KitLog pro

Powered By Kitlog Pro v2.0

Alans Web Site
Work Logs Found: 141
Category Work Time: 387 Hours
 Date
Hours
Work Log Summary

Details

 08-24-2022
2.50
test stand
Details
       

 06-10-2022
3.00
wiring instrument panel
Details
       

 06-06-2022
3.00
installed front fuselage gussets left and right si
Details

 05-23-2022
4.00
instrument and counsol panels
Details
       

 11-09-2021
2.00
installed oil filter housing
Details

 04-14-2021
3.00
remove oil pan and oil pump housing
Details

 03-05-2021
2.00
inventary of parts on shelve
Details

 03-04-2021
2.00
installed carb mixture cable
Details

 02-22-2021
2.00
shimed starter ring gear and drive clearence
Details

 02-21-2021
2.00
modify test stand engine cover
Details

 02-20-2021
2.00
engine test stand install mixture cable
Details

 02-02-2021
3.00
gussets and l angles up drilled
Details

 02-01-2021
3.00
install L and gussets right side
Details

 01-30-2021
3.00
installed gusset and l L on front left fuselage
Details

 06-27-2020
2.00
taylor made ignition plug wires
Details
       

 06-25-2020
2.00
lock tight screws on distributor
Details
       

 06-11-2020
5.00
modified ignition distributor
Details
       

 06-09-2020
2.00
removed oil cooler on test stand engine
Details
     

 04-16-2020
2.00
wired instrument, lighting installed connect block
Details

 04-05-2020
3.00
fitted instrument panel to fusalage
Details
       

 03-18-2020
1.00
ordered and received new front wheel suspenstion
Details
     

 03-17-2020
3.00
drilled holes for counsel lights
Details
       

 03-10-2020
2.00
cut holes for fuel level and fuel pressure guages
Details

 03-05-2020
2.75
Installed the transponder and Icom
Details
       

 02-28-2020
3.00
up dating instrument panel
Details
       

 12-07-2018
3.00
updating instrument panel with new plate
Details
       

 06-30-2018
1.00
installed fuel line for fuel primer solinoid
Details
       

 04-13-2018
2.00
installed coil wire tower/ taylor made coil wire
Details
       

 04-09-2018
2.00
finish the final touches on blast cover,for coils
Details
       

 04-01-2018
2.50
Drill and tap holes for cover
Details
       

 03-29-2018
2.00
Continues fabricating firewall cool blast cover
Details
       

 03-27-2018
2.50
Install ignition coils
Details
       

 03-25-2018
2.00
heat shield cover for fuel pumps and coils
Details

 03-24-2018
2.00
Made flare line for fuel pump connection
Details

 03-24-2018
1.00
Installed dual coil redundant isolator
Details

 03-21-2018
1.00
replace solid mounts to rubber insulated mounts
Details
       

 03-11-2018
2.00
installed ignition wires on engine/ oil lines
Details
       

 11-06-2016
2.00
installed side stiffeners on front fuselage
Details

 11-03-2016
0.50
put front tire on rim, packed wheel bearings
Details

 10-31-2016
1.00
drill steering flange
Details
       

 10-25-2016
1.00
front landing gear brackets drill
Details

 01-06-2016
0.50
changes to panel
Details
       

 11-05-2014
0.10
testing date log
Details

 04-11-2011
4.00
Deburred and corrision proofed, rivet entire botto
Details
       

 04-10-2011
4.00
final drilling for A4 and A5 rivets drill rudder b
Details
       

 04-09-2011
5.00
bottom L / Z gussets,longerons, lower rudder hinge
Details
       

 03-06-2011
2.50
installed fuel tank in leading edge
Details

 02-27-2011
2.50
finish bottom panel
Details

 02-14-2011
2.00
Install stall warning sender on leading edge
Details

 02-08-2011
2.00
Drill and clecoed fiberglass wing tip
Details

 02-03-2011
3.00
drill hole for fuel tank filler
Details

 11-05-2010
2.00
Calibrated fuel probe
Details

 11-03-2010
3.00
Cut out hole on leading edge for wing light
Details
       

 11-02-2010
3.00
Drilled leading edge ribs and clecoed
Details

 11-01-2010
3.00
Drilled to next size for A5 rivets started to debu

 11-01-2010
3.00
deburred entire wing on bottom
Details

 10-31-2010
2.00
drill next size holes on bottom. #20
Details

 10-23-2010
2.00
bottom of wing clecoed with leading edge
Details
       

 10-20-2010
1.00
install weather pack connectors to wing light
Details

 10-18-2010
1.00
drilled hole for fuel sender on left tank,
Details

 10-17-2010
2.50
drilled and clecoed leading edge panel
Details

 10-16-2010
2.50
drilled and clecoed bottom rear panel

 10-01-2010
2.00
finished riveting top skin flip over
       

 09-19-2010
2.50
Riveted rear spar angles and doublers
Details
       

 09-17-2010
2.00
deburred wing top, ribs and spars.
     

 09-15-2010
3.50
Finished drilling top of wing skin.
Details

 09-14-2010
4.00
drilled L angle braces on top wing skin
Details
       

 09-13-2010
4.50
Cut and installed L angles between aileron control
Details
       

 09-12-2010
2.00
drill holes to final size for A5 rivets
Details
       

 09-11-2010
4.00
Install doublers on rear spar
Details
       

 09-10-2010
3.00
front ribs and brackets
Details
       

 09-08-2010
3.00
reinstalled front spar on rear ribs
Details

 09-02-2010
3.00
removed old spar angle and installed new update an
Details

 03-23-2009
2.50
Drilled pilot hole for wing top sheet.
       

 03-17-2009
6.00
mounted wire brackets to hold support wiring
Details

 03-16-2009
3.00
drilled wing ribs
Details

 02-24-2009
1.00
built brackets to support wiring through rib hole

 02-23-2009
2.00
started deburring and corrosion proofing ribs
Details
       

 02-13-2009
2.00
resurface gasket area on heads
Details
       

 02-06-2009
2.00
up drill all holes to A5 rivet holes
Details
       

 02-04-2009
2.00
drill and clecoed front leading edge ribs.
Details
       

 02-01-2009
3.00
drilled and clecoed L angles on ribs
Details
       

 01-31-2009
2.00
drilled aileron control horns,
Details
     

 01-29-2009
1.50
left wing drilled and clecoed aft spar
Details
     

 01-28-2009
3.00
move right wing on stand, start left wing assemble
Details
       

 01-26-2009
1.00
drill and clecoed wing tip, right wing
     

 01-25-2009
2.00
right fiberglass wing tip
Details
       

 01-24-2009
4.00
closed leading edge
Details
       

 01-21-2009
2.00
check fuel tank for leaks
Details
     

 01-18-2009
4.00
deburred entire top of wing
Details
       

 01-17-2009
4.00
installed trim indicators
Details
       

 01-03-2009
8.00
instrument panel continue
Details
       

 11-29-2008
5.00
instru. panel gauge, radio, transponder, power
Details
       

 11-11-2008
1.00
fabricated oil port cover
Details
       

 11-11-2008
2.00
built wing stand
Details
       

 11-09-2008
4.00
strapped leading edge over front ribs
Details
       

 11-08-2008
4.00
installed cork on right wing fuel tank
Details

 11-05-2008
1.50
cut mock panel out of cardboard
Details
     

 11-02-2008
4.00
deburred, and riveted
Details
       

 11-02-2008
2.00
cut holes for avionic gauges
Details

 10-26-2008
2.00
drilled remain holes to A5 rivets
Details
       

 10-22-2008
2.00
drill front ribs
Details
       

 10-18-2008
3.00
drilled leading edge
Details
       

 10-13-2008
5.00
drilled bottom wing panel
Details
       

 10-10-2008
1.50
drill holes in tanks
Details
       

 09-21-2008
2.00
replace rudder rib 6t4-6
Details
     

 09-20-2008
1.00
marked and drilled left wing rear spar

 09-14-2008
2.00
Made 3 arbours for mini angle grinder
Details
       

 09-14-2008
2.00
Drilled holes in wing skin for A5 rivets
Details
     

 09-14-2008
2.00
Drilled forward ribs and clecoed
Details

 09-14-2008
2.00
Applied 2nd coat of apoxy resin and glass
Details
     

 09-13-2008
5.00
manufactured alum plates for wing tip lights
Details
       

 09-12-2008
4.00
drilled & clecoed pilot holes
Details
       

 08-25-2008
2.00
wing skeleton
Details
       

 08-03-2008
8.00
assembled engine block
Details
       

 07-27-2008
2.00
right wing drilled rear spar
Details

 07-25-2008
0.50
doubler for aft spar left and right wing
Details

 07-24-2008
2.00
finished drilling and cleced ribs
Details
       

 07-22-2008
2.00
finished bell crank brakets
Details
     

 07-21-2008
2.00
made aileron control brakets
Details

 07-17-2008
2.00
right wing assembly
Details

 07-05-2008
2.50
right wing assembly
Details
       

 07-01-2008
1.00
check distributor from William Wynns
Details

 04-27-2008
4.00
deburred and riveted elevator
Details
       

 04-26-2008
4.00
Installed elevator horns and braces
Details
     

 04-25-2008
4.00
elevator control horns
     

 04-22-2008
2.00
drill pilot holes for elevator hinge to stab
Details
       

 04-12-2008
5.00
elevator and elevator trim tab and servo assembly
Details
       

 04-07-2008
1.50
started assembly of rear elevator
Details

 03-28-2008
8.00
complete kit inventory
Details
       

 03-22-2008
4.00
drilled all pilot holes with #30 drill bit
Details
       

 03-17-2008
6.00
rear stabilizer assembly
Details
       

 01-12-2008
4.50
riveted skelton, drilled elevator skins
Details

 01-12-2008
1.50
cut out end cover crank housing as per manual
Details
       

 01-11-2008
2.50
disassembled and deburred skeleton
Details

 01-04-2008
3.50
drilled remaining pilot holes on horzontal skeleto
Details
       

 11-09-2007
4.00
horizonal tail. marked drilled clecoed
Details
     

 10-22-2007
5.00
rudder skin pages 1 to 14 completed rudder
Details
       

 10-21-2007
2.00
rudder skins 6 -T -5 pages 1 to 14 in manual
Details
       

 10-20-2007
6.00
rudder skeleton pages 1 to 16 in manual
Details
       

 07-04-2005
8.00
disassembled used corvair engine core
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.