Work Logs Found:
73
Category Work Time:
747 Hours
Date
Hours
Work Log Summary
Details
07-26-2008
26.00
Finally got labels installed for breakers & switch
Details
05-14-2008
24.00
CAD drawing of aluminum panel inserts
Details
05-06-2008
7.00
assemble and match drill first flap
01-19-2007
8.00
installing floor panels a
01-16-2007
5.00
floor pans
01-15-2007
6.00
baggage door
12-08-2006
6.00
reviting four fuse skins
12-02-2006
8.00
assembling fuselage
11-18-2006
8.00
machine countersink and dimple fuse parts
11-11-2006
10.00
match drilling fuse parts
10-28-2006
10.00
installing insulation in fuse floor
10-21-2006
7.00
dimpling and priming fuselage skins & parts
10-14-2006
8.00
bending longerons and misc.
10-07-2006
10.00
installing bottom skin on fuselage
Details
09-30-2006
10.00
firewall parts assembly
09-23-2006
10.00
assembling fuselage
09-14-2006
4.00
bringing crate home
06-24-2006
10.00
reviting wing bottom skin -small piece
06-17-2006
8.00
Installing pitot tube sleeve in wing bottom
06-10-2006
8.00
reviting on small bottom wing skin
06-03-2006
6.00
Installing the aileron servo
05-28-2006
6.00
finish riveting top & bottom skin and prosealed tr
05-24-2006
4.00
dimple and paint flaps parts
05-21-2006
7.00
match drill and dimple first flap
05-07-2006
5.00
assemble flap and dimple, countersink
04-23-2006
4.00
assembly, revit and final adjust on wing
04-17-2006
2.00
assemble and mount on wing & adjust
04-15-2006
8.00
assemble aileron and mount on wing
04-10-2006
3.00
final assembly and proseal trailing edge
04-09-2006
6.00
dissemble, dimple, Countersink, and prime
04-08-2006
6.00
assemble and match drill second aileron
04-05-2006
3.00
assemble aileron and proseal trailing edge
04-02-2006
5.00
dimple and prime inside all parts
04-01-2006
7.00
assemble, match drill, and dissamble
03-19-2006
3.00
assemble, match drill &proseal tank ribs, & rivet
03-18-2006
4.00
right gas tank sealing and riveting
03-12-2006
6.00
testing for leaks with balloon
02-11-2006
8.00
assemble and match drill second tank
02-07-2006
5.00
prosealing left fuel tank
02-06-2006
2.00
inboard fuel tank -dimpleing left
02-05-2006
6.00
indoard fuel tank left
02-04-2006
4.00
inboard leading edge=fuel tank match drill
02-03-2006
4.00
inboard leading edge =fuel tank
01-31-2006
6.00
Outboard eading edge right wing- section 17
01-29-2006
4.00
revited skin a ribs to spar
01-28-2006
4.00
worked on trailing edge- visited rv-10 in Conroe
01-27-2006
5.00
working on right wing spar & ribs
01-24-2006
6.00
no pro seal- so started right wing spar
01-22-2006
4.00
left wing make ready
01-21-2006
5.00
dimpleing left fuel tank
01-20-2006
6.00
cut all the tank baffles and pieces
01-15-2006
6.00
start right wing- spar work
01-15-2006
6.00
assembling left fuel tank
01-14-2006
4.00
build a cradle for wings
01-13-2006
6.00
getting fuel tank ready to close
01-08-2006
6.00
installing ribs and match drilling leading edge fu
01-07-2006
7.00
attaching leading edge to main spa
01-06-2006
7.00
reviting leading edge skin of wing
01-04-2006
7.00
getting ribs and skin ready to rivet & prime
01-02-2006
4.00
revit top skins behind main spar
12-30-2005
5.00
riveting the top skin on ribs and spar
12-28-2005
5.00
dimpleing and priming top skins
12-26-2005
6.00
adding the rear spar to the ribs
12-24-2005
7.00
getting ribs ready to rivet
12-21-2005
6.00
working on ribs additions
12-20-2005
6.00
installing rivet nuts and extension
11-26-2005
40.00
asseble all sections/servo/bell cramk
11-15-2005
80.00
build tail cone bulkheads and skins
09-30-2005
60.00
assemble elevators & trim tabs
09-19-2005
60.00
horizontal stabilizer
09-09-2005
20.00
assemble rudder
09-02-2005
40.00
build vertical stabilizer
Details
08-28-2005
12.00
unpacking everything
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
73
747
Avionics
1
26
Empennage
7
312
Fuselage
14
110
Panel
1
24
Tail
1
6
Wings
49
269