RV-8 N998W
Work Logs Found: 813
Category Work Time: 2981 Hours
 Date
Hours
Work Log Summary

Details

 06-04-2011
3.00
Paint
       

 06-04-2011
6.00
N998W back from the paint shop.
Details
       

 05-23-2010
0.00
First Flight
Details
       

 05-23-2010
0.00
First flight
       

 05-23-2010
0.00
First Flight
       

 05-23-2010
0.00
First Flight
       

 05-18-2010
5.00
Checked and set instrument parameters.
Details

 05-17-2010
3.00
Checked and retightened loose power connection.
Details

 05-14-2010
3.00
Fuel quantity sender units leaking.
Details

 05-12-2010
6.00
Safety wired brake calipers.
Details

 05-11-2010
5.50
Drilled axles for wheel bearing nut cotter keys.

 05-08-2010
11.00
Finished interior install.
Details

 05-01-2010
5.00
Continued interior installation.
Details

 04-30-2010
6.00
Continued installing interior
Details

 04-29-2010
5.00
Install interior.
Details

 04-25-2010
5.00
DAR Inspection issues
Details

 04-23-2010
3.00
DAR Inspection

 04-08-2010
5.00
Edited max oil temp limit.
Details

 04-07-2010
5.00
Changed out firewall hardware bolts for longer.
Details

 04-06-2010
3.00
Installed nut plates on prop spinner back plate.
Details

 04-05-2010
5.00
Installed canopy latch set screw.
Details

 04-03-2010
5.00
Set engine limits in EFIS. Adjusted flap travel.
Details

 04-01-2010
5.00
Measured equipment arms.
Details

 03-31-2010
3.00
Finished installing fuel pump drain tube.
Details

 03-29-2010
6.00
Began installing empennage fairing.
Details

 03-28-2010
3.00
Finished installing and torquing spar bolts.
Details

 03-27-2010
5.00
Installed new EGT probe.
Details

 03-26-2010
4.00
Set idle and adjusted linkage.

 03-23-2010
6.00
Fixed Emag anomoly. Addressed tach problem.
Details

 03-21-2010
6.00
Anaylized engine start problems.

 03-20-2010
4.00
First engine start
Details

 03-15-2010
2.00
A/C W&B completed. Brakes bleed.

 03-14-2010
4.00
Install spinner.
Details

 03-13-2010
6.00
Install LH aileron Stop & Flap

 03-12-2010
4.00
Re installed plate nut on LH wing tip.
Details

 03-11-2010
3.00
Torqued, safetied prop & alternator

 03-09-2010
6.00
Installed prop and trim servo connector.
Details

 03-03-2010
3.00
Installation on LH fuse tank bracket.

 03-02-2010
4.00
Flaps install & adjust. Work on LH tank bracket.

 03-01-2010
3.00
Installed RH tank bracket & vent line.

 02-28-2010
4.00
Fitting RH Fuse tank bracket & RH flap fairing.

 02-26-2010
6.00
Fit and adjust flaps to wing & LH fairing.

 02-25-2010
5.00
Fit and adjust flaps to wing

 02-24-2010
4.00
Fit and adjust flaps to wing.

 02-20-2010
6.00
Set wing sweep & insidence
Details

 02-19-2010
5.00
Set wing sweep & insidence

 02-18-2010
3.00
Set wing sweep & insidence

 02-14-2010
4.00
Installed wing fairings, nutp[lates & flap sensor.

 02-13-2010
3.50
Installed wing fairings & nutplates.

 02-11-2010
4.50
Installed wing fairings & nutplates.

 02-08-2010
4.50
Installed empennage assembly

 02-04-2010
6.00
Installed empennage assembly

 02-03-2010
3.50
Installed empennage assembly

 02-01-2010
3.00
Installed empennage assembly

 01-26-2010
4.00
Preped & primed windscreen & forskin

 01-25-2010
3.00
Cleaned up wiring inside RH & reinstalled canopy.

 01-24-2010
4.00
Finisshed installing canopy latch & lock.
Details

 01-23-2010
4.00
Install canopy latch & lock.

 01-22-2010
2.00
Fabricate switch panel cover
Details

 01-21-2010
3.00
Continued windscreen detail sanding.
Details

 01-20-2010
4.00
Fairing finshing.
Details

 01-19-2010
3.00
Wheel pant, leg & intersection fairings finishing

 01-17-2010
4.00
Wheel pants, leg fairings installed

 01-14-2010
3.00
Continued windscreen prep and finish

 01-13-2010
1.00
Continued windscreen prep and finish

 01-12-2010
2.00
Finished sikaflex windscreen & LH skirt prep

 01-10-2010
3.00
Windscreen trim

 01-05-2010
1.80
Windscreen trim

 12-20-2009
1.00
Windscreen trim

 12-14-2009
4.00
Windscreen trim

 12-10-2009
1.00
Windscreen trim

 12-03-2009
1.00
Windscreen trim

 12-01-2009
6.00
Canopy windscreen prep.

 11-30-2009
5.00
Windscreen prep for epoxy.

 11-29-2009
1.50
Windscreen epoxy & dress

 11-28-2009
2.50
Windscreen fit & prep

 11-25-2009
1.20
Windscreen fit & prerp

 11-22-2009
2.50
Installed Alt static air port & A/S tube bulkhead

 11-21-2009
3.50
Canopy skirt prep & prime

 11-20-2009
6.10
Installed cowl hinge pin covers, Cowling prep for

 11-19-2009
6.20
Front bagage door adjust.

 11-18-2009
3.70
Wind screen fit, canop yskirt adjust.

 11-17-2009
3.00
Canopy skirt adjust & fit

 11-13-2009
4.00
Sanded canopy skirt

 11-12-2009
4.00
Wings & empenage to hangar.
Details

 11-09-2009
2.00
Cut & readjust rear canopy skirt

 11-07-2009
4.50
Skirt rived to frame & glassed in with micro.

 11-06-2009
3.00
Glue canopy skirt.

 11-05-2009
2.00
Continued canopy skirt fit.

 11-04-2009
4.70
Trim & adjust canopy skirt. Shorten front control

 11-03-2009
6.30
Contunued canopy skrit trim & fit.
Details

 11-01-2009
2.00
Canopy skirt trim and fit

 10-31-2009
2.00
Canopy skirt trim and fit

 10-30-2009
3.00
Canopy skirt trim and fit

 10-29-2009
2.00
Canopy skirt trim and fit

 10-26-2009
3.00
Trimmed and fit canopy skirts
     

 10-25-2009
3.00
Trimmed and fit canopy skirts
     

 10-22-2009
6.00
Trimmed and fit canopy skirts

 10-21-2009
5.50
Trimmed and fit canopy skirts
     

 10-19-2009
3.00
Started fitting right hand canopy skirt
       

 10-18-2009
1.00
Finished gluing spacer holes

 10-17-2009
6.60
Canopy prep and glue

 10-16-2009
2.20
And more canopy trimming

 10-14-2009
3.80
More canopy trimming

 10-13-2009
3.50
Canopy trimming

 10-12-2009
3.00
Cutting the canopy
       

 10-11-2009
2.70
More canopy trimming
       

 10-05-2009
3.00
Trimed canopy

 10-04-2009
2.00
Trimed canopy

 10-03-2009
3.30
Trimed canopy
     

 10-01-2009
1.30
Trimed canopy
     

 09-28-2009
4.00
Installed flexible brake lines on landing gear.
     

 09-21-2009
3.00
Re installed cowl hinges and pins.
       

 09-20-2009
2.00
Re installed cowl hinges and pins.
       

 08-23-2009
3.10
Finished installing air seals.

 08-17-2009
3.20
Finished installing oil door hinge.

 08-16-2009
3.20
Finished tip fairingprep and installed

 08-15-2009
2.70
Epoxy & rivet cowl hinges.
Details

 08-14-2009
0.60
Epoxy & rivet cowl hinges.
Details
       

 08-13-2009
2.00
Fabricated aluminum backing strips for tip fairing
Details

 08-12-2009
1.80
Fabricated aluminum backing strips for tip fairing

 08-11-2009
2.50
Expoxy & rivet cowl hinges.

 08-09-2009
2.30
Expoxy & rivet cowl hinges.

 08-08-2009
4.80
Preped & installed Wing tip aileron ribs.
     

 08-07-2009
2.00
Preped cowl hinges

 08-06-2009
2.50
Preped cowl hinges

 06-10-2009
6.00
Continued wing tip prep.
Details

 06-09-2009
4.00
Continued wing tip prep
     

 06-08-2009
3.00
Preped tips for fiber glass trim & installation
       

 06-04-2009
3.50
Re installed wing tanks on both wings.

 06-03-2009
3.00
Completed Van's S/B tank mods.
Details
       

 05-27-2009
6.00
More fuel tank prep.
Details
       

 05-26-2009
8.00
Installed pitot tube.
Details
       

 05-22-2009
4.00
Removed RH fuel tank

 05-20-2009
4.00
Removed left fuel tank.
Details
       

 05-19-2009
3.20
Fabricated left tank fuel return.
       

 05-17-2009
4.50
Install strob light wiring in LH & RH wing.
Details
       

 05-16-2009
2.00
Installed RH wing NACA vent for rear seat air.
Details
       

 05-15-2009
4.00
Checked wing connections. Installed data plate.
Details
       

 05-10-2009
4.00
Installed cockpit labels and battery.
       

 05-09-2009
4.00
Reinstalled and timed ignitions
Details

 04-18-2009
2.00
Installed mid cabin brace fasteners.

 04-17-2009
3.50
Installed front seat back modification.

 04-15-2009
2.40
Trimmed forward bag door. Installed Hall effect co
Details

 04-14-2009
4.50
Installed front baggage shelf.
Details

 04-13-2009
5.20
Installed rear bag comp, floors and seats
       

 04-11-2009
1.50
Fit and installed lower firewall blanket& rudder p
       

 04-10-2009
3.60
Began installation of firewall blanket. Placed N#.
Details
     

 04-09-2009
1.40
Began firewall blanket fitting.
Details

 04-06-2009
1.80
Finished fabricating front spar angle F-862 L&R
       

 04-05-2009
2.00
Fabricate front spar angle F-862 L&R

 04-04-2009
1.50
Fabricate front spar angle F-862 L&R

 04-03-2009
1.50
Begin fabrication of F-862 L&R

 04-02-2009
2.00
Reinstalled Garmin antenna BNC connectors.
Details
     

 04-01-2009
2.00
Standby Mic jack pilot seat inop. Replaced wiring.

 03-30-2009
2.50
Avionics hookup and test
     

 03-29-2009
5.00
Reinstalled instrument panel.

 03-27-2009
3.80
Forward baggag door lock adjustment.
Details

 03-21-2009
3.00
Installed forward baggage door inner skin.
     

 03-19-2009
1.90
Ajust and fitforward baggage door

 03-18-2009
2.00
Forward baggage door fabrication & installation.

 03-16-2009
2.00
Forward baggage door fabrication & installation.

 03-15-2009
5.10
Forward baggage door fabrication & installation.

 03-14-2009
1.50
Refit and assemble Forward baggage door.

 03-12-2009
2.70
Refit and assemble Forward baggage door.

 03-11-2009
5.30
Finished riveting foreskin.
Details
       

 03-10-2009
4.00
Painted glareshield and mounted compass.
Details
       

 03-09-2009
3.00
Modified oil can stringer
       

 03-08-2009
3.90
Rived F-821PP innassembley
Details

 03-07-2009
3.80
Began rivetinf F-821PP in assembley.

 03-05-2009
5.80
Installed additional nutplates for the floor.
Details

 03-04-2009
2.50
Fabricated instrument panel access door modificati
Details

 03-03-2009
6.30
Fabricate and install baggfge door

 03-02-2009
3.30
Fabricate and install baggfge door

 03-01-2009
2.80
Fabricate and install baggfge door

 02-28-2009
4.00
Install pitot line from panel to LH wing root.
Details

 02-27-2009
2.00
Finish BNC connectors. Install compass lite pigtai
Details

 02-26-2009
2.50
Install BNC connectors & Ant splitter,

 02-24-2009
2.00
Install Stby A/S indicator
     

 02-23-2009
3.80
Refitted floor panels and finished rear stick floo
     

 02-22-2009
6.10
Install bushings for VOR coax.
Details

 02-21-2009
2.90
Panel punched for Stby A/S indiccator.
Details

 02-19-2009
3.20
Installed rear stick grip.
Details
     

 02-14-2009
2.00
Installed rear scat tube and fresh air vent.
     

 02-13-2009
3.00
Installed A/P Master switch and roll control arm.
       

 02-11-2009
1.40
Installed backup set of headset jacks

 02-10-2009
1.00
Installed backup set of headset jacks

 02-09-2009
2.00
Installed backup headset jacks

 02-04-2009
3.00
Final fitting of forreskin and wiring.

 02-01-2009
3.00
Fit foreskin & removed instrument panel.

 01-30-2009
2.00
Fabricated airseals for baffels.
Details
       

 01-18-2009
2.00
Fabricated airseals for baffels

 01-12-2009
4.70
Fabricated airseals for baffels

 01-09-2009
2.00
Fabricated airseals for baffels

 01-05-2009
2.00
Fabricated airseals for baffels

 01-03-2009
4.00
Fabricated baffle modification for olil cooler.

 01-02-2009
2.00
Applied RTV to engine baffles.

 01-01-2009
2.00
Installed oil breather and timed ignition.
       

 12-30-2008
2.20
Continued to tighten lines and hook up ignition.

 12-28-2008
1.30
Tightened line with Tightseal.

 12-27-2008
2.50
Fabricated plug leads, painted oil cap, tighten li

 12-16-2008
1.50
Fabricated Firewall penitration.

 12-15-2008
1.50
Safetywired lowewr engine baffles

 12-14-2008
1.50
Safetywired lower cylinder baffles.

 11-25-2008
0.70
Installed plug leads.

 11-24-2008
2.60
Fabricated and installed plug leads.

 11-23-2008
4.90
Reinstalled Fuel Pump.
Details

 11-22-2008
3.50
Reposition Fuel Pump bracket.

 11-16-2008
1.50
Canopy frame block installed.

 11-15-2008
2.00
Flap position sensor installed.

 11-13-2008
3.00
Elevator trim wiring and calibration.

 11-12-2008
7.00
Installed Aileron.Elevator & flap sensor wiring.
Details

 11-11-2008
4.30
Installed aileron trim.
Details

 11-10-2008
5.00
EFIS & EIS programming

 11-09-2008
4.00
EFIS & EIS programming

 11-03-2008
3.50
EFIS & EIS programming

 10-30-2008
5.00
Magnetometer alignment

 10-29-2008
4.00
Fabricated & Installled RT radio rack brace.
Details

 10-15-2008
2.00
Finished installing main bus to avionics bus diode

 10-15-2008
1.50
Fabricated & Installed LT radio rack brace.

 10-14-2008
1.50
Installed Lt inst panel attach bolt.
Details

 09-28-2008
2.70
Canopy side rails and frame installation.
     

 09-21-2008
1.80
Canopy side rails and frame installation.
     

 09-20-2008
2.30
Canopy side rails and frame installation.
     

 09-05-2008
4.00
Canopy side rails fabrication.
     

 09-04-2008
4.30
Canopy side rail fabrication

 09-03-2008
4.50
Canopy side rails fabrication.

 09-01-2008
3.50
Finished installing switch panel
     

 08-31-2008
6.00
Switch panel installed

 08-30-2008
6.50
WD 814 installed. ESS/Avionics buss relay intalled
Details

 08-24-2008
4.00
Forward NACA vent fresh air vent scat tube install
Details

 08-24-2008
2.50
Aux fuel pump re assemble, Fuel valve re install.

 08-23-2008
5.30
Fab fuel line for engine pump,.
Details

 08-20-2008
5.20
More cowl fitting, changed out mixture cable.

 08-19-2008
1.00
Installed firesleeve, mount Fuel flow transducer.
Details

 08-18-2008
1.00
Fuel flow transducer mounted to firewall.

 08-17-2008
4.30
Cowl & Oil cooler door fit.

 08-16-2008
2.30
Engine cowl fit.

 08-14-2008
5.70
Engine cowl fit.

 08-10-2008
3.00
Cowl fit, replaced fuel valve fittings
Details

 08-09-2008
2.00
Engine cowl fit

 07-16-2008
2.40
Secure electrical wiring fore & aft of firewall -
     

 07-15-2008
4.10
O/P, F/P, Hobbs transduces & switches.
Details

 07-14-2008
4.00
Fabrication O/P, M/P line

 07-12-2008
2.00
Fabricated M/P line from Cyl to Firewall.

 07-05-2008
2.00
Replaced & rerouted alt air cable.
     

 07-03-2008
2.00
Mounted & installed magnetometer in aft fuselage.
     

 07-02-2008
2.00
Fabricated bracket for magnetometer.

 06-30-2008
1.00
Rewired starter & removed solenoid strap.

 06-29-2008
3.00
Finished installing Molex connectors on Switch pa
     

 06-16-2008
3.30
Installed molex connectors for switch panel.
Details
       

 06-15-2008
1.20
Installed molex connectors for switch panel.

 06-14-2008
1.50
Installed molex connectors for switch panel.

 06-13-2008
6.00
Installed molex connectors for switch panel.

 06-11-2008
4.50
Installed molex connectors for switch panel.

 06-09-2008
3.30
Installed molex connectors for switch panel.

 06-08-2008
5.00
Installed molex connectors for switch panel.

 06-06-2008
1.30
Installed molex connectors for switch panel.

 06-05-2008
1.80
Installed molex connectors for switch panel.

 05-17-2008
4.10
Installed avionics bus relay.

 04-20-2008
2.00
Attached Throttle quad cables
       

 04-18-2008
5.50
Installed eng control cable firewall carry through
Details

 04-14-2008
2.80
Installed Alt Air & Cabin Heat cables.

 04-13-2008
2.00
Removed old wires from switch panel.
Details

 09-03-2007
2.00
Install switch panel Molex connectors

 08-05-2007
2.00
Installed M/P attachments & UBS cables for EFIS

 07-31-2007
3.30
Installed Stby Alt Kit.
Details

 07-29-2007
4.00
Installed control quad cables

 07-25-2007
2.00
Made connections for "Canopy Open" light

 07-24-2007
2.50
Installed blast tubes for Atlternator & Mags.
Details

 07-23-2007
3.00
Connected starter cable.
Details

 07-21-2007
2.50
Made firewall penitrations.
Details

 07-18-2007
3.00
Worked on switch panel anomolies.

 07-17-2007
3.00
Cabled antennas

 07-16-2007
3.00
Installed Com & Xponder antennas

 07-02-2007
3.00
Switch panel wiring

 07-01-2007
3.00
Reconnected front stick connections

 06-29-2007
3.30
Remover rear stick grip.
Details

 06-28-2007
3.30
Installed pitch servo & cable.
Details

 06-27-2007
3.00
Shortened front control stick.
Details

 04-08-2007
6.10
Panel wiring

 04-07-2007
3.50
AHRS mounting bracket

 04-06-2007
4.70
AHRS Mounting bracket

 03-21-2007
3.50
Panel wiring

 03-20-2007
4.00
Panel wiring

 03-19-2007
2.00
Panel wiring

 03-08-2007
2.70
Panel wiring

 02-27-2007
7.10
EIS & Switch panel wiring.

 02-26-2007
3.20
EIS wiring.

 02-25-2007
3.90
Wire EIS to engine.

 02-24-2007
4.00
Wire EIS to engine.

 02-23-2007
2.00
Installed fuse links and start contactor.

 02-22-2007
1.60
Measured and ordered quadrant control cables.

 02-21-2007
2.20
Modified prop control bracket for fit.

 02-20-2007
2.00
Wiring EIS to engine.

 02-19-2007
2.50
Panel wiring

 02-18-2007
1.00
Installed panel
     

 02-17-2007
2.50
Reworked right rear baffle & installed oil dip sti

 02-13-2007
2.00
Wired LH Pmag, install throttle bracket & Stby alt

 02-11-2007
3.00
Install CYL & EGT probes, OT sensor & quick drain.

 02-10-2007
3.00
Installed oil cooler fittings, alternator & mix br

 02-09-2007
6.00
Baffle & snorkle installation completed.

 02-08-2007
4.00
Baffle installation.
Details

 02-07-2007
4.00
Baffle installation

 02-06-2007
6.00
Blast tubes...
Details
       

 01-13-2007
3.00
Oil cooler mount
       

 01-12-2007
3.00
Oil cooler mount assembly

 01-09-2007
5.70
Oil cooler mount assembly.

 12-31-2006
5.50
Oil cooler mounting assembly.

 12-29-2006
2.50
Snorkle installation

 12-28-2006
2.00
Snorkle installation
       

 12-24-2006
4.00
Snorkle fit & asembly.
       

 12-20-2006
2.00
Assembled & mounted heat muff to exhaust.
       

 12-15-2006
6.00
Trimmed & adjusted snorkle for assembly.

 12-12-2006
3.00
Baffle assembly & rived cowl hinges to fuselage.

 12-11-2006
4.50
Baffle installation

 12-08-2006
2.00
Baffle installation

 12-07-2006
3.00
Baffle installation

 11-22-2006
1.80
Baffles installation

 11-20-2006
3.80
Baffles

 11-19-2006
4.30
Baffles

 11-18-2006
3.50
Baffles

 11-17-2006
2.70
Baffles

 11-16-2006
4.60
Baffle assembly
Details

 11-15-2006
4.40
Baffle assembly

 11-14-2006
1.50
Baffle assembly

 11-13-2006
3.50
Installed exhaust pipes & hangers.
       

 11-12-2006
2.00
Installed intake pipes

 11-11-2006
4.00
Installed cowl hinges

 11-10-2006
2.70
Trimmed cowl

 11-09-2006
4.30
Finished trimming cowl and installed rear hinges.

 10-26-2006
5.90
Installed securing bolt for rear stick.
Details

 10-23-2006
2.80
Finished cut and fit upper cowl.
       

 10-22-2006
2.80
Fit top cowl to fuse.
       

 10-20-2006
1.50
Fiberglass patch cowl

 10-19-2006
3.30
Installed cowl hinges. Fixed mic jacks.

 10-17-2006
5.60
Trim cowl front and bevel cowl hing.
       

 10-16-2006
3.00
Removed Fuel Pump, refit fuel bulkhead fitting.
Details

 10-15-2006
2.60
Fixed cutting mistake.

 10-14-2006
4.10
Installed upper rear cowl hinge.
Details

 10-12-2006
5.10
Stick Grip &TRBB termination
     

 10-11-2006
3.90
Stick Grip & TRBB termination

 10-10-2006
4.00
Stick Grip & TRBB termination

 10-07-2006
0.50
Installed stick grips
     

 10-03-2006
2.30
Hung Engine
       

 10-01-2006
5.00
Installes Infinity stick grips.

 09-17-2006
3.00
Terminate switch panel wires.

 09-16-2006
4.80
Terminate switch panel wires.

 09-15-2006
6.70
Terminate switch panel wirres

 09-14-2006
4.30
Terminated switch panel wires

 09-13-2006
3.80
Painted switch panel skirt.
Details

 09-11-2006
5.30
Finished mounting switch panel.
     

 09-10-2006
4.50
Finished mounting wheel farings.
Details
       

 09-04-2006
5.00
Installed wheel farings.

 08-26-2006
1.00
Pulled EMags off to reture to mfg for firmware upd

 08-11-2006
3.50
More fuel lines and valve.

 08-09-2006
0.80
Test fuel line install installation
     

 07-08-2006
5.00
Install fuel lines and valve.
       

 07-07-2006
2.50
Install fuel lines.

 07-06-2006
0.50
Install fuel lines.

 07-05-2006
1.50
Install fuel lines.

 07-04-2006
4.50
Finished installing fuel vents.
Details

 07-03-2006
5.60
Install fuel & vent lines

 07-02-2006
2.30
Install fuel lines.

 07-01-2006
9.50
Finish install gear leg fairings.
Details

 06-29-2006
1.50
Install Gear leg fairings.

 06-28-2006
2.60
Installed gear leg fairings.

 06-27-2006
4.60
Installed brake lines,map lightsEngine mount washe

 06-20-2006
3.50
Installed axels,wheel pant brackets, brakes wheels
Details

 06-18-2006
5.00
Finished engine build up.
       

 06-17-2006
10.00
Built up the engine in PHX with Robbie Attaway.
       

 06-16-2006
2.00
Mounted tubes, tires and wheels

 06-06-2006
3.80
Attached gear legs to Fuelage.
       

 06-05-2006
1.20
Preped gear legs for assembly.

 06-02-2006
4.90
Riveted Top aft skin.

 05-30-2006
2.00
Ran grd for strob. ty wraped wie bundles.
Details

 05-29-2006
3.00
Finished labeling & terminating G3 connectings.

 05-28-2006
5.70
Mounted rear floor flood switch.
Details

 05-27-2006
6.90
Terminate & mount dimmers.
Details

 05-25-2006
3.80
Label & terminated wires

 05-23-2006
4.00
Tech Counselor Bill Truax looked at Fuselage.
Details

 05-22-2006
3.20
Finished installing Aileron trim.
Details

 05-21-2006
4.60
Installed aileron trim.

 05-19-2006
4.80
Riveted doubler to firewall for electrical compone
Details

 05-18-2006
6.30
Fabricated firewall doubler for electrical compone
Details

 05-15-2006
7.10
Wired electrical components.

 05-13-2006
2.50
Riveted forward baggage bulkhead in place.
Details

 05-12-2006
3.00
Started wiring electrical components.

 05-11-2006
3.80
Plumed fuselage brake lines.

 05-10-2006
6.20
Fuel valve installation fabricated.
Details

 05-09-2006
3.10
Installed F-802N brace.
Details

 05-08-2006
5.00
Installed buses & brace F-802N.
Details

 05-07-2006
5.00
Fabricated Batt access in forward
Details

 05-03-2006
3.00
Reinstalled static Safe1 static system.
Details

 04-29-2006
4.50
Installed front NACA vent.
Details

 04-28-2006
3.00
Drilled engine cable holes in F-802A.
Details

 04-27-2006
1.00
Drilled Wd-814 windscreen support to fuselage.
Details

 04-26-2006
2.70
Painted interior parts & fit F821

 04-25-2006
2.00
Refit front 7 rear throttle Quads

 04-23-2006
1.50
Installed Aux Fuel Pump & forward Bag comp.

 04-21-2006
7.50
Installed pitch & roll servo brackets
     

 03-08-2006
2.00
Front seat back Fab finish.
Details
     

 03-08-2006
1.00
Debur, dimple & paint F-821

 03-05-2006
1.00
Debur & Dimple F-821

 03-04-2006
6.20
Aft wiring & Assemble front & rear seat backs.

 03-03-2006
6.20
Installed aft wiring
     

 03-02-2006
5.10
Seat backs preped for painting. wired strobs.

 03-01-2006
1.30
Rear bay bottom stiffiner fabricated.

 02-27-2006
2.20
Installed in assembly bushings for tail strob & po

 02-25-2006
5.20
Installed ELT braket.
Details
       

 02-24-2006
2.40
Fabricated ELT bracket.

 02-23-2006
7.00
Rear Seat back Assembly, ELT Bracket
Details

 02-14-2006
2.50
Rear seat back assembly.

 02-13-2006
4.10
Assembled front seat back.

 02-11-2006
2.40
Bolted/riveted to Fuse Wd808,F856,816,816B.

 02-10-2006
3.40
Bolted/riveted to fuse, Wd808,F856,816, 816B.

 02-02-2006
5.60
Fabricated F816Bs.
Details

 02-01-2006
2.50
Fit & assemble rear throttle, Fabricate F-816Bs.

 01-31-2006
3.30
Fit and assembled rear throttle.
     

 01-24-2006
1.50
Fabricate switch template.
     

 01-23-2006
3.10
Fit, drill and cleco in assembly F-816APP L&R side
Details

 01-20-2006
1.80
Fit F-816APP side rails in assembley.

 01-19-2006
2.50
Finished fastening FF-817L&R in place.
Details

 12-23-2005
4.00
Back drilled F-821 at left WD-802 left side.
Details

 12-22-2005
5.20
Drill and debur F-821.

 12-21-2005
5.00
Riveted F845L&R, 846L&R and 848L&R in assembly.
Details

 12-19-2005
5.50
Preped and assembled F803 instrument panel.

 12-15-2005
3.50
Assembled F821BPPs to F-866BPP & F801PP.
Details

 12-14-2005
1.50
Installed pitot static system in aft Fuselage.
Details

 12-11-2005
6.50
Fab & installed rear throttle
Details

 12-10-2005
5.10
Installed static system.
Details

 11-30-2005
4.00
Reinstalled gear box hardware, F866A&B.
Details

 11-21-2005
3.80
Finished gear box fasteners
Details

 11-20-2005
1.20
Inst Panel access door assembly.
     

 11-19-2005
5.00
Fabricated instrument panel access door.
       

 11-17-2005
2.00
Installed F861 landing gear cover plates.

 11-12-2005
7.00
Finish prep F867. Rivet F851s, 802k, 822.

 11-11-2005
3.50
Finished drilled F867, preped, primed, riveted ass

 11-10-2005
5.20
Installed front floor platenuts. Assembled F867 co

 11-04-2005
0.80
Assembled F867, Cooling Ramp.
       

 11-03-2005
7.50
Fab. Inst Access panel. riveted in assembleF802k,m

 11-02-2005
4.00
Fabricate instrument panel access door. Fwd Bag.

 10-27-2005
1.70
Debur, dimple F822,802K,M,836L&R.

 10-26-2005
4.20
Cleco & drill F803K&M, 835L7R, 850, 851.
Details

 10-25-2005
4.00
Finished gear alignment and drilled gear legs on.

 10-24-2005
3.00
Gear leg alignment. Instrument panel door dblr.

 10-01-2005
2.00
Drilled 7/16 hole in U804s & 806-1s. Bolted gear l

 09-30-2005
4.10
Finished F825.
Details

 09-29-2005
4.00
Finished deburing F825, Drilled F858's in assembly

 09-28-2005
2.30
Fabricated F858L&R, Debured & dimpled F825PP.

 09-27-2005
2.00
Finish drilled F825PP to assembly.

 09-26-2005
3.30
Drilled F825PP to fuselage.

 09-25-2005
3.50
Rudder stops installed, removed empenage, Riveted

 09-20-2005
4.00
Rig rudder peddles, cables. Installed rear hardwar

 09-18-2005
3.10
Rig elev, Mount V/S, rudder, cables & peddles.

 08-12-2005
2.00
Elevator rigging and..
Details
       

 07-24-2005
3.00
Elevator rigging

 07-23-2005
2.30
Began elevator rigging...

 07-20-2005
2.00
Mounted fuel pump....
Details

 07-19-2005
4.00
Fabricated fuel pump platform.
       

 07-06-2005
3.00
Fabricated, primed and assembled F-839..
Details

 07-05-2005
4.50
Fabricated, preped, primed and installed
Details

 06-30-2005
4.75
Drilled, rivetd and bolyted F-681 in ...
Details

 06-29-2005
5.00
Aligned and drilled in assembly...
Details

 06-16-2005
6.00
Drilled H/S to Fuse.. Installed hardware

 06-15-2005
5.00
Leveled and aligned fuse and H/S

 06-14-2005
4.00
Preped rudder peddle assmebly &
Details

 05-31-2005
1.50
Preped rudder peddle angles...
Details

 05-22-2005
2.20
Primed forwad seat ramp parts...
Details

 05-21-2005
2.30
Fit, drilled, deburred forward...
Details

 05-20-2005
2.70
Installed platenuts for midcabin covers.

 05-14-2005
5.70
Primed and re installed RH mid cabin...
Details

 05-13-2005
7.20
Installed RH mid cabin brace...
Details

 05-12-2005
2.30
Installed WD 813 weldments

 05-11-2005
1.60
Finished riveting F-802Cs

 05-10-2005
2.60
WD 813s drilled in place...
Details

 05-05-2005
1.80
Mounted platenuts on F865 brackets.

 05-02-2005
2.50
Started fabrication of new F-864PP....
Details

 05-01-2005
7.00
Finished mounting plantenuts for...
Details

 04-30-2005
2.00
Drilled deburred & clecoed platenuts...
Details

 04-29-2005
6.00
Drilled & Clecoed F-834&835 in assembly.
Details
       

 04-28-2005
2.00
Cut & fit rear bag shelf F834 & 835....
Details

 04-27-2005
1.00
Drilled and clecoed F804NPP MainSpar....
Details

 04-26-2005
5.00
Drilled, deburred,dimpled,primed...
Details

 04-25-2005
1.80
Install fwd baggage comp platenutes.
Details

 04-24-2005
2.50
Assembly of fws baggage compartment
Details

 04-23-2005
0.50
Riveted upper flap actuator doubler.
       

 04-10-2005
3.50
Fab upper flap actuator doubler
Details
     

 04-02-2005
2.50
Fabricated wood temp floor panels

 03-11-2005
2.00
Glassed in plate nut strips in Rt tip

 03-05-2005
1.50
Installed right pos/strobe & lens

 02-26-2005
2.50
Installed left pos/strobe & lens.

 02-25-2005
2.80
Rough cut tip lenses...
Details

 02-22-2005
3.00
Preped wing tips for assembly
Details

 02-20-2005
1.20
Preped wing tips for assembly
Details

 02-11-2005
1.50
Fab rt wing tip pos light platenut assem

 02-10-2005
3.80
Fab nutplate strips for wing tips, L&R.
Details

 02-09-2005
3.50
Trimmed and fit both wing tips
Details

 02-03-2005
2.50
Drilled wing skins to accept tips

 02-02-2005
4.00
Mounted control surfaces and push rods
Details

 01-14-2005
2.60
Drill F864 in assembly.

 11-24-2004
2.00
Riveted Aft deck F819.
Details

 11-10-2004
4.00
Drilled F866 ABC in assembly
Details

 11-09-2004
3.30
Rivet arm rests. Install F837 plate nuts

 11-08-2004
5.30
Fit and checked flap actator mech.
Details

 10-21-2004
1.80
Fit and drilled inside side panels

 10-19-2004
6.10
Mount F837.
Details

 10-18-2004
7.20
Fab battery box mounting bracket.
Details

 10-17-2004
7.60
Finish installing floor plate nuts.
Details

 10-16-2004
3.20
Prep and install floor plate nuts.

 10-15-2004
3.00
Fab F833D-R hinge.
Details

 10-14-2004
3.50
Drilled floors and footwells to fuse.
Details
       

 10-07-2004
4.00
Preded floors and riveted stiffners.

 10-06-2004
3.80
Finished rear seat foot wells.

 10-05-2004
2.30

Details

 10-04-2004
2.60
Preped & riveted 810C&D,811L, 865 to 807
Details

 10-02-2004
2.20
Drilled stiffners and hing to F829.
Details

 10-01-2004
5.20
Fabricate F805 B L&R, C, F L&R
Details

 09-30-2004
3.60
Rivet F820L.
Details
     

 09-29-2004
5.30
Rivet F820R & Gear Box. F802A&B (L&R)
Details

 09-28-2004
3.30
Fabricate F810C,811C,812B.
Details

 09-27-2004
4.60
Riveted left gear box in assmbly
     

 09-25-2004
0.50
Clecoed gear boxes to F820 L&R
     

 09-24-2004
12.00
Rivet F822, 823 L&R, 824, 826 & 827
     

 09-18-2004
3.40
Installed keeper rivetd on F844 L&R.
Details

 09-17-2004
2.50
Pro sealed F822 to firewall flange

 09-15-2004
1.40
Prime & prep F826, 827
Details

 09-10-2004
2.00
Prep F822, 826, 827 for riveting
     

 09-09-2004
3.40
Rivet F823L&R
       

 09-08-2004
3.10
Rivet F 823L&R
       

 09-07-2004
4.00
Prep F805LR, 806LR, 806LR for riveting

 09-02-2004
0.60
Prep F-823L

 09-01-2004
13.90
Finish rivet F824's L&R. Prep F823 L&R
Details
     

 08-27-2004
2.20
Rivet F824 L

 08-26-2004
3.50
Rivet F828 842. Cleco F824 L

 08-20-2004
8.40
Riveted skins F828 & F842 to fuse.

 08-07-2004
3.30
F824 L&R preped & primed, rolled edges

 07-30-2004
1.50
F842 preded & primed

 07-15-2004
2.30
WD409 nuts (AN365) torqued to 235 in #s
Details

 07-13-2004
3.20
Fuse rivet prep

 07-09-2004
2.10
Riveted F818L&R in place.
Details

 07-08-2004
3.00
Deburr, Dimple F824PPL & F842PP

 07-07-2004
3.20
Debur, dimple F824ppl & F842pp

 06-19-2004
2.00
Deburr, Dimple, countersink
Details

 06-18-2004
3.70
Deburr F-824L

 05-28-2004
4.10
Dimpling & Deburring
Details

 04-27-2004
1.00
Deburr F822PPL & Stringers

 03-17-2004
1.60
Finished drilled, dimple, deburr F823PP

 03-16-2004
5.80
Drill, Deburr, Dimple F822pp and F826pp
Details

 03-14-2004
3.70
RH Ger tower and skin prep

 03-13-2004
5.30
Primed LH skins and tower parts.
Details

 03-12-2004
4.60
Left landing gear sub assemblies prep
Details

 11-04-2003
0.60
Gear Towers R&R G L&R brackets.
       

 11-03-2003
3.40
Gear towers. R&R G L&R brackets

 10-26-2003
4.40
Remove and Replace WD822 L&R

 10-25-2003
6.30
Fit Gear towers.
Details
       

 10-20-2003
2.60
F802 assmeble

 10-19-2003
5.20
Install and drill in assembly F 802
Details

 10-18-2003
6.30
Preped and primed F802 ABCEF
Details

 10-17-2003
4.80
Finished drilling in assembly F802 ABC
Details

 06-02-2003
2.90
Remake F802 G rt

 05-20-2003
3.30
F802 A,B,C, E,F Assembly

 05-12-2003
3.00
F802 E,F,G,H
Details

 05-11-2003
3.70
F802 E,F, G,H
Details

 05-08-2003
3.80
Drilled in assembly F802 left. A,B,C,E,F

 05-07-2003
4.80
F802G & WD822L
Details

 04-30-2003
1.70
F802S - R
Details

 04-24-2003
3.60
F802A,B,C,E,F
Details

 04-23-2003
4.30
F802D&S
Details

 04-22-2003
6.75
Drilled skins
Details

 04-21-2003
2.00
Drilled F826 and F827 skins

 11-03-2002
1.50
Drilled F826 and F827 skins to assembly

 11-02-2002
6.50
Longerons, Seat brackets, Drilling
Details

 10-27-2002
7.60
Seat brackets & Skins
Details

 10-26-2002
5.70
Side skin & seat belt anchor
Details

 10-25-2002
2.00
Skins & longeron
Details

 10-24-2002
2.00
Bulkheads
Details

 10-23-2002
5.60
Skins & bulkheads
Details

 10-22-2002
5.80
Fuse skins
Details
       

 10-21-2002
7.00
Drilled skins to assembly
Details

 10-19-2002
1.50
Longerons and skins
Details

 10-18-2002
5.90
Tail spring mount, Longerons
Details

 10-17-2002
5.10
Floor skeleton
Details
     

 10-16-2002
4.40
Floor skeleton
Details

 10-15-2002
2.40
Longerons
Details

 10-14-2002
2.60
Cockpit floor area
Details

 10-13-2002
5.50
Cockpit floor area
Details

 10-11-2002
2.50
Cockpit floor area
Details

 10-10-2002
6.30
Cockpit floor area
Details

 10-06-2002
4.30
Cockpit floor area
Details

 10-05-2002
8.50
Cockpit floor area
Details

 10-04-2002
3.00
Cockpit floor area
Details

 10-03-2002
2.40
Cockpit floor area
Details

 10-02-2002
3.20
Cockpit floora area
Details

 09-30-2002
5.70
Cockpit floor area
Details

 09-29-2002
3.50
Cockpit floor area
Details

 09-28-2002
1.70
Cockpit floor area
Details

 09-27-2002
2.70
Cockpit floor area
Details

 09-25-2002
2.60
Cockpit floor area
Details

 09-24-2002
1.00
Cockpit floor area
Details

 09-23-2002
4.00
Cockpit floor area
Details

 09-22-2002
5.20
Cockpit floor area
Details

 02-17-2000
2.70
Cockpit floor area
Details

 02-16-2000
1.40
Cockpit floor area
Details

 02-09-2000
5.70
Cockpit floor area
Details

 02-01-2000
3.70
Bulkhead assembly
Details

 01-31-2000
4.00
Bulkhead prep
Details

 01-30-2000
4.20
Bulkhead prep
Details
     

 01-25-2000
4.50
Firewall components
Details

 01-23-2000
4.50
Firewall
Details

 01-17-2000
3.60
F-801 and components
Details

 01-16-2000
2.20
Fuselage jig
Details
       

 01-15-2000
6.60
Inventory
Details

 01-14-2000
8.00
Unpacked fuselage kit
Details

 01-13-2000
5.00
Landing light lenses
Details

 01-12-2000
6.00
Wing tanks
Details

 01-11-2000
3.70
Pitot tube
Details

 01-10-2000
5.00
Nut plates
Details

 01-07-2000
1.40
Wing flap hinges
Details

 01-06-2000
11.30
LH bottom wing skin
Details

 01-05-2000
9.60
LH bottom wing skins
Details

 01-04-2000
2.80
Wing skins
Details

 01-03-2000
2.30
RH ribs
Details

 01-02-2000
2.50
RH bottom skins
Details

 01-01-2000
4.80
Bottom skins
Details

 12-23-1999
0.30
Bottom skins
Details

 12-20-1999
2.70
Bottom skins
Details

 12-19-1999
4.30
Cleared items
Details

 12-17-1999
2.00
Tech inspection
Details
       

 11-25-1999
0.50
Wing tip prep
Details
       

 11-21-1999
7.00
Push rods
Details

 11-20-1999
3.30
RH Flap seal
Details

 11-19-1999
4.90
RH Flap
Details

 11-12-1999
3.50
RH aileron
Details

 11-11-1999
3.30
Leak test
Details

 11-04-1999
4.00
LH aileron gap seal
Details

 11-03-1999
6.50
LH Flap
Details

 10-31-1999
2.00
LH Flap
Details

 10-30-1999
4.70
Aileron push rod
Details

 10-29-1999
4.00
LH Aileron
Details

 10-24-1999
4.50
LH Flap brace
Details

 10-23-1999
2.10
LH aileron hinges
Details

 10-22-1999
8.30
RH Flap
Details

 10-21-1999
4.50
LH Flap assembly
Details

 10-20-1999
3.30
LH flap bracket
Details

 10-06-1999
5.30
RH wings skins
Details

 10-05-1999
5.30
Fuel tank mounting
Details

 10-04-1999
5.60
LH Wing skins
Details

 10-03-1999
9.00
Leading edges to wing
Details

 10-02-1999
2.00
Leading edge attachment
Details

 10-01-1999
2.10
Top wing skins
Details

 09-30-1999
8.00
Flap prep
Details

 09-29-1999
6.60
Flap prep
Details

 09-28-1999
6.70
Flap control bracket
Details

 09-27-1999
5.80
LH Flap
Details

 09-26-1999
8.70
RH Tank baffle
Details

 09-25-1999
6.10
LH Aileron assembly
Details

 09-24-1999
6.00
RH Aileron assembly
Details

 09-23-1999
2.00
RH Aileron
Details

 09-02-1999
1.50
Aileron prep
Details

 09-02-1999
2.80
Aileron prep
Details

 09-01-1999
2.30
Aileron Prep
Details

 08-28-1999
5.50
LH wing tank
Details

 08-27-1999
6.80
Aileron stiffners
Details

 08-26-1999
2.00
Ailerons prep
Details

 08-25-1999
1.50
Ailerons prep
Details

 08-24-1999
7.00
LH aileron prep
Details

 08-16-1999
2.50
LH Tank
Details

 08-15-1999
8.50
RH Tank
Details

 08-14-1999
3.00
RH Tank Prep
Details

 07-20-1999
1.50
LH Tank baffel
Details

 07-15-1999
5.40
LH Tank
Details

 07-14-1999
2.50
LH Tank
Details

 07-07-1999
5.10
LH tank seal
Details

 12-13-1998
2.00
LH tank prep
Details

 12-12-1998
3.70
LH tank prep
Details

 12-06-1998
1.80
RH tank prep
Details

 12-05-1998
5.30
Fuel vents
Details

 12-04-1998
3.30
Fuel vents
Details

 11-29-1998
3.40
Proseal prep
Details

 11-28-1998
1.80
Fuel cap assembly
Details

 11-22-1998
2.70
Tank stiffners
Details

 11-21-1998
2.30
Vent lines
Details

 11-19-1998
2.40
Fuel pick ups
Details

 11-18-1998
1.30
RH fuel sender
Details

 11-14-1998
5.90
RH tank
Details

 11-13-1998
2.70
RH wink tank
Details

 11-07-1998
1.60
RH tank shin
Details

 11-06-1998
1.90
RH nose ribs
Details

 11-05-1998
2.30
RH tank skin
Details

 11-04-1998
6.80
Stiffners debur and dimple
Details

 11-03-1998
4.30
T-410 doublers
Details

 11-02-1998
2.30
Wing attachangle
Details

 11-01-1998
6.70
LH skin stiffners
Details

 10-31-1998
2.00
Tank stiffners
Details

 10-30-1998
5.20
Tank stiffners
Details

 10-29-1998
6.20
Tank skin
Details

 10-28-1998
2.10
Tank skin
Details

 10-12-1998
4.00
Tank baffles
Details

 10-07-1998
4.80
Tank baffles
Details

 10-06-1998
5.00
Tank baffles
Details

 09-21-1998
1.30
Tank baffles
Details

 09-13-1998
5.90
LH and RH tank baffels
Details

 09-12-1998
1.70
Nutplates, Z brackets
Details

 09-09-1998
0.60
Nutplates
Details

 09-08-1998
5.40
Landing light
Details

 09-07-1998
7.20
Landing light
Details
       

 09-06-1998
4.90
R&R main rib
Details

 09-01-1998
1.70
LE skin
Details

 08-30-1998
7.70
Leading edges
Details

 08-29-1998
2.00
RH leading edge skin
Details

 08-25-1998
2.40
Dimple skins
Details

 08-24-1998
2.40
Skins
Details

 08-21-1998
3.80
Skins and ribs
Details

 08-20-1998
7.10
Wing skins and ribs
Details

 08-19-1998
4.90
Rib flanges
Details

 08-18-1998
6.60
LH wing skins
Details

 08-13-1998
2.10
Lower wing skins
Details

 08-12-1998
4.30
Wing skins
Details

 08-11-1998
1.00
Wing skins
Details

 07-30-1998
1.30
Main ribs
Details

 07-29-1998
6.90
Wing leading edge
Details

 07-28-1998
5.90
Leading edge skins
Details

 07-21-1998
6.50
Wing skins
Details

 07-20-1998
5.50
Leveled wig skeletons
Details

 07-15-1998
7.00
Aileron bellcranks
Details

 07-14-1998
3.00
Changed out ribs
Details

 07-13-1998
2.00
Finished second wing jig
Details

 07-08-1998
5.00
Second wing jig
Details

 07-07-1998
4.50
Assembled ribs and spars
Details
       

 07-06-1998
4.80
Rib holes for conduit
Details

 07-01-1998
3.80
Tip plugs
Details

 06-30-1998
3.20
Rear spar
Details

 06-29-1998
3.00
Prime
Details
     

 06-28-1998
2.40
Spars
Details

 06-26-1998
1.20
Nose ribs
Details

 06-25-1998
7.30
Ribs, Front & Rear spars
Details

 06-21-1998
4.00
Tank rib, Tie down
Details

 06-20-1998
1.50
Tank vents
Details

 06-11-1998
2.80
Wing spar & ribs
Details
     

 05-28-1998
1.00
Pitot tube
Details

 05-27-1998
5.20
Rib prep.Tie down brackets fabricated.

 05-22-1998
2.00
Rib prep

 05-07-1998
4.50
Rib prep
Details

 05-06-1998
3.30
Rib prep
Details

 05-05-1998
1.50
Rib prep
Details

 05-02-1998
2.30
Rib prep
Details
     

 05-01-1998
3.50
Spar, Rib prep
Details

 04-15-1998
3.30
Spar prep
Details

 04-05-1998
5.20
Spar prep
Details

 04-04-1998
5.00
Inventory wing kit
Details

 03-13-1998
2.50
Tips
Details

 03-03-1998
2.50
RH elevator
Details
       

 03-02-1998
6.50
LH elev leading edge
Details

 03-01-1998
4.30
Trim tab
Details

 02-24-1998
7.80
Servo cover plate
Details

 02-23-1998
9.70
Elevator skeleton
Details

 02-22-1998
1.50
Elevaror leading edge
Details

 02-19-1998
2.50
Elevator skin rivit
Details

 02-18-1998
4.30
Rudder leading edge
Details
     

 02-18-1998
4.00
Elevator skin
Details

 02-17-1998
2.20
Rudder bracket
Details

 02-16-1998
7.70
Rudder skin
Details
     

 02-12-1998
7.80
VS skin
Details

 02-11-1998
7.50
HS skins
Details
     

 02-10-1998
8.80
Stiffners
Details

 02-09-1998
6.90
Rivit stiffners
Details

 02-07-1998
3.00
Stiffners
Details

 02-05-1998
5.30
Priming
Details
     

 02-03-1998
3.80
Trim servo
Details
     

 01-29-1998
2.90
Elevator stiffners
Details

 01-27-1998
3.20
HS ribs
Details

 01-22-1998
7.10
Elevator assembly
Details
     

 01-21-1998
8.00
VS skin
Details

 01-20-1998
2.50
VS assembly
Details

 01-16-1998
6.90
Rudder assembly
Details

 01-15-1998
6.30
Rudder aasembly
Details

 01-14-1998
7.30
Rudder stiffners
Details

 01-13-1998
2.70
VS skins
Details

 01-06-1998
3.70
VS assembly
Details

 12-30-1997
3.00
Rear HS spar nut
Details

 12-29-1997
3.00
Tech inspection
Details

 12-22-1997
4.20
VS assembly
Details

 12-21-1997
2.00
VS assembly
Details
     

 12-18-1997
4.40
Rear spar
Details

 12-17-1997
5.70
Spars
Details

 12-16-1997
2.20
Replaced HS rib 404
Details

 12-02-1997
4.70
HS components
Details

 12-01-1997
2.50
HS skins
Details

 11-24-1997
5.10
HS skins
Details

 11-23-1997
2.40
HS skins
Details

 11-04-1997
6.00
Ribs, spars
Details

 11-03-1997
5.20
Spars
Details

 10-30-1997
6.30
Spar alignment
Details

 10-29-1997
2.00
HS jig brackets
Details

 10-21-1997
4.40
HS assemblies
Details

 10-20-1997
1.30
Prepared HS assemblies
Details

 10-19-1997
1.30
HS assemblies
Details

 10-17-1997
2.30
HS assemblies
Details
 

 10-16-1997
6.50
HS assembly
Details
     

 10-15-1997
5.90
Spar channels
Details

 10-13-1997
1.50
Splice angle
Details

 10-12-1997
1.00
Hinge brackets
Details

 10-11-1997
7.80
Rear spar components
Details

 10-10-1997
2.50
Drilling assemblies
Details

 10-09-1997
4.20
Flange strips
Details

 10-07-1997
2.50
Finished edges
Details

 10-06-1997
2.50
Drilled skins to spar
Details

 10-05-1997
3.50
Hand brake and C frame tool,rear spar
Details

 10-01-1997
4.00
Inventroy
Details

 09-28-1997
1.00
Jig construction
Details

 09-27-1997
3.00
Jig construction
Details

 09-25-1997
2.50
Jig construction
Details