Date
|
Hours
|
Work Log Summary
|
Details
|
10-11-2013
|
90.00
|
Final Log Entry
|
Details
|
|
|
05-22-2013
|
30.00
|
30 hours into Phase 1
|
Details
|
|
|
02-11-2013
|
2.00
|
10 Hours into Flying
|
Details
|
|
|
01-20-2013
|
2.00
|
First Flight
|
Details
|
|
|
01-16-2013
|
4.00
|
Flight Training for the X-10 First Flight
|
Details
|
|
|
01-14-2013
|
6.00
|
Fuel Calibration
|
Details
|
|
|
12-15-2012
|
4.00
|
High Speed Taxi Test
|
Details
|
|
|
12-02-2012
|
2.00
|
DAR Inspection
|
Details
|
|
|
11-12-2012
|
10.00
|
N number and riveted on the data plate.
|
Details
|
|
|
11-04-2012
|
15.00
|
Weights and Balance of the Aircraft
|
Details
|
|
|
10-21-2012
|
30.00
|
First Engine Start
|
Details
|
|
|
10-14-2012
|
30.00
|
SCAT tubing and Mufflers and Misc Stuff
|
Details
|
|
|
10-07-2012
|
32.00
|
Engine Exhaust and Baffling with the Rubber Gap S
|
Details
|
|
|
09-29-2012
|
15.00
|
Forward Air Box or FAB Installation
|
Details
|
|
|
09-23-2012
|
8.00
|
Cowl Top and Bottoms Rivited to Completion
|
Details
|
|
|
09-22-2012
|
16.00
|
X-10 Cowl Upper and Lower Installation
|
Details
|
|
|
09-15-2012
|
20.00
|
Installed Hartzell blended airfoil and Aircraft C
|
Details
|
|
|
09-09-2012
|
15.00
|
Hang the IO-540 A1D5 Engine to the X-10
|
Details
|
|
|
09-04-2012
|
8.00
|
Firewall Foward Section 2 Baffling Installation Fi
|
Details
|
|
|
09-02-2012
|
8.00
|
Unloaded the new aircraft propulsion unit or IO-54
|
Details
|
|
|
08-31-2012
|
16.00
|
Picked up the IO-540 A1D5 engine from Air-Tec in O
|
Details
|
|
|
08-25-2012
|
3.00
|
Co-pilot Stick there was a clearance problem.
|
Details
|
|
|
08-19-2012
|
20.00
|
Dynon Skyview Auto-Pilot Pitch and Roll Servo’s
|
Details
|
|
|
08-11-2012
|
19.00
|
Manifold pressure sensor, Amp Shunt, Garmoin SL-40
|
Details
|
|
|
08-05-2012
|
10.00
|
Garmin SL-40 radio transceiver installation in the
|
Details
|
|
|
07-29-2012
|
20.00
|
Dynon Heated AOA/Airspeed Pitot Probe. Completed,
|
Details
|
|
|
07-22-2012
|
20.00
|
Dynon Heated Pitot Tube and EMS Sensors Package
|
Details
|
|
|
07-15-2012
|
15.00
|
Propeller Spinner and Wing Tips Install
|
Details
|
|
|
07-08-2012
|
6.00
|
wing spar nuts/bolts to 80 foot pounds
|
Details
|
|
|
07-06-2012
|
8.00
|
Propeller/Spinner combination
|
Details
|
|
|
07-03-2012
|
2.00
|
artzel Blended Airfoil or propeller from the Team
|
Details
|
|
|
06-30-2012
|
5.00
|
Began the final installation of the X-10 Wings
|
Details
|
|
|
06-29-2012
|
8.00
|
Final Installation of the Elevators, Trim tabs and
|
Details
|
|
|
06-24-2012
|
8.00
|
nstalling the Horizontal and Vertical Stabilizer f
|
Details
|
|
|
06-19-2012
|
9.00
|
Finally Moving the X-10 Fuselage to the Hanger
|
Details
|
|
|
06-16-2012
|
8.00
|
Perry Houston County airport in Perry Georgia.
|
Details
|
|
|
05-23-2012
|
5.00
|
Ameri-King AK-451 ELT install and Bill of Sale fo
|
Details
|
|
|
05-19-2012
|
6.00
|
Installing the Ameri-King AK-451 ELT inthe Tail Co
|
Details
|
|
|
05-15-2012
|
6.00
|
Whelen Combination Tail Strobe and Position Light
|
Details
|
|
|
05-13-2012
|
2.00
|
Combination RED/WHITE LED strip lights under the g
|
Details
|
|
|
05-06-2012
|
6.00
|
Labeling the X-10 panel items and clear coat
|
Details
|
|
|
04-26-2012
|
6.00
|
Strobes’N More Pro Series 606 strobe light kit
|
Details
|
|
|
04-14-2012
|
4.00
|
Niagara Thermal 20006A Oil Cooler
|
Details
|
|
|
04-07-2012
|
4.00
|
POS-12 Sensor for determining where the Flaps posi
|
Details
|
|
|
03-11-2012
|
7.00
|
Green (starboard) and Red (Port) side LED Navigati
|
Details
|
|
|
03-04-2012
|
10.00
|
O2 Bulkhead Plug-ins and Clar Coat Gloss Paint
|
Details
|
|
|
02-25-2012
|
8.00
|
Mountain High O2 Supply Remote Filler and Glossy I
|
Details
|
|
|
02-22-2012
|
6.00
|
Oxygen level gage in the Baggage Bulkhead
|
Details
|
|
|
02-12-2012
|
8.00
|
anel Painting and Mpounting Dynon EMS module
|
Details
|
|
|
02-04-2012
|
10.00
|
Annunciator Warning Lights Indicator Panel
|
Details
|
|
|
01-22-2012
|
8.00
|
ADAHRS computer install
|
Details
|
|
|
01-14-2012
|
9.00
|
SkyView Up and Testing
|
Details
|
|
|
01-12-2012
|
5.00
|
Dynon Skyview Arrived
|
Details
|
|
|
11-06-2011
|
8.00
|
Empennage Gap Cover on the tail of the aircraft
|
Details
|
|
|
10-25-2011
|
4.00
|
FF3-2 Control Cable Blue Prop Gov cable (72.5 inch
|
Details
|
|
|
10-23-2011
|
3.00
|
Eye-Ball Bulkhead Fitting
|
Details
|
|
|
10-22-2011
|
6.00
|
Primer paint bottom of the fueslage with DTM prime
|
Details
|
|
|
10-02-2011
|
8.00
|
X-10 Cowls, both the upper and lower
|
Details
|
|
|
09-25-2011
|
8.00
|
Oil Cooler bracket, a set fuel and oil hoses insta
|
Details
|
|
|
09-04-2011
|
6.00
|
Final Wet Sanding of the Wing
|
Details
|
|
|
08-14-2011
|
5.00
|
nstalled the Garmin 340, 327 and AK 350,
|
Details
|
|
|
08-09-2011
|
15.00
|
GTX-327 Transponder and America King 350 from Sara
|
Details
|
|
|
07-31-2011
|
8.00
|
Sanding the Right Wing
|
Details
|
|
|
07-17-2011
|
6.00
|
Wiring the Warning Lights
|
Details
|
|
|
07-03-2011
|
5.00
|
Heaphone and microphone jacks
|
Details
|
|
|
06-18-2011
|
4.00
|
Garmin GMA 340 Comm Panel
|
Details
|
|
|
06-04-2011
|
15.00
|
Forward Air Box or FAB and Carpeting/Interior work
|
Details
|
|
|
05-22-2011
|
20.00
|
Completed the carpeting set for the X-10, and the
|
Details
|
|
|
05-08-2011
|
5.00
|
Brake Bleeding and Carpet Binding
|
Details
|
|
|
05-01-2011
|
2.00
|
#2 Cylinder Ramp Baffle
|
Details
|
|
|
04-30-2011
|
3.00
|
Carpeting and Baffling for Cylinder #1
|
Details
|
|
|
04-24-2011
|
2.00
|
I purchased the X-10 carpeting today. andthe Cowl
|
Details
|
|
|
04-17-2011
|
8.00
|
Completed Left Wing P{aint and Engine Baffle
|
Details
|
|
|
04-09-2011
|
3.00
|
complete the interior leather seat package.
|
Details
|
|
|
04-06-2011
|
2.00
|
t Flightline Interiors finally came through with m
|
Details
|
|
|
04-05-2011
|
1.00
|
ocated the CB-1000A and CB-1000E Baffle Stiffeners
|
Details
|
|
|
04-05-2011
|
2.00
|
CB-1005A Cylinder 6 Aft Baffle.
|
Details
|
|
|
04-04-2011
|
4.00
|
Installed the IE SPDT Oil Pressure 15 switch (to a
|
Details
|
|
|
03-10-2011
|
2.00
|
Garmin GX-327 Transponder antenna.
|
Details
|
|
|
03-05-2011
|
2.00
|
Van’s fuel valve indicator plate installed
|
Details
|
|
|
03-03-2011
|
1.00
|
Aero-Tuff Seat Belts Installation Complete
|
Details
|
|
|
02-23-2011
|
1.00
|
RAMI AVT-4 antenna installed
|
Details
|
|
|
02-21-2011
|
3.00
|
Built-In Oxygen System 1/4" O.D. Copper tubing and
|
Details
|
|
|
02-13-2011
|
6.00
|
RA Miller AVT-4 com and Marker Beacon antenna
|
Details
|
|
|
01-30-2011
|
6.00
|
ynon Avionics SkyView Autopilot SV-NET Servo tefze
|
Details
|
|
|
01-23-2011
|
2.00
|
Stein aluminum air vents.
|
Details
|
|
|
01-08-2011
|
6.00
|
Vinyl Glare Shield Completed
|
Details
|
|
|
01-01-2011
|
8.00
|
Wheel Fairings Final Primer Paint, Nutpls to the B
|
Details
|
|
|
12-12-2010
|
3.00
|
custom engineered built-in Oxygen or O2 system
|
Details
|
|
|
12-11-2010
|
6.00
|
Wheel Fairing Painting and Sanding UV Smooth Prime
|
Details
|
|
|
12-09-2010
|
2.00
|
Stainless steel hook striking plate
|
Details
|
|
|
12-05-2010
|
2.00
|
The SCAT Tubing Installations
|
Details
|
|
|
12-05-2010
|
3.00
|
DOOR WARNING LATCH SYSTEM
|
Details
|
|
|
12-04-2010
|
2.00
|
Seat Rails and Seat
|
Details
|
|
|
12-02-2010
|
2.00
|
Seat Belt Harness Screws and Bolts
|
Details
|
|
|
11-29-2010
|
1.50
|
ASN737TW-66 hose clamp and S.S. Screws
|
Details
|
|
|
11-28-2010
|
3.00
|
U-1018C Nose Gear Leg Hinge and the U-1018A Nose
|
Details
|
|
|
11-27-2010
|
2.00
|
I Cut-out template on the U-1018A Nose Gear Leg Fa
|
Details
|
|
|
11-26-2010
|
2.00
|
wo U-1013A and B Wheel Fairings together and using
|
Details
|
|
|
11-24-2010
|
3.00
|
I checked the alignment of the U-1013 with the flo
|
Details
|
|
|
11-20-2010
|
10.00
|
Adding a inspevtion door to the Wheel Fairings
|
Details
|
|
|
11-15-2010
|
6.00
|
U-1020 L/R and the U-1019 L/R Gear Leg Fairings
|
Details
|
|
|
11-14-2010
|
4.00
|
X-10 I measured 27 inches from the aircraft center
|
Details
|
|
|
11-14-2010
|
1.00
|
U-1013C-L/R Nose Wheel Fairing Brackets.
|
Details
|
|
|
11-13-2010
|
2.00
|
U-1013B Wheel Fairing Rear upside down and in the
|
Details
|
|
|
11-12-2010
|
2.00
|
ront and Rear Wheel Fairings U-1013A and U1013B
|
Details
|
|
|
11-07-2010
|
3.00
|
U-1017B Gear Leg Fairing Hinge
|
Details
|
|
|
11-06-2010
|
2.00
|
U-1017A Gear Leg Fairing
|
Details
|
|
|
11-03-2010
|
5.00
|
Rear Wheel Fairing back into place and Nut Extens
|
Details
|
|
|
10-31-2010
|
8.00
|
U-1057B L/R Rear Wheel Fairing with Epoxy/Flox
|
Details
|
|
|
10-30-2010
|
4.00
|
U-1057B L/R Wheel Fairing Rear over the tire and s
|
Details
|
|
|
10-24-2010
|
1.00
|
U-1057 A and B Wheel Fairing halves and drilled #
|
Details
|
|
|
10-24-2010
|
4.00
|
U-1010-L/R Main Wheel Fairing Bracket
|
Details
|
|
|
10-23-2010
|
3.00
|
U-1057 Wheel Fairing A and B Left and Right.
|
Details
|
|
|
10-22-2010
|
6.00
|
Hidden Door Spring Hinge and Cam Locks
|
Details
|
|
|
10-20-2010
|
4.00
|
Cutt 1.75" Slot in to Cowl and Let/Right 10 Inlet
|
Details
|
|
|
10-16-2010
|
3.00
|
Air Cowl 10 Inlet
|
Details
|
|
|
10-10-2010
|
8.00
|
Painting the inside with White Jet Flex water redu
|
Details
|
|
|
10-02-2010
|
4.00
|
D-1015 Nose Gear Link Collar Assembly onto the sha
|
Details
|
|
|
09-30-2010
|
4.00
|
painted WD-1031 Axle Flange onto the Nose Gear Leg
|
Details
|
|
|
09-28-2010
|
3.00
|
Mounting Main Tires and Brake Mount Assembly to A
|
Details
|
|
|
09-27-2010
|
4.00
|
SECTION 46-04 Landing Gear Mounting
|
Details
|
|
|
09-26-2010
|
2.50
|
U-1001 L/R Main Landing Gears Legs Mounting to the
|
Details
|
|
|
09-25-2010
|
2.00
|
Main and Nose Wheels and Tire Assembly
|
Details
|
|
|
09-24-2010
|
1.50
|
Bolting Dyna-1 Engine Mount to Firewall Assembly
|
Details
|
|
|
09-23-2010
|
5.00
|
Windscreen FiberGlass LayUps
|
Details
|
|
|
09-22-2010
|
2.00
|
Applying the Windscreen tothe Fuselage
|
Details
|
|
|
09-19-2010
|
2.00
|
Piper Factorry Tour at Vero Beach Florida Sept. 15
|
Details
|
|
|
09-06-2010
|
5.00
|
Installed the Windscreen in Process
|
Details
|
|
|
09-05-2010
|
8.00
|
Final Doors and Rear Transparacies Completed
|
Details
|
|
|
08-29-2010
|
6.00
|
The doors saga continue
|
Details
|
|
|
08-23-2010
|
4.00
|
C-1003 L/R Front Window Gluing with Weld-On
|
Details
|
|
|
08-20-2010
|
6.00
|
hand fitting, hand sanding, and continue sanding (
|
Details
|
|
|
08-15-2010
|
8.00
|
Still fitting, sanding, Super-Fill and sanding and
|
Details
|
|
|
08-08-2010
|
10.00
|
WD-1023 Gas Strut Attach Bracket
|
Details
|
|
|
07-31-2010
|
6.00
|
Cabin Drill Pin Blocks
|
Details
|
|
|
07-30-2010
|
3.00
|
C-1021 Latch Angle Assembly
|
Details
|
|
|
07-30-2010
|
5.00
|
1021B and C-1021C Doublers Plates
|
Details
|
|
|
07-25-2010
|
1.00
|
C-1021 BC Drill Template
|
Details
|
|
|
07-25-2010
|
2.00
|
C-1011 L/R Fwd and Aft Latch Pins
|
Details
|
|
|
07-24-2010
|
1.00
|
C-1002 door latch Springs
|
Details
|
|
|
07-19-2010
|
2.00
|
Safety Latch Laminations and Cutting Each
|
Details
|
|
|
07-19-2010
|
1.00
|
Latch Attach Angle
|
Details
|
|
|
07-18-2010
|
2.00
|
Door Handle Assembly with Rack Handles
|
Details
|
|
|
07-17-2010
|
2.00
|
Door Fwd and Aft Pin Block
|
Details
|
|
|
07-17-2010
|
1.00
|
Cutting steel C-rack 10” and Door Assembly
|
Details
|
|
|
07-16-2010
|
3.00
|
C-656 Canopy Handles
|
Details
|
|
|
07-14-2010
|
2.00
|
C-1003 L/R Front Windows Transparencies trimmed
|
Details
|
|
|
07-13-2010
|
2.00
|
Duct taped the door to the fuselage, drilled hinge
|
Details
|
|
|
07-12-2010
|
1.50
|
Mount the Hinges and Drill the Doors L/R
|
Details
|
|
|
07-11-2010
|
14.00
|
Fitting of the Doors (grinding and sanding and san
|
Details
|
|
|
07-05-2010
|
9.00
|
Aeropoxy Door Shell Together Left and Right
|
Details
|
|
|
07-04-2010
|
4.00
|
Clecoed the C-1002A-L/R Outside Door Shells and C
|
Details
|
|
|
07-02-2010
|
5.00
|
Rough Fitting of the Door Shells
|
Details
|
|
|
07-02-2010
|
6.00
|
Inventory the Final Kit
|
Details
|
|
|
06-27-2010
|
5.00
|
grip stick relays and some final electrical (avion
|
Details
|
|
|
06-19-2010
|
6.00
|
Junction Box Completed
|
Details
|
|
|
06-08-2010
|
4.00
|
Continued wiring the electrical and the pane
|
Details
|
|
|
05-29-2010
|
6.00
|
Wiring the Avionics and the Panel
|
Details
|
|
|
05-22-2010
|
3.00
|
The Infinity Aerospace grips installation
|
Details
|
|
|
05-21-2010
|
0.00
|
Chapter 38th EAA Technical Counselor Visit
|
Details
|
|
|
05-15-2010
|
5.00
|
I am smoothing, filling, sanding, and painting wit
|
Details
|
|
|
05-02-2010
|
3.00
|
Visited Peachtree City Falcon Field Apt for the an
|
Details
|
|
|
04-29-2010
|
3.00
|
Fill and Sand the interior
|
Details
|
|
|
04-25-2010
|
0.00
|
Ordering the 4/4 Final sub-kit
|
Details
|
|
|
04-19-2010
|
0.00
|
Sun 'n Fun 2010
|
Details
|
|
|
04-11-2010
|
1.00
|
SECTION 43 CABIN COVER Page 43-13 Steps 1 and 2
|
Details
|
|
|
04-10-2010
|
2.00
|
SECTION 43 CABIN COVER Page 43-12 Steps 1 to 3
|
Details
|
|
|
04-02-2010
|
16.00
|
SECTION 43 CABIN COVER Page 43-10 Steps 1 to 10
|
Details
|
|
|
03-31-2010
|
6.00
|
SECTION 43 CABIN COVER Page 43-11 Steps 1 and 2
|
Details
|
|
|
03-20-2010
|
4.00
|
SECTION 43 CABIN COVER Page 43-9 Steps 1 to 9
|
Details
|
|
|
03-19-2010
|
2.00
|
SECTION 43 CABIN COVER Page 43-8 Steps 5 to 8
|
Details
|
|
|
03-14-2010
|
2.00
|
SECTION 43 CABIN COVER Page 43-8 Steps 1 to 8
|
Details
|
|
|
03-14-2010
|
3.00
|
Section 37 FUEL SYSTEM page 37-4 Steps 5 to 7
|
Details
|
|
|
03-06-2010
|
2.00
|
SECTION 43 CABIN COVER Page 43-7 Steps 1 to 8
|
Details
|
|
|
03-06-2010
|
1.00
|
SECTION 43 CABIN COVER Page 43-6 Steps 1 to 4
|
Details
|
|
|
03-05-2010
|
2.00
|
SECTION 43 CABIN COVER Page 43-5 Steps 1 to 5
|
Details
|
|
|
02-27-2010
|
4.00
|
Section 37 FUEL SYSTEM page 37-4 Steps 1 to 4
|
Details
|
|
|
02-21-2010
|
5.00
|
SECTION 43 CABIN COVER Page 43-4
|
Details
|
|
|
02-20-2010
|
1.50
|
SECTION 43 CABIN COVER Page 43-3
|
Details
|
|
|
02-20-2010
|
0.15
|
SECTION 43 CABIN COVER Page 43-2
|
Details
|
|
|
02-15-2010
|
2.00
|
SECTION 42 REAR SEATS BACK Page 42-4
|
Details
|
|
|
02-14-2010
|
3.00
|
SECTION 42 REAR SEATS BACK Page 42-3
|
Details
|
|
|
02-14-2010
|
2.00
|
SECTION 42 REAR SEATS BACK Page 42-2
|
Details
|
|
|
02-13-2010
|
2.00
|
SECTION 41 UPPER FORWARD FUSELAGE INSTALLATION Pag
|
Details
|
|
|
02-12-2010
|
2.00
|
SECTION 41 UPPER FORWARD FUSELAGE INSTALLATION Pag
|
Details
|
|
|
02-10-2010
|
6.00
|
SECTION 41 UPPER FORWARD FUSELAGE INSTALLATION Pag
|
Details
|
|
|
02-04-2010
|
10.00
|
SECTION 40 FLAP SYSTEM, Page 40-1
|
Details
|
|
|
01-30-2010
|
1.00
|
SECTION 39 CONTROL SYSTEM, Page 39-10, Step 1 to
|
Details
|
|
|
01-29-2010
|
3.00
|
SECTION 39 CONTROL SYSTEM, Page 39-7, Step 1 to 4
|
Details
|
|
|
01-23-2010
|
3.00
|
SECTION 39 CONTROL SYSTEM, Page 39-8, Step 1 to 3
|
Details
|
|
|
01-23-2010
|
1.50
|
SECTION 39 CONTROL SYSTEM, Page 39-6, Step 1 to 3
|
Details
|
|
|
01-22-2010
|
3.00
|
SECTION 39 CONTROL SYSTEM, Page 39-5, Step 1 to 3
|
Details
|
|
|
01-21-2010
|
1.50
|
SECTION 39 CONTROL SYSTEM, Page 39-4, Step 1 to 5
|
Details
|
|
|
01-20-2010
|
1.50
|
SECTION 39 CONTROL SYSTEM, Page 39-3, Step 1 to 5
|
Details
|
|
|
01-17-2010
|
2.00
|
SECTION 38 RUDDER PETALS & BRAKE SYSTEM, Page 38-8
|
Details
|
|
|
01-17-2010
|
2.00
|
SECTION 38 RUDDER PETALS & BRAKE SYSTEM, Page 38-4
|
Details
|
|
|
01-17-2010
|
1.00
|
SECTION 38 RUDDER PETALS & BRAKE SYSTEM, Page 38-1
|
Details
|
|
|
01-16-2010
|
0.50
|
Section OP37- RV-10 WIRING HARNESS Page OP37-16 St
|
Details
|
|
|
01-16-2010
|
3.00
|
SECTION 38 RUDDER PETALS & BRAKE SYSTEM, Page 38-3
|
Details
|
|
|
01-16-2010
|
2.00
|
SECTION 38 RUDDER PETALS & BRAKE SYSTEM, Page 38-2
|
Details
|
|
|
01-15-2010
|
0.00
|
Section OP37- RV-10 WIRING HARNESS Page OP37-14 St
|
Details
|
|
|
01-15-2010
|
0.25
|
Section OP37- RV-10 WIRING HARNESS Page OP37-13 St
|
Details
|
|
|
01-14-2010
|
2.00
|
Section OP37- RV-10 WIRING HARNESS Page OP37-12 St
|
Details
|
|
|
01-13-2010
|
3.00
|
Section OP37- RV-10 WIRING HARNESS Page OP37-8 Ste
|
Details
|
|
|
01-09-2010
|
0.25
|
Section OP37- RV-10 WIRING HARNESS Page OP37-7 Ste
|
Details
|
|
|
01-09-2010
|
1.00
|
Section OP37- RV-10 WIRING HARNESS Page OP37-6 Ste
|
Details
|
|
|
01-08-2010
|
1.00
|
Section OP37- RV-10 WIRING HARNESS Page OP37-5 Ste
|
Details
|
|
|
01-07-2010
|
1.00
|
Section OP37- RV-10 WIRING HARNESS Page OP37-4 Ste
|
Details
|
|
|
01-06-2010
|
2.00
|
Section OP37- RV-10 WIRING HARNESS Page OP37-3 Ste
|
Details
|
|
|
01-04-2010
|
1.00
|
Section OP37- RV-10 WIRING HARNESS Page OP37-2, St
|
Details
|
|
|
01-03-2010
|
2.00
|
Section 37 FUEL SYSTEM page 37-3 Steps 1 to 9
|
Details
|
|
|
01-02-2010
|
2.00
|
Section 37 FUEL SYSTEM page 37-2 Steps 1 to 5
|
Details
|
|
|
12-18-2009
|
0.00
|
Section 36 BRAKE LINE Page 36-4 Steps 1 and 2
|
Details
|
|
|
12-18-2009
|
1.00
|
Section 36 BRAKE LINE Page 36-3 Steps 1 to 6
|
Details
|
|
|
12-17-2009
|
2.00
|
Section 36 BRAKE LINE Page 36-2 Steps 1 to 6
|
Details
|
|
|
12-13-2009
|
8.00
|
Painting the Interior of the X-10 Fuselage
|
Details
|
|
|
12-06-2009
|
1.00
|
Section 35 ACCESS COVERS and FLOOR PANELS Page 35-
|
Details
|
|
|
12-05-2009
|
1.00
|
Section 35 ACCESS COVERS and FLOOR PANELS Page 35-
|
Details
|
|
|
12-05-2009
|
1.00
|
Section 35 ACCESS COVERS and FLOOR PANELS Page 35-
|
Details
|
|
|
12-05-2009
|
0.50
|
Section 35 ACCESS COVERS and FLOOR PANELS Page 35-
|
Details
|
|
|
12-02-2009
|
2.00
|
Section 35 ACCESS COVERS and FLOOR PANELS Page 35-
|
Details
|
|
|
11-29-2009
|
1.00
|
Section 35 ACCESS COVERS and FLOOR PANELS Page 35-
|
Details
|
|
|
11-28-2009
|
4.00
|
Section 35 ACCESS COVERS and FLOOR PANELS Page 35
|
Details
|
|
|
11-26-2009
|
1.00
|
Section 34 BAGGAGE AREA … Page 34 -7 Steps 1 to 5
|
Details
|
|
|
11-26-2009
|
1.00
|
Section 34 BAGGAGE AREA … Page 34 -6 Steps 1 to 7
|
Details
|
|
|
11-26-2009
|
1.00
|
Section 34 BAGGAGE AREA … Page 34 -5 Steps 1 to 7
|
Details
|
|
|
11-26-2009
|
2.00
|
Section 34 BAGGAGE AREA … Page 34 -4 Steps 1 to 9
|
Details
|
|
|
11-25-2009
|
1.00
|
Section 34 BAGGAGE AREA … Page 34 -3 Steps 1 to 4
|
Details
|
|
|
11-25-2009
|
1.00
|
Section 34 BAGGAGE AREA … Page 34 -2 Steps 4 to 8
|
Details
|
|
|
11-25-2009
|
1.00
|
Section 34 BAGGAGE AREA … Page 34 -2 Steps 1 to
|
Details
|
|
|
11-21-2009
|
2.00
|
Section 33 BAGGAGE AREA … Page 33 -9 Steps 1 to 8
|
Details
|
|
|
11-21-2009
|
1.00
|
Section 33 BAGGAGE AREA … Page 33 -8 Steps 1 to
|
Details
|
|
|
11-21-2009
|
1.00
|
Section 33 BAGGAGE AREA … Page 33 -10 Steps 1 to
|
Details
|
|
|
11-20-2009
|
3.00
|
Section 33 BAGGAGE AREA … Page 33 -7 Steps 1 to
|
Details
|
|
|
11-18-2009
|
2.00
|
Section 33 BAGGAGE AREA … Page 33 -6 Steps 1 an
|
Details
|
|
|
11-15-2009
|
5.00
|
Section 33 BAGGAGE AREA … Page 33 -5 Steps 10 t
|
Details
|
|
|
11-14-2009
|
4.00
|
Section 33 BAGGAGE AREA … Page 33 -5 Steps 1 to
|
Details
|
|
|
11-14-2009
|
2.00
|
Section 33 BAGGAGE AREA … Page 33 -4 Steps 1 to
|
Details
|
|
|
11-13-2009
|
2.00
|
Section 33 BAGGAGE AREA … Page 33 -3 Steps 1 to 1
|
Details
|
|
|
11-13-2009
|
2.00
|
Section 33 BAGGAGE AREA … Page 33 -2 Steps 1 to
|
Details
|
|
|
11-12-2009
|
8.00
|
Section 32 TAILCONE ATTACHMENT … Page 32 -5 Step
|
Details
|
|
|
11-09-2009
|
4.00
|
Section 32 TAILCONE ATTACHMENT … Page 32 -5 Step
|
Details
|
|
|
11-08-2009
|
2.00
|
Section 32 TAILCONE ATTACHMENT … Page 32 -4 Step
|
Details
|
|
|
11-07-2009
|
3.00
|
Section 32 TAILCONE ATTACHMENT … Page 32 -3 Step
|
Details
|
|
|
11-07-2009
|
2.00
|
Section 32 TAILCONE ATTACHMENT … Page 32 -2 Steps
|
Details
|
|
|
11-06-2009
|
2.00
|
I completed the final priming and painting with th
|
Details
|
|
|
11-01-2009
|
6.00
|
15” X 13” shelf to hold my ELT, Whelan Strob, addi
|
Details
|
|
|
10-31-2009
|
2.00
|
Section 31 UPPER FORWARD FUSELAGE ASSEMBLY... Pag
|
Details
|
|
|
10-30-2009
|
3.00
|
Section 31 UPPER FORWARD FUSELAGE ASSEMBLY... Pag
|
Details
|
|
|
10-28-2009
|
1.00
|
Section 31 UPPER FORWARD FUSELAGE ASSEMBLY... Pag
|
Details
|
|
|
10-27-2009
|
4.00
|
Section 31 UPPER FORWARD FUSELAGE ASSEMBLY... Pag
|
Details
|
|
|
10-26-2009
|
4.00
|
Section 31 UPPER FORWARD FUSELAGE ASSEMBLY .. Pa
|
Details
|
|
|
10-24-2009
|
6.00
|
Section 31 UPPER FORWARD FUSELAGE ASSEMBLY .. Pa
|
Details
|
|
|
10-24-2009
|
2.50
|
Section 31 UPPER FORWARD FUSELAGE ASSEMBLY .. Pa
|
Details
|
|
|
10-23-2009
|
1.50
|
Section 31 UPPER FORWARD FUSELAGE ASSEMBLY .. Pa
|
Details
|
|
|
10-23-2009
|
1.00
|
Section 31 UPPER FORWARD FUSELAGE ASSEMBLY .. Pa
|
Details
|
|
|
10-22-2009
|
2.00
|
Section 31 UPPER FORWARD FUSELAGE ASSEMBLY .. Pa
|
Details
|
|
|
10-21-2009
|
0.50
|
Section 30, STEP INSTALLATION …. Pages 30-4, Steps
|
Details
|
|
|
10-20-2009
|
1.75
|
Section 30, STEP INSTALLATION …. Pages 30-3, Steps
|
Details
|
|
|
10-19-2009
|
2.50
|
Section 30, STEP INSTALLATION …. Pages 30-2, Steps
|
Details
|
|
|
10-18-2009
|
4.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-21, St
|
Details
|
|
|
10-16-2009
|
3.00
|
F1050 L and R Cabin Floor Panels Section 29, FUSEL
|
Details
|
|
|
10-13-2009
|
2.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-19, St
|
Details
|
|
|
10-12-2009
|
2.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-19, St
|
Details
|
|
|
10-12-2009
|
8.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-18, St
|
Details
|
|
|
10-10-2009
|
4.00
|
ection 29, FUSELAGE SIDE SKINS …. Pages 29-17, Ste
|
Details
|
|
|
10-09-2009
|
8.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-17, St
|
Details
|
|
|
10-05-2009
|
2.00
|
Primed the F-1069 and F-1070 Mid and Side Fuselage
|
Details
|
|
|
10-04-2009
|
7.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-15, St
|
Details
|
|
|
10-03-2009
|
5.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-16, St
|
Details
|
|
|
09-27-2009
|
8.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-14, St
|
Details
|
|
|
09-26-2009
|
3.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-13, St
|
Details
|
|
|
09-25-2009
|
2.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-12, St
|
Details
|
|
|
09-24-2009
|
2.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-11, St
|
Details
|
|
|
09-23-2009
|
3.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-11, St
|
Details
|
|
|
09-22-2009
|
1.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-10, St
|
Details
|
|
|
09-21-2009
|
3.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-8, Ste
|
Details
|
|
|
09-20-2009
|
2.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-7, Ste
|
Details
|
|
|
09-20-2009
|
1.00
|
ection 29, FUSELAGE SIDE SKINS …. Pages 29-8, Step
|
Details
|
|
|
09-19-2009
|
2.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-6, Ste
|
Details
|
|
|
09-18-2009
|
4.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-5, Ste
|
Details
|
|
|
09-17-2009
|
3.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-4, St
|
Details
|
|
|
09-16-2009
|
2.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-3 Step
|
Details
|
|
|
09-15-2009
|
3.00
|
Section 29, FUSELAGE SIDE SKINS …. Pages 29-2 Step
|
Details
|
|
|
09-13-2009
|
3.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
09-12-2009
|
6.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
09-11-2009
|
4.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
09-10-2009
|
10.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
09-08-2009
|
4.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
09-07-2009
|
1.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
09-06-2009
|
5.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
09-05-2009
|
10.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
09-04-2009
|
4.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
09-03-2009
|
3.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
09-02-2009
|
3.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
09-01-2009
|
8.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
08-30-2009
|
4.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
08-29-2009
|
5.00
|
Section 28 Page 28-4
|
Details
|
|
|
08-26-2009
|
4.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
08-25-2009
|
3.00
|
Section 28, FWD FUSELAGE RIBS, BHDS, BOTTOM SKINS
|
Details
|
|
|
08-23-2009
|
5.00
|
Section 27 Firewall … Page 27-6, Steps 1
|
Details
|
|
|
08-22-2009
|
8.00
|
Section 27 Firewall … Page 27-4, Steps 8
|
Details
|
|
|
08-21-2009
|
3.00
|
Section 27 Firewall … Page 27-2, Steps 7
|
Details
|
|
|
08-19-2009
|
2.00
|
Section 27 Firewall … Page 27-2, Step 6
|
Details
|
|
|
08-16-2009
|
3.00
|
Section 27 Firewall … Page 27-2, Step 5.
|
Details
|
|
|
08-15-2009
|
8.00
|
Section 27 Firewall … Page 27-2, Steps 1 to 4.
|
Details
|
|
|
08-12-2009
|
5.00
|
Section 26 Mid. Fuselage Ribs and Bottom Skins. P
|
Details
|
|
|
08-09-2009
|
3.00
|
Section 26 Mid. Fuselage Ribs and Bottom Skins. P
|
Details
|
|
|
08-09-2009
|
8.00
|
Section 26 Mid. Fuselage Ribs and Bottom Skins. P
|
Details
|
|
|
08-08-2009
|
5.00
|
Section 26 Mid. Fuselage Ribs and Bottom Skins. Pa
|
Details
|
|
|
08-08-2009
|
3.00
|
Section 26 Mid. Fuselage Ribs and Bottom Skins. Pa
|
Details
|
|
|
08-06-2009
|
5.00
|
Section 26 Mid. Fuselage Ribs and Bottom Skins. Pa
|
Details
|
|
|
08-05-2009
|
3.00
|
Section 26 Mid. Fuselage Ribs and Bottom Skins. Pa
|
Details
|
|
|
08-02-2009
|
5.00
|
Section 26 Mid. Fuselage Ribs and Bottom Skins. Pa
|
Details
|
|
|
08-01-2009
|
4.00
|
Section 26 Mid. Fuselage Ribs and Bottom Skins.
|
Details
|
|
|
07-30-2009
|
4.00
|
Section 26 Mid Fuselage Ribs and Bottom Skins. S
|
Details
|
|
|
07-29-2009
|
4.00
|
Completed Section 25-8 Rear Seat Bulkhead Steps 1
|
Details
|
|
|
07-27-2009
|
4.00
|
Section 25-7 Rear Spar Bulkhead Assembly Steps 1 t
|
Details
|
|
|
07-26-2009
|
5.00
|
Section 25-6, Steps 1 to 7 Riveting the Aft Bulkhe
|
Details
|
|
|
07-25-2009
|
6.00
|
Completed Section 25_5
|
Details
|
|
|
07-24-2009
|
6.00
|
Section 25 Mid Fuse Bulkheads section 25-2 and 3
|
Details
|
|
|
07-22-2009
|
6.00
|
FUSELAGE Received the 3rd of 4th sub-kit
|
Details
|
|
|
07-11-2009
|
1.00
|
Move Wings into Shed for Storage
|
Details
|
|
|
07-03-2009
|
3.00
|
WING COMPLETED SUCESSFULLY !!!!! and Aileron
|
Details
|
|
|
07-02-2009
|
4.00
|
DTS Primer/Finisher Wings with Aileron and Flaps
|
Details
|
|
|
06-27-2009
|
2.00
|
DTS primer/finisher painting of the L/R wings skin
|
Details
|
|
|
06-25-2009
|
4.00
|
Preping Wings for Painting
|
Details
|
|
|
06-20-2009
|
4.00
|
Finish painting with DTS Primer Flaps and Alirons
|
Details
|
|
|
06-11-2009
|
7.00
|
Wing Tip Lighting reference option OP-32
|
Details
|
|
|
06-09-2009
|
4.00
|
continued section 24 Page 24-3 Steps 1 to 4. NUTPL
|
Details
|
|
|
06-07-2009
|
2.00
|
LAYING OUT THE WING TIP AFT RIVET PATTERN
|
Details
|
|
|
06-06-2009
|
4.00
|
NUTPLATE ATTACHMENT to Wing Tips
|
Details
|
|
|
06-05-2009
|
8.00
|
WING TIP TOP and Bottom TRIM LENS MODIFICATION
|
Details
|
|
|
06-03-2009
|
4.00
|
FORWARD TORQUE TUBE SUB-ASSEMBLY and AFT TORQUE TU
|
Details
|
|
|
06-02-2009
|
2.00
|
AILERON BELL CRANK BUSHING INSTALLATION and AILERO
|
Details
|
|
|
06-01-2009
|
1.00
|
ROD END BEARING AND JAM NUT INSTALLATION, and AIL
|
Details
|
|
|
05-30-2009
|
3.00
|
BELLCRANK TO AILERON PUSHROD FABRICATION and PILOT
|
Details
|
|
|
05-29-2009
|
3.00
|
THREADED ROD END INSTALLATION
|
Details
|
|
|
05-28-2009
|
3.00
|
RQUE TUBE TO BELL CRANK PUSHROD FABRICATION,
|
Details
|
|
|
05-28-2009
|
1.00
|
EAA TECHNICAL COUNSELOR ViISIT
|
Details
|
|
|
05-25-2009
|
4.00
|
RIVETING NOSE AND TOP SKINS.
|
Details
|
|
|
05-24-2009
|
5.00
|
ATTACHING NOSE SKINS and ATTACHING TOP SKIN
|
Details
|
|
|
05-23-2009
|
4.00
|
Riveted the FL-10004 –L Nose Ribs FL-1005-L and FL
|
Details
|
|
|
05-19-2009
|
6.00
|
22-6 Steps 1 to 6. OUTBOARD ROD END RIB SUBASSEMB
|
Details
|
|
|
05-18-2009
|
3.00
|
Primed White the Inside Flaps
|
Details
|
|
|
05-17-2009
|
10.00
|
Bottom Skin FL-1002, Top Skin FL-1001C, Inboard No
|
Details
|
|
|
05-10-2009
|
4.00
|
FL-1004-L Nose Rib and the FL-1007 Hinge Bracket a
|
Details
|
|
|
05-09-2009
|
3.00
|
FL-1007-L Hinge Brackets as shown in Figure 3
|
Details
|
|
|
05-09-2009
|
3.00
|
FL-1005-R/L Main Ribs.
|
Details
|
|
|
05-08-2009
|
1.00
|
removed the A-1001 Trailing Edge from both Aileron
|
Details
|
|
|
05-07-2009
|
2.00
|
Turned the assembly over and riveted the assigned
|
Details
|
|
|
05-06-2009
|
1.00
|
Clecoed the end ribs A1005-L and A-1005-R to the M
|
Details
|
|
|
05-05-2009
|
1.00
|
21-6 Completed Step 2 with for the Bottom Skin Ass
|
Details
|
|
|
05-04-2009
|
2.00
|
Clecoed at every other hole the Top Skin Assembly
|
Details
|
|
|
05-03-2009
|
1.00
|
Spar A-1003-L in the cradle I lowered the A-1001A-
|
Details
|
|
|
05-02-2009
|
3.00
|
Attached the A-1004-L and A-1004 Nose Ribs to the
|
Details
|
|
|
05-01-2009
|
1.00
|
Clecoed the A-1014 Spacer to the A-1003 Spar.
|
Details
|
|
|
04-30-2009
|
2.00
|
clecoed in place the A-1011 Trailing Edge made fro
|
Details
|
|
|
04-29-2009
|
4.00
|
Began by clecoing the Counter Balance Weight or “p
|
Details
|
|
|
04-28-2009
|
2.00
|
Attached the Bottom Skin Assembly to the Spar and
|
Details
|
|
|
04-27-2009
|
2.00
|
Completed riveting all the Rib Stiffeners A-710 to
|
Details
|
|
|
04-24-2009
|
0.00
|
Sun-n-Fun at LackLand, Florida 2009
|
Details
|
|
|
04-22-2009
|
3.00
|
Section 21-3 Steps 6 to 8 After orienting the A-10
|
Details
|
|
|
04-19-2009
|
4.00
|
Section 21-3 Out-Board / In-Board Hinge Bracket an
|
Details
|
|
|
04-17-2009
|
3.00
|
Started the Ailerons Nose Rib, Doublers Counter W
|
Details
|
|
|
04-10-2009
|
8.00
|
Section 20 Bottom Wing Skins ....Page 20-5 step 11
|
Details
|
|
|
04-10-2009
|
4.00
|
Section 20 Bottom Wing Skins ....Page 20-5 step 10
|
Details
|
|
|
04-09-2009
|
6.00
|
Section 20 Bottom Wing Skins ....Page 20-5 Steps 8
|
Details
|
|
|
04-08-2009
|
2.00
|
X-10 NACA 23013.5 Air Foil
|
Details
|
|
|
04-08-2009
|
3.00
|
Section 20 Bottom Wing Skins page 20-5 steps 1 to
|
Details
|
|
|
04-07-2009
|
1.00
|
Completed step 1 on page 20-4. For the Right Wing
|
Details
|
|
|
04-06-2009
|
6.00
|
Section 20 Bottom Wing Skins completed steps 2 to
|
Details
|
|
|
04-05-2009
|
2.00
|
Section 20 Bottom Skins page 20-6 Step 1
|
Details
|
|
|
04-04-2009
|
6.00
|
Riveting the Bottom Wing Skin W-1005-L
|
Details
|
|
|
04-03-2009
|
1.00
|
Adding the Pitot Mast to the Bottom Skin W-1005 -L
|
Details
|
|
|
03-31-2009
|
6.00
|
Riveting the W-1004-L Bottom Skin
|
Details
|
|
|
03-25-2009
|
3.00
|
Bottom Skins Dimpled and Primmed
|
Details
|
|
|
03-22-2009
|
2.00
|
Bottom Wing Skins adn J-Channel Stiffners #40 Fina
|
Details
|
|
|
03-21-2009
|
4.00
|
Aileron Gap Fairng and Flap Gap Fairing Fillet
|
Details
|
|
|
03-20-2009
|
1.00
|
Running the White Wire in the Wing
|
Details
|
|
|
03-17-2009
|
0.50
|
Stall Waring Wire Wrap
|
Details
|
|
|
03-15-2009
|
2.00
|
Pitot and AOA Lines Installed
|
Details
|
|
|
03-14-2009
|
3.00
|
Attached the Leading Edge and Fuel Tank to the Lef
|
Details
|
|
|
03-10-2009
|
6.00
|
DuckWorks Aviation Leading Edge Lights
|
Details
|
|
|
02-22-2009
|
4.00
|
Section 18-8 Fuel Tank Leak Testing
|
Details
|
|
|
02-15-2009
|
4.00
|
Tank Fuel Skin
|
Details
|
|
|
02-12-2009
|
3.00
|
Section Fuel Tank 18-8
|
Details
|
|
|
02-05-2009
|
2.00
|
Section 19 Stall Warning System Steps 1 to 8
|
Details
|
|
|
02-05-2009
|
2.00
|
Fabricate the Stall Waring Switch
|
Details
|
|
|
02-01-2009
|
1.00
|
Section 18 Page 18-7 Steps 1 to 3.
|
Details
|
|
|
01-31-2009
|
2.50
|
Section 18 Fuel Tank, Page 18-6 Steps 1 to 6
|
Details
|
|
|
01-28-2009
|
12.00
|
Section 18 Fuel Tank, Page 18-5 Steps 5 to 9
|
Details
|
|
|
01-26-2009
|
3.00
|
Section Fuel Tank, Page 18-5 Step 4
|
Details
|
|
|
01-25-2009
|
2.00
|
Section 18 Fuel Tank, Page 18-5 steps 1 to 8
|
Details
|
|
|
01-24-2009
|
8.00
|
Section 18 Fuel Tank, Page 18-4
|
Details
|
|
|
01-17-2009
|
12.00
|
Section 18, Page 18-2, Steps 5 to 6
|
Details
|
|
|
01-16-2009
|
4.00
|
Section 18 Fuel Tank, Page 18-2 , Steps 1 to 4
|
Details
|
|
|
01-13-2009
|
10.00
|
Section 17 Outborad Leading Edge, Page 17-4, Step
|
Details
|
|
|
01-11-2009
|
10.00
|
Section 17 Outborad Leading Edge, Page 17-4 , Step
|
Details
|
|
|
01-10-2009
|
10.00
|
Section 17 Outboard Leading Edge, Steps 9 to 14,
|
Details
|
|
|
01-06-2009
|
5.00
|
Section 17 Outborad leading Edge, Page 17-3 Compl
|
Details
|
|
|
01-05-2009
|
6.00
|
Section 17 Outboard Leading Edge, Page 17-2, Ste
|
Details
|
|
|
12-30-2008
|
0.00
|
Van's factory Tour....
|
Details
|
|
|
12-13-2008
|
8.00
|
Top Wing Skins Section 16-2 Steps 5 to 8 Riveting
|
Details
|
|
|
12-07-2008
|
4.00
|
Top Wing 16-2 steps 1 to 4 section
|
Details
|
|
|
12-04-2008
|
3.00
|
Rear Spar 15-4 final drilling of the #30,#40 and a
|
Details
|
|
|
12-03-2008
|
1.50
|
Rear Spar 15-3 Finished step 1 to 4
|
Details
|
|
|
12-02-2008
|
4.00
|
Rear Spar 15-2 Completed steps 1 to 7
|
Details
|
|
|
12-01-2008
|
4.00
|
Wing Spar 14-5 d riveted the 15 Wing Ribs 1010 ..
|
Details
|
|
|
11-29-2008
|
3.00
|
Section14-3 Flap Hinge Rib W-1025B and Flap Hinge
|
Details
|
|
|
11-28-2008
|
2.00
|
Priimed the Ribs W-1010, W 1011 and W 1012 Wing R
|
Details
|
|
|
11-24-2008
|
5.00
|
Section 14... Page 14-3...
|
Details
|
|
|
11-23-2008
|
6.00
|
Wing Ribs Section 14, steps 1 too 4
|
Details
|
|
|
11-21-2008
|
5.00
|
Wing Ribs Section 14, steps 1 to 10
|
Details
|
|
|
11-21-2008
|
1.00
|
Section 13-5 . Step 1
|
Details
|
|
|
11-20-2008
|
2.00
|
Section 13-4 ... Steps 6 to 10 on page 13-4
|
Details
|
|
|
11-18-2008
|
3.00
|
Section 13-3, Continued steps 5 to 9 on page 13-3.
|
Details
|
|
|
11-17-2008
|
2.00
|
Section 13-3, Completed steps 1 to 4
|
Details
|
|
|
11-15-2008
|
3.00
|
Wings Section 13-2... I completed steps 1 to 8 on
|
Details
|
|
|
11-11-2008
|
6.00
|
Section 13 Wings Unloading and Inventory of the Wi
|
Details
|
|
|
10-20-2008
|
5.00
|
Painting the Empennage parts (continued)
|
Details
|
|
|
10-19-2008
|
30.00
|
Painting the Empennage Parts
|
Details
|
|
|
10-15-2008
|
5.00
|
Painting the Tail Cone
|
Details
|
|
|
09-26-2008
|
1.00
|
EMPENNAGE / TAILCONE is COMPLETE !!!!!
|
Details
|
|
|
09-25-2008
|
2.00
|
Empennage Fairing 12-4, VS-1009 Vertical Stabilize
|
Details
|
|
|
09-22-2008
|
4.00
|
Empennage Attachment 12-3. Steps 5 to 12
|
Details
|
|
|
09-21-2008
|
0.50
|
-1001 Rudder Bottom Fairing to the bottom of the R
|
Details
|
|
|
09-20-2008
|
2.00
|
Section 12-3.Step 4 to 9
|
Details
|
|
|
09-18-2008
|
4.00
|
I attached the E-912 Elevator Tip Fairings to the
|
Details
|
|
|
09-13-2008
|
4.00
|
Empennage Attachment Section 11-10
|
Details
|
|
|
09-12-2008
|
1.00
|
Empennage Attachment Section 11-9
|
Details
|
|
|
09-11-2008
|
5.00
|
Empennage Attachment Section 11-8
|
Details
|
|
|
09-11-2008
|
2.00
|
Empennage Attachment Section 11-5
|
Details
|
|
|
09-10-2008
|
1.00
|
Empennage Attachment Section 11-6 Vertical Stab to
|
Details
|
|
|
09-10-2008
|
1.00
|
Digital Torque Wrench
|
Details
|
|
|
09-09-2008
|
2.00
|
Empennage Attachment Section 11-04, Steps 1 to 4.
|
Details
|
|
|
09-07-2008
|
3.00
|
Empennage Attachment Section 11-3
|
Details
|
|
|
09-07-2008
|
4.00
|
Empennage Attachment Attached the Eye Bolts or Ro
|
Details
|
|
|
09-05-2008
|
5.00
|
Tail Cone Section 10-24
|
Details
|
|
|
09-02-2008
|
2.00
|
Tail Cone Section 10-23
|
Details
|
|
|
09-01-2008
|
1.00
|
Tail Cone Section 10-21. Steps 4 and 5
|
Details
|
|
|
08-30-2008
|
2.00
|
Tail Cone Section 10-22
|
Details
|
|
|
08-30-2008
|
16.00
|
Tail Cone Section 10-20
|
Details
|
|
|
08-20-2008
|
8.00
|
Tail Cone Section 10-20
|
Details
|
|
|
08-19-2008
|
3.00
|
I primed some of the parts for the interior assemb
|
Details
|
|
|
08-17-2008
|
2.00
|
Tail Cone Section 10-18, Steps 1 to 3
|
Details
|
|
|
08-17-2008
|
3.00
|
Tail Cone Section 10-17, Steps 1 to 6
|
Details
|
|
|
08-16-2008
|
2.00
|
Tail Cone Section 10-16 Steps 1 to 8
|
Details
|
|
|
08-16-2008
|
2.00
|
Tail Cone Section 10-15, Steps 1 to 9
|
Details
|
|
|
08-15-2008
|
1.00
|
Tail Cone Section 10-14, Steps 1 too 5
|
Details
|
|
|
08-15-2008
|
1.00
|
Tail Cone Section 10-13 Steps 1 to 7
|
Details
|
|
|
08-14-2008
|
2.00
|
Tail Cone Section 10-12, Steps 1 to 9.
|
Details
|
|
|
08-13-2008
|
2.00
|
Tail Cone Section 10-11
|
Details
|
|
|
08-11-2008
|
1.00
|
Tail Cone Section 10-10 Steps ......
|
Details
|
|
|
08-10-2008
|
2.00
|
Section 10-9, Steps 1 to 5
|
Details
|
|
|
08-09-2008
|
6.00
|
Section 10-8, Steps 1 to 7
|
Details
|
|
|
08-08-2008
|
6.00
|
Section 10-6, Steps 1 to 7
|
Details
|
|
|
08-05-2008
|
2.00
|
Section 10-5, step 1, 2 and 3
|
Details
|
|
|
08-04-2008
|
2.00
|
Tail Cone Section 10-4 and 10-5
|
Details
|
|
|
08-03-2008
|
2.00
|
Completed Steps 1 to 6 Section 10-2
|
Details
|
|
|
08-02-2008
|
1.00
|
Section 10-4 Steps 1 to 5 I fabricated the F-101A
|
Details
|
|
|
08-02-2008
|
6.00
|
Horizontal Elevator Section 9-1 to 9-21
|
Details
|
|
|
08-01-2008
|
4.00
|
HE Section 9-17, Step 5 to 10, I cut out PVC foam
|
Details
|
|
|
07-30-2008
|
4.00
|
HE Section 9-17, Completed steps 1 to 4. Created
|
Details
|
|
|
07-29-2008
|
4.00
|
HE Section 9-16, bending all four end tabs on E-91
|
Details
|
|
|
07-27-2008
|
2.00
|
six clamping blocks
|
Details
|
|
|
07-26-2008
|
3.00
|
Section HE 9-15, Steps 8 and 9. Trimmed the lead
|
Details
|
|
|
07-25-2008
|
4.00
|
HE Section 9-15 riveted the sheer clip E-1022 to
|
Details
|
|
|
07-24-2008
|
4.00
|
Completed step 11 by using the hex de-burred
|
Details
|
|
|
07-18-2008
|
4.00
|
Horizontal Elevator Section 9-12
|
Details
|
|
|
07-17-2008
|
3.00
|
Horizontal Elevator Section 9-12
|
Details
|
|
|
07-16-2008
|
2.00
|
Horizontal Elevator Section 9-11
|
Details
|
|
|
07-15-2008
|
2.00
|
Horizontal Elevator Section 9-11
|
Details
|
|
|
07-13-2008
|
6.00
|
Horizontal Elevator Section 9-11
|
Details
|
|
|
07-12-2008
|
3.00
|
Horizontal Elevator Section 9-10
|
Details
|
|
|
07-11-2008
|
5.00
|
Horizontal Elevator Section 9-9
|
Details
|
|
|
07-10-2008
|
6.00
|
Horizontal Elevator Section 9-7
|
Details
|
|
|
07-08-2008
|
6.00
|
Section 9 Horizontal Elevator Sections 9-7
|
Details
|
|
|
07-06-2008
|
6.00
|
Horizontal Elevator Sections 9 Pages 9-5 to 9-6
|
Details
|
|
|
07-05-2008
|
7.00
|
Section 9 Horizontal Elevator 9-1 to 9-4
|
Details
|
|
|
07-04-2008
|
4.00
|
Husky 20 gallon, 1.8 hp air compresso
|
Details
|
|
|
07-03-2008
|
5.00
|
Completed Section 8 Horizontal Stabilizer
|
Details
|
|
|
06-29-2008
|
6.00
|
HS Riveting in Process
|
Details
|
|
|
06-27-2008
|
4.00
|
HS Skins HS 1001 in rack
|
Details
|
|
|
06-25-2008
|
6.00
|
Primed Section above and Rivited to the Front Spar
|
Details
|
|
|
06-22-2008
|
5.00
|
I completed Section 7 the Rudder.
|
Details
|
|
|
06-21-2008
|
8.00
|
Horziontal Stabilizer Section 8-9.
|
Details
|
|
|
06-19-2008
|
10.00
|
Final Drilling of all the common holes of the Horz
|
Details
|
|
|
06-14-2008
|
4.00
|
Section 7-8 and 7-9 about gluing (pro-seal) the t
|
Details
|
|
|
06-14-2008
|
5.00
|
completed the cradle for holding the HS-1001 skin
|
Details
|
|
|
06-11-2008
|
2.00
|
Completed Section 8-6 on the Horizontal Stabilizer
|
Details
|
|
|
06-08-2008
|
8.00
|
Beganning the Hortizontal Stab
|
Details
|
|
|
06-07-2008
|
5.00
|
Section 7-10
|
Details
|
|
|
06-06-2008
|
7.00
|
Rudder skins R 1001-L and R 1001-R
|
Details
|
|
|
06-05-2008
|
8.00
|
completed skin dimple and riveted R-1004 and R1006
|
Details
|
|
|
06-01-2008
|
6.00
|
Rudder Section 7-1 to 7-6.
|
Details
|
|
|
05-24-2008
|
12.00
|
Vertical Stabilizer Section 6 Completed
|
Details
|
|
|
05-21-2008
|
10.00
|
Vertical Stabilizer Match Drilled and Dimpled
|
Details
|
|
|
05-17-2008
|
6.00
|
Section 6 Vertical Stabilizer
|
Details
|
|
|
05-11-2008
|
10.00
|
The Empennage Kit Arrives
|
Details
|
|