-25-2008
|
2.25
|
Finsihed deburring and began dimpling
|
Details
|
|
|
06-24-2008
|
2.50
|
Deburring elevator parts
|
Details
|
|
|
06-23-2008
|
3.00
|
More Match Drilling
|
Details
|
|
|
06-22-2008
|
2.00
|
Match drilling
|
Details
|
|
|
06-19-2008
|
0.20
|
Elevator horns and close-out tabs
|
Details
|
|
|
06-18-2008
|
0.45
|
Top skin and trailing edge
|
Details
|
|
|
06-17-2008
|
0.50
|
Elevator Internal construction cont.
|
Details
|
|
|
06-17-2008
|
1.50
|
Elevator internal construction
|
Details
|
|
|
06-16-2008
|
0.80
|
Hinge reinforecments+ spar and rib placement
|
Details
|
|
|
06-13-2008
|
1.00
|
Finished Tip ribs and bent Elev skin tabs
|
Details
|
|
|
06-11-2008
|
1.50
|
rib deburring and tip rib assembly
|
Details
|
|
|
06-10-2008
|
2.00
|
Elevator ribs
|
Details
|
|
|
06-08-2008
|
1.00
|
Trailing Edge and forward edge finished
|
Details
|
|
|
06-08-2008
|
2.00
|
Rudder counterweight and completion
|
Details
|
|
|
06-07-2008
|
2.00
|
Riveted Rudder trailing edge
|
Details
|
|
|
06-03-2008
|
1.50
|
Riveted rudder spar
|
Details
|
|
|
05-30-2008
|
1.00
|
Rudder skin assembly
|
Details
|
|
|
05-27-2008
|
1.00
|
HS Complete!
|
Details
|
|
|
05-26-2008
|
3.00
|
Riveting HS cont.
|
Details
|
|
|
05-23-2008
|
4.50
|
Riveting HS
|
Details
|
|
|
05-22-2008
|
2.00
|
HS Riveting
|
Details
|
|
|
05-21-2008
|
3.20
|
Began riveting HS
|
Details
|
|
|
05-20-2008
|
1.25
|
Rudder final construction
|
Details
|
|
|
05-19-2008
|
5.00
|
Prime rudder and HS parts
|
Details
|
|
|
05-12-2008
|
1.50
|
Rudder work
|
Details
|
|
|
05-12-2008
|
3.00
|
HS Dimpling complete
|
Details
|
|
|
05-09-2008
|
2.50
|
Deburred complete- Dimpling begins
|
Details
|
|
|
05-08-2008
|
2.00
|
More deburring.
|
Details
|
|
|
05-07-2008
|
1.00
|
Deburring
|
Details
|
|
|
05-06-2008
|
1.00
|
HS disassmebly
|
Details
|
|
|
05-05-2008
|
2.00
|
HS Assenbly cont
|
Details
|
|
|
05-04-2008
|
0.40
|
HS Assembly cont.
|
Details
|
|
|
05-03-2008
|
2.50
|
HS Assembly
|
Details
|
|
|
05-03-2008
|
1.00
|
Con't HS assembly
|
Details
|
|
|
05-02-2008
|
3.00
|
Modified HS Ribs
|
Details
|
|
|
05-02-2008
|
1.50
|
Built cradles and began HS assembly
|
Details
|
|
|
05-01-2008
|
3.00
|
Finished VS
|
Details
|
|
|
04-26-2008
|
1.00
|
Forward HS spar assembly
|
Details
|
|
|
04-19-2008
|
1.50
|
Assmbled fwd and aft HS spar
|
Details
|
|
|
04-18-2008
|
1.25
|
Riveted VS skeleton
|
Details
|
|
|
04-18-2008
|
0.50
|
Riveted Rudder lower rib and spar
|
Details
|
|
|
04-18-2008
|
0.25
|
Finished rudder spar
|
Details
|
|
|
04-17-2008
|
5.00
|
Riveted VS Spar
|
Details
|
|
|
04-16-2008
|
3.00
|
Prime
|
Details
|
|
|
04-16-2008
|
2.00
|
Alodined all parts
|
Details
|
|
|
04-15-2008
|
3.50
|
Prep for Priming
|
Details
|
|
|
03-28-2008
|
5.50
|
HS Front and Rear spars
|
Details
|
|
|
03-27-2008
|
1.50
|
Cut and deburr spar caps and attach brackets
|
Details
|
|
|
03-26-2008
|
1.50
|
Deburr HS spars
|
Details
|
|
|
03-24-2008
|
1.00
|
VS final deburr
|
Details
|
|
|
03-16-2008
|
0.75
|
Dimpled rudder parts
|
Details
|
|
|
03-12-2008
|
1.50
|
Rudder construction cont.
|
Details
|
|
|
03-11-2008
|
2.00
|
Rudder Skeleton and Skin Prep
|
Details
|
|
|
03-10-2008
|
2.50
|
Rudder Skeleton Assembly
|
Details
|
|
|
03-07-2008
|
0.50
|
Separated R1003 /R1004 /R1010 parts
|
Details
|
|
|
03-07-2008
|
0.75
|
Rear Spar Dblr and Rudder Stops
|
Details
|
|
|
03-06-2008
|
3.00
|
VS skeleton preparation
|
Details
|
|
|
03-05-2008
|
2.25
|
VS skin Dimpled
|
Details
|
|
|
03-04-2008
|
2.00
|
VS skin fitting
|
Details
|
|
|
02-29-2008
|
1.00
|
VS Skeleton Assembly
|
Details
|
|
|
02-28-2008
|
2.00
|
Spar Caps and Rear Spar Assembly
|
Details
|
|
|
02-11-2008
|
2.50
|
completed tail kit inventory
|
Details
|
|