Powered By Kitlog Pro v2.0
Louis Rans S7-S Courier
S-7S Courier
All
Work Logs Found:
92
Category Work Time:
383 Hours
Date
Hours
Work Log Summary
Details
06-09-2010
1.00
Adding ground wire to VDO engine gauges
05-02-2010
3.00
Finshed a few loose ends.
02-15-2010
1.50
Choke pull cable housing in panel
Details
02-13-2010
4.00
Wiring panel
02-08-2010
4.00
Wiring panel
02-07-2010
6.00
Wiring panel
Details
02-05-2010
4.00
Making copper buss bars
Details
02-05-2010
3.00
Copper buss bars
02-04-2010
4.00
Wiring trim
02-03-2010
3.00
Wiring survo stick harness
02-02-2010
4.00
Wiring trim survo
Details
02-01-2010
6.00
Wiring the Ray Allen switch on front stick
Details
01-31-2010
3.00
Installing Soft Start on the Rotax engine
01-29-2010
2.00
Safty wire muffler wrap and carb heat manifolds
01-29-2010
4.00
Battery cable conduit
Details
01-26-2010
3.00
90* quick oil drain
01-25-2010
8.00
Panel wiring
Details
01-24-2010
4.00
Studying the job ahead of wiring this bird
Details
01-23-2010
3.00
Finsh installing Rotax oil pressure hose
Details
01-19-2010
2.00
Oetiker stepless ear hose clamps
Details
01-18-2010
3.00
Still working with the right side pipes
Details
01-18-2010
8.00
Installing fuel and oil hoses
Details
01-17-2010
4.00
Installing radator
12-29-2009
5.00
Installed oil cooler
12-28-2009
3.00
Installed choke cables
Details
12-26-2009
2.00
Relocating throttle springs on carburetors
Details
12-26-2009
4.00
Relocate water pump's lower-left coolant tube
Details
12-26-2009
4.00
Installing throttle cables
Details
12-24-2009
3.00
Muffler installation
Details
12-24-2009
2.00
Muffler / heater wrap assembly
Details
12-14-2009
3.00
Installed the engine/FWD mount to AFT mount
Details
12-13-2009
4.00
Bending the forward engine mount to fit engine
Details
12-13-2009
4.00
Bending the forward engine mount to fit engine
Details
10-30-2009
3.00
Rotate starter mounting strap
Details
10-29-2009
4.00
Unpacking Rotax
Details
09-29-2009
6.00
Adjusting elevators
Details
09-29-2009
0.50
Adjusting elevator and trim tab
Details
09-11-2009
8.00
Finshed the right elevator
Details
05-13-2009
2.00
Triming fairings
Details
05-13-2009
1.00
Installing seat belts
Details
05-08-2009
4.00
Installing gauges in panel
Details
05-05-2009
3.00
Installing aileron cable pulleys at station 3
Details
05-04-2009
4.00
Throttle lever
Details
05-03-2009
3.00
Lower panel
Details
05-02-2009
4.00
Installing master relay
Details
04-30-2009
8.00
Lower panel
Details
04-29-2009
8.00
Building lower panel
Details
04-24-2009
6.00
Matco brake parking valve replacement
Details
04-21-2009
6.00
Working with panel
Details
04-20-2009
8.00
Working with panel
Details
04-15-2009
8.00
Working with panel
Details
04-14-2009
6.00
Working with panel
Details
04-13-2009
5.00
Working with panel
Details
04-10-2009
6.00
Working with panel
Details
04-09-2009
6.00
Mounting ELT
Details
04-08-2009
5.00
Problem with Matco parking brake valve
Details
04-07-2009
4.00
Firewall
Details
04-06-2009
10.00
Build seats
Details
04-05-2009
3.00
Pedal brake cylinders installation
Details
04-04-2009
4.00
Rudder pedals installation
Details
04-04-2009
2.00
Installing flap lever
Details
04-03-2009
0.10
Tools
Details
04-03-2009
0.10
Tools
Details
04-03-2009
2.00
Elevator push/pull tube assembly
Details
04-03-2009
2.00
Elevator control system installation
Details
04-03-2009
4.00
Elevator control system installation
Details
04-02-2009
6.00
Torque tube & control sticks final installation
Details
04-02-2009
0.20
Control stick's brass bushing installation
Details
04-01-2009
0.50
powder-coating parts
Details
04-01-2009
1.00
Door's window support tubes
Details
03-31-2009
3.00
Fitting window support tubes to left door
Details
03-30-2009
4.00
Fitting panel
Details
03-28-2009
6.00
Working on ideas for the panel
Details
03-25-2009
1.00
Making a pattern to trim leg fairings
Details
03-25-2009
1.00
Fitting gear leg fairings with bootcowl installed
Details
03-25-2009
1.00
Fitting gear leg fairings with bootcowl installed
Details
03-24-2009
8.00
Bootcowl
Details
03-24-2009
2.00
Bootcowl
Details
03-20-2009
2.00
Bootcowl fit up
Details
03-19-2009
1.00
Getting panel ideas
Details
03-17-2009
4.00
Firewall instalation
Details
03-16-2009
2.00
Rounding up parts for gray powder coating
Details
03-14-2009
4.00
Torque tube fit up
Details
03-13-2009
2.00
Mounting rudder on tail
Details
03-13-2009
3.00
Hooking cables to tail wheel
Details
03-13-2009
4.00
fit, drill, stain, and varnish floorboards
Details
03-12-2009
8.00
Trim tab assembly
Details
03-12-2009
8.00
Balance left elevator
Details
03-11-2009
10.00
Final installation of gear legs
Details
03-09-2009
12.00
Installing horizontal stabilizers
Details
03-07-2009
4.00
tail wheel assembly & installation
Details
03-06-2009
18.00
Unbox kit & start inventory
Details
SITE NAVIGATION
Contact Builder
S-7S Courier Home
Category
# Logs
# Hours
All
92
381
Brakes
3
14
Control Linkage
9
27
Doors
2
4
Electrical
15
62
Elevator
5
30
Engine
12
44
Exhast System
4
10
Firewall
2
8
Fuselage
4
16
Horizontal Stabilize
1
12
Inventory
1
18
Main Gear Legs
4
13
Miscellaneous
2
8
Motor Mounts
3
10
Panel
12
67
Powder-coat / Paint
2
2
Rudder
1
2
Seats
2
11
Tail Wheel
2
7
Throttle Controls
3
10
Tools
3
6
Copyright © 2001-2024 Matronics. All Rights Reserved.