Powered By Kitlog Pro v2.0
Bearhawk Patrol #42
Bearhawk Patrol
All
Work Logs Found:
125
Category Work Time:
432 Hours
Date
Hours
Work Log Summary
Details
10-27-2010
1.50
Rivetted in place 15 more rib agle stiffeners.
Details
10-26-2010
1.50
Rivetted in place first rib agle stiffener.
Details
04-21-2010
1.00
Trimmed to fit rear spar plate parts.
Details
04-20-2010
2.00
Trimmed 0.125 wing plate parts to final dimensions
Details
04-17-2010
5.00
Rough cut front spar cap strips to size.
Details
04-16-2010
6.00
Drilled all rear spar attach angles. Trimmed to si
Details
04-14-2010
5.75
Finished drilling the 38 remaining long center att
Details
04-12-2010
2.00
Setup for drilling long center attach angles and d
Details
04-11-2010
7.00
Finished trimming and deburring 214 wing rib angle
Details
04-08-2010
2.00
Worked on rib attach angles.
Details
04-07-2010
1.50
Worked on rib attach angles.
Details
04-06-2010
3.00
Matched drilled last 10 nose ribs and stiffeners a
Details
04-04-2010
5.00
Prepped and painted 30 nose rib stiffeners.
Details
04-02-2010
3.00
I made the rest of the wing inspection cover and b
Details
04-01-2010
1.00
I made my 1 of 6 wing inspection cover and backing
Details
03-31-2010
2.00
Constructed wing inspection cover and hole hole ji
Details
03-30-2010
2.00
Finished routing lightning holes in rear spars.
Details
03-29-2010
4.00
Laid out left and right rear spars.
Details
03-28-2010
2.50
Finished routing lightning holes in main spars.
Details
03-27-2010
8.50
Laid out left and right main spars.
Details
03-24-2010
2.25
Made jig to route 3 1/2” lightening holes in main
Details
03-22-2010
4.00
Made jig to route 5” lightening holes in main spar
Details
03-21-2010
5.00
Finished bending main and rear spars.
Details
03-20-2010
5.00
Finished cutting out main and rear spar blanks.
Details
03-18-2010
2.00
Rough cut main spar blanks out of .032 2024-T3
Details
03-17-2010
2.50
Finalized main and rear spar bend dimensions.
Details
03-15-2010
3.00
Flanged aft rib lightning holes and straightened.
Details
03-14-2010
3.00
Formed 20 trailing edge ribs.
Details
03-12-2010
3.00
Routed and deburred 20 aft ribs.
Details
03-11-2010
2.00
Rough cut trailing edge ribs
Details
03-10-2010
0.00
Patrol wings without flaps
Details
03-07-2010
6.00
Made aft rib router form
Details
03-06-2010
4.00
Sketched out cap and spar
Details
02-27-2010
8.00
Made some decisions and sourced a bunch of items
Details
06-23-2009
2.00
Tack welded 2 outboard flap hinges
Details
06-19-2009
2.00
Tack welded second inboard aileron hinge.
Details
12-21-2008
3.00
Tack welded one inboard aileron hinge.
Details
12-15-2008
1.50
Tack welded outboard aileron hinges.
Details
12-14-2008
3.00
Welded aileron and flap hinge feet.
Details
12-11-2008
1.00
Finished up the aileron and flap hinge jig.
Details
12-10-2008
2.00
Worked on a new aileron and flap hinge jig.
Details
12-09-2008
1.10
Worked on a new aileron and flap hinge jig.
Details
12-08-2008
3.90
Worked on wing steel parts.
Details
12-07-2008
8.00
Worked on wing steel. parts.
Details
12-02-2008
1.10
Worked on wing steel parts.
Details
12-01-2008
3.10
Worked on wing steel parts
Details
11-30-2008
7.70
Worked on wing steel parts
Details
11-29-2008
5.70
Worked on wing steel parts
Details
11-29-2008
1.00
Worked on trimming attach angles to finished lengt
Details
11-27-2008
0.00
Grease fitting on the 7/8x058 slip fit flap contro
Details
11-26-2008
5.50
Worked on wing steel parts
Details
11-25-2008
2.70
Worked on wing steel parts
Details
11-24-2008
4.00
Worked on wing steel parts
Details
11-22-2008
7.50
Worked on wing steel parts
Details
11-22-2008
2.60
Finished up rib attatch angles
Details
11-21-2008
0.90
Worked on rib attach angle
Details
11-21-2008
1.80
Tack welded first drive linkage
Details
11-20-2008
0.70
Setup for drilling the aileron and flap control li
Details
11-20-2008
1.70
Rough cut last of the rib attatch angles
Details
11-20-2008
1.00
More welding practice
Details
11-19-2008
0.80
Welding practice
Details
11-18-2008
1.00
More welding practice
Details
11-17-2008
3.00
Cleaned shop and practiced welding
Details
11-16-2008
6.00
Made drill jig for rib stiffeners.
Details
11-15-2008
3.00
Finished cutting out wing spar plate parts
Details
11-15-2008
3.00
Finished cutting out wing spar plate parts
Details
11-13-2008
1.00
Worked on rear spar .125 plate parts
Details
11-13-2008
1.00
Deburred flap and spar backing plates
Details
11-12-2008
2.00
Worked on 063 spar plate parts
Details
11-10-2008
1.50
Worked on wing steel
Details
11-10-2008
1.50
Worked on rib attach angles
Details
11-09-2008
2.00
Worked on wing attach angles
Details
11-09-2008
3.00
Cut 1/8 and 1/4 spar spacers
Details
11-07-2008
1.50
Finished deburring rib stiffeners
Details
11-07-2008
1.50
Finish cut and deburred 1/16x1/2x3-7/8 6061 Rear s
Details
11-05-2008
2.00
Cleaned and setup band saw
Details
11-03-2008
1.50
Ripped 1/16x1/2x3-7/8 6061 Rear spar spacers
Details
11-02-2008
2.00
Second try at bending the flap spar
Details
11-01-2008
0.00
Resolved wing spar spacer rivet question
Details
11-01-2008
1.00
Made spare bend templates
Details
10-30-2008
1.00
Worked on wing rib stiffeners
Details
10-30-2008
1.70
Bent first flap spar
Details
10-29-2008
1.00
Debur wing stiffeners
Details
10-29-2008
1.00
Bent aileron spar
Details
10-28-2008
3.00
Bent aileron spar
Details
10-27-2008
1.80
Worked on nose stifeners.
Details
10-27-2008
3.00
Finished flange, flute, and bob stick on long ribs
Details
10-25-2008
3.00
Trimmed and deburred wing center rib stiffeners.
Details
10-25-2008
5.50
Formed, fluted, and Bob sticked remainder of the c
Details
10-23-2008
2.00
Formed, fluted, and Bob sticked 8 center ribs.
Details
10-22-2008
3.00
Formed last of the nose ribs and first center rib.
Details
10-21-2008
2.00
Formed 9 more nose ribs
Details
10-18-2008
0.00
Barhawk BBQ
Details
10-12-2008
3.00
Formed 7 more nose ribs
Details
10-11-2008
2.50
Formed 10 nose ribs.
Details
10-08-2008
2.50
Finished cutting out last center rib
Details
10-07-2008
2.00
Debured center and long ribs
Details
10-06-2008
0.70
Removed plastic backing from ribs
Details
10-05-2008
5.00
Finished routing out center ribs and long rib
Details
10-04-2008
3.50
Rough cut 12 remaining center ribs
Details
10-02-2008
2.00
Formed aileron pocket ribs
Details
10-01-2008
3.00
Formed flap nose ribs
Details
09-30-2008
2.00
Debur wing ribs
Details
09-28-2008
3.00
Organized purchasing plan
Details
09-27-2008
5.00
Worked on wing ribs
Details
09-25-2008
3.00
Worked on .025 rib stiffeners
Details
09-24-2008
3.00
Worked on .025 rib stiffeners
Details
09-23-2008
2.50
Worked on .025 rib stiffeners
Details
09-21-2008
2.50
Finished up spar bending brake jig
Details
09-17-2008
4.00
Worked on spar bending brake jig
Details
09-17-2008
0.10
Color scheme thoughts
Details
09-16-2008
2.00
Worked on spar bending brake jig
Details
09-15-2008
2.00
Worked on spar bending brake jig
Details
09-14-2008
3.00
Finished up wing steel lugs
Details
09-11-2008
0.25
Thoughts on options
Details
09-10-2008
3.50
Worked on wing steel lugs
Details
09-09-2008
3.50
Worked on wing steel lugs
Details
09-08-2008
1.00
Worked on wing steel lugs
Details
09-07-2008
3.00
Cleaned and orginized work space
Details
03-29-2008
16.00
Cut and formed wing flap and aileron hinges
Details
03-19-2008
1.00
Designed drill jig for hinge lugs
Details
02-17-2008
13.00
Routed out wing ribs
Details
01-01-2008
6.00
Made aileron and flap hinge foot washers
Details
01-10-2007
40.00
Completed aileron aft ribs
Details
08-27-2006
32.00
Completed aileron nose ribs
Details
SITE NAVIGATION
Contact Builder
Bearhawk Patrol Home
Category
# Logs
# Hours
All
125
432
Miscellaneous
12
22
Prop
1
2
Wings
112
408
Copyright © 2001-2024 Matronics. All Rights Reserved.