Date
|
Hours
|
Work Log Summary
|
Details
|
01-06-2019
|
2.50
|
Pitched propellers, sanded bottom cowl
|
Details
|
|
|
01-05-2019
|
4.50
|
Propeller SB, Bottom cowl repair
|
Details
|
|
|
01-01-2019
|
5.00
|
Condition inspection
|
Details
|
|
|
12-30-2018
|
5.00
|
Stabilator Front Spar Service Bulletin
|
Details
|
|
|
12-29-2018
|
6.00
|
Stabilator Front Spar Service Bulletin
|
Details
|
|
|
12-27-2018
|
1.00
|
Stabilator Front Spar Service Bulletin
|
Details
|
|
|
12-25-2018
|
1.50
|
Stabilator Front Spar Service Bulletin
|
Details
|
|
|
12-22-2018
|
5.00
|
Stabilator Front Spar Service Bulletin
|
Details
|
|
|
12-20-2018
|
1.50
|
Horizontal Stabilator Service Bulletin
|
Details
|
|
|
12-18-2018
|
1.00
|
AST Service Bulletin
|
Details
|
|
|
12-16-2018
|
2.00
|
Anti-Servo Tab Service Bulletin
|
Details
|
|
|
07-28-2018
|
5.00
|
Silent Hektik Voltage Regulator Upgrade
|
Details
|
|
|
07-27-2018
|
1.50
|
Silent Hektik Voltage Regulator Upgrade
|
Details
|
|
|
07-26-2018
|
1.50
|
Silent Hektik Voltage Regulator Upgrade
|
Details
|
|
|
07-24-2018
|
1.50
|
Silent Hektik Voltage Regulator Upgrade
|
Details
|
|
|
07-22-2018
|
3.00
|
Upgrade to Silent Hektik Voltage Regulator
|
Details
|
|
|
07-21-2018
|
1.00
|
Replaced Transponder Antenna
|
Details
|
|
|
07-08-2018
|
2.50
|
Installed canopy gussets and new voltage regulator
|
Details
|
|
|
07-04-2018
|
1.50
|
Support frame gussets
|
Details
|
|
|
06-24-2018
|
1.50
|
Replaced Tee connector to brake reservoir
|
Details
|
|
|
04-17-2018
|
1.00
|
Work on left main wheel fairing
|
Details
|
|
|
04-15-2018
|
4.00
|
Work on wheel fairings
|
Details
|
|
|
04-14-2018
|
2.00
|
Work on right main wheel fairings
|
Details
|
|
|
04-08-2018
|
3.00
|
Work on main wheel fairings
|
Details
|
|
|
04-07-2018
|
3.00
|
Work on wheel fairings
|
Details
|
|
|
03-25-2018
|
2.00
|
Replaced brake pads
|
Details
|
|
|
03-20-2018
|
1.50
|
Installed locking fuel cap, sanded fairings
|
Details
|
|
|
03-18-2018
|
4.00
|
Trimmed wheel fairings
|
Details
|
|
|
03-17-2018
|
3.00
|
|
Details
|
|
|
03-15-2018
|
1.00
|
Installed right wheel and fairing bracket
|
Details
|
|
|
03-13-2018
|
1.50
|
Installed left wheel assembly
|
Details
|
|
|
03-11-2018
|
5.00
|
Installed fairing bracket
|
Details
|
|
|
03-10-2018
|
4.00
|
Rotated tires
|
Details
|
|
|
02-25-2018
|
2.00
|
Work on nose leg and nose wheel fairings
|
Details
|
|
|
02-24-2018
|
2.00
|
Nose leg fairing work
|
Details
|
|
|
02-19-2018
|
0.50
|
Work on nose gear leg fairing
|
Details
|
|
|
02-11-2018
|
1.50
|
Work on nose leg fairing
|
Details
|
|
|
01-28-2018
|
1.50
|
Redrilled holes in nose leg, fixed fuel leak
|
Details
|
|
|
01-20-2018
|
0.50
|
Covered holes in nose leg with epoxy
|
Details
|
|
|
01-14-2018
|
1.00
|
Work on nose leg fairing
|
Details
|
|
|
01-13-2018
|
2.00
|
Work on nose leg fairing
|
Details
|
|
|
01-01-2018
|
1.00
|
Nose leg fairing
|
Details
|
|
|
12-31-2017
|
2.50
|
Nose wheel fairing
|
Details
|
|
|
12-19-2017
|
1.00
|
Reiff Preheat system install
|
Details
|
|
|
12-17-2017
|
2.00
|
Install Reiff Preheat System
|
Details
|
|
|
12-16-2017
|
3.00
|
Installed Left Stabilator Tip Fairing
|
Details
|
|
|
12-15-2017
|
2.00
|
Installed right stabilator tip fairing
|
Details
|
|
|
12-14-2017
|
1.50
|
Installed nose wheel assembly
|
Details
|
|
|
12-13-2017
|
1.50
|
Stabilator Tip Fairing upgrade
|
Details
|
|
|
12-10-2017
|
1.00
|
Primed stabilator ribs, installed nose fork
|
Details
|
|
|
12-09-2017
|
4.00
|
Stabilator tip fairings
|
Details
|
|
|
11-23-2017
|
1.00
|
Cut opening for main gear legs in fairings
|
Details
|
|
|
11-18-2017
|
1.50
|
Radiator cover assembly
|
Details
|
|
|
11-12-2017
|
7.00
|
100 hour engine maintenance
|
Details
|
|
|
11-11-2017
|
3.00
|
100 hour engine maintenance
|
Details
|
|
|
11-05-2017
|
3.00
|
Wheel fairings
|
Details
|
|
|
11-04-2017
|
1.50
|
Wheel fairings
|
Details
|
|
|
10-29-2017
|
2.00
|
Wheel fairings
|
Details
|
|
|
10-15-2017
|
4.00
|
Work on wheel fairings
|
Details
|
|
|
10-09-2017
|
3.50
|
Work on wheel fairings
|
Details
|
|
|
10-08-2017
|
5.00
|
Work on Nose Wheel fairing
|
Details
|
|
|
10-07-2017
|
6.00
|
Nose Fork Upgrade and Wheel Fairing work
|
Details
|
|
|
10-01-2017
|
0.50
|
Worked on wheel fairings
|
Details
|
|
|
09-30-2017
|
3.00
|
Nose Fork Upgrade and wheel fairings installation
|
Details
|
|
|
06-17-2017
|
1.00
|
Prepped ADS-B 472 bracket
|
Details
|
|
|
05-14-2017
|
1.00
|
Checked wing spar play
|
Details
|
|
|
05-12-2017
|
5.00
|
Looked for fuel leaks
|
Details
|
|
|
04-15-2017
|
2.00
|
25-hour oil change
|
Details
|
|
|
03-18-2017
|
1.00
|
Squeezed left Flaperon
|
Details
|
|
|
03-16-2017
|
1.00
|
Made a radiator cover
|
Details
|
|
|
03-05-2017
|
1.00
|
Checked carburetor floats
|
Details
|
|
|
02-25-2017
|
5.00
|
Checked for fuel leak
|
Details
|
|
|
02-12-2017
|
4.00
|
Troubleshooting radio noise
|
Details
|
|
|
02-11-2017
|
1.00
|
Updated Skyview software
|
Details
|
|
|
02-05-2017
|
2.00
|
Checked the headset jacks
|
Details
|
|
|
01-22-2017
|
3.00
|
Adjusted K ratio, purged brake lines
|
Details
|
|
|
01-16-2017
|
2.00
|
Checked Landing Gear Nuts
|
Details
|
|
|
01-06-2017
|
0.50
|
Adjusted the K-value
|
Details
|
|
|
12-31-2016
|
0.50
|
Adjusted stall warning vane, Trim setup
|
Details
|
|
|
12-30-2016
|
4.00
|
Checked brake lines, placed original panel screws
|
Details
|
|
|
12-29-2016
|
5.00
|
Replaced brakelines, tightened fittings
|
Details
|
|
|
12-28-2016
|
2.00
|
Replaced more panel screws
|
Details
|
|
|
12-18-2016
|
2.00
|
Replaced Panel screws, installed fire extinguisher
|
Details
|
|
|
12-17-2016
|
1.00
|
Tightened landing gear bolts, checked for leaks
|
Details
|
|
|
12-11-2016
|
1.00
|
Tightened Canopy and Aft Window screws
|
Details
|
|
|
12-10-2016
|
1.00
|
Re-installed the Tunnel Cover
|
Details
|
|
|
12-04-2016
|
4.00
|
Fixed Fuel Return Line leak
|
Details
|
|
|
12-03-2016
|
2.00
|
Removed Cowl to check for leaks
|
Details
|
|
|
11-27-2016
|
2.00
|
Taxi tests and pre-flight inspection
|
Details
|
|
|
11-26-2016
|
4.00
|
DAR Inspection
|
Details
|
|
|
11-24-2016
|
4.00
|
Prepped aircraft for DAR inspection
|
Details
|
|
|
11-22-2016
|
1.50
|
Worked on "Squawk" items
|
Details
|
|
|
11-20-2016
|
2.50
|
|
Details
|
|
|
11-19-2016
|
1.50
|
Fix items in the "squawk" list
|
Details
|
|
|
11-18-2016
|
2.00
|
Helped A&P with initial condition inspection
|
Details
|
|
|
11-13-2016
|
3.00
|
SV Backup Battery test
|
Details
|
|
|
11-12-2016
|
2.00
|
Fuel calibration
|
Details
|
|
|
11-11-2016
|
5.50
|
Drained fuel, repositioned fuel line
|
Details
|
|
|
11-06-2016
|
5.00
|
Taxi test, brake tests, compass calibration
|
Details
|
|
|
11-05-2016
|
5.00
|
Fuel System Calibration
|
Details
|
|
|
11-04-2016
|
1.00
|
Redid Weight and Balance
|
Details
|
|
|
11-03-2016
|
2.00
|
Weight and Balance
|
Details
|
|
|
11-01-2016
|
2.00
|
Weight and Balance
|
Details
|
|
|
10-30-2016
|
6.00
|
Check carb bowls, installed all parts for W&B
|
Details
|
|
|
10-29-2016
|
7.00
|
Pneumatic carb sync, fixed low fuel pressure
|
Details
|
|
|
10-28-2016
|
5.50
|
Troubleshooting low fuel pressure
|
Details
|
|
|
10-23-2016
|
2.00
|
Setting idle speed
|
Details
|
|
|
10-19-2016
|
1.00
|
Adjusted idle speed and engine run up
|
Details
|
|
|
10-16-2016
|
1.00
|
Setting engine idle speed
|
Details
|
|
|
10-15-2016
|
3.50
|
Mechanical Carburetor synchronization
|
Details
|
|
|
10-12-2016
|
1.00
|
Riveted the Canopy Catch
|
Details
|
|
|
10-10-2016
|
2.50
|
Prepped Canopy Catch parts, did Nose Fork SB
|
Details
|
|
|
10-05-2016
|
1.50
|
Worked on SB, installed cover plates and carpet
|
Details
|
|
|
10-02-2016
|
6.00
|
Painted gear legs, installed covers and fairings
|
Details
|
|
|
10-01-2016
|
7.00
|
First Engine Start
|
Details
|
|
|
09-18-2016
|
4.00
|
Tech Counselor visit, installed tie down ring
|
Details
|
|
|
09-17-2016
|
4.00
|
Systems check, installed Wing Walk
|
Details
|
|
|
09-11-2016
|
3.00
|
Cleaned Canopy, Placard and Systems check
|
Details
|
|
|
09-10-2016
|
5.50
|
Work on right wheel assemby and Canopy
|
Details
|
|
|
09-07-2016
|
1.50
|
Worked on left wheel assemby and brake.
|
Details
|
|
|
09-05-2016
|
3.50
|
Installed Wings and Canopy
|
Details
|
|
|
09-04-2016
|
3.00
|
Covered avionics bay, fixed Fuse Pin Stoppers
|
Details
|
|
|
09-03-2016
|
4.00
|
Secured wires, installed Fuse Side Covers
|
Details
|
|
|
08-31-2016
|
0.50
|
Removed isolator washers from headphone jacks
|
Details
|
|
|
08-28-2016
|
3.00
|
Installed gasket at wing root. Worked on radio.
|
Details
|
|
|
08-27-2016
|
3.00
|
Worked on Audio and Landing Gear bolts
|
Details
|
|
|
08-23-2016
|
1.00
|
Audio wiring fixes
|
Details
|
|
|
08-21-2016
|
2.50
|
Add Wires to Radio, Checked landing gear bolts
|
Details
|
|
|
08-18-2016
|
3.00
|
Installed ELT Bracket, did hangar clean up.
|
Details
|
|
|
08-14-2016
|
3.00
|
Replaced Canopy Gas Struts, Installed Steps
|
Details
|
|
|
08-13-2016
|
2.50
|
Assebled Fuse Pins, placed placard
|
Details
|
|
|
08-07-2016
|
3.00
|
Worked on radio again, checked headset jacks
|
Details
|
|
|
08-06-2016
|
3.50
|
Painted Fuselage Pins, cleaned aircraft surfaces
|
Details
|
|
|
07-31-2016
|
3.00
|
Work on Canopy and Fairing
|
Details
|
|
|
07-30-2016
|
3.00
|
Work on Fuselage Pins and Canopy Fairing
|
Details
|
|
|
07-24-2016
|
2.00
|
More cleaning of the skins
|
Details
|
|
|
07-23-2016
|
4.00
|
Clean up of aluminum skins
|
Details
|
|
|
07-17-2016
|
4.00
|
Installed placards and cleaned the skins
|
Details
|
|
|
07-16-2016
|
6.00
|
Installed Aft Window
|
Details
|
|
|
07-09-2016
|
4.00
|
Trimmed fuel vent line, cleaned aircraft surfaces
|
Details
|
|
|
07-06-2016
|
2.50
|
Installed placards and upholstery pieces
|
Details
|
|
|
07-04-2016
|
3.50
|
Installed Data Plate, sealed Canopy Fairing
|
Details
|
|
|
07-03-2016
|
3.00
|
Work on interior, Canopy Fairing and COM
|
Details
|
|
|
07-02-2016
|
4.00
|
Fitting and installation of upholstery
|
Details
|
|
|
06-26-2016
|
2.50
|
Worked on COM radio, installed placard
|
Details
|
|
|
06-25-2016
|
3.00
|
Updated Aux Music Jack wires, place upholstery
|
Details
|
|
|
06-22-2016
|
1.00
|
Repaired a Trim wire, Check Comm radio
|
Details
|
|
|
06-20-2016
|
1.50
|
Work on new Aux Music Jack
|
Details
|
|
|
06-19-2016
|
3.00
|
Work on radio, sanded the Canopy Fairing
|
Details
|
|
|
06-18-2016
|
4.00
|
Reviewed Pre-start procedure, Canopy Fairing work
|
Details
|
|
|
06-12-2016
|
3.00
|
Connected Aux Music Jack wires, worked on ICS
|
Details
|
|
|
06-11-2016
|
3.50
|
Checked prop pitch and tracking
|
Details
|
|
|
06-08-2016
|
1.50
|
Tested fuel flow rate
|
Details
|
|
|
06-05-2016
|
3.00
|
Fuel system check, Canopy Fairing work
|
Details
|
|
|
06-04-2016
|
4.50
|
Fixed Pitot System leak, Canopy Fairing work
|
Details
|
|
|
05-30-2016
|
3.50
|
Pitot/Static system work, replaced Aux Music Jack
|
Details
|
|
|
05-29-2016
|
2.00
|
Troubleshooting Pitot System leak
|
Details
|
|
|
05-28-2016
|
3.00
|
Purged oil system, Pitot system test
|
Details
|
|
|
05-21-2016
|
2.00
|
Purging of the Oil System, New Aux Music Jack
|
Details
|
|
|
05-15-2016
|
3.00
|
Purged engine oil system
|
Details
|
|
|
05-14-2016
|
2.00
|
Put coolant in engine, work on Canopy Fairing
|
Details
|
|
|
05-13-2016
|
1.50
|
Worked on Comm and Canopy Fairing
|
Details
|
|
|
05-12-2016
|
4.00
|
Flight Controls and Systems checks
|
Details
|
|
|
05-08-2016
|
2.00
|
Updated Skyview software, did systems checks
|
Details
|
|
|
05-07-2016
|
4.00
|
Work on Trim and tested Aux Music jack
|
Details
|
|
|
05-01-2016
|
2.00
|
Troubleshooting AutoPilot modules and Trim
|
Details
|
|
|
04-30-2016
|
4.00
|
GTR 200 and ADS-B installation
|
Details
|
|
|
04-24-2016
|
4.00
|
GTR 200 Retrofit
|
Details
|
|
|
04-23-2016
|
5.50
|
Work on GTR 200 Retrofit
|
Details
|
|
|
04-17-2016
|
2.00
|
Worked on wiiring in L Fuselage, installed Nav lig
|
Details
|
|
|
04-16-2016
|
3.50
|
Fuselage and Avionics wiring correction
|
Details
|
|
|
04-10-2016
|
3.00
|
Tested Trim Servo. Removed L80 and L82 wires
|
Details
|
|
|
04-09-2016
|
3.00
|
Looking for source of short circuit
|
Details
|
|
|
04-02-2016
|
2.50
|
Still working on wiring issues
|
Details
|
|
|
03-30-2016
|
2.50
|
Reversed headset harness connections
|
Details
|
|
|
03-27-2016
|
2.00
|
Checked Left Fuselage electrical connections
|
Details
|
|
|
03-26-2016
|
2.00
|
Looking for source of short circuit
|
Details
|
|
|
03-22-2016
|
0.50
|
Check for short in Strobe Power wiring
|
Details
|
|
|
03-20-2016
|
1.50
|
Wiring checks
|
Details
|
|
|
03-19-2016
|
2.00
|
Tested wiring to look for source of short circuit
|
Details
|
|
|
03-13-2016
|
3.00
|
Checked fuselage wiring
|
Details
|
|
|
03-06-2016
|
2.50
|
Looking for short circuit
|
Details
|
|
|
03-05-2016
|
3.00
|
Systems Testing and put washers under screws
|
Details
|
|
|
02-28-2016
|
1.00
|
Put washers under canopy screws & Systems Testing
|
Details
|
|
|
02-27-2016
|
3.50
|
Updated Skyview software
|
Details
|
|
|
02-20-2016
|
1.00
|
Moved the Canopy and trimmed the fairing
|
Details
|
|
|
02-14-2016
|
2.00
|
Peeled the Canopy Fairing from the Fuselage
|
Details
|
|
|
02-13-2016
|
4.00
|
Sanded Canopy Fairing and drilled pivot holes
|
Details
|
|
|
02-06-2016
|
1.00
|
Applied UV Smooth Prime on Canopy Fairing
|
Details
|
|
|
01-24-2016
|
2.00
|
Sanded the Canopy Fairing
|
Details
|
|
|
01-10-2016
|
2.50
|
Filled low areas on the Canopy Fairing
|
Details
|
|
|
01-09-2016
|
4.00
|
Squeezed the Stabilator and Rudder
|
Details
|
|
|
01-03-2016
|
2.00
|
Squeezed Flaperons and more Canopy Fairing work
|
Details
|
|
|
01-02-2016
|
1.50
|
Work on Canopy Fairing
|
Details
|
|
|
01-01-2016
|
2.00
|
Work on Canopy Fairing
|
Details
|
|
|
12-30-2015
|
3.00
|
Sanded Canopy Fairing
|
Details
|
|
|
12-29-2015
|
4.00
|
Work on Canopy Fairing
|
Details
|
|
|
12-28-2015
|
6.00
|
Work on Canopy Fairing
|
Details
|
|
|
12-27-2015
|
3.00
|
Work on Canopy, Trimmed Flaperon skins
|
Details
|
|
|
12-20-2015
|
3.50
|
Removed old sealant & put Flox on Canopy Foams
|
Details
|
|
|
12-19-2015
|
4.00
|
Removed Canopy Fairing
|
Details
|
|
|
12-13-2015
|
4.50
|
Installed Canopy & Wings, Latch Warning work
|
Details
|
|
|
12-12-2015
|
1.00
|
Checked movement of controls and attachments
|
Details
|
|
|
12-06-2015
|
3.00
|
Installed Canopy Seals and Koger Shade
|
Details
|
|
|
12-05-2015
|
3.00
|
Installed Placards on Panels, riveted extensions
|
Details
|
|
|
11-29-2015
|
4.50
|
Installed Latch Plate and Microswitch on Roll Bar
|
Details
|
|
|
11-22-2015
|
4.00
|
Installed Fuel Tank
|
Details
|
|
|
11-21-2015
|
2.00
|
Put brake fluid in system
|
Details
|
|
|
11-15-2015
|
6.00
|
Riveted Fwd Turtle Deck Skins, painted Roll Bar
|
Details
|
|
|
11-14-2015
|
5.00
|
Re-primed the Roll Bar
|
Details
|
|
|
11-13-2015
|
3.50
|
Re-installed brake line fittings
|
Details
|
|
|
11-11-2015
|
2.00
|
Reversed orientation of CPU fans
|
Details
|
|
|
11-08-2015
|
3.00
|
Set prop pitch angle
|
Details
|
|
|
11-07-2015
|
5.00
|
Brake line bleeding, trimmed prop gap fillers
|
Details
|
|
|
11-01-2015
|
5.00
|
Installed new spar pin switch, purged brake lines
|
Details
|
|
|
10-31-2015
|
2.50
|
Spar Pin Switch Upgrade
|
Details
|
|
|
10-17-2015
|
4.00
|
Final stab cable adjustment, fuel pump noise filte
|
Details
|
|
|
10-12-2015
|
3.00
|
Installed propeller and another spacer
|
Details
|
|
|
10-11-2015
|
4.50
|
Check stab cable tension, cut spring in flap handl
|
Details
|
|
|
10-10-2015
|
3.00
|
Work on Stabilator cables
|
Details
|
|
|
10-03-2015
|
2.00
|
Fuel Vent Lines install, Tunnel Pocket trial insta
|
Details
|
|
|
09-27-2015
|
4.00
|
Work on Stab cables, shoulder harness, etc
|
Details
|
|
|
09-26-2015
|
5.00
|
Installed Stabilator and cables
|
Details
|
|
|
09-20-2015
|
3.00
|
Connected rudder cables
|
Details
|
|
|
09-19-2015
|
6.00
|
Installed Map Box, Rudder and Cables
|
Details
|
|
|
09-13-2015
|
2.50
|
Installed EFIS, AP Knobs and ADSB
|
Details
|
|
|
09-12-2015
|
6.00
|
Secured brake lines and wiring
|
Details
|
|
|
09-07-2015
|
2.00
|
Riveted holes in Fuselage and Tailcone
|
Details
|
|
|
09-06-2015
|
4.00
|
Riveted Tailcone to Fuselage
|
Details
|
|
|
09-05-2015
|
6.00
|
Replaced bolt in Torque Arm, Clecoed TC to Fuse
|
Details
|
|
|
08-30-2015
|
3.00
|
Work on flight controls
|
Details
|
|
|
08-29-2015
|
3.50
|
Applied firewall sealant to firewall penetrations
|
Details
|
|
|
08-23-2015
|
2.00
|
Firewall forward work
|
Details
|
|
|
08-22-2015
|
5.00
|
Connected Throttle and Choke cable to Carbs
|
Details
|
|
|
08-21-2015
|
2.00
|
Replaced carburetor floats
|
Details
|
|
|
08-09-2015
|
3.00
|
Installed new fuel lines and tightened fittings
|
Details
|
|
|
08-08-2015
|
1.50
|
Fabricated new fuel line
|
Details
|
|
|
08-02-2015
|
3.00
|
Work on SV AP Knob Panel and wire harnesses
|
Details
|
|
|
08-01-2015
|
4.00
|
Work on the Canopy Latch
|
Details
|
|
|
07-26-2015
|
2.00
|
Changed AP Disconnect Switch
|
Details
|
|
|
07-25-2015
|
3.50
|
Check cylinder heads, disconnected Fuel Rtn Assy
|
Details
|
|
|
07-19-2015
|
2.00
|
Redid the Fuel Return Line Aft
|
Details
|
|
|
07-18-2015
|
3.00
|
Work on Wing electrical connector & Fuel vent line
|
Details
|
|
|
07-12-2015
|
3.00
|
Electrical work on ELT, wings and headsets
|
Details
|
|
|
07-11-2015
|
4.00
|
Fuel Tank Vent Modification, checked Emp. bolts
|
Details
|
|
|
07-05-2015
|
3.00
|
Installed safety belts and anti-abrasion strip
|
Details
|
|
|
07-04-2015
|
3.50
|
Work on Baggage Bulkhead, TC, N14-05-14
|
Details
|
|
|
07-03-2015
|
5.00
|
Baggage Bulkhead Corrugation and AOA mods
|
Details
|
|
|
06-29-2015
|
2.00
|
Baggage Bulkhead Corrugation modification
|
Details
|
|
|
06-28-2015
|
4.00
|
Baggage Bulkhead, Aft Floor and AOA mods
|
Details
|
|
|
06-27-2015
|
5.00
|
Riveted the doublers to the wings, ADAHRS wiring
|
Details
|
|
|
06-24-2015
|
1.50
|
Prepped the doublers for riveting
|
Details
|
|
|
06-22-2015
|
2.00
|
Wing skin/spar flange rivet wear SB
|
Details
|
|
|
06-21-2015
|
2.00
|
Work on the Rudder Cables
|
Details
|
|
|
06-20-2015
|
3.00
|
Work on Rudder Cables
|
Details
|
|
|
06-14-2015
|
5.00
|
Work on flight controls, rudder
|
Details
|
|
|
06-13-2015
|
4.00
|
Work on cooling system, empennage & glare shield
|
Details
|
|
|
06-11-2015
|
1.50
|
Installed shroud hose, repositioned oil cooler
|
Details
|
|
|
05-31-2015
|
1.50
|
Fitting the Bottom Cowl and Oil Cooler
|
Details
|
|
|
05-30-2015
|
5.00
|
Placed heat shield on cow, installed oil hoses
|
Details
|
|
|
05-25-2015
|
4.00
|
Autopilot knob installation work
|
Details
|
|
|
05-24-2015
|
2.00
|
Work on SV Autopilot knob installation
|
Details
|
|
|
05-23-2015
|
7.00
|
Installed heat shield and Trim Tab. AP knob work
|
Details
|
|
|
05-21-2015
|
1.00
|
Made templates for Cowl Bottom heat shields
|
Details
|
|
|
05-19-2015
|
1.50
|
Attached Cowl Duct Seal
|
Details
|
|
|
05-17-2015
|
3.50
|
Work on Cooling Duct and Throttle & Choke cables
|
Details
|
|
|
05-16-2015
|
4.00
|
Work on cooling system, throttle and choke cables
|
Details
|
|
|
05-10-2015
|
4.00
|
Epoxied the Cooling Duct and Interface to the Cowl
|
Details
|
|
|
05-09-2015
|
2.00
|
Installed Trim Tab
|
Details
|
|
|
04-26-2015
|
1.50
|
More work on the cooling duct and interface
|
Details
|
|
|
04-19-2015
|
4.00
|
Work on the Cooling Duct and Cowl Interface
|
Details
|
|
|
04-12-2015
|
5.00
|
Work on cooling system
|
Details
|
|
|
02-28-2015
|
3.00
|
Work on the aft fuel lines and fittings
|
Details
|
|
|
02-15-2015
|
2.00
|
New Bearing Bracket Brace SB
|
Details
|
|
|
02-02-2015
|
0.50
|
Primed and riveted Bracket Brace and Angles.
|
Details
|
|
|
01-24-2015
|
3.00
|
Bearing Bracket Brace Service Bulletin
|
Details
|
|
|
01-11-2015
|
2.00
|
Trimmed Drain Hose and Vent Tube, checked SV
|
Details
|
|
|
01-10-2015
|
4.00
|
Pitot Interconnect, Cooler Cable & Prop Spacer wor
|
Details
|
|
|
01-04-2015
|
4.00
|
Relocated Regulator, Redo of Cable to Cooler Door
|
Details
|
|
|
01-03-2015
|
6.50
|
Cooling system work, rectifier reposition
|
Details
|
|
|
12-23-2014
|
3.00
|
Work on Cooler Box cable & Secured brake lines
|
Details
|
|
|
12-22-2014
|
3.00
|
Installed Radiator and Seal Face
|
Details
|
|
|
12-21-2014
|
5.00
|
Installed Oil Tank Assembly and Overflow Bottle
|
Details
|
|
|
12-20-2014
|
3.50
|
Installed Cowl Oil Door and new throttle springs
|
Details
|
|
|
12-14-2014
|
3.00
|
Work on the Cowl Cooling Duct & Oil Cooler
|
Details
|
|
|
12-13-2014
|
1.00
|
Trimmed Cowl Cooling Duct
|
Details
|
|
|
11-30-2014
|
1.50
|
Work on Radiator positioning
|
Details
|
|
|
11-29-2014
|
8.00
|
Work on Cooling System
|
Details
|
|
|
11-23-2014
|
1.50
|
Painted Cooling System parts
|
Details
|
|
|
11-22-2014
|
6.00
|
Work on Cooling System
|
Details
|
|
|
11-21-2014
|
1.50
|
Work on Cooler Box Assembly
|
Details
|
|
|
11-16-2014
|
3.00
|
Work on Bottom Cowl Close-Out
|
Details
|
|
|
11-15-2014
|
6.00
|
Cowling and Cooling System work
|
Details
|
|
|
11-09-2014
|
1.50
|
Riveted the Upper Cowl Hinges
|
Details
|
|
|
11-08-2014
|
5.50
|
Work on Cowling
|
Details
|
|
|
11-02-2014
|
3.00
|
Cowling work
|
Details
|
|
|
11-01-2014
|
8.00
|
Work on Spinner and Cowling
|
Details
|
|
|
10-31-2014
|
0.50
|
Primed spinner plates
|
Details
|
|
|
10-14-2014
|
5.50
|
Work on Exhaust System
|
Details
|
|
|
10-13-2014
|
6.50
|
Riveted nutplates to spinner parts
|
Details
|
|
|
10-11-2014
|
5.00
|
Positioned spinner and drilled holes into plates
|
Details
|
|
|
09-28-2014
|
2.50
|
Installed Exhaust System, trimmed gap fillers
|
Details
|
|
|
09-27-2014
|
6.00
|
Worked on Pitot, Spinner and Prop
|
Details
|
|
|
09-14-2014
|
2.00
|
Finished making 2 saw horses
|
Details
|
|
|
09-13-2014
|
4.50
|
Trimmed inboard wing skins.
|
Details
|
|
|
08-23-2014
|
4.00
|
Final-drilled holes in Flaperon Torque Arms & Tube
|
Details
|
|
|
08-22-2014
|
2.00
|
Drilled hoes in Flaperon Torque Tubes
|
Details
|
|
|
08-17-2014
|
2.50
|
Positioned Flaperon Torque Tubes for drilling
|
Details
|
|
|
08-16-2014
|
4.00
|
Torqued engine mt. bolts, FWF wiring & plumbing
|
Details
|
|
|
07-27-2014
|
4.00
|
FWF wiring and plumbing
|
Details
|
|
|
07-26-2014
|
5.50
|
Hung Rotax 912 ULS
|
Details
|
|
|
07-05-2014
|
2.00
|
Canopy latch switch retrofit
|
Details
|
|
|
07-04-2014
|
5.50
|
Installed ADAHRS stiffener, drilled holes for engi
|
Details
|
|
|
06-30-2014
|
0.50
|
Prepped ADAHRS Stiffener
|
Details
|
|
|
06-22-2014
|
3.00
|
Wiring for canopy latch. Drilled hole for engine m
|
Details
|
|
|
06-21-2014
|
5.50
|
Installed cooling shroud and drip trays
|
Details
|
|
|
06-20-2014
|
4.00
|
Installed Engine Mount Ring & canopy latch wiring
|
Details
|
|
|
06-11-2014
|
0.50
|
Painted the drip trays
|
Details
|
|
|
05-31-2014
|
4.00
|
Assembled Drip Trays
|
Details
|
|
|
05-26-2014
|
2.50
|
Work on cooling shroud and drip trays
|
Details
|
|
|
05-25-2014
|
5.50
|
Engine cooling shroud work
|
Details
|
|
|
05-24-2014
|
4.00
|
Started work on Rotax 912 ULS
|
Details
|
|
|
04-05-2014
|
2.00
|
FWF wiring, EAA Tech Counselor visit
|
Details
|
|
|
04-03-2014
|
4.00
|
Firewall forward wiring
|
Details
|
|
|
04-02-2014
|
1.00
|
Work on EGT, FWF and Power wiring
|
Details
|
|
|
03-16-2014
|
1.50
|
Installed battery and other electrical parts
|
Details
|
|
|
03-15-2014
|
2.00
|
More work on cowling and started work on FWF
|
Details
|
|
|
03-12-2014
|
1.00
|
Primed the Fuel Tank and the Neck
|
Details
|
|
|
03-02-2014
|
3.50
|
Drilled holes in Top Cowl and sanded edges
|
Details
|
|
|
03-01-2014
|
4.00
|
Work on cowl hinges
|
Details
|
|
|
02-28-2014
|
4.50
|
More work on cowling
|
Details
|
|
|
02-27-2014
|
7.00
|
Work on cowling and inventoried parts
|
Details
|
|
|
02-26-2014
|
2.50
|
Inventoried Firewall Fwd parts
|
Details
|
|
|
02-19-2014
|
1.00
|
Retested fuel tank for leaks
|
Details
|
|
|
02-18-2014
|
0.50
|
Firewall Forward kit arrived
|
Details
|
|
|
02-16-2014
|
1.50
|
Fuel tank leak test
|
Details
|
|
|
02-09-2014
|
2.50
|
Assembled a tool cart
|
Details
|
|
|
02-08-2014
|
2.00
|
Completed service bulletins for fuel tank
|
Details
|
|
|
01-25-2014
|
1.50
|
Fuel tank vent modification
|
Details
|
|
|
01-20-2014
|
5.50
|
Installed Fuel Tank Vent, Gauge and nutplates
|
Details
|
|
|
01-19-2014
|
5.00
|
Fuel Tank Attach Modification
|
Details
|
|
|
01-18-2014
|
4.00
|
Fuel Tank Attach Modification
|
Details
|
|
|
01-01-2014
|
1.50
|
Fuel Tank Mods work
|
Details
|
|
|
12-29-2013
|
4.00
|
Fuel Tank Modifications
|
Details
|
|
|
12-22-2013
|
4.50
|
Work on Fuel Tank mods and Cowl Hinges
|
Details
|
|
|
12-21-2013
|
1.50
|
Work on Cowl, Hinge Pins and Fuel Tank parts
|
Details
|
|
|
12-20-2013
|
1.50
|
Made 2 Hinge Pins and prepped Fuel Tank for mods
|
Details
|
|
|
12-01-2013
|
4.00
|
Work on Cowl and Hinge Pins
|
Details
|
|
|
11-30-2013
|
1.50
|
Work on Top Cowl
|
Details
|
|
|
11-24-2013
|
1.50
|
Prepped Oil Door and hinge parts, and rudder links
|
Details
|
|
|
11-23-2013
|
1.00
|
Reinstalled ELT remote switch
|
Details
|
|
|
11-22-2013
|
6.00
|
Installed AP Pitch Servo, Intercom & ELT Remote sw
|
Details
|
|
|
11-21-2013
|
4.00
|
Installed Flaperon Pushrod Assembly and AP Servo
|
Details
|
|
|
11-11-2013
|
4.00
|
Installed Flap/Pushrod & Ctrl Stick Pushrod Assemb
|
Details
|
|
|
11-03-2013
|
3.00
|
Installed Skyview Display and GPS antenna
|
Details
|
|
|
11-02-2013
|
5.00
|
ADS-B upgrade, installed other avionics
|
Details
|
|
|
10-20-2013
|
2.50
|
ADS-B Upgrade
|
Details
|
|
|
10-19-2013
|
5.00
|
ADS-B Upgrade
|
Details
|
|
|
10-08-2013
|
4.50
|
Drilled holes in Canopy Fairing, assembled latch
|
Details
|
|
|
09-29-2013
|
2.00
|
Glued the Canopy Fairing to the Fuselage
|
Details
|
|
|
09-28-2013
|
0.50
|
Sanded the canopy foams some more
|
Details
|
|
|
09-25-2013
|
0.50
|
Sanded the Canopy Foams
|
Details
|
|
|
09-22-2013
|
4.00
|
Trimmed Canopy Fairing
|
Details
|
|
|
09-21-2013
|
3.50
|
Scuffed canopy and skirt, marked fairing for trimm
|
Details
|
|
|
09-07-2013
|
3.00
|
Trial fit of Canopy Latch, riveted Latch Block
|
Details
|
|
|
09-02-2013
|
2.00
|
Shaped the Canopy Foams
|
Details
|
|
|
09-01-2013
|
4.00
|
Trimmed the Canopy Foams and glued to the Frame
|
Details
|
|
|
08-31-2013
|
5.00
|
Installed Canopy, Skirts, Guide Plates & Latch Han
|
Details
|
|
|
08-30-2013
|
1.00
|
Filed Aft Window edges, shaped Canopy Handle
|
Details
|
|
|
08-24-2013
|
3.00
|
Primed and painted the Canopy Frame
|
Details
|
|
|
08-23-2013
|
3.00
|
Canopy work
|
Details
|
|
|
08-20-2013
|
0.50
|
Primed and painted Turtle Deck Skins
|
Details
|
|
|
08-19-2013
|
0.50
|
Deburred Turtle Deck Skins
|
Details
|
|
|
08-18-2013
|
2.00
|
Canopy work
|
Details
|
|
|
08-12-2013
|
4.00
|
More Canopy work.
|
Details
|
|
|
08-04-2013
|
3.50
|
Tapped holes in Roll Bar and filed the Canopy
|
Details
|
|
|
08-03-2013
|
4.00
|
Tailcone and Canopy work
|
Details
|
|
|
07-28-2013
|
5.00
|
More Canopy work
|
Details
|
|
|
07-27-2013
|
5.00
|
Canopy work
|
Details
|
|
|
07-21-2013
|
2.00
|
Canopy and Instrument Panel work
|
Details
|
|
|
07-20-2013
|
4.50
|
Canopy, Instrument Panel and Avionics work
|
Details
|
|
|
07-08-2013
|
0.50
|
Added wire to COM wiring harness
|
Details
|
|
|
07-04-2013
|
3.00
|
Replaced Servo and Trim Wire pins
|
Details
|
|
|
06-30-2013
|
3.50
|
Avionics wiring and installation
|
Details
|
|
|
06-29-2013
|
5.50
|
Canopy frame work and avionics wiring
|
Details
|
|
|
06-23-2013
|
4.50
|
Work on Canopy Frame
|
Details
|
|
|
06-22-2013
|
5.00
|
Avionics wiring and completion of Stiffener Retrof
|
Details
|
|
|
06-19-2013
|
3.00
|
Stiffener Retrofit work
|
Details
|
|
|
06-16-2013
|
4.00
|
Firewall Stiffener retrofit and APDC wiring work
|
Details
|
|
|
06-15-2013
|
6.00
|
Stiffener Retrofit
|
Details
|
|
|
05-30-2013
|
3.00
|
Revised Autopilot wiring
|
Details
|
|
|
05-27-2013
|
3.00
|
Worked on ADAHRS and Autopilot wiring
|
Details
|
|
|
05-26-2013
|
3.00
|
Work on Wing Electrical Interconnector Update
|
Details
|
|
|
05-25-2013
|
4.00
|
Work on Dynon SV wiring upgrade
|
Details
|
|
|
05-06-2013
|
0.50
|
Primed and painted the MOD Rib
|
Details
|
|
|
05-05-2013
|
3.00
|
Installed Over Rudder Wireway
|
Details
|
|
|
05-04-2013
|
5.00
|
Oil tank mount bracket SB and wiring
|
Details
|
|
|
04-14-2013
|
4.50
|
Worked on electrical wiring
|
Details
|
|
|
04-13-2013
|
2.50
|
Tightened axle nuts and Nose Fork Assembly
|
Details
|
|
|
03-17-2013
|
2.50
|
Drilled hole in Firewall and tapped holes in Nose
|
Details
|
|
|
03-16-2013
|
5.50
|
Fabricated Caliper Brake Lines
|
Details
|
|
|
03-10-2013
|
3.50
|
Installed main wheels, nose gear and anti-rotation
|
Details
|
|
|
03-09-2013
|
5.00
|
Bolted main gear axles, installed nose gear
|
Details
|
|
|
02-24-2013
|
4.00
|
Riveted right side skin doublers, attached right g
|
Details
|
|
|
02-23-2013
|
5.00
|
Riveted left side skin doublers and attached left
|
Details
|
|
|
02-18-2013
|
4.00
|
Landing gear modification and more
|
Details
|
|
|
02-17-2013
|
4.00
|
Landing gear modification
|
Details
|
|
|
02-16-2013
|
3.00
|
Landing Gear modification
|
Details
|
|
|
02-02-2013
|
5.50
|
Landing gear modification
|
Details
|
|
|
02-01-2013
|
1.00
|
Worked on landing gear mod parts
|
Details
|
|
|
01-28-2013
|
1.50
|
Primed Side Skin Doublers and Stiffener angles
|
Details
|
|
|
01-27-2013
|
4.50
|
Landing gear modification
|
Details
|
|
|
01-26-2013
|
2.50
|
Landing Gear modification
|
Details
|
|
|
01-01-2013
|
4.00
|
Landing Gear modification
|
Details
|
|
|
12-22-2012
|
3.50
|
Work on Skyview wiring upgrade and SB 12-11-09
|
Details
|
|
|
12-09-2012
|
4.00
|
Replaced aft fuel return line, worked on avionics
|
Details
|
|
|
12-08-2012
|
5.00
|
Finished righ wing wiring upgrade, changed fuel li
|
Details
|
|
|
11-25-2012
|
5.00
|
Right wing wiring upgrade
|
Details
|
|
|
11-24-2012
|
6.00
|
Wing wiring upgrade
|
Details
|
|
|
11-22-2012
|
2.50
|
Installing new wing wires
|
Details
|
|
|
11-18-2012
|
4.50
|
Reinstalled Pushrod Assembly, etc
|
Details
|
|
|
11-17-2012
|
2.50
|
Crimped Molex sockets to AP Servos, etc
|
Details
|
|
|
11-16-2012
|
0.50
|
Primed Parts
|
Details
|
|
|
11-11-2012
|
2.50
|
Installed OAT Probe and ADAHRS
|
Details
|
|
|
11-10-2012
|
5.00
|
Fabricated Servo Pushrod Assemblies, Static line w
|
Details
|
|
|
11-09-2012
|
1.00
|
Primed parts and riveted nutplates
|
Details
|
|
|
11-07-2012
|
1.50
|
Worked on Rudder Pedal Access Covers
|
Details
|
|
|
11-01-2012
|
0.50
|
Drilled out rivets from map box door
|
Details
|
|
|
10-28-2012
|
4.50
|
Installed ELT and put spacers to Flaperon Torque T
|
Details
|
|
|
10-27-2012
|
5.00
|
Installed Servo Trim Wire Upgrade
|
Details
|
|
|
10-26-2012
|
6.00
|
Instrument Panel and Map Box work
|
Details
|
|
|
10-08-2012
|
3.50
|
Fitted and trimmed Flap Handle Tube, etc
|
Details
|
|
|
10-07-2012
|
6.00
|
Fabricated flight control parts
|
Details
|
|
|
10-06-2012
|
3.00
|
Installed the Flap Handle/Pushrod Assembly
|
Details
|
|
|
10-05-2012
|
1.00
|
Riveted Flap Handle Forks and Flap Detent parts
|
Details
|
|
|
10-04-2012
|
1.00
|
Drilled holes in the Flap Detent Angle
|
Details
|
|
|
10-03-2012
|
1.00
|
Drilled holes in the the Map Box Door and hinge
|
Details
|
|
|
09-27-2012
|
0.50
|
Primed the Tunnel Pocket parts
|
Details
|
|
|
09-26-2012
|
1.00
|
Painted map box and POH tray
|
Details
|
|
|
09-23-2012
|
4.50
|
Work on map box, POH tray & tunnel pocket
|
Details
|
|
|
09-22-2012
|
5.50
|
Installed new Inst and Com Supports, did other wor
|
Details
|
|
|
09-20-2012
|
1.00
|
Work on Flap control parts
|
Details
|
|
|
09-19-2012
|
1.00
|
Work on Servo upgrade and Instrument Panels
|
Details
|
|
|
09-17-2012
|
1.00
|
Work on hardware for Skyview upgrade
|
Details
|
|
|
09-05-2012
|
0.50
|
Primed New Servo Tray and Com Supports
|
Details
|
|
|
08-30-2012
|
2.00
|
Riveted nutplates to Inst Stack Angles
|
Details
|
|
|
08-29-2012
|
2.50
|
New inst stack angles and ADAHRS bracket work
|
Details
|
|
|
08-27-2012
|
2.00
|
Inventoried Avionics Kit
|
Details
|
|
|
08-26-2012
|
5.00
|
Modifications for Skyview upgrade
|
Details
|
|
|
08-12-2012
|
3.00
|
TC Fairing work and installed Brake Reservoir
|
Details
|
|
|
08-11-2012
|
5.00
|
Installed nutplates to TC and installed Servo
|
Details
|
|
|
07-29-2012
|
4.50
|
Work on Tail Cone Fairings
|
Details
|
|
|
07-08-2012
|
6.00
|
More work on the Tailcone Fairings
|
Details
|
|
|
07-04-2012
|
6.00
|
Work on Tailcone Fairings
|
Details
|
|
|
07-02-2012
|
1.50
|
Filed the edges of the Tailcone Fairings
|
Details
|
|
|
07-01-2012
|
3.00
|
Worked on the Tailcone Fairings.
|
Details
|
|
|
06-17-2012
|
3.00
|
Attached the AST assemblies to the Stabilator
|
Details
|
|
|
06-11-2012
|
3.00
|
Made the Flap Handle/Pushrod Assembly
|
Details
|
|
|
06-02-2012
|
4.00
|
Built a shelving unit and cleaned hangar
|
Details
|
|
|
05-28-2012
|
5.00
|
Worked on spar opening, cart assembly, shop organi
|
Details
|
|
|
05-02-2012
|
4.50
|
Trial installed the Wings and installed the Flaper
|
Details
|
|
|
03-25-2012
|
1.00
|
Torqued the bolts and installed the brake discs
|
Details
|
|
|
03-24-2012
|
2.00
|
Installed tire on second main wheel
|
Details
|
|
|
02-06-2012
|
2.50
|
Installed tire on one main wheel
|
Details
|
|
|
01-22-2012
|
24.00
|
Assembled workbench, unpacked tools and parts
|
Details
|
|
|
12-28-2011
|
6.00
|
Unloaded airplane into hangar and fitted the wings
|
Details
|
|
|
12-26-2011
|
5.00
|
Loaded aircraft in UHaul truck
|
Details
|
|
|
12-21-2011
|
1.50
|
Assembled nosewheel
|
Details
|
|
|
11-23-2011
|
2.00
|
Worked on Flaperon Mixer Bellcrank and brackets
|
Details
|
|
|
11-22-2011
|
0.50
|
Prepped wireway and ELT brackets
|
Details
|
|
|
11-17-2011
|
1.50
|
Work on bushings of control sticks
|
Details
|
|
|
11-12-2011
|
3.00
|
Work on control sticks
|
Details
|
|
|
11-09-2011
|
1.00
|
Replaced auxiliary audio output jack
|
Details
|
|
|
11-08-2011
|
1.00
|
Installed auxiliary audio output jack
|
Details
|
|
|
11-03-2011
|
2.00
|
Installed PTT switches in control sticks
|
Details
|
|
|
10-31-2011
|
1.00
|
Worked on the control stick hand grips
|
Details
|
|
|
10-29-2011
|
3.00
|
Installed headset jacks and power outlet
|
Details
|
|
|
10-26-2011
|
1.50
|
Work on optional harness, Reed switches and pins
|
Details
|
|
|
10-25-2011
|
2.00
|
Work on Reed switches and Spar Pins
|
Details
|
|
|
10-24-2011
|
1.50
|
More work on Reed switches
|
Details
|
|
|
10-23-2011
|
2.00
|
Installed Reed switches
|
Details
|
|
|
10-10-2011
|
2.00
|
Wired the Fuel Pump
|
Details
|
|
|
10-09-2011
|
4.00
|
Installed Tunnel Harness
|
Details
|
|
|
09-18-2011
|
3.00
|
Routed cables from panel to center section
|
Details
|
|
|
09-13-2011
|
1.00
|
Replaced the epoxy in the Pin Stoppers
|
Details
|
|
|
09-12-2011
|
1.00
|
Work on Fuselage Pins
|
Details
|
|
|
08-13-2011
|
1.50
|
More parts inventory
|
Details
|
|
|
08-09-2011
|
0.50
|
Inventory of Subkit #3
|
Details
|
|
|
08-07-2011
|
1.00
|
Inventory of Subkit #4 and hardware bag
|
Details
|
|
|
07-30-2011
|
1.00
|
Started inventory of Finishing Kit
|
Details
|
|
|
07-28-2011
|
0.50
|
Finishing Kit arrives
|
Details
|
|
|
07-18-2011
|
1.50
|
Installed Oil Tank an Battery Mount Braces
|
Details
|
|
|
07-16-2011
|
1.50
|
Applied new sealant to the Firewall
|
Details
|
|
|
07-11-2011
|
0.50
|
Visit by EAA Tech Counselor
|
Details
|
|
|
07-04-2011
|
0.50
|
Removed the Upper Fwd Fuse Skin
|
Details
|
|
|
07-03-2011
|
1.00
|
Trial fit of the Upper Fwd Fuse Skin
|
Details
|
|
|
07-02-2011
|
5.00
|
Prepped the Upper Fwd Fuse Skin & other parts
|
Details
|
|
|
06-28-2011
|
1.00
|
Sealed the Canopy Rib bottoms
|
Details
|
|
|
06-27-2011
|
2.00
|
Riveted Panel Base Assembly & applied sealant
|
Details
|
|
|
06-26-2011
|
5.00
|
Installed nutplates to Panel Base, Canopy Ribs, et
|
Details
|
|
|
06-25-2011
|
6.00
|
Match-drilled holes in Longeron and Strut Angles
|
Details
|
|
|
06-24-2011
|
0.50
|
Trial fit of Panel Base and Canopy Ribs
|
Details
|
|
|
06-23-2011
|
1.50
|
Work on Strut Attach Angle and Canopy Doublers
|
Details
|
|
|
06-22-2011
|
1.00
|
Worked on Strut Attach Angles
|
Details
|
|
|
06-21-2011
|
2.00
|
Countersinked and Dimpled parts
|
Details
|
|
|
06-20-2011
|
2.00
|
Prepared upper fuse parts
|
Details
|
|
|
06-19-2011
|
1.00
|
Installed Mid Cowl Hinges and Skin Stiffeners
|
Details
|
|
|
06-18-2011
|
2.50
|
Prepped Mid Cowl Hinges and Fwd Skin Stiffeners
|
Details
|
|
|
06-15-2011
|
2.00
|
Riveted Firewall Upper to the Firewall Shelf
|
Details
|
|
|
06-14-2011
|
2.00
|
Riveted the Cowl Hinges to the Doubler
|
Details
|
|
|
06-13-2011
|
2.00
|
Match-drilled Cowl Hinges
|
Details
|
|
|
06-12-2011
|
5.00
|
Woked on Firewall Upper
|
Details
|
|
|
06-11-2011
|
3.50
|
Put brass insert in brake line & moved airplane pa
|
Details
|
|
|
06-07-2011
|
1.50
|
Installed fittings to brake lines
|
Details
|
|
|
05-30-2011
|
2.00
|
Made the Fuel Return Line Fwd
|
Details
|
|
|
05-29-2011
|
2.00
|
Made the F-1259H Fuel Return Line Aft
|
Details
|
|
|
05-27-2011
|
1.00
|
Redid the F-1259E Fuel Line
|
Details
|
|
|
05-26-2011
|
0.50
|
Repositioned the brake lines in the tunnel
|
Details
|
|
|
05-25-2011
|
1.00
|
Fabricated the Fuel Line Pump-Valve
|
Details
|
|
|
05-24-2011
|
0.50
|
Installed Bulkhead Fitting.
|
Details
|
|
|
05-22-2011
|
2.00
|
More fuel line work
|
Details
|
|
|
05-21-2011
|
4.00
|
Worked on fuel lines, gascolator & fuel flow meter
|
Details
|
|
|
05-19-2011
|
2.00
|
Worked on Fuel Valve parts
|
Details
|
|
|
05-18-2011
|
2.00
|
Work on Fuel System parts
|
Details
|
|
|
05-15-2011
|
4.00
|
Made the Main and Reservoir Brake Lines
|
Details
|
|
|
05-14-2011
|
2.00
|
Installed the brass elbows to the master cylinders
|
Details
|
|
|
05-13-2011
|
1.50
|
Prepared brake lines
|
Details
|
|
|
05-10-2011
|
2.00
|
Installed Rudder Pedal Assembly to Firewall Shelf
|
Details
|
|
|
05-09-2011
|
5.00
|
Worked on Rudder Pedal Assembly
|
Details
|
|
|
05-08-2011
|
1.00
|
Started work on the Rudder Pedal & Brake System
|
Details
|
|
|
05-01-2011
|
1.00
|
Painted the Seatback Assemblies
|
Details
|
|
|
04-30-2011
|
2.50
|
Riveted the other Seatback Assembly
|
Details
|
|
|
04-29-2011
|
1.00
|
Primed Seatback parts and did some riveting
|
Details
|
|
|
04-28-2011
|
1.50
|
Riveted one Seatback
|
Details
|
|
|
04-27-2011
|
1.50
|
Primed the Seatback parts
|
Details
|
|
|
04-26-2011
|
2.00
|
Made more Seatback Hinges
|
Details
|
|
|
04-25-2011
|
1.50
|
Fabricated Seatback Hinges
|
Details
|
|
|
04-23-2011
|
2.00
|
Prepared Seatback parts
|
Details
|
|
|
04-21-2011
|
0.50
|
Riveted left Support Frame
|
Details
|
|
|
04-20-2011
|
2.00
|
Riveted Bulkhead Assembly and Roll Bar Brace
|
Details
|
|
|
04-19-2011
|
2.00
|
Riveted Baggage Bulkheads Assembly
|
Details
|
|
|
04-18-2011
|
0.50
|
Painted Bulkheads and Attach Angle
|
Details
|
|
|
04-17-2011
|
1.50
|
Match-drilled the Shear Clips
|
Details
|
|
|
04-16-2011
|
2.00
|
Installed Cockpit Light and riveted Roll Bar
|
Details
|
|
|
04-14-2011
|
1.50
|
Painted the Roll Bar Assembly
|
Details
|
|
|
04-13-2011
|
0.50
|
Installed Roll Bar Braces and spliced cockpit wire
|
Details
|
|
|
04-10-2011
|
4.00
|
Riveted the Roll Bar Assembly
|
Details
|
|
|
04-09-2011
|
6.00
|
Work on Roll Bar Assembly parts
|
Details
|
|
|
04-07-2011
|
1.00
|
Attached Roll Bar Bases
|
Details
|
|
|
04-05-2011
|
1.50
|
Countersinked holes in the Roll Bar Frames
|
Details
|
|
|
04-04-2011
|
1.00
|
Worked on the baggage bulkheads and angles
|
Details
|
|
|
03-30-2011
|
1.00
|
More deburring of Roll Bar parts.
|
Details
|
|
|
03-29-2011
|
1.50
|
Deburred Roll Bar parts
|
Details
|
|
|
03-28-2011
|
3.00
|
Final-drilled holes in the Roll Bar Frames
|
Details
|
|
|
03-26-2011
|
1.50
|
Started work on Roll Bar Assembly
|
Details
|
|
|
03-20-2011
|
2.00
|
Riveted Lwr Cowl Hinges
|
Details
|
|
|
03-19-2011
|
9.00
|
Fabricated Vent parts and cowl hinges
|
Details
|
|
|
03-17-2011
|
2.50
|
Riveted right Fuse Side Skin and other parts
|
Details
|
|
|
03-16-2011
|
1.50
|
Worked on the right side of fuselage
|
Details
|
|
|
03-15-2011
|
1.00
|
Prepped the Skin Stiffeners
|
Details
|
|
|
03-13-2011
|
2.00
|
Finished riveting left Fuse Side Skin
|
Details
|
|
|
03-12-2011
|
5.00
|
Painted Fuse Skins and inside of Fuselage
|
Details
|
|
|
02-26-2011
|
5.00
|
More prep work on the Fuselage Side Skins
|
Details
|
|
|
02-25-2011
|
9.00
|
Fuse Side Skins prep and Longeron match-drilling
|
Details
|
|
|
02-24-2011
|
1.50
|
Riveted Bulkhead Side Channels
|
Details
|
|
|
02-21-2011
|
3.00
|
Primed Arm Rests, Bulkhead Side Channels, etc
|
Details
|
|
|
02-20-2011
|
1.50
|
Prepped Fuselage parts
|
Details
|
|
|
02-19-2011
|
8.00
|
Match-drilled Longerons and worked on other parts
|
Details
|
|
|
02-15-2011
|
1.50
|
More work on the Right Longeron
|
Details
|
|
|
02-14-2011
|
1.00
|
Work on Right Longeron
|
Details
|
|
|
02-12-2011
|
1.50
|
Continued work on the Left Longeron
|
Details
|
|
|
02-07-2011
|
1.50
|
Work on the Left Longeron
|
Details
|
|
|
01-29-2011
|
2.50
|
Joined the Fwd Fuse and Mid Fuse Assemblies
|
Details
|
|
|
01-24-2011
|
1.50
|
Installed the System Block Studs to the Bottom Ski
|
Details
|
|
|
01-20-2011
|
6.00
|
Installed the Firewall Shelf and Flo-Scan Bracket
|
Details
|
|
|
01-17-2011
|
1.00
|
Riveted Cowl Attach Plates to the Fuse Assembly
|
Details
|
|
|
01-16-2011
|
3.00
|
Riveted the Firewall Bottom and Fwd Fuse Skins
|
Details
|
|
|
01-15-2011
|
8.00
|
Work on Fwd Lower Fuselage Tunnel Assembly
|
Details
|
|
|
01-13-2011
|
0.50
|
Tried to install systems block studs
|
Details
|
|
|
01-12-2011
|
1.50
|
Riveted Autopilot Servo Brackets and Angles
|
Details
|
|
|
01-10-2011
|
4.00
|
Riveted Step Angles and Bulkhead
|
Details
|
|
|
01-09-2011
|
1.00
|
Match-drilled holes for the Left Step
|
Details
|
|
|
01-02-2011
|
2.50
|
Prepped Fwd Lower Fuselage parts
|
Details
|
|
|
01-01-2011
|
2.00
|
Prepped Fwd Lower Fuselage parts
|
Details
|
|
|
12-31-2010
|
0.50
|
Located fuselage parts
|
Details
|
|
|
12-26-2010
|
3.00
|
Match-drilled the Step Attach Angles
|
Details
|
|
|
12-24-2010
|
5.00
|
Made workbench smaller
|
Details
|
|
|
12-24-2010
|
2.00
|
Completed riveting the Bottom Skin
|
Details
|
|
|
12-23-2010
|
4.00
|
Riveted Doublers, Stiffeners and Bottom Skin
|
Details
|
|
|
12-22-2010
|
2.00
|
Removed the Vinyl film around the rivet holes
|
Details
|
|
|
12-21-2010
|
1.00
|
Clecoed Bottom Skin, Doublers and Stiffeners
|
Details
|
|
|
12-20-2010
|
2.00
|
Riveted the Corner Skins and Nutplates
|
Details
|
|
|
12-19-2010
|
2.00
|
Prepped Bottom Skin
|
Details
|
|
|
12-18-2010
|
3.00
|
Riveted Step Ribs and Corner Skins
|
Details
|
|
|
12-17-2010
|
1.00
|
Installed the Control Column
|
Details
|
|
|
12-13-2010
|
2.00
|
Riveted Seat Ramp Floors
|
Details
|
|
|
12-12-2010
|
5.00
|
More parts preparation and priming
|
Details
|
|
|
12-11-2010
|
7.00
|
More fuselage parts preparation
|
Details
|
|
|
12-10-2010
|
1.50
|
Dimpled and final-drilled holes in Floor Ramps
|
Details
|
|
|
12-09-2010
|
1.50
|
Riveted Bulkhead to the Seat Ribs
|
Details
|
|
|
12-08-2010
|
1.50
|
Installed nutplates and riveted Bulkhead Doublers
|
Details
|
|
|
12-07-2010
|
2.00
|
Riveted Doublers and Control Assembly to Bulkhead
|
Details
|
|
|
12-06-2010
|
1.50
|
Assembled the Control Column Mounts
|
Details
|
|
|
11-30-2010
|
0.50
|
Primed parts
|
Details
|
|
|
11-29-2010
|
3.00
|
Prepped Control Column Mt Assembly and Bulkhead
|
Details
|
|
|
11-28-2010
|
1.50
|
Riveted Fwd Bulkhead Side Assemblies
|
Details
|
|
|
11-26-2010
|
4.00
|
Riveted Seat Floor Assemblies to the Bulkhead
|
Details
|
|
|
11-25-2010
|
4.00
|
Riveted Seat Floors and Nutplates
|
Details
|
|
|
11-24-2010
|
1.50
|
Prepared fuselage parts
|
Details
|
|
|
11-23-2010
|
2.00
|
Installed Seatback Hinges and nutplates
|
Details
|
|
|
11-22-2010
|
1.00
|
Primed Seat Floors and hinges
|
Details
|
|
|
11-21-2010
|
6.00
|
Riveted Crotch Brackets with Seat Rib Assemblies
|
Details
|
|
|
11-20-2010
|
4.50
|
Riveted Bracket Assemblies to Seat Ribs
|
Details
|
|
|
11-19-2010
|
1.50
|
Prepped Autopilot Servo Bracket parts
|
Details
|
|
|
11-18-2010
|
2.00
|
Preparation of Seat Ribs and other parts
|
Details
|
|
|
11-17-2010
|
2.00
|
Final-drilled Seat Ribs and Attach Lugs
|
Details
|
|
|
11-16-2010
|
2.00
|
Seat Ribs preparation
|
Details
|
|
|
11-15-2010
|
2.00
|
Completed Bracket Assemblies
|
Details
|
|
|
11-14-2010
|
6.00
|
Riveted Bulkhead, Baggage Floors and Ribs
|
Details
|
|
|
11-13-2010
|
5.00
|
Prepared Rear Spar Receptacles, Brackets & Ribs
|
Details
|
|
|
11-12-2010
|
2.50
|
Riveted the Baggage Ribs
|
Details
|
|
|
11-11-2010
|
2.00
|
Completed prepping the Baggage Ribs
|
Details
|
|
|
11-09-2010
|
2.00
|
Replaced 2 rivets and deburred parts
|
Details
|
|
|
11-08-2010
|
2.50
|
Riveted Baggage Floors to Bulkhead
|
Details
|
|
|
11-07-2010
|
3.00
|
Installed Skin Stiffeners
|
Details
|
|
|
10-26-2010
|
0.50
|
Finished riveting the Center Section Aft Bulkhead
|
Details
|
|
|
10-25-2010
|
2.00
|
Riveted the Bulkhead Assembly
|
Details
|
|
|
10-24-2010
|
2.00
|
Primed parts and installed Skin Attach Flanges
|
Details
|
|
|
10-23-2010
|
3.00
|
Match-drilled and countersunk holes
|
Details
|
|
|
10-22-2010
|
1.50
|
Match-drilled holes in the Center Section Assembly
|
Details
|
|
|
10-21-2010
|
1.50
|
Match-drilling of Center Section
|
Details
|
|
|
10-20-2010
|
1.00
|
Separated Skin Stiffeners and Skin Attach Flanges
|
Details
|
|
|
10-19-2010
|
1.50
|
Countersunk holes and installed nutplates
|
Details
|
|
|
10-18-2010
|
1.00
|
Located and separated parts and hardware
|
Details
|
|
|
10-17-2010
|
1.00
|
Organize Fuselage parts
|
Details
|
|
|
10-16-2010
|
1.50
|
Put Wings in Stand & modified cradle to hold parts
|
Details
|
|
|
10-15-2010
|
1.00
|
Completed Wing Stand
|
Details
|
|
|
10-14-2010
|
1.50
|
Work on the Wing Stand
|
Details
|
|
|
10-13-2010
|
1.50
|
Clean up garage
|
Details
|
|
|
10-12-2010
|
1.00
|
Work on Wing Stand
|
Details
|
|
|
10-11-2010
|
2.00
|
Wing stand construction
|
Details
|
|
|
10-10-2010
|
2.00
|
Installed Wing Tip Lights
|
Details
|
|
|
10-09-2010
|
6.50
|
Completed R Flaperon and worked on Extensions
|
Details
|
|
|
10-08-2010
|
2.00
|
Riveted Flaperon Skins and Outb Nose Skin
|
Details
|
|
|
10-07-2010
|
1.00
|
Riveted top of the Flaperon Skins
|
Details
|
|
|
10-06-2010
|
2.00
|
Installed Brackets and Ribs to Flaperon Spar
|
Details
|
|
|
10-05-2010
|
2.00
|
Match-drilled the Actuation Bracket & did priming
|
Details
|
|
|
10-04-2010
|
2.00
|
Fabricated another Right Actuation Bracket
|
Details
|
|
|
09-25-2010
|
2.00
|
Primed Flaperon parts
|
Details
|
|
|
09-23-2010
|
1.50
|
Deburred Main Ribs and Flaperon Skins
|
Details
|
|
|
09-22-2010
|
1.00
|
Deburred Nose Skins
|
Details
|
|
|
09-21-2010
|
1.00
|
Work on Actuation and Pivot Brackets
|
Details
|
|
|
09-20-2010
|
1.00
|
Deburred Flaperon parts
|
Details
|
|
|
09-19-2010
|
3.00
|
Work on Right Flaperon
|
Details
|
|
|
09-18-2010
|
3.00
|
More work on the Right Extension
|
Details
|
|
|
09-17-2010
|
1.00
|
Work on Right Extension
|
Details
|
|
|
09-16-2010
|
1.00
|
Installed Mid Nose Skin and Rod End Bearings
|
Details
|
|
|
09-15-2010
|
2.00
|
Installed Flaperon Nose Skins
|
Details
|
|
|
09-14-2010
|
1.50
|
Work on Flaperon Skins
|
Details
|
|
|
09-09-2010
|
1.00
|
Riveted Flaperon Skins
|
Details
|
|
|
09-05-2010
|
3.50
|
Work on Left Flaperon
|
Details
|
|
|
09-03-2010
|
2.00
|
Installed A-1206 Pivot Brackets
|
Details
|
|
|
09-02-2010
|
1.00
|
Work on Right Flaperon
|
Details
|
|
|
08-30-2010
|
1.50
|
Work on Right Wing Tip Extension
|
Details
|
|
|
08-29-2010
|
9.00
|
Work on Right Wing Tip
|
Details
|
|
|
08-28-2010
|
6.00
|
Riveted Wing Walk Doubler and Fwd part of skins
|
Details
|
|
|
08-27-2010
|
4.00
|
Riveted R Mid and Outbd Upper Skins
|
Details
|
|
|
08-17-2010
|
2.00
|
Work on Left Wing Access Hatch
|
Details
|
|
|
08-16-2010
|
2.50
|
Prepped Outbd and Mid Upper Wing Skins
|
Details
|
|
|
08-15-2010
|
2.00
|
Riveted the Inbd Upper Wing Skin
|
Details
|
|
|
08-14-2010
|
2.00
|
Tech Counselor visit and Clecoed Inbd Upper Skin
|
Details
|
|
|
08-12-2010
|
2.00
|
Replaced Landing Light Lens
|
Details
|
|
|
08-08-2010
|
1.00
|
Wing Skin Prep and Pivot Bracket fabrication
|
Details
|
|
|
07-31-2010
|
8.00
|
Work on Flaperon
|
Details
|
|
|
07-21-2010
|
1.00
|
Riveted the LL ribs and fwd edges of wing skins
|
Details
|
|
|
07-20-2010
|
0.50
|
Installed Landing LightLens
|
Details
|
|
|
07-19-2010
|
2.00
|
Prepared wiring for Landing Light
|
Details
|
|
|
07-18-2010
|
3.00
|
Work on landing light lens and attachments
|
Details
|
|
|
07-17-2010
|
1.50
|
Trimmed landing light lens
|
Details
|
|
|
07-14-2010
|
0.50
|
Right wing checked by A&P
|
Details
|
|
|
07-12-2010
|
2.00
|
Drilled holes in the Landing Light Lens
|
Details
|
|
|
07-05-2010
|
4.00
|
Match drilled Flaperon parts
|
Details
|
|
|
07-04-2010
|
7.00
|
Work on Flaperons
|
Details
|
|
|
06-16-2010
|
2.00
|
Parts inventory
|
Details
|
|
|
06-15-2010
|
1.00
|
Riveted top front holes of Inbd Wing Skin
|
Details
|
|
|
06-14-2010
|
1.00
|
Work on right wing skins
|
Details
|
|
|
06-14-2010
|
1.00
|
Started Fuselage Kit inventory
|
Details
|
|
|
06-13-2010
|
6.00
|
Riveted bottom of Wing Skins
|
Details
|
|
|
06-12-2010
|
5.00
|
Work on R Outbd Wing Skin and lighting system
|
Details
|
|
|
06-11-2010
|
1.00
|
Completed riveting the bottom of the Inbd Skin
|
Details
|
|
|
06-10-2010
|
2.00
|
Riveted the Right Inbd Wing Skin
|
Details
|
|
|
06-09-2010
|
2.50
|
Work on Right Inbd Wing Skin
|
Details
|
|
|
06-08-2010
|
2.00
|
Fabricated the right Actuation Bracket
|
Details
|
|
|
06-04-2010
|
0.50
|
Fuselage Kit arrives
|
Details
|
|
|
06-03-2010
|
0.50
|
Work on wiring of left wing lights
|
Details
|
|
|
06-02-2010
|
0.50
|
Completed second Pivot Bracket
|
Details
|
|
|
06-01-2010
|
2.00
|
Work on Flaperon Nose Ribs and a Pivot Bracket
|
Details
|
|
|
05-31-2010
|
3.00
|
Fabricated a Pivot Bracket
|
Details
|
|
|
05-30-2010
|
3.00
|
Started work on the Flaperon
|
Details
|
|
|
05-28-2010
|
1.50
|
Preparation of wiring of R wing lighting system
|
Details
|
|
|
05-27-2010
|
2.00
|
Riveted the Nose Ribs
|
Details
|
|
|
05-26-2010
|
2.00
|
Riveted Main Ribs and the Rear Spar Assembly
|
Details
|
|
|
05-25-2010
|
0.50
|
Work on Right Extension
|
Details
|
|
|
05-23-2010
|
1.00
|
Riveted more Main Ribs
|
Details
|
|
|
05-22-2010
|
2.00
|
Installation of outboard Main Ribs
|
Details
|
|
|
05-16-2010
|
5.00
|
Work on L Wing Extension
|
Details
|
|
|
05-15-2010
|
3.00
|
Put Flox on Extension, Made another Wing Cradle
|
Details
|
|
|
05-14-2010
|
2.00
|
Built a wing cradle
|
Details
|
|
|
05-13-2010
|
2.00
|
Riveted Wing Tip Close-out
|
Details
|
|
|
05-11-2010
|
2.00
|
Prepared wiring for wing tip lights
|
Details
|
|
|
05-10-2010
|
2.00
|
More work on the Wing Tip Extension
|
Details
|
|
|
05-09-2010
|
6.00
|
Bent the Close-out tabs and trimmed Extension
|
Details
|
|
|
05-08-2010
|
2.00
|
Fabricated bending tool and deburred parts
|
Details
|
|
|
05-06-2010
|
1.00
|
Made access opening in L WingTip Close-Out
|
Details
|
|
|
05-05-2010
|
1.00
|
Riveted Wing Tip Ribs
|
Details
|
|
|
05-04-2010
|
2.00
|
Riveted Wing Tip Fwd and Aft Skins
|
Details
|
|
|
05-03-2010
|
2.00
|
Prep and riveting of wing tip parts
|
Details
|
|
|
05-02-2010
|
2.00
|
Prepared the L wing tip parts
|
Details
|
|
|
04-30-2010
|
0.50
|
Inspected Nose Ribs for cracks
|
Details
|
|
|
04-25-2010
|
5.00
|
Riveted Wing Walker Doubler and Skins
|
Details
|
|
|
04-24-2010
|
7.00
|
Riveted Upper Skins
|
Details
|
|
|
04-23-2010
|
2.00
|
Riveted and prepped Upper Wing Skins
|
Details
|
|
|
04-22-2010
|
1.50
|
Riveted Inbd Upper Wing Skin
|
Details
|
|
|
04-21-2010
|
2.00
|
Installed the Hinge Ribs and Hinge Brackets
|
Details
|
|
|
04-20-2010
|
1.50
|
Hinge Ribs and Inbd Upper Wing Skin prep
|
Details
|
|
|
04-19-2010
|
8.00
|
Rivet Left Wing Bottom Skins
|
Details
|
|
|
04-18-2010
|
5.00
|
Priming, Lighting System Wiring and Riveting
|
Details
|
|
|
04-17-2010
|
3.00
|
Preparation of Left Wing Bottom Skins
|
Details
|
|
|
04-13-2010
|
2.00
|
Installation of the Terminal Brackets
|
Details
|
|
|
04-12-2010
|
1.00
|
Repositioned Stall Warning Assembly
|
Details
|
|
|
04-11-2010
|
1.00
|
Check position of Stall Warning Assembly
|
Details
|
|
|
04-09-2010
|
1.00
|
Stall Warning Assembly Installation.
|
Details
|
|
|
04-06-2010
|
1.00
|
Terminal Bracket preparation
|
Details
|
|
|
04-03-2010
|
5.00
|
Stall Warnng Assembly
|
Details
|
|
|
04-02-2010
|
3.00
|
Installation of Left Wing Nose Ribs
|
Details
|
|
|
04-01-2010
|
2.00
|
Priming & prep space for Nose Ribs installation
|
Details
|
|
|
03-31-2010
|
1.50
|
Priming
|
Details
|
|
|
03-30-2010
|
2.00
|
More Priming.
|
Details
|
|
|
03-29-2010
|
5.00
|
Installed Main Ribs and Rear Spar Assembly
|
Details
|
|
|
03-28-2010
|
7.00
|
Fluting, deburring and priming of Main Ribs.
|
Details
|
|
|
03-24-2010
|
1.00
|
Match drilled Main Ribs
|
Details
|
|
|
03-22-2010
|
1.50
|
Nutplates Installation and Trimming of Main Ribs
|
Details
|
|
|
03-21-2010
|
5.00
|
Work on Nose Ribs
|
Details
|
|
|
03-20-2010
|
4.00
|
Riveted Hinge Assemblies and Work on Nose Ribs
|
Details
|
|
|
03-19-2010
|
1.00
|
Assembly of Hinge Assemblies and Rear Spars.
|
Details
|
|
|
03-17-2010
|
1.00
|
Riveting of Hinge Assemblies.
|
Details
|
|
|
03-15-2010
|
3.00
|
Riveting of Stub Spars and Hinge Brackets.
|
Details
|
|
|
03-14-2010
|
5.00
|
Work on Rear Spars and Hinge Brackets
|
Details
|
|
|
03-13-2010
|
6.00
|
Work on Stub Spar Assembly and Flaperon parts.
|
Details
|
|
|
03-12-2010
|
2.00
|
Riveted Angles to Spars.
|
Details
|
|
|
03-09-2010
|
2.00
|
Attach Angles ready for riveting.
|
Details
|
|
|
03-08-2010
|
2.00
|
Primed parts and worked on Tie Down.
|
Details
|
|
|
03-07-2010
|
2.00
|
Prepped Angles and Rib Doubler.
|
Details
|
|
|
03-04-2010
|
1.00
|
Work on Attach Angles and Rib Doubler.
|
Details
|
|
|
02-27-2010
|
2.00
|
Wing Kit Inventory
|
Details
|
|
|
02-24-2010
|
2.00
|
Wing kit arrival and inventory
|
Details
|
|
|
02-17-2010
|
2.00
|
Repositioned H-Stab
|
Details
|
|
|
01-04-2010
|
4.00
|
Repaired overhead storage and organized garage
|
Details
|
|
|
12-30-2009
|
4.00
|
Repositioned Tailcone
|
Details
|
|
|
12-26-2009
|
2.00
|
Drilling and Riveting of Fairings
|
Details
|
|
|
11-12-2009
|
1.50
|
Work on V-Stab Fairing
|
Details
|
|
|
11-11-2009
|
3.00
|
Work on Rudder Tip Fairing
|
Details
|
|
|
11-10-2009
|
1.00
|
Riveting of Pushrod Assembly
|
Details
|
|
|
11-09-2009
|
2.00
|
Pushrod Assembly
|
Details
|
|
|
11-02-2009
|
1.00
|
Spade connectors installation.
|
Details
|
|
|
11-01-2009
|
5.00
|
Servo Tray Preparation
|
Details
|
|
|
10-31-2009
|
1.50
|
V-Stab Installation
|
Details
|
|
|
10-30-2009
|
0.50
|
Completed Riveting Tailcone
|
Details
|
|
|
10-29-2009
|
1.50
|
Riveting of Tail Cone
|
Details
|
|
|
10-28-2009
|
2.50
|
Riveting of Top and Side Skins.
|
Details
|
|
|
10-27-2009
|
1.00
|
Servo Tray Preparation and visit by Tech Counselor
|
Details
|
|
|
10-11-2009
|
6.00
|
Riveting of Side and Upper Skins.
|
Details
|
|
|
10-10-2009
|
8.00
|
Work on Pitot tubing, Brackets & Fwd Skin Rib.
|
Details
|
|
|
10-09-2009
|
1.50
|
Temporary Attachment ofUpper Skins.
|
Details
|
|
|
10-08-2009
|
1.50
|
Attachment of BulkHead and Side Skins.
|
Details
|
|
|
10-07-2009
|
2.00
|
Riveted Lower Skins to the Bottom Skins.
|
Details
|
|
|
10-06-2009
|
2.00
|
Riveting Bottom Skins
|
Details
|
|
|
10-05-2009
|
2.50
|
Attachment of the Lower Skins.
|
Details
|
|
|
10-04-2009
|
2.50
|
Tailcone Bottom Skin Assembly
|
Details
|
|
|
09-27-2009
|
3.00
|
Priming of Tailcone Skins.
|
Details
|
|
|
09-25-2009
|
2.00
|
Temporary installation of Bulkhead Assy to H-Stab.
|
Details
|
|
|
09-24-2009
|
1.00
|
Re-install Hinge Brackets.
|
Details
|
|
|
09-19-2009
|
2.50
|
Removal of Hinge Brackets.
|
Details
|
|
|
09-15-2009
|
1.00
|
Hinge Brackets attached to Bulkhead Assembly.
|
Details
|
|
|
09-14-2009
|
2.00
|
Work on Bulkhead Assembly.
|
Details
|
|
|
09-13-2009
|
2.00
|
Riveting of F-1211 bulkhead assembly.
|
Details
|
|
|
09-06-2009
|
4.00
|
Tail Skid Bracket Work and Bulkhead Assembly.
|
Details
|
|
|
09-05-2009
|
4.00
|
Tail Skid and Bulkhead Work.
|
Details
|
|
|
09-04-2009
|
2.00
|
Fuselage Frames Assembly
|
Details
|
|
|
09-03-2009
|
1.00
|
Primed Tail Cone Parts.
|
Details
|
|
|
09-01-2009
|
5.00
|
Started work on Tail Cone
|
Details
|
|
|
08-20-2009
|
1.00
|
Installation of Counterbalance Weights.
|
Details
|
|
|
08-19-2009
|
2.50
|
Enlarged holes of Counterbalance Brackets.
|
Details
|
|
|
08-18-2009
|
4.00
|
Installation of the Upper and Lower Horns.
|
Details
|
|
|
08-17-2009
|
2.50
|
Preparation and installation of Aft Skins.
|
Details
|
|
|
08-13-2009
|
2.50
|
Riveting of Main Skin and Hinges.
|
Details
|
|
|
08-11-2009
|
1.50
|
Hinge preparation.
|
Details
|
|
|
08-09-2009
|
3.00
|
Riveting of bottom skin.
|
Details
|
|
|
08-08-2009
|
4.00
|
Priming and preparation of Skins.
|
Details
|
|
|
08-07-2009
|
2.50
|
Skin Splice Plate and Aft Skin Preparation.
|
Details
|
|
|
08-06-2009
|
2.00
|
Main Skin Attached to Skeleton.
|
Details
|
|
|
08-05-2009
|
2.00
|
Hinge and Mainskin Preparation.
|
Details
|
|
|
08-03-2009
|
3.00
|
Completion of Stabilator Skeleton Assembly.
|
Details
|
|
|
08-02-2009
|
1.00
|
Riveting Rib Clips and Ribs.
|
Details
|
|
|
08-01-2009
|
1.00
|
Rib Preparation.
|
Details
|
|
|
07-31-2009
|
1.50
|
Preparation of Ribs.
|
Details
|
|
|
07-30-2009
|
1.00
|
Riveting Spar Box Assembly.
|
Details
|
|
|
07-29-2009
|
1.00
|
Riveted CB bracket to Fwd Spar.
|
Details
|
|
|
07-28-2009
|
2.00
|
Riveting of CB Bracket and making Hinge Stops.
|
Details
|
|
|
07-27-2009
|
2.00
|
Attachment of Doublers and Nutplates.
|
Details
|
|
|
07-26-2009
|
4.00
|
Drilling of nutplate attach rivet holes.
|
Details
|
|
|
07-25-2009
|
5.00
|
Spar Box assembly.
|
Details
|
|
|
07-24-2009
|
2.00
|
HS Spar Box assembly
|
Details
|
|
|
07-13-2009
|
1.50
|
Countersinking and Final drilling stabilator parts
|
Details
|
|
|
07-12-2009
|
2.00
|
Started work on stabilator.
|
Details
|
|
|
07-06-2009
|
1.50
|
Completed riveting of AST.
|
Details
|
|
|
07-05-2009
|
4.00
|
Riveted AST assembly, match drilled hinges.
|
Details
|
|
|
07-04-2009
|
5.00
|
Work on anti-servo tabs.
|
Details
|
|
|
07-03-2009
|
5.00
|
Primed and riveted rudder skin to skeleton.
|
Details
|
|
|
07-01-2009
|
3.00
|
Riveting of rudder hinge brackets and ribs.
|
Details
|
|
|
06-30-2009
|
2.50
|
Riveted rudder parts.
|
Details
|
|
|
06-29-2009
|
1.00
|
Riveting Main Rib to Spar and Spar Caps.
|
Details
|
|
|
06-28-2009
|
3.00
|
Completed riveting skin to V-Stab assembly.
|
Details
|
|
|
06-27-2009
|
1.00
|
Riveting of V-Stab main skin.
|
Details
|
|
|
06-26-2009
|
4.00
|
Primed rudder parts, Replaced rivets, Inspection.
|
Details
|
|
|
06-23-2009
|
1.00
|
Work on Rudder Ribs.
|
Details
|
|
|
06-22-2009
|
2.00
|
Work on rudder horn and ribs.
|
Details
|
|
|
06-21-2009
|
1.50
|
Drilling of Spar Caps and Hinge Brackets.
|
Details
|
|
|
06-20-2009
|
1.00
|
Separated Spar Caps and Hinge Brackets.
|
Details
|
|
|
06-19-2009
|
2.50
|
Assembly of V-Stab main skin to skeleton.
|
Details
|
|
|
06-18-2009
|
3.00
|
Dimpling of nutplates and holes.
|
Details
|
|
|
06-16-2009
|
1.50
|
Final drilling and dimpling of V-stab skins.
|
Details
|
|
|
06-15-2009
|
4.00
|
V-Stab skeleton assembly.
|
Details
|
|
|
06-14-2009
|
4.00
|
Riveted V-stab parts.
|
Details
|
|
|
06-13-2009
|
2.00
|
Priming V-Stab parts.
|
Details
|
|
|
06-10-2009
|
1.00
|
Countersinking of V stab skeleton parts.
|
Details
|
|
|
06-09-2009
|
2.00
|
Left spar cap work. Completed hinge assemblies.
|
Details
|
|
|
06-07-2009
|
1.00
|
Continuing work on left spar caps
|
Details
|
|
|
06-02-2009
|
1.00
|
Worked on Left spar caps.
|
Details
|
|
|
05-31-2009
|
5.00
|
Upper and lower spar caps. Priming issues.
|
Details
|
|
|
05-25-2009
|
2.00
|
Upper and lower spar caps work.
|
Details
|
|
|
05-24-2009
|
2.00
|
V-stab upper and lower hinge assemblies.
|
Details
|
|
|
05-16-2009
|
5.00
|
Built a workbench.
|
Details
|
|
|
05-10-2009
|
2.00
|
Parts inventory.
|
Details
|
|
|
05-07-2009
|
0.00
|
Empennage/Tail cone kit arrives.
|
Details
|
|