Date
|
Hours
|
Work Log Summary
|
Details
|
03-13-2011
|
2.00
|
I installed the new Pitot tube. Its chrome. I kn
|
|
|
|
03-12-2011
|
0.00
|
My bird is home. It looks great
|
|
|
|
03-11-2011
|
0.00
|
I got the call today. N526RV is ready.
|
Details
|
|
|
03-03-2011
|
0.00
|
Paint shop progress update
|
|
|
|
02-17-2011
|
0.00
|
Paint shop pictures
|
Details
|
|
|
01-28-2011
|
1.00
|
I delivered 526RV to the paint shop.
|
Details
|
|
|
11-24-2010
|
0.00
|
6000 feet above and below.
|
|
|
|
10-17-2010
|
0.00
|
Yee Haw
|
Details
|
|
|
10-16-2010
|
0.00
|
Flying pictures
|
|
|
|
10-15-2010
|
80.00
|
Gear leg and wheel fairings installed
|
Details
|
|
|
08-28-2010
|
4.00
|
It Flies!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
|
Details
|
|
|
08-27-2010
|
1.00
|
Piddled
|
Details
|
|
|
08-20-2010
|
0.00
|
To do list.
|
Details
|
|
|
08-20-2010
|
2.00
|
The "Ta-Do" list is "Ta-Done"
|
Details
|
|
|
08-19-2010
|
4.00
|
inspection preps.
|
Details
|
|
|
08-15-2010
|
4.00
|
Two steps forward, one step back.
|
Details
|
|
|
08-14-2010
|
5.00
|
Sealed the fire wall penetrations
|
Details
|
|
|
08-01-2010
|
5.00
|
One item off the To-Do list, adding one.
|
Details
|
|
|
07-31-2010
|
4.00
|
Working on the "To Do" list
|
Details
|
|
|
07-24-2010
|
3.00
|
Weight and balance
|
Details
|
|
|
07-23-2010
|
0.00
|
I have completed transition training.
|
Details
|
|
|
07-21-2010
|
6.00
|
Hangar cleanup day
|
Details
|
|
|
07-20-2010
|
14.00
|
Cleco Free - Set the LAST rivet
|
Details
|
|
|
07-18-2010
|
10.00
|
Big day. Tons accomplished
|
Details
|
|
|
07-17-2010
|
4.00
|
A short day.
|
Details
|
|
|
07-16-2010
|
8.00
|
interior is in
|
Details
|
|
|
07-15-2010
|
10.00
|
working on the to-do list.
|
Details
|
|
|
07-14-2010
|
10.00
|
installed empennage tips.
|
Details
|
|
|
07-11-2010
|
5.00
|
Fiberglass work continues
|
Details
|
|
|
07-10-2010
|
6.00
|
Started fiberglass work
|
Details
|
|
|
07-08-2010
|
8.00
|
Canopy
|
Details
|
|
|
07-07-2010
|
8.00
|
Misc stuff
|
Details
|
|
|
07-06-2010
|
8.00
|
More canopy
|
Details
|
|
|
07-05-2010
|
12.00
|
More Canopy trimming
|
Details
|
|
|
07-01-2010
|
6.00
|
bolted on the canopy to the frame.
|
Details
|
|
|
06-18-2010
|
6.00
|
Canopy fitting
|
Details
|
|
|
06-16-2010
|
24.00
|
Canopy fitting
|
Details
|
|
|
06-15-2010
|
0.00
|
The interior has arrived.
|
Details
|
|
|
05-20-2010
|
0.00
|
I ordered the inerior
|
Details
|
|
|
05-20-2010
|
12.00
|
Back to work
|
Details
|
|
|
11-23-2009
|
2.00
|
Started the Baffle gap seals
|
Details
|
|
|
11-23-2009
|
0.50
|
Adjusted the hi speed stop
|
Details
|
|
|
11-12-2009
|
6.00
|
Finished up the backup alternator
|
Details
|
|
|
11-09-2009
|
6.00
|
UPDATE!
|
Details
|
|
|
11-06-2009
|
1.00
|
Centered the spinner
|
Details
|
|
|
11-05-2009
|
2.00
|
I cut the spinner
|
Details
|
|
|
11-03-2009
|
16.00
|
Cowling and alternator
|
Details
|
|
|
10-18-2009
|
16.00
|
Working off the to-do list
|
Details
|
|
|
10-16-2009
|
12.00
|
OAT and aileron pushrod tube
|
Details
|
|
|
10-11-2009
|
8.00
|
Wings wiring
|
Details
|
|
|
10-10-2009
|
1.00
|
Two steps forward, one step back
|
Details
|
|
|
10-09-2009
|
32.00
|
Wings are on for good, bolted
|
Details
|
|
|
09-29-2009
|
2.00
|
Drilled the gear legs for cotter pins.
|
Details
|
|
|
09-20-2009
|
24.00
|
Panel is done
|
Details
|
|
|
09-20-2009
|
1.00
|
First engine start.
|
Details
|
|
|
08-27-2009
|
6.00
|
I drilled the magic hole for the wings.
|
Details
|
|
|
08-15-2009
|
2.00
|
Started looking at the sweep
|
|
|
|
08-15-2009
|
2.00
|
Plugged the wings into the fuselage.
|
Details
|
|
|
07-24-2009
|
8.00
|
I have Heat
|
Details
|
|
|
07-08-2009
|
12.00
|
Fuel pump, brake lines and fuel lines
|
Details
|
|
|
07-07-2009
|
8.00
|
Fuel flow sensor
|
Details
|
|
|
05-17-2009
|
24.00
|
Moved all my tools and all of the remaining parts
|
|
|
|
03-21-2009
|
5.00
|
Right Wing Skins
|
Details
|
|
|
02-28-2009
|
6.00
|
Riveted bottom skins on left wing
|
Details
|
|
|
10-15-2008
|
4.00
|
Moved to the airport, OJ6
|
|
|
|
10-15-2008
|
0.00
|
more pics
|
|
|
|
07-08-2008
|
2.00
|
Pictures of my manifold tubing
|
Details
|
|
|
07-07-2008
|
8.00
|
Air intake box
|
Details
|
|
|
07-06-2008
|
12.00
|
Oil cooler installation
|
Details
|
|
|
07-05-2008
|
12.00
|
Baffles, yet again
|
Details
|
|
|
07-04-2008
|
12.00
|
engine baffle inlet ramps
|
Details
|
|
|
07-03-2008
|
18.00
|
Engine Baffles.
|
Details
|
|
|
07-02-2008
|
36.00
|
Cowl
|
Details
|
|
|
06-21-2008
|
24.00
|
Throttle Quadrant
|
Details
|
|
|
06-04-2008
|
16.00
|
Engine controls and exhasut.
|
Details
|
|
|
05-31-2008
|
3.00
|
I hung the prop
|
Details
|
|
|
05-28-2008
|
4.00
|
Hung the engine
|
|
|
|
05-26-2008
|
3.00
|
Its on the GEAR!!!!
|
Details
|
|
|
05-18-2008
|
6.00
|
Firewall pass throughs.
|
Details
|
|
|
05-15-2008
|
4.00
|
The engine has arrived
|
Details
|
|
|
03-16-2008
|
20.00
|
Installed the Stark harness
|
Details
|
|
|
03-14-2008
|
0.00
|
more wiring pics
|
|
|
|
03-13-2008
|
60.00
|
I been doing some wiring
|
Details
|
|
|
03-06-2008
|
3.00
|
Electrical - Alternator
|
Details
|
|
|
03-05-2008
|
2.00
|
Relabled the Panel
|
Details
|
|
|
02-21-2008
|
4.00
|
Painted, labeled, and reassembled the panel
|
|
|
|
01-29-2008
|
6.00
|
Closing out the Tail Boom
|
Details
|
|
|
01-25-2008
|
16.00
|
update - avionics
|
Details
|
|
|
01-25-2008
|
0.00
|
more pics
|
Details
|
|
|
01-25-2008
|
0.00
|
more pics
|
Details
|
|
|
01-10-2008
|
0.00
|
The prop has arrived.
|
Details
|
|
|
09-20-2007
|
12.00
|
Cut out the left panel
|
Details
|
|
|
09-19-2007
|
4.00
|
Wiring - Strobes
|
Details
|
|
|
09-01-2007
|
0.00
|
more pics III
|
|
|
|
09-01-2007
|
0.00
|
more pics II
|
|
|
|
09-01-2007
|
0.00
|
more pics
|
|
|
|
09-01-2007
|
36.00
|
Big Update
|
Details
|
|
|
07-23-2007
|
1.00
|
More canopy pics
|
Details
|
|
|
07-23-2007
|
24.00
|
Canopy Frame and Plexiglass
|
Details
|
|
|
07-15-2007
|
6.00
|
firewall and instrument panel
|
Details
|
|
|
07-15-2007
|
6.00
|
Canopy Frame
|
Details
|
|
|
07-14-2007
|
2.00
|
brake lines and more canopy latch
|
Details
|
|
|
07-03-2007
|
2.00
|
Tail strobe
|
Details
|
|
|
06-24-2007
|
8.00
|
Canopy latch
|
Details
|
|
|
06-18-2007
|
12.00
|
Canopy latch cutout.
|
Details
|
|
|
06-17-2007
|
4.00
|
NACA air ducts
|
Details
|
|
|
06-14-2007
|
8.00
|
Modular panel install
|
Details
|
|
|
05-30-2007
|
2.00
|
Drilled the firewall for the engine mount
|
|
|
|
05-25-2007
|
2.00
|
plumbed up the brake pedals
|
Details
|
|
|
05-24-2007
|
3.00
|
Finishing kit arrived
|
Details
|
|
|
03-29-2007
|
6.00
|
finished the cabin frame for now.
|
Details
|
|
|
03-28-2007
|
6.00
|
Started fabbing the cabin frame
|
|
|
|
03-26-2007
|
4.00
|
Rigged the elavator and rudder
|
Details
|
|
|
03-24-2007
|
8.00
|
Fuel pump and lines
|
Details
|
|
|
03-23-2007
|
12.00
|
Drilled the vertical stabilizer
|
Details
|
|
|
03-15-2007
|
4.00
|
Mounted the Horizontal stabilizer
|
Details
|
|
|
03-11-2007
|
12.00
|
Aft Skins
|
Details
|
|
|
03-05-2007
|
6.00
|
Cabin Paint
|
Details
|
|
|
03-03-2007
|
8.00
|
Baggage bulkhead cover and Static
|
Details
|
|
|
02-25-2007
|
2.00
|
panel test fit
|
Details
|
|
|
02-24-2007
|
12.00
|
flaps and skins
|
Details
|
|
|
02-23-2007
|
8.00
|
It is looking like an airplane
|
Details
|
|
|
02-22-2007
|
3.00
|
Baggage compartment
|
Details
|
|
|
02-21-2007
|
8.00
|
Landing gear mounts
|
Details
|
|
|
02-20-2007
|
6.00
|
Steps
|
Details
|
|
|
02-19-2007
|
8.00
|
misc.
|
Details
|
|
|
02-18-2007
|
6.00
|
Began Aft Skins
|
Details
|
|
|
02-18-2007
|
4.00
|
Aft deck success
|
Details
|
|
|
02-17-2007
|
6.00
|
Moving on
|
Details
|
|
|
02-16-2007
|
1.00
|
Flipped the canoe
|
Details
|
|
|
02-14-2007
|
6.00
|
misc prior to tipping
|
Details
|
|
|
02-13-2007
|
16.00
|
Riveting the fuselage
|
Details
|
|
|
01-21-2007
|
16.00
|
Begining to put it all together.
|
Details
|
|
|
01-11-2007
|
16.00
|
edge prepping, deburring
|
Details
|
|
|
01-05-2007
|
4.00
|
Forward fuse
|
Details
|
|
|
12-31-2006
|
4.00
|
Misc. catchup and shop cleanup.
|
|
|
|
12-30-2006
|
8.00
|
Main Gear Mounts
|
Details
|
|
|
12-25-2006
|
10.00
|
forward fuselage
|
Details
|
|
|
12-24-2006
|
8.00
|
Forward Fuselage
|
Details
|
|
|
12-23-2006
|
12.00
|
Building the canoe
|
Details
|
|
|
12-22-2006
|
12.00
|
Center section riveting and fuse joining.
|
Details
|
|
|
12-21-2006
|
4.00
|
Brake pedals and misc.
|
Details
|
|
|
12-20-2006
|
8.00
|
Seat backs
|
Details
|
|
|
12-19-2006
|
4.00
|
Aft Fuse is riveted up
|
Details
|
|
|
12-17-2006
|
8.00
|
Aft Fuselage
|
Details
|
|
|
12-09-2006
|
8.00
|
Center section
|
Details
|
|
|
11-29-2006
|
4.00
|
Forward Spar Carry through
|
Details
|
|
|
11-26-2006
|
8.00
|
Started on the center section
|
Details
|
|
|
11-19-2006
|
5.00
|
Aft Fusealge stringers
|
Details
|
|
|
11-15-2006
|
6.00
|
Aft Fuselage
|
Details
|
|
|
11-14-2006
|
8.00
|
Longerons, yet again
|
Details
|
|
|
11-13-2006
|
8.00
|
Bent the left Longeron
|
Details
|
|
|
11-12-2006
|
8.00
|
Bulkheads
|
Details
|
|
|
11-11-2006
|
24.00
|
Working on the bulkheads
|
Details
|
|
|
11-02-2006
|
4.00
|
Center section
|
Details
|
|
|
11-01-2006
|
6.00
|
Firewall and control column
|
Details
|
|
|
10-27-2006
|
8.00
|
Firewall
|
Details
|
|
|
10-26-2006
|
3.00
|
Completed Inventory
|
Details
|
|
|
10-25-2006
|
2.00
|
Fuselage finally arrives
|
Details
|
|
|
08-17-2006
|
8.00
|
More wingtips
|
Details
|
|
|
08-16-2006
|
0.00
|
Ordered the fuselage
|
Details
|
|
|
08-13-2006
|
4.00
|
Wingtips
|
Details
|
|
|
08-12-2006
|
16.00
|
Ailerons, flaps, wingtips
|
Details
|
|
|
08-07-2006
|
4.00
|
Right wing is off the stand
|
Details
|
|
|
08-06-2006
|
2.00
|
Riveted outboard top right skin
|
|
|
|
08-04-2006
|
2.00
|
Riveted the inboard right top skin
|
|
|
|
08-04-2006
|
1.50
|
Leak tested the right fuel tank
|
Details
|
|
|
08-03-2006
|
12.00
|
Right fuel tank almost complete
|
Details
|
|
|
08-02-2006
|
12.00
|
Right Fuel Tank
|
Details
|
|
|
08-01-2006
|
8.00
|
Skins again
|
Details
|
|
|
07-31-2006
|
8.00
|
skins
|
Details
|
|
|
07-30-2006
|
6.00
|
more wing work
|
Details
|
|
|
07-29-2006
|
1.50
|
Right Landing Light
|
Details
|
|
|
07-29-2006
|
4.00
|
Ribs
|
Details
|
|
|
07-27-2006
|
12.00
|
Drill, Debur, dimple, repeat
|
Details
|
|
|
07-26-2006
|
10.00
|
Busted off on the right wing
|
Details
|
|
|
07-25-2006
|
2.00
|
Pitot tube mast
|
Details
|
|
|
07-24-2006
|
1.50
|
Left wing is on the cradle
|
Details
|
|
|
07-24-2006
|
3.00
|
Fitting left aileron
|
Details
|
|
|
07-23-2006
|
7.00
|
Flap brace, Aileron Gap seal, Wing Cradle
|
Details
|
|
|
07-22-2006
|
3.00
|
Finished Aileron brackets
|
Details
|
|
|
07-21-2006
|
1.50
|
Started working on the Aileron brackets
|
|
|
|
07-20-2006
|
3.00
|
Finished Rivetting the Top left wing skin
|
Details
|
|
|
07-19-2006
|
6.00
|
Began rivetting the top skins, - left wing
|
Details
|
|
|
07-17-2006
|
1.00
|
misc
|
Details
|
|
|
07-15-2006
|
1.50
|
Mounted the left tank
|
Details
|
|
|
07-14-2006
|
1.50
|
Left Tank Leak test
|
Details
|
|
|
07-13-2006
|
1.50
|
Left Tank install
|
Details
|
|
|
07-12-2006
|
35.00
|
Left Tank Complete
|
Details
|
|
|
03-19-2006
|
3.00
|
left fuel tank stiffners
|
Details
|
|
|
03-19-2006
|
6.00
|
Final drilled the left tank
|
Details
|
|
|
03-18-2006
|
3.00
|
Tank attach brackets
|
Details
|
|
|
03-15-2006
|
5.00
|
Z-Brackets
|
Details
|
|
|
03-14-2006
|
2.00
|
Riveted the left wing ribs
|
Details
|
|
|
03-13-2006
|
2.00
|
Fabricated the tank joiner plate
|
|
|
|
03-12-2006
|
2.00
|
Left Leading edge
|
Details
|
|
|
03-11-2006
|
12.00
|
jigs and tables
|
Details
|
|
|
03-10-2006
|
3.00
|
Tank Z- Brackets
|
Details
|
|
|
03-07-2006
|
4.00
|
Wing Skins
|
Details
|
|
|
03-06-2006
|
24.00
|
Flaps and Ailerons
|
Details
|
|
|
03-05-2006
|
8.00
|
Wing stand
|
Details
|
|
|
02-18-2006
|
8.00
|
aileron stiffners
|
Details
|
|
|
02-05-2006
|
8.00
|
More debur and flute on the ribs
|
Details
|
|
|
02-04-2006
|
8.00
|
Wing Ribs
|
Details
|
|
|
01-29-2006
|
4.00
|
flaps and ailerons
|
Details
|
|
|
01-22-2006
|
4.00
|
More Aileron Stiffners
|
Details
|
|
|
01-22-2006
|
2.00
|
Left-Rear Spar.
|
Details
|
|
|
01-22-2006
|
0.00
|
Fuse Longeron shipping damage
|
Details
|
|
|
01-22-2006
|
4.00
|
Aileron Stiffners
|
Details
|
|
|
01-21-2006
|
8.00
|
Rear Spar
|
Details
|
|
|
01-21-2006
|
0.00
|
More Rear Spar Pics
|
|
|
|
01-20-2006
|
4.00
|
Tie-down Plates
|
Details
|
|
|
01-14-2006
|
0.00
|
Wing Stand
|
Details
|
|
|
01-14-2006
|
12.00
|
Tank and inspection plate attachment platenuts
|
Details
|
|
|
01-13-2006
|
2.00
|
Inventory of wing Kit
|
Details
|
|
|
01-12-2006
|
2.00
|
The Wings have arrived
|
Details
|
|
|
01-12-2006
|
1.00
|
More unpacking pics
|
|
|
|
12-09-2005
|
2.00
|
Mounted Both elevators to the HS
|
Details
|
|
|
12-09-2005
|
4.00
|
Left Elevator - rolled leading edge.
|
Details
|
|
|
11-29-2005
|
5.00
|
Fiberglass Tips
|
Details
|
|
|
11-25-2005
|
4.00
|
Rudder and VS test fit
|
Details
|
|
|
11-25-2005
|
4.00
|
Right elevator
|
Details
|
|
|
11-23-2005
|
4.00
|
Rudder Trailing edge
|
Details
|
|
|
11-18-2005
|
8.00
|
Trim tab
|
Details
|
|
|
11-17-2005
|
2.00
|
Right Elevator
|
Details
|
|
|
11-11-2005
|
2.00
|
Elevator skins
|
Details
|
|
|
11-10-2005
|
2.00
|
HS Rear Spar
|
Details
|
|
|
11-10-2005
|
2.00
|
HS Frame
|
Details
|
|
|
11-10-2005
|
4.00
|
Elevators
|
Details
|
|
|
11-09-2005
|
6.00
|
HS skin
|
Details
|
|
|
11-07-2005
|
2.00
|
HS Rear Spar
|
Details
|
|
|
11-04-2005
|
4.00
|
Rudder assembly
|
Details
|
|
|
11-04-2005
|
1.00
|
More Rudder Pics
|
|
|
|
11-04-2005
|
1.00
|
HS prime
|
Details
|
|
|
10-30-2005
|
4.00
|
Rudder Frame
|
Details
|
|
|
10-29-2005
|
6.00
|
Rudder Stiffeners
|
Details
|
|
|
10-28-2005
|
4.00
|
Riveted VS
|
Details
|
|
|
10-27-2005
|
4.00
|
Riveted VS frame
|
Details
|
|
|
10-26-2005
|
4.00
|
Verticle Stab
|
Details
|
|
|
10-26-2005
|
3.00
|
Verticle Stab
|
Details
|
|
|
10-21-2005
|
1.00
|
Kit Arrives
|
Details
|
|
|
10-21-2005
|
4.00
|
Getting started
|
Details
|
|