Powered By Kitlog Pro v2.0
Bruces S-19 Build Log
S-19 Venterra
All
Work Logs Found:
460
Category Work Time:
1984 Hours
Date
Hours
Work Log Summary
Details
07-22-2019
1.00
Started moving oil cooler
Details
06-25-2019
1.00
Made collapsable tow bar/gust lock
Details
06-21-2019
1.00
Trouble shooting high oil temperature
Details
06-13-2019
0.80
First Flight
Details
06-06-2019
1.00
Final taxi test
Details
03-21-2019
1.00
Fabricated and installed canopy seat plate
Details
03-13-2019
1.00
Designed and Installed Aft Cowl Support
Details
02-20-2019
1.00
FAA Airworthiness Inspection
Details
11-06-2018
1.00
Installed External Power Plug door
Details
10-09-2018
1.00
Installed elevator bungie
Details
10-04-2018
1.00
Static leak check
Details
09-24-2018
1.00
First Taxi
Details
09-21-2018
1.00
Weighed Aircraft
Details
09-13-2018
1.00
Oil door
Details
09-03-2018
1.00
Built a aircraft jack
Details
08-23-2018
1.00
Control Surface Assy
Details
08-20-2018
1.00
Installed Wings
Details
08-14-2018
1.00
Moved Airplane to hanger
Details
08-07-2018
1.00
Glassed over old scoop location
Details
08-07-2018
1.00
continued fiberglassing cowl
Details
08-04-2018
1.00
Final Cowl Trim
Details
08-02-2018
1.00
Set Tailpipe out to be welded
Details
07-31-2018
1.00
tested landing light
Details
07-30-2018
1.00
Designed, fabricated and installed the landing lig
Details
07-28-2018
1.00
Installed the heater air inlet scoop
Details
07-12-2018
1.00
Built heater air inlet
Details
07-08-2018
1.00
glassed in a lower ramp segment of the duct
Details
06-29-2018
1.00
Built a external power plug
Details
06-17-2018
1.00
Glassed in the air scoop into its new location
Details
06-08-2018
1.00
Rebuilt scoop in new location
Details
05-31-2018
1.00
Cut out the old air scoop location
Details
05-30-2018
1.00
Started modifying cowing radiator scoop
Details
03-02-2018
1.00
Balancing the stabilator
Details
03-01-2018
1.00
Cast Lead weights for control surfaces
Details
02-27-2018
1.00
Installed Tailcone Stinger
Details
01-28-2018
1.00
After Paint Roll-out
Details
01-25-2018
1.00
Finished painting fuselage
Details
01-06-2018
1.00
Started Fuselage Painting
Details
12-16-2017
1.00
Finished painting wings
Details
11-12-2017
1.00
Fixed paint runs
Details
10-30-2017
1.00
Wing Paint
Details
09-22-2017
1.00
Built wing-to-body fairings
Details
09-15-2017
1.00
Prefit wings
Details
08-19-2017
1.00
Metallic Blue
Details
08-17-2017
1.00
Color coat on the feathers
Details
08-14-2017
1.00
Started Painting
Details
08-04-2017
1.00
Reemed Stab Hinge Bolt holes
Details
07-24-2017
1.00
trimed and installed Rear Baggage bulkhead
Details
07-05-2017
1.00
Installed windscreen
Details
07-03-2017
1.00
Installed glare shield
Details
06-27-2017
1.00
Top Panel ready for close-out
Details
06-16-2017
1.00
Moving Compass & top panel work
Details
05-07-2017
1.00
First Engine Start!
Details
04-30-2017
1.00
Built the "Steve Mauler Memorial Paint Booth"
Details
02-13-2017
1.00
Compass Reads Wrong
Details
02-10-2017
1.00
Nailed down baggage floor
Details
02-06-2017
1.00
Installed Transponder
Details
01-30-2017
1.00
Preparing for first start
Details
01-29-2017
1.00
Fuel system leak test
Details
01-13-2017
1.00
Installed Propeller
Details
01-05-2017
1.00
Added fuel bypass orfice
Details
12-28-2016
1.00
Revised Radiator mount
Details
12-25-2016
1.00
Routed Brake Lines
Details
12-15-2016
1.00
Started tailcone stinger
Details
11-15-2016
1.00
Oil and Fuel lines
Details
11-06-2016
1.00
Finished heat muff
Details
11-02-2016
1.00
Measured and ordered fuel and oil lines
Details
09-30-2016
1.00
Started on a cabin heater
Details
09-21-2016
1.00
Remade ipad power supply
Details
09-20-2016
1.00
Installed a vertical card compass
Details
09-15-2016
1.00
Finished ipad mount
Details
09-08-2016
1.00
Continued with ipad mount
Details
08-23-2016
1.00
continuing with the ipad mount
Details
07-20-2016
1.00
Started a ipad mount
Details
06-04-2016
0.00
Attempted to Degauss Rollbar
Details
06-03-2016
1.00
powder coated the spot light bracket
Details
05-22-2016
1.00
Buitl a spot light 2
Details
05-22-2016
1.00
Built a cockpit spotlight 1
Details
04-23-2016
1.00
More electrical work
Details
03-30-2016
1.00
Installed Throttle (Final)
Details
03-22-2016
2.00
Motor mount work
Details
03-06-2016
0.00
Brothers visit
Details
02-18-2016
2.00
Support for Engine ECU Plugs
Details
02-08-2016
2.00
Rotax ECU Wire harness Firewall penitration
Details
02-04-2016
1.00
Bracket for ECU
Details
02-02-2016
1.00
Finished oil tank and overflow bottle support
Details
01-29-2016
1.00
Radiator mounting
Details
01-26-2016
1.00
Finding a radiator location
Details
01-22-2016
1.00
Working on oil tank and radiator overflow bottle
Details
01-14-2016
1.00
Fitting oil cooler
Details
01-07-2016
1.00
Cowling trim
Details
01-02-2016
1.00
Started on Cowling
Details
12-13-2015
1.00
Installed Engine!
Details
12-12-2015
1.00
Wiring and installed motor mount
Details
11-20-2015
1.00
Finished fuel lines
Details
11-19-2015
1.00
Final installed fuel selector valve
Details
11-16-2015
1.00
More fuel line work
Details
11-09-2015
1.00
Built a battery bos
Details
10-31-2015
1.00
Cut Fire Wall Penitration
Details
10-29-2015
1.00
Installed Fuse Box
Details
10-11-2015
6.00
Fuel Filter bracket
Details
10-05-2015
4.00
Fabricated a Fuel Pump Assy Backup Doubler
Details
10-02-2015
4.00
Fabricated a gascolator bracket
Details
09-16-2015
8.00
Tom welded a motor mount
Details
09-01-2015
4.00
More fuel lines
Details
08-31-2015
4.00
Fabricated first cockpit fuel line
Details
08-21-2015
1.00
Modified the throtle cable firewall bulkhead fitti
Details
08-20-2015
1.00
Planing fuel system run
Details
08-20-2015
1.00
Painted interiour floor
Details
07-07-2015
1.00
Rotax 912is Engine delivered
Details
06-10-2015
4.00
Drilled and trimed aft canopy skirt
Details
06-01-2015
4.00
Canopy Plexiglass installation trick
Details
05-29-2015
2.00
Trimed aft edge of canopy
Details
05-27-2015
8.00
Reinforced the roll bar
Details
04-26-2015
2.00
Drilling Conopy frame
Details
04-18-2015
0.10
912is Engine mount arives
Details
04-17-2015
8.00
Started Canopy
Details
04-17-2015
4.00
Fit the conopy frame to the sliders
Details
03-14-2015
1.00
Drilled the windshield capture strip
Details
03-13-2015
1.00
Drilled the roll bar
Details
03-12-2015
1.00
Positioned the Windshield
Details
03-01-2015
6.00
Reinforced the D-1000 EFIS Skyview Cut-out
Details
02-27-2015
1.00
Bought a Vernier Assist throttle
Details
01-26-2015
10.00
Added wing wiring disconect
Details
12-01-2014
10.00
Powered up and tested radio
Details
11-28-2014
10.00
Wiring the radios
Details
11-25-2014
10.00
Finished wire harness fab
Details
11-18-2014
8.00
Started Wiring the radio
Details
09-01-2014
2.00
Enlarged access to ELT transmitter
Details
08-29-2014
2.00
Routed Coax to ELT antenna
Details
08-27-2014
2.00
Installed ELT Antenna
Details
08-17-2014
2.00
Finished USB Power supply
Details
08-13-2014
4.00
Designed and fabed a music in and Auxillary power
Details
08-04-2014
2.00
Modified center tunnel
Details
07-31-2014
2.00
First Light-up
Details
07-26-2014
4.00
More panel wiring
Details
07-16-2014
4.00
Finished EMS and ADSB brackets
Details
07-02-2014
4.00
Wired the subpanel
Details
06-30-2014
4.00
Stick wire harness installation
Details
06-24-2014
8.00
Control stick wiring
Details
06-18-2014
4.00
Made support brackets clips for control stick wiri
Details
06-04-2014
10.00
Built rack for avionics
Details
05-02-2014
1.00
Mocked up IPad installation
Details
05-01-2014
2.00
Installed panel
Details
04-30-2014
6.00
Painted Panel
Details
04-25-2014
8.00
Bulit a Enunciator panel
Details
04-23-2014
8.00
Finished Cutting Panel
Details
04-19-2014
8.00
Cut the panel holes
Details
04-09-2014
4.00
Finished Stick Grips
Details
04-08-2014
4.00
Stick grip wieing
Details
04-05-2014
4.00
Auto Pilot Servos
Details
03-22-2014
4.00
Floor ready to install
Details
03-21-2014
20.00
Routing wires under the floor
Details
03-15-2014
4.00
Installed MLG fairings
Details
02-03-2014
2.00
Installed VHF Com Antenna
Details
01-13-2014
4.00
ELT warning buzzer holder
Details
01-06-2014
8.00
Finished the Interiour
Details
01-03-2014
16.00
Trimed Interiour Panels
Details
12-31-2013
4.00
Started Interiour Panel Installation
Details
12-30-2013
2.00
Finished ELT wire harness
Details
12-28-2013
4.00
Made up the ELT wire harness
Details
12-27-2013
5.00
Finished the center panel
Details
12-26-2013
1.00
Ouch that hurt!
Details
12-20-2013
20.00
Designed and scratch built a center panel
Details
11-04-2013
20.00
Prototype work on instrument panel concept.
Details
10-01-2013
10.00
Started on subpanel
Details
08-28-2013
8.00
Completed Fiberglass Tip
Details
08-26-2013
8.00
Installed antenna in tip
Details
08-22-2013
6.00
Checking antenna performance
Details
08-09-2013
6.00
Installing fiberglass tip
Details
08-06-2013
8.00
Layed-up a fiberglass fwd tip skin
Details
07-29-2013
8.00
Made a fiberglass tip spar
Details
07-24-2013
8.00
re-made the skin a little thicker
Details
07-23-2013
8.00
Aft skin lay-up
Details
07-22-2013
8.00
Started building a fiberglass tip
Details
06-27-2013
6.00
Built an ADS-B antenna bracket
Details
06-21-2013
5.00
This could of been a big Oops
Details
06-12-2013
2.00
Installed Nose gear
Details
06-10-2013
1.00
Built a tip support stand
Details
05-27-2013
8.00
Rearanged Shop
Details
05-10-2013
8.00
Finished RHS Wing Tip
Details
05-05-2013
4.00
Installed lower skin
Details
05-05-2013
8.00
Finished Wing
Details
05-04-2013
2.00
Installed Pitot Tube
Details
05-02-2013
4.00
Final Systems Installation
Details
05-01-2013
4.00
Installing Fuel Tank
Details
04-25-2013
1.00
Fixed cap fuel leak
Details
04-24-2013
4.00
Pressure tested tank with home-made manometer
Details
04-19-2013
3.00
Built pitot/AOA probe
Details
04-18-2013
4.00
Preparing fuel tank
Details
04-16-2013
8.00
Single ADAHRS configuration
Details
04-16-2013
8.00
Prewire and plumb for 2nd ADAHRS unit
Details
04-16-2013
8.00
Finished the Pitot heat instalation
Details
04-15-2013
4.00
Wing tip Nav/Strobe lights
Details
04-13-2013
0.10
What to do with the sealant tube nozzel thingie
Details
04-12-2013
4.00
Pitot tube construction
Details
04-10-2013
6.00
Bending ADAHRS Tubes
Details
03-12-2013
8.00
Building ADAHRS wire harness
Details
02-07-2013
10.00
Assembled frame, started electrical installation
Details
02-02-2013
8.00
Primed wing details
Details
12-20-2012
5.00
Finished up the tip
Details
12-19-2012
5.00
Built a wing tip Nav/Strobe light bracket
Details
12-17-2012
10.00
Built the RHS wing tip
Details
12-12-2012
10.00
Finished drilling wing skins
Details
12-01-2012
20.00
Started skining wing
Details
11-26-2012
5.00
Assembled Wing frame
Details
11-25-2012
4.00
LED instrument lights
Details
11-25-2012
5.00
Built ELT bracket
Details
11-24-2012
8.00
Primed wing components
Details
11-19-2012
10.00
Prepared wing for primer
Details
09-26-2012
0.00
Cruise to Austraila
Details
09-19-2012
5.00
Built dummy ADAHARS sensor
Details
09-12-2012
10.00
Built ADAHARS bracket
Details
08-16-2012
20.00
Designed Dynon ADAHARS support bracket for wing
Details
07-23-2012
10.00
Building up the frame
Details
07-18-2012
10.00
Started the Right Hand Wing
Details
07-15-2012
2.00
Dynon Avionics are received
Details
07-14-2012
1.00
First Sit
Details
07-13-2012
20.00
Finished Seats
Details
07-06-2012
20.00
Seat back frames
Details
07-02-2012
20.00
Continued with seats
Details
06-22-2012
8.00
Finished Flaps
Details
06-21-2012
16.00
Drilled and primed the flap skins
Details
06-11-2012
2.00
Fitting up flap skins
Details
06-10-2012
4.00
Riveted the flap frames
Details
06-08-2012
6.00
prep'd and primed flaps
Details
06-04-2012
4.00
Started Seats
Details
05-12-2012
8.00
Started Flaps
Details
04-27-2012
2.00
Hung wing in rafters for safe keeping
Details
04-10-2012
6.00
Finished the Left Hand Wing!
Details
04-08-2012
6.00
Turned wing upright and clecoed upper skin
Details
04-07-2012
8.00
Riveted Lower Wing Skin
Details
04-01-2012
4.00
Installed Lower Aft wing skin
Details
03-31-2012
6.00
Installed Fuel Tank
Details
03-28-2012
4.00
Fixed leaky fuel cap
Details
03-25-2012
8.00
Pressure tested tank - home made manometer.
Details
03-21-2012
3.00
Installing fuel sender
Details
03-21-2012
2.00
Finisher sender installation
Details
03-03-2012
8.00
Fuel tank prep
Details
02-26-2012
2.00
Finished fuel lines
Details
02-26-2012
8.00
Fabricated fuel return lines
Details
01-29-2012
2.00
Fuel tank prep
Details
01-15-2012
4.00
Fuel tank hadware
Details
01-14-2012
4.00
Drilled the fuel pick-up tubes.
Details
12-24-2011
4.00
Modified sender ring, drilled mounting holes in ta
Details
12-23-2011
2.00
Trimed fuel tank filler necks
Details
12-14-2011
6.00
Planing for a wing tip VOR/ILS antenna
Details
11-30-2011
16.00
Primed Skins and Leading Edge
Details
10-31-2011
6.00
Built a handling table
Details
10-23-2011
6.00
Started with fuel tank
Details
10-22-2011
8.00
Building the aileron push rods
Details
10-09-2011
8.00
Finished drilling left hand wing
Details
10-04-2011
2.00
How not to drill a hole (or impress your wife)
Details
10-02-2011
6.00
Formed LE skins
Details
10-01-2011
1.00
Turned wing top side up
Details
10-01-2011
2.00
Finished the bottom of the wing.
Details
10-01-2011
6.00
Fabricated Torque Angle
Details
09-24-2011
4.00
Drilled Lower Leading Edge Skin
Details
09-09-2011
2.00
Loaded LE wing skin
Details
09-07-2011
2.00
Trimed fwd LE ribs
Details
09-05-2011
2.00
Modified and match drilled aileron hinge doublers
Details
08-29-2011
3.00
Set Flap hinge
Details
08-28-2011
6.00
Aligned Aileron Hinge
Details
08-10-2011
3.00
Finished ailerons
Details
08-09-2011
8.00
Riveted skins to frame
Details
08-08-2011
4.00
Repair of miss-drilled hole
Details
08-07-2011
6.00
Ops!
Details
08-06-2011
6.00
Drilling skins
Details
08-01-2011
8.00
Started drilling the skins, dinged one a little
Details
07-31-2011
4.00
Final assy of the aileron frames
Details
07-30-2011
8.00
Primed aileron frame detail parts
Details
07-29-2011
8.00
Deburing
Details
07-25-2011
3.00
Dissasemble and debur
Details
07-17-2011
6.00
Aileron build-up
Details
07-12-2011
3.00
Ops
Details
07-08-2011
4.00
Started Aileron Assembly
Details
07-04-2011
2.00
Reset wing top side up
Details
07-03-2011
1.00
One man wing flip
Details
07-03-2011
8.00
Drilling wing skins
Details
07-02-2011
4.00
Drilling wing skins
Details
07-01-2011
4.00
Started drilling wing skins
Details
06-28-2011
1.00
Fabricated wing skin stiffeners
Details
06-26-2011
2.00
working on the wing skins
Details
06-25-2011
6.00
Set up work bench blocks and trued wing
Details
06-20-2011
16.00
primed and riveted the LHS wing frame
Details
06-18-2011
12.00
primed the LHS wing frame
Details
06-11-2011
4.00
Details
06-04-2011
6.00
Deburing wing details
Details
05-30-2011
4.00
Drilling out the rear spar
Details
05-26-2011
3.00
Nose rib assy
05-21-2011
8.00
Touch up work on the machined spars
Details
05-21-2011
4.00
Continuing on the left hand wing assy
Details
04-28-2011
0.00
Took a 2 month trip on a 100 yr old sailing ship
Details
01-12-2011
8.00
Perliminary assy of the wing
Details
01-09-2011
8.00
Unpacked wing crate and started LH wing
Details
12-27-2010
1.00
new computer test
Details
12-01-2010
1.00
Filed down nose gear axel
Details
11-28-2010
2.00
Installed MLG wheels. Set airplane on its wheels!
Details
11-27-2010
10.00
Main Landing Gear legs
Details
11-26-2010
4.00
Drilled-up nose gear strut
Details
11-25-2010
12.00
Riveted forward side skins
Details
11-21-2010
2.00
Stab pushrod attachment
Details
11-20-2010
8.00
Joined Forward Fuselage
Details
11-12-2010
2.00
Nose landing gear truss install
Details
11-11-2010
4.00
Formed and routed brake lines
Details
10-30-2010
4.00
Torque Tube Bushings and Control stick
Details
10-24-2010
2.00
Assembling the Flap handle
Details
10-23-2010
8.00
Joining Tailcone to Center fuselage
Details
10-16-2010
4.00
Prefit the Main Landing Gear legs
Details
10-15-2010
12.00
Riveted the center fuselage skins to the frame
Details
10-09-2010
12.00
Debur and paint fuselage skins and details
Details
10-06-2010
2.00
Auto Pilot Brackets
Details
10-02-2010
14.00
Drilled out the fuselage fwd fuselage and tailcone
Details
10-01-2010
6.00
preparing the center fuselage for joining
Details
09-18-2010
4.00
Finished the Tail Cone
Details
09-17-2010
3.00
Trimed Vertical Stabilizer
Details
09-06-2010
20.00
Wired, plumbed and cabled the aft fuselage
Details
08-21-2010
8.00
Prep and prime upper deck
Details
08-11-2010
4.00
Rudder Pedels
Details
07-31-2010
8.00
Drilled up the tailcone upper deck
Details
07-24-2010
6.00
Static line routing
Details
07-17-2010
10.00
Lotsa riveting and something I wished I'd done dif
Details
07-16-2010
8.00
Final assy of tailcone
Details
07-10-2010
10.00
Painting day
Details
07-09-2010
12.00
Debured tail cone parts
Details
07-03-2010
8.00
Mounted vertical stabilizer
Details
07-02-2010
6.00
Tail cone details
Details
06-25-2010
8.00
Longeron and bulkhead #5 work
Details
06-13-2010
6.00
Bulkhead 5
Details
06-06-2010
8.00
Building up Tailcone
Details
06-05-2010
2.00
Rebent the left hand side skin
Details
05-30-2010
4.00
Reamed Wing Spars
Details
05-22-2010
2.00
Corrected poor fit on stringer
Details
05-22-2010
6.00
Continued build-up of the tailcone
Details
05-16-2010
1.00
Started building up the tail cone sidewall skins
Details
05-16-2010
6.00
Inventoried wing kit
Details
05-14-2010
2.00
Discovered shipping damage to tailcone skins
Details
05-09-2010
2.00
Fit-up fwd fuselage
Details
05-08-2010
4.00
Bent LHS Fwd Side Skin
Details
05-05-2010
2.00
Bent RHS Fwd Side Skin
Details
05-04-2010
2.00
Drilled wire holes in control sticks
Details
05-02-2010
8.00
Cut the NACA vents in the fwd side skins
Details
05-01-2010
8.00
Fit-up of fwd to aft fuselage
Details
04-24-2010
6.00
Finished riveting fwd fuselage frame
Details
04-21-2010
4.00
Finished Rudder pedel components
Details
04-17-2010
6.00
Trial fit up of components
Details
04-16-2010
4.00
Broke my hand riveter
Details
04-15-2010
2.00
Powder coated rudder pedals
Details
04-13-2010
5.00
Started final assembly of fwd fuselage
Details
04-11-2010
8.00
Primed lower fwd fuselage parts
Details
04-08-2010
4.00
Wing Kit Arived
Details
04-05-2010
8.00
Debured Fwd Fuselage parts
Details
03-20-2010
12.00
Finished drilling belly skin and fwd floor
Details
03-14-2010
4.00
Drilled upper firewall fittings
Details
02-23-2010
3.00
Continued firewall and floor preassembly
Details
02-22-2010
4.00
Finished Fwd Upper Fuselage frame
Details
02-21-2010
6.00
Primed upper fwd fuselage parts
Details
02-20-2010
6.00
Drilled instrument panel mount and roll bar suppor
Details
02-19-2010
4.00
Debured and edge polished parts
Details
02-17-2010
2.00
Sorted out Firewall supports
Details
02-14-2010
6.00
Started Forward Fuselage
Details
02-03-2010
2.00
completed rear spar attach lug area
Details
01-31-2010
6.00
Started final assembly of center fuselage frame
Details
01-30-2010
12.00
Primed center fusleage frame
Details
01-28-2010
2.00
Finished deburing
Details
01-27-2010
2.00
Deburing
Details
01-24-2010
4.00
Started to dissasemble and debur Center Fuselage
Details
01-23-2010
4.00
Finished drilling center fuselage
Details
01-10-2010
1.00
Back at work
Details
11-14-2009
6.00
Replaced misdrilled rear spar flange
Details
11-01-2009
4.00
Seat & Baggage floor and shoot -Not another one!
Details
10-31-2009
0.00
Installed garage heater
Details
10-31-2009
2.00
Drilled Landing gear blocks.
Details
10-30-2009
8.00
Clecoed and drilled belly skins
Details
10-21-2009
4.00
Transfer drilled the longerons to the side skins
Details
10-18-2009
6.00
Fixed Fridays mistake and formed RH longeron
Details
10-16-2009
2.00
Ops!
Details
10-11-2009
4.00
Joggling side skin stiffeners
Details
10-10-2009
8.00
Formed side skins and prefit skins
Details
10-08-2009
4.00
Fluted fuselage side rib
Details
10-03-2009
6.00
Fabricated parts
Details
09-27-2009
4.00
Drilling and deburing fuselage bits and pieces
Details
09-13-2009
1.00
Trial fit of a breakdown bicycle
Details
09-12-2009
4.00
Figuring out assembly problems
Details
09-05-2009
2.00
Pre-fiting center fuselage
Details
08-29-2009
5.00
Started Center Fuslege
Details
08-28-2009
4.00
Inventoried Fuselage Kit
Details
08-24-2009
2.00
Finished Horizontal Stabilator and Empennage
Details
08-23-2009
8.00
Riveted trim Tab and trimed Stabilator tips
Details
08-21-2009
3.00
Primed Trim Tab parts
Details
08-20-2009
2.00
Debured and preped Trim Tab for paint
Details
08-18-2009
3.00
Finished riveting Stab skins
Details
08-17-2009
3.00
Continue Riveting skins
Details
08-16-2009
8.00
Started Trim Tab construction
Details
08-15-2009
8.00
Riveted Stab upper skin
Details
08-12-2009
3.00
Riveted frame, started skining
Details
08-11-2009
3.00
Riveting Horizontal Stab Frame
Details
08-10-2009
3.00
Riveted Stab frame front spar
Details
08-09-2009
2.00
Started final assembly
Details
08-08-2009
12.00
Primered the Stab
Details
08-06-2009
3.00
Deburing
Details
08-05-2009
3.00
deburing
Details
08-04-2009
3.00
Deburing
Details
08-02-2009
5.00
Debur and edge polish H.S.
Details
08-01-2009
0.00
Preventing edge damage to thin bandsawn parts
Details
08-01-2009
0.00
Made a hinge pin bending jig
Details
08-01-2009
4.00
Hinge pin fab and deburing
Details
07-27-2009
2.00
Deburing begins
Details
07-25-2009
9.00
Drilled out skins to full size
Details
07-21-2009
0.00
Fuselage kit arrived
Details
07-20-2009
3.00
Trial fit of trim tab
Details
07-18-2009
8.00
Installing forward skins
Details
07-16-2009
4.00
Continued drilling stabilator skins
Details
07-11-2009
8.00
Fixing a new mistake
Details
07-04-2009
6.00
Started skining stabilator
Details
07-02-2009
6.00
Loaded frame in jig
Details
07-01-2009
0.00
Rivet push tool
Details
06-29-2009
0.00
Adjustable support stand-off
Details
06-28-2009
4.00
Drilled out the frame to full size.
Details
06-27-2009
6.00
Clecoed Stabilator frame
Details
06-26-2009
4.00
Started Horizontal Stabilator
Details
06-21-2009
6.00
Finished Vertical Stabiliser
Details
06-17-2009
4.00
6/17 - 6/19 Deburing skins
Details
06-05-2009
0.00
Flight Report
Details
06-05-2009
0.00
Factory visit and S-19 prototype demo flight
Details
05-31-2009
6.00
Finished drilling the leading edge
Details
05-30-2009
8.00
Started fiting VS Leading Edge skins
Details
05-29-2009
3.00
Drilling VS side skins
Details
05-25-2009
6.00
Finished VS frame
Details
05-24-2009
8.00
Drilled Vertical Stablizer rear spar
Details
05-23-2009
12.00
Fixed the elongated holes in the front spar
Details
05-22-2009
2.00
Repaired the elongated holes in the Front spar
Details
05-12-2009
0.00
Rudder
Details
05-12-2009
2.00
Finished the rudder
Details
05-11-2009
2.00
Started Final assembly of the ruder
Details
05-10-2009
8.00
Primed the vertical stab frame details
Details
05-09-2009
9.00
Primed interiour of rudder skins
Details
05-08-2009
6.00
Continue on with vert stab
Details
05-05-2009
2.00
First attempt to fix the root plate holes
Details
05-03-2009
4.00
Started Vertical Stablizer
Details
05-02-2009
4.00
Re-Rolled Rudder Skin
Details
05-01-2009
4.00
Rolled rudder skins
Details
04-25-2009
7.00
Drilled rudder skins
Details
04-24-2009
4.00
Rudder skining
Details
04-23-2009
3.00
Fabricated Rudder skin stiffeners
Details
04-19-2009
4.00
Riveted Rudder Frame
Details
04-18-2009
4.00
Primed Rudder Frame
Details
04-04-2009
4.00
Started construction of the rudder frame
Details
04-01-2009
0.00
Drilling single fastener joints
Details
03-29-2009
2.00
Inventoryed Empennage kit
03-28-2009
0.00
Work bench details
Details
03-28-2009
0.00
Built a workbench
Details
03-13-2009
0.00
Picked up empenage kit
Details
02-15-2009
0.00
Usefull tools 2
Details
02-15-2009
0.00
Useful tools
Details
02-15-2009
0.00
Built some shop aids
Details
02-15-2009
0.00
Bench Sander
Details
01-16-2009
0.00
Ordered Empennage kit
Details
01-01-2009
0.00
Builder Profile
Details
01-01-2009
0.00
Airplane Description
Details
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
460
1984
Aft Fuselage
20
138
Aileron
13
71
Assembly
9
9
Builder
1
Canopy
12
37
Center Fuselage
31
165
Controls
9
15
Cowling
16
16
Demo Flight
2
Distractions
2
Electrical
28
156
Empennage
3
2
Engine
7
8
Fiberglass Tip for V
9
68
Flaps
6
44
Flight Test
5
5
Forward Fuselage
27
139
Fuselage
6
11
FWF
33
57
Horiz Stabilator
29
131
Instruments
42
201
Interiour
6
35
Landing Gear
9
31
Paint
10
10
Project
1
Rudder
11
47
Seats
5
65
Shop
4
Tips
7
0
Tools
3
Trim Tab
1
8
Vertical Stablizer
13
75
Wings
80
440
Copyright © 2001-2024 Matronics. All Rights Reserved.