Patrick Kelley (Flion)
Work Logs Found: 434
Category Work Time: 1452 Hours
 Date
Hours
Work Log Summary

Details

 10-16-2017
0.00
Lift failure and damage
Details
       

 10-14-2017
4.00
Fabricate VP-X power cables, panel start
Details
       

 09-18-2017
1.00
Replaced fuel line, pinned copilot cable
Details
       

 09-16-2017
2.00
Misc panel and an oops!
Details
     

 09-16-2017
2.00
Install exhaust collectors
Details
       

 09-12-2017
4.00
Connect panel grounds and firewall plug 1
Details
       

 09-09-2017
2.00
Installed panel in airframe
Details
       

 09-07-2017
2.00
Built mount and installed VP-X #2
Details

 09-01-2017
2.00
Hung engine on airframe
Details
       

 09-01-2017
5.00
Built new mount for VP-X #1
Details
       

 07-26-2017
3.00
Adjusted right-rear baffle
Details
       

 07-22-2017
1.00
Engine baffling with some problems
Details
       

 07-17-2017
4.00
Adding accessory case components
Details
       

 07-12-2017
3.00
Begin construction of engine baffles
Details
       

 07-11-2017
0.00
Catching up
Details
       

 09-19-2015
3.50
Remove panel from airframe
Details
       

 08-12-2015
1.50
Final drill rear cabin top
Details
       

 08-12-2015
2.00
Close rear of HS and VS fairings
Details
       

 08-11-2015
4.70
Finish fairing
Details
       

 08-10-2015
5.30
More fairing work
Details
       

 08-09-2015
2.00
More fiberglass work
Details
       

 08-09-2015
1.20
Bond trim tab ribs
Details
       

 08-08-2015
4.00
Fit empennage fairing
Details
       

 08-05-2015
4.00
More empennage fairing work
Details
       

 08-05-2015
0.50
Created capture for rudder trim hinge
Details
       

 08-04-2015
4.00
Empennage fairing work
Details
       

 08-03-2015
3.00
Miscellaneous panel forward
Details
       

 08-02-2015
2.00
Install flap motor
Details
       

 08-01-2015
5.00
Build and install flap torsion arm.
Details
       

 07-31-2015
2.30
Miscellaneous
Details
       

 07-29-2015
3.00
LSE to firewall and some fiberglass
Details
       

 07-28-2015
2.30
Rebuild access panel for AHRS
Details
       

 07-28-2015
1.00
Put cabin top on fuselage
Details
       

 07-28-2015
2.00
Install cabin heat controls
Details
       

 07-27-2015
4.50
Add side vents, prepare for cabin top
Details
       

 07-26-2015
3.00
Final layups for the overhead console
Details
       

 07-25-2015
2.00
Glue overhead console to cabin top
Details
       

 07-25-2015
2.60
Finish wiring the overhead console
Details
       

 07-24-2015
2.00
Overhead wiring
Details
       

 07-23-2015
3.00
Baggage bulkhead and right side panel
Details
       

 07-23-2015
2.00
Attach rudder cables
Details
       

 07-22-2015
4.00
Miscellaneous, including front seats
Details
       

 07-21-2015
4.00
Right baggage floor and seat pan
Details
       

 07-20-2015
2.70
Match drill right baggage floor and seat
Details
       

 07-20-2015
2.50
Left baggage side and seat back closeout
Details
       

 07-20-2015
1.00
Add baggage door lock
Details
       

 07-18-2015
1.20
Overhead lighting
Details
       

 07-18-2015
4.60
Attach baggage door
Details
       

 07-17-2015
4.00
Rivet baggage door
Details
       

 07-16-2015
1.50
Miscellaneous jobs
Details
       

 07-16-2015
2.20
Baggage door fabrication
Details
       

 07-15-2015
2.00
Misc plus finish riveting rear floor pans
Details
       

 07-14-2015
3.20
left rear seat pan and glass work
Details
       

 07-13-2015
2.30
Overhead access screws
Details
       

 07-13-2015
2.20
Finish left baggage floor
Details
       

 07-12-2015
3.00
Rivet left baggage floor
Details
       

 07-11-2015
4.00
Left baggage floor with access plate
Details
       

 07-09-2015
3.00
Wire overhead lighting
Details
       

 07-08-2015
4.00
Install overhead access covers
Details
       

 07-07-2015
3.00
Plumb overhead oxygen lines
Details
       

 07-04-2015
2.00
Misc Prep of overhead console
Details
       

 07-01-2015
3.50
Install components into overhead
Details
       

 06-30-2015
3.00
Routed A/C hoses
Details
       

 06-29-2015
3.00
Fabricate hoses from A/C to compressor
Details
     

 06-23-2015
1.00
Remove VP DU, finish firewall plug 2
Details
       

 06-23-2015
3.00
close firewall openings
Details
       

 06-10-2015
3.00
Mod for remote oil filter
Details
       

 10-30-2014
1.00
Reinstall nose gear to engine mount
Details
       

 10-28-2014
0.00
Compliance with Service Bulletin
Details
       

 10-07-2014
2.00
Compliance with service bulletin
Details
       

 07-13-2014
4.00
Miscellaneous, Oxy system
Details
       

 07-12-2014
5.00
Install pitch servo, battery, Oxy bottle
Details
       

 07-11-2014
3.00
Install aft rudder cable guides and fairings
Details
       

 07-09-2014
6.00
A/C plumbing
Details
       

 07-05-2014
6.00
Route wiring through tail cone
Details
       

 06-05-2014
6.00
Cut rudder trim, add control linkage.
Details
       

 06-03-2014
5.00
Overhead console O2, speaker install
Details
       

 12-24-2013
0.30
Test fit rudder to fuselage
Details
       

 12-23-2013
0.50
Install tail strobe
Details
       

 12-22-2013
1.00
Finish installing rudder bottom fairing
Details

 12-11-2013
1.00
Rivet rudder leading edge
Details
       

 12-06-2013
2.00
Rudder lower fairing
Details
       

 12-02-2013
2.00
Install counterbalance weight
Details
       

 11-30-2013
1.00
Roll rudder leading edge
Details
       

 11-27-2013
2.00
Rivet front spar, fit bottom fairing
Details
       

 11-20-2013
3.00
Wire leads for trim tab servo
Details
       

 11-09-2013
1.00
Rivet the rudder trailing edge
Details
       

 11-04-2013
1.50
Glue in rudder TE
Details
       

 10-31-2013
2.00
Rivet rudder halves together
Details
       

 10-29-2013
1.00
Install studs, trim servo, ribs
Details
       

 10-26-2013
3.30
Back rivet rudder stiffeners, etc.
Details
       

 10-21-2013
2.20
Trim Tab Hinge, countersinking
Details
       

 10-20-2013
1.50
Dimple the rudder skin
Details

 10-19-2013
2.00
Fabricated trim access panel
Details
       

 10-10-2013
0.50
Initial riveting of structure
Details
       

 10-08-2013
3.00
Dimple skins and skeleton
Details

 10-02-2013
1.50
Match-drill rudder skins
Details
       

 09-18-2013
2.00
Cleco the rudder skins in place
Details
       

 09-13-2013
2.00
Assemble rudder skeleton
Details
       

 09-10-2013
2.00
Final prep of rudder skeleton parts
Details

 09-09-2013
4.00
Prepare parts for rudder skeleton
Details
       

 08-23-2013
2.00
Attempt to attach a speaker
Details
       

 08-21-2013
1.00
GPS test
Details
       

 08-14-2013
3.00
Firewall Plug #1 and overhead
Details
       

 08-12-2013
5.00
Remove cabin top, misc.
Details
       

 08-10-2013
2.00
Firewall coax pass through
Details
       

 08-10-2013
4.00
Build LSE CU mounts
Details
       

 08-09-2013
5.00
Firewall Plug FP-2
Details
       

 08-08-2013
4.00
Firewall work
Details
       

 08-08-2013
2.00
Finish installing pilot side door
Details
     

 08-05-2013
5.00
Copilot door strut and pilot door latch
Details
       

 08-03-2013
2.00
Finish door latch pins - copilot door
Details
       

 08-03-2013
2.00
Door pin guide installation - copilot door
Details
       

 08-02-2013
3.00
Overhead Console planning
Details
       

 07-31-2013
3.00
Door hinges and strut mount
Details
       

 07-30-2013
8.50
Connected headest jacks
Details
       

 07-26-2013
6.00
Assemble inner door handles
Details
       

 07-24-2013
5.00
Final fit pilot door; hinge work
Details
       

 07-23-2013
3.00
Trim pilot side door plus misc.
Details
       

 07-21-2013
2.00
Center console stuff
Details
       

 07-20-2013
5.50
Miscellaneous fun
Details
       

 07-18-2013
4.00
Hinge copilot door
Details
       

 07-14-2013
1.00
Modifications to door latch
Details

 07-13-2013
4.00
Doors and sunshades
Details
       

 07-12-2013
2.00
Bond the copilot side door
Details

 07-11-2013
4.00
prepare copilot door for bonding
Details
       

 07-11-2013
1.00
Drill the cabin brace to the cabin shell
Details
       

 07-11-2013
1.00
Assemble the door latch gear
Details
       

 07-10-2013
2.00
Glued pilot door halves together
Details
       

 07-09-2013
1.00
Install the door strut braces
Details
       

 07-09-2013
3.00
Cut door opening and copilot door
Details
       

 07-08-2013
4.00
Begin copilot side door
Details
       

 07-06-2013
4.00
Trim and fit pilot door halves together
Details
       

 07-04-2013
2.00
Trial fit of pilot door
Details
       

 06-30-2013
2.00
Finalize the power circuit
Details
       

 06-26-2013
1.00
Misc control stuff
Details
       

 06-26-2013
5.00
Make up control sticks
Details
       

 06-24-2013
5.00
Assemble control sticks
Details
       

 06-23-2013
6.00
Control System pushrods
Details
       

 06-22-2013
4.00
Finished power circuits
Details
       

 06-17-2013
7.00
Antenna cabling
Details
       

 06-15-2013
6.00
More contactor wiring
Details
       

 06-13-2013
6.00
Misc. Panel Stuff
Details
       

 06-12-2013
4.00
Prepare for panel installation
Details
       

 06-12-2013
0.50
Install panel
Details
       

 06-11-2013
4.50
Began wiring power circuit
Details
       

 06-10-2013
4.00
install left rear floor, windscreen brace
Details
       

 06-08-2013
4.50
Drill cabin top to airframe
Details
       

 06-07-2013
2.00
More cabin top trimming
Details
       

 06-06-2013
4.00
Trim cabin cover to fit
Details
     

 06-01-2013
2.50
Mark the fuselage and rough cut the cabin
Details
       

 05-30-2013
6.00
Miscellaneous baggage floor plus mods
Details
       

 05-11-2013
2.50
Rivet sub-panel together
Details
       

 05-08-2013
1.50
Install caterpillar grommet in subpanel
Details
       

 09-18-2012
2.00
Test fit subpanel components
Details
       

 09-15-2012
1.00
Set up panel for subpanel assembly
Details
       

 09-14-2012
2.00
Recieved Panel from Aerotronics
Details
       

 06-22-2012
1.20
Added custom pedal pads
Details
       

 06-16-2012
3.50
Install brakes, rudder cables
Details
       

 06-15-2012
2.00
Install rudder pedal brake lines
Details
       

 06-14-2012
3.00
Finish Ground Power Receptacle Mount
Details
       

 06-14-2012
1.00
Built a rolling weight
Details
       

 06-13-2012
1.00
Fabrication of External Power Mount
Details
       

 06-12-2012
3.00
Installed rudder pedal assemblies
Details
       

 06-09-2012
4.00
Install fuselage fuel system components
Details
       

 06-08-2012
4.00
Assemble pedals and master cylinders
Details
       

 06-07-2012
3.00
Build pedals, install brake reservoir
Details
       

 06-03-2012
2.00
Fuel System fabrication
Details
       

 06-02-2012
5.00
Installed the fuselage hard brake lines
Details
       

 06-01-2012
1.50
Assembled left baggage floor stiffeners
Details
     

 05-31-2012
3.00
Miscellaneous, including O2 fill
Details
       

 05-30-2012
5.00
Install left baggage floor and etc.
Details
       

 05-29-2012
5.00
Rivet Right Rear Floor, Fuselage Join
Details
       

 05-17-2012
4.00
Finish left step, then right step
Details
       

 05-16-2012
2.50
Drill left step, install second A/C hose
Details
       

 01-31-2012
1.20
Finalize left LSE module rack
Details
       

 01-16-2012
1.00
Continuing LSE mount fabrication
Details
       

 01-13-2012
2.00
Fab mounts for LSE boxes
Details
       

 01-11-2012
3.00
Build VP-200 mounts
Details
       

 12-26-2011
4.00
Close up the left tank
Details
       

 12-25-2011
2.00
Left tank vent line, level sender, end rib
Details
       

 12-24-2011
7.00
Riveting left tank
Details
       

 12-23-2011
2.00
Prosealed interior ribs in left tank
Details
       

 12-23-2011
2.50
Prosealed and riveted stiffeners
Details
       

 12-22-2011
5.00
Prepare Left Wing Tank for Proseal
Details
     

 12-19-2011
3.00
Partially reassembled left tank
Details

 12-18-2011
2.00
Install panel flanges and hand holds
Details
       

 12-17-2011
3.00
Installed the forward deck skin
Details
       

 12-15-2011
2.00
Begin assembling panel flanges
Details
       

 12-13-2011
1.00
Assembled sub-panel structure
Details
       

 12-01-2011
1.00
Started riveting in the right aft floor
Details
       

 11-26-2011
2.00
Started installing A/C hoses
Details
       

 11-26-2011
1.00
Prepare right rear floor for riveting
Details
     

 11-26-2011
2.00
Install AHRS mount
Details
       

 11-23-2011
5.00
Fab AHRS mount, run NAV coduit
Details
       

 11-01-2011
5.00
Empennage attach, elev. trim adjust
Details
       

 10-30-2011
3.00
Rear floor pan install
Details
       

 10-26-2011
4.50
Riveting and inital seat install
Details
       

 10-25-2011
5.00
Miscellaneous tasks
Details
       

 10-23-2011
3.50
Assemble wheels
Details
       

 10-21-2011
2.00
Rivet left side mid-fuselage deck
Details
     

 10-20-2011
5.20
Prepare gear legs for wheels
Details
       

 10-19-2011
4.50
Dimple and prepare fuselage for join
Details
       

 10-18-2011
2.70
Countersink fuselage join, mid-fuse deck
Details
       

 10-17-2011
5.00
Assemble main wheels, other stuff
Details
       

 10-16-2011
3.00
More fuselage mating work
Details
       

 10-15-2011
3.00
Install gear legs
Details
       

 10-15-2011
3.00
Inital mating of fuselage halves
Details
       

 10-13-2011
3.40
Install main landing gear mounts
Details
       

 10-12-2011
4.00
More rudder trim fabrication
Details
       

 10-11-2011
8.00
Installing the forward fuselage floors
Details
       

 10-01-2011
6.00
Fabricating rudder trim tab, part 1
Details
       

 09-30-2011
2.00
Riveting side skins - final part
Details
       

 09-29-2011
6.00
Riveting side skins part 4
Details
       

 09-28-2011
2.00
Install rudder trim servo
Details
       

 09-24-2011
3.50
Cut out rudder for trim and servo
Details
       

 09-23-2011
3.00
Finished VOR antenna, laid out rudder trim
Details
       

 09-21-2011
3.00
Prepare mount for VOR antenna
Details
       

 09-20-2011
2.00
Remove empennage surfaces
Details
       

 09-12-2011
3.20
Riveting side skins part 3
Details
       

 09-10-2011
7.00
Riveting forward side skins part 2
Details
       

 09-09-2011
3.50
Riveting forward side skins
Details
       

 09-07-2011
5.00
Empennage, controls attach
Details
       

 09-05-2011
1.00
Rivet aft top tailcone skin
Details
       

 09-05-2011
1.00
Attach HS to tailcone
Details
       

 09-03-2011
2.00
Static System Plumbing
Details
       

 09-03-2011
2.00
Fabricated doubler for ELT antenna
Details
       

 09-01-2011
3.00
Assemble subpanel structure
Details
       

 08-31-2011
3.00
Fabricated Andair fuel valve mount
Details
       

 08-30-2011
4.00
Miscellaneous fabrication
Details
       

 08-24-2011
2.00
Added systems mountings to tailcone
Details
       

 08-23-2011
6.50
Riveting rear side skin, deck, etc.
Details
       

 08-22-2011
4.30
Rivel left side tailcone skin
Details
       

 08-20-2011
4.00
Prepare right side skins for riveting
Details
       

 08-19-2011
5.00
Assembled right side structure
Details
       

 08-18-2011
5.00
Assembled Elevator Trim mount
Details
       

 08-17-2011
6.00
Rivet tailcone right side skin
Details
       

 08-15-2011
6.00
Riveted left substructure together
Details
       

 08-13-2011
7.00
Prepare left skin and structure for riveting
Details
       

 08-11-2011
3.60
Prepare for riveting
Details
       

 08-11-2011
2.00
Installed Marker Beacon antenna
Details
       

 08-10-2011
5.00
Clean and reorganize workshop
Details
       

 08-09-2011
4.00
Install elevators on HS
Details
       

 08-06-2011
4.50
Riveted right top wing skins
Details
       

 07-23-2011
4.00
Prepare tail cone for riveting
Details
       

 07-22-2011
3.00
More riveting, pulling right wing wiring
Details
       

 07-21-2011
2.00
Started riveting the top wing skins
Details
       

 07-21-2011
5.00
Rivet right leading edge
Details
       

 07-21-2011
2.00
Install AOA tubing in right wing
Details
       

 07-18-2011
4.20
Prepare right leading edge for riveting
Details
       

 07-18-2011
1.00
Install AOA ports in right leading edge
Details
       

 07-16-2011
5.00
Match drill right leading edge, AOA prep
Details
       

 07-15-2011
3.00
Assemble right leading edge
Details
       

 07-14-2011
8.00
Prepare right top wing skins for riveting
Details
       

 07-13-2011
4.00
Match drill top right wing skins
Details
       

 07-11-2011
5.00
rivet rear spar, cleco top skins on right wing
Details
       

 07-10-2011
4.50
Bolt ribs, roll servo, and fab right rear spar
Details
       

 07-09-2011
8.30
Rivet ribs together and to rigth wing spar
Details
       

 07-08-2011
5.80
More planning and running the condiut
Details
       

 07-07-2011
4.00
Match-drill engine mount, avionics routing
Details
     

 07-06-2011
4.50
Match-drill the forward fuselage structure
Details
       

 07-05-2011
6.80
Match drill forward left side skin
Details
       

 07-04-2011
6.20
Match drill fwd side skins
Details
       

 07-03-2011
3.00
Forward side skin structure
Details
       

 07-02-2011
10.30
Fabricate and match-drill aft side skins
Details
       

 06-30-2011
7.50
Building stucture for fuselage sides
Details
       

 06-29-2011
3.40
Riveting the parts from yesterday
Details
       

 06-28-2011
4.80
Misc. fuselage fabrication
Details
       

 06-27-2011
5.80
Final drill gear towers to fuselage
Details
       

 06-25-2011
1.00
Trial fitting the gear towers
Details
       

 06-24-2011
3.20
Bolt and rivet the foward bulkhead
Details
       

 06-23-2011
3.80
Mated the forward and center sections
Details
       

 06-22-2011
3.50
Finish riveting and mate fwd and mid fuselage
Details
       

 06-21-2011
6.60
Assemble and rivet forward bottom skin
Details
       

 06-20-2011
6.40
Prepare forward fuselage for riveting
Details
       

 06-19-2011
2.00
Start disassebmling fwd fuselage, prep for rivetin
Details
       

 06-18-2011
5.30
Prepare Fuel Tank for riveting
Details
       

 06-17-2011
2.00
Match-drilled bottom skins and left fuel tank baff
Details

 06-16-2011
4.30
Mate the forward and mid- fuselage.
Details
       

 06-15-2011
5.20
Finish riveting, more fuel tank assembly
Details
       

 06-14-2011
2.50
Yet more riveting
Details
       

 06-14-2011
5.00
Assemble and match drill the left fuel tank
Details
       

 06-13-2011
3.60
More riveting the left top wing skin
Details
       

 06-13-2011
4.50
Installed Pitot mount and plumbing
Details
       

 06-12-2011
6.50
Riveting of left outboard LE, start fuel tank
Details
       

 06-08-2011
3.00
riveting the left top wing skin
Details
       

 06-08-2011
5.50
riveted leading edge assembly
Details
       

 06-07-2011
7.20
Prepared left outboard leading edge for riveting
Details
       

 06-04-2011
5.80
Prepare and cleco left leading edge together
Details
       

 06-04-2011
4.00
Build wing cradles, correct some previous work
Details
       

 06-03-2011
3.00
Install left wing wiring harness
Details
       

 06-01-2011
4.80
Dimpling left wing skins for riveting
Details
       

 05-31-2011
3.20
Prepare left top wing skins for riveting
Details
       

 05-30-2011
6.00
Dimple and rivet bottom fuselage skins
Details
       

 05-29-2011
2.00
Dimple and countersink wing walk area
Details
       

 05-29-2011
1.00
Built the aileron trim mount
Details
       

 05-29-2011
2.00
Assembled pitot heat control mount.
Details
       

 05-28-2011
3.00
Miscellaneous avionics tasks (mostly left wing)
Details
       

 05-28-2011
4.00
Match drilled left top wing skins
Details
       

 05-26-2011
2.00
ELT Mounting
Details
       

 05-25-2011
2.00
Fabricated Transpoder Antenna mount
Details
       

 05-24-2011
3.50
Riveted rear spar together and to ribs
Details
       

 05-24-2011
0.50
Clecoed Left Top Wing Skins to structure
Details
       

 05-23-2011
5.00
Assemble left rear spar
Details
       

 05-21-2011
1.50
Pressi in aileron hinge bearings, rivet assemblies
Details
       

 05-20-2011
3.00
Bolt ribs to left spar; fabricate aileron hinge br
Details
       

 05-19-2011
7.00
Rivet ribs together and to left spar
Details
       

 05-17-2011
3.00
Finisihed left wing spar
Details
       

 05-17-2011
2.50
Fabricate wing ribs and begin left wing assembly
Details
       

 05-16-2011
3.00
Countersink the spar rivet holes and rivet nutplat
Details
       

 05-11-2011
3.50
Drilled left wing stiffeners using spar as guide
Details
     

 05-10-2011
2.30
Installed nutplates on COMM antenna doublers
Details
       

 05-03-2011
3.00
Spring Cleaning II
Details
       

 05-02-2011
5.00
Spring Cleaning
Details
       

 04-30-2011
10.00
Paint Scheme Planning
Details
       

 03-13-2011
6.00
Added nutplats and tiedown to right wing
Details
       

 03-12-2011
2.50
Countersinking right wing spar
Details
       

 03-09-2011
3.50
Drill right wing box stringers
Details
       

 03-08-2011
2.00
Riveted the spar extensions
Details
       

 02-28-2011
1.20
Drill and prepare wing spar extensions
Details
       

 02-26-2011
6.00
Got wing cradles from Mike Andresen
Details
       

 02-18-2011
3.00
Fabricated COMM antenna doublers
Details
       

 02-13-2011
2.00
Drill out the floors and add the fwd center sectio
Details
       

 02-11-2011
2.30
Forward bottom skin and floor assembly
Details
       

 02-01-2011
3.20
Forward Fuselage Bulkhead Assembly
Details
       

 01-29-2011
1.00
Milling the control column mounts
Details
       

 01-25-2011
1.60
Assemble forward bottom skin and stiffeners
Details
       

 01-23-2011
3.00
Assemble left and right seat bulkhead assemblies
Details
       

 01-22-2011
2.00
Rivet borward seat bulkhead parts
Details
       

 01-18-2011
3.00
Misc. Forward Spar bulkhead/seat parts
Details
       

 01-17-2011
4.00
Riveted the left rib and both ribs to the firewall
Details
       

 01-16-2011
2.00
Riveted the right rib subassembly
Details
       

 01-15-2011
2.50
Assembled forward rib subassemblies
Details
       

 01-13-2011
3.50
Firewall assembly
Details
       

 01-12-2011
3.50
Installed eyeball hardware in firewall recess
Details
       

 01-10-2011
4.50
Countersink/dimple firewall parts, begin riveting
Details
       

 01-08-2011
3.50
Deburr firewall parts
Details

 01-05-2011
4.00
Assemble firewall
Details
       

 01-04-2011
6.30
Match drilled bottom skins to structure
Details
       

 01-03-2011
4.00
Deburr and rivet baggage bulkhead and floor ribs
Details
       

 12-29-2010
3.00
Rivet rear seat ribs, fit baggage ribs
Details
       

 12-28-2010
4.50
Rivet aft spar bulkhead
Details
       

 12-27-2010
5.00
Assemble rear spar and seat ribs
Details
       

 12-26-2010
4.00
Riveted outboard seat ribs, assembled to rear spar
Details
       

 12-22-2010
3.00
Fuselage ribs aft of spar
Details
       

 06-16-2010
1.50
Assemble oxygen tank mount and bellcrank
Details
       

 06-09-2010
6.00
More systems installation planning and install
Details
       

 06-07-2010
5.00
Riveted bellcrank rib assemblies, systems installa
Details
       

 06-06-2010
6.00
Tailcone prep / register assembly and riveting
Details
       

 06-05-2010
6.00
riveting bottom tailcone skin, dimpling
Details
       

 06-04-2010
4.00
Deburr and riveting
Details
       

 06-03-2010
2.00
Nutplates to rear center bulkhead, inboard seat ri
Details
       

 06-02-2010
1.50
Fuselage bulkhead riveting
Details
       

 06-01-2010
4.00
Riveting wing spar aft bulkhead, tail cone
Details
       

 05-29-2010
5.50
Assembled rear spar bulkhead
Details
       

 05-28-2010
6.00
Attach trim tabs to elevators
Details
       

 05-27-2010
4.00
Assemble aft wing carrythrough bulkhead
Details
       

 05-26-2010
3.50
Assemble aft wing spar carrythrough
Details
       

 05-25-2010
6.00
Bulkhead riveting; other assembly
Details
       

 05-24-2010
3.50
Finish riveting right elevator
Details
       

 05-23-2010
3.00
Elevator counter-weight and trim tabs
Details
       

 05-23-2010
3.00
Assembly of forward center spar carrythrough
Details
       

 05-22-2010
7.00
Fabricate and pre-assemble elevator trim tabs
Details
       

 05-20-2010
4.00
Match Drill landing gear mounts to spar
Details
       

 05-19-2010
6.00
Modify battery mount, cut A/C louvers
Details
       

 05-18-2010
3.00
Prosealed second elevator, A/C fab
Details
       

 05-18-2010
1.50
Forward spar fabrication
Details
       

 05-14-2010
2.00
Empennage trailing and leading edge
Details
       

 01-01-2010
2.00
More right elevator riveting
Details
       

 12-31-2009
4.00
Riveting the top skin and the skins together
Details
       

 12-29-2009
2.50
Dimpled, riveted right bottom elevator skin
Details
       

 12-23-2009
2.00
Prosealed TE ribs and wedge
Details
       

 12-22-2009
5.00
Continue left elevator riveting
Details
       

 12-21-2009
4.50
Continue riveting left elevator
Details
       

 12-19-2009
1.00
Began riveting left elevator
Details
       

 12-14-2009
3.00
Begin riveting right elevator
Details
       

 12-12-2009
1.50
Tailcone miscellaney and dimpling the right elevat
Details
       

 11-21-2009
3.50
Riveted last three tailcone bulkheads
Details
       

 11-20-2009
3.00
Disassemble tailcone for deburr and dimple
Details
     

 11-19-2009
2.60
Installed the rear deck
Details
       

 11-17-2009
7.00
Match Drilling; adding top skins
Details
       

 11-15-2009
4.00
Added longerons, rear deck
Details
       

 11-13-2009
3.70
Tail cone skeleton assembly and skinning
Details
       

 11-12-2009
3.50
Assemble tail cone skeleton
Details
       

 11-11-2009
4.00
Assembly of bulkheads, stringers.
Details
       

 11-10-2009
3.00
Assemble the rear two bulkheads
Details
       

 11-07-2009
3.00
More Elevator riveting prep
Details
       

 11-06-2009
1.80
Deburr and dimple elevator parts
Details
     

 11-05-2009
0.80
Disassembly for debur and dimpling prep
Details
     

 11-02-2009
3.30
Final assembly, match drilling elevator
Details
       

 10-28-2009
3.50
Finish assembly, begin match-drilling skins
Details
       

 10-27-2009
3.20
More elevator assembly
Details
       

 10-26-2009
3.00
Elevator assembly
Details
       

 10-24-2009
3.50
Finished riveting the HS (again!)
Details
       

 10-22-2009
4.00
More riveting
Details

 10-21-2009
3.50
Riveting skeleton into HS skins
Details
       

 10-17-2009
5.00
finished disassembly, prepped the new skins
Details
       

 10-16-2009
3.20
Drilling the skins off the skeleton, continued
Details
       

 10-14-2009
4.00
Drilling off the HS skins
Details
       

 10-10-2009
5.00
Finished HS, began making up elevator ribs
Details
       

 10-09-2009
2.50
Installed rear spar and riveted ribs
Details
       

 10-08-2009
4.00
Riveted skins to HS skeleton
Details
       

 10-07-2009
4.10
Positioned skeleton in skins, riveted front HS spa
Details
       

 10-06-2009
5.30
finished dimpling and riveting HS skeleton
Details
       

 10-03-2009
2.50
Finished dimpling skins, installed nose ribs
Details
       

 09-26-2009
4.00
Finished match drilling, began dimpling
Details
       

 09-25-2009
3.00
Match drilling HS
Details
     

 09-19-2009
2.00
Clecoed skin to HS skeleton
Details
       

 09-17-2009
7.00
Assemble HS skeleton and begin skinning
Details
       

 09-16-2009
3.00
Rebuilt HS forward spar
Details
       

 09-08-2009
3.00
Assembling HS front spar
Details
       

 09-05-2009
1.00
Deburred spar cap strips
Details
     

 09-04-2009
5.00
Built rolling cradles for Horizontal Stabilizer
Details
       

 09-02-2009
6.00
Riveted rudder TE, rolled LE, installed counterwei
Details
       

 09-01-2009
2.00
Riveted rudder spar
Details
       

 08-31-2009
0.20
Phil Cobbin milled stringers
Details
     

 08-28-2009
4.20
Riveted rudder skins, prosealed trailing edge
Details
       

 08-27-2009
3.50
Rivet rear spar and hinge brackets, fab forward br
Details
       

 08-26-2009
3.00
Assemble VS rear spar
Details
       

 08-21-2009
3.00
Dimple skins, prime, begin skeleton riveting
Details
       

 08-20-2009
3.00
Final drill skins, diaassemble, debur, and dimple
Details
       

 08-19-2009
6.00
Assemble rudder skeleton and skins
Details
       

 08-18-2009
3.00
Organized small parts
Details

 08-17-2009
5.00
Riveted VS skin
Details
       

 08-16-2009
7.00
Riveting prep and VS skeleton riveting
Details
       

 03-24-2009
2.00
Inventoried wing kit
Details
       

 03-23-2009
1.00
Recieved wing kit, checked for damage
Details
     

 03-21-2009
3.00
Cleco and drill VS skin to skeleton
Details
       

 03-18-2009
4.00
Assemble VS skeleton
Details
       

 03-17-2009
2.00
Assembled rear spar caps to HS rear spar
Details
       

 03-14-2009
1.00
Trimmed rear VS spar caps
Details
     

 02-26-2009
2.00
Recieved and inventoried the tail kit
Details
       

 02-12-2009
0.00
FedEx Freight fail
Details

 02-04-2009
0.10
Ordered first kits
Details