KitLog pro

Powered By Kitlog Pro v2.0

Patrick Kelley (Flion)
Work Logs Found: 105
Category Work Time: 466 Hours
 Date
Hours
Work Log Summary

Details

 07-24-2017
45.00
Troubleshoot/repair left ignition
Details

 07-22-2015
4.00
Miscellaneous, including front seats
Details
       

 09-26-2009
0.50
Replaced backup altimeter, switch lamp
Details
     

 05-20-2009
4.00
Rotated tires, installed main gear pants
Details
       

 05-15-2009
1.00
Installed carpets, oxygen
Details
       

 03-18-2009
2.00
Made template for carpet
Details
       

 02-26-2009
1.00
Installed stick boots and new seat cushions
Details
       

 12-06-2008
2.00
Fabricated bracket for charger connection
Details
       

 11-17-2008
2.00
Fast Taxi Test
Details

 11-16-2008
4.00
Buttoning up for first flight
Details

 11-05-2008
1.00
Installed Fuel Selector Indicator Plate
Details
     

 11-03-2008
2.00
trim canopy gap seal, install passenger vent, fwd
Details
       

 11-01-2008
3.00
Inspect canopy gap seal, fiberglass louvres
Details
       

 10-31-2008
5.00
Canopy gap seal, cowling louvres, taxi test
Details
       

 10-30-2008
5.00
Canopy Seal, left vent, Canopy handle
Details
       

 10-28-2008
3.00
Apply markings, canopy side strips, repair rt. bra
Details
       

 10-25-2008
3.00
tail hinge bolts, seat belts, panel markings
Details
       

 10-24-2008
1.00
Adjust tachometer, set idle speed
Details
     

 10-23-2008
4.00
tach sender install, taxi test, canopy fabrication
Details
       

 10-21-2008
2.00
Runup to fine tune and check RPM reading
Details

 10-19-2008
2.00
fixed oil leak, other troubleshooting
Details

 10-18-2008
1.00
First engine start
Details

 10-17-2008
5.00
Center baffle seal, prepare for engine start
Details

 10-14-2008
3.00
Finialized wheel installations for first flight
Details

 10-12-2008
4.00
baffle seal, weight and balance
Details

 10-10-2008
2.00
Baffle seal
Details

 10-08-2008
3.00
Baffle seal
Details
       

 08-22-2008
6.00
Baffle construction, safety prop
Details
       

 08-21-2008
6.00
Trim baffling, cowl fit adjustment
Details
       

 08-20-2008
6.00
forward baffle construction
Details
       

 08-19-2008
4.00
Breather and fuel vent lines, saftey alternator
Details
       

 08-18-2008
6.00
Connect engine sensors, fiberglass work
Details
       

 08-17-2008
5.00
More FWF cleanup, FAB construction
Details
       

 08-16-2008
4.00
FWF routings, FAB/cowl scoop connection
Details
       

 08-15-2008
5.00
FAB construction, cowling fabrication
Details
       

 08-14-2008
3.00
FAB construction
Details
       

 08-13-2008
6.00
Spinner gap seal, cowling support, FAB constructio
Details
       

 08-12-2008
6.00
Prop spinner fabrication, IFR pitot/static check
Details
       

 08-02-2008
6.00
EGT probe installation, finish cowling fasteners
Details
       

 08-01-2008
5.00
Cowling fastener installation
Details
       

 07-29-2008
10.00
Ignition work, spinner, prop install, miscellaneou
Details
       

 07-28-2008
4.00
Spinner parts
Details
     

 07-27-2008
4.00
Cowl fitting; final riveting of top skin
Details

 07-26-2008
4.00
Bottom cowling fit
Details
       

 07-25-2008
4.00
top cowling install
Details
       

 07-24-2008
4.00
Riveting forward top skin
Details
     

 07-23-2008
5.00
Prepped forward top skin for riveting
Details

 07-22-2008
4.00
Shim front top skin
Details

 07-21-2008
5.00
Fuel sender calibration
Details

 07-19-2008
6.00
Tested and purged fuel system
Details

 07-18-2008
2.00
Replaced fuel pump
Details

 07-17-2008
6.00
Firewall shields, hobbs wiring, canopy latch
Details

 07-15-2008
4.00
replaced intake, replaced tanks, wired senders, fi
Details

 07-14-2008
4.00
Reinstalled canopy, test install of forward skin
Details

 07-13-2008
4.00
Fuel Pump cover, pitot static check
Details
     

 07-12-2008
6.00
relocated gps antenna to wing, oil filler door
Details
       

 07-11-2008
6.00
Removed broken bolt, completed spark wires
Details
       

 07-10-2008
4.00
Spark plug wiring, re-route left CHT sensors
Details
       

 07-09-2008
6.00
pressure sender installation, tank sender, right f
Details
     

 07-08-2008
2.00
cleanup
Details

 07-07-2008
6.00
Right flap repair, brake fluid added
Details
       

 07-06-2008
6.00
Loom for control cables, oil filler door, cleanup
Details
       

 07-05-2008
6.00
Pressure sender location, initial cowl fitting
Details
       

 07-04-2008
4.00
fuel sender preparation
Details
       

 07-03-2008
4.00
Removed wing tanks and fuel senders
Details
       

 07-02-2008
4.00
Autopilot troubleshooting, engine controls
Details
       

 07-01-2008
4.00
Removed tanks to reinstall senders
Details

 06-30-2008
6.00
Finished main power connections and engine pod cab
Details
       

 06-29-2008
6.00
Fabricated P1 installation
Details
       

 06-28-2008
4.00
Cleaned up wiring runs behind panel
Details
     

 06-27-2008
5.00
Wiring of Lightspeed ignition boxes
Details
       

 06-26-2008
6.00
Manifold pressure plumbing, wiring tidy, prep for
Details
       

 06-25-2008
6.00
wiring cleanup, prop and trim controls, Floscan
Details
       

 06-24-2008
6.00
Fabbed center column, cabin heat controls.
Details
       

 06-23-2008
4.00
NAV troubleshooting, fuel sender wiring
Details

 06-21-2008
4.00
CHT sensors installed
Details
       

 06-20-2008
3.00
More NAV troubleshooting
Details

 06-19-2008
3.00
Hangar reorganization, antenna troubleshooting
Details
     

 06-18-2008
2.00
Pitot hookup
Details

 06-17-2008
6.00
Wiring from wing spar forward/manifold pressure ta
Details
       

 06-16-2008
3.00
Cabin heat box and breather seperator install
Details
       

 06-14-2008
4.00
Reinstalled flap mechanism & canopy latch
Details
       

 06-13-2008
6.00
Finished aft section
Details
       

 06-12-2008
6.00
Fuel pump plumbing
Details
       

 06-11-2008
3.00
Ignition and solenoid wiring
Details
       

 06-10-2008
3.00
Firewall penetrations for ignition and fuel
Details
       

 06-06-2008
5.00
Routing of Lightspeed ignition wiring
Details
       

 06-04-2008
7.00
Fabricated main battery cables
Details
       

 06-02-2008
6.00
Riveted top skin
Details
       

 06-01-2008
2.50
Prepped top skin for riveting
Details

 05-30-2008
3.00
Installed oil cooler, fuel lines
Details

 05-29-2008
5.00
Firewall penetrations and remount engine
Details
       

 05-28-2008
5.00
Made firewall penetrations
Details
       

 05-26-2008
3.00
Fuel Pump plumbing and first battery box
Details
       

 05-23-2008
3.00
Engine baffling and throttle/mixture cable bracket
Details
       

 05-22-2008
5.00
Fuel pump installation and cable bracket fabricati
Details
       

 05-20-2008
2.00
baffling construction
Details

 05-07-2008
3.50
baffling construction
Details
       

 05-06-2008
4.00
split canopy and baffling construction
Details
       

 05-04-2008
2.00
baffling construction
Details

 05-03-2008
5.00
Rear canopy install
Details
       

 04-30-2008
3.50
Fuel pump, baffles, headphone jacks
Details
     

 04-29-2008
1.50
Baggage compartment paint
Details
     

 04-28-2008
3.00
ELT Battery and wiring
Details
       

 04-27-2008
0.00
Reference First Kitlog Pro Entry
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.