Powered By Kitlog Pro v2.0
Colin Cameron - Skybolt build
Skybolt Delta
All
Work Logs Found:
190
Category Work Time:
535 Hours
Date
Hours
Work Log Summary
Details
12-02-2010
8.00
Install nut plates on servo tab spars
Details
12-01-2010
3.00
Start hinging 1st servo tab
Details
11-30-2010
4.00
Start 1st Servo/Trim Tab
Details
11-21-2010
3.00
Finish second elevator tip
Details
11-20-2010
2.00
Jig second elevator and stabilizer
Details
11-19-2010
3.00
Finish elevator tip
Details
11-18-2010
1.00
Make various thickness blocks
Details
11-18-2010
5.00
Finish weld stabilizer and repeat for second
Details
11-17-2010
4.00
Fit tip ribs and cut stabilizer spar to match
Details
11-16-2010
2.00
Fit stabilizer ribs to jig
Details
11-15-2010
3.00
Shape leading edges of stabilizer
Details
11-14-2010
3.00
Prepare Stabilizer jig
Details
11-13-2010
6.00
Repeat process for second elevator
Details
05-03-2010
4.00
Finish weld elevator
Details
05-02-2010
3.00
Fit ribs and trailing edge to elevator
Details
04-29-2010
2.00
Shape leading edge
Details
04-28-2010
2.00
Fit elevator ribs to leading edge
Details
04-27-2010
3.00
Layout elevator on building table and prepare jig
Details
04-25-2010
3.00
Finish weld rudder
Details
04-18-2010
3.00
Cut and fit rudder ribs and trailing edge
Details
04-07-2010
2.00
Fabricate Stab Wire Attach Straps
Details
04-06-2010
4.00
Fabricate Elevator Horns
Details
04-05-2010
4.00
Fabricate Rudder Horn
Details
04-04-2010
2.00
Prepare rudder jig and fit ribs to rudder post
Details
04-03-2010
2.00
finish cutting hinges and then ream to size
Details
04-02-2010
4.00
Cut hinges from blanks and dress edges
Details
04-01-2010
1.00
Make jig to hold hinges for dressing
Details
03-31-2010
3.00
Weld tubing to form hinge blanks
Details
03-30-2010
2.00
Shape top of rudder post
Details
03-30-2010
1.00
Draw Rudder Horn in DeltaCAD
Details
03-29-2010
3.00
Shape rudder trailing edge and cut front post
Details
03-28-2010
6.00
Prepare table for rudder construction
Details
03-25-2010
6.00
Weld torque tube collars to fuselage
Details
03-23-2010
4.00
Prepare torque tube for fitting to fuselage
Details
03-22-2010
6.00
Finish fabrication of Torque tube
Details
03-21-2010
4.00
Fabricate stick to stick pushrod
Details
12-30-2009
3.00
Finish weld stick boots to torque tube
Details
12-29-2009
2.00
Fit Torque tube and stick boots to jig
Details
12-28-2009
6.00
Fit stick boots to torque tube
Details
12-26-2009
10.00
Remake torque tube collars
Details
11-25-2009
2.00
Drill stick socket pivot and prepare bushings
Details
11-24-2009
3.00
Add elongated washer to stick boot
Details
11-20-2009
1.00
Set up Cross Vice for drilling stick sockets
Details
11-17-2009
2.00
Squeeze bottom of stick sockets to shape
Details
11-16-2009
2.00
Fabricate stick sockets
Details
11-14-2009
3.00
Finish torque tube jig
Details
11-13-2009
1.00
Fabricate stick boot to torque tube jig fitting
Details
11-12-2009
4.00
Construct torque tube jig
Details
11-11-2009
4.00
Bend 2nd stick boot. Bend boot tops
Details
11-10-2009
3.00
Bend 1st stick boot
Details
11-09-2009
3.00
Hone torque tube collars
Details
11-09-2009
3.00
Fabricate stick boots
Details
11-08-2009
2.00
Fabricate stick to stick pushrod fittings
Details
11-07-2009
2.00
Fabricate second torque tube collar
Details
11-06-2009
4.00
Cut torque tube collars, begin fabrication.
Details
11-05-2009
1.00
Fabricate stick boot fittings
Details
11-04-2009
2.00
Fabricate stick boot fittings
Details
11-04-2009
2.00
Fabricate aileron activating arm
Details
11-03-2009
1.00
Draw aileron activating arm in DeltaCAD
Details
11-02-2009
3.00
Draw stick socket and boot in DeltaCAD
Details
11-01-2009
4.00
Finish walking beam
Details
10-31-2009
6.00
Fabricate walking beam
Details
10-30-2009
1.00
Draw walking beam in DeltaCAD
Details
10-27-2009
4.00
Fabricate elevator reverser
Details
10-25-2009
3.00
Fabricate SB3PW-050 & 051 cabane fittings
Details
10-24-2009
3.00
Fabricate SB3PW-048 & 049 cabane fittings
Details
10-23-2009
3.00
Fabricate SB3PW-053 & 054 cabane fittings
Details
10-22-2009
2.00
Fabricate SB3PW-055 & 056 cabane fittings
Details
10-21-2009
4.00
Fabricate SB3PW-052 cabane fittings
Details
10-20-2009
6.00
Decide on Skybolt variant before starting cabane
Details
10-19-2009
5.00
Weld Fittings to rudder and brake pedals
Details
10-18-2009
4.00
Cut rudder pedal and brake fittings
Details
10-15-2009
4.00
Fit foot bar to rudder pedal
Details
10-14-2009
2.00
Cut and fit foot bar and end caps
Details
10-13-2009
6.00
Cut and fit brake pedal hinge brackets
Details
10-12-2009
2.00
Finish weld rudder pedals
Details
10-11-2009
3.00
Cut and fit rudder pedal parts to jig
Details
10-10-2009
1.00
Plot rudder pedal fittings in DeltaCad
Details
10-09-2009
2.00
Finish weld brake pedals
Details
10-08-2009
2.00
Cut and fit tubing for brake pedals
Details
10-06-2009
6.00
Cut and fit front gear mount reinforcement straps
Details
10-05-2009
4.00
Cut and fit reinforcement straps to crossmembers
Details
10-04-2009
8.00
Finish weld and add axle reinforcement straps
Details
10-03-2009
3.00
Shape axles to streamlined tubing
Details
10-02-2009
3.00
Cut and fit right gear leg streamlined tube
Details
10-01-2009
3.00
Fine tune alignment and fit left streamlined tube
Details
09-30-2009
3.00
Jig gear legs, cut and fit cross bar
Details
09-29-2009
3.00
Cut and weld gear rebound pad
Details
09-28-2009
4.00
Fit reinforcement strap to rear gear mount
Details
09-27-2009
4.00
Fit and weld rear gear mount
Details
09-26-2009
1.00
Shape lower front gear legs to bushing
Details
09-25-2009
4.00
Tack weld gear legs and fabricate rear mount
Details
09-24-2009
3.00
Cut and fit front right gear leg
Details
09-23-2009
5.00
Cut and fit rear left gear leg
Details
09-20-2009
2.00
Cut and fit front right gear leg
Details
09-19-2009
3.00
Cut and fit front left gear leg
Details
09-18-2009
2.00
Machine landing gear bushings
Details
09-17-2009
2.00
Fit Axles to jig and check alignment
Details
09-16-2009
3.00
Mount axle jig to fuselage
Details
09-15-2009
4.00
Fit front landing gear fittings and weld
Details
09-14-2009
3.00
Finish weld rear gear fittings
Details
09-13-2009
3.00
Fit rear gear fittings
Details
09-12-2009
2.00
Fabricate jig to hold landing gear fittings
Details
09-11-2009
2.00
Fabricate jig to hold fuselage for gear fitting
Details
09-10-2009
2.00
Correct landing gear jig
Details
09-09-2009
2.00
Finish landing gear jig
Details
09-08-2009
4.00
Fabricate landing gear jig
Details
09-07-2009
3.00
Finish weld battery tray and supports
Details
09-06-2009
4.00
Tack weld battery tray in place
Details
09-05-2009
1.00
Plot battery tray position using Deltacad
Details
09-04-2009
3.00
Fabricate battery tray
Details
09-03-2009
2.00
Finish weld seat frames
Details
09-02-2009
3.00
Align seat frames and tack weld in final position
Details
09-01-2009
2.00
Cut and fit front seat supports
Details
08-31-2009
4.00
Cut and fit rear seat supports
Details
08-30-2009
2.00
Fabricate two seat pan frames
Details
08-29-2009
1.00
Draw seats in CAD and make jig
Details
08-27-2009
5.00
Finish front landing gear & flying wire fittings
Details
08-26-2009
1.00
Make Aluminum vice jaws for bending fittings
Details
08-25-2009
2.00
Weld doubler to front landing gear fittings
Details
08-24-2009
2.00
Fabricate front landing gear & flying wire fitting
Details
08-23-2009
3.00
Fabricate rear landing gear & lower wing fitting
Details
08-22-2009
2.00
Modify Brake Fingers for correct radius
Details
08-22-2009
1.00
Draw Rear Lower Wing Fitting
Details
08-21-2009
2.00
Draw front landing gear, stab straps, and elevator
Details
08-20-2009
2.00
Plate Shear & Box and Pan Brake
Details
08-19-2009
2.00
Make Bend Allowance Spreadsheet
Details
08-18-2009
1.00
Inventory 4130 steel plate
Details
08-17-2009
2.00
Draw rear landing gear fitting
Details
08-16-2009
1.00
Remove finished basic fuselage from jig
Details
08-15-2009
2.00
Finish weld 0 lower
Details
08-14-2009
2.00
Finish weld 0 upper
Details
08-13-2009
2.00
Finish weld 13
Details
08-11-2009
3.00
Finish weld 34 to 24
Details
08-10-2009
3.00
Finish weld 57 1/8 to 51
Details
08-09-2009
2.00
Finish weld 79
Details
08-08-2009
3.00
Finish weld 99 to 85
Details
08-07-2009
4.00
Finish weld 137 to 111
Details
08-06-2009
2.00
Finish weld 162 to 142
Details
08-05-2009
1.00
Finish weld Tailpost
Details
08-04-2009
1.00
Trim top longeron at 0
Details
08-04-2009
2.00
cap longerons at tailpost
Details
08-03-2009
2.00
Fit fuselage to jig
Details
08-02-2009
2.00
Construct finish welding jig
Details
08-01-2009
2.00
internal diagonal 0 to 24 (2 of 2)
Details
07-31-2009
3.00
internal diagonal 0 to 24 (1 of 2)
Details
07-30-2009
1.00
Ready for longeron to fuel tank clearance check
Details
07-29-2009
2.00
Internal diagonal 120 to 137
Details
07-28-2009
3.00
Internal diagonal 85 to 120
Details
07-27-2009
2.00
Dummy fuel tank for diagonal clearance check
Details
07-25-2009
2.00
Internall diagonals 79 to 85
Details
07-24-2009
2.00
Internal diagonals 0
Details
07-23-2009
2.00
Trim bottom longeron at station 0
Details
07-22-2009
2.00
Bottom diagonals 79 to 142
Details
07-21-2009
2.00
Bottom diagonals 57 1/8 to 79
Details
07-19-2009
2.00
Bottom diagonals 34 to 57 1/8
Details
07-16-2009
2.00
Bottom diagonals13 to 34
Details
07-14-2009
2.00
Bottom diagonals 0 to 13
Details
07-12-2009
2.00
top rear diagonals
Details
07-10-2009
2.00
bottom rear crossmembers
Details
07-08-2009
2.00
Top rear cross members
Details
07-05-2009
5.00
Main gear truss
Details
07-01-2009
2.00
square tailpost and tack weld in position
Details
06-30-2009
2.00
Form Longerons to tailpost
Details
06-29-2009
1.00
drill table for tailpost
Details
06-28-2009
2.00
Bend longerons
Details
06-27-2009
4.00
square fuselage sides in jig
Details
06-26-2009
2.00
layout assembly table for fuselage top
Details
06-25-2009
2.00
tack weld second fuselage side
Details
06-23-2009
1.00
17th upright
Details
06-22-2009
1.00
16th upright
Details
06-20-2009
1.00
15th upright
Details
06-17-2009
1.00
14th upright
Details
06-14-2009
1.00
12th & 13th upright
Details
06-08-2009
1.00
10th & 11th
Details
06-04-2009
1.00
8th & 9th uprights
Details
06-02-2009
5.00
Start second fuselage side
Details
04-26-2003
3.00
Tack weld all joints
Details
04-25-2003
3.00
16th & 17th upright
Details
04-24-2003
4.00
13th, 14th & 15th upright
Details
04-23-2003
1.00
12th upright
Details
04-22-2003
4.00
8th - 11th uprights
Details
04-21-2003
2.00
6th & 7th upright
Details
04-20-2003
3.00
4th & 5th upright
Details
04-15-2003
3.00
1st, 2nd & 3rd upright
Details
04-14-2003
3.00
Weld longeron splice and bend lower
Details
04-11-2003
2.00
Longeron Splice
Details
04-08-2003
4.00
Mark fuselage sides on assembly table
Details
04-07-2003
3.00
Steel and Centerline aids
Details
03-03-2003
6.00
Assembly table
Details
SITE NAVIGATION
Contact Builder
Skybolt Delta Home
Category
# Logs
# Hours
All
190
535
Cabane
6
21
Control Systems
31
103
Empennage
31
100
Fittings
9
20
Fuselage
72
168
Landing Gear
26
85
Rudder Pedals
10
31
Tools
5
7
Copyright © 2001-2024 Matronics. All Rights Reserved.