Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
Work Logs Found:
416
Category Work Time:
779 Hours
Date
Hours
Work Log Summary
Details
12-05-2020
1.00
Project sold to a new builder in Quebec
Details
11-28-2020
1.00
Project at CYPQ hangar, for sale
Details
02-08-2020
1.00
Install the aft heat duct
Details
02-01-2020
1.00
Install Transition Piece in Aft Heat Duct
Details
01-25-2020
2.00
Glass Aft Heat Duct
Details
01-18-2020
2.50
Installing plywood inserts
Details
01-12-2020
3.00
Fabricate Angle Brackets
Details
01-11-2020
2.50
Fabricate plywood inserts
Details
01-04-2020
1.50
Flox aluminum tabs
Details
01-01-2020
2.00
Install Shoulder Harness Attachments
Details
12-31-2019
1.50
Fasten Nutplates to Aluminum Plates
Details
12-27-2019
1.50
Prepare Shoulder Harness Bolt Attachment Plates
Details
11-10-2019
1.00
Shoulder Support Reinforcements
Details
10-12-2019
2.50
Reinforce the shoulder support anchor points
Details
10-09-2019
4.00
Shoulder Brace 2-ply BID lay out
Details
10-07-2019
1.50
Glassing the Heat Duct and Transition Piece
Details
10-05-2019
3.00
Shape heat duct transition piece form
Details
10-02-2019
4.50
Shoulder Support Insert Reinforcements
Details
09-26-2019
2.50
Fitting the rear heat duct in place
Details
09-25-2019
2.00
Installing the Shoulder Brace
Details
09-23-2019
3.00
Canopy hinges, heat duct, headrest
Details
09-16-2019
4.00
Heat Duct and Head Rests
Details
09-12-2019
0.50
Shoulder Support
Details
09-11-2019
1.50
Canopy Hinges and Locking Rod
Details
09-10-2019
0.50
Flox Canopy Hinges in place
Details
09-08-2019
1.00
Cut Canopy Hinge
Details
09-07-2019
3.00
Shoulder Braces & Head Rests
Details
09-04-2019
1.50
Fit shoulder supports
Details
09-02-2019
1.00
Shoulder Braces and Headrests
Details
09-01-2019
3.00
Fabricate Headrests
Details
08-05-2019
2.50
Fabricating the headrest pieces
Details
07-21-2019
1.50
Trim & Sand Right Fuselage Side
Details
06-28-2019
7.00
Glassing the left fuselage side
Details
06-15-2019
1.00
Preparing Left Fuselage Side
Details
06-14-2019
2.00
Trimmed and Sanded Right Fuselage Side
Details
05-17-2019
9.00
Glass the right fuselage side
Details
04-28-2019
1.50
The Cozy Rotisserie
Details
04-27-2019
1.00
Round the top right side of fuselage
Details
04-06-2019
2.00
Rounded Top Left Fuselage Side
Details
03-30-2019
1.50
Carve out Fuel Sight Gauge Locations
Details
03-24-2019
2.50
Fabricate Fuselage Curvature Templates
Details
03-23-2019
2.00
Canard Cutout
Details
03-11-2019
0.50
Trim NACA Scoop & Sand
Details
03-10-2019
1.00
Removed peel ply and started sanding bottom
Details
02-23-2019
10.00
Glass Fuselage Bottom
Details
02-17-2019
2.00
Leveled Fuselage & Cut Cloth
Details
02-10-2019
2.00
Prepare Fuselage Bottom for Glassing
Details
01-19-2019
3.00
Install the glide slope antenna
Details
01-12-2019
3.00
Step Insert
Details
01-06-2019
2.00
Fuselage to Nose Interface
Details
01-01-2019
1.50
Temporarily Install the Landing Brake
Details
12-31-2018
2.00
Sand a depression around the landing brake
Details
12-29-2018
3.00
NACA Scoop & Fuselage Bottom
Details
12-28-2018
2.00
Shaping bottom left exterior of the fuselage
Details
12-26-2018
2.00
Shaping the bottom of the fuselage
Details
12-24-2018
2.00
Sanding the bottom left side of the fuselage
Details
12-08-2018
2.50
Begin to contour the fuselage bottom corners
Details
12-01-2018
3.50
Taper the aft sides
Details
11-17-2018
2.00
Trim and Sand NACA Scoop
Details
11-10-2018
2.00
Glass NACA scoop
Details
11-04-2018
2.50
Glass inside of scoop (aft section)
Details
11-03-2018
1.50
Install Aluminum Inserts
Details
10-28-2018
1.50
Rout foam for aluminum inserts
Details
10-14-2018
1.50
Shaping the fuselage bottom aft
Details
10-07-2018
1.00
Joggle for front landing gear bulkhead cover
Details
10-06-2018
1.00
Sanding the NACA Scoop
Details
09-10-2018
1.50
Adding material to fuselage bottom
Details
08-07-2018
4.50
Began shaping the NACA scoop foam
Details
08-04-2018
2.00
Flox PVC foam between bulkheads
Details
07-29-2018
3.50
Installed 2" blocks & fabricated alum inserts
Details
07-22-2018
1.50
Cut 2" thick blocks to size
Details
07-14-2018
2.50
Install more foam and wood to form the NACA scoop
Details
07-07-2018
2.00
NACA Scoop Part D
Details
07-02-2018
4.50
Expoxy scoop foam and birch plywood in place
Details
06-26-2018
2.00
Make birch reinforcements for rear bulkheads
Details
06-24-2018
2.00
Shape foam for NACA Scoop
Details
06-17-2018
3.50
Started Chapter 7 Fuselage Exterior
Details
05-24-2018
0.50
Removed wooden boards from fuselage bottom
Details
05-19-2018
3.00
Tape front fuselage section floor joints
Details
05-13-2018
1.50
Tape front seat joints
Details
05-06-2018
2.00
Taped rear seat fuselage joints
Details
04-15-2018
2.00
Taped floor to landing gear bulkhead corner
Details
03-31-2018
3.50
Permanent floor installation
Details
03-30-2018
1.00
Shim gaps between fuselage floor and sides
Details
03-25-2018
1.50
Positioning & Fitting floor into fuselage assembly
Details
03-17-2018
2.50
Trim & Sand The Floor
Details
03-12-2018
7.00
Glassing the floor
Details
02-25-2018
1.00
Adding a radius to the top edges
Details
02-24-2018
1.00
Position floor on worktable for glassing
Details
02-20-2018
1.00
Remove nails and trim floor spacers
Details
02-18-2018
2.00
Installed Remaining Floor Spacers
Details
02-11-2018
5.00
Finished shaping floor spacers
Details
02-06-2018
1.50
Remove nails & trim floor spacers
Details
02-03-2018
2.00
Install Floor Spacers for the Console
Details
01-29-2018
2.00
Micro aft floor spacers in place.
Details
01-26-2018
1.50
Micro centre floor spacer in place
Details
01-21-2018
1.50
Contouring the floor
Details
01-14-2018
2.00
Contouring the aircraft floor
Details
01-13-2018
1.00
Contouring the floor
Details
01-07-2018
1.50
Shaping spacers for the floor
Details
01-06-2018
2.50
Contouring the floor spacers
Details
01-05-2018
1.00
Cut out the landing brake
Details
01-01-2018
5.00
Shape the bottom of the fuselage
Details
12-31-2017
1.50
Tape seat brace and heat duct corners
Details
12-29-2017
1.00
Prepare tape for seat brace and heat duct joints
Details
12-27-2017
3.00
Permanent install of seat brace & heat duct
Details
12-26-2017
2.50
Sanding bottom of seatback and IP
Details
12-24-2017
2.00
Trim and Sand Seat Brace and Heat Duct
Details
12-17-2017
2.00
2" taped joint for heat duct and seat brace
Details
12-16-2017
3.00
Flox seat brace to heat duct
Details
12-09-2017
2.50
Trimmed and Sanded Heat Duct & Seat Brace
Details
12-03-2017
2.00
Glass 2nd side of seat brace
Details
12-02-2017
2.00
Glass the heat duct with 2 ply BID
Details
11-27-2017
1.50
Cut Cloth for heat duct and seat brace
Details
11-18-2017
7.00
Trimming and Sanding the bulkheads
Details
11-05-2017
1.50
Glass 1st side of triangular brace
Details
10-29-2017
1.00
Prepare 1st side Seat Brace for Glassing
Details
10-28-2017
2.50
7 layer UND on heat duct
Details
10-20-2017
1.00
Flox Fuel Valve & Bracket Assembly in place
Details
10-16-2017
1.00
Fitting fuel valve and bracket in place
Details
10-15-2017
1.00
Installed spares to 2nd side triangular brace
Details
10-14-2017
2.00
Install spacers 1st side of triagular brace
Details
10-09-2017
1.00
Glass the triangular brace spacers
Details
10-08-2017
1.50
Cut glass for triangular brace spacers
Details
10-07-2017
2.00
Install safety belt tube in heat duct
Details
10-06-2017
3.00
Flox heat duct together
Details
10-01-2017
2.00
Preparing Centre Keel
Details
09-17-2017
2.00
Tape inside corners lower firewall
Details
09-09-2017
2.00
Permanently Install Lower Firewall
Details
09-04-2017
2.00
Inboard foam shims for lower firewall
Details
09-03-2017
1.00
Install outer foam shims for firewall
Details
08-24-2017
4.00
Filing and shimming the firewall
Details
08-07-2017
2.00
Aligning Bottom Permanent Firewall
Details
07-30-2017
1.50
Positioning the bottom permanent firewall
Details
07-09-2017
1.50
Trimming and sanding 6 ply layup and aileron torqu
Details
07-03-2017
1.50
Drilling Aileron Torque Tube Holes
Details
07-02-2017
2.00
tape aft side of forward landing gear bulkhead
Details
07-01-2017
2.00
6-ply UND landing gear bulkhead layup
Details
06-25-2017
1.50
Prepare for 6-ly UND layup
Details
06-17-2017
2.00
Flip over fuselage
Details
06-11-2017
1.50
Tape the joint between upper and lower bulkhead
Details
06-10-2017
2.00
Applying 3 ply UND to landing gear bulkhead
Details
06-04-2017
1.50
Prepare for 3 ply UND layup on bulkhead
Details
05-22-2017
1.00
Paper patterns for 3-ply UND layup
Details
05-13-2017
2.50
Flox upper landing gear bulkhead in place
Details
05-07-2017
1.00
Aft landing gear bulkhead hardpoint holes
Details
04-29-2017
1.00
Flox fwd landing gear bulkhead in place
Details
04-08-2017
3.00
Positioning Forward Gear Bulkhead
Details
03-17-2017
3.00
Taped aft landing gear bulkhed corners
Details
03-16-2017
2.00
Fwd landing gear bulkhead install prep
Details
03-15-2017
3.00
Flox Aft Landing Gear Bulkhead in place
Details
03-12-2017
1.00
Tape F28 corners
Details
03-11-2017
2.00
Install Bulkhead F28
Details
02-26-2017
1.00
Position Bulkhead F28
Details
02-25-2017
2.50
Canard Reinforcements
Details
02-11-2017
2.00
Trimming and Sanding IP & F22 Joints
Details
02-04-2017
3.00
Reinforcing IP and F22 Joints
Details
01-29-2017
1.50
Sanding bulkhead joints
Details
01-22-2017
2.00
Reinforce Front Seatback
Details
01-21-2017
1.50
Sand Seatback Joints
Details
01-14-2017
2.25
Secure fuselage asembly
Details
01-13-2017
0.50
Flox Plywood Inserts in place
Details
01-07-2017
1.00
Trial fit fuel valve & bracket assembly
Details
01-07-2017
1.00
Prepare seat braces for plywood insert
Details
01-06-2017
1.50
Fabricated fuel valve bracket
Details
01-02-2017
1.00
Trimming seat brace
Details
01-01-2017
2.50
Making a new seat brace
Details
12-31-2016
1.50
Quality checks on centre keel and heat duct
Details
12-28-2016
2.00
Cut the keel and heat duct parts to size
Details
12-27-2016
2.50
Glass keel and air duct parts
Details
12-26-2016
1.50
Cut cloth for centre keel and seatback brace
Details
12-24-2016
1.50
0.25" birch inserts
Details
12-23-2016
1.50
Layout the parts
Details
12-03-2016
1.00
Positioning left side of front seatback
Details
11-12-2016
3.00
Positioning front seatback
Details
11-05-2016
2.00
Position Instrument Panel Bulkhead
Details
10-30-2016
1.00
Locate IP and Seatback positions
Details
10-29-2016
2.00
Aligning F22 and Sides
Details
10-15-2016
1.50
Sanded front right fuselage side
Details
10-10-2016
2.00
Level left fuselage side
Details
10-01-2016
4.00
Leveling RS fuselage side in jig
Details
09-03-2016
1.00
Placing fuselage sides in temp firewall
Details
08-13-2016
2.00
Install brace to support temporary firewall
Details
08-07-2016
0.50
Installing temporary firewall to jig
Details
07-10-2016
1.50
Nail 2x4s to plank
Details
07-10-2016
0.50
Filling small voids
Details
07-09-2016
0.50
Draw Centreline on plank
Details
07-03-2016
1.00
Leveling 10 foot plank
Details
06-26-2016
1.00
Adjusted fit of temporary firewall (right side)
Details
06-25-2016
1.00
Temp Firewall left side fit adjustments
Details
06-17-2016
1.00
F-22 positioning
Details
05-22-2016
1.00
Fill a few gaps at top longerons
Details
05-01-2016
2.00
Sand top surface of upper longerons
Details
04-30-2016
1.50
Finished trimming aft end of fuselage sides
Details
04-24-2016
2.00
Trimming fuselage edges
Details
04-03-2016
2.50
Prepare to square off fuselage sides
Details
03-25-2016
1.00
Prepare outer surface and forms (left side)
Details
03-12-2016
1.00
Prepare outer surface and forms (right side)
Details
03-05-2016
1.00
Popped sides out of forms
Details
02-15-2016
1.50
Trim and Sand aft area fiberglass
Details
02-06-2016
4.00
Apply 6 layers of BID
Details
01-10-2016
1.50
Fill cracks with dry micro
Details
01-09-2016
1.00
Fuselage aft electrical channels enclosed.
Details
01-08-2016
0.50
Sanded Electrical Channel Covers
Details
01-03-2016
1.50
Electric Channel Covers
Details
01-02-2016
5.00
Centre Section Spar Jig
Details
01-01-2016
1.50
Shaped the electrical channel transitions
Details
12-31-2015
2.00
Shaped foam for aft fuselage
Details
12-28-2015
2.00
Apply BID cloth to support the stringers
Details
12-27-2015
1.00
Prepare for LWX LWY corner layup
Details
12-26-2015
2.00
Flox'd stringers LWX & LWY in place
Details
12-24-2015
1.00
1 ply BID cloth to the electrical channels
Details
12-19-2015
1.00
Sanding and LWX LWY positioning
Details
11-22-2015
1.00
Cut away layers covering electrical channels
Details
11-01-2015
1.50
Fabricate wooden stringers
Details
10-31-2015
1.00
Install 20.5" doublers
Details
10-26-2015
1.50
Prepared fuselage side aft bottom doublers
Details
10-17-2015
2.00
Sanding bottom of fuselage sides
Details
10-12-2015
2.00
Lower longeron left fuselage side
Details
10-10-2015
1.00
Flox lower longeron to right side of fuselage
Details
10-04-2015
1.50
Fabricated wood blocks for clamping longerons
Details
10-02-2015
2.00
Temporarily positioned lower longerons
Details
09-18-2015
2.00
Preparation of lower triangular longerons
Details
08-22-2015
1.00
Inject Epoxy into air gaps
Details
08-03-2015
1.00
Sanding top longerons and inspected for air bubble
Details
07-31-2015
1.00
Trimming the top longerons
Details
06-13-2015
5.00
Glassed Top Longerons
Details
05-08-2015
1.50
Sanding Fuselage Sides
Details
04-30-2015
1.50
Fuselage Side Repairs
Details
04-18-2015
8.00
Inside Layup & Install Upper Longerons
Details
04-05-2015
1.00
Fuselage Side glassing preparation
Details
04-04-2015
0.50
Completing step 3
Details
03-15-2015
1.00
Trial Fit Upper Longerons
Details
03-07-2015
1.00
Left fuel sight gauge depression
Details
03-01-2015
0.50
Right fuel sight gauge location prepared
Details
02-28-2015
1.00
Create control stick depressions
Details
02-27-2015
0.10
Locate fuel sight guage locations
Details
02-21-2015
0.50
Locate 8" diam depression for control sticks
Details
02-15-2015
1.50
Fuselage Side Contouring Complete
Details
02-01-2015
1.50
Installed bottom right side spacers
Details
01-25-2015
1.00
Shaped remaining EE spacers
Details
01-24-2015
1.50
Shaped Left side spacer EE piece #1
Details
01-13-2015
2.50
Install aft spacers
Details
01-12-2015
2.00
Shape the aft end spacers
Details
01-10-2015
3.50
Shape & install spacers CC
Details
01-09-2015
3.00
Shape & install spacers BB
Details
01-08-2015
3.00
Shape & install spacers AA
Details
01-07-2015
2.00
Determining Spacer Dimensions
Details
01-03-2015
1.00
Fix PVC foam to forms
Details
11-29-2014
2.50
Assembling the forms
Details
11-23-2014
1.00
Measure & mark reference locations for jigs
Details
11-22-2014
1.50
Sand & 30 degree lines
Details
11-16-2014
2.00
Add length and trim fuselage sides
Details
11-15-2014
2.00
Cutting Foam
Details
11-09-2014
1.50
Epoxy foam pieces together
Details
11-01-2014
1.00
Complete the masonite fuselage side forms
Details
10-28-2014
0.50
Epoxy masonite pieces to length
Details
10-25-2014
2.50
Cut remainder of masonite forms
Details
10-24-2014
2.00
Prepare masonite to cut
Details
10-21-2014
0.50
Repair Bottom Firewall bulkhead
Details
10-05-2014
1.00
Completed Top Longerons
Details
09-29-2014
1.00
Taper the doublers
Details
09-16-2014
0.50
Measure 5.5" doublers
Details
09-07-2014
1.00
Flox 60" stiffners to the top longerons
Details
05-19-2014
1.00
Cut stiffners to match longeron curvatures
Details
05-18-2014
1.00
Taper wood stiffner ends
Details
05-11-2014
1.50
Laminated Top Longerons
Details
05-08-2014
1.00
Fuselage side top longerons ready for laminating
Details
01-01-2014
1.50
Jigs for top longerons secured to worktable
Details
12-28-2013
4.00
Finished Fuselage Side Jigs
Details
09-14-2013
2.00
Traced & Cut Jigs
Details
08-11-2013
2.00
Extended work table for chapter 5 work
Details
01-26-2013
0.00
New Workshop
Details
12-02-2012
0.00
New workshop construction finally progressing
11-10-2012
0.00
The Suborbital Pilot's Ground School Manual
Details
10-25-2012
0.00
Workshop Construction
10-13-2012
0.00
New Garage Workshop Construction starts !
Details
09-16-2012
0.00
Building permit for new workshop
Details
05-12-2012
0.00
Project on Hold pending new workshop
Details
04-28-2012
2.00
Finishing Firewall
Details
04-21-2012
3.00
Forward Face Firewall Layup
Details
04-15-2012
1.50
Cut Cloth for fwd face of firewall
Details
04-08-2012
2.00
Cut & Sand firewall
Details
03-30-2012
1.00
Flox blind screws into firewall
Details
03-25-2012
1.00
Fit blind screws into firewall
Details
03-18-2012
1.00
Repair Aft Side Firewall glass
Details
03-13-2012
0.50
Prepare for firewall aft face glass repair
Details
03-10-2012
0.50
Epoxy Welding Wire to Blind Screws
Details
02-26-2012
2.00
Finish preparing blind screws and sanding firewall
Details
02-20-2012
0.50
Blind Screw Preparation
Details
02-19-2012
2.00
Blind Screw/Firewall Preparation
Details
02-12-2012
1.00
Prototyping fix for blind screw rotation
Details
02-10-2012
1.50
Drill holes for blind screws in firewall
Details
02-06-2012
1.00
Trim Firewall Aft Face Layup
Details
02-03-2012
3.00
1st firewall layup
Details
02-02-2012
1.00
Cut Cloth for Permanent Firewall
Details
02-01-2012
1.00
Prepare Permanent Firewall for first layup
Details
01-28-2012
14.00
Oshkosh SportAir Workshops
Details
01-22-2012
1.00
Install Aluminum Inserts in Firewall
Details
01-21-2012
1.00
Apply chrome coating to firewall inserts
Details
12-03-2011
1.50
Cut out permanent firewall pieces
Details
11-26-2011
1.00
Trace Permanent Firewall Pieces
Details
11-20-2011
1.00
Finished Temporary Firewall
Details
11-14-2011
0.50
Fabricate Aluminum Inserts for Firewall
Details
11-13-2011
1.00
Temporary Firewall Fabrication
Details
11-12-2011
1.00
Trace-out Temporary Firewall
Details
11-11-2011
1.00
Bottom Right Side Firewall Template
Details
11-06-2011
1.00
Top Right Side Firewall Template
Details
10-23-2011
0.50
FWD landing gear hardpoint repair
Details
10-22-2011
1.00
Sanded fwd landing gear bulkhead bottom half
Details
10-15-2011
1.50
Finished 2 of the 3 landing gear bulkheads
Details
10-08-2011
1.00
Trimmed 2nd landing gear bulkhead layup
Details
10-01-2011
3.50
Layup aft sides of landing gear bulkheads
Details
09-27-2011
3.00
Cut cloth for 2nd landing gear bulkhead layup
Details
09-11-2011
1.00
Clean Shop and Re-stock
Details
08-29-2011
1.00
Sanding landing gear bulkhead
Details
08-27-2011
1.50
Trim 1st landing gear bulkheads layups
Details
08-19-2011
3.50
fwd face landing gear bulkhead layups
Details
07-24-2011
1.50
Fwd landing gear bulkhead forward face layup
Details
07-10-2011
3.00
Landing Gear Bulkheads fwd face cloth
Details
07-03-2011
1.50
5-min epoxy hardpoints into landing gear bulkheads
Details
07-02-2011
1.50
Cut out landing gear hardpoints
Details
06-17-2011
0.50
Trace Landing Gear Hardpoints on glass
Details
06-16-2011
3.00
Landing Gear Bulkhead - Hardpoint Layup
Details
06-12-2011
2.00
Cut BID for landing gear hardpoints
Details
06-11-2011
1.00
Landing Gear Hardpoint Layup Preparation
Details
06-07-2011
1.00
Shape aft gear bulkhead foam
Details
05-31-2011
1.00
Upper forward gear bulkhead beveled edges
Details
05-29-2011
1.50
Cut Upper FWD Gear Bulkhead foam
Details
05-23-2011
1.00
Finish tracing gear bulkheads onto foam
Details
05-22-2011
1.00
Cut Lower forward gear bulkhead foam
Details
05-14-2011
0.50
Trace Lower FWD gear bulkhead on foam
Details
05-14-2011
1.00
Cutout landing gear templates
Details
05-13-2011
1.00
Aft Gear Bulkhead template traced
Details
05-12-2011
0.50
Trace lower forward gear bulkhead and hardpoint
Details
05-10-2011
1.00
FWD Gear Bulkhead template tracing
Details
05-07-2011
2.00
Sanding Instrument Panel
Details
05-01-2011
1.00
Cut excess glass off stiffners
Details
04-30-2011
1.00
Fill air gaps in stiffners
Details
04-24-2011
3.00
Instrument Panel Stiffners Bottom Bid Layup
Details
03-27-2011
3.00
Instrument Panel Cloth - bottom/outside of stiffne
Details
02-21-2011
1.00
Sand Instrument Panel Stiffner Layup 1
Details
02-12-2011
2.50
Glass Instrument Panel Stiffners - top/inner sides
Details
02-08-2011
1.00
Instrument Panel cloth cutting for top/inside of s
Details
01-22-2011
1.00
Epoxy Foam Stiffners to Instrument Panel
Details
01-21-2011
1.50
Cut foam for Instrument Panel stiffner ribs
Details
01-20-2011
2.00
Sanding Instrument Panel
Details
01-02-2011
0.50
Instrument Panel Repair
Details
01-01-2011
1.50
Instrument Panel Trim
Details
12-30-2010
2.50
Instrument Panel Forward Face Layup
Details
12-05-2010
2.00
Instrument Panel Fwd Face Layup Preparations
Details
11-28-2010
1.00
Instrument Panel Aft Face Sanding
Details
11-27-2010
0.50
Instrument Panel aft side - trimming
Details
11-26-2010
1.00
Trim outer edge - instrument panel aft side
Details
11-20-2010
3.00
Instrument Panel - aft layup
Details
11-19-2010
2.00
Instrument Panel - Aft Layup Preparations
Details
11-14-2010
2.00
Instrument Panel Foam - final shaping
Details
11-06-2010
2.00
Instrument Panel Foam Shaping - right side
Details
11-05-2010
2.00
Instrument Panel - foam shaping
Details
10-31-2010
1.50
Instrument Panel Paper Templates Traced onto Foam
Details
10-30-2010
1.00
Instrument Panel Foam Pieces
Details
10-29-2010
2.50
Top half of Instrument Panel templates
Details
10-23-2010
3.00
Lower half of instrument panel - template
Details
10-22-2010
1.50
F22 forward face layup cut, sanded, stored
Details
10-17-2010
3.50
F22 forward face layup
Details
10-16-2010
3.50
Cut F22 Forward Face Cloth
Details
10-09-2010
1.50
Clean Hardner from Pump
Details
09-26-2010
1.00
Clean Shop for F22 forward layup
Details
09-25-2010
0.50
F22 Aft layup sanding
Details
09-24-2010
2.00
F22 aft layup trimming
Details
09-19-2010
3.00
F22 aft layup
Details
09-17-2010
2.00
Cut Cloth for F22 aft layup
Details
09-12-2010
0.50
F22 layup peparations
Details
09-11-2010
1.00
Calibrate Epoxy Pump & Clean Shop
Details
09-10-2010
1.00
F28 bulkhead - final trim, sand, & store
Details
08-29-2010
1.00
F28 forward face layup
Details
08-28-2010
1.00
F28 aft face trim and sand
Details
08-26-2010
1.50
F28 aft face layup
Details
08-22-2010
1.00
Larry Hill's Cozy
Details
08-07-2010
0.50
F28 and F22 bulkheads ready for glass
Details
08-05-2010
1.00
Remove excess epoxy from F22 foam
Details
08-02-2010
1.50
Join F22 foam together
Details
08-01-2010
3.00
Shape F22 bulkhead foam
Details
07-25-2010
2.00
Shape F28 and F22 doubler foam
Details
07-24-2010
3.00
F22 & F28 Bulkhead Templates
Details
07-11-2010
0.50
Seatback - fill small air bubbles with epoxy
Details
07-10-2010
1.00
Sanded Seatback
Details
07-09-2010
2.00
Seatback - drilled holes and cut centre slots
Details
07-03-2010
1.50
Seatback - 2nd layup
Details
07-03-2010
2.00
Cut Cloth and Flox for 2nd seatback layup
Details
07-03-2010
0.50
2nd seatback layup - knife trimmed
Details
07-02-2010
2.00
Seatback flox corners
Details
07-01-2010
2.50
Cutting out the seatback slots
Details
06-26-2010
2.50
Sanding first seatback layup
Details
06-25-2010
4.00
Front Seatback 1st layup
Details
06-22-2010
2.00
Prepare front seatback foam
Details
06-20-2010
1.00
Front Seatback Templates
Details
06-19-2010
0.50
Chapter 3 - Practice work completed
Details
06-18-2010
2.00
Book End - 3rd Layup
Details
06-12-2010
1.00
3rd Layup Preparation
Details
06-11-2010
2.00
Book End - 2nd Layup
Details
06-05-2010
0.60
Book End - Make Depression for Photo
Details
06-04-2010
1.50
Book End - Trim and Cut
Details
05-28-2010
2.50
Book End - first layup
Details
05-07-2010
1.00
Book End - 2nd foam block joined to 1st
Details
05-02-2010
1.50
Book End - first foam block
Details
04-30-2010
0.10
Testing Confidence Layup with Load
Details
04-25-2010
1.00
Confidence Layup - cutting, sanding, waiting
Details
04-23-2010
4.00
Confidence Layup
Details
04-17-2010
1.00
Tools to improve quality
Details
04-04-2010
1.50
Confidence Layup - foam shaping
Details
03-26-2010
2.00
Flat Layup
Details
07-05-2009
8.00
Hot Wire Cutter
Details
06-07-2009
8.00
Shop setup and helpers
Details
05-15-2009
1.00
Cozy plans & workshop setup
Details
01-17-2009
16.00
EAA Composite Workshop
Details
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.