Date
|
Hours
|
Work Log Summary
|
Details
|
02-07-2006
|
3.00
|
Fitting aft fuselage skins
|
Details
|
|
|
02-05-2006
|
7.00
|
Finished de-burring and priming aft fuselage parts
|
Details
|
|
|
02-04-2006
|
7.00
|
De-burred and primed aft fuselage parts
|
|
|
|
02-02-2006
|
3.00
|
Match drilled rear fuselage
|
|
|
|
02-02-2006
|
3.00
|
Finished match drilling rear fuselage
|
Details
|
|
|
01-30-2006
|
3.00
|
Assembled rear fuselage for match drilling
|
|
|
|
01-27-2006
|
4.00
|
Started bending longerons
|
|
|
|
01-19-2006
|
2.00
|
F-706 bulkhead
|
|
|
|
01-18-2006
|
2.00
|
F-706 bulkhead
|
|
|
|
01-17-2006
|
2.00
|
Primed parts of F-706
|
|
|
|
01-16-2006
|
3.00
|
Worked on the 706 bulkhead
|
|
|
|
01-15-2006
|
4.00
|
Primed all parts of 711 and 712 bulkhead
|
Details
|
|
|
01-10-2006
|
4.00
|
worked on F-711 and F-112 bulkheads
|
|
|
|
01-09-2006
|
3.00
|
F-706 bulkhead
|
|
|
|
01-08-2006
|
5.00
|
Riveted F-705 bulkhead
|
|
|
|
01-06-2006
|
2.00
|
F-705 bulkhead
|
|
|
|
01-05-2006
|
4.00
|
Worked on F-705 bulkhead
|
|
|
|
01-04-2006
|
2.00
|
worked on F-705 bulkhead
|
|
|
|
01-03-2006
|
2.00
|
F-705 bulkhead
|
|
|
|
01-02-2006
|
4.00
|
Started on F-704 bulkhead
|
|
|
|
12-31-2005
|
4.00
|
Worked on F-704 spar carry throughs
|
|
|
|
12-26-2005
|
4.00
|
Riveted Firewall
|
|
|
|
12-25-2005
|
4.00
|
Prepared firewall pieces for riveting
|
|
|
|
12-23-2005
|
4.00
|
Made misc firewal parts
|
|
|
|
12-23-2005
|
2.00
|
Installed aileron stops
|
|
|
|
12-17-2005
|
4.00
|
Primed and installed gap seals on right wing.
|
Details
|
|
|
12-16-2005
|
3.00
|
Riveted aileron brackets on right wing
|
|
|
|
12-15-2005
|
3.00
|
Aileron brackets right wing
|
|
|
|
12-14-2005
|
3.50
|
Finished riveting top skin, right wing
|
Details
|
|
|
12-13-2005
|
1.50
|
Riveted some on top skin , right wing
|
|
|
|
12-10-2005
|
5.00
|
Built long aileron push-pull tubes
|
Details
|
|
|
12-09-2005
|
0.00
|
Resting right hand- feels like carpal tunnel
|
|
|
|
12-08-2005
|
0.00
|
Resting right hand- feels like carpal tunnel
|
|
|
|
12-07-2005
|
0.00
|
Resting right hand- feels like carpal tunnel
|
|
|
|
12-04-2005
|
7.00
|
Fabricated short aileron push pull tubes
|
Details
|
|
|
12-03-2005
|
2.00
|
Riveted ribs to top skins, right flap
|
Details
|
|
|
12-02-2005
|
2.00
|
Riveted ribs to lower skin, right flap
|
|
|
|
12-01-2005
|
2.00
|
Finished riveting left flap
|
|
|
|
11-30-2005
|
2.00
|
Riveted more of the top skins, right wing
|
|
|
|
11-29-2005
|
2.00
|
Riveted some of the top skins. right wing
|
|
|
|
11-28-2005
|
3.00
|
Riveted bottom skin on left flap
|
|
|
|
11-27-2005
|
4.00
|
finished drilling flap parts and primed them
|
|
|
|
11-26-2005
|
8.00
|
Match drilled and dimpled flap parts
|
|
|
|
11-25-2005
|
1.00
|
Installed inspection plate on right tank
|
|
|
|
11-24-2005
|
3.00
|
De-burring flap ribs and spars
|
|
|
|
11-24-2005
|
4.00
|
De-burred and dimpled top wing skins, right wing
|
Details
|
|
|
11-23-2005
|
1.00
|
De-burred flap spars
|
|
|
|
11-21-2005
|
3.00
|
Dimpled ribs and top inboard skin of right wing.
|
Details
|
|
|
11-20-2005
|
4.00
|
De-burred and dimpled right wing ribs
|
|
|
|
11-19-2005
|
10.00
|
Installed leading edge on right wing
|
Details
|
|
|
11-18-2005
|
5.00
|
Intstalled rear baffle on right fuel tank
|
|
|
|
11-13-2005
|
5.00
|
Riveted end ribs on right fuel tank
|
|
|
|
11-12-2005
|
1.50
|
Ran vent line in right tank
|
|
|
|
11-11-2005
|
5.00
|
Riveted last two internal ribs in right fuel tank
|
|
|
|
11-10-2005
|
2.50
|
Riveted one rib in right fuel tank
|
|
|
|
11-09-2005
|
2.50
|
Riveted and sealed one rib in right fuel tank
|
|
|
|
11-08-2005
|
2.50
|
Sealed and riveted one rib of right fuel tank
|
Details
|
|
|
11-07-2005
|
0.75
|
Prepared tank ribs
|
Details
|
|
|
11-06-2005
|
7.00
|
Riveted right leading edge
|
|
|
|
11-05-2005
|
5.00
|
Riveted stiffeners onto right tank skin
|
|
|
|
11-05-2005
|
1.50
|
Riveted fuel filler ring and tank drain fitting
|
Details
|
|
|
11-04-2005
|
3.00
|
deburred and dimpled rigtht fuel tank skin
|
|
|
|
11-02-2005
|
2.50
|
Drilled z brackets for right fuel tank
|
Details
|
|
|
11-01-2005
|
2.00
|
Installed nut-plates on z-brackets for right fuel
|
|
|
|
10-31-2005
|
3.00
|
Started right fuel tank
|
|
|
|
10-30-2005
|
6.00
|
Drilled right wing skins
|
Details
|
|
|
10-29-2005
|
0.00
|
No work today. Airshow all day at TVR
|
|
|
|
10-28-2005
|
0.00
|
No work today. Flew to TVR for night airshow
|
|
|
|
10-27-2005
|
2.00
|
Pulled plastic from flap parts
|
Details
|
|
|
10-26-2005
|
2.00
|
Finished left aileron
|
Details
|
|
|
10-25-2005
|
4.00
|
riveted left aileron
|
|
|
|
10-24-2005
|
3.00
|
Deburred and dimpled left aileron
|
|
|
|
10-23-2005
|
5.00
|
finished riveting right aileron
|
|
|
|
10-18-2005
|
3.50
|
Primed aileron stuctures, started assembly
|
|
|
|
10-16-2005
|
2.00
|
ailerons
|
Details
|
|
|
10-14-2005
|
3.00
|
Ailerons
|
|
|
|
10-13-2005
|
2.00
|
Ailerons
|
|
|
|
10-12-2005
|
3.00
|
Ailerons
|
|
|
|
10-10-2005
|
3.00
|
Cleaned up and drilled aileron stiffers
|
|
|
|
10-09-2005
|
6.00
|
Riveted flap and aileron fairings left wing
|
Details
|
|
|
10-07-2005
|
2.00
|
Deburring flap and aileron fairings
|
|
|
|
10-05-2005
|
3.00
|
Aileron brackets
|
|
|
|
10-04-2005
|
3.00
|
Fitting tank and moving wing to table form jig
|
|
|
|
10-03-2005
|
2.50
|
Finished adding proseal to back of tank
|
|
|
|
10-02-2005
|
2.00
|
Finished riveting top left skins
|
|
|
|
10-02-2005
|
3.00
|
Finished all riveting on top skin left wing
|
|
|
|
09-29-2005
|
2.00
|
Riveting top outboard skin left wing
|
|
|
|
09-26-2005
|
1.50
|
Riveting skins left wing
|
Details
|
|
|
09-26-2005
|
1.00
|
Deburred and dimpled more ribs, left wing.
|
|
|
|
09-25-2005
|
1.00
|
Riveted left inboard skin to one rib
|
|
|
|
09-24-2005
|
3.00
|
Deburred and dimpled top inboard skin left wing
|
Details
|
|
|
09-23-2005
|
2.00
|
Dimpled ribs for top inboard skin
|
|
|
|
09-20-2005
|
3.00
|
deburred rib holes for inboard skins
|
|
|
|
09-19-2005
|
4.00
|
Riveting left leading edge to spar
|
|
|
|
09-18-2005
|
5.00
|
Riveting left leading edge to spar
|
|
|
|
09-17-2005
|
8.00
|
Left wing
|
Details
|
|
|
09-03-2005
|
3.00
|
Installed outboard rib in left tank
|
|
|
|
09-02-2005
|
2.00
|
left fuel tank, installed vent line
|
|
|
|
09-01-2005
|
3.00
|
installed one rib in left fuel tank
|
|
|
|
08-31-2005
|
2.00
|
Installed one rib, left fuel tank
|
|
|
|
08-30-2005
|
3.00
|
Installed one rib, left fuel tank
|
|
|
|
08-29-2005
|
3.00
|
Installed one rib in left tank
|
|
|
|
08-28-2005
|
3.00
|
Installed one rib in left tank
|
|
|
|
08-27-2005
|
3.00
|
fabricated fuel pick-up tubes, both tanks
|
|
|
|
08-26-2005
|
2.00
|
left tank
|
|
|
|
08-25-2005
|
3.00
|
left tank
|
|
|
|
08-24-2005
|
3.00
|
rivet drain flange and anti rotation bracket, left
|
|
|
|
08-23-2005
|
6.00
|
Preped left fuel tank and prosealed filler neck
|
|
|
|
08-22-2005
|
3.00
|
Prepared tanks parts for both tanks
|
|
|
|
08-21-2005
|
8.00
|
left fuel tank
|
|
|
|
08-20-2005
|
8.00
|
Worked on left fuel tank
|
|
|
|
08-19-2005
|
3.00
|
left fuel tank
|
|
|
|
08-18-2005
|
3.00
|
left fuel tank
|
|
|
|
08-17-2005
|
2.00
|
level wing in wing stand
|
|
|
|
08-16-2005
|
3.00
|
left wing
|
|
|
|
08-15-2005
|
2.50
|
Fabricated and drilled wing walk doublers
|
Details
|
|
|
08-13-2005
|
6.00
|
Claened and Primed right main ribs
|
|
|
|
08-12-2005
|
1.50
|
drilled conduit hole in right ribs and deburred ri
|
|
|
|
08-09-2005
|
3.00
|
Moved left wing back to wing stand.
|
Details
|
|
|
08-08-2005
|
2.50
|
Riveting ribs to rear spar on left wing
|
|
|
|
08-07-2005
|
4.00
|
Rivet main ribs to left main spar
|
|
|
|
08-03-2005
|
3.00
|
Washed left wing ribs
|
|
|
|
08-02-2005
|
3.00
|
Inventory parts
|
|
|
|
08-01-2005
|
4.00
|
Fuselage arrived, unpacking
|
|
|
|
07-31-2005
|
3.00
|
moving wing to table, and match drilling ribs to s
|
|
|
|
07-20-2005
|
1.00
|
Finished deburring main ribs
|
|
|
|
07-19-2005
|
2.00
|
worked on wing jig
|
|
|
|
07-17-2005
|
1.00
|
First assembly of ribs to spar left wing
|
|
|
|
07-17-2005
|
4.00
|
Building wing stands
|
|
|
|
07-16-2005
|
1.00
|
Painted some on garage
|
|
|
|
07-16-2005
|
4.00
|
Built wing cradle and leading edge cradle
|
|
|
|
07-14-2005
|
2.50
|
Deburred and fluted 9 ribs
|
|
|
|
07-13-2005
|
2.50
|
Cleaning up ribs
|
|
|
|
07-12-2005
|
1.50
|
Cleaning up fibs
|
|
|
|
07-11-2005
|
3.00
|
Deburring wing ribs
|
|
|
|
07-10-2005
|
8.00
|
Rear spars
|
Details
|
|
|
07-09-2005
|
8.00
|
Started rear spars
|
Details
|
|
|
07-08-2005
|
3.00
|
Finished mounting the nutplates
|
Details
|
|
|
07-07-2005
|
3.00
|
Countersunk nutplate holes in spars
|
|
|
|
07-06-2005
|
3.00
|
Tie down brackets
|
|
|
|
07-05-2005
|
3.00
|
Continied mounting nutplates
|
|
|
|
07-04-2005
|
6.00
|
Started mounting nutplates on spars
|
|
|
|
07-04-2005
|
1.00
|
Finished fairing on top of rudder
|
|
|
|
06-19-2005
|
6.00
|
Fiberglass on empennage fairings
|
|
|
|
06-18-2005
|
6.00
|
Fiberglass on empennage fairings
|
|
|
|
05-30-2005
|
6.00
|
Assembled emp and worked on fairings
|
|
|
|
05-29-2005
|
2.00
|
Rolling elevators
|
|
|
|
05-28-2005
|
6.00
|
finishing up elevators
|
|
|
|
05-27-2005
|
3.00
|
Riveted left elevator
|
|
|
|
05-26-2005
|
3.00
|
Riveting right elevator
|
|
|
|
05-25-2005
|
2.50
|
Riveting elevator structures
|
|
|
|
05-24-2005
|
2.50
|
Riviting elevator structures
|
|
|
|
05-23-2005
|
3.00
|
Primed elevator parts
|
|
|
|
05-22-2005
|
2.00
|
elevators
|
|
|
|
05-18-2005
|
3.00
|
elevators
|
|
|
|
05-17-2005
|
3.00
|
Left elevator and trim tab
|
|
|
|
05-17-2005
|
4.00
|
Elevators and trim tab bending
|
|
|
|
05-16-2005
|
3.00
|
Deburrig and dimpling elevators
|
|
|
|
05-15-2005
|
2.00
|
elevators
|
|
|
|
05-13-2005
|
2.00
|
elevators
|
|
|
|
05-11-2005
|
2.00
|
Elevators
|
|
|
|
05-10-2005
|
2.00
|
Elevators
|
|
|
|
05-09-2005
|
3.00
|
elevator structure assembly
|
|
|
|
05-08-2005
|
6.00
|
priming and riveting stiffners on Elev's
|
|
|
|
05-07-2005
|
3.00
|
Deburred elevator skins and dimpled
|
|
|
|
05-06-2005
|
2.00
|
Deburred elevator skins
|
|
|
|
05-05-2005
|
3.00
|
Deburred and drilled elev stiffners
|
|
|
|
05-03-2005
|
4.00
|
Rolled leading edge of rudder
|
|
|
|
05-03-2005
|
2.00
|
Checked straightness of rudder
|
|
|
|
05-02-2005
|
2.00
|
Riveted last of rudder rivets on ribs
|
|
|
|
04-27-2005
|
3.00
|
riveted rudder trailing egde
|
|
|
|
04-26-2005
|
1.00
|
Deburring elevator stiffners
|
|
|
|
04-19-2005
|
2.00
|
Glued trailing edge of rudder
|
|
|
|
04-17-2005
|
3.00
|
Riveting rudder
|
|
|
|
04-16-2005
|
8.00
|
Primed and assembled rudder
|
|
|
|
04-14-2005
|
3.00
|
De burred and dimpled rudder parts
|
|
|
|
04-13-2005
|
2.00
|
Drilled all holes in Rudder
|
|
|
|
04-12-2005
|
3.00
|
Rudder
|
|
|
|
04-10-2005
|
2.50
|
Back riveted rudder stiffners
|
|
|
|
04-08-2005
|
3.00
|
Matched drilled rudder stiffiners
|
|
|
|
04-07-2005
|
2.00
|
Cut and trimmed rudder stiffiners
|
|
|
|
04-06-2005
|
3.00
|
Finished riveting HS
|
|
|
|
04-01-2005
|
2.00
|
Riveting VS
|
|
|
|
04-01-2005
|
3.00
|
Riveting rear spar on VS
|
Details
|
|
|
03-30-2005
|
2.00
|
Started riveting rear spar of VS
|
|
|
|
03-29-2005
|
2.00
|
Riveted rear spar onto HS
|
|
|
|
03-29-2005
|
1.00
|
EAA Tech Councelor inspection of EMP
|
Details
|
|
|
03-28-2005
|
2.00
|
Priming VS parts
|
|
|
|
03-27-2005
|
5.00
|
Drilling and deburring VS
|
|
|
|
03-26-2005
|
1.00
|
VS
|
|
|
|
03-23-2005
|
2.50
|
Riveting on HS
|
|
|
|
03-22-2005
|
1.00
|
Riveting HS
|
|
|
|
03-21-2005
|
3.00
|
Riveting HS
|
|
|
|
03-20-2005
|
6.00
|
|
Details
|
|
|
03-18-2005
|
2.00
|
Built HS plywood supports
|
Details
|
|
|
03-17-2005
|
3.00
|
Assembled front HS Spar
|
|
|
|
03-16-2005
|
1.50
|
Riveted elevator hinge brackets on HS
|
|
|
|
03-16-2005
|
2.00
|
Built carpeted table for DRDT-2
|
|
|
|
03-15-2005
|
3.00
|
Riveting rear spar os HS
|
|
|
|
03-14-2005
|
1.00
|
Priming HS parts
|
|
|
|
03-13-2005
|
4.00
|
Cleaning and priming HS parts
|
|
|
|
03-10-2005
|
3.00
|
de-burring and dimpling HS
|
|
|
|
03-09-2005
|
2.00
|
de-burring and dimpling HS
|
|
|
|
03-07-2005
|
2.00
|
Checked out new paint gun
|
|
|
|
03-04-2005
|
0.50
|
Match drilled skin in left HS
|
|
|
|
03-02-2005
|
1.00
|
Drilled 405-705-404-710 on both HS
|
|
|
|
02-28-2005
|
2.00
|
Assembly of right horizontal stabilizer
|
Details
|
|
|
02-27-2005
|
1.50
|
Assembled right HS structure
|
|
|
|
02-26-2005
|
8.00
|
First assy of left horizontal stabilizer
|
|
|
|
02-25-2005
|
3.00
|
Deburring parts
|
|
|
|
02-24-2005
|
3.00
|
Front spar on HS
|
|
|
|
02-23-2005
|
3.00
|
Started Front Spar of HS
|
|
|
|
02-22-2005
|
3.00
|
Working on rear spar of HS
|
|
|
|
02-21-2005
|
1.00
|
trying out new HVLP paint gun
|
|
|
|
02-21-2005
|
3.00
|
Match drilled rear spar
|
|
|
|
02-20-2005
|
8.00
|
Cleaning and painting garage
|
|
|
|
02-19-2005
|
4.00
|
Painting and cleaning garage
|
|
|
|
02-19-2005
|
2.00
|
Built 2' X 4' work table
|
|
|
|
02-10-2005
|
1.50
|
Worked on grinder
|
Details
|
|
|
02-09-2005
|
0.50
|
Deburring horizontal stablizer spars
|
|
|
|
02-06-2005
|
0.50
|
Looked at drawings and started deburing
|
Details
|
|
|
01-23-2005
|
0.50
|
Placed emp hardware in bins
|
|
|
|
01-13-2005
|
1.50
|
Unpacking and inventory of parts
|
|
|
|
12-31-2004
|
2.00
|
Getting Garage ready
|
|
|