KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
Work Logs Found: 1608
Category Work Time: 2447 Hours
 Date
Hours
Work Log Summary

Details

 08-22-2021
0.00
Replace Rear Oil Seal
Details
       

 02-21-2020
0.00
Cabin Heater Testing Again
Details
       

 02-09-2020
0.00
Cabin Heater Testing 2 of 2
Details
       

 02-09-2020
0.00
Cabin Heater Testing 1 of 2
Details
       

 02-02-2020
0.00
Cabin Heater Testing
Details
     

 01-26-2020
0.00
Cabin Heater Testing 2 of 2
Details
       

 01-26-2020
0.00
Cabin Heater Testing 1 of 2
Details
       

 01-18-2020
0.00
Cabin Heat 2.0 Testing
Details

 01-15-2020
0.00
Cabin Heat 2.0 Pg 3 of 3
Details
       

 01-04-2020
0.00
Cabin Heat 2.0 Pg 2 of 3
Details
       

 01-04-2020
0.00
Cabin Heat 2.0 Pg 1 of 3
Details
       

 10-03-2019
0.00
5.25 year update
Details
       

 06-03-2018
0.00
Wing Root Fairings
Details
       

 04-22-2018
0.00
Polishing after 4 years
Details
       

 11-23-2017
0.00
ADSB Installation
Details
     

 11-18-2017
0.00
ADSB Installation
Details
       

 11-12-2017
0.00
Oil cooler blank plate
Details
     

 11-12-2017
0.00
ADSB Install
Details
       

 11-12-2017
0.00
ADSB Install
Details
       

 08-09-2017
0.00
Install spark plug Time-Serts
Details

 07-04-2017
0.00
Helicoil for stripped bolt hole 2 of 2
Details
       

 07-04-2017
0.00
Helicoil for stripped bolt hole 1 of 2
Details
       

 06-09-2017
0.00
Changing to Top Oil Cooler 2 of 2
Details
     

 06-09-2017
7.00
Changing to Top Oil Cooler 1 of 2
Details
       

 06-08-2017
0.00
Changing to Top Oil Cooler 3 of 3
Details
       

 06-08-2017
0.00
Changing to Top Oil Cooler 2 of 3
Details
       

 06-08-2017
7.00
Changing to Top Oil Cooler 1 of 3
Details
       

 11-16-2016
0.00
If You Have a Hot Engine (part 2)
Details

 11-16-2016
0.00
If You Have a Hot Engine (Part 1)
Details

 09-24-2016
0.00
Re-mark fuel sight gauge
Details
       

 09-24-2016
0.00
Re-mark fuel sight gauge
Details
       

 09-24-2016
0.00
New switch positions and labels
Details
     

 06-19-2016
0.00
New Canopy (2 of 2)
Details
       

 06-19-2016
0.00
New Canopy (1 of 2)
Details
       

 06-18-2016
0.00
Making A New Canopy (2 of 2)
Details
       

 06-18-2016
0.00
Making A New Canopy
Details
       

 01-30-2016
0.00
Tail wheel rod end bearings
Details
       

 12-26-2015
0.00
New pushrod tubes
Details
       

 10-29-2015
0.00
New oil cooler hoses
Details
       

 10-24-2015
0.00
Oil change + alternator stator
Details

 10-21-2015
0.00
First Flight on Rebuilt Engine
Details

 10-17-2015
0.00
First Startup after Rebuild
Details

 10-13-2015
0.00
Installed oil cooler
Details

 10-12-2015
0.00
Reinstall Engine
Details
       

 10-11-2015
0.00
Completion of engine rebuild (2 of 2)
       

 10-11-2015
0.00
Completion of engine rebuild (1 of 2)
Details
       

 10-10-2015
0.00
Back of case hardware (2 of 2)
Details
     

 10-10-2015
0.00
Back of case hardware (1 of 2)
Details
       

 10-08-2015
0.00
Misc case accessories
Details
       

 10-07-2015
0.00
Deck heights & compression
Details
     

 10-06-2015
0.00
Crank-Cam-Case (4 of 4)
       

 10-06-2015
0.00
Crank-Cam-Case (3 of 4)
       

 10-06-2015
0.00
Crank-Cam-Case (2 of 4)
       

 10-06-2015
0.00
Crank-Cam-Case (1 of 4)
Details
       

 10-05-2015
0.00
Bearing and case assembly
Details
       

 10-04-2015
0.00
Install prop hub
Details
       

 10-03-2015
0.00
Timing gear installation
Details
     

 10-03-2015
0.00
Oil relief seat
Details
       

 10-02-2015
0.00
Press off prop hub
Details
       

 09-28-2015
0.00
Measure the cc's of the heads
Details
       

 09-26-2015
0.00
Clean cases
Details

 09-25-2015
2.00
Almost finished cleaning
Details

 09-24-2015
0.00
Remove con rods; clean more parts (3 of 3)
       

 09-24-2015
0.00
Remove con rods; clean more parts (2 of 3)
       

 09-24-2015
0.00
Remove con rods; clean more parts (1 of 3)
Details
       

 09-23-2015
0.00
More cleaning
Details

 09-22-2015
0.00
Remove pistons; Open case (2 of 2)
Details
       

 09-22-2015
0.00
Remove pistons; Open case (1 of 2)
Details
       

 09-20-2015
0.00
Begin engine disassembly (3 of 3)
       

 09-20-2015
0.00
Begin engine disassembly (2 of 3)
       

 09-20-2015
0.00
Begin engine disassembly (1 of 3)
Details
       

 09-19-2015
0.00
Remove engine for rebuild
Details
       

 09-05-2015
0.00
Nickasil Cylinder Damage
Details
       

 08-29-2015
0.00
New tailwheel pushrod
Details
       

 06-19-2015
0.00
New gear leg fairings
Details
       

 06-06-2015
0.00
Flywheel Cap Screw Failure (2 of 2)
Details
       

 06-06-2015
0.00
Flywheel Cap Screw Failure (1 of 2)
Details
       

 06-06-2015
0.00
Engine repairs
Details
       

 06-06-2015
0.00
Engine repairs
Details
       

 06-04-2015
0.00
New heat muff
Details
       

 06-02-2015
0.00
Mount Fire Extinguisher
Details
       

 05-06-2015
0.00
Update
Details
       

 04-15-2015
0.00
New stick boots (2 of 2)
Details
       

 04-15-2015
4.00
New stick boots (1 of 2)
Details
       

 04-04-2015
0.00
Remote charging port (2 of 2)
Details
       

 04-04-2015
2.00
Remote charging port (1 of 2)
Details
       

 03-03-2015
1.50
New Heat Muff
Details
       

 02-22-2015
2.00
New Heat Muff
Details
       

 02-21-2015
2.00
New Heat Muff
Details
       

 02-16-2015
0.00
Winter in New England, 2015
Details
       

 01-05-2015
0.00
Battery Charge Connection
Details
       

 01-03-2015
0.00
Canopy Seal - 2 of 2
Details
       

 01-03-2015
0.00
Canopy Seal - 1 of 2
Details
       

 11-15-2014
0.50
Brake handle installed
Details
       

 11-13-2014
3.00
New Brake Handle
Details
       

 11-09-2014
0.00
More photos
Details
       

 11-01-2014
0.00
Install cowl
Details
       

 10-30-2014
1.00
Clear coat upper cowl
Details
     

 10-29-2014
2.00
Clear coat lower cowl
Details

 10-28-2014
0.00
Chocks
Details
       

 10-27-2014
0.00
Flight Guide Page
Details
     

 10-26-2014
0.00
Wheel chocks
Details
     

 10-26-2014
0.50
Finished brakes
Details
     

 10-23-2014
2.00
More painting...
Details

 10-22-2014
3.00
More painting...
Details

 10-21-2014
3.00
More painting
Details
     

 10-20-2014
2.00
More prime painting
Details
     

 10-19-2014
3.00
Prime painting
Details
     

 10-18-2014
2.00
Prime paint wheel pants
Details
       

 10-18-2014
2.00
Hydraulic Brakes
Details
       

 10-18-2014
1.00
Hydraulic Brakes
Details
       

 10-15-2014
1.00
Hydraulic Brakes
Details
       

 10-12-2014
0.00
Wheel Pants
Details
     

 10-11-2014
2.50
New engine shock mounts
Details
       

 10-11-2014
3.00
Hydraulic Brakes
Details
       

 10-07-2014
2.00
New fuel door
Details
       

 10-05-2014
1.00
Hydraulic Brakes
Details
       

 10-04-2014
0.00
Hydraulic Brakes (2 of 2)
Details
       

 10-04-2014
4.00
Hydraulic Brakes (1 of 2)
Details
       

 10-03-2014
0.00
Hydraulic Brakes (3 of 3)
Details
       

 10-03-2014
0.00
Hydraulic Brakes (2 of 3)
Details
       

 10-03-2014
4.00
Hydraulic Brakes (1 of 3)
Details
       

 10-02-2014
1.00
Hydraulic Brakes
Details
       

 09-30-2014
2.00
Wheel pant work for new brakes
Details
       

 09-30-2014
1.00
New center panel
Details
     

 09-29-2014
2.50
New Center Panel
Details
     

 09-15-2014
1.50
Brake backing plates
Details
       

 09-11-2014
1.00
Finish master cylinder brackets
Details
       

 09-10-2014
1.50
Change to Sonex hydraulic brakes
Details

 08-30-2014
0.00
Success with the AeroCarb!
Details

 08-26-2014
0.00
Up to 31 hours today.
Details

 08-10-2014
0.00
Flight #14
Details

 08-09-2014
0.00
Flight #13
Details

 08-08-2014
0.00
Flight #12
Details
       

 08-04-2014
0.00
Flight #11
Details

 08-03-2014
0.00
Flight #10
Details
       

 07-19-2014
0.00
1 day, 3rd of 3 flights
Details

 07-19-2014
0.00
1 day, 2 of 3 flights
Details
       

 07-17-2014
0.00
Flight #6
Details

 07-16-2014
0.00
Adjust heavy R wing
Details

 07-15-2014
0.00
Installed velcro
Details

 07-11-2014
0.00
New upholstery complete!
Details
       

 07-10-2014
0.00
Flight #5
Details
       

 06-30-2014
0.00
Engine click solved!
Details
       

 06-24-2014
0.00
Engine Click!
Details

 06-22-2014
0.00
Engine parameters
Details
       

 06-21-2014
0.00
1st FLIGHT !! - 2
Details
       

 06-21-2014
0.00
1st FLIGHT !! - 1
Details
       

 06-18-2014
0.00
Final install of new throttle/mixture cables
Details
       

 06-17-2014
0.00
New fuel line and throttle cable
Details
       

 06-17-2014
0.00
Fiberglass work
Details
       

 06-11-2014
0.00
Starting replacement of throttle cable
Details
       

 06-08-2014
0.00
First flight no-go.
Details
       

 06-07-2014
0.00
Reversing flywheel magnet
Details
       

 06-07-2014
0.00
Last minute pre-flight tasks
Details
       

 06-05-2014
0.00
Disconnect prior to engine removal
Details
       

 06-01-2014
0.00
Trim, ELT, Prop, Mag
Details
       

 05-31-2014
0.00
Primary ignition with Keith Macht
Details
       

 05-30-2014
0.00
I'M DECLARING "FINISHED"
Details

 05-26-2014
1.00
Mag checks
Details

 05-25-2014
0.00
AIRWORTHINESS INSPECTION!
Details

 05-24-2014
1.00
Taxi test
Details

 05-24-2014
4.00
Secure forward lower skin
Details
       

 05-24-2014
1.00
Re-set tail wheel angle
Details
     

 05-24-2014
2.00
Fix sticky right brake
Details
       

 05-24-2014
0.00
Canopy & locking pin - 2
Details
       

 05-24-2014
1.00
Canopy & locking pin
Details
       

 05-23-2014
1.75
Get ready to rivet last skin
Details
       

 05-22-2014
1.25
Wiring & labels
Details
       

 05-22-2014
1.50
Pushrod covers
Details
       

 05-21-2014
0.50
Drain extension
Details
     

 05-21-2014
1.50
Connect wires for lights
Details

 05-21-2014
1.00
Check in-flight fuel levels
Details
     

 05-19-2014
4.00
More tweaking of ailerons
Details

 05-18-2014
1.50
Wing finally installed!
Details
     

 05-18-2014
0.00
Tested lights
Details
       

 05-18-2014
0.50
Finish riveting lower rear skin
Details

 05-18-2014
2.00
Attach and trim flaps
Details
     

 05-18-2014
0.00
Aileron controls and trimming (pg 2)
Details
     

 05-18-2014
3.00
Aileron controls and trimming (pg 1)
Details
       

 05-17-2014
1.00
Root gap seal
Details
       

 05-17-2014
3.00
Reinstallation of control stick assembly
Details
       

 05-17-2014
2.00
Re-check upper plugs
Details
     

 05-17-2014
1.00
Final a/c weight
Details
       

 05-17-2014
0.50
Attach pitot static tubing
Details
     

 05-17-2014
4.00
Aileron interferences
Details
       

 05-15-2014
3.50
Finish control triangle
Details
       

 05-14-2014
1.25
Re-make pilot controls
Details
       

 05-14-2014
0.00
MOVE TO AIRPORT!
Details
       

 05-13-2014
2.00
New fuel hose with drain
Details
       

 05-12-2014
2.00
New fuel hose with drain
Details
       

 05-11-2014
0.00
Another test run
Details
       

 05-10-2014
2.00
Reinstall oil sump plate nuts
Details
       

 05-10-2014
1.00
Another cowl test fit
Details
       

 05-09-2014
1.50
Removable tail fairing
Details
       

 05-07-2014
1.00
EAA Tech Councelor
Details

 05-06-2014
2.00
Wire guard/tray
Details
       

 05-05-2014
0.25
Trimmed forward "tabs"
Details
       

 05-05-2014
2.00
Reinstalled new EGT #4 probe
Details
       

 05-04-2014
2.50
More fiberglass
Details
       

 05-01-2014
2.50
Flap fairings
Details
     

 04-30-2014
2.50
Rivet lower REAR skin
Details
       

 04-29-2014
3.00
Elec, throttle, heat
Details
       

 04-28-2014
2.50
Windscreen, inspection panels, etc
Details

 04-27-2014
0.00
Wing walk - Pg 2
Details
       

 04-27-2014
4.00
Wing walk - Pg 1
Details
       

 04-27-2014
1.00
Inspection covers
Details
     

 04-26-2014
1.25
Wing root doublers
Details
     

 04-26-2014
0.75
Compression check
Details

 04-25-2014
0.00
How?
Details
       

 04-24-2014
1.00
Wing light connectors
Details

 04-24-2014
2.50
Attach wing root doublers
Details
       

 04-22-2014
1.50
Polish & 2nd N-number
Details
     

 04-22-2014
2.00
Connectors for wing lights
Details
       

 04-21-2014
1.50
Wing controls
Details

 04-21-2014
1.00
Weighed the aircraft
Details
       

 04-21-2014
2.50
Misc engine stuff
Details

 04-21-2014
0.50
High angle fuel flow test
Details
       

 04-20-2014
3.50
Wing/tail punch list items
Details
       

 04-20-2014
0.00
Another Engine Start
Details

 04-16-2014
2.00
Wing root doublers
Details
     

 04-12-2014
0.50
Install wings (temporary)
Details
       

 04-12-2014
1.00
FIRST SUCCESSFUL ENGINE START!
Details
       

 04-11-2014
2.00
Switches & shunt
Details
       

 04-11-2014
1.50
New brake fitting
Details
       

 04-10-2014
1.00
New brake pully bracket
Details
     

 04-10-2014
1.00
Add N-number
Details
       

 04-08-2014
1.00
Polishing again
Details
       

 04-07-2014
0.50
Fuel flow test - parked
Details
       

 04-06-2014
2.00
New coil wiring
Details

 04-05-2014
0.00
Attempted first start
Details
       

 04-04-2014
2.00
Finish fuel system
Details
       

 04-02-2014
1.00
Separate switch for Coils
Details
       

 04-02-2014
1.00
Cowl fastening work
Details
       

 04-01-2014
0.00
Over torque spark plug
Details
       

 03-29-2014
0.50
Sound damping angles
Details
     

 03-29-2014
0.50
Re-installed battery & connections
Details
       

 03-29-2014
0.50
Air cleaner blister - done
Details
     

 03-28-2014
1.00
Air cleaner blister
Details
     

 03-27-2014
1.00
Air cleaner blister
Details
     

 03-26-2014
1.00
Air cleaner blister
Details
     

 03-22-2014
0.00
Move from basement to garage
Details
       

 03-22-2014
0.00
More MOVE pictures
Details
       

 03-22-2014
0.00
More MOVE pictures
Details
       

 03-17-2014
0.50
Air cleaner blister
Details
     

 03-16-2014
1.00
Misc fuel punch list items
Details

 03-16-2014
0.50
Air cleaner blister
Details

 03-15-2014
0.50
Air cleaner blister
Details
       

 03-14-2014
1.00
Air cleaner blister
Details
       

 03-12-2014
1.00
Air cleaner blister
Details
       

 03-11-2014
1.50
Cowl vs Air Cleaner
Details
       

 03-06-2014
1.00
ELT wire + Transponder antenna
Details
       

 03-05-2014
1.00
Fuselage acoustic angles
Details

 03-03-2014
1.50
Fuselage acoustic angles
Details
       

 03-02-2014
1.50
Fuselage acoustic angles
Details
       

 03-01-2014
2.00
Differential compression check
Details
     

 02-28-2014
1.50
Add wheel pant screw
Details
     

 02-24-2014
1.50
Static/Pitot leak tests
Details
       

 02-23-2014
3.00
ELT installation
Details
       

 02-22-2014
4.00
ELT Mount
Details
       

 02-22-2014
1.50
ELT antenna installation
Details
       

 02-21-2014
1.50
ELT Installation
Details
       

 02-19-2014
2.00
Pushrod cover
Details
       

 02-17-2014
0.50
Pushrod cover
Details
     

 02-17-2014
0.25
Pattern for ELT cockpit remote
Details
     

 02-17-2014
1.00
Clear coat final tail tip
Details
     

 02-16-2014
1.00
Modified air/oil separator
Details
       

 02-16-2014
1.50
Finishing off the tail tip paint
Details
       

 02-15-2014
0.00
My Current Punch List
Details

 02-14-2014
1.50
Punch list
Details

 02-09-2014
1.00
Data plate & punch list
Details
     

 02-08-2014
3.00
More canopy tweaking
Details
     

 02-07-2014
4.00
Attach canopy to frame
Details
       

 02-03-2014
1.50
Paint last tail tip
Details
       

 02-03-2014
0.50
Finish prop install
Details
     

 01-20-2014
1.50
Prime paint final tail tip
Details
       

 01-17-2014
0.75
Reinstall oil cooler
Details
       

 01-17-2014
0.25
New engraved labels
Details
       

 01-15-2014
0.50
Reinstalling new oil cooler
Details
     

 01-15-2014
0.50
Install prop
Details
       

 01-13-2014
0.50
Remove oil cooler
Details
       

 01-13-2014
0.00
Colors?
Details
     

 01-11-2014
2.50
Fastening canopy
Details
       

 01-10-2014
0.00
New prop bolt
Details
     

 01-10-2014
1.50
Begin putting on the canopy
Details
       

 01-08-2014
2.00
Tweak gear leg fairings
Details

 01-06-2014
0.50
More patterns
Details
     

 01-06-2014
0.00
Left gear leg fairing (2 of 2)
Details
       

 01-06-2014
1.50
Left gear leg fairing (1 of 2)
Details
       

 01-03-2014
2.00
Patterns for upholstery
Details
       

 01-03-2014
0.50
Clear coat on canopy frame
Details
     

 01-01-2014
2.00
Gear fairings
Details
       

 12-31-2013
1.50
Paint canopy frame
Details
     

 12-30-2013
1.00
Paint rear canopy frame
Details
       

 12-29-2013
5.50
Canopy holes and hardware
Details
       

 12-28-2013
0.25
Install prob hub
Details
     

 12-28-2013
0.00
Canopy holes at pilot-side - 2 of 2
Details
     

 12-28-2013
2.00
Canopy holes at pilot-side - 1 of 2
Details
       

 12-27-2013
3.00
Canopy hinge strap
Details
       

 12-26-2013
0.75
More holes in canopy bows
Details

 12-24-2013
0.00
Got the new prop today!
Details
     

 12-23-2013
1.00
Paint vertical tail tip
Details
     

 12-23-2013
2.00
Locate holes in canopy bows
Details
       

 12-22-2013
0.00
Drill screw holes in canopy (pg 2 of 2)
Details
       

 12-22-2013
2.00
Drill screw holes in canopy (pg 1 of 2)
Details
       

 12-21-2013
0.75
Sanded canopy edges
Details
     

 12-21-2013
1.25
Prepped vertical tail tip for paint
Details
       

 12-17-2013
0.00
Remove masking from tail tip
Details
     

 12-17-2013
0.00
Edge sanding
Details
     

 12-16-2013
3.00
Fitting canopy
Details
       

 12-15-2013
0.75
Paint horiz tail tip
Details
       

 12-14-2013
1.00
Paint horizontal tail tip
Details
       

 12-14-2013
0.00
Air filter
Details
     

 12-12-2013
0.25
Reinstall wheels
Details
     

 12-12-2013
0.75
Re-secure right side stick
Details
     

 12-08-2013
0.75
Mask tail tip #1
Details
       

 12-05-2013
0.00
Avionics default setups
Details
       

 12-03-2013
2.00
Wheel pant anchors
Details
       

 12-02-2013
1.00
Wheel pant anchors
Details
       

 11-25-2013
1.00
Wheel pants on brake drum
Details
       

 11-25-2013
0.50
Jacking up wheels
Details
       

 11-23-2013
4.00
Cutting & fitting canopy
Details
       

 11-20-2013
1.25
Wheel pant install
Details
       

 11-19-2013
1.25
Oil cooler lines
Details
       

 11-16-2013
1.25
Fire sleeve & connections
Details
       

 11-16-2013
1.25
Canopy restraint cable
Details
       

 11-15-2013
1.00
Fuel lines
Details
       

 11-14-2013
1.00
Air/Oil Separator
Details
       

 11-14-2013
0.00
Air/Oil Separator
Details
     

 11-09-2013
1.50
Whiskey compass install
Details
     

 11-02-2013
0.75
Air/Oil separator
Details
       

 11-01-2013
2.00
Added rear bow bracing
Details
       

 10-29-2013
0.75
Air/Oil separator...again
Details
       

 10-29-2013
1.00
Added rear bow bracing
Details
       

 10-28-2013
1.25
Oil breather thru baffle
Details
       

 10-28-2013
1.25
Additional rear bow reinforcing
Details
     

 10-27-2013
1.50
Wheel Pants & Canopy
Details
       

 10-26-2013
2.00
Finish canopy frame
Details
       

 10-25-2013
2.50
Front canopy bow
Details
       

 10-25-2013
1.00
Forward bow
Details
       

 10-23-2013
3.00
Finalize rear bow
Details
       

 10-22-2013
2.00
Rear bow + horizontals
Details
       

 10-21-2013
1.50
Starting on the Canopy!
Details
       

 10-21-2013
0.00
Rear canopy bow in place
Details
     

 10-21-2013
0.50
Finishing touches
Details

 10-19-2013
0.00
Sanding, hinges. riveting (2 of 2)
Details
       

 10-19-2013
3.00
Sanding, hinges. riveting (1 of 2)
Details
       

 10-18-2013
1.00
Another hour of sanding
Details

 10-17-2013
1.00
Adding more filler
Details
       

 10-14-2013
1.00
Sanding filler
Details
       

 10-13-2013
1.50
Cowl filler
Details
       

 10-09-2013
1.25
Sanding & filling
Details
       

 10-09-2013
0.25
Fill the wheel pants
Details
       

 10-08-2013
1.50
Wheel pants reinforcing
Details
       

 10-07-2013
3.00
Wheel pants
Details
       

 10-04-2013
3.25
Misc stuff
Details
       

 10-02-2013
2.00
Access doors
Details
       

 10-02-2013
0.00
Access doors
Details
       

 10-01-2013
1.50
Exhaust wrap + air/oil separator
Details
     

 09-30-2013
2.00
Exhaust wrap, air/oil separator
Details
       

 09-29-2013
2.00
Cowl fitting & attachment
Details
       

 09-28-2013
1.00
Fuel + fasteners
Details

 09-27-2013
1.50
Oil filler door
Details
       

 09-27-2013
0.25
Labels
Details
       

 09-27-2013
1.25
Cowl cutout for fuel filler
Details
       

 09-26-2013
1.50
Cowl + heater SCAT
Details
       

 09-25-2013
1.00
2nd cowl tab
Details

 09-24-2013
2.00
Wiring + heater + cowl
Details
       

 09-23-2013
2.00
Forward cowl tabs
Details
       

 09-22-2013
1.25
Plumbing the smoke system
Details
       

 09-22-2013
0.75
Exhaust
Details
       

 09-21-2013
2.50
Oil Cooler Baffles - Done
Details
       

 09-20-2013
2.00
Oil Cooler Baffles
Details
       

 09-17-2013
1.75
Oil Cooler Baffles
Details
       

 09-16-2013
1.75
Oil Cooler Baffle
Details
     

 09-15-2013
2.00
Oil Cooler Baffles
Details
       

 09-14-2013
0.75
Right exhaust attach
Details
       

 09-14-2013
1.25
Oil cooler baffles
Details
     

 09-14-2013
1.00
Cowl repairs
Details
       

 09-12-2013
0.00
Cowl + EGT probe, 2 of 2
Details
       

 09-12-2013
2.00
Cowl + EGT probe, 1 of 2
Details
       

 09-11-2013
2.00
Oil cooler, exhausts, cowl
Details
       

 09-10-2013
3.00
Exhaust pipes & shield
Details
       

 09-09-2013
1.50
Cowl air deflector
Details
       

 09-08-2013
0.00
Exhaust opening (2 of 2)
Details
       

 09-08-2013
1.75
Exhaust opening (1 of 2)
Details
       

 09-07-2013
2.50
Gear leg fairings
Details
       

 09-04-2013
1.00
Exhaust springs
Details
       

 09-04-2013
1.50
Exhaust pipes & other things
Details
       

 09-03-2013
0.00
Custom canopy lock - Pg 3 of 3
Details
       

 09-03-2013
0.00
Custom canopy lock - Pg 2 of 3
Details
       

 09-03-2013
2.50
Custom canopy lock - Pg 1 of 3
Details
       

 09-02-2013
0.50
Securing under-panel wires
Details
     

 09-02-2013
0.50
More cowl glass
Details
     

 08-31-2013
1.00
Fiberglassing the nose
Details
       

 08-30-2013
1.75
Reforming nose
Details
       

 08-29-2013
2.00
Gear leg fairings
Details
     

 08-28-2013
1.00
Superfil cowl nose
Details
     

 08-28-2013
0.50
Bending gear leg fairings
Details
       

 08-27-2013
1.00
Started glassing the nose
Details

 08-26-2013
1.00
Gave in and started cutting
Details
       

 08-25-2013
1.00
More tweaking
Details

 08-24-2013
1.00
Re-fitting the cowl
Details
       

 08-23-2013
1.00
Glassing the top seam
Details
     

 08-23-2013
2.00
Finish second half of the engine
Details
       

 08-22-2013
0.25
Transponder static connection
Details
     

 08-22-2013
0.00
Don't do this!
Details
     

 08-20-2013
1.50
Clip replacement...
Details
       

 08-19-2013
0.00
Trailer hitch pins for wing bolts
Details
       

 08-19-2013
2.75
Still working on clip replacement
Details
     

 08-18-2013
1.50
More head installation
Details
     

 08-16-2013
1.00
Gear leg fairings
Details
       

 08-16-2013
1.50
Bundling wire
Details
     

 08-15-2013
0.50
Wheel pants & gear fairings
Details
       

 08-15-2013
0.50
Add Click-Bonds for wiring
Details

 08-13-2013
0.50
Last layer of fiberglass
Details

 08-13-2013
1.25
Bundling wires
Details

 08-12-2013
0.50
More cowl fiberglass
Details

 08-11-2013
0.75
More fiberglass on cowl
Details
     

 08-11-2013
0.75
Finish fuel tank vent
Details
     

 08-09-2013
1.50
Cowl fiberglass
Details
       

 08-08-2013
1.25
Install transponder
Details
       

 08-07-2013
0.50
Fuel tank vent
Details

 08-06-2013
1.00
Transponder harness
Details

 08-05-2013
1.00
Transponder harness
Details
       

 08-04-2013
0.50
Fuel vent
Details

 08-03-2013
2.00
Rocker assembly
Details
       

 07-16-2013
1.25
Bundling wiring
Details

 07-15-2013
1.50
Smoke tank vent
Details
       

 07-15-2013
0.50
Master switch guard
Details
       

 07-12-2013
2.00
Reassemble 1/2 engine
Details
       

 07-06-2013
2.00
Fuel shut-off
Details
       

 07-04-2013
2.25
Rewire headset jacks
Details

 07-03-2013
1.50
Rewire headset jacks
Details

 07-03-2013
0.50
Replacing wrist pin clips
Details

 06-29-2013
0.50
Replacing wrist pins
Details
     

 06-29-2013
0.50
A little rewiring results in AVIONICS ALIVE!
Details
     

 06-26-2013
1.00
Raplacing wrist pins
Details

 06-24-2013
1.00
First top overhaul... sort of
Details
       

 06-19-2013
1.50
Wire ties
Details
       

 06-18-2013
1.00
Wire ties
Details
     

 06-17-2013
0.50
Wiring, battery... Energize!
Details

 06-15-2013
1.50
Final wiring
Details

 06-14-2013
2.25
Final wiring
Details
       

 06-12-2013
1.50
Wiring CAN buses
Details

 06-09-2013
1.00
Click Bonds
Details

 06-08-2013
3.50
Wiring P-leads + RDAC
Details
       

 06-05-2013
1.50
Wiring...
Details

 06-04-2013
1.00
Click-Bond wire supports
Details

 06-01-2013
1.50
Patch seat pan
Details
       

 05-31-2013
2.00
Patch seat pan
Details
       

 05-30-2013
1.00
Coil wiring
Details

 05-29-2013
0.50
More wiring
Details

 05-28-2013
1.75
Outside Air Temp probe
Details
       

 05-25-2013
2.50
More wiring...
Details

 05-24-2013
4.75
Lots of wiring...
Details

 05-23-2013
2.00
Wire bundles + fuel sight tube
Details
       

 05-22-2013
2.00
Wiring + pitot connections
Details
       

 05-20-2013
2.00
Wire PTT switches + others
Details
       

 05-19-2013
3.50
Wire headset harness to jacks
Details
       

 05-18-2013
1.00
Wire supports
Details
       

 05-16-2013
2.50
Install Click-Bond wire supports
Details
       

 05-14-2013
1.50
New ground connectors
Details
     

 05-14-2013
1.50
CHT probes + Secure cables
Details
       

 05-13-2013
1.50
RDAC install
Details
       

 05-11-2013
3.00
More wiring
Details
     

 05-10-2013
3.00
Wiring layouts + RDAC cover
Details
       

 05-10-2013
0.00
MGL CAN Bus Diagrams
Details
       

 05-07-2013
2.25
RDAC, Magnetometer, Connectors
Details
       

 05-06-2013
2.50
AHARS & Magnetometer Install
Details
       

 05-06-2013
0.00
AHARS & Magnetometer Install
Details
       

 05-05-2013
2.00
Making AHARS brackets
Details
       

 05-05-2013
1.00
Install center panel section
Details
       

 05-04-2013
2.75
Wiring + panel install
Details
       

 05-03-2013
0.75
Rivet panel pieces
Details

 05-02-2013
1.50
Panel rivets + wiring
Details
       

 05-01-2013
1.25
Panel rivets + wiring
Details
       

 04-30-2013
2.00
Wiring behind panel
Details
       

 04-29-2013
1.25
Begin panel switch installation
Details
       

 04-25-2013
2.00
Cockpit light
Details
       

 04-24-2013
1.25
Glass lower cowl
Details

 04-23-2013
0.75
Make waterproof fiberglass RDAC cover
Details
       

 04-23-2013
0.75
Final glassing of top cowl
Details
     

 04-21-2013
1.25
Started glassing the upper cowl
Details
       

 04-21-2013
0.75
Paint instrument panel
Details
     

 04-19-2013
4.25
Misc avionics
Details
       

 04-18-2013
2.00
Modify panel + misc
Details

 04-18-2013
1.00
Install cowl with baffles in place
Details

 04-17-2013
1.25
Finish lower baffles
Details
     

 04-16-2013
1.50
Lower right baffle seals
Details
     

 04-15-2013
1.75
Rivet lower left baffle seals
Details

 04-14-2013
2.00
Lower baffle seals
Details
       

 04-13-2013
1.75
Completer rear and side baffles
Details
       

 04-12-2013
3.00
Rear baffle seal
Details
     

 04-10-2013
1.25
Extend baffles
Details
       

 04-09-2013
1.75
Attaching baffle material
Details
       

 04-08-2013
2.00
Testing baffle material placement
Details
       

 04-06-2013
0.75
Figure how to mount GPS
Details
       

 04-06-2013
2.00
Cut baffles to fit cowl
Details
       

 04-05-2013
2.00
Rivet baffles
Details
       

 04-04-2013
0.00
Avionics arrived!
Details
       

 04-03-2013
2.00
Drill baffles
Details
       

 04-02-2013
3.00
Finalize baffle layout
Details
       

 04-01-2013
2.25
Baffles
Details
       

 03-31-2013
0.00
More baffle photos
Details
       

 03-31-2013
2.00
Learn baffle locations
Details
       

 03-30-2013
1.00
More fiberglass
Details
     

 03-29-2013
1.75
Partial fiberglass lower cowl halves
Details
       

 03-29-2013
1.00
Mount COM antenna
Details
       

 03-28-2013
1.00
Prep cowl for fiberglass
Details
       

 03-25-2013
2.00
Cowl connections
Details
       

 03-24-2013
2.00
Lower cowl hinges
Details
       

 03-23-2013
0.50
Trim cowl inlets
Details
       

 03-23-2013
1.00
Lower cowl hinge
Details
       

 03-23-2013
1.50
Connect upper cowl halves
Details
       

 03-22-2013
1.50
Attach left cowl
Details
       

 03-21-2013
2.50
Continue left cowl
Details
       

 03-20-2013
1.25
Continue fitting left cowl
Details
       

 03-19-2013
2.50
Begin LEFT cowl
Details
       

 03-18-2013
2.00
Rivet right cowl
Details
       

 03-18-2013
0.00
Rivet right cowl
Details
       

 03-17-2013
3.00
Continue right cowl
Details
       

 03-17-2013
0.00
Continue right cowl
Details
       

 03-16-2013
2.50
Continue right cowl
Details
       

 03-15-2013
2.50
Attaching lower right cowl
Details
       

 03-15-2013
0.00
Attaching lower right cowl
Details
       

 03-14-2013
1.50
Cutting the right cowl
Details
       

 03-14-2013
0.00
Cutting the right cowl
Details
       

 03-10-2013
1.50
Continue fitting right cowl
Details

 03-09-2013
1.00
Continue fitting right cowl
Details
       

 03-08-2013
1.75
Continue fitting right cowl
Details
       

 03-08-2013
0.00
Continue fitting right cowl
Details
       

 03-06-2013
1.00
Begin fitting right cowl
Details
       

 03-05-2013
1.50
Attach mixture cable
Details
       

 03-04-2013
2.00
AeroInjector connections
Details
       

 03-03-2013
2.00
Engine alignment, etc.
Details
       

 03-01-2013
0.50
Trim glare shield fabric
Details

 02-25-2013
0.50
Misc stuff
Details

 02-24-2013
0.75
Start of cowl construction
Details
       

 02-24-2013
1.50
Attach heat muff + fit exhaust pipes
Details
       

 02-22-2013
1.50
Baffles & cowl
Details
       

 02-13-2013
2.00
Baffles
Details
       

 02-12-2013
2.50
Rear baffle
Details
       

 02-12-2013
0.00
Rear baffle
Details
       

 02-12-2013
0.00
Rear baffle
Details
       

 02-11-2013
1.00
Engine baffles
Details
       

 02-11-2013
2.50
Coil plug-wires + baffles
Details
       

 02-10-2013
1.00
Control cables and supports
Details

 02-09-2013
2.00
Fuel line + control cable shields
Details
       

 02-09-2013
1.00
Finish heat muff
Details
     

 02-08-2013
3.00
Remake heat muff
Details
       

 02-06-2013
1.75
Throttle & mixture cables
Details
       

 02-06-2013
0.25
Fuel filter & AeroInjector (carb)
Details
       

 02-05-2013
2.00
Mixture control bracket
Details
       

 02-04-2013
1.25
Panel cutouts
Details
       

 02-04-2013
2.00
Oil Cooler Baffle
Details
       

 02-03-2013
1.50
More panel cutouts
Details
       

 02-02-2013
1.00
Wiring + AeroInjector
Details
       

 02-02-2013
2.00
Oil Cooler
Details
       

 02-02-2013
0.00
Engine hanging day!
Details
       

 01-31-2013
0.75
Spark plugs + terminal block
Details
       

 01-31-2013
0.75
Heat control cable
Details
       

 01-30-2013
0.50
Heat muff + starter ground
Details

 01-29-2013
0.75
Heat muff
Details

 01-28-2013
1.25
Intake, exhaust, probes
Details
       

 01-28-2013
1.00
Continue on heat muff + got cowl!
Details
       

 01-26-2013
1.25
Exhaust + electrics
Details
       

 01-26-2013
1.25
Cabin heat muff
Details
       

 01-25-2013
1.25
Cabin heat muff
Details
       

 01-23-2013
0.00
Welded SS bungs on exhaust
Details
     

 01-22-2013
1.50
More molex connectors
Details
     

 01-21-2013
1.00
Molex connectors
Details
       

 01-19-2013
0.00
FIRST DAY ON ITS OWN LEGS!
Details
       

 01-17-2013
0.75
Finally got the last engine mount screw in!
Details

 01-16-2013
0.50
Trying to install last screw
Details

 01-16-2013
0.50
More wire connectors
Details

 01-15-2013
2.00
Panel & wiring
Details
       

 01-15-2013
1.00
Install engine mount for good!
Details
       

 01-14-2013
1.75
Panel & wiring
Details
       

 01-12-2013
2.50
More wiring
Details

 01-11-2013
2.00
More wiring
Details
       

 01-08-2013
2.00
More wiring
Details
       

 01-02-2013
1.50
More wire connectors
Details

 01-01-2013
1.75
More wire connectors
Details

 12-30-2012
4.00
Engine & firewall electrical
Details
       

 12-27-2012
1.00
Terminal block install
Details

 12-26-2012
1.50
Laying out electric runs & firewall penetration
Details
       

 12-26-2012
0.50
Drill holes in exhause pipes
Details
     

 12-22-2012
2.00
Firewall forward wiring
Details
       

 12-20-2012
2.00
CHT & Spark Plugs
Details
       

 12-19-2012
2.00
Add master & starter relays to firewall
Details
       

 12-17-2012
1.50
More firewall prep
Details
       

 12-15-2012
1.00
Smoke system hose & fittings
Details
     

 12-15-2012
1.50
More firewall prep
Details
       

 12-14-2012
0.00
Smoke oil tank considerations (READ THIS)
Details
     

 12-14-2012
2.50
More firewall prep
Details
       

 12-13-2012
2.00
More firewall prep
Details

 12-12-2012
2.00
Laying out and drilling firewall
Details
       

 12-12-2012
0.00
Engine timing mark
Details
     

 12-09-2012
2.00
Start Sonex smoke system setup
Details
       

 12-09-2012
0.00
More smoke system photos
Details
       

 12-08-2012
1.25
Oil Cooler
Details
       

 12-08-2012
1.25
Alternator Install
Details
       

 12-07-2012
2.50
Intake
Details
       

 12-07-2012
0.00
Intake
Details
       

 12-06-2012
2.00
Finally finished flywheel
Details
       

 12-01-2012
1.00
Re-doing shims
Details

 11-28-2012
2.00
Re-doing shims
Details
       

 11-16-2012
1.00
Re-do flywheel assembly
Details
       

 11-16-2012
0.25
Oil sump plate
Details
       

 11-12-2012
2.00
Misc
Details
       

 11-10-2012
3.00
Flywheel & accessory plate
Details
       

 11-10-2012
0.00
Flywheel & accessory plate
Details
       

 11-09-2012
3.00
Rockers, crank seal, accessory plates
Details
       

 11-09-2012
0.00
Accessory plates
Details
     

 11-08-2012
2.50
2nd rockers + oil accessories
Details
       

 11-05-2012
0.00
Pushrods & rockers
Details
       

 11-05-2012
3.50
Push rods & rockers
Details
       

 11-03-2012
1.75
Redo + rocker arms
Details
       

 11-02-2012
2.00
Attach cylinders & heads
Details
       

 10-29-2012
2.00
Cylinder Assembly
Details
       

 10-27-2012
1.50
Isolate headset jacks
Details
       

 10-21-2012
2.25
Assemble crank case
Details
       

 10-21-2012
0.00
Assemble crank case
Details
       

 10-18-2012
1.25
Crank & cam installation
Details
       

 10-18-2012
0.00
Crank & cam installation
Details
     

 10-17-2012
0.75
Massage canopy latch
Details

 10-16-2012
1.75
Assemble case & bearings
Details
       

 10-16-2012
0.00
Assemble case & bearings
Details
       

 10-13-2012
2.50
Paint engine block
Details
       

 10-12-2012
3.50
STARTED MY AEROVEE BUILD!
Details
       

 10-12-2012
0.00
More pics of day 1
Details
       

 10-02-2012
1.25
Hinge cotter pins + LED light wiring
Details
       

 09-15-2012
1.00
New cockpit fuel line
Details
       

 09-14-2012
0.00
Little progress, but ordered AeroVee!
Details

 09-11-2012
0.50
Design storage
Details
       

 09-08-2012
0.75
Secure headset wiring to fuselage
Details
       

 09-08-2012
0.75
Fix loose pilot stick
Details
     

 09-01-2012
1.25
Install headset jacks
Details
       

 08-31-2012
1.00
Vent + fuel line
Details
       

 08-31-2012
0.75
Install brake cable
Details
       

 08-31-2012
1.25
Firewall fuel fitting
Details
       

 08-20-2012
1.25
Brake cables
Details
       

 08-17-2012
1.75
Wheels & brakes
Details
       

 08-16-2012
2.00
Tap axle for bolt
Details
     

 08-14-2012
1.50
Fitting gear to fuselage
Details
       

 08-11-2012
2.00
Hinge pin cotters
Details
     

 08-10-2012
3.00
Cabin heat box (shuttle)
Details
       

 08-09-2012
1.25
Right axle/brake
Details
       

 08-07-2012
2.75
Left wheel...continuing
Details
       

 08-06-2012
1.25
Mount brake back plate
Details
       

 08-05-2012
1.00
Assemble wheels & tires
Details
       

 08-04-2012
2.25
Drill axles
Details
       

 08-03-2012
0.75
Wheel bearings
Details
       

 08-03-2012
1.25
Wheel axle spacer & brake guide
Details
       

 07-20-2012
0.50
Grind brake cams
Details
       

 07-19-2012
1.50
Setting Toe-In
Details
       

 07-15-2012
0.50
Starting gear installation
Details
     

 07-15-2012
1.00
Complete battery box
Details
       

 07-14-2012
3.00
Battery Box
Details
       

 07-12-2012
2.00
Battery Box - again!
Details
       

 07-10-2012
0.25
Battery box
Details

 07-09-2012
0.50
Brake drum to axle
Details
       

 07-09-2012
1.00
Battery Box
Details
     

 07-08-2012
2.00
Gear legs and brakes
Details
       

 07-07-2012
0.75
Engine mount - final prep
Details
       

 07-07-2012
2.00
Drilling gear legs
Details
       

 07-07-2012
0.50
Axle assemblies
Details
       

 07-06-2012
0.50
Hone holes for landing gear
Details
       

 07-06-2012
0.75
Engine mount - finish holes
Details
       

 07-05-2012
2.25
Engine Mount
Details
       

 07-04-2012
1.75
Engine Mount
Details
       

 07-02-2012
2.00
Shims for engine mount
Details
       

 06-30-2012
0.75
Test fitting engine mount
Details
       

 06-28-2012
0.00
Received engine mount & wheel assemblies
Details
       

 06-27-2012
1.00
Control bungee + hinge cotters
Details
       

 06-26-2012
2.00
Install left aileron & flap
Details
       

 06-24-2012
1.50
Install right flap & aileron
Details
       

 06-23-2012
1.00
Fix elevator travel
Details

 06-22-2012
1.00
Elevator trim
Details
       

 06-22-2012
2.25
Elevator pushrod
Details
       

 06-21-2012
2.00
Elevator pushrod attachment
Details
       

 06-20-2012
1.50
Install control stick assembly
Details
       

 06-20-2012
0.00
Install control stick assembly
Details
       

 06-18-2012
1.75
Control stick assembly
Details
       

 06-17-2012
2.00
Controls
Details
       

 06-16-2012
1.00
Flush rivets inside spar tunnel
Details
       

 06-14-2012
2.00
Rear and forward spar work
Details
       

 06-12-2012
2.00
Continue rear spar carry through
Details
       

 06-11-2012
1.50
Rear spar carry through
Details
       

 06-10-2012
0.50
Wing Rigging #6
Details
       

 06-10-2012
0.00
Wing Rigging #5
Details
       

 06-10-2012
0.00
Wing Rigging #4
Details
       

 06-10-2012
0.00
Wing Rigging #3
Details
       

 06-10-2012
0.00
Wing Rigging #2
Details
       

 06-10-2012
6.00
Wing Rigging #1
Details
       

 06-08-2012
1.00
Prep for wing rigging
Details

 06-07-2012
1.75
Prep for wing rigging
Details
       

 06-05-2012
1.00
Cockpit LED light
Details

 06-04-2012
0.50
Cockpit LED light
Details
       

 06-02-2012
5.00
Wing rack
Details
     

 05-31-2012
1.75
Prep for wing rigging
Details
       

 05-28-2012
1.25
Wing rigging drill guide
Details

 05-24-2012
0.00
I haven't quit!
Details

 05-19-2012
0.75
Windscreen - more fasteners
Details

 05-15-2012
1.25
Headphone jacks
Details
       

 05-15-2012
0.00
Basement/garage doors
Details
     

 05-11-2012
1.75
Windscreen - fasteners
Details
       

 05-10-2012
2.00
Left Wing - install tip & light
Details
       

 05-05-2012
0.50
Windscreen - attachment
Details
       

 05-04-2012
3.00
Windscreen - begin installing on fuselage
Details
       

 05-03-2012
0.50
Windscreen - paint bow strap
Details

 05-01-2012
1.00
Painting windscreen parts
Details
       

 04-30-2012
1.75
Painting windscreen parts
Details
       

 04-29-2012
3.00
Windscreen - tap & dimple
Details
       

 04-28-2012
1.75
Windscreen - Drill and tap
Details
       

 04-27-2012
2.25
Windscreen - bow and windscreen drilling
Details
       

 04-26-2012
3.00
Windscreen - strap & bow drilling
Details
       

 04-26-2012
0.00
Windscreen - strap & bow drilling
Details
       

 04-26-2012
0.00
Windscreen - strap & bow drilling
Details
     

 04-25-2012
2.25
Windscreen - trim & drill
Details
       

 04-25-2012
0.00
Windscreen - trim & drill
Details
       

 04-24-2012
0.75
Complete tailwheel installation
Details
       

 04-23-2012
3.00
Begin install of windscreen
Details
       

 04-23-2012
0.00
Begin install of windscreen
Details
       

 04-22-2012
1.00
Paint left wing tip
Details

 04-21-2012
1.50
Throttle quadrant installation
Details
       

 04-21-2012
0.75
Tail wheel steering rod
Details
       

 04-20-2012
1.00
Balance right aileron
Details
       

 04-19-2012
1.00
PTT wiring + more paint
Details
       

 04-16-2012
1.00
Painting LEFT wing tip
Details
       

 04-16-2012
1.50
Install glare shield fabric
Details
       

 04-16-2012
0.75
Install accessory outlets
Details
       

 04-14-2012
3.00
LEFT wing painting
Details
       

 04-13-2012
2.25
LEFT wing aileron controls + paint masking
Details
       

 04-08-2012
1.00
Finished landing light installation
Details
       

 04-06-2012
2.00
Wing tip light
Details
       

 03-30-2012
1.25
Right wing tip install
Details
       

 03-30-2012
0.50
Modify basement wall
Details

 03-29-2012
1.00
Install Right wingtip
Details
       

 03-28-2012
1.00
Overflow pan
Details
       

 03-26-2012
1.25
Fuel drain line
Details
       

 03-25-2012
1.50
Guide pin made and installed
Details
       

 03-25-2012
1.00
2nd Head set jack
Details

 03-24-2012
1.50
Head set jack
Details
       

 03-23-2012
1.50
Paint, canopy slide, cabin heat
Details
       

 03-23-2012
1.00
Fuel drip pan + fuel line
Details
       

 03-19-2012
1.75
Overflow pan
Details
       

 03-17-2012
2.00
Paint, weights, panel, fuel...
Details
       

 03-17-2012
0.00
Paint, weights, panel, fuel...
Details
       

 03-16-2012
2.50
Install fuel tank straps
Details
       

 03-15-2012
1.00
Finished color coats on wing tip
Details

 03-14-2012
0.50
Paint aileron & wing tip
Details

 03-14-2012
1.75
Custom fuel vent
Details
       

 03-14-2012
0.00

Details
       

 03-13-2012
0.50
Basement wall modifications
Details
       

 03-12-2012
1.00
Rivet canopy hinge to fuselage
Details
       

 03-11-2012
1.50
Canopy parts + painting
Details
       

 03-10-2012
4.25
Hook Angle (for canopy)
Details
       

 03-10-2012
1.50
Canopy hinges & rods
Details

 03-09-2012
1.75
Hook Angle (for canopy)
Details
       

 03-04-2012
1.00
Catch "pan" to catch fuel spills
Details
     

 03-03-2012
0.50
Paint aileron
Details

 03-03-2012
4.50
Catch "pan" to catch fuel spills
Details
       

 03-03-2012
0.00
Catch "pan" to catch fuel spills
Details
       

 02-29-2012
2.75
Rudder cable + cable fairing + prime paint
Details
       

 02-28-2012
1.00
Left rudder cable
Details
       

 02-27-2012
1.00
Rudder cables
Details
       

 02-27-2012
0.50
Prep aileron for paint
Details
     

 02-27-2012
0.75
Filler cap spill catch
Details
       

 02-26-2012
1.00
Rudder cables through fairleads
Details
       

 02-26-2012
1.50
Control stick grips & PTT switches
Details
       

 02-25-2012
3.75
Control assembly
Details
       

 02-24-2012
2.25
Fuel tank fittings
Details
       

 02-24-2012
1.00
Control horn assembly
Details
       

 02-22-2012
1.25
Fuel tank straps + fuel tank prep
Details
       

 02-22-2012
1.00
Brake cable pulley
Details
       

 02-18-2012
1.00
Welded cockpit controls
Details
     

 02-18-2012
1.00
Fuel tank install
Details

 02-17-2012
2.25
Trim cable & Brake Parts
Details
       

 02-16-2012
0.50
Prime R wing tip
Details

 02-13-2012
1.75
Prep right wintip for paint
Details
       

 02-12-2012
2.00
Install R wing aileron pushrods
Details
       

 02-12-2012
0.50
Elevator trim cable
Details
     

 02-11-2012
1.25
Rudder spring + cable fairings
Details
       

 02-08-2012
1.25
Rudder pedal install
Details
     

 02-07-2012
1.75
Rudder pedal install
Details
       

 02-04-2012
2.00
Rudder pedal support blocks
Details
       

 02-03-2012
2.50
Pushrods & rudder pedal support blocks
Details
       

 02-01-2012
2.00
Water bottles and rod end bearings
Details
       

 01-31-2012
1.00
Bushings
Details

 01-30-2012
1.00
Control bushings
Details
     

 01-21-2012
0.50
Trim cable
Details
       

 01-21-2012
2.75
Elevator push rod connections
Details
       

 01-20-2012
2.25
Install flap/brake controls
Details
       

 01-20-2012
0.25
Install elevator trim cable
Details
       

 01-18-2012
0.50
Flap controls
Details
       

 01-16-2012
1.50
Flap & Brake handles
Details
       

 01-15-2012
1.75
Elevator & Flap systems
Details

 01-14-2012
2.50
Hand brake
Details
       

 01-14-2012
1.00
Elevator pushrod
Details
       

 01-13-2012
2.00
Flap tube supports
Details
       

 01-13-2012
0.25
Flap tube
Details
       

 01-11-2012
2.50
Flap handle assembly
Details
       

 01-10-2012
1.50
Miscellaneous
Details

 01-07-2012
4.25
Tail fairings complete
Details
       

 01-06-2012
2.00
Tail wheel push rod
Details
       

 01-06-2012
0.00
Tail wheel push rod
Details
       

 01-02-2012
0.25
Tail fillets
Details
       

 01-01-2012
3.00
Tail wheel installation
Details
       

 12-31-2011
2.50
Tail wheel rod & fittings
Details
       

 12-29-2011
2.00
Rudder hinge, stops & fillets
Details
       

 12-29-2011
0.00
Misc shots of project to date
Details
       

 12-28-2011
2.00
Secure vertical stab bolts
Details
       

 12-27-2011
0.00
Vertical stabilizer tail post
Details
     

 12-27-2011
3.50
Bolting down vertical tail
Details
       

 12-26-2011
1.25
Vertical stabilizer attachment
Details
       

 12-26-2011
1.75
Secure horizontal stab
Details
       

 12-23-2011
1.75
Fit horizontal stabilizer
Details

 12-22-2011
2.00
Water bottles & seat belts
Details
       

 12-22-2011
0.00
Seat belt installation
Details
       

 12-21-2011
0.50
Deburring tail holes
Details

 12-19-2011
2.25
Horizontal Tail Attach
Details
       

 12-18-2011
0.00
Horizontal Tail Attach
Details
       

 12-18-2011
2.50
2nd Vent + Horizontal Tail Attach
Details
       

 12-17-2011
4.25
Cockpit air vents
Details
       

 12-17-2011
0.00
Cockpit air vents
Details
       

 12-17-2011
0.00
Cockpit air vents
Details
       

 12-16-2011
2.50
Riveted glare shield in place
Details
       

 12-13-2011
2.00
Glare shield
Details
       

 12-12-2011
0.25
Glare shield accessory power
Details
       

 12-12-2011
1.75
Glare shield
Details
       

 12-11-2011
2.00
Glare shield-to-firewall angles
Details
       

 12-10-2011
3.25
Cross tie plates + deburring
Details
       

 12-09-2011
2.50
Instrument panel & glare shield
Details
       

 12-09-2011
0.00
Instrument panel & glare shield
Details
       

 12-09-2011
0.00
Instrument panel & glare shield
Details
       

 12-06-2011
2.75
Glare shield & Instrument panel
Details
       

 12-04-2011
2.00
Instrument panel
Details
       

 12-04-2011
2.25
Glare shield & panel
Details
       

 12-02-2011
3.25
Seat pan installation complete
Details
       

 12-02-2011
0.00
Seat pan installation complete
Details
       

 12-01-2011
2.75
Forward fuselage floor structure (complete)
Details
       

 11-30-2011
3.00
Forward fuselage floor structure
Details
       

 11-29-2011
2.50
Forward fuselage floor structure
Details
       

 11-28-2011
1.75
Forward fuselage floor structure
Details

 11-27-2011
3.00
Forward fuselage floor structure
Details
       

 11-26-2011
2.25
Forward fuselage floor structure
Details
       

 11-25-2011
4.00
Lower fuselage structure
Details
       

 11-24-2011
2.75
Seat pan hinges
Details
       

 11-23-2011
1.50
Seat Hinges
Details

 11-22-2011
2.50
Finish F11 of forward fuselage
Details
       

 11-22-2011
0.00
Finish F11 of forward fuselage
Details
       

 11-20-2011
2.00
F19 finish; F11 continue
Details
       

 11-19-2011
1.75
Forward fuselage
Details

 11-16-2011
1.50
Forward fuselage deburring
Details

 11-15-2011
1.50
Forward fuselage deburring
Details
       

 11-14-2011
1.25
Forward fuselage - finished updrilling
Details
       

 11-12-2011
1.00
Forward fuselage drilling
Details

 11-11-2011
1.50
Updrilling forward fuselage
Details
       

 11-10-2011
2.00
Upper firewall - complete
Details
       

 11-08-2011
2.50
Upper firewall - fuel filler box
Details
       

 11-07-2011
2.00
Upper Firewall
Details
       

 11-05-2011
1.25
Upper firewall
Details
       

 11-04-2011
2.00
Lower firewall
Details
       

 11-01-2011
2.50
Misc pilot holes in forward fuselage
Details
       

 10-28-2011
1.00
Spar tunnel
Details

 10-25-2011
1.75
Spar Tunnel
Details
       

 10-24-2011
1.25
Finished sheet F03
Details
       

 10-23-2011
3.00
Floor stiffener + misc
Details
       

 10-22-2011
1.75
Stainless +
Details

 10-20-2011
2.25
Spar tunnel & Upper firewall
Details

 10-19-2011
1.75
Continue tunnel parts
Details
       

 10-18-2011
2.50
Upper firewall + forward tunnel Z
Details
       

 10-17-2011
1.50
Aft tunnel web
Details
       

 10-16-2011
3.00
Lower & upper firewall parts
Details
       

 10-15-2011
2.75
Lower firewall + upper firewall
Details
       

 10-14-2011
2.25
Lower firewall + upper firewall
Details
       

 10-12-2011
1.75
Lower firewall
Details
       

 10-11-2011
3.00
Lower firewall
Details
       

 10-10-2011
1.00
Bottom skin + forward cross ties
Details
       

 10-09-2011
3.75
Fwd fuselage side panels + bottom skin
Details
       

 10-09-2011
0.00
Fwd fuselage side panels + bottom skin
Details
       

 10-08-2011
2.00
Trim/Flap Assembly
Details
       

 10-08-2011
1.00
Installation of fwd fuselage side panels
Details
       

 10-06-2011
2.50
Aft spar tunnel web assembly
Details
       

 10-04-2011
2.50
Aft spar tunnel web assembly
Details
       

 10-03-2011
1.75
Aft spar tunnel web assembly
Details
       

 10-02-2011
4.25
LEFT forward fuselage complete
Details
       

 10-01-2011
3.00
LEFT forward fuselage
Details

 09-29-2011
2.50
LEFT forward fuselage
Details
       

 09-27-2011
1.75
Start LEFT forward fuselage
Details
       

 09-26-2011
1.75
Finished RIGHT forward fuselage
Details
       

 09-25-2011
4.25
RIGHT forward fuselage
Details
       

 09-24-2011
3.25
RIGHT forward fuselage
Details
       

 09-23-2011
3.00
RIGHT forward fuselage
Details
       

 09-23-2011
0.00
RIGHT forward fuselage
Details
       

 09-22-2011
2.00
Starting RIGHT forward fuselage
Details
       

 09-21-2011
2.50
Polish forward fuselage sides
Details
       

 09-19-2011
0.50
Re-paint parts + prep fwd fuselage sides
Details

 09-18-2011
1.50
Paint misc parts
Details

 09-18-2011
0.00
Bent seat pan
Details
       

 09-18-2011
0.50
Bent glare shield & seat pan
Details
       

 09-17-2011
0.75
Paint misc parts
Details
     

 09-17-2011
2.75
Assemblies F14-01 L&R
Details
       

 09-16-2011
2.75
Finish riveting turtle deck
Details

 09-15-2011
3.25
Turtle Deck: finish debur & start riveting
Details
       

 09-14-2011
2.25
Turtle deck disassembly & deburing
Details
       

 09-13-2011
2.25
Turtle deck former installation
Details
       

 09-12-2011
0.25
Updrill turtle deck
Details

 09-11-2011
2.50
Turtle deck former install
Details
       

 09-11-2011
0.00
Turtle deck former install
Details
       

 09-10-2011
2.50
#1 turtle deck formers
Details
       

 09-09-2011
2.00
Turtle deck installation
Details
       

 09-08-2011
2.50
Turtle deck formers
Details
       

 09-07-2011
1.75
Misc parts + turtle deck formers
Details
       

 09-06-2011
2.50
Begin Turtle Deck
Details
       

 09-05-2011
3.00
18 Aft tailcone completion
Details
       

 09-03-2011
0.00
17 Aft tailcone assembly
Details
       

 09-03-2011
0.00
16 Aft tailcone assembly
Details
       

 09-03-2011
3.50
15 Aft tailcone assembly
Details
       

 09-02-2011
2.25
14 Aft tailcone assembly
Details
       

 09-01-2011
0.75
13 Debur aft tailcone assembly
Details
       

 08-31-2011
3.25
12 Aft tailcone assembly
Details
     

 08-30-2011
2.25
11 Aft tailcone assembly
Details
       

 08-29-2011
0.00
9 Aft tailcone assembly
Details
       

 08-29-2011
2.75
8 Aft tailcone assembly
Details
       

 08-29-2011
0.00
10 Aft tailcone assembly
Details
       

 08-28-2011
0.00
7 Aft tailcone assembly
Details
       

 08-28-2011
1.25
6 Aft tailcone assembly
Details
       

 08-27-2011
0.00
5 Aft tailcone assembly
Details
       

 08-27-2011
0.00
4 Aft tailcone assembly
Details
       

 08-27-2011
0.00
3 Aft tailcone assembly
Details
       

 08-27-2011
3.50
2 Aft tailcone assembly
Details
       

 08-27-2011
0.50
1 Seat Belt Attach Brackets
Details
       

 08-26-2011
3.00
Flap drive + tailcone cross members
Details
       

 08-25-2011
1.25
Flap drive block
Details
       

 08-25-2011
1.00
Complete longerons
Details
     

 08-24-2011
2.75
Canopy rail/slides
Details
       

 08-24-2011
0.00
Canopy rail/slides
Details
       

 08-23-2011
3.00
Fairleads + Rudder pedal brackets
Details
       

 08-22-2011
1.00
Complete 3 Fairleads
Details
       

 08-19-2011
2.50
F10-17 assembly completed
Details
     

 08-18-2011
2.50
F10-17 assembly
Details
       

 08-17-2011
1.75
Fairleads & misc
Details
       

 08-16-2011
1.75
Tailcone + prime wing tips
Details
     

 08-15-2011
1.50
Tailcone; aft channel
Details
       

 08-14-2011
1.50
Aft fuselage, lower skin
Details
       

 08-11-2011
1.00
Drilling channels; aft fuselage
Details
       

 08-10-2011
1.50
Squaring and setting the first bulkhead
Details
       

 08-09-2011
0.50
Head scratching & cleanup
Details
       

 08-08-2011
2.75
F24-01 Cross Tie Box Ass'y
Details
       

 08-08-2011
0.00
F24-01 Cross Tie Box Ass'y
Details
       

 08-07-2011
1.50
Fuselage test layout + wingtip lights
Details
       

 08-07-2011
0.00
Fuselage test layout + wingtip lights
Details
       

 08-06-2011
2.00
Misc
Details
       

 08-04-2011
1.00
Fairleads
Details

 08-03-2011
2.50
Fairleads & seat belt brackets
Details
       

 07-15-2011
2.00
LEFT aft fuselage construction
Details
       

 07-14-2011
1.50
LEFT aft fuselage construction
Details
       

 07-13-2011
1.25
LEFT aft fuselage construction
Details
       

 07-12-2011
1.25
LEFT aft fuselage construction
Details
       

 07-11-2011
1.25
LEFT aft fuselage construction
Details
     

 07-10-2011
2.50
Remake fuselage channel
Details
     

 07-09-2011
2.75
RIGHT aft fuselage construction
Details
       

 07-09-2011
2.00
Fitting control surfaces to wings
Details
       

 07-09-2011
0.00
Fitting control surfaces to wings
Details
       

 07-07-2011
2.00
RIGHT aft fuselage brackets
Details
       

 07-07-2011
0.00
RIGHT aft fuselage brackets
Details
       

 07-06-2011
2.25
RIGHT aft fuselage channels
Details
       

 07-06-2011
0.00
RIGHT aft fuselage channels
Details
       

 07-05-2011
2.50
Remake fuselage channels
Details
       

 06-28-2011
1.25
AFT FUSELAGE construction
Details
       

 06-27-2011
0.50
LEFT flap construction
Details
       

 06-27-2011
2.25
Begin AFT FUSELAGE construction!
Details
       

 06-26-2011
2.00
LEFT flap construction
Details
       

 06-25-2011
3.25
LEFT flap construction
Details
       

 06-24-2011
2.25
LEFT flap construction
Details
       

 06-23-2011
2.00
RIGHT flap construction
Details
       

 06-23-2011
1.00
LEFT flap construction
Details
       

 06-22-2011
2.50
RIGHT flap construction
Details
       

 06-20-2011
2.50
RIGHT flap construction
Details
       

 06-19-2011
2.50
RIGHT flap construction
Details
       

 06-18-2011
2.50
RIGHT flap construction
Details
       

 06-18-2011
0.00
RIGHT flap construction
Details
       

 06-17-2011
1.50
Polish skins for flaps
Details

 06-17-2011
1.00
Flap skin pre-construction
Details

 06-14-2011
1.50
Polish skins for flaps
Details

 06-13-2011
1.50
Aileron counterweights
Details

 06-12-2011
2.50
RIGHT horiz tail tip installation
Details
       

 06-12-2011
1.00
Aileron counterweights
Details
       

 06-11-2011
4.50
Horiz tail tip installation
Details
       

 06-11-2011
0.00
Horiz tail tip installation
Details
       

 06-09-2011
1.00
LEFT horiz tail tip installation
Details

 06-08-2011
1.25
LEFT horiz tail tip installation
Details
       

 06-07-2011
1.00
Horiz tail tips
Details

 06-05-2011
1.25
LEFT aileron complete
Details
       

 06-04-2011
2.25
LEFT aileron construction
Details
       

 06-03-2011
2.75
LEFT aileron construction
Details
       

 06-01-2011
2.00
LEFT aileron construction
Details
       

 05-30-2011
1.00
RIGHT Aileron construction
Details
       

 05-30-2011
2.25
LEFT aileron construction
Details

 05-29-2011
3.75
RIGHT Aileron construction
Details
       

 05-29-2011
0.00
RIGHT Aileron construction
Details
       

 05-28-2011
3.00
RIGHT Aileron construction
Details
       

 05-28-2011
0.00
RIGHT Aileron construction
Details
     

 05-27-2011
3.50
Aileron skins
Details
       

 05-27-2011
0.00
Aileron skins
Details
       

 05-26-2011
2.00
Bend aileron skins
Details
       

 05-26-2011
0.00
Bend aileron skins
Details
       

 05-24-2011
2.00
Begin work on ailerons
Details

 05-22-2011
3.75
Landing light lens install
Details
       

 05-22-2011
0.00
Landing light lens install
Details
       

 05-21-2011
1.00
RIGHT wing -- FINISHED!
Details
       

 05-21-2011
3.00
Landing light lens install
Details
       

 05-19-2011
2.00
RIGHT wing riveting
Details

 05-18-2011
2.50
RIGHT wing tip + riveting
Details
       

 05-17-2011
2.00
RIGHT wing tip (tip rib)
Details

 05-16-2011
1.75
RIGHT wing riveting
Details
       

 05-15-2011
3.75
RIGHT wing root doubler + riveting
Details
       

 05-14-2011
1.50
RIGHT wing root doubler
Details

 05-12-2011
2.25
RIGHT wing root doubler
Details

 05-11-2011
1.50
RIGHT wing misc + root doubler
Details
       

 05-10-2011
0.50
RIGHT wing misc
Details

 05-09-2011
2.50
RIGHT wing preparations for riveting
Details
       

 05-08-2011
1.50
LEFT wing complete!
Details
       

 05-07-2011
5.25
LEFT wing riveting
Details
       

 05-06-2011
2.75
LEFT wing riveting!
Details
       

 05-05-2011
2.50
LEFT wing final prep
Details

 05-04-2011
2.00
LEFT wing walk & root doubler
Details
       

 05-03-2011
2.00
LEFT wing walk & root doubler
Details
       

 05-03-2011
0.00
LEFT wing walk & root doubler
Details
       

 05-02-2011
1.50
LEFT wingtip light pod
Details
       

 05-01-2011
1.50
LEFT wing walk
Details
       

 05-01-2011
0.00
LEFT wing walk
Details
       

 04-30-2011
3.00
LEFT wingtip install
Details
       

 04-29-2011
1.75
LEFT wingtip install
Details
       

 04-29-2011
0.00
LEFT wingtip install
Details
       

 04-27-2011
0.75
LEFT wing hinges
Details

 04-26-2011
1.75
LEFT wing hinges
Details
       

 04-25-2011
3.50
Dimpling LEFT leading edge skin + more
Details
       

 04-24-2011
3.00
Dimpling LEFT leading edge skin
Details
       

 04-23-2011
1.50
Dimpling LEFT leading edge skin
Details
     

 04-22-2011
1.50
Install LEFT leading edge skin
Details
       

 04-22-2011
0.00
Flying with friends
Details
       

 04-21-2011
2.00
Install LEFT leading edge skin
Details

 04-20-2011
2.75
Install LEFT leading edge skin
Details

 04-19-2011
2.25
Install LEFT leading edge skin
Details
       

 04-18-2011
2.00
RIGHT wing - deburring
Details

 04-16-2011
3.25
Hinges & Deburring RIGHT wing
Details
       

 04-15-2011
1.75
Flap & Aileron Hinges - RIGHT wing
Details

 04-14-2011
1.00
Flap Hinge - RIGHT wing
Details
       

 04-12-2011
2.75
Dimpling RIGHT leading edge skin
Details
       

 04-11-2011
2.25
Dimpling RIGHT leading edge skin
Details
       

 04-10-2011
2.00
Landing Light Cutout
Details
       

 04-10-2011
1.75
Install RIGHT leading edge skin
Details
       

 04-07-2011
0.75
Install RIGHT leading edge skin
Details

 04-06-2011
2.00
Install RIGHT leading edge skin
Details

 04-05-2011
2.00
Install RIGHT leading edge skin
Details
       

 04-04-2011
2.25
Install RIGHT leading edge skin
Details
       

 04-04-2011
0.00
Install RIGHT leading edge skin
Details
       

 04-03-2011
1.00
Leading Edge Skin bending
Details
       

 04-03-2011
0.00
Leading Edge Skin bending
Details
       

 04-02-2011
2.00
Leading Edge Skin bending
Details

 04-01-2011
1.00
Leading Edge Skin bending
Details
       

 04-01-2011
0.00
Leading Edge Skin bending
Details
       

 04-01-2011
1.50
LEADING EDGE bending brake
Details
       

 03-31-2011
2.00
Polish last leading edge wing skin
Details

 03-18-2011
1.00
Polished another flap skin
Details

 03-13-2011
1.00
Polish Flap Skin
Details
       

 03-12-2011
1.50
Vertical tail tip
Details
       

 03-11-2011
0.50
Set up for more polishing
Details

 03-09-2011
0.75
Vertical tail tip
Details

 03-08-2011
1.50
Vertical tail tip
Details
       

 03-08-2011
0.00
Vertical tail tip
Details
       

 03-08-2011
0.00
Vertical tail tip
Details
       

 03-07-2011
2.50
Vertical tail tip
Details
       

 03-07-2011
0.00
Vertical tail tip
Details
     

 03-06-2011
1.00
Tail tip ponderings
Details

 03-05-2011
2.25
F22-01 Lower fuselage skin
Details
       

 03-05-2011
1.00
F22 - Last piece to finish sheet
Details
       

 03-04-2011
1.50
F22-01 Lower fuselage skin
Details

 03-02-2011
1.75
F22-01 Lower fuselage skin
Details

 03-01-2011
1.50
LEFT wing - W18-01 leading edge skin
Details
     

 02-26-2011
3.25
RIGHT wing deburring + nose skin
Details

 02-19-2011
2.50
RIGHT wing deburring
Details

 02-18-2011
1.50
RIGHT wing deburring (reached 1000 hours)
Details

 02-16-2011
1.50
RIGHT wing - deburring
Details

 02-15-2011
2.00
RIGHT wing - more drilling
Details
       

 02-15-2011
0.50
LEADING EDGE bending brake
Details
       

 02-14-2011
2.75
RIGHT wing - aft upper skin
Details
       

 02-13-2011
2.00
RIGHT Wing - lower aft skin
Details

 02-12-2011
2.75
Started skinning RIGHT wing
Details
       

 02-11-2011
2.50
LEFT wing deburring
Details

 02-10-2011
1.00
LEFT wing deburring
Details

 02-09-2011
2.50
LEFT Wing updrill & debur
Details
       

 02-05-2011
2.50
LEFT Wing - Vacuum bend forward skin
Details
       

 02-05-2011
0.00
LEFT Wing - Vacuum bend forward skin
Details
       

 02-05-2011
0.00
LEFT Wing - Vacuum bend forward skin
Details
       

 02-03-2011
1.00
LEFT Wing - lower aft skin + inspection cover
Details
     

 02-02-2011
2.00
LEFT Wing - lower aft skin
Details

 02-01-2011
3.00
LEFT Wing - upper & lower aft skins
Details
       

 02-01-2011
0.00
LEFT Wing - lower aft skin (more photos)
Details
       

 01-31-2011
0.75
LEFT Wing - drilled upper aft skin to spar
Details

 01-30-2011
2.25
LEFT Wing - drilled upper aft skin
Details
       

 01-29-2011
2.25
Started skinning LEFT wing
Details
       

 01-29-2011
0.00
Skinning LEFT wing
Details
       

 01-29-2011
0.00
Skinning LEFT wing
Details
       

 01-29-2011
0.00
Skinning LEFT wing
Details
       

 01-29-2011
0.00
EAA TECH COUNCELOR VISIT
Details

 01-28-2011
1.25
Pitot/static attach plate REVISED
Details
       

 01-12-2011
1.25
Pitot/Static attach plate
Details
       

 01-11-2011
3.25
FINISHED THE RUDDER!
Details
       

 01-10-2011
2.50
Rudder hing layout and drilling
Details
       

 01-08-2011
2.50
Drilled rudder for all ribs
Details
       

 01-07-2011
1.25
Holes in rudder skin for ribs
Details

 01-05-2011
1.00
Cut outs in rudder
Details

 01-04-2011
2.00
Bent rudder skin
Details
       

 01-03-2011
2.50
Finished polishing last wing skin + elect
Details
       

 01-01-2011
2.50
Polished another wing skin
Details
     

 12-30-2010
2.25
Polished another large wing skin
Details

 12-23-2010
1.75
Polished another upper wing skin
Details

 12-22-2010
1.50
Polished lower wing skin
Details
       

 12-18-2010
2.00
Polished a lower wing skin
Details

 12-17-2010
0.75
Finished polishing 2nd turtle deck skin
Details

 12-15-2010
0.50
Polishing another turtle deck
Details

 12-14-2010
1.00
Polished a turtle deck skin
Details

 12-13-2010
2.00
Finished another fuselage side
Details
       

 12-10-2010
0.50
Polishing fuselage skin
Details

 12-07-2010
0.50
Polishing another fuselage skin
Details

 12-05-2010
1.75
Polish fuselage side
Details
     

 12-04-2010
1.50
Rudder skin polishing
Details
       

 12-02-2010
0.50
T13 Rudder skin
Details

 12-01-2010
1.00
(4) W18-02 inspection covers
Details

 11-30-2010
3.00
Wing Skins - Finish W18-01 R
Details
       

 11-29-2010
2.75
Wing Skins - W18-01 R
Details

 11-28-2010
0.75
Wing Skins - W18-01 R
Details
     

 11-28-2010
1.75
Aft Fuselage Skins
Details

 11-27-2010
1.25
Wing Skins - Finish W19-01 L
Details
     

 11-27-2010
1.25
Aft Fuselage Skin
Details
       

 11-17-2010
1.00
Wing Skins
Details
     

 11-13-2010
3.00
Wing Skins
Details
       

 11-12-2010
3.50
Wing electrical + skins
Details
       

 11-12-2010
1.50
Aft Fuselage Skin
Details
     

 11-10-2010
1.00
Landing Light
Details
       

 11-10-2010
2.50
Fuselage Skins
Details

 11-08-2010
1.75
Wing Skins
Details
     

 11-08-2010
1.00
Fuselage Skins
Details
       

 11-07-2010
1.00
Wing Skins
Details

 11-06-2010
3.50
Wing Skins
Details
       

 11-05-2010
3.00
Wing Skins
Details
       

 11-04-2010
3.00
Wing Skins
Details
       

 11-01-2010
2.00
Aft Turtle Deck Skins
Details
       

 10-31-2010
2.00
Aft Turtle Deck Skins
Details

 10-30-2010
2.00
Aft Fuselage Skins + tube for lighting
Details
       

 10-27-2010
2.25
Landing Light Installation
Details
       

 10-23-2010
5.50
Left Wing - Finished all ribs + rear spar
Details
       

 10-22-2010
2.75
Left Wing - Rivet root ribs
Details
       

 10-21-2010
3.00
Left Wing - Aft root rib
Details

 10-20-2010
0.75
Left Wing - Root ribs
Details

 10-19-2010
2.00
Left Wing - Add rear spar + make root ribs
Details
       

 10-18-2010
1.75
Left Wing - Deburr + rear spar
Details
       

 10-17-2010
0.75
Left Wing - Updrilling ribs
Details

 10-16-2010
4.50
Left Wing - forward and aft ribs on
Details
       

 10-15-2010
2.75
Left Wing - Locatel nose ribs
Details
       

 10-14-2010
2.50
Left Wing - Drill web spacers
Details
       

 10-13-2010
2.75
Left Wing - Finished inboard ribs; #9 bellcrank
Details
       

 10-12-2010
1.00
Left Wing - Continued inboard ribs
Details

 10-11-2010
3.00
LEFT WING - Begin - Rib mods
Details
       

 10-10-2010
2.25
Right Wing - Finished riveting ribs
Details
       

 10-09-2010
5.00
Right Wing - Riveting
Details
       

 10-08-2010
2.25
Right Wing - Riveting
Details
       

 10-07-2010
0.00
Right Wing - Aft root rib - more pics
Details
       

 10-07-2010
0.00
Right Wing - Aft root rib - more pics
Details
       

 10-07-2010
3.00
Right Wing - Aft root rib
Details
       

 10-06-2010
1.25
Right Wing - Root rib construction
Details
     

 10-05-2010
2.00
Right Wing - rear spar to ribs
Details
       

 10-03-2010
2.50
Right Wing - Test fits + W23-08
Details
       

 10-02-2010
3.25
Right Wing - Updrill for spar mating
Details
       

 10-02-2010
0.00
Right Wing - Updrill for spar mating
Details
       

 10-02-2010
0.00
Right Wing - Updrill for spar mating
Details
       

 10-01-2010
2.75
Right Wing - deburring
Details
     

 09-30-2010
1.25
Right Wing - Updrill ribs
Details

 09-29-2010
2.00
Right Wing - Finish aileron bell crank
Details
       

 09-29-2010
0.75
Right Wing - cleco'd everything for a look-see
Details
       

 09-27-2010
2.50
Right Wing - last 2 ribs + bell crank
Details
       

 09-26-2010
2.00
Right Wing - 5 more main ribs
Details
       

 09-25-2010
4.25
Right Wing - more main ribs
Details
       

 09-24-2010
2.50
Right Wing - main ribs
Details
       

 09-23-2010
2.25
Right Wing - Finished nose ribs
Details
       

 09-21-2010
2.50
Right Wing - Attach nose ribs
Details
       

 09-20-2010
2.50
Root rib mod + spacer layout
Details
       

 09-20-2010
0.00
Root rib mod + spacer layout
Details
       

 09-19-2010
2.75
Root ribs + right wing layout
Details
       

 09-18-2010
0.50
Trim tab; Finished T02
Details
       

 09-18-2010
2.00
Root rib gussets
Details
       

 09-18-2010
2.00
Modify root ribs
Details
       

 09-16-2010
0.00
FINISHED the elevators!
Details
       

 09-16-2010
1.25
FINISHED the elevators!
Details
       

 09-15-2010
3.00
Deburr & rivet elevator skins
Details
       

 09-14-2010
1.50
Updrilling & deburring elevators
Details

 09-13-2010
2.75
Elevator hinges & updrilling
Details
       

 09-12-2010
1.75
Elevator hinges
Details
       

 09-11-2010
1.50
Finished elevator horn
Details
       

 09-11-2010
1.50
Attached elevator horn assembly
Details
       

 09-10-2010
2.75
Elevators + Elevator Horn
Details
       

 09-09-2010
2.50
Right, then back to left, elevator
Details
       

 09-08-2010
2.25
Right elevator
Details
       

 09-07-2010
2.00
Left elevator
Details
       

 09-06-2010
2.00
Trim tab & elevator hinges
Details
     

 09-06-2010
2.50
Elevators
Details
       

 09-01-2010
1.50
Elevator skins & trim tab
Details
       

 08-31-2010
0.75
Finished 1st elevator skin; started next
Details
     

 08-30-2010
1.75
Bent then cut 2nd elevator skin
Details
       

 08-29-2010
1.00
Polished 2nd elevator skin
Details
     

 08-29-2010
1.00
Polish second elevator skin
Details
     

 08-29-2010
1.75
Bent the first elevator skin
Details
       

 08-28-2010
1.50
Polished one elevator skin
Details
       

 08-28-2010
0.25
FINISHED ALL THE WING RIBS!
Details

 08-27-2010
1.75
Last wing ribs
Details

 08-26-2010
1.75
Elevator skins
Details
       

 08-25-2010
2.25
Finished pile of ribs + cut control skins
Details

 08-24-2010
1.50
More ribs
Details

 08-23-2010
0.75
4 more ribs
Details
     

 08-22-2010
3.00
Main ribs
Details
       

 08-21-2010
2.00
More main ribs
Details
       

 08-20-2010
1.50
All nose ribs done; bending main ribs
Details
       

 08-19-2010
2.00
Bent nose ribs + CAD work
Details
       

 08-18-2010
1.00
Finished finishing ribs, then started bending
Details

 08-17-2010
1.50
File and sand rib blanks
Details

 08-16-2010
1.50
File and sand rib blanks
Details

 08-15-2010
3.00
Routed all but 1 rib blank
Details

 08-14-2010
1.00
Rib blanks
Details
       

 08-13-2010
0.50
Rib blanks
Details

 08-12-2010
2.00
More rib blanks
Details
       

 08-11-2010
0.75
More rib blanks
Details

 08-10-2010
2.00
Finished cutting out 5 main ribs
Details
     

 08-09-2010
1.00
Started routing main ribs
Details

 08-08-2010
2.50
Cut rib blanks and drilled for template/jig
Details
     

 08-07-2010
4.25
Wing ribs (make template + cut)
Details
       

 08-06-2010
0.50
Back from OSH - Clean-up
Details
       

 07-16-2010
0.00
The ubiquitous "mated spar" photo (pg 1)
Details
       

 07-16-2010
0.00
More pics of the mated spars (pg 2)
Details
       

 07-14-2010
1.00
BOTH MAIN WING SPARS COMPLETE!
Details
       

 07-13-2010
1.25
Cleanup work on both wing spars
Details

 07-12-2010
1.75
Set bolts and screws in left spar
Details
       

 07-11-2010
2.00
Finished flush rivets
Details
       

 07-10-2010
0.75
Flush rivets at the spar root
Details
     

 07-09-2010
1.50
Setting flush rivets
Details

 07-08-2010
2.25
Rivet repairs + dimpling
Details
       

 07-07-2010
0.25
Bad rivets
Details

 07-06-2010
2.00
More rivets...
Details
       

 07-04-2010
0.25
Pounded rivets
Details

 07-02-2010
1.25
Started riveting
Details
       

 07-02-2010
1.75
Countersinking & reassembly of left spar
Details
       

 07-01-2010
1.25
Deburring and countersinking left spar
Details

 06-30-2010
1.75
Finished deburring; drilled W11-08
Details
       

 06-29-2010
2.00
Finished updrilling; started deburring
Details
       

 06-28-2010
1.25
Updrilling left wing spar
Details

 06-27-2010
3.75
Drilled nearly every pilot hole in spar/caps
Details
       

 06-26-2010
1.00
Drilling thru left wing spar caps
Details
       

 06-25-2010
1.75
Started LEFT wing spar
Details

 06-25-2010
1.00
FINISHED RIGHT WING SPAR!
Details

 06-23-2010
2.00
Almost finished right wing spar
Details
       

 06-22-2010
2.50
Finished dimpling; set flush rivets
Details
       

 06-21-2010
2.25
Finished standard; started flush rivets
Details
       

 06-20-2010
2.50
More spar riveting
Details
       

 06-19-2010
1.00
Continued spar rivets
Details
     

 06-16-2010
1.25
Drove more rivets in right spar
Details
       

 06-15-2010
1.25
Started pounding rivets!
Details
       

 06-14-2010
2.00
Ready to start pounding spar rivets
Details
       

 06-13-2010
3.00
Deburred holes in right spar
Details

 06-12-2010
4.25
Spar web holes
Details
       

 06-11-2010
1.25
Finished pilot holes in right spar
Details

 06-10-2010
2.00
More hole drilling in right spar
Details
       

 06-09-2010
2.50
Started drilling thru spar cap
Details
       

 06-08-2010
1.25
Trying out new spar spacing jig
Details
       

 06-06-2010
1.00
Finished countersinking left spar
Details

 06-05-2010
0.50
Started countersinking for left wing spar
Details
       

 06-05-2010
2.50
Jig for wing spars + more countersinking
Details
       

 06-04-2010
1.25
Test fit of wing spar caps
Details
       

 06-02-2010
1.75
Started counter-sinking W10-03 of right spar
Details
       

 06-01-2010
0.75
Made channel F20-07
Details
       

 06-01-2010
1.00
Left main spar web - transfer hole locations
Details
       

 05-31-2010
2.50
Left main spar web - drilled for W20-02 & -03
Details
       

 05-30-2010
2.00
Angles on left wing spar webs
Details
       

 05-29-2010
2.50
Began on left wing spar webs
Details
       

 05-28-2010
2.50
Continued right wing spar
Details
     

 05-27-2010
1.00
Continued right wing spar
Details
       

 05-25-2010
1.50
Continued right wing spar
Details
       

 05-24-2010
2.75
Angles on right wing spar webs
Details
       

 05-23-2010
1.00
Begin right wing spar assembly
Details
       

 05-22-2010
1.00
Finished sheet W10
Details

 05-21-2010
0.50
Deburring wing spar webs
Details

 05-20-2010
2.00
Continued with second wing spar web
Details
       

 05-19-2010
2.50
More work on spar webs
Details
       

 05-18-2010
2.50
Laid up and drilled stack of spar webs
Details
       

 05-15-2010
2.00
Finished the wing attach blocks W11-02/-06
Details
       

 05-15-2010
1.50
Finished (2) W10-01 spar webs
Details
     

 05-14-2010
3.25
W10-01: Finished one; started another
Details
       

 05-13-2010
1.50
Drilling forward wing spar web
Details

 05-12-2010
2.00
Started drilling forward wing spar web
Details
       

 05-11-2010
2.50
Finished Tunnel Channels
Details
       

 05-10-2010
3.00
F16-02 Tunnel Zee
Details
       

 05-09-2010
2.50
Finished left wing root doubler
Details
       

 05-08-2010
2.75
Wing root doublers + fuselage tunnel pieces
Details
       

 05-06-2010
1.00
Finished laying out W20-01's
Details
     

 05-05-2010
2.50
Laying out W20-04
Details

 05-03-2010
2.00
Working on main wing spars
Details

 05-02-2010
2.00
Wing spar prep & shop cleanup
Details

 05-01-2010
2.00
"Really" finished the bellcranks...
Details

 04-30-2010
2.50
Right-hand bellcrank assembly
Details

 04-29-2010
2.00
Left-hand bell crank assembly
Details
       

 04-25-2010
2.75
Finished rear wing spar W12-01L
Details
       

 04-22-2010
1.50
Finished rear wing spar assembly W12-01R
Details
       

 04-21-2010
2.00
Rear wing spars
Details
       

 04-20-2010
1.50
Continued on W12-01R
Details

 04-19-2010
7.00
W12-01L rear wing spar
Details
       

 04-19-2010
0.00
Setback!
Details
       

 04-18-2010
2.50
Worked on W12-01L rear wing spar ass'y
Details
       

 04-17-2010
2.50
Remade C06-05 + made F10-09 assemblies
Details
       

 04-16-2010
1.00
Made W11-06's
Details
     

 04-14-2010
2.50
Wing attach assemblies
Details
       

 04-13-2010
2.50
Misc wing angles + spar layout
Details
       

 04-12-2010
2.00
Miscellaneous wing assemblies
Details

 04-11-2010
2.25
Sub assemblies on W06 and W10
Details
       

 04-10-2010
2.25
Made the 2nd W03-03 counterbalance
Details

 04-08-2010
1.50
Finished counterbalance assembly W03-03
Details
       

 04-07-2010
3.25
Started on aileron drive rib assemblies
Details
       

 04-06-2010
2.75
Horiz and vert stabs
Details
       

 04-05-2010
4.00
Continued skinning horiz stab
Details
       

 04-04-2010
1.50
Continued 2nd skin of horiz stab
Details

 04-03-2010
2.00
Started on 2nd skin of horiz stab
Details
     

 04-02-2010
1.00
Finished riveting 1st skin of horiz stab
Details

 04-01-2010
3.00
Updrilled holes in 1st horiz stab skin
Details
       

 03-31-2010
2.50
Started skinning the horizontal stabilizer
Details
       

 03-29-2010
1.50
Rivets on 2nd side of vert stab
Details
     

 03-28-2010
4.75
Started skinning the vert stab
Details
       

 03-28-2010
0.00
Photos of vert tail skinning
Details
       

 03-28-2010
0.00
Photos of vert tail skinning
Details
       

 03-28-2010
0.00
Photos of vert tail skinning
Details
       

 03-27-2010
1.00
Polished the vert stab
Details
     

 03-27-2010
3.00
Finished framing of horiz stab
Details

 03-26-2010
3.50
Finished vert stab framing (mostly)
Details
       

 03-24-2010
1.25
Started drilling vert stab
Details
     

 03-23-2010
3.00
Layout of vert stab
Details
       

 03-21-2010
1.25
T13-02 Rudder drive horn assembly
Details
       

 03-21-2010
1.00
Finished T09-01 vert stab main spar
Details
       

 03-20-2010
3.00
Continued main spar of vert stab
Details
       

 03-20-2010
2.50
Continued main spar ass'y of the vertical stab
Details
       

 03-19-2010
0.50
Worked on 2nd rear wing spar
Details

 03-19-2010
2.75
Forward spar of vert stab
Details
       

 03-18-2010
2.50
More work on rear wing spars
Details

 03-16-2010
2.75
Bent spar W12-02R & Finished W12-02L
Details
       

 03-14-2010
2.00
Bent rear spar of wing
Details
       

 03-10-2010
1.50
Deburred & riveted Horiz Stab ribs
Details
       

 03-09-2010
3.00
Continued with Horiz Stab
Details
       

 03-08-2010
2.50
Horiz stab ribs
Details
       

 03-07-2010
2.50
Finished main spar assembly of horiz stab
Details
       

 03-06-2010
3.00
Horiz stab, front spar ass'y
Details
       

 03-06-2010
2.50
Forward and Main Horiz Stab Assemblies
Details
       

 03-05-2010
3.25
Started BUILDING horiz stabilizer
Details
       

 03-03-2010
2.50
Bent last F-channels
Details
       

 03-02-2010
1.00
Bent 3 fuselage channels
Details

 03-02-2010
0.75
2 channels for tail
Details

 03-01-2010
1.75
Made fuselage channels
Details
     

 03-01-2010
1.00
Bending tail channels
Details
     

 02-28-2010
1.00
Finished the bending brake
Details
       

 02-28-2010
2.25
Bending channels for the tail
Details
     

 02-27-2010
2.75
Last steps in bending brake construction
Details

 02-26-2010
2.75
Painting the bending brake
Details
       

 02-25-2010
1.50
Bending brake
Details

 02-24-2010
0.75
Continued on bending brake
Details

 02-23-2010
0.50
F20-05
Details
     

 02-23-2010
0.50
Continued on the bending brake
Details
       

 02-22-2010
0.50
Continuing making bending brake
Details

 02-21-2010
2.00
F20-01 Fuselage Bulkheads
Details
       

 02-19-2010
3.50
Making 10' bending brake
Details
       

 02-15-2010
1.00
Finished T05-01 L
Details
     

 02-14-2010
1.75
Polishing horiz stab
Details
       

 02-10-2010
1.00
First try at polishing a skin
Details
       

 02-07-2010
2.50
Wing nose ribs...
Details

 02-06-2010
3.00
Remake flap detent + more wing ribs
Details
       

 02-05-2010
1.00
More wing nose ribs
Details

 02-04-2010
0.00
The panel may look like this someday...
Details
       

 02-02-2010
1.00
Wing nose ribs
Details
     

 02-01-2010
2.75
Channels for tail & fuselage + wing nose rib
Details
       

 01-31-2010
2.00
Lay out channels for horiz stab
Details

 01-30-2010
4.00
More channels...
Details
       

 01-29-2010
2.50
More fuselage channels...
Details

 01-27-2010
2.00
Fuselage channels
Details

 01-26-2010
1.50
Fuselage channels
Details
     

 01-25-2010
3.25
Fuselage & tail channels
Details
     

 01-24-2010
2.50
Fuselage channels & 1 tail channel
Details
     

 01-23-2010
3.00
Tail and Fuselage Channels
Details

 01-22-2010
0.00
#3 Final photos of channel bending process
       

 01-22-2010
0.00
#2 More photos of channel bending process
       

 01-22-2010
1.75
#1 Creating channels
Details
       

 01-21-2010
1.50
Creating channel parts
Details
     

 01-20-2010
2.50
Nose ribs and wing channels
Details

 01-19-2010
1.25
Finished wing skin + deburred ribs
Details

 01-16-2010
2.00
More nose ribs + deburred wing skin
Details

 01-15-2010
2.25
Wing skin and nose ribs
Details
     

 01-13-2010
2.00
Finished .025 blanks
Details
       

 01-12-2010
1.50
Cutting up .025 channel stock
Details

 01-11-2010
1.00
Cutting .025 for channels
Details

 01-10-2010
4.00
Cutting rib blanks & channel stock
Details
       

 01-09-2010
2.25
Ribs & channels
Details

 01-08-2010
2.50
Wing rib router blocks & rib cutting
Details
       

 01-06-2010
1.50
Tail & wing parts
Details

 01-05-2010
1.50
Wing & Tail Parts
Details

 01-04-2010
0.75
T05-01 L
Details

 01-02-2010
4.00
Finished 2 empanage skins
Details

 01-01-2010
4.75
Empenage skins
Details
       

 12-30-2009
2.00
Patterns for .025 parts
Details

 12-29-2009
0.50
Prepped for empenage skins
Details

 12-28-2009
0.50
Fluted tail ribs
Details

 12-27-2009
3.50
Forward wing skin
Details

 12-26-2009
2.75
Wing skin & fuselage parts
Details
       

 12-21-2009
2.00
Fuselage channel & bulkheads
Details
       

 12-19-2009
2.50
Fuselage parts
Details

 12-18-2009
3.00
Empenage Ribs
Details
     

 12-16-2009
0.00
T06-03... just more pics
Details
       

 12-16-2009
1.00
T06-03... Finally!
Details
       

 12-14-2009
2.00
T06-03
Details

 12-13-2009
2.50
T06-03
Details

 12-12-2009
3.00
Re-drawing fuselage bulkhead patterns
Details

 12-11-2009
2.00
Bent tail ribs
Details

 12-08-2009
0.50
Deburring .025 parts
Details

 12-06-2009
1.50
T06-03
Details

 12-05-2009
0.50
T06-03: Last angle part to make
Details

 12-05-2009
3.00
Cutting .025 metal parts
Details
     

 12-04-2009
1.00
Pattern for wing forward ribs
Details

 12-03-2009
1.75
.025 parts
Details

 12-01-2009
3.00
.025 patterns
Details

 11-29-2009
2.00
.025 Parts
Details

 11-28-2009
3.00
Misc .032 parts
Details

 11-27-2009
3.00
More .025 patterns
Details

 11-25-2009
1.50
Misc F/C parts
Details

 11-23-2009
2.50
T03-02 Finished + W11-06
Details
       

 11-22-2009
5.75
T03-02
Details

 11-21-2009
2.50
.025 Patterns
Details

 11-19-2009
1.50
.025 Patterns
Details

 11-16-2009
2.50
Wing angle parts
Details

 11-15-2009
6.00
Fuselage angle parts
Details
       

 11-14-2009
1.50
F15-02L
Details

 11-13-2009
3.00
Patterns and angle parts
Details

 11-12-2009
0.50
Fuselage angle parts
Details

 11-10-2009
0.50
Fuselage angle parts
Details
       

 11-09-2009
1.25
Fuselage angle parts
Details

 11-08-2009
3.00
Fuselage Angle Parts
Details

 11-07-2009
2.00
2.5" angle parts
Details

 11-04-2009
1.50
Angle Patterns
Details

 11-03-2009
4.00
.025 Patterns
Details
     

 11-01-2009
1.00
.025 patterns
Details

 10-31-2009
1.50
.025 patterns
Details

 10-25-2009
2.00
Wing rib shims
Details

 10-23-2009
1.00
Patterns
Details

 10-22-2009
0.50
W14-02 shims
Details

 10-21-2009
2.00
Misc Parts
Details

 10-20-2009
1.50
W15/W16 Gussets
Details
     

 10-13-2009
2.50
W15/W16 Gussets
Details

 10-12-2009
1.75
W15 Gussets
Details

 10-11-2009
2.00
W15 Gussets
Details
     

 10-09-2009
3.00
W15 Gussets
Details
       

 10-05-2009
3.00
Work on channels
Details

 10-04-2009
3.00
Gussets and channels
Details

 10-03-2009
1.50
W15-08/-09 gusset stock
Details

 10-01-2009
1.50
Channels & gussets
Details

 09-30-2009
2.50
.032 channels
Details

 09-29-2009
3.00
Flap/Aeileron ribs & Misc
Details

 09-28-2009
2.00
Flap/Aeileron ribs
Details

 09-27-2009
1.50
Flap/Aeileron ribs
Details
       

 09-26-2009
2.50
Flap/Aeileron ribs
Details
     

 09-24-2009
2.75
More .032 parts
Details

 09-23-2009
1.00
Patterns for .063 parts
Details

 09-22-2009
0.00
Progress
Details
       

 09-22-2009
1.25
Misc .032 parts
Details
       

 09-21-2009
1.75
More .032 parts
Details

 09-20-2009
3.00
.032 Fuselage Parts
Details

 09-19-2009
3.50
Misc .032 parts
Details

 09-18-2009
2.00
Finished seat sling
Details
       

 09-15-2009
3.00
Cut out seat sling
Details

 09-14-2009
2.25
Fuselage side + other parts
Details

 09-13-2009
3.25
Cut/drill .032 fuselage sides
Details

 09-12-2009
0.00
Learning Point for Adhesive for Patterns
Details

 09-12-2009
3.00
F13-01R fuselage side
Details
       

 09-11-2009
3.00
Cut/Bend .032 Parts
Details

 09-10-2009
2.50
Fuselage parts from .032 sheet
Details

 09-09-2009
2.50
Cut/Bend .032 Parts
Details
     

 09-08-2009
3.00
Cut/Bend .032 Parts
Details

 09-07-2009
3.00
Cutting/Bending .032 Parts
Details

 09-05-2009
2.75
Cutting .032 Parts
Details
     

 09-04-2009
3.00
Patterns
Details

 09-03-2009
3.50
Cutting .032 Parts
Details

 09-02-2009
2.75
Cutting .032 parts
Details

 09-01-2009
2.50
Cutting .032 parts
Details
       

 08-31-2009
2.50
Cutting .032 parts
Details

 08-30-2009
3.00
Patterns
Details

 08-29-2009
3.00
Patterns
Details

 08-28-2009
3.00
Patterns
Details

 08-27-2009
1.00
Patterns
Details

 08-26-2009
1.00
Patterns
Details

 08-24-2009
3.00
Patterns
Details

 08-22-2009
1.50
2nd Rear Wing Spar
Details

 08-21-2009
3.50
Wing Spars
Details
       

 08-20-2009
2.00
Wing Spar Pieces
Details

 08-19-2009
1.50
2nd Wing Spar
Details
       

 08-17-2009
0.50
Rough cut 2nd wing spar
Details

 08-16-2009
1.00
Main wing spar web (#2)
Details

 08-15-2009
0.00
1st North East Sonex Fly-In
Details
       

 08-13-2009
2.50
Wing parts & patterns
Details

 08-12-2009
2.00
Flap & Aeileron ribs
Details

 08-11-2009
2.50
Flap & Aeileron ribs
Details
       

 08-10-2009
2.50
Wing parts
Details

 08-09-2009
3.00
Cut 1 wing spar web
Details
       

 08-08-2009
2.50
Finished work table shelves
Details

 08-08-2009
0.50
Bending small parts
Details

 08-07-2009
2.50
Bending & cutting
Details
       

 08-06-2009
2.00
Patterns & Sheet Alum
Details
       

 07-30-2009
2.50
Parts Prep
Details

 07-28-2009
1.00
Parts prep
Details

 07-25-2009
2.50
Parts Prep
Details

 07-22-2009
1.50
Parts Prep
Details

 07-19-2009
1.00
Parts Prep
Details

 07-15-2009
1.50
Parts Prep
Details

 07-14-2009
1.50
Parts Prep
Details

 07-13-2009
2.25
Parts Prep
Details

 07-11-2009
2.00
Parts Prep
Details

 07-10-2009
3.00
Parts Preparation
Details

 07-09-2009
2.50
Parts Preparation
Details

 07-08-2009
2.00
Work Table
Details
       

 07-08-2009
1.00
Parts Preparation
Details
     

 07-02-2009
0.50
Parts Preparation
Details

 06-30-2009
0.50
Parts Preparation
Details

 06-29-2009
0.75
Parts Preparation
Details

 06-28-2009
1.25
Parts Preparation
Details

 06-26-2009
3.00
Parts Preparation
Details
       

 06-24-2009
4.00
Parts Preparation
Details
       

 06-23-2009
1.50
Parts Preparation
Details

 06-22-2009
1.50
Parts Preparation
Details

 06-19-2009
2.25
Work table
Details
       

 06-17-2009
1.50
Work table
Details
       

 06-16-2009
0.50
Work table construction
Details

 06-16-2009
2.00
Parts Preparation
Details

 06-15-2009
2.00
Parts Preparation
Details

 06-12-2009
5.00
Parts Preparation
Details

 06-10-2009
1.50
Parts Preparation
Details

 06-09-2009
2.50
Parts Preparation
Details
       

 06-08-2009
2.50
Parts Preparation
Details

 06-07-2009
3.00
Parts Preparation
Details
       

 06-05-2009
2.00
2nd wing spar piece + small parts layouts
Details
       

 06-03-2009
2.50
1st Wing Spar piece
Details
       

 06-01-2009
1.00
Parts Preparation
Details

 05-31-2009
2.75
Parts Preparation
Details

 05-29-2009
2.00
Storage & work surfaces
Details
       

 05-28-2009
2.00
Parts Preparation
Details

 05-27-2009
2.25
Parts Preparation
Details

 05-26-2009
1.25
Parts Preparation
Details

 05-25-2009
1.25
Parts Preparation
Details

 05-23-2009
3.25
Parts Preparation
Details
       

 05-22-2009
1.00
Parts Preparation
Details

 05-22-2009
1.75
Parts Preparation
Details

 05-21-2009
2.50
Parts Preparation
Details

 05-19-2009
1.00
Parts Preparation
Details

 05-18-2009
2.50
Parts Preparation
Details

 05-08-2009
1.00
Parts Preparation
Details

 05-07-2009
1.50
Parts Preparation
Details

 05-06-2009
2.50
Parts Preparation
Details

 05-05-2009
2.25
Parts Preparation
Details

 05-03-2009
3.50
Parts Preparation
Details

 05-02-2009
2.25
Parts Preparation
Details

 05-02-2009
1.50
Parts Preparation
Details

 04-29-2009
1.25
Parts Preparation
Details

 04-28-2009
2.50
Parts Preparation
Details

 04-27-2009
1.50
Parts Preparation
Details

 04-26-2009
2.00
Parts Preparation
Details

 04-24-2009
1.00
Parts Preparation
Details

 04-23-2009
2.50
Parts Preparation
Details
       

 04-22-2009
0.00
Red Sox!
Details

 04-21-2009
1.50
Parts Preparation
Details

 04-20-2009
1.00
Parts Preparation
Details

 04-19-2009
3.00
Parts Preparation
Details

 04-18-2009
3.75
Parts Preparation
Details

 04-17-2009
0.50
Parts Preparation
Details

 04-16-2009
1.00
Parts Preparation
Details

 04-15-2009
1.50
Parts Preparation
Details

 04-14-2009
2.50
Parts Preparation
Details
       

 04-13-2009
2.50
Parts Preparation
Details

 04-12-2009
2.00
Parts Preparation
Details

 04-11-2009
1.25
Parts Preparation
Details

 04-10-2009
1.00
Parts Preparation
Details

 04-09-2009
2.50
Parts Preparation
Details

 04-08-2009
1.00
Parts Preparation
Details

 04-07-2009
1.00
Parts Preparation
Details

 04-06-2009
3.75
Parts Preparation
Details
       

 04-04-2009
2.50
Parts Preparation
Details
       

 04-03-2009
2.25
Parts Preparation
Details

 04-02-2009
0.50
Parts Preparation
Details

 04-01-2009
1.00
Parts Preparation
Details

 03-31-2009
1.50
Parts Preparation
Details

 03-30-2009
2.00
Parts Preparation
Details

 03-29-2009
4.00
Parts Preparation
Details

 03-28-2009
1.50
Parts Preparation
Details

 03-27-2009
3.00
Parts Preparation
Details

 03-26-2009
2.00
Parts Preparation
Details
       

 02-15-2009
2.00
Parts Preparation
Details

 01-20-2009
0.00
Looking and learning
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.