Date
|
Hours
|
Work Log Summary
|
Details
|
01-08-2011
|
112.90
|
completed panel and started wiring
|
Details
|
|
|
12-13-2010
|
22.90
|
Hooked up rudder and redid. Under seat lines
|
Details
|
|
|
12-06-2010
|
41.20
|
finished and tensioned el cables, panel, rudder li
|
Details
|
|
|
11-22-2010
|
27.50
|
Connect and rig flaperons
|
Details
|
|
|
11-15-2010
|
23.80
|
Attached flaperons. Gas lines.
|
Details
|
|
|
11-06-2010
|
30.70
|
Installed brake lines, wired nav lights
|
Details
|
|
|
10-29-2010
|
28.10
|
Wiring, top wing panel, fuel lines, elevator contr
|
Details
|
|
|
10-25-2010
|
37.60
|
Installed elevator, wiring, gas lines, elevator ca
|
Details
|
|
|
10-11-2010
|
24.20
|
Ran fuel lines, wiring hung elevator
|
Details
|
|
|
10-04-2010
|
56.50
|
Elevator, Wing Panels, Fuselage Stiffner
|
Details
|
|
|
09-20-2010
|
50.50
|
Install horizontal stabilizer; build map box
|
Details
|
|
|
08-24-2010
|
33.10
|
Jury Struts
|
Details
|
|
|
08-09-2010
|
41.90
|
Bolt on wings and slats
|
Details
|
|
|
08-07-2010
|
62.90
|
Attached Wings
|
Details
|
|
|
07-26-2010
|
42.30
|
Finish left wing. Work on struts
|
Details
|
|
|
07-18-2010
|
17.40
|
Deburr and treat left wing. Rivet to complete
|
Details
|
|
|
07-14-2010
|
49.30
|
Build left wing
|
Details
|
|
|
05-31-2010
|
19.60
|
Finished R wing. Started L wing
|
Details
|
|
|
05-25-2010
|
10.00
|
Build a stand for the wings
|
Details
|
|
|
04-30-2010
|
27.80
|
Re-assembled R Wing, wired light, finished it
|
Details
|
|
|
03-27-2010
|
29.30
|
Work on cabin, windows and wing
|
Details
|
|
|
03-11-2010
|
35.00
|
flaperon supports, windows, seat belts, seats
|
Details
|
|
|
03-03-2010
|
9.40
|
Deburred and treated bottom RH Wing. Riveted
|
Details
|
|
|
02-27-2010
|
20.00
|
Riveted fuselage, installed torque tube
|
Details
|
|
|
02-24-2010
|
9.10
|
Continuing skinning bottom of Right Wing
|
Details
|
|
|
02-19-2010
|
10.10
|
Riveted RHS wing skeleton and fitted bottom skin
|
Details
|
|
|
02-13-2010
|
44.50
|
Continued clicoing the fuselage
|
Details
|
|
|
02-02-2010
|
10.00
|
Continue disassemble and deburr RHS
|
Details
|
|
|
01-31-2010
|
21.00
|
New bottom and RHS rear skin extensions
|
Details
|
|
|
01-23-2010
|
21.60
|
Work on right hand wing skeleton
|
Details
|
|
|
12-31-2009
|
12.00
|
Late entry to include photos. See 12/31/09
|
Details
|
|
|
12-30-2009
|
30.00
|
Put new right side skin on. Straighten fuselage
|
Details
|
|
|
12-07-2009
|
26.10
|
Rebuilding rear fuselage: Start on wings
|
Details
|
|
|
11-21-2009
|
9.70
|
Flaperons and fuselage
|
Details
|
|
|
11-12-2009
|
18.00
|
Worked on RHS skin to straighten fuselage
|
Details
|
|
|
11-10-2009
|
30.10
|
Work on fuselage problem and flaperons
|
Details
|
|
|
10-20-2009
|
2.00
|
Worked on left IB flap and right ob flap
|
Details
|
|
|
10-18-2009
|
24.30
|
Fabricated flaperons
|
Details
|
|
|
10-18-2009
|
22.10
|
Aligning top and bottom skins
|
Details
|
|
|
09-30-2009
|
26.40
|
Rudder mounting and flaperons
|
Details
|
|
|
09-21-2009
|
16.00
|
Riveting cockpit parts
|
Details
|
|
|
09-15-2009
|
18.50
|
Fuselage alignment
|
Details
|
|
|
09-05-2009
|
9.30
|
Fairleads for rudder cables
|
Details
|
|
|
09-02-2009
|
17.30
|
RH main mount, safety wire nose strut, cables
|
Details
|
|
|
08-30-2009
|
13.90
|
Mounted main mounts. Prepared to debur fwd fuselag
|
Details
|
|
|
08-28-2009
|
14.90
|
Prepared parts and installed main landing gear str
|
Details
|
|
|
08-23-2009
|
5.10
|
Completed nose wheel strut. Riveted main mount gui
|
Details
|
|
|
08-11-2009
|
12.60
|
Nose gear and wheel. Seats
|
Details
|
|
|
08-06-2009
|
3.90
|
Nose wheel strut. Nose wheel.
|
Details
|
|
|
08-04-2009
|
6.80
|
Seat Pans. Nose gear strut.
|
Details
|
|
|
08-02-2009
|
7.40
|
Worked on nose gear strut
|
Details
|
|
|
07-25-2009
|
10.00
|
Install top forward skin
|
Details
|
|
|
07-22-2009
|
6.20
|
Fitted langing gear strut doublers
|
Details
|
|
|
07-14-2009
|
5.00
|
Fitted left seat base. Fitted left gear strut fitt
|
Details
|
|
|
07-08-2009
|
15.60
|
Lower engine mount. Gear strut fittings.
|
Details
|
|
|
07-05-2009
|
5.30
|
Fitted left hand seat. Installed firewall.
|
Details
|
|
|
07-02-2009
|
6.40
|
Fitting in the seat pan.
|
Details
|
|
|
06-29-2009
|
7.70
|
Worked on controls. Riveted fuselage
|
Details
|
|
|
06-26-2009
|
8.60
|
Joined fwd and rear fuselage. Control linkages
|
Details
|
|
|
06-22-2009
|
4.00
|
Worked on bottom inspection plate. Rudder pedals
|
Details
|
|
|
06-17-2009
|
3.90
|
Prepared bottom inspection door. Controls.
|
Details
|
|
|
06-16-2009
|
6.70
|
Riveting in baggage compartment. Flaperon controls
|
Details
|
|
|
06-15-2009
|
4.80
|
Repaired some firewall rivets and fuselage rivets
|
Details
|
|
|
06-14-2009
|
10.70
|
re-assembled and riveted firewall
|
Details
|
|
|
06-11-2009
|
8.30
|
Deburred, treated and re-assembled firewall
|
Details
|
|
|
05-22-2009
|
7.10
|
Continue working on the firewall
|
Details
|
|
|
05-20-2009
|
3.00
|
Worked on firewall
|
Details
|
|
|
05-19-2009
|
4.90
|
Re-assembled fwd fuselage. Started on firewall
|
Details
|
|
|
05-18-2009
|
4.30
|
Deburred, ZnO, reassembled fwd fuselage
|
Details
|
|
|
05-17-2009
|
19.20
|
Deburring, preparing rear fuselage for joining
|
Details
|
|
|
05-12-2009
|
5.70
|
Deburred, Zinc Oxide, re-installed parts
|
Details
|
|
|
05-07-2009
|
6.30
|
Make L's and start deburring fwd fuselage
|
Details
|
|
|
04-14-2009
|
10.90
|
Added "L" s to fwd fuselage as indicated
|
Details
|
|
|
04-12-2009
|
10.00
|
Cleco'd fwd fuselage. Fitted rudder pedals.
|
Details
|
|
|
04-11-2009
|
2.60
|
Drilled and cleco'd parts in the forward fuselage
|
Details
|
|
|
04-10-2009
|
12.40
|
Started assembly of forward fuselage
|
Details
|
|
|
04-08-2009
|
6.90
|
Located and assembled control linkages
|
Details
|
|
|
04-06-2009
|
11.30
|
Clico'd baggage compartment. Worked on controls.
|
Details
|
|
|
04-05-2009
|
6.70
|
Put top skin on. Baggage back. Flaperon cross bar.
|
Details
|
|
|
04-04-2009
|
11.40
|
Lot of time getting rear bulkhead to fit
|
Details
|
|
|
04-03-2009
|
6.40
|
Attached sides to bottom; worked on bulkheads
|
Details
|
|
|
03-31-2009
|
2.90
|
Prepared front end of the top. Flaperon linkage br
|
Details
|
|
|
03-30-2009
|
11.20
|
Prepared RHS to assemble with bottom.
|
Details
|
|
|
03-29-2009
|
14.10
|
Built up baggage cpt and got right side ready for
|
Details
|
|
|
03-27-2009
|
6.40
|
Riveted up the bottom
|
Details
|
|
|
03-26-2009
|
6.30
|
Built up left side of baggage area on left side
|
Details
|
|
|
03-23-2009
|
7.60
|
Studied plans and pre-positioned inner structures
|
Details
|
|
|
03-22-2009
|
9.10
|
Baggage area. Difficult 3D problem.
|
Details
|
|
|
03-21-2009
|
4.10
|
Deburred bottom and started on baggage compartment
|
Details
|
|
|
03-20-2009
|
4.10
|
Added L sections to bottom skin. Fabricated rear t
|
Details
|
|
|
03-19-2009
|
5.40
|
Drilled and clido'd the bottom skin
|
Details
|
|
|
03-17-2009
|
8.70
|
Reassembled and riveted top section. Got longerons
|
Details
|
|
|
03-16-2009
|
9.30
|
Stiffners, bulkheads, deburring and ZnO to top
|
Details
|
|
|
03-15-2009
|
10.30
|
Clico'd longerons to top. Fabricated cross members
|
Details
|
|
|
03-13-2009
|
5.10
|
Finished riveting LHS. Started on fuselage rear to
|
Details
|
|
|
03-12-2009
|
3.90
|
Deburred and treated LHS with Zinc Oxide
|
Details
|
|
|
03-11-2009
|
9.60
|
Put longerons and stiffners onto LHS skin
|
Details
|
|
|
03-10-2009
|
4.20
|
Applied ZnO to RHS, cleco'd and riveted it.
|
Details
|
|
|
03-04-2009
|
3.80
|
Disassembled RHS and deburred
|
Details
|
|
|
03-03-2009
|
3.80
|
Put last stiffners on the fuselage RHS
|
Details
|
|
|
03-01-2009
|
4.90
|
Fabricated diagonal L sections for RHS, drilled, c
|
Details
|
|
|
02-28-2009
|
8.40
|
Attached longerons to RHS. Drilled for "L"'s
|
Details
|
|
|
02-27-2009
|
4.80
|
Started drilling and clecoing longeron to RH skin
|
Details
|
|
|
02-26-2009
|
8.40
|
Picked out all fuselage parts. Studied plan.
|
Details
|
|
|
02-26-2009
|
4.00
|
Drilled and clico'd parts of the interior of the r
|
Details
|
|
|
02-25-2009
|
8.60
|
Finished slats. Started on flaperons
|
Details
|
|
|
02-23-2009
|
16.80
|
Boyd built 2 great 6x3 workbenches. Slats.
|
Details
|
|
|
02-20-2009
|
8.10
|
Worked on flaperons then inventoried shipment
|
Details
|
|
|
02-19-2009
|
5.60
|
Worked on slats and started on flaperons
|
Details
|
|
|
02-17-2009
|
8.70
|
Finished right slats. Continued working on left
|
Details
|
|
|
02-16-2009
|
9.60
|
Built stand for tail surfaces. Worked on slats
|
Details
|
|
|
02-15-2009
|
10.00
|
Worked on slats
|
Details
|
|
|
02-13-2009
|
9.80
|
Disassembled one slat for ZnO. Started on another
|
Details
|
|
|
02-12-2009
|
5.60
|
Drilled left slat skin for doublers. Fabricated L
|
Details
|
|
|
02-09-2009
|
1.50
|
Completed the stabilizer. Studied Slats
|
Details
|
|
|
02-08-2009
|
14.80
|
Deburred, zinc'd, and reassembled stabilizer
|
Details
|
|
|
02-07-2009
|
11.80
|
Reassembled elevator and finished it
|
Details
|
|
|
02-06-2009
|
10.70
|
Deburred, treated with Zinc-Oxide, started reassem
|
Details
|
|
|
02-05-2009
|
7.60
|
Deburring and fitting the servo
|
Details
|
|
|
02-01-2009
|
8.70
|
Replaced stab right tip rib and started deburring
|
Details
|
|
|
01-31-2009
|
3.00
|
Trim nose skin on elevator
|
Details
|
|
|
01-30-2009
|
8.00
|
Finished clecoing stabilizer skin
|
Details
|
|
|
01-28-2009
|
6.00
|
Riveted spar doublers. Started skin on stabilizer
|
Details
|
|
|
01-27-2009
|
9.00
|
Prepared to skin stabilizer. Treated spar doublers
|
Details
|
|
|
01-25-2009
|
11.00
|
Added nose skin to the elevator and misc.
|
Details
|
|
|
01-24-2009
|
6.00
|
Wired cable to servo and worked on trim tab
|
Details
|
|
|
01-24-2009
|
6.00
|
Wired cable to servo and worked on trim tab
|
Details
|
|
|
01-23-2009
|
10.00
|
Continued work on elevator and trim tab
|
Details
|
|
|
01-20-2009
|
9.00
|
Continued work on the elevator
|
Details
|
|
|
01-19-2009
|
4.00
|
Continued work on the elevator
|
Details
|
|
|
01-18-2009
|
6.00
|
Fabrication of the Elevator
|
Details
|
|
|
01-16-2009
|
4.00
|
Fabricated center bracket assembly. Ready to skin
|
Details
|
|
|
01-14-2009
|
8.00
|
Finished stabilizer skeleton
|
Details
|
|
|
01-13-2009
|
7.00
|
Fabricate front and rear stabilizer spars
|
Details
|
|
|
01-12-2009
|
3.50
|
Picked up kit and inventoried it
|
Details
|
|
|
12-05-2008
|
16.00
|
Finished rudder skeleton, trimmed skin and install
|
Details
|
|
|
12-04-2008
|
14.00
|
Doubled Spar, Prepared Skeleton
|
Details
|
|