Date
|
Hours
|
Work Log Summary
|
Details
|
06-04-2011
|
3.00
|
Paint
|
|
|
|
06-04-2011
|
6.00
|
N998W back from the paint shop.
|
Details
|
|
|
05-23-2010
|
0.00
|
First Flight
|
Details
|
|
|
05-23-2010
|
0.00
|
First flight
|
|
|
|
05-23-2010
|
0.00
|
First Flight
|
|
|
|
05-23-2010
|
0.00
|
First Flight
|
|
|
|
05-18-2010
|
5.00
|
Checked and set instrument parameters.
|
Details
|
|
|
05-17-2010
|
3.00
|
Checked and retightened loose power connection.
|
Details
|
|
|
05-14-2010
|
3.00
|
Fuel quantity sender units leaking.
|
Details
|
|
|
05-12-2010
|
6.00
|
Safety wired brake calipers.
|
Details
|
|
|
05-11-2010
|
5.50
|
Drilled axles for wheel bearing nut cotter keys.
|
|
|
|
05-08-2010
|
11.00
|
Finished interior install.
|
Details
|
|
|
05-01-2010
|
5.00
|
Continued interior installation.
|
Details
|
|
|
04-30-2010
|
6.00
|
Continued installing interior
|
Details
|
|
|
04-29-2010
|
5.00
|
Install interior.
|
Details
|
|
|
04-25-2010
|
5.00
|
DAR Inspection issues
|
Details
|
|
|
04-23-2010
|
3.00
|
DAR Inspection
|
|
|
|
04-08-2010
|
5.00
|
Edited max oil temp limit.
|
Details
|
|
|
04-07-2010
|
5.00
|
Changed out firewall hardware bolts for longer.
|
Details
|
|
|
04-06-2010
|
3.00
|
Installed nut plates on prop spinner back plate.
|
Details
|
|
|
04-05-2010
|
5.00
|
Installed canopy latch set screw.
|
Details
|
|
|
04-03-2010
|
5.00
|
Set engine limits in EFIS. Adjusted flap travel.
|
Details
|
|
|
04-01-2010
|
5.00
|
Measured equipment arms.
|
Details
|
|
|
03-31-2010
|
3.00
|
Finished installing fuel pump drain tube.
|
Details
|
|
|
03-29-2010
|
6.00
|
Began installing empennage fairing.
|
Details
|
|
|
03-28-2010
|
3.00
|
Finished installing and torquing spar bolts.
|
Details
|
|
|
03-27-2010
|
5.00
|
Installed new EGT probe.
|
Details
|
|
|
03-26-2010
|
4.00
|
Set idle and adjusted linkage.
|
|
|
|
03-23-2010
|
6.00
|
Fixed Emag anomoly. Addressed tach problem.
|
Details
|
|
|
03-21-2010
|
6.00
|
Anaylized engine start problems.
|
|
|
|
03-20-2010
|
4.00
|
First engine start
|
Details
|
|
|
03-15-2010
|
2.00
|
A/C W&B completed. Brakes bleed.
|
|
|
|
03-14-2010
|
4.00
|
Install spinner.
|
Details
|
|
|
03-13-2010
|
6.00
|
Install LH aileron Stop & Flap
|
|
|
|
03-12-2010
|
4.00
|
Re installed plate nut on LH wing tip.
|
Details
|
|
|
03-11-2010
|
3.00
|
Torqued, safetied prop & alternator
|
|
|
|
03-09-2010
|
6.00
|
Installed prop and trim servo connector.
|
Details
|
|
|
03-03-2010
|
3.00
|
Installation on LH fuse tank bracket.
|
|
|
|
03-02-2010
|
4.00
|
Flaps install & adjust. Work on LH tank bracket.
|
|
|
|
03-01-2010
|
3.00
|
Installed RH tank bracket & vent line.
|
|
|
|
02-28-2010
|
4.00
|
Fitting RH Fuse tank bracket & RH flap fairing.
|
|
|
|
02-26-2010
|
6.00
|
Fit and adjust flaps to wing & LH fairing.
|
|
|
|
02-25-2010
|
5.00
|
Fit and adjust flaps to wing
|
|
|
|
02-24-2010
|
4.00
|
Fit and adjust flaps to wing.
|
|
|
|
02-20-2010
|
6.00
|
Set wing sweep & insidence
|
Details
|
|
|
02-19-2010
|
5.00
|
Set wing sweep & insidence
|
|
|
|
02-18-2010
|
3.00
|
Set wing sweep & insidence
|
|
|
|
02-14-2010
|
4.00
|
Installed wing fairings, nutp[lates & flap sensor.
|
|
|
|
02-13-2010
|
3.50
|
Installed wing fairings & nutplates.
|
|
|
|
02-11-2010
|
4.50
|
Installed wing fairings & nutplates.
|
|
|
|
02-08-2010
|
4.50
|
Installed empennage assembly
|
|
|
|
02-04-2010
|
6.00
|
Installed empennage assembly
|
|
|
|
02-03-2010
|
3.50
|
Installed empennage assembly
|
|
|
|
02-01-2010
|
3.00
|
Installed empennage assembly
|
|
|
|
01-26-2010
|
4.00
|
Preped & primed windscreen & forskin
|
|
|
|
01-25-2010
|
3.00
|
Cleaned up wiring inside RH & reinstalled canopy.
|
|
|
|
01-24-2010
|
4.00
|
Finisshed installing canopy latch & lock.
|
Details
|
|
|
01-23-2010
|
4.00
|
Install canopy latch & lock.
|
|
|
|
01-22-2010
|
2.00
|
Fabricate switch panel cover
|
Details
|
|
|
01-21-2010
|
3.00
|
Continued windscreen detail sanding.
|
Details
|
|
|
01-20-2010
|
4.00
|
Fairing finshing.
|
Details
|
|
|
01-19-2010
|
3.00
|
Wheel pant, leg & intersection fairings finishing
|
|
|
|
01-17-2010
|
4.00
|
Wheel pants, leg fairings installed
|
|
|
|
01-14-2010
|
3.00
|
Continued windscreen prep and finish
|
|
|
|
01-13-2010
|
1.00
|
Continued windscreen prep and finish
|
|
|
|
01-12-2010
|
2.00
|
Finished sikaflex windscreen & LH skirt prep
|
|
|
|
01-10-2010
|
3.00
|
Windscreen trim
|
|
|
|
01-05-2010
|
1.80
|
Windscreen trim
|
|
|
|
12-20-2009
|
1.00
|
Windscreen trim
|
|
|
|
12-14-2009
|
4.00
|
Windscreen trim
|
|
|
|
12-10-2009
|
1.00
|
Windscreen trim
|
|
|
|
12-03-2009
|
1.00
|
Windscreen trim
|
|
|
|
12-01-2009
|
6.00
|
Canopy windscreen prep.
|
|
|
|
11-30-2009
|
5.00
|
Windscreen prep for epoxy.
|
|
|
|
11-29-2009
|
1.50
|
Windscreen epoxy & dress
|
|
|
|
11-28-2009
|
2.50
|
Windscreen fit & prep
|
|
|
|
11-25-2009
|
1.20
|
Windscreen fit & prerp
|
|
|
|
11-22-2009
|
2.50
|
Installed Alt static air port & A/S tube bulkhead
|
|
|
|
11-21-2009
|
3.50
|
Canopy skirt prep & prime
|
|
|
|
11-20-2009
|
6.10
|
Installed cowl hinge pin covers, Cowling prep for
|
|
|
|
11-19-2009
|
6.20
|
Front bagage door adjust.
|
|
|
|
11-18-2009
|
3.70
|
Wind screen fit, canop yskirt adjust.
|
|
|
|
11-17-2009
|
3.00
|
Canopy skirt adjust & fit
|
|
|
|
11-13-2009
|
4.00
|
Sanded canopy skirt
|
|
|
|
11-12-2009
|
4.00
|
Wings & empenage to hangar.
|
Details
|
|
|
11-09-2009
|
2.00
|
Cut & readjust rear canopy skirt
|
|
|
|
11-07-2009
|
4.50
|
Skirt rived to frame & glassed in with micro.
|
|
|
|
11-06-2009
|
3.00
|
Glue canopy skirt.
|
|
|
|
11-05-2009
|
2.00
|
Continued canopy skirt fit.
|
|
|
|
11-04-2009
|
4.70
|
Trim & adjust canopy skirt. Shorten front control
|
|
|
|
11-03-2009
|
6.30
|
Contunued canopy skrit trim & fit.
|
Details
|
|
|
11-01-2009
|
2.00
|
Canopy skirt trim and fit
|
|
|
|
10-31-2009
|
2.00
|
Canopy skirt trim and fit
|
|
|
|
10-30-2009
|
3.00
|
Canopy skirt trim and fit
|
|
|
|
10-29-2009
|
2.00
|
Canopy skirt trim and fit
|
|
|
|
10-26-2009
|
3.00
|
Trimmed and fit canopy skirts
|
|
|
|
10-25-2009
|
3.00
|
Trimmed and fit canopy skirts
|
|
|
|
10-22-2009
|
6.00
|
Trimmed and fit canopy skirts
|
|
|
|
10-21-2009
|
5.50
|
Trimmed and fit canopy skirts
|
|
|
|
10-19-2009
|
3.00
|
Started fitting right hand canopy skirt
|
|
|
|
10-18-2009
|
1.00
|
Finished gluing spacer holes
|
|
|
|
10-17-2009
|
6.60
|
Canopy prep and glue
|
|
|
|
10-16-2009
|
2.20
|
And more canopy trimming
|
|
|
|
10-14-2009
|
3.80
|
More canopy trimming
|
|
|
|
10-13-2009
|
3.50
|
Canopy trimming
|
|
|
|
10-12-2009
|
3.00
|
Cutting the canopy
|
|
|
|
10-11-2009
|
2.70
|
More canopy trimming
|
|
|
|
10-05-2009
|
3.00
|
Trimed canopy
|
|
|
|
10-04-2009
|
2.00
|
Trimed canopy
|
|
|
|
10-03-2009
|
3.30
|
Trimed canopy
|
|
|
|
10-01-2009
|
1.30
|
Trimed canopy
|
|
|
|
09-28-2009
|
4.00
|
Installed flexible brake lines on landing gear.
|
|
|
|
09-21-2009
|
3.00
|
Re installed cowl hinges and pins.
|
|
|
|
09-20-2009
|
2.00
|
Re installed cowl hinges and pins.
|
|
|
|
08-23-2009
|
3.10
|
Finished installing air seals.
|
|
|
|
08-17-2009
|
3.20
|
Finished installing oil door hinge.
|
|
|
|
08-16-2009
|
3.20
|
Finished tip fairingprep and installed
|
|
|
|
08-15-2009
|
2.70
|
Epoxy & rivet cowl hinges.
|
Details
|
|
|
08-14-2009
|
0.60
|
Epoxy & rivet cowl hinges.
|
Details
|
|
|
08-13-2009
|
2.00
|
Fabricated aluminum backing strips for tip fairing
|
Details
|
|
|
08-12-2009
|
1.80
|
Fabricated aluminum backing strips for tip fairing
|
|
|
|
08-11-2009
|
2.50
|
Expoxy & rivet cowl hinges.
|
|
|
|
08-09-2009
|
2.30
|
Expoxy & rivet cowl hinges.
|
|
|
|
08-08-2009
|
4.80
|
Preped & installed Wing tip aileron ribs.
|
|
|
|
08-07-2009
|
2.00
|
Preped cowl hinges
|
|
|
|
08-06-2009
|
2.50
|
Preped cowl hinges
|
|
|
|
06-10-2009
|
6.00
|
Continued wing tip prep.
|
Details
|
|
|
06-09-2009
|
4.00
|
Continued wing tip prep
|
|
|
|
06-08-2009
|
3.00
|
Preped tips for fiber glass trim & installation
|
|
|
|
06-04-2009
|
3.50
|
Re installed wing tanks on both wings.
|
|
|
|
06-03-2009
|
3.00
|
Completed Van's S/B tank mods.
|
Details
|
|
|
05-27-2009
|
6.00
|
More fuel tank prep.
|
Details
|
|
|
05-26-2009
|
8.00
|
Installed pitot tube.
|
Details
|
|
|
05-22-2009
|
4.00
|
Removed RH fuel tank
|
|
|
|
05-20-2009
|
4.00
|
Removed left fuel tank.
|
Details
|
|
|
05-19-2009
|
3.20
|
Fabricated left tank fuel return.
|
|
|
|
05-17-2009
|
4.50
|
Install strob light wiring in LH & RH wing.
|
Details
|
|
|
05-16-2009
|
2.00
|
Installed RH wing NACA vent for rear seat air.
|
Details
|
|
|
05-15-2009
|
4.00
|
Checked wing connections. Installed data plate.
|
Details
|
|
|
05-10-2009
|
4.00
|
Installed cockpit labels and battery.
|
|
|
|
05-09-2009
|
4.00
|
Reinstalled and timed ignitions
|
Details
|
|
|
04-18-2009
|
2.00
|
Installed mid cabin brace fasteners.
|
|
|
|
04-17-2009
|
3.50
|
Installed front seat back modification.
|
|
|
|
04-15-2009
|
2.40
|
Trimmed forward bag door. Installed Hall effect co
|
Details
|
|
|
04-14-2009
|
4.50
|
Installed front baggage shelf.
|
Details
|
|
|
04-13-2009
|
5.20
|
Installed rear bag comp, floors and seats
|
|
|
|
04-11-2009
|
1.50
|
Fit and installed lower firewall blanket& rudder p
|
|
|
|
04-10-2009
|
3.60
|
Began installation of firewall blanket. Placed N#.
|
Details
|
|
|
04-09-2009
|
1.40
|
Began firewall blanket fitting.
|
Details
|
|
|
04-06-2009
|
1.80
|
Finished fabricating front spar angle F-862 L&R
|
|
|
|
04-05-2009
|
2.00
|
Fabricate front spar angle F-862 L&R
|
|
|
|
04-04-2009
|
1.50
|
Fabricate front spar angle F-862 L&R
|
|
|
|
04-03-2009
|
1.50
|
Begin fabrication of F-862 L&R
|
|
|
|
04-02-2009
|
2.00
|
Reinstalled Garmin antenna BNC connectors.
|
Details
|
|
|
04-01-2009
|
2.00
|
Standby Mic jack pilot seat inop. Replaced wiring.
|
|
|
|
03-30-2009
|
2.50
|
Avionics hookup and test
|
|
|
|
03-29-2009
|
5.00
|
Reinstalled instrument panel.
|
|
|
|
03-27-2009
|
3.80
|
Forward baggag door lock adjustment.
|
Details
|
|
|
03-21-2009
|
3.00
|
Installed forward baggage door inner skin.
|
|
|
|
03-19-2009
|
1.90
|
Ajust and fitforward baggage door
|
|
|
|
03-18-2009
|
2.00
|
Forward baggage door fabrication & installation.
|
|
|
|
03-16-2009
|
2.00
|
Forward baggage door fabrication & installation.
|
|
|
|
03-15-2009
|
5.10
|
Forward baggage door fabrication & installation.
|
|
|
|
03-14-2009
|
1.50
|
Refit and assemble Forward baggage door.
|
|
|
|
03-12-2009
|
2.70
|
Refit and assemble Forward baggage door.
|
|
|
|
03-11-2009
|
5.30
|
Finished riveting foreskin.
|
Details
|
|
|
03-10-2009
|
4.00
|
Painted glareshield and mounted compass.
|
Details
|
|
|
03-09-2009
|
3.00
|
Modified oil can stringer
|
|
|
|
03-08-2009
|
3.90
|
Rived F-821PP innassembley
|
Details
|
|
|
03-07-2009
|
3.80
|
Began rivetinf F-821PP in assembley.
|
|
|
|
03-05-2009
|
5.80
|
Installed additional nutplates for the floor.
|
Details
|
|
|
03-04-2009
|
2.50
|
Fabricated instrument panel access door modificati
|
Details
|
|
|
03-03-2009
|
6.30
|
Fabricate and install baggfge door
|
|
|
|
03-02-2009
|
3.30
|
Fabricate and install baggfge door
|
|
|
|
03-01-2009
|
2.80
|
Fabricate and install baggfge door
|
|
|
|
02-28-2009
|
4.00
|
Install pitot line from panel to LH wing root.
|
Details
|
|
|
02-27-2009
|
2.00
|
Finish BNC connectors. Install compass lite pigtai
|
Details
|
|
|
02-26-2009
|
2.50
|
Install BNC connectors & Ant splitter,
|
|
|
|
02-24-2009
|
2.00
|
Install Stby A/S indicator
|
|
|
|
02-23-2009
|
3.80
|
Refitted floor panels and finished rear stick floo
|
|
|
|
02-22-2009
|
6.10
|
Install bushings for VOR coax.
|
Details
|
|
|
02-21-2009
|
2.90
|
Panel punched for Stby A/S indiccator.
|
Details
|
|
|
02-19-2009
|
3.20
|
Installed rear stick grip.
|
Details
|
|
|
02-14-2009
|
2.00
|
Installed rear scat tube and fresh air vent.
|
|
|
|
02-13-2009
|
3.00
|
Installed A/P Master switch and roll control arm.
|
|
|
|
02-11-2009
|
1.40
|
Installed backup set of headset jacks
|
|
|
|
02-10-2009
|
1.00
|
Installed backup set of headset jacks
|
|
|
|
02-09-2009
|
2.00
|
Installed backup headset jacks
|
|
|
|
02-04-2009
|
3.00
|
Final fitting of forreskin and wiring.
|
|
|
|
02-01-2009
|
3.00
|
Fit foreskin & removed instrument panel.
|
|
|
|
01-30-2009
|
2.00
|
Fabricated airseals for baffels.
|
Details
|
|
|
01-18-2009
|
2.00
|
Fabricated airseals for baffels
|
|
|
|
01-12-2009
|
4.70
|
Fabricated airseals for baffels
|
|
|
|
01-09-2009
|
2.00
|
Fabricated airseals for baffels
|
|
|
|
01-05-2009
|
2.00
|
Fabricated airseals for baffels
|
|
|
|
01-03-2009
|
4.00
|
Fabricated baffle modification for olil cooler.
|
|
|
|
01-02-2009
|
2.00
|
Applied RTV to engine baffles.
|
|
|
|
01-01-2009
|
2.00
|
Installed oil breather and timed ignition.
|
|
|
|
12-30-2008
|
2.20
|
Continued to tighten lines and hook up ignition.
|
|
|
|
12-28-2008
|
1.30
|
Tightened line with Tightseal.
|
|
|
|
12-27-2008
|
2.50
|
Fabricated plug leads, painted oil cap, tighten li
|
|
|
|
12-16-2008
|
1.50
|
Fabricated Firewall penitration.
|
|
|
|
12-15-2008
|
1.50
|
Safetywired lowewr engine baffles
|
|
|
|
12-14-2008
|
1.50
|
Safetywired lower cylinder baffles.
|
|
|
|
11-25-2008
|
0.70
|
Installed plug leads.
|
|
|
|
11-24-2008
|
2.60
|
Fabricated and installed plug leads.
|
|
|
|
11-23-2008
|
4.90
|
Reinstalled Fuel Pump.
|
Details
|
|
|
11-22-2008
|
3.50
|
Reposition Fuel Pump bracket.
|
|
|
|
11-16-2008
|
1.50
|
Canopy frame block installed.
|
|
|
|
11-15-2008
|
2.00
|
Flap position sensor installed.
|
|
|
|
11-13-2008
|
3.00
|
Elevator trim wiring and calibration.
|
|
|
|
11-12-2008
|
7.00
|
Installed Aileron.Elevator & flap sensor wiring.
|
Details
|
|
|
11-11-2008
|
4.30
|
Installed aileron trim.
|
Details
|
|
|
11-10-2008
|
5.00
|
EFIS & EIS programming
|
|
|
|
11-09-2008
|
4.00
|
EFIS & EIS programming
|
|
|
|
11-03-2008
|
3.50
|
EFIS & EIS programming
|
|
|
|
10-30-2008
|
5.00
|
Magnetometer alignment
|
|
|
|
10-29-2008
|
4.00
|
Fabricated & Installled RT radio rack brace.
|
Details
|
|
|
10-15-2008
|
2.00
|
Finished installing main bus to avionics bus diode
|
|
|
|
10-15-2008
|
1.50
|
Fabricated & Installed LT radio rack brace.
|
|
|
|
10-14-2008
|
1.50
|
Installed Lt inst panel attach bolt.
|
Details
|
|
|
09-28-2008
|
2.70
|
Canopy side rails and frame installation.
|
|
|
|
09-21-2008
|
1.80
|
Canopy side rails and frame installation.
|
|
|
|
09-20-2008
|
2.30
|
Canopy side rails and frame installation.
|
|
|
|
09-05-2008
|
4.00
|
Canopy side rails fabrication.
|
|
|
|
09-04-2008
|
4.30
|
Canopy side rail fabrication
|
|
|
|
09-03-2008
|
4.50
|
Canopy side rails fabrication.
|
|
|
|
09-01-2008
|
3.50
|
Finished installing switch panel
|
|
|
|
08-31-2008
|
6.00
|
Switch panel installed
|
|
|
|
08-30-2008
|
6.50
|
WD 814 installed. ESS/Avionics buss relay intalled
|
Details
|
|
|
08-24-2008
|
4.00
|
Forward NACA vent fresh air vent scat tube install
|
Details
|
|
|
08-24-2008
|
2.50
|
Aux fuel pump re assemble, Fuel valve re install.
|
|
|
|
08-23-2008
|
5.30
|
Fab fuel line for engine pump,.
|
Details
|
|
|
08-20-2008
|
5.20
|
More cowl fitting, changed out mixture cable.
|
|
|
|
08-19-2008
|
1.00
|
Installed firesleeve, mount Fuel flow transducer.
|
Details
|
|
|
08-18-2008
|
1.00
|
Fuel flow transducer mounted to firewall.
|
|
|
|
08-17-2008
|
4.30
|
Cowl & Oil cooler door fit.
|
|
|
|
08-16-2008
|
2.30
|
Engine cowl fit.
|
|
|
|
08-14-2008
|
5.70
|
Engine cowl fit.
|
|
|
|
08-10-2008
|
3.00
|
Cowl fit, replaced fuel valve fittings
|
Details
|
|
|
08-09-2008
|
2.00
|
Engine cowl fit
|
|
|
|
07-16-2008
|
2.40
|
Secure electrical wiring fore & aft of firewall -
|
|
|
|
07-15-2008
|
4.10
|
O/P, F/P, Hobbs transduces & switches.
|
Details
|
|
|
07-14-2008
|
4.00
|
Fabrication O/P, M/P line
|
|
|
|
07-12-2008
|
2.00
|
Fabricated M/P line from Cyl to Firewall.
|
|
|
|
07-05-2008
|
2.00
|
Replaced & rerouted alt air cable.
|
|
|
|
07-03-2008
|
2.00
|
Mounted & installed magnetometer in aft fuselage.
|
|
|
|
07-02-2008
|
2.00
|
Fabricated bracket for magnetometer.
|
|
|
|
06-30-2008
|
1.00
|
Rewired starter & removed solenoid strap.
|
|
|
|
06-29-2008
|
3.00
|
Finished installing Molex connectors on Switch pa
|
|
|
|
06-16-2008
|
3.30
|
Installed molex connectors for switch panel.
|
Details
|
|
|
06-15-2008
|
1.20
|
Installed molex connectors for switch panel.
|
|
|
|
06-14-2008
|
1.50
|
Installed molex connectors for switch panel.
|
|
|
|
06-13-2008
|
6.00
|
Installed molex connectors for switch panel.
|
|
|
|
06-11-2008
|
4.50
|
Installed molex connectors for switch panel.
|
|
|
|
06-09-2008
|
3.30
|
Installed molex connectors for switch panel.
|
|
|
|
06-08-2008
|
5.00
|
Installed molex connectors for switch panel.
|
|
|
|
06-06-2008
|
1.30
|
Installed molex connectors for switch panel.
|
|
|
|
06-05-2008
|
1.80
|
Installed molex connectors for switch panel.
|
|
|
|
05-17-2008
|
4.10
|
Installed avionics bus relay.
|
|
|
|
04-20-2008
|
2.00
|
Attached Throttle quad cables
|
|
|
|
04-18-2008
|
5.50
|
Installed eng control cable firewall carry through
|
Details
|
|
|
04-14-2008
|
2.80
|
Installed Alt Air & Cabin Heat cables.
|
|
|
|
04-13-2008
|
2.00
|
Removed old wires from switch panel.
|
Details
|
|
|
09-03-2007
|
2.00
|
Install switch panel Molex connectors
|
|
|
|
08-05-2007
|
2.00
|
Installed M/P attachments & UBS cables for EFIS
|
|
|
|
07-31-2007
|
3.30
|
Installed Stby Alt Kit.
|
Details
|
|
|
07-29-2007
|
4.00
|
Installed control quad cables
|
|
|
|
07-25-2007
|
2.00
|
Made connections for "Canopy Open" light
|
|
|
|
07-24-2007
|
2.50
|
Installed blast tubes for Atlternator & Mags.
|
Details
|
|
|
07-23-2007
|
3.00
|
Connected starter cable.
|
Details
|
|
|
07-21-2007
|
2.50
|
Made firewall penitrations.
|
Details
|
|
|
07-18-2007
|
3.00
|
Worked on switch panel anomolies.
|
|
|
|
07-17-2007
|
3.00
|
Cabled antennas
|
|
|
|
07-16-2007
|
3.00
|
Installed Com & Xponder antennas
|
|
|
|
07-02-2007
|
3.00
|
Switch panel wiring
|
|
|
|
07-01-2007
|
3.00
|
Reconnected front stick connections
|
|
|
|
06-29-2007
|
3.30
|
Remover rear stick grip.
|
Details
|
|
|
06-28-2007
|
3.30
|
Installed pitch servo & cable.
|
Details
|
|
|
06-27-2007
|
3.00
|
Shortened front control stick.
|
Details
|
|
|
04-08-2007
|
6.10
|
Panel wiring
|
|
|
|
04-07-2007
|
3.50
|
AHRS mounting bracket
|
|
|
|
04-06-2007
|
4.70
|
AHRS Mounting bracket
|
|
|
|
03-21-2007
|
3.50
|
Panel wiring
|
|
|
|
03-20-2007
|
4.00
|
Panel wiring
|
|
|
|
03-19-2007
|
2.00
|
Panel wiring
|
|
|
|
03-08-2007
|
2.70
|
Panel wiring
|
|
|
|
02-27-2007
|
7.10
|
EIS & Switch panel wiring.
|
|
|
|
02-26-2007
|
3.20
|
EIS wiring.
|
|
|
|
02-25-2007
|
3.90
|
Wire EIS to engine.
|
|
|
|
02-24-2007
|
4.00
|
Wire EIS to engine.
|
|
|
|
02-23-2007
|
2.00
|
Installed fuse links and start contactor.
|
|
|
|
02-22-2007
|
1.60
|
Measured and ordered quadrant control cables.
|
|
|
|
02-21-2007
|
2.20
|
Modified prop control bracket for fit.
|
|
|
|
02-20-2007
|
2.00
|
Wiring EIS to engine.
|
|
|
|
02-19-2007
|
2.50
|
Panel wiring
|
|
|
|
02-18-2007
|
1.00
|
Installed panel
|
|
|
|
02-17-2007
|
2.50
|
Reworked right rear baffle & installed oil dip sti
|
|
|
|
02-13-2007
|
2.00
|
Wired LH Pmag, install throttle bracket & Stby alt
|
|
|
|
02-11-2007
|
3.00
|
Install CYL & EGT probes, OT sensor & quick drain.
|
|
|
|
02-10-2007
|
3.00
|
Installed oil cooler fittings, alternator & mix br
|
|
|
|
02-09-2007
|
6.00
|
Baffle & snorkle installation completed.
|
|
|
|
02-08-2007
|
4.00
|
Baffle installation.
|
Details
|
|
|
02-07-2007
|
4.00
|
Baffle installation
|
|
|
|
02-06-2007
|
6.00
|
Blast tubes...
|
Details
|
|
|
01-13-2007
|
3.00
|
Oil cooler mount
|
|
|
|
01-12-2007
|
3.00
|
Oil cooler mount assembly
|
|
|
|
01-09-2007
|
5.70
|
Oil cooler mount assembly.
|
|
|
|
12-31-2006
|
5.50
|
Oil cooler mounting assembly.
|
|
|
|
12-29-2006
|
2.50
|
Snorkle installation
|
|
|
|
12-28-2006
|
2.00
|
Snorkle installation
|
|
|
|
12-24-2006
|
4.00
|
Snorkle fit & asembly.
|
|
|
|
12-20-2006
|
2.00
|
Assembled & mounted heat muff to exhaust.
|
|
|
|
12-15-2006
|
6.00
|
Trimmed & adjusted snorkle for assembly.
|
|
|
|
12-12-2006
|
3.00
|
Baffle assembly & rived cowl hinges to fuselage.
|
|
|
|
12-11-2006
|
4.50
|
Baffle installation
|
|
|
|
12-08-2006
|
2.00
|
Baffle installation
|
|
|
|
12-07-2006
|
3.00
|
Baffle installation
|
|
|
|
11-22-2006
|
1.80
|
Baffles installation
|
|
|
|
11-20-2006
|
3.80
|
Baffles
|
|
|
|
11-19-2006
|
4.30
|
Baffles
|
|
|
|
11-18-2006
|
3.50
|
Baffles
|
|
|
|
11-17-2006
|
2.70
|
Baffles
|
|
|
|
11-16-2006
|
4.60
|
Baffle assembly
|
Details
|
|
|
11-15-2006
|
4.40
|
Baffle assembly
|
|
|
|
11-14-2006
|
1.50
|
Baffle assembly
|
|
|
|
11-13-2006
|
3.50
|
Installed exhaust pipes & hangers.
|
|
|
|
11-12-2006
|
2.00
|
Installed intake pipes
|
|
|
|
11-11-2006
|
4.00
|
Installed cowl hinges
|
|
|
|
11-10-2006
|
2.70
|
Trimmed cowl
|
|
|
|
11-09-2006
|
4.30
|
Finished trimming cowl and installed rear hinges.
|
|
|
|
10-26-2006
|
5.90
|
Installed securing bolt for rear stick.
|
Details
|
|
|
10-23-2006
|
2.80
|
Finished cut and fit upper cowl.
|
|
|
|
10-22-2006
|
2.80
|
Fit top cowl to fuse.
|
|
|
|
10-20-2006
|
1.50
|
Fiberglass patch cowl
|
|
|
|
10-19-2006
|
3.30
|
Installed cowl hinges. Fixed mic jacks.
|
|
|
|
10-17-2006
|
5.60
|
Trim cowl front and bevel cowl hing.
|
|
|
|
10-16-2006
|
3.00
|
Removed Fuel Pump, refit fuel bulkhead fitting.
|
Details
|
|
|
10-15-2006
|
2.60
|
Fixed cutting mistake.
|
|
|
|
10-14-2006
|
4.10
|
Installed upper rear cowl hinge.
|
Details
|
|
|
10-12-2006
|
5.10
|
Stick Grip &TRBB termination
|
|
|
|
10-11-2006
|
3.90
|
Stick Grip & TRBB termination
|
|
|
|
10-10-2006
|
4.00
|
Stick Grip & TRBB termination
|
|
|
|
10-07-2006
|
0.50
|
Installed stick grips
|
|
|
|
10-03-2006
|
2.30
|
Hung Engine
|
|
|
|
10-01-2006
|
5.00
|
Installes Infinity stick grips.
|
|
|
|
09-17-2006
|
3.00
|
Terminate switch panel wires.
|
|
|
|
09-16-2006
|
4.80
|
Terminate switch panel wires.
|
|
|
|
09-15-2006
|
6.70
|
Terminate switch panel wirres
|
|
|
|
09-14-2006
|
4.30
|
Terminated switch panel wires
|
|
|
|
09-13-2006
|
3.80
|
Painted switch panel skirt.
|
Details
|
|
|
09-11-2006
|
5.30
|
Finished mounting switch panel.
|
|
|
|
09-10-2006
|
4.50
|
Finished mounting wheel farings.
|
Details
|
|
|
09-04-2006
|
5.00
|
Installed wheel farings.
|
|
|
|
08-26-2006
|
1.00
|
Pulled EMags off to reture to mfg for firmware upd
|
|
|
|
08-11-2006
|
3.50
|
More fuel lines and valve.
|
|
|
|
08-09-2006
|
0.80
|
Test fuel line install installation
|
|
|
|
07-08-2006
|
5.00
|
Install fuel lines and valve.
|
|
|
|
07-07-2006
|
2.50
|
Install fuel lines.
|
|
|
|
07-06-2006
|
0.50
|
Install fuel lines.
|
|
|
|
07-05-2006
|
1.50
|
Install fuel lines.
|
|
|
|
07-04-2006
|
4.50
|
Finished installing fuel vents.
|
Details
|
|
|
07-03-2006
|
5.60
|
Install fuel & vent lines
|
|
|
|
07-02-2006
|
2.30
|
Install fuel lines.
|
|
|
|
07-01-2006
|
9.50
|
Finish install gear leg fairings.
|
Details
|
|
|
06-29-2006
|
1.50
|
Install Gear leg fairings.
|
|
|
|
06-28-2006
|
2.60
|
Installed gear leg fairings.
|
|
|
|
06-27-2006
|
4.60
|
Installed brake lines,map lightsEngine mount washe
|
|
|
|
06-20-2006
|
3.50
|
Installed axels,wheel pant brackets, brakes wheels
|
Details
|
|
|
06-18-2006
|
5.00
|
Finished engine build up.
|
|
|
|
06-17-2006
|
10.00
|
Built up the engine in PHX with Robbie Attaway.
|
|
|
|
06-16-2006
|
2.00
|
Mounted tubes, tires and wheels
|
|
|
|
06-06-2006
|
3.80
|
Attached gear legs to Fuelage.
|
|
|
|
06-05-2006
|
1.20
|
Preped gear legs for assembly.
|
|
|
|
06-02-2006
|
4.90
|
Riveted Top aft skin.
|
|
|
|
05-30-2006
|
2.00
|
Ran grd for strob. ty wraped wie bundles.
|
Details
|
|
|
05-29-2006
|
3.00
|
Finished labeling & terminating G3 connectings.
|
|
|
|
05-28-2006
|
5.70
|
Mounted rear floor flood switch.
|
Details
|
|
|
05-27-2006
|
6.90
|
Terminate & mount dimmers.
|
Details
|
|
|
05-25-2006
|
3.80
|
Label & terminated wires
|
|
|
|
05-23-2006
|
4.00
|
Tech Counselor Bill Truax looked at Fuselage.
|
Details
|
|
|
05-22-2006
|
3.20
|
Finished installing Aileron trim.
|
Details
|
|
|
05-21-2006
|
4.60
|
Installed aileron trim.
|
|
|
|
05-19-2006
|
4.80
|
Riveted doubler to firewall for electrical compone
|
Details
|
|
|
05-18-2006
|
6.30
|
Fabricated firewall doubler for electrical compone
|
Details
|
|
|
05-15-2006
|
7.10
|
Wired electrical components.
|
|
|
|
05-13-2006
|
2.50
|
Riveted forward baggage bulkhead in place.
|
Details
|
|
|
05-12-2006
|
3.00
|
Started wiring electrical components.
|
|
|
|
05-11-2006
|
3.80
|
Plumed fuselage brake lines.
|
|
|
|
05-10-2006
|
6.20
|
Fuel valve installation fabricated.
|
Details
|
|
|
05-09-2006
|
3.10
|
Installed F-802N brace.
|
Details
|
|
|
05-08-2006
|
5.00
|
Installed buses & brace F-802N.
|
Details
|
|
|
05-07-2006
|
5.00
|
Fabricated Batt access in forward
|
Details
|
|
|
05-03-2006
|
3.00
|
Reinstalled static Safe1 static system.
|
Details
|
|
|
04-29-2006
|
4.50
|
Installed front NACA vent.
|
Details
|
|
|
04-28-2006
|
3.00
|
Drilled engine cable holes in F-802A.
|
Details
|
|
|
04-27-2006
|
1.00
|
Drilled Wd-814 windscreen support to fuselage.
|
Details
|
|
|
04-26-2006
|
2.70
|
Painted interior parts & fit F821
|
|
|
|
04-25-2006
|
2.00
|
Refit front 7 rear throttle Quads
|
|
|
|
04-23-2006
|
1.50
|
Installed Aux Fuel Pump & forward Bag comp.
|
|
|
|
04-21-2006
|
7.50
|
Installed pitch & roll servo brackets
|
|
|
|
03-08-2006
|
2.00
|
Front seat back Fab finish.
|
Details
|
|
|
03-08-2006
|
1.00
|
Debur, dimple & paint F-821
|
|
|
|
03-05-2006
|
1.00
|
Debur & Dimple F-821
|
|
|
|
03-04-2006
|
6.20
|
Aft wiring & Assemble front & rear seat backs.
|
|
|
|
03-03-2006
|
6.20
|
Installed aft wiring
|
|
|
|
03-02-2006
|
5.10
|
Seat backs preped for painting. wired strobs.
|
|
|
|
03-01-2006
|
1.30
|
Rear bay bottom stiffiner fabricated.
|
|
|
|
02-27-2006
|
2.20
|
Installed in assembly bushings for tail strob & po
|
|
|
|
02-25-2006
|
5.20
|
Installed ELT braket.
|
Details
|
|
|
02-24-2006
|
2.40
|
Fabricated ELT bracket.
|
|
|
|
02-23-2006
|
7.00
|
Rear Seat back Assembly, ELT Bracket
|
Details
|
|
|
02-14-2006
|
2.50
|
Rear seat back assembly.
|
|
|
|
02-13-2006
|
4.10
|
Assembled front seat back.
|
|
|
|
02-11-2006
|
2.40
|
Bolted/riveted to Fuse Wd808,F856,816,816B.
|
|
|
|
02-10-2006
|
3.40
|
Bolted/riveted to fuse, Wd808,F856,816, 816B.
|
|
|
|
02-02-2006
|
5.60
|
Fabricated F816Bs.
|
Details
|
|
|
02-01-2006
|
2.50
|
Fit & assemble rear throttle, Fabricate F-816Bs.
|
|
|
|
01-31-2006
|
3.30
|
Fit and assembled rear throttle.
|
|
|
|
01-24-2006
|
1.50
|
Fabricate switch template.
|
|
|
|
01-23-2006
|
3.10
|
Fit, drill and cleco in assembly F-816APP L&R side
|
Details
|
|
|
01-20-2006
|
1.80
|
Fit F-816APP side rails in assembley.
|
|
|
|
01-19-2006
|
2.50
|
Finished fastening FF-817L&R in place.
|
Details
|
|
|
12-23-2005
|
4.00
|
Back drilled F-821 at left WD-802 left side.
|
Details
|
|
|
12-22-2005
|
5.20
|
Drill and debur F-821.
|
|
|
|
12-21-2005
|
5.00
|
Riveted F845L&R, 846L&R and 848L&R in assembly.
|
Details
|
|
|
12-19-2005
|
5.50
|
Preped and assembled F803 instrument panel.
|
|
|
|
12-15-2005
|
3.50
|
Assembled F821BPPs to F-866BPP & F801PP.
|
Details
|
|
|
12-14-2005
|
1.50
|
Installed pitot static system in aft Fuselage.
|
Details
|
|
|
12-11-2005
|
6.50
|
Fab & installed rear throttle
|
Details
|
|
|
12-10-2005
|
5.10
|
Installed static system.
|
Details
|
|
|
11-30-2005
|
4.00
|
Reinstalled gear box hardware, F866A&B.
|
Details
|
|
|
11-21-2005
|
3.80
|
Finished gear box fasteners
|
Details
|
|
|
11-20-2005
|
1.20
|
Inst Panel access door assembly.
|
|
|
|
11-19-2005
|
5.00
|
Fabricated instrument panel access door.
|
|
|
|
11-17-2005
|
2.00
|
Installed F861 landing gear cover plates.
|
|
|
|
11-12-2005
|
7.00
|
Finish prep F867. Rivet F851s, 802k, 822.
|
|
|
|
11-11-2005
|
3.50
|
Finished drilled F867, preped, primed, riveted ass
|
|
|
|
11-10-2005
|
5.20
|
Installed front floor platenuts. Assembled F867 co
|
|
|
|
11-04-2005
|
0.80
|
Assembled F867, Cooling Ramp.
|
|
|
|
11-03-2005
|
7.50
|
Fab. Inst Access panel. riveted in assembleF802k,m
|
|
|
|
11-02-2005
|
4.00
|
Fabricate instrument panel access door. Fwd Bag.
|
|
|
|
10-27-2005
|
1.70
|
Debur, dimple F822,802K,M,836L&R.
|
|
|
|
10-26-2005
|
4.20
|
Cleco & drill F803K&M, 835L7R, 850, 851.
|
Details
|
|
|
10-25-2005
|
4.00
|
Finished gear alignment and drilled gear legs on.
|
|
|
|
10-24-2005
|
3.00
|
Gear leg alignment. Instrument panel door dblr.
|
|
|
|
10-01-2005
|
2.00
|
Drilled 7/16 hole in U804s & 806-1s. Bolted gear l
|
|
|
|
09-30-2005
|
4.10
|
Finished F825.
|
Details
|
|
|
09-29-2005
|
4.00
|
Finished deburing F825, Drilled F858's in assembly
|
|
|
|
09-28-2005
|
2.30
|
Fabricated F858L&R, Debured & dimpled F825PP.
|
|
|
|
09-27-2005
|
2.00
|
Finish drilled F825PP to assembly.
|
|
|
|
09-26-2005
|
3.30
|
Drilled F825PP to fuselage.
|
|
|
|
09-25-2005
|
3.50
|
Rudder stops installed, removed empenage, Riveted
|
|
|
|
09-20-2005
|
4.00
|
Rig rudder peddles, cables. Installed rear hardwar
|
|
|
|
09-18-2005
|
3.10
|
Rig elev, Mount V/S, rudder, cables & peddles.
|
|
|
|
08-12-2005
|
2.00
|
Elevator rigging and..
|
Details
|
|
|
07-24-2005
|
3.00
|
Elevator rigging
|
|
|
|
07-23-2005
|
2.30
|
Began elevator rigging...
|
|
|
|
07-20-2005
|
2.00
|
Mounted fuel pump....
|
Details
|
|
|
07-19-2005
|
4.00
|
Fabricated fuel pump platform.
|
|
|
|
07-06-2005
|
3.00
|
Fabricated, primed and assembled F-839..
|
Details
|
|
|
07-05-2005
|
4.50
|
Fabricated, preped, primed and installed
|
Details
|
|
|
06-30-2005
|
4.75
|
Drilled, rivetd and bolyted F-681 in ...
|
Details
|
|
|
06-29-2005
|
5.00
|
Aligned and drilled in assembly...
|
Details
|
|
|
06-16-2005
|
6.00
|
Drilled H/S to Fuse.. Installed hardware
|
|
|
|
06-15-2005
|
5.00
|
Leveled and aligned fuse and H/S
|
|
|
|
06-14-2005
|
4.00
|
Preped rudder peddle assmebly &
|
Details
|
|
|
05-31-2005
|
1.50
|
Preped rudder peddle angles...
|
Details
|
|
|
05-22-2005
|
2.20
|
Primed forwad seat ramp parts...
|
Details
|
|
|
05-21-2005
|
2.30
|
Fit, drilled, deburred forward...
|
Details
|
|
|
05-20-2005
|
2.70
|
Installed platenuts for midcabin covers.
|
|
|
|
05-14-2005
|
5.70
|
Primed and re installed RH mid cabin...
|
Details
|
|
|
05-13-2005
|
7.20
|
Installed RH mid cabin brace...
|
Details
|
|
|
05-12-2005
|
2.30
|
Installed WD 813 weldments
|
|
|
|
05-11-2005
|
1.60
|
Finished riveting F-802Cs
|
|
|
|
05-10-2005
|
2.60
|
WD 813s drilled in place...
|
Details
|
|
|
05-05-2005
|
1.80
|
Mounted platenuts on F865 brackets.
|
|
|
|
05-02-2005
|
2.50
|
Started fabrication of new F-864PP....
|
Details
|
|
|
05-01-2005
|
7.00
|
Finished mounting plantenuts for...
|
Details
|
|
|
04-30-2005
|
2.00
|
Drilled deburred & clecoed platenuts...
|
Details
|
|
|
04-29-2005
|
6.00
|
Drilled & Clecoed F-834&835 in assembly.
|
Details
|
|
|
04-28-2005
|
2.00
|
Cut & fit rear bag shelf F834 & 835....
|
Details
|
|
|
04-27-2005
|
1.00
|
Drilled and clecoed F804NPP MainSpar....
|
Details
|
|
|
04-26-2005
|
5.00
|
Drilled, deburred,dimpled,primed...
|
Details
|
|
|
04-25-2005
|
1.80
|
Install fwd baggage comp platenutes.
|
Details
|
|
|
04-24-2005
|
2.50
|
Assembly of fws baggage compartment
|
Details
|
|
|
04-23-2005
|
0.50
|
Riveted upper flap actuator doubler.
|
|
|
|
04-10-2005
|
3.50
|
Fab upper flap actuator doubler
|
Details
|
|
|
04-02-2005
|
2.50
|
Fabricated wood temp floor panels
|
|
|
|
03-11-2005
|
2.00
|
Glassed in plate nut strips in Rt tip
|
|
|
|
03-05-2005
|
1.50
|
Installed right pos/strobe & lens
|
|
|
|
02-26-2005
|
2.50
|
Installed left pos/strobe & lens.
|
|
|
|
02-25-2005
|
2.80
|
Rough cut tip lenses...
|
Details
|
|
|
02-22-2005
|
3.00
|
Preped wing tips for assembly
|
Details
|
|
|
02-20-2005
|
1.20
|
Preped wing tips for assembly
|
Details
|
|
|
02-11-2005
|
1.50
|
Fab rt wing tip pos light platenut assem
|
|
|
|
02-10-2005
|
3.80
|
Fab nutplate strips for wing tips, L&R.
|
Details
|
|
|
02-09-2005
|
3.50
|
Trimmed and fit both wing tips
|
Details
|
|
|
02-03-2005
|
2.50
|
Drilled wing skins to accept tips
|
|
|
|
02-02-2005
|
4.00
|
Mounted control surfaces and push rods
|
Details
|
|
|
01-14-2005
|
2.60
|
Drill F864 in assembly.
|
|
|
|
11-24-2004
|
2.00
|
Riveted Aft deck F819.
|
Details
|
|
|
11-10-2004
|
4.00
|
Drilled F866 ABC in assembly
|
Details
|
|
|
11-09-2004
|
3.30
|
Rivet arm rests. Install F837 plate nuts
|
|
|
|
11-08-2004
|
5.30
|
Fit and checked flap actator mech.
|
Details
|
|
|
10-21-2004
|
1.80
|
Fit and drilled inside side panels
|
|
|
|
10-19-2004
|
6.10
|
Mount F837.
|
Details
|
|
|
10-18-2004
|
7.20
|
Fab battery box mounting bracket.
|
Details
|
|
|
10-17-2004
|
7.60
|
Finish installing floor plate nuts.
|
Details
|
|
|
10-16-2004
|
3.20
|
Prep and install floor plate nuts.
|
|
|
|
10-15-2004
|
3.00
|
Fab F833D-R hinge.
|
Details
|
|
|
10-14-2004
|
3.50
|
Drilled floors and footwells to fuse.
|
Details
|
|
|
10-07-2004
|
4.00
|
Preded floors and riveted stiffners.
|
|
|
|
10-06-2004
|
3.80
|
Finished rear seat foot wells.
|
|
|
|
10-05-2004
|
2.30
|
|
Details
|
|
|
10-04-2004
|
2.60
|
Preped & riveted 810C&D,811L, 865 to 807
|
Details
|
|
|
10-02-2004
|
2.20
|
Drilled stiffners and hing to F829.
|
Details
|
|
|
10-01-2004
|
5.20
|
Fabricate F805 B L&R, C, F L&R
|
Details
|
|
|
09-30-2004
|
3.60
|
Rivet F820L.
|
Details
|
|
|
09-29-2004
|
5.30
|
Rivet F820R & Gear Box. F802A&B (L&R)
|
Details
|
|
|
09-28-2004
|
3.30
|
Fabricate F810C,811C,812B.
|
Details
|
|
|
09-27-2004
|
4.60
|
Riveted left gear box in assmbly
|
|
|
|
09-25-2004
|
0.50
|
Clecoed gear boxes to F820 L&R
|
|
|
|
09-24-2004
|
12.00
|
Rivet F822, 823 L&R, 824, 826 & 827
|
|
|
|
09-18-2004
|
3.40
|
Installed keeper rivetd on F844 L&R.
|
Details
|
|
|
09-17-2004
|
2.50
|
Pro sealed F822 to firewall flange
|
|
|
|
09-15-2004
|
1.40
|
Prime & prep F826, 827
|
Details
|
|
|
09-10-2004
|
2.00
|
Prep F822, 826, 827 for riveting
|
|
|
|
09-09-2004
|
3.40
|
Rivet F823L&R
|
|
|
|
09-08-2004
|
3.10
|
Rivet F 823L&R
|
|
|
|
09-07-2004
|
4.00
|
Prep F805LR, 806LR, 806LR for riveting
|
|
|
|
09-02-2004
|
0.60
|
Prep F-823L
|
|
|
|
09-01-2004
|
13.90
|
Finish rivet F824's L&R. Prep F823 L&R
|
Details
|
|
|
08-27-2004
|
2.20
|
Rivet F824 L
|
|
|
|
08-26-2004
|
3.50
|
Rivet F828 842. Cleco F824 L
|
|
|
|
08-20-2004
|
8.40
|
Riveted skins F828 & F842 to fuse.
|
|
|
|
08-07-2004
|
3.30
|
F824 L&R preped & primed, rolled edges
|
|
|
|
07-30-2004
|
1.50
|
F842 preded & primed
|
|
|
|
07-15-2004
|
2.30
|
WD409 nuts (AN365) torqued to 235 in #s
|
Details
|
|
|
07-13-2004
|
3.20
|
Fuse rivet prep
|
|
|
|
07-09-2004
|
2.10
|
Riveted F818L&R in place.
|
Details
|
|
|
07-08-2004
|
3.00
|
Deburr, Dimple F824PPL & F842PP
|
|
|
|
07-07-2004
|
3.20
|
Debur, dimple F824ppl & F842pp
|
|
|
|
06-19-2004
|
2.00
|
Deburr, Dimple, countersink
|
Details
|
|
|
06-18-2004
|
3.70
|
Deburr F-824L
|
|
|
|
05-28-2004
|
4.10
|
Dimpling & Deburring
|
Details
|
|
|
04-27-2004
|
1.00
|
Deburr F822PPL & Stringers
|
|
|
|
03-17-2004
|
1.60
|
Finished drilled, dimple, deburr F823PP
|
|
|
|
03-16-2004
|
5.80
|
Drill, Deburr, Dimple F822pp and F826pp
|
Details
|
|
|
03-14-2004
|
3.70
|
RH Ger tower and skin prep
|
|
|
|
03-13-2004
|
5.30
|
Primed LH skins and tower parts.
|
Details
|
|
|
03-12-2004
|
4.60
|
Left landing gear sub assemblies prep
|
Details
|
|
|
11-04-2003
|
0.60
|
Gear Towers R&R G L&R brackets.
|
|
|
|
11-03-2003
|
3.40
|
Gear towers. R&R G L&R brackets
|
|
|
|
10-26-2003
|
4.40
|
Remove and Replace WD822 L&R
|
|
|
|
10-25-2003
|
6.30
|
Fit Gear towers.
|
Details
|
|
|
10-20-2003
|
2.60
|
F802 assmeble
|
|
|
|
10-19-2003
|
5.20
|
Install and drill in assembly F 802
|
Details
|
|
|
10-18-2003
|
6.30
|
Preped and primed F802 ABCEF
|
Details
|
|
|
10-17-2003
|
4.80
|
Finished drilling in assembly F802 ABC
|
Details
|
|
|
06-02-2003
|
2.90
|
Remake F802 G rt
|
|
|
|
05-20-2003
|
3.30
|
F802 A,B,C, E,F Assembly
|
|
|
|
05-12-2003
|
3.00
|
F802 E,F,G,H
|
Details
|
|
|
05-11-2003
|
3.70
|
F802 E,F, G,H
|
Details
|
|
|
05-08-2003
|
3.80
|
Drilled in assembly F802 left. A,B,C,E,F
|
|
|
|
05-07-2003
|
4.80
|
F802G & WD822L
|
Details
|
|
|
04-30-2003
|
1.70
|
F802S - R
|
Details
|
|
|
04-24-2003
|
3.60
|
F802A,B,C,E,F
|
Details
|
|
|
04-23-2003
|
4.30
|
F802D&S
|
Details
|
|
|
04-22-2003
|
6.75
|
Drilled skins
|
Details
|
|
|
04-21-2003
|
2.00
|
Drilled F826 and F827 skins
|
|
|
|
11-03-2002
|
1.50
|
Drilled F826 and F827 skins to assembly
|
|
|
|
11-02-2002
|
6.50
|
Longerons, Seat brackets, Drilling
|
Details
|
|
|
10-27-2002
|
7.60
|
Seat brackets & Skins
|
Details
|
|
|
10-26-2002
|
5.70
|
Side skin & seat belt anchor
|
Details
|
|
|
10-25-2002
|
2.00
|
Skins & longeron
|
Details
|
|
|
10-24-2002
|
2.00
|
Bulkheads
|
Details
|
|
|
10-23-2002
|
5.60
|
Skins & bulkheads
|
Details
|
|
|
10-22-2002
|
5.80
|
Fuse skins
|
Details
|
|
|
10-21-2002
|
7.00
|
Drilled skins to assembly
|
Details
|
|
|
10-19-2002
|
1.50
|
Longerons and skins
|
Details
|
|
|
10-18-2002
|
5.90
|
Tail spring mount, Longerons
|
Details
|
|
|
10-17-2002
|
5.10
|
Floor skeleton
|
Details
|
|
|
10-16-2002
|
4.40
|
Floor skeleton
|
Details
|
|
|
10-15-2002
|
2.40
|
Longerons
|
Details
|
|
|
10-14-2002
|
2.60
|
Cockpit floor area
|
Details
|
|
|
10-13-2002
|
5.50
|
Cockpit floor area
|
Details
|
|
|
10-11-2002
|
2.50
|
Cockpit floor area
|
Details
|
|
|
10-10-2002
|
6.30
|
Cockpit floor area
|
Details
|
|
|
10-06-2002
|
4.30
|
Cockpit floor area
|
Details
|
|
|
10-05-2002
|
8.50
|
Cockpit floor area
|
Details
|
|
|
10-04-2002
|
3.00
|
Cockpit floor area
|
Details
|
|
|
10-03-2002
|
2.40
|
Cockpit floor area
|
Details
|
|
|
10-02-2002
|
3.20
|
Cockpit floora area
|
Details
|
|
|
09-30-2002
|
5.70
|
Cockpit floor area
|
Details
|
|
|
09-29-2002
|
3.50
|
Cockpit floor area
|
Details
|
|
|
09-28-2002
|
1.70
|
Cockpit floor area
|
Details
|
|
|
09-27-2002
|
2.70
|
Cockpit floor area
|
Details
|
|
|
09-25-2002
|
2.60
|
Cockpit floor area
|
Details
|
|
|
09-24-2002
|
1.00
|
Cockpit floor area
|
Details
|
|
|
09-23-2002
|
4.00
|
Cockpit floor area
|
Details
|
|
|
09-22-2002
|
5.20
|
Cockpit floor area
|
Details
|
|
|
02-17-2000
|
2.70
|
Cockpit floor area
|
Details
|
|
|
02-16-2000
|
1.40
|
Cockpit floor area
|
Details
|
|
|
02-09-2000
|
5.70
|
Cockpit floor area
|
Details
|
|
|
02-01-2000
|
3.70
|
Bulkhead assembly
|
Details
|
|
|
01-31-2000
|
4.00
|
Bulkhead prep
|
Details
|
|
|
01-30-2000
|
4.20
|
Bulkhead prep
|
Details
|
|
|
01-25-2000
|
4.50
|
Firewall components
|
Details
|
|
|
01-23-2000
|
4.50
|
Firewall
|
Details
|
|
|
01-17-2000
|
3.60
|
F-801 and components
|
Details
|
|
|
01-16-2000
|
2.20
|
Fuselage jig
|
Details
|
|
|
01-15-2000
|
6.60
|
Inventory
|
Details
|
|
|
01-14-2000
|
8.00
|
Unpacked fuselage kit
|
Details
|
|
|
01-13-2000
|
5.00
|
Landing light lenses
|
Details
|
|
|
01-12-2000
|
6.00
|
Wing tanks
|
Details
|
|
|
01-11-2000
|
3.70
|
Pitot tube
|
Details
|
|
|
01-10-2000
|
5.00
|
Nut plates
|
Details
|
|
|
01-07-2000
|
1.40
|
Wing flap hinges
|
Details
|
|
|
01-06-2000
|
11.30
|
LH bottom wing skin
|
Details
|
|
|
01-05-2000
|
9.60
|
LH bottom wing skins
|
Details
|
|
|
01-04-2000
|
2.80
|
Wing skins
|
Details
|
|
|
01-03-2000
|
2.30
|
RH ribs
|
Details
|
|
|
01-02-2000
|
2.50
|
RH bottom skins
|
Details
|
|
|
01-01-2000
|
4.80
|
Bottom skins
|
Details
|
|
|
12-23-1999
|
0.30
|
Bottom skins
|
Details
|
|
|
12-20-1999
|
2.70
|
Bottom skins
|
Details
|
|
|
12-19-1999
|
4.30
|
Cleared items
|
Details
|
|
|
12-17-1999
|
2.00
|
Tech inspection
|
Details
|
|
|
11-25-1999
|
0.50
|
Wing tip prep
|
Details
|
|
|
11-21-1999
|
7.00
|
Push rods
|
Details
|
|
|
11-20-1999
|
3.30
|
RH Flap seal
|
Details
|
|
|
11-19-1999
|
4.90
|
RH Flap
|
Details
|
|
|
11-12-1999
|
3.50
|
RH aileron
|
Details
|
|
|
11-11-1999
|
3.30
|
Leak test
|
Details
|
|
|
11-04-1999
|
4.00
|
LH aileron gap seal
|
Details
|
|
|
11-03-1999
|
6.50
|
LH Flap
|
Details
|
|
|
10-31-1999
|
2.00
|
LH Flap
|
Details
|
|
|
10-30-1999
|
4.70
|
Aileron push rod
|
Details
|
|
|
10-29-1999
|
4.00
|
LH Aileron
|
Details
|
|
|
10-24-1999
|
4.50
|
LH Flap brace
|
Details
|
|
|
10-23-1999
|
2.10
|
LH aileron hinges
|
Details
|
|
|
10-22-1999
|
8.30
|
RH Flap
|
Details
|
|
|
10-21-1999
|
4.50
|
LH Flap assembly
|
Details
|
|
|
10-20-1999
|
3.30
|
LH flap bracket
|
Details
|
|
|
10-06-1999
|
5.30
|
RH wings skins
|
Details
|
|
|
10-05-1999
|
5.30
|
Fuel tank mounting
|
Details
|
|
|
10-04-1999
|
5.60
|
LH Wing skins
|
Details
|
|
|
10-03-1999
|
9.00
|
Leading edges to wing
|
Details
|
|
|
10-02-1999
|
2.00
|
Leading edge attachment
|
Details
|
|
|
10-01-1999
|
2.10
|
Top wing skins
|
Details
|
|
|
09-30-1999
|
8.00
|
Flap prep
|
Details
|
|
|
09-29-1999
|
6.60
|
Flap prep
|
Details
|
|
|
09-28-1999
|
6.70
|
Flap control bracket
|
Details
|
|
|
09-27-1999
|
5.80
|
LH Flap
|
Details
|
|
|
09-26-1999
|
8.70
|
RH Tank baffle
|
Details
|
|
|
09-25-1999
|
6.10
|
LH Aileron assembly
|
Details
|
|
|
09-24-1999
|
6.00
|
RH Aileron assembly
|
Details
|
|
|
09-23-1999
|
2.00
|
RH Aileron
|
Details
|
|
|
09-02-1999
|
1.50
|
Aileron prep
|
Details
|
|
|
09-02-1999
|
2.80
|
Aileron prep
|
Details
|
|
|
09-01-1999
|
2.30
|
Aileron Prep
|
Details
|
|
|
08-28-1999
|
5.50
|
LH wing tank
|
Details
|
|
|
08-27-1999
|
6.80
|
Aileron stiffners
|
Details
|
|
|
08-26-1999
|
2.00
|
Ailerons prep
|
Details
|
|
|
08-25-1999
|
1.50
|
Ailerons prep
|
Details
|
|
|
08-24-1999
|
7.00
|
LH aileron prep
|
Details
|
|
|
08-16-1999
|
2.50
|
LH Tank
|
Details
|
|
|
08-15-1999
|
8.50
|
RH Tank
|
Details
|
|
|
08-14-1999
|
3.00
|
RH Tank Prep
|
Details
|
|
|
07-20-1999
|
1.50
|
LH Tank baffel
|
Details
|
|
|
07-15-1999
|
5.40
|
LH Tank
|
Details
|
|
|
07-14-1999
|
2.50
|
LH Tank
|
Details
|
|
|
07-07-1999
|
5.10
|
LH tank seal
|
Details
|
|
|
12-13-1998
|
2.00
|
LH tank prep
|
Details
|
|
|
12-12-1998
|
3.70
|
LH tank prep
|
Details
|
|
|
12-06-1998
|
1.80
|
RH tank prep
|
Details
|
|
|
12-05-1998
|
5.30
|
Fuel vents
|
Details
|
|
|
12-04-1998
|
3.30
|
Fuel vents
|
Details
|
|
|
11-29-1998
|
3.40
|
Proseal prep
|
Details
|
|
|
11-28-1998
|
1.80
|
Fuel cap assembly
|
Details
|
|
|
11-22-1998
|
2.70
|
Tank stiffners
|
Details
|
|
|
11-21-1998
|
2.30
|
Vent lines
|
Details
|
|
|
11-19-1998
|
2.40
|
Fuel pick ups
|
Details
|
|
|
11-18-1998
|
1.30
|
RH fuel sender
|
Details
|
|
|
11-14-1998
|
5.90
|
RH tank
|
Details
|
|
|
11-13-1998
|
2.70
|
RH wink tank
|
Details
|
|
|
11-07-1998
|
1.60
|
RH tank shin
|
Details
|
|
|
11-06-1998
|
1.90
|
RH nose ribs
|
Details
|
|
|
11-05-1998
|
2.30
|
RH tank skin
|
Details
|
|
|
11-04-1998
|
6.80
|
Stiffners debur and dimple
|
Details
|
|
|
11-03-1998
|
4.30
|
T-410 doublers
|
Details
|
|
|
11-02-1998
|
2.30
|
Wing attachangle
|
Details
|
|
|
11-01-1998
|
6.70
|
LH skin stiffners
|
Details
|
|
|
10-31-1998
|
2.00
|
Tank stiffners
|
Details
|
|
|
10-30-1998
|
5.20
|
Tank stiffners
|
Details
|
|
|
10-29-1998
|
6.20
|
Tank skin
|
Details
|
|
|
10-28-1998
|
2.10
|
Tank skin
|
Details
|
|
|
10-12-1998
|
4.00
|
Tank baffles
|
Details
|
|
|
10-07-1998
|
4.80
|
Tank baffles
|
Details
|
|
|
10-06-1998
|
5.00
|
Tank baffles
|
Details
|
|
|
09-21-1998
|
1.30
|
Tank baffles
|
Details
|
|
|
09-13-1998
|
5.90
|
LH and RH tank baffels
|
Details
|
|
|
09-12-1998
|
1.70
|
Nutplates, Z brackets
|
Details
|
|
|
09-09-1998
|
0.60
|
Nutplates
|
Details
|
|
|
09-08-1998
|
5.40
|
Landing light
|
Details
|
|
|
09-07-1998
|
7.20
|
Landing light
|
Details
|
|
|
09-06-1998
|
4.90
|
R&R main rib
|
Details
|
|
|
09-01-1998
|
1.70
|
LE skin
|
Details
|
|
|
08-30-1998
|
7.70
|
Leading edges
|
Details
|
|
|
08-29-1998
|
2.00
|
RH leading edge skin
|
Details
|
|
|
08-25-1998
|
2.40
|
Dimple skins
|
Details
|
|
|
08-24-1998
|
2.40
|
Skins
|
Details
|
|
|
08-21-1998
|
3.80
|
Skins and ribs
|
Details
|
|
|
08-20-1998
|
7.10
|
Wing skins and ribs
|
Details
|
|
|
08-19-1998
|
4.90
|
Rib flanges
|
Details
|
|
|
08-18-1998
|
6.60
|
LH wing skins
|
Details
|
|
|
08-13-1998
|
2.10
|
Lower wing skins
|
Details
|
|
|
08-12-1998
|
4.30
|
Wing skins
|
Details
|
|
|
08-11-1998
|
1.00
|
Wing skins
|
Details
|
|
|
07-30-1998
|
1.30
|
Main ribs
|
Details
|
|
|
07-29-1998
|
6.90
|
Wing leading edge
|
Details
|
|
|
07-28-1998
|
5.90
|
Leading edge skins
|
Details
|
|
|
07-21-1998
|
6.50
|
Wing skins
|
Details
|
|
|
07-20-1998
|
5.50
|
Leveled wig skeletons
|
Details
|
|
|
07-15-1998
|
7.00
|
Aileron bellcranks
|
Details
|
|
|
07-14-1998
|
3.00
|
Changed out ribs
|
Details
|
|
|
07-13-1998
|
2.00
|
Finished second wing jig
|
Details
|
|
|
07-08-1998
|
5.00
|
Second wing jig
|
Details
|
|
|
07-07-1998
|
4.50
|
Assembled ribs and spars
|
Details
|
|
|
07-06-1998
|
4.80
|
Rib holes for conduit
|
Details
|
|
|
07-01-1998
|
3.80
|
Tip plugs
|
Details
|
|
|
06-30-1998
|
3.20
|
Rear spar
|
Details
|
|
|
06-29-1998
|
3.00
|
Prime
|
Details
|
|
|
06-28-1998
|
2.40
|
Spars
|
Details
|
|
|
06-26-1998
|
1.20
|
Nose ribs
|
Details
|
|
|
06-25-1998
|
7.30
|
Ribs, Front & Rear spars
|
Details
|
|
|
06-21-1998
|
4.00
|
Tank rib, Tie down
|
Details
|
|
|
06-20-1998
|
1.50
|
Tank vents
|
Details
|
|
|
06-11-1998
|
2.80
|
Wing spar & ribs
|
Details
|
|
|
05-28-1998
|
1.00
|
Pitot tube
|
Details
|
|
|
05-27-1998
|
5.20
|
Rib prep.Tie down brackets fabricated.
|
|
|
|
05-22-1998
|
2.00
|
Rib prep
|
|
|
|
05-07-1998
|
4.50
|
Rib prep
|
Details
|
|
|
05-06-1998
|
3.30
|
Rib prep
|
Details
|
|
|
05-05-1998
|
1.50
|
Rib prep
|
Details
|
|
|
05-02-1998
|
2.30
|
Rib prep
|
Details
|
|
|
05-01-1998
|
3.50
|
Spar, Rib prep
|
Details
|
|
|
04-15-1998
|
3.30
|
Spar prep
|
Details
|
|
|
04-05-1998
|
5.20
|
Spar prep
|
Details
|
|
|
04-04-1998
|
5.00
|
Inventory wing kit
|
Details
|
|
|
03-13-1998
|
2.50
|
Tips
|
Details
|
|
|
03-03-1998
|
2.50
|
RH elevator
|
Details
|
|
|
03-02-1998
|
6.50
|
LH elev leading edge
|
Details
|
|
|
03-01-1998
|
4.30
|
Trim tab
|
Details
|
|
|
02-24-1998
|
7.80
|
Servo cover plate
|
Details
|
|
|
02-23-1998
|
9.70
|
Elevator skeleton
|
Details
|
|
|
02-22-1998
|
1.50
|
Elevaror leading edge
|
Details
|
|
|
02-19-1998
|
2.50
|
Elevator skin rivit
|
Details
|
|
|
02-18-1998
|
4.30
|
Rudder leading edge
|
Details
|
|
|
02-18-1998
|
4.00
|
Elevator skin
|
Details
|
|
|
02-17-1998
|
2.20
|
Rudder bracket
|
Details
|
|
|
02-16-1998
|
7.70
|
Rudder skin
|
Details
|
|
|
02-12-1998
|
7.80
|
VS skin
|
Details
|
|
|
02-11-1998
|
7.50
|
HS skins
|
Details
|
|
|
02-10-1998
|
8.80
|
Stiffners
|
Details
|
|
|
02-09-1998
|
6.90
|
Rivit stiffners
|
Details
|
|
|
02-07-1998
|
3.00
|
Stiffners
|
Details
|
|
|
02-05-1998
|
5.30
|
Priming
|
Details
|
|
|
02-03-1998
|
3.80
|
Trim servo
|
Details
|
|
|
01-29-1998
|
2.90
|
Elevator stiffners
|
Details
|
|
|
01-27-1998
|
3.20
|
HS ribs
|
Details
|
|
|
01-22-1998
|
7.10
|
Elevator assembly
|
Details
|
|
|
01-21-1998
|
8.00
|
VS skin
|
Details
|
|
|
01-20-1998
|
2.50
|
VS assembly
|
Details
|
|
|
01-16-1998
|
6.90
|
Rudder assembly
|
Details
|
|
|
01-15-1998
|
6.30
|
Rudder aasembly
|
Details
|
|
|
01-14-1998
|
7.30
|
Rudder stiffners
|
Details
|
|
|
01-13-1998
|
2.70
|
VS skins
|
Details
|
|
|
01-06-1998
|
3.70
|
VS assembly
|
Details
|
|
|
12-30-1997
|
3.00
|
Rear HS spar nut
|
Details
|
|
|
12-29-1997
|
3.00
|
Tech inspection
|
Details
|
|
|
12-22-1997
|
4.20
|
VS assembly
|
Details
|
|
|
12-21-1997
|
2.00
|
VS assembly
|
Details
|
|
|
12-18-1997
|
4.40
|
Rear spar
|
Details
|
|
|
12-17-1997
|
5.70
|
Spars
|
Details
|
|
|
12-16-1997
|
2.20
|
Replaced HS rib 404
|
Details
|
|
|
12-02-1997
|
4.70
|
HS components
|
Details
|
|
|
12-01-1997
|
2.50
|
HS skins
|
Details
|
|
|
11-24-1997
|
5.10
|
HS skins
|
Details
|
|
|
11-23-1997
|
2.40
|
HS skins
|
Details
|
|
|
11-04-1997
|
6.00
|
Ribs, spars
|
Details
|
|
|
11-03-1997
|
5.20
|
Spars
|
Details
|
|
|
10-30-1997
|
6.30
|
Spar alignment
|
Details
|
|
|
10-29-1997
|
2.00
|
HS jig brackets
|
Details
|
|
|
10-21-1997
|
4.40
|
HS assemblies
|
Details
|
|
|
10-20-1997
|
1.30
|
Prepared HS assemblies
|
Details
|
|
|
10-19-1997
|
1.30
|
HS assemblies
|
Details
|
|
|
10-17-1997
|
2.30
|
HS assemblies
|
Details
|
|
|
10-16-1997
|
6.50
|
HS assembly
|
Details
|
|
|
10-15-1997
|
5.90
|
Spar channels
|
Details
|
|
|
10-13-1997
|
1.50
|
Splice angle
|
Details
|
|
|
10-12-1997
|
1.00
|
Hinge brackets
|
Details
|
|
|
10-11-1997
|
7.80
|
Rear spar components
|
Details
|
|
|
10-10-1997
|
2.50
|
Drilling assemblies
|
Details
|
|
|
10-09-1997
|
4.20
|
Flange strips
|
Details
|
|
|
10-07-1997
|
2.50
|
Finished edges
|
Details
|
|
|
10-06-1997
|
2.50
|
Drilled skins to spar
|
Details
|
|
|
10-05-1997
|
3.50
|
Hand brake and C frame tool,rear spar
|
Details
|
|
|
10-01-1997
|
4.00
|
Inventroy
|
Details
|
|
|
09-28-1997
|
1.00
|
Jig construction
|
Details
|
|
|
09-27-1997
|
3.00
|
Jig construction
|
Details
|
|
|
09-25-1997
|
2.50
|
Jig construction
|
Details
|
|