Powered By Kitlog Pro v2.0
Daytons Web site
RV 4
All
Work Logs Found:
107
Category Work Time:
1090 Hours
Date
Hours
Work Log Summary
Details
12-24-2006
2.00
Inside photo's
Details
12-24-2006
2.00
Finished
Details
12-13-2006
3.00
Airworthyness
Details
12-11-2006
3.00
Weight and Balance
Details
12-11-2006
2.00
Small Details
Details
12-10-2006
2.00
Graphics
Details
12-03-2006
2.00
Engine start
Details
12-02-2006
8.00
Engine start prep
Details
11-26-2006
8.00
Finish painting
Details
11-24-2006
8.00
Painting
Details
09-27-2006
3.00
Oil cooler lines
Details
09-10-2006
4.00
Baffle seals
Details
09-02-2006
4.00
Inter cylinder baffles
Details
09-01-2006
2.00
Oil Cooler
Details
08-28-2006
5.00
Baffle fit
Details
08-27-2006
40.00
Painting
Details
08-27-2006
12.00
Baffells
Details
07-19-2006
40.00
Painting
Details
05-28-2006
6.00
Pinholes
Details
04-28-2006
3.00
Cowl to spinner build up
Details
04-23-2006
2.00
Cowl to spinner build up
Details
04-23-2006
6.00
Air box
Details
04-18-2006
4.00
Air box
Details
04-16-2006
4.00
Install cowl cheeks
Details
04-03-2006
3.00
Re-Build Left Elevator
Details
03-28-2006
3.00
Re-Build Left Elevator
Details
03-24-2006
2.00
Re-Build Left Elevator
Details
03-21-2006
2.00
Re- Build Left Elevator
Details
03-19-2006
3.00
Re- Build Left Elevator
Details
01-20-2006
15.00
Intersection fairings on the Wheel Pants
Details
12-31-2005
12.00
Finish cowl
Details
12-14-2005
6.00
Installing cowl
Details
12-05-2005
8.00
Installing cowl
Details
11-27-2005
6.00
Cowl Hinges
Details
11-19-2005
4.00
Cowl trimming
Details
11-10-2005
2.00
Cowl Trimming
Details
11-09-2005
2.00
Cowl Trimming
Details
11-01-2005
1.00
Start Cowl
Details
10-29-2005
8.00
Finish starter wire
Details
10-29-2005
4.00
Finish engine installation
Details
10-15-2005
6.00
Finish engine wire
Details
10-09-2005
8.00
Gascolator mount
Details
10-02-2005
1.00
Mixture cable
Details
10-01-2005
5.00
Install engine
Details
09-18-2005
5.00
Installing Wing tips
Details
08-14-2005
5.00
Installing wings
Details
08-05-2005
2.00
Installing wings
Details
08-04-2005
5.00
Installing wings
Details
08-04-2005
3.00
Installing wings
Details
08-03-2005
40.00
Finish gear leg fairings and wheel pants
Details
05-22-2005
5.00
Canopy fairing
Details
05-21-2005
5.00
Aft canopy skin
Details
05-03-2005
25.00
Canopy skins
Details
05-03-2005
5.00
Canopy skins
Details
04-11-2005
5.00
Canopy Drilling
Details
03-31-2005
5.00
Cutting Canopy
Details
03-31-2005
5.00
Canopy bow
Details
03-20-2005
5.00
Canopy support system
Details
03-18-2005
5.00
Canopy forward skin
Details
03-14-2005
40.00
Canopy frame
Details
01-15-2005
10.00
Empennage Fairing
Details
12-12-2004
5.00
Empennage Fairing
Details
12-11-2004
5.00
Empennage fairing
Details
11-06-2004
20.00
Wiring
Details
11-06-2004
20.00
More wiring
11-06-2004
20.00
More wiring
07-18-2004
20.00
Rear upper skin
Details
06-29-2004
20.00
Rudder cables
Details
06-07-2004
20.00
Throttle quadrants
Details
06-07-2004
20.00
Roll cage
Details
05-24-2004
8.00
Install cockpit rails
Details
05-03-2004
20.00
Fishiishing details
Details
04-29-2004
20.00
Rivet sides
Details
04-25-2004
20.00
Skinning the fuselage frame
Details
03-01-2004
20.00
Building the fuselage frame
Details
12-23-2003
30.00
Starting fuselage
Details
11-07-2002
25.00
Building Flaps
Details
10-21-2002
25.00
Started Ailerons
Details
10-20-2002
6.00
Finish fuel tanks
Details
10-15-2002
3.00
Fuel tanks
Details
09-27-2002
3.00
Riveting top skins
Details
09-18-2002
10.00
Riveting leading edge
Details
08-08-2002
25.00
Start fuel tanks
Details
06-21-2002
5.00
Wing structure prep.
Details
06-01-2002
15.00
Nose rib assembly
Details
05-15-2002
10.00
Aligning wing assembly
Details
05-11-2002
4.00
Bell crank
Details
05-10-2002
10.00
Mount wing
Details
04-26-2002
6.00
Drilling ribs
Details
04-25-2002
8.00
Rib prep.
Details
04-20-2002
10.00
Rear spar assembly
Details
04-15-2002
6.00
F404 bulkhead assembly
Details
04-12-2002
6.00
Spar assembly
Details
04-08-2002
15.00
Spar prep.
Details
05-03-2000
5.00
Elevator Trim Tab
Details
05-01-2000
30.00
Elevators
Details
04-01-2000
25.00
Starting Rudder
Details
03-05-2000
10.00
Riveting Vertical Stab
Details
03-04-2000
5.00
Vertical Stab Frame
Details
03-03-2000
10.00
Assembling Vertical Stab
Details
03-02-2000
5.00
Vertical Spar
Details
03-01-2000
10.00
Starting Vertical Stab.
Details
02-16-2000
25.00
Skinning Horizontal
Details
02-13-2000
10.00
Horazontal Spar
Details
02-12-2000
10.00
Horazontal Spar
Details
02-10-2000
10.00
Wing Jig
Details
12-04-1999
24.00
Trip to Van's
Details
SITE NAVIGATION
Contact Builder
RV 4 Home
Category
# Logs
# Hours
All
107
1090
Cowl,Spinner and Coo
17
80
Empennage
17
168
Engine
2
10
Firewall Forward
8
42
Fuselage
31
413
Hardware
2
43
None
3
7
Painting
7
106
Shop Supplies
1
24
Wings
19
197
Copyright © 2001-2024 Matronics. All Rights Reserved.