KitLog pro

Powered By Kitlog Pro v2.0

Scotts Kitfox Sport project
Work Logs Found: 429
Category Work Time: 1145 Hours
 Date
Hours
Work Log Summary

Details

 06-27-2009
2.60
AOA flap position micro switch installation.
Details
       

 04-05-2009
1.20
Seat pan installation.
Details
       

 04-04-2009
1.50
Pitch trim assist installation
Details
       

 04-04-2009
0.70
Cargo bay installation.
Details
       

 03-29-2009
2.00
Autopilot pitch servo pushrod installation.
Details
       

 03-24-2009
1.40
Static port installation.
Details
     

 03-22-2009
1.70
Cabin lighting installation
Details
       

 03-21-2009
3.30
Control stick wiring
Details
       

 03-08-2009
3.50
Seat support strap installation.
Details
       

 01-25-2009
4.00
Altrak autopilot installation.
Details
       

 01-18-2009
2.30
Pitch trim installation
Details
       

 01-03-2009
2.60
R/H landing light installation.
Details
       

 01-01-2009
3.00
Final graphics installation.
Details
       

 12-30-2008
0.50
Rudder cable installation.
Details
     

 12-30-2008
1.60
Cowling installation
Details
       

 12-29-2008
2.00
Wingtip light installation.
Details
       

 12-29-2008
0.70
L/H anding light lens installation.
Details
       

 12-29-2008
2.40
Altrak wire harness fabrication and hookup.
Details

 12-25-2008
0.80
Nose wheel pant installation plus graphics applica
Details
       

 11-30-2008
0.30
Wing tank fuel drain installation.
Details

 11-30-2008
0.50
Trim tab installation.
Details
       

 11-30-2008
0.70
Autopilot roll servo pushrod installation.
Details
       

 11-30-2008
1.00
Aluminum fuel line installation.
Details

 11-29-2008
3.50
Flaperon rigging
Details
       

 11-29-2008
2.90
Flaperon installation.
Details

 11-26-2008
9.30
Final spraying of Aerothane.
Details
       

 11-25-2008
2.50
Altrak VS autopilot servo installation.
Details
       

 11-24-2008
7.50
Aerothane application for wing tips, etc.
Details
     

 11-23-2008
3.20
Graphics installation on tail.
Details
       

 11-23-2008
1.80
Altrak VS autopilot installation
Details
       

 11-15-2008
0.60
Rudder final installation.
Details

 11-15-2008
1.20
main gear wheel pant installation.
Details
       

 11-15-2008
1.00
final installation of horizontal stab and elevator
Details

 11-09-2008
6.40
Aerothane application for assorted parts.
Details

 11-03-2008
7.00
Horizontal stab, rudder, and elevator painting.
Details

 10-30-2008
7.20
Primer for turtledeck, wing tip, and nose wheel pa
Details
       

 10-22-2008
1.20
Trim tab installation
Details
       

 10-21-2008
5.00
Epoxy primer application for assorted parts.
Details

 10-16-2008
3.50
Paint prep work for misc parts.
Details
       

 10-16-2008
0.60
L/H wheel pant paint prep.
Details

 10-14-2008
3.50
Composite part sand and fill work.
Details

 10-13-2008
1.40
Wingtip paint prep work.
Details

 10-12-2008
3.80
Final cross-coat of Polyspray on tailfeathers.
Details

 10-11-2008
5.80
Wet sand Polyspray on tailfeathers.
Details
     

 10-11-2008
3.00
L/H landing light mounting bracket fabrication.
Details
       

 10-10-2008
3.40
2nd cross-coat of Polyspray on tailfeathers.
Details

 10-09-2008
4.20
Polyspray UV application on tailfeathers.
Details

 10-08-2008
4.20
Heat smoothing imperfections in Polybrush.
Details

 10-06-2008
2.20
Nose wheel pant paint prep.
Details

 10-06-2008
4.30
Landing light lens installation.
Details

 10-06-2008
3.70
2nd cross-coat of Polybrush on tailfeathers.
Details

 10-05-2008
4.60
Nose gear pant installation.
Details
       

 10-05-2008
3.80
1st cross-coat of Polybrush on tailfeathers.
Details

 10-04-2008
1.40
Wingtip strobe mount fabrication.
Details

 10-04-2008
4.20
50:50 polyspray application on tailfeathers.
Details

 10-03-2008
2.00
Alakaline clean of tailfeathers.
Details

 10-01-2008
3.00
L/H wing installation.
Details

 09-30-2008
3.50
Final installation of R/H wing.
Details

 09-29-2008
3.00
Windshield installation.
Details

 09-29-2008
1.20
Cabin door installation.
Details

 09-28-2008
2.70
UV smooth prime application.
Details

 09-27-2008
3.50
Oil system installation.
Details

 09-26-2008
6.50
Aerothane spraying on wing struts and doors.
Details

 09-25-2008
5.30
Sanded wing struts for final paint.
Details

 09-22-2008
3.30
Sanded epoxy primer on cabin doors.
Details

 09-21-2008
4.70
Primer main gear wheel pants and cowl.
Details

 09-20-2008
7.50
Paint prep work.
Details

 09-18-2008
5.60
Prime wing struts, doors, and door hardware.
Details

 06-08-2008
2.00
Garmin GPS antenna mount.
Details
       

 06-08-2008
1.80
Cabin soundproofing.
Details
       

 06-07-2008
1.00
EFIS upgraded display installation.
Details
       

 06-01-2008
2.80
Garmin/XM satalite radio/weather antenna install.
Details
       

 05-26-2008
4.20
Wire harnes fabrication, routing, and hookup.
Details
       

 05-18-2008
6.00
Electrical wire installation and hookup.
Details
     

 05-17-2008
2.30
EFIS display upgrade.
Details
       

 05-11-2008
6.20
Wire harness installation.
Details
     

 05-03-2008
4.50
Electrical wire installation.
Details
       

 04-27-2008
0.50
EIS and Low Fuel warning light installation.
Details
       

 04-27-2008
1.80
Autopilot roll servo wiring.
Details
       

 04-26-2008
4.20
EFIS fuel flow sensor installation.
Details
       

 04-20-2008
3.60
Electrical wire installation.
Details
     

 04-08-2008
6.50
Electrical wire installation.
Details
       

 03-30-2008
4.40
Electrical wire installation.
Details
       

 03-29-2008
5.00
Electrical wire installation.
Details
     

 03-26-2008
0.50
Ground block installation.
Details
       

 03-26-2008
3.50
Electrical wire installation.
Details
       

 03-26-2008
1.50
Circuit breaker installation.
Details
       

 03-16-2008
6.30
Instrument panel installation.
Details
       

 03-09-2008
1.00
Exhaust system installation.
Details
       

 03-09-2008
0.50
Exhast stinger reinforcement.
Details
       

 03-08-2008
0.50
Electric carb heat probe installation.
Details
       

 03-02-2008
2.00
Map box latch fabrication.
Details
       

 02-24-2008
0.50
Prop and spinner installation.
Details
       

 02-24-2008
0.50
Instrument panel fabrication.
Details
       

 02-24-2008
0.40
Cabin heat control valve
Details
       

 02-12-2008
1.70
TruTrak autopilot roll servo installation.
Details
       

 02-12-2008
1.40
Master and stater solinoid installation.
Details
       

 02-12-2008
2.20
Cockpit throttle mount fab and install.
Details
       

 02-07-2008
0.40
Rotax regulator/rectifier installation.
Details
       

 02-07-2008
0.80
Engine fuel system installation.
Details
       

 02-07-2008
0.60
Coolant system hose installation.
Details
       

 02-06-2008
0.60
Nose gear strut installation.
Details
     

 02-06-2008
0.50
Nose gear shock mount installation.
Details
       

 02-06-2008
0.50
Nose gear fork installation.
Details
       

 02-06-2008
0.80
Firewall and engine mount installation.
Details
       

 02-06-2008
1.10
Engine installation.
Details
       

 02-06-2008
0.30
Coolant radiator installation.
Details
       

 02-03-2008
0.90
L/H wing vortex generator installation.
Details
       

 02-03-2008
0.60
fiberglass strut fairings.
Details
       

 01-12-2008
0.40
Quarter window installation.
Details
       

 01-01-2008
0.70
Fiberglass wing strut fairings.
Details
       

 12-31-2007
0.50
Brake system plumbing.
Details
       

 12-30-2007
0.60
Battery box installation.
Details
       

 12-30-2007
0.70
AHRS mounting plate installation.
Details
       

 12-28-2007
1.00
Wing strut fiberglass.
Details
       

 12-27-2007
0.40
Firewall soundproofing.
Details
       

 12-27-2007
0.80
Fiberglass installation on wing strut.
Details
       

 12-23-2007
0.50
Wheel and brake installation.
Details
       

 12-23-2007
0.80
Sand and fill wing strut fairings
Details
       

 12-23-2007
0.40
Main gear installation.
Details
       

 12-15-2007
0.60
ELT antenna installation.
Details
     

 12-12-2007
0.40
Comm and transponder antenna installation.
Details

 12-08-2007
6.20
Final paint for misc parts.
Details

 12-06-2007
1.20
Sanding filler on wing strut fairings.
Details
     

 12-06-2007
3.00
Sanded primered part for Aerothane painting.
Details

 12-03-2007
4.20
Primer misc part in paint booth.
Details

 12-02-2007
3.80
Assorted parts paint prep.
Details
       

 11-25-2007
6.20
Aerothane color coat on fuselage.
Details
       

 11-24-2007
0.80
Wingtip landing light lens installation.
Details
       

 11-24-2007
1.00
Foam strut fairing contour.
Details
       

 11-18-2007
1.20
Foam block contouring.
Details
       

 11-18-2007
1.00
Flaperon end caps.
Details
       

 11-11-2007
0.70
Mask cabin doors for paint.
Details
       

 11-11-2007
1.60
Bonding foam blocks to wing struts.
Details
       

 11-10-2007
3.80
Final application of Polyspray on fuselage.
Details

 11-10-2007
0.40
Cowl mismatch filler application.
Details
     

 11-07-2007
1.10
R/H wing VG installation.
Details
       

 11-07-2007
1.20
Fill rivet holes in cabin doors.
Details
       

 11-06-2007
3.80
Wet sand Polyspray on fuselage.
Details
       

 11-05-2007
3.40
Fuselage Polyspray application.
Details

 11-04-2007
3.60
Fuselage Polyspray application.
Details

 11-04-2007
1.00
Bond PVC strut fairing to R/H strut.
Details
     

 11-03-2007
5.20
Heat smoothed Polybursh imperfections.
Details

 10-28-2007
6.70
Painted L/H wing with Aerothane.
Details
     

 10-27-2007
6.50
Painting R/H wing.
Details
     

 10-26-2007
1.50
Wing drain holes.
Details
       

 10-24-2007
4.00
Fuselage Polybrush spray application.
Details
       

 10-24-2007
4.20
Fuselage Polybrush spary application.
Details

 10-23-2007
3.70
Spraying Polybrush on fuselage.
Details
     

 10-23-2007
3.10
Masking fuselage for painting.
Details

 10-22-2007
4.00
Masking fuselage for spraying finishes.
Details

 10-20-2007
1.30
Alkaline clean fuselage.
Details
       

 10-14-2007
5.30
3rd coat of Polyspray on wings.
Details

 10-13-2007
4.50
Wet sand Polyspray on wings.
Details

 10-12-2007
4.20
Wet sand Polyspray on wings.
Details

 10-08-2007
4.10
Polyspray application on wings.
Details
     

 10-07-2007
3.80
Heat smooth sprayed Polybrush.
Details

 10-07-2007
4.00
1st coat of Polyspray on wings.
Details

 10-05-2007
4.00
Polybrush application.
Details

 10-04-2007
4.50
Spray coat of Polybursh on wings.
Details
     

 10-03-2007
4.00
Polybrush spray application.
Details

 09-23-2007
2.20
Alakaline washing of wings.
Details
       

 06-11-2007
0.80
NACA cabin air intake duct.
Details
       

 06-07-2007
2.30
Wingtip installation
Details
       

 05-28-2007
0.70
Instrument panel installation.
Details
       

 05-26-2007
0.80
NACA cabin air inlets.
Details
       

 05-26-2007
0.50
Instrument panel storage compartment.
Details
       

 05-20-2007
3.00
Instrument panel storage.
Details
       

 05-20-2007
0.80
Instrument panel installation.
Details
     

 05-19-2007
2.50
Instrument panel storage compartment.
Details
       

 05-06-2007
4.50
Instrument panel installation.
Details
       

 04-29-2007
0.60
Exhaust system installation.
Details
       

 03-31-2007
0.80
Instrument panel fabrication.
Details
       

 02-04-2007
3.00
Heat smooth fabric.
Details

 01-20-2007
6.20
Heat smooth fabric.
Details

 11-13-2006
7.50
Heat smooth finishing tapes.
Details

 11-12-2006
1.70
Fuselage finishing tapes.
Details

 10-22-2006
1.30
Fabric damage repair.
Details
       

 10-21-2006
4.80
Disassembly of fuselage for paint.
Details

 09-24-2006
8.30
Heat smoothing fabric.
Details

 09-09-2006
8.50
Heat smoothing fabric.
Details

 08-26-2006
6.30
L/H wing finishing tapes.
Details

 08-20-2006
3.50
L/H wing finishing tapes.
Details
       

 06-21-2006
3.60
R/H wing finishing tapes.
Details
       

 06-19-2006
3.70
R/H wing finishing tapes.
Details
       

 06-18-2006
1.00
Remove wings
Details

 06-18-2006
4.30
R/H wing finishing tapes.
Details
       

 06-10-2006
1.00
Air induction flange installation.
Details
       

 06-07-2006
0.80
Oil service door installaiton.
Details
       

 06-07-2006
0.40
Nose wheel pant installation.
Details
       

 06-07-2006
1.00
L/E wing root fairing installation.
Details
     

 06-07-2006
0.80
L./E wing rood fairing fabrication.
Details
       

 06-07-2006
1.20
Engine cowl installation.
Details
     

 06-06-2006
1.20
Oil tank door installation.
Details
       

 06-06-2006
1.40
L/E wing root fairing.
Details
       

 05-07-2006
1.40
L/E wing root fairing installation.
Details
       

 05-07-2006
1.00
Cowling installation.
Details
       

 05-06-2006
0.80
Wingstrut installation.
Details
       

 05-06-2006
1.20
Engine cowl installation.
Details
       

 04-25-2006
2.00
Windshield fitting and trimming.
Details
       

 04-22-2006
2.50
Turtledeck wing root fairings.
Details
       

 04-11-2006
2.60
PVC wing strut fairings.
Details
       

 04-11-2006
2.60
Nose wheel fairing installation.
Details
       

 04-09-2006
3.30
Wingtip installation.
Details
       

 04-02-2006
1.20
Cooling inlet duct installation.
Details
       

 03-12-2006
2.50
R/H wingtip installation.
Details
       

 03-12-2006
0.50
Carb drip pan installation.
Details
       

 03-11-2006
1.00
Cowl inlet duct installation.
Details
       

 02-12-2006
1.30
Radiator side suport fabrication.
Details
       

 02-12-2006
2.40
Radiator installation.
Details
       

 02-12-2006
1.60
Radiator installaion.
Details
       

 02-12-2006
1.80
Cowl cooling duct installation.
Details

 02-11-2006
1.10
Prop installation.
Details
     

 02-11-2006
0.50
Prop fit check.
Details
       

 02-11-2006
3.90
Engine cowl installation..
Details
       

 02-11-2006
0.30
Cowl NACA cooling duct installation.
Details
       

 02-06-2006
2.10
Engine installation.
Details
     

 02-06-2006
2.50
Engine cowl installation.
Details
       

 12-28-2005
1.00
Instrument panel installation.
Details

 12-28-2005
1.20
Instrument panel installation.
Details
     

 12-05-2005
2.30
Nose gear shock mount installation.
Details
       

 12-05-2005
0.30
Nose gear fork installation.
Details
       

 11-27-2005
1.70
Nose gear strut installation.
Details
       

 10-02-2005
5.00
Rib stitching L/H wing.
Details
       

 09-30-2005
3.50
L/H wing fabric covering.
Details
       

 09-30-2005
5.30
L/H wing fabric covering.
Details
       

 09-28-2005
5.00
L/H wing fabric covering.
Details
       

 09-27-2005
1.30
Pitot tube instllation
Details
       

 09-18-2005
2.20
Rudder finishing tapes.
Details
       

 09-18-2005
2.10
Elevator finishing tape installaion.
Details
       

 09-17-2005
1.30
Elevator finishing tapes.
Details
     

 09-16-2005
3.20
Finishing tape installation.
Details
       

 09-15-2005
3.50
Fabric finishing tape installation.
Details
       

 09-14-2005
1.50
Fabric covering of tailfeathers.
Details
       

 09-13-2005
1.40
Elevator fabric covering.
Details
       

 09-11-2005
3.70
Fabric covering.
Details
       

 09-10-2005
1.20
Rudder fabric covering.
Details
       

 09-10-2005
1.20
Magnetometer mount installation.
Details

 09-08-2005
1.80
R/H wing root gap cover.
Details
       

 09-08-2005
3.40
Magnetometer wing mount installation.
Details
       

 09-08-2005
1.30
Horizontal stab fabric covering.
Details
       

 09-07-2005
2.10
L/H wing root close out panel.
Details
       

 09-03-2005
1.40
Turtledeck camlock installation.
Details
       

 03-27-2005
1.50
Turtledeck installation.
Details
       

 03-12-2005
2.80
Door gas strut installation.
Details
       

 03-12-2005
1.00
Cabin door window installation.
Details
       

 12-12-2004
2.00
Main gear wheel pant installation.
Details
       

 12-11-2004
2.50
Wheel pant installation.
Details
       

 12-11-2004
2.80
Main gear installation.
Details
       

 09-26-2004
3.20
L/H horzontal stab fabric covering.
Details
       

 09-25-2004
1.50
Wheel assembly, Main.
Details
       

 09-03-2004
5.50
Fuselage fabric covering.
Details
       

 08-29-2004
9.00
Fuselage fabric covering.
Details
       

 08-22-2004
1.60
Upholstery installation.
Details
       

 08-22-2004
3.50
Master cylinder installation.
Details
       

 08-22-2004
2.20
Fuel valve installation.
Details
     

 08-22-2004
3.00
Center console side panel installation.
Details
       

 08-03-2004
3.20
R/H wing fabric covering.
Details
       

 06-19-2004
3.60
Fuselage fabric covering.
Details
       

 06-16-2004
2.50
Fuselage fabric covering
Details
       

 06-11-2004
2.10
Fuselage fabric covering.
Details
       

 06-10-2004
2.90
Fuselage fabric covering.
Details
       

 06-10-2004
1.80
Fuselage fabric covering.
Details
       

 06-08-2004
5.20
Fuselage fabric covering.
Details
       

 06-06-2004
2.40
Fuselage fabric covering.
Details
       

 06-05-2004
5.50
Fuselage fabric covering.
Details
       

 05-31-2004
0.80
Cabin door installation.
Details

 05-30-2004
4.00
Cabin heater installation.
Details
       

 05-30-2004
0.60
Cabin door installation.
Details

 05-29-2004
0.30
Sholder harness attachment holes.
Details
     

 05-20-2004
2.70
Door frame shimming.
Details
       

 05-19-2004
2.40
R/H cabin door installation.
Details
       

 05-18-2004
3.00
L/H cabin door shimming.
Details
     

 05-16-2004
1.20
Tail access cover.
Details
       

 05-16-2004
2.80
Stabilizer brace access panel installation.
Details
       

 05-16-2004
0.40
Door gas spring strut bracket,
Details
       

 05-15-2004
1.60
Tail access cover installation.
Details
       

 05-12-2004
1.90
Stab strut access cover installation.
Details
       

 05-12-2004
0.40
Rudder fairing installation.
Details
       

 05-12-2004
1.00
Pitch trim bracket and cable installation.
Details
       

 05-12-2004
0.50
Door frame installation.
Details
       

 05-05-2004
2.00
Quarter window installation.
Details
       

 05-03-2004
2.80
Tail access cover mounting provisions.
Details
       

 05-02-2004
1.50
Tail access cover mounting provisions.
Details
       

 05-02-2004
0.50
Rudder fairing installation.
Details

 04-29-2004
1.40
Rudder cable installation.
Details
       

 04-25-2004
1.40
Windshield installation.
Details
       

 04-25-2004
1.60
Skylight angle installation.
Details
       

 04-25-2004
0.50
Rudder fairing installation.
Details

 04-25-2004
1.20
Foam tip installation.
Details
       

 04-25-2004
0.90
Foam tip installation.
Details
       

 04-25-2004
1.30
Foam end cap installation.
Details
       

 04-25-2004
0.70
End cap installation.
Details
       

 04-24-2004
1.00
Tail access bulkhead installation.
Details
       

 04-24-2004
0.80
Foam end cap installation.
Details
     

 09-02-2003
8.00
R/H wing rib stiching
Details
       

 09-01-2003
5.00
R/H wing fabric covering.
Details

 08-31-2003
7.50
R/H wing fabric covering.
Details
       

 08-24-2003
5.20
R/H wing fabric covering.
Details

 08-23-2003
7.00
L/H wing fabric covering.
Details
       

 08-23-2003
0.80
AOA wing port installation.
Details

 08-10-2003
0.60
Turtledeck installation.
Details
       

 08-10-2003
1.90
Turtledeck installation.
Details
       

 08-10-2003
2.30
Removal of wings.
Details
       

 08-10-2003
2.20
Center console installation.
Details
       

 08-10-2003
1.60
Center console bracket installation.
Details

 08-10-2003
4.40
AOA wing pressure port installation.
Details
       

 08-09-2003
5.40
Turtledeck assembly and installation.
Details
       

 08-09-2003
3.50
Epoxy prime small parts.
Details

 08-08-2003
1.40
Turtledeck assembly and installation.
Details

 08-08-2003
4.40
Trim tab installation.
Details
       

 08-08-2003
0.80
Tip fairing installation.
Details
     

 08-07-2003
2.70
Trim tab installation.
Details
       

 08-07-2003
1.70
Butt rib installation.
Details
     

 08-06-2003
7.00
Wingtip installation.
Details

 08-05-2003
7.00
Wingtip installation.
Details
       

 08-03-2003
2.60
Fuel tank installation.
Details

 08-03-2003
2.40
Fuel tank installation.
Details

 08-03-2003
2.70
Fuel tank installation R/H.
Details

 08-02-2003
1.80
Trailing edge installation.
Details

 07-27-2003
2.90
Fuel tank installation.
Details
       

 07-27-2003
1.70
Fuel tank installation.
Details

 07-27-2003
2.50
Fuel tank installation L/H.
Details

 07-27-2003
1.80
Belly stringer installation.
Details

 07-26-2003
3.30
Horizontal stablilizer installation.
Details
       

 07-26-2003
2.20
Header tank installation.
Details
       

 07-26-2003
2.50
Fuel tank installation.
Details
       

 07-26-2003
4.20
Fuel tank installation.
Details
       

 07-26-2003
2.00
Cargo bay installation.
Details
       

 07-25-2003
4.50
Leading edge installation.
Details

 07-25-2003
3.50
Fuel tank pressure test.
Details

 07-24-2003
4.50
Wing leading edge installation.
Details

 07-24-2003
1.00
Turtledeck attach angle
Details
     

 07-24-2003
1.60
Slide block installation.
Details
     

 07-24-2003
1.20
Rudder fairing installation.
Details

 07-24-2003
3.00
Flaperon bracket installaition.
Details
       

 07-23-2003
1.00
Flaperon tip installation.
Details

 07-23-2003
3.20
Flaperon mass balance installation.
Details
       

 07-23-2003
3.50
Flaperon conrol horn assembly,
Details
       

 07-22-2003
2.50
Flaperon tip installation.
Details
     

 07-21-2003
3.50
Wing strut fairing installation.
Details

 07-21-2003
5.80
Butt rib installation.
Details
     

 07-20-2003
1.50
Leading edge installation.
Details
     

 07-20-2003
3.00
Flaperon installation.
Details
     

 07-20-2003
3.00
Flaperon end rib and tip installation.
Details
       

 07-20-2003
3.20
Flaperon clamping fixture.
Details
     

 07-06-2003
2.50
False rib installation.
Details

 07-06-2003
1.20
Butt rib installation.
Details
     

 07-05-2003
8.20
Leading edge installation
Details
       

 07-05-2003
5.50
Epoxy varnish.
Details

 07-04-2003
8.50
Flaperon bracket installation
Details
       

 07-04-2003
9.50
False rib installation.
Details
       

 07-02-2003
1.20
Vertical stabilizer and rudder tip fairings.
Details

 07-02-2003
3.50
Epoxy varnish.
Details

 07-02-2003
6.50
Epoxy varnish wooden parts.
Details

 07-01-2003
0.90
Vertical stabilizer tib fabrication.
Details
       

 07-01-2003
1.70
Trim lever installation.
Details
     

 07-01-2003
1.20
Center console installation.
Details
     

 07-01-2003
7.00
Airfoiled vertical tail installation.
Details
       

 06-30-2003
7.40
Stabilizer rib installation.
Details

 06-29-2003
8.70
Stabilizer rib installation.
Details
       

 06-29-2003
1.40
Horizontail stabilizer installation.
Details

 06-22-2003
3.10
Wing rib installation,
Details

 06-22-2003
6.40
Wing epoxy varnishing.
Details

 06-21-2003
3.20
Varnish wing ribs,
Details

 06-21-2003
0.40
Rudder rib installation.
Details

 06-20-2003
5.10
Rudder pedal installation.
Details
       

 06-20-2003
2.50
Rudder pedal installation
Details
       

 06-20-2003
2.50
False rib installation.
Details

 06-19-2003
1.80
Rudder pedal pully installation.
Details
       

 06-19-2003
1.70
Rudder pedal installation.
Details
       

 06-19-2003
1.30
Rudder pedal ajustment lever installation.
Details
       

 06-19-2003
1.90
Rudder cable installation.
Details
       

 06-19-2003
2.80
Center console installation
Details
     

 06-19-2003
0.70
Butt rib installation
Details
       

 06-18-2003
3.00
Varnish wood ribs in vertical stab and rudder.
Details

 06-18-2003
1.00
Center consol installation.
Details
     

 06-18-2003
3.20
Butt rib installation.
Details
       

 06-18-2003
1.70
Adjustable rudder pedal installation.
Details
       

 06-17-2003
8.70
Rudder rib installation.
Details
       

 06-16-2003
9.20
Vertical Stab rib installation.
Details
       

 06-16-2003
1.60
#1 rib installation.
Details
       

 05-26-2003
2.80
Wing dihedral and twist adjustment.
Details

 05-26-2003
3.80
Jury strut installation.
Details
       

 05-25-2003
1.10
Wing rib #1 installation.
Details
       

 05-25-2003
0.50
Stringer and false rib installation.
Details
     

 05-25-2003
7.00
Sand wing ribs.
Details
       

 05-25-2003
3.20
Initial wing installation.
Details
       

 05-24-2003
2.80
Spar attach reinforcement fitting installation.
Details

 05-24-2003
1.50
Lift strut attach bracket installation.
Details
     

 05-24-2003
1.40
Lift strut attach bracket installation
Details

 05-24-2003
0.30
Lift strut / bracket installation
Details

 05-23-2003
3.10
Spar attach reinforcement fitting installation.
Details
       

 05-23-2003
1.50
Lift strut attach bracket installation.
Details
       

 05-18-2003
3.30
Spar attach reinforcement fitting installation.
Details
       

 05-18-2003
5.80
Lift strut bracket installation.
Details
       

 05-18-2003
1.50
Lift strut attach bracket installation.
Details
       

 05-18-2003
0.40
Insturment panel installation.
Details
     

 05-17-2003
2.30
Door parts fabrication.
Details
       

 05-17-2003
1.10
Door frame installation.
Details

 05-04-2003
2.90
Door frame installation.
Details
       

 05-04-2003
4.90
Door frame installation.
Details
       

 05-04-2003
3.80
Door frame installation
Details
       

 05-03-2003
2.30
Door frame installation.
Details
       

 05-03-2003
4.30
Door frame installation
Details
       

 04-20-2003
1.90
Door frame installation.
Details
       

 04-20-2003
5.70
Door frame installation.
Details
     

 04-20-2003
1.90
Door frame installation.
Details
       

 04-20-2003
1.40
Door frame installation.
Details
       

 04-19-2003
6.20
Door frame installation.
Details
       

 04-18-2003
3.50
Door latch Installation.
Details
       

 04-18-2003
5.60
Door frame installation.
Details
       

 03-23-2003
5.20
Side stringer installation
Details
       

 03-23-2003
1.50
Seat pan installation.
Details
       

 03-23-2003
0.60
Rudder installation.
Details
       

 03-23-2003
0.40
Rudder cable pulley installation.
Details
     

 03-23-2003
1.60
Mixer and push-pull tube installation.
Details
       

 03-23-2003
1.40
Floorboard installation.
Details
       

 03-23-2003
1.70
Flap handle installation
Details
       

 03-23-2003
2.60
Elevator push-pull tube installation
Details
       

 02-23-2003
0.70
Fuselage preparation.
Details

 02-23-2003
1.80
Flaperon mixer assembly
Details
       

 02-23-2003
0.70
Elevator bellcrank installation.
Details
     

 02-23-2003
1.50
Control stick pivots installation.
Details

 02-23-2003
2.10
Control column installation.
Details
     

 02-23-2003
1.00
Control column bracket assembly.
Details

 02-23-2003
1.00
Control column assembly.
Details

 02-23-2003
0.60
Aileron bellcrank installation.
Details
     

 02-22-2003
0.50
Flight control installation.
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.