KitLog pro

Powered By Kitlog Pro v2.0

LOU'S WEB SITE
Work Logs Found: 43
Category Work Time: 158 Hours
 Date
Hours
Work Log Summary

Details

 01-21-2011
39.00
Preparing Vertical Stabilizer spar
Details
       

 05-16-2010
2.50
Drilling the Vertical Stabilizer
Details
       

 11-08-2009
2.00
Primer touch up, final step for horizontal stablil
Details
       

 11-05-2009
0.50
Fixing last rivet on tip rib
Details
       

 10-30-2009
0.50
Horizontal Stabilizer Inspection
Details
     

 10-24-2009
6.00
Completing HS forward spar and rib riveting
Details
       

 10-22-2009
0.75
Finish rivet of bottom side of port stabilizer
Details
       

 10-21-2009
1.50
Riveting Skins to Front Spar and Ribs H. Stab
Details
       

 10-17-2009
4.00
Attaching Forward Spar to Horizontal Stab
Details
       

 10-16-2009
3.00
Riveting the HS-707 nose rib
Details
       

 10-15-2009
2.00
Dressing internal skin scratches/Fitting nose rib
Details
       

 09-06-2009
1.00
Attaching HS404/405 nose and main rib to front spa
Details
       

 08-30-2009
3.00
Attaching HS-710/714 to HS-702 Front Spar
Details
       

 08-13-2009
1.00
Front horizontal spar
Details
       

 08-02-2009
20.00
Finished sanding and priming HS skeleton
Details
       

 07-29-2009
1.50
Finish Riveting Rear Spar, Mount Bearings
Details
       

 07-26-2009
7.00
Priming spars and starting to rivet
Details
       

 07-21-2009
4.00
Dimpling Skins
Details
     

 07-19-2009
2.00
Dimpling spars and ribs
Details
     

 07-16-2009
3.50
Smoothing edges on skins and ribs
Details
       

 07-11-2009
0.10
Which tools to buy?
Details
       

 07-11-2009
8.50
Finished Drilling Horiz. Stab. Section
Details
       

 07-02-2009
0.50
Drilling out the HS405/710-714/702/403
Details
       

 06-27-2009
2.50
HS-404 and 405 installation
Details
       

 06-22-2009
1.50
Fitting the second 601 PP skin to the spar and rib
Details
       

 06-21-2009
3.00
Fitting the 601PP skins
Details
       

 06-16-2009
1.50
Drilling the Horizontal Stabilizer
Details

 06-14-2009
2.50
Prep Ribs
Details
       

 06-06-2009
2.00
Finishing front spar assembly
Details
       

 05-30-2009
1.00
Trimming HS-702 flange and making notch relief
Details
       

 05-27-2009
1.45
HS-702 marking bend lines and trim area
Details
       

 05-26-2009
1.00
Bending HS710/714 to 6 degree angle
Details
       

 05-25-2009
5.50
HS-710/714 trimming ends
Details
     

 05-23-2009
0.50
Front Spar Assembly - Drill HS-702/710/714
Details

 05-20-2009
1.00
Rivet VA-146 bearing
Details
       

 05-19-2009
1.00
VA-146 bearing, primed with Mar-hyde
Details
       

 05-08-2009
1.00
Waiting for the primer, deburring edges
Details

 05-07-2009
3.00
Elevator attach brackets and HS 411 / VA-146 Beari
Details

 04-15-2009
1.00
Finished drilling all holes in HS609 / 603
Details
     

 04-09-2009
3.50
Smoothing HS-609 PP to a satin like finish
Details
       

 04-05-2009
1.00
Trimming HS-609PP
Details
     

 04-04-2009
7.00
Removing the blue protective plastic
Details
     

 04-02-2009
3.50
Empennage Inventory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.