KitLog pro

Powered By Kitlog Pro v2.0

Marks Web site
Work Logs Found: 224
Category Work Time: 687 Hours
 Date
Hours
Work Log Summary

Details

 02-07-2006
3.00
Fitting aft fuselage skins
Details
       

 02-05-2006
7.00
Finished de-burring and priming aft fuselage parts
Details

 02-04-2006
7.00
De-burred and primed aft fuselage parts

 02-02-2006
3.00
Match drilled rear fuselage

 02-02-2006
3.00
Finished match drilling rear fuselage
Details
       

 01-30-2006
3.00
Assembled rear fuselage for match drilling

 01-27-2006
4.00
Started bending longerons
       

 01-19-2006
2.00
F-706 bulkhead

 01-18-2006
2.00
F-706 bulkhead

 01-17-2006
2.00
Primed parts of F-706

 01-16-2006
3.00
Worked on the 706 bulkhead

 01-15-2006
4.00
Primed all parts of 711 and 712 bulkhead
Details

 01-10-2006
4.00
worked on F-711 and F-112 bulkheads

 01-09-2006
3.00
F-706 bulkhead

 01-08-2006
5.00
Riveted F-705 bulkhead

 01-06-2006
2.00
F-705 bulkhead

 01-05-2006
4.00
Worked on F-705 bulkhead

 01-04-2006
2.00
worked on F-705 bulkhead

 01-03-2006
2.00
F-705 bulkhead

 01-02-2006
4.00
Started on F-704 bulkhead

 12-31-2005
4.00
Worked on F-704 spar carry throughs

 12-26-2005
4.00
Riveted Firewall

 12-25-2005
4.00
Prepared firewall pieces for riveting

 12-23-2005
4.00
Made misc firewal parts

 12-23-2005
2.00
Installed aileron stops

 12-17-2005
4.00
Primed and installed gap seals on right wing.
Details

 12-16-2005
3.00
Riveted aileron brackets on right wing

 12-15-2005
3.00
Aileron brackets right wing

 12-14-2005
3.50
Finished riveting top skin, right wing
Details

 12-13-2005
1.50
Riveted some on top skin , right wing

 12-10-2005
5.00
Built long aileron push-pull tubes
Details

 12-09-2005
0.00
Resting right hand- feels like carpal tunnel

 12-08-2005
0.00
Resting right hand- feels like carpal tunnel

 12-07-2005
0.00
Resting right hand- feels like carpal tunnel

 12-04-2005
7.00
Fabricated short aileron push pull tubes
Details

 12-03-2005
2.00
Riveted ribs to top skins, right flap
Details

 12-02-2005
2.00
Riveted ribs to lower skin, right flap

 12-01-2005
2.00
Finished riveting left flap

 11-30-2005
2.00
Riveted more of the top skins, right wing

 11-29-2005
2.00
Riveted some of the top skins. right wing

 11-28-2005
3.00
Riveted bottom skin on left flap

 11-27-2005
4.00
finished drilling flap parts and primed them

 11-26-2005
8.00
Match drilled and dimpled flap parts

 11-25-2005
1.00
Installed inspection plate on right tank

 11-24-2005
3.00
De-burring flap ribs and spars

 11-24-2005
4.00
De-burred and dimpled top wing skins, right wing
Details

 11-23-2005
1.00
De-burred flap spars

 11-21-2005
3.00
Dimpled ribs and top inboard skin of right wing.
Details

 11-20-2005
4.00
De-burred and dimpled right wing ribs

 11-19-2005
10.00
Installed leading edge on right wing
Details

 11-18-2005
5.00
Intstalled rear baffle on right fuel tank

 11-13-2005
5.00
Riveted end ribs on right fuel tank

 11-12-2005
1.50
Ran vent line in right tank
       

 11-11-2005
5.00
Riveted last two internal ribs in right fuel tank

 11-10-2005
2.50
Riveted one rib in right fuel tank

 11-09-2005
2.50
Riveted and sealed one rib in right fuel tank

 11-08-2005
2.50
Sealed and riveted one rib of right fuel tank
Details

 11-07-2005
0.75
Prepared tank ribs
Details

 11-06-2005
7.00
Riveted right leading edge

 11-05-2005
5.00
Riveted stiffeners onto right tank skin
       

 11-05-2005
1.50
Riveted fuel filler ring and tank drain fitting
Details
       

 11-04-2005
3.00
deburred and dimpled rigtht fuel tank skin

 11-02-2005
2.50
Drilled z brackets for right fuel tank
Details

 11-01-2005
2.00
Installed nut-plates on z-brackets for right fuel

 10-31-2005
3.00
Started right fuel tank

 10-30-2005
6.00
Drilled right wing skins
Details

 10-29-2005
0.00
No work today. Airshow all day at TVR

 10-28-2005
0.00
No work today. Flew to TVR for night airshow

 10-27-2005
2.00
Pulled plastic from flap parts
Details

 10-26-2005
2.00
Finished left aileron
Details
       

 10-25-2005
4.00
riveted left aileron
       

 10-24-2005
3.00
Deburred and dimpled left aileron

 10-23-2005
5.00
finished riveting right aileron

 10-18-2005
3.50
Primed aileron stuctures, started assembly
       

 10-16-2005
2.00
ailerons
Details

 10-14-2005
3.00
Ailerons

 10-13-2005
2.00
Ailerons

 10-12-2005
3.00
Ailerons

 10-10-2005
3.00
Cleaned up and drilled aileron stiffers

 10-09-2005
6.00
Riveted flap and aileron fairings left wing
Details
     

 10-07-2005
2.00
Deburring flap and aileron fairings

 10-05-2005
3.00
Aileron brackets

 10-04-2005
3.00
Fitting tank and moving wing to table form jig

 10-03-2005
2.50
Finished adding proseal to back of tank

 10-02-2005
2.00
Finished riveting top left skins

 10-02-2005
3.00
Finished all riveting on top skin left wing
     

 09-29-2005
2.00
Riveting top outboard skin left wing

 09-26-2005
1.50
Riveting skins left wing
Details
       

 09-26-2005
1.00
Deburred and dimpled more ribs, left wing.
     

 09-25-2005
1.00
Riveted left inboard skin to one rib

 09-24-2005
3.00
Deburred and dimpled top inboard skin left wing
Details

 09-23-2005
2.00
Dimpled ribs for top inboard skin

 09-20-2005
3.00
deburred rib holes for inboard skins

 09-19-2005
4.00
Riveting left leading edge to spar

 09-18-2005
5.00
Riveting left leading edge to spar

 09-17-2005
8.00
Left wing
Details

 09-03-2005
3.00
Installed outboard rib in left tank

 09-02-2005
2.00
left fuel tank, installed vent line
       

 09-01-2005
3.00
installed one rib in left fuel tank

 08-31-2005
2.00
Installed one rib, left fuel tank

 08-30-2005
3.00
Installed one rib, left fuel tank

 08-29-2005
3.00
Installed one rib in left tank

 08-28-2005
3.00
Installed one rib in left tank

 08-27-2005
3.00
fabricated fuel pick-up tubes, both tanks

 08-26-2005
2.00
left tank

 08-25-2005
3.00
left tank

 08-24-2005
3.00
rivet drain flange and anti rotation bracket, left

 08-23-2005
6.00
Preped left fuel tank and prosealed filler neck

 08-22-2005
3.00
Prepared tanks parts for both tanks

 08-21-2005
8.00
left fuel tank

 08-20-2005
8.00
Worked on left fuel tank

 08-19-2005
3.00
left fuel tank
     

 08-18-2005
3.00
left fuel tank

 08-17-2005
2.00
level wing in wing stand

 08-16-2005
3.00
left wing

 08-15-2005
2.50
Fabricated and drilled wing walk doublers
Details

 08-13-2005
6.00
Claened and Primed right main ribs

 08-12-2005
1.50
drilled conduit hole in right ribs and deburred ri

 08-09-2005
3.00
Moved left wing back to wing stand.
Details

 08-08-2005
2.50
Riveting ribs to rear spar on left wing

 08-07-2005
4.00
Rivet main ribs to left main spar

 08-03-2005
3.00
Washed left wing ribs

 08-02-2005
3.00
Inventory parts

 08-01-2005
4.00
Fuselage arrived, unpacking

 07-31-2005
3.00
moving wing to table, and match drilling ribs to s

 07-20-2005
1.00
Finished deburring main ribs

 07-19-2005
2.00
worked on wing jig

 07-17-2005
1.00
First assembly of ribs to spar left wing

 07-17-2005
4.00
Building wing stands

 07-16-2005
1.00
Painted some on garage

 07-16-2005
4.00
Built wing cradle and leading edge cradle

 07-14-2005
2.50
Deburred and fluted 9 ribs

 07-13-2005
2.50
Cleaning up ribs

 07-12-2005
1.50
Cleaning up fibs

 07-11-2005
3.00
Deburring wing ribs

 07-10-2005
8.00
Rear spars
Details

 07-09-2005
8.00
Started rear spars
Details

 07-08-2005
3.00
Finished mounting the nutplates
Details

 07-07-2005
3.00
Countersunk nutplate holes in spars

 07-06-2005
3.00
Tie down brackets

 07-05-2005
3.00
Continied mounting nutplates

 07-04-2005
6.00
Started mounting nutplates on spars

 07-04-2005
1.00
Finished fairing on top of rudder

 06-19-2005
6.00
Fiberglass on empennage fairings
       

 06-18-2005
6.00
Fiberglass on empennage fairings

 05-30-2005
6.00
Assembled emp and worked on fairings

 05-29-2005
2.00
Rolling elevators

 05-28-2005
6.00
finishing up elevators

 05-27-2005
3.00
Riveted left elevator

 05-26-2005
3.00
Riveting right elevator

 05-25-2005
2.50
Riveting elevator structures

 05-24-2005
2.50
Riviting elevator structures

 05-23-2005
3.00
Primed elevator parts

 05-22-2005
2.00
elevators

 05-18-2005
3.00
elevators

 05-17-2005
3.00
Left elevator and trim tab

 05-17-2005
4.00
Elevators and trim tab bending
       

 05-16-2005
3.00
Deburrig and dimpling elevators

 05-15-2005
2.00
elevators

 05-13-2005
2.00
elevators

 05-11-2005
2.00
Elevators

 05-10-2005
2.00
Elevators

 05-09-2005
3.00
elevator structure assembly

 05-08-2005
6.00
priming and riveting stiffners on Elev's

 05-07-2005
3.00
Deburred elevator skins and dimpled

 05-06-2005
2.00
Deburred elevator skins

 05-05-2005
3.00
Deburred and drilled elev stiffners

 05-03-2005
4.00
Rolled leading edge of rudder

 05-03-2005
2.00
Checked straightness of rudder

 05-02-2005
2.00
Riveted last of rudder rivets on ribs

 04-27-2005
3.00
riveted rudder trailing egde

 04-26-2005
1.00
Deburring elevator stiffners

 04-19-2005
2.00
Glued trailing edge of rudder

 04-17-2005
3.00
Riveting rudder
     

 04-16-2005
8.00
Primed and assembled rudder

 04-14-2005
3.00
De burred and dimpled rudder parts

 04-13-2005
2.00
Drilled all holes in Rudder

 04-12-2005
3.00
Rudder

 04-10-2005
2.50
Back riveted rudder stiffners
     

 04-08-2005
3.00
Matched drilled rudder stiffiners

 04-07-2005
2.00
Cut and trimmed rudder stiffiners

 04-06-2005
3.00
Finished riveting HS

 04-01-2005
2.00
Riveting VS

 04-01-2005
3.00
Riveting rear spar on VS
Details

 03-30-2005
2.00
Started riveting rear spar of VS

 03-29-2005
2.00
Riveted rear spar onto HS

 03-29-2005
1.00
EAA Tech Councelor inspection of EMP
Details

 03-28-2005
2.00
Priming VS parts

 03-27-2005
5.00
Drilling and deburring VS

 03-26-2005
1.00
VS

 03-23-2005
2.50
Riveting on HS

 03-22-2005
1.00
Riveting HS

 03-21-2005
3.00
Riveting HS

 03-20-2005
6.00

Details

 03-18-2005
2.00
Built HS plywood supports
Details

 03-17-2005
3.00
Assembled front HS Spar

 03-16-2005
1.50
Riveted elevator hinge brackets on HS

 03-16-2005
2.00
Built carpeted table for DRDT-2

 03-15-2005
3.00
Riveting rear spar os HS

 03-14-2005
1.00
Priming HS parts

 03-13-2005
4.00
Cleaning and priming HS parts

 03-10-2005
3.00
de-burring and dimpling HS

 03-09-2005
2.00
de-burring and dimpling HS

 03-07-2005
2.00
Checked out new paint gun

 03-04-2005
0.50
Match drilled skin in left HS

 03-02-2005
1.00
Drilled 405-705-404-710 on both HS

 02-28-2005
2.00
Assembly of right horizontal stabilizer
Details

 02-27-2005
1.50
Assembled right HS structure

 02-26-2005
8.00
First assy of left horizontal stabilizer
       

 02-25-2005
3.00
Deburring parts

 02-24-2005
3.00
Front spar on HS

 02-23-2005
3.00
Started Front Spar of HS

 02-22-2005
3.00
Working on rear spar of HS

 02-21-2005
1.00
trying out new HVLP paint gun

 02-21-2005
3.00
Match drilled rear spar

 02-20-2005
8.00
Cleaning and painting garage

 02-19-2005
4.00
Painting and cleaning garage

 02-19-2005
2.00
Built 2' X 4' work table

 02-10-2005
1.50
Worked on grinder
Details

 02-09-2005
0.50
Deburring horizontal stablizer spars

 02-06-2005
0.50
Looked at drawings and started deburing
Details

 01-23-2005
0.50
Placed emp hardware in bins

 01-13-2005
1.50
Unpacking and inventory of parts

 12-31-2004
2.00
Getting Garage ready










Copyright © 2001-2024 Matronics. All Rights Reserved.