Date
|
Hours
|
Work Log Summary
|
Details
|
01-03-2011
|
1.00
|
Fabricated the aileron control stops
|
Details
|
|
|
01-02-2011
|
3.50
|
Right wing stuff
|
Details
|
|
|
01-01-2011
|
4.00
|
Left wing
|
Details
|
|
|
12-08-2010
|
2.00
|
Riveted top outer skin - left wing
|
Details
|
|
|
12-02-2010
|
2.00
|
Riveted flap hinge to flap
|
|
|
|
12-01-2010
|
6.00
|
Attaching aileron and flap to right wing
|
Details
|
|
|
11-30-2010
|
2.00
|
Riveted aileron gap fairing
|
Details
|
|
|
11-29-2010
|
2.00
|
Riveted right aileron hinges to spar
|
Details
|
|
|
11-28-2010
|
0.25
|
Move right wing to cradle
|
Details
|
|
|
11-27-2010
|
5.00
|
Build wing cradle
|
Details
|
|
|
11-22-2010
|
2.00
|
Riveted top skin of right wing
|
Details
|
|
|
11-20-2010
|
4.00
|
Left wing leading edge work
|
|
|
|
11-17-2010
|
1.50
|
Left wing leading edge assembly
|
Details
|
|
|
11-16-2010
|
2.00
|
Completed riveting top skin right wing
|
Details
|
|
|
11-14-2010
|
2.00
|
Riveting outboard skin
|
|
|
|
11-13-2010
|
1.00
|
Riveted lower inboard top skin to rear spar
|
|
|
|
11-09-2010
|
4.00
|
Fabricated the aileron to control stick pushrods
|
Details
|
|
|
11-07-2010
|
3.00
|
Started to rivet top skin to right wing
|
Details
|
|
|
11-06-2010
|
6.00
|
Riveted right wing leading edge to spar
|
Details
|
|
|
10-01-2010
|
4.00
|
Bending the fuselage main longerons and drilling a
|
Details
|
|
|
09-26-2010
|
1.00
|
Tail cone cut-out for tail wheel spring
|
|
|
|
09-25-2010
|
2.00
|
Working on tailcone assembly
|
|
|
|
09-21-2010
|
0.00
|
More bulkhead pictures
|
|
|
|
09-20-2010
|
4.00
|
Primed and stated to rivet bulkhead parts
|
|
|
|
09-18-2010
|
7.00
|
Alumipreped and started priming bulkheads
|
|
|
|
09-12-2010
|
2.00
|
Contunued to prep parts for priming
|
|
|
|
09-07-2010
|
1.00
|
More preping of parts for alumiprep and priming
|
|
|
|
09-06-2010
|
3.00
|
Started F710 bulkhead
|
Details
|
|
|
08-23-2010
|
4.00
|
F710 and F711 bulkheads completed
|
|
|
|
08-20-2010
|
2.00
|
Continued smoothing F707 F708 bulkheads
|
|
|
|
08-19-2010
|
2.00
|
Started F707 and F708 bulkheads
|
Details
|
|
|
08-18-2010
|
3.00
|
Started F706 bulkhead
|
Details
|
|
|
08-17-2010
|
4.00
|
Completed all parts of F705 bulkhead
|
|
|
|
08-16-2010
|
4.00
|
More work on F705 Rear spar bulkhead assembly
|
Details
|
|
|
08-15-2010
|
3.50
|
More work on F705 rear spar bulkhead
|
Details
|
|
|
08-13-2010
|
5.00
|
Started the F705 rear spar bulkhead
|
Details
|
|
|
08-08-2010
|
2.00
|
Assembled control column mount
|
|
|
|
08-07-2010
|
5.00
|
More work on center section bulkhead
|
Details
|
|
|
08-06-2010
|
1.00
|
Drilled bolt holes in Centre section bulkhead to s
|
|
|
|
08-05-2010
|
4.50
|
Work on forward and aft centersection bulkhead
|
|
|
|
08-04-2010
|
3.00
|
Center section
|
Details
|
|
|
07-26-2010
|
0.00
|
OSH Planes
|
|
|
|
07-26-2010
|
0.00
|
OSH Planes
|
|
|
|
07-19-2010
|
1.00
|
Started center section bulkhead
|
|
|
|
07-18-2010
|
3.00
|
Riveted firewall
|
Details
|
|
|
07-17-2010
|
5.00
|
Alumiprep and prime firewall parts
|
|
|
|
07-16-2010
|
2.00
|
Setting up to leak test RW fuel tank
|
Details
|
|
|
07-16-2010
|
3.50
|
More work on firewall
|
Details
|
|
|
07-13-2010
|
4.50
|
Fabricated firewall brackets and angle
|
|
|
|
07-12-2010
|
2.00
|
Started to clecoe F-601 firewall parts
|
|
|
|
07-11-2010
|
5.50
|
Riveted RW tank baffle
|
Details
|
|
|
07-06-2010
|
2.50
|
Prep tank and baffle and bent fuel sender rod
|
Details
|
|
|
06-18-2010
|
2.50
|
Riveted last rib of right wing tank
|
|
|
|
06-16-2010
|
2.50
|
Sealed RW fuel tank inboard rib
|
Details
|
|
|
06-15-2010
|
1.00
|
Fabricated RW vent line
|
|
|
|
06-14-2010
|
2.00
|
Last internal rib sealed
|
Details
|
|
|
06-01-2010
|
2.25
|
Anothe rib sealed in right tank
|
Details
|
|
|
05-31-2010
|
1.00
|
Right tank fuel pick up tube
|
Details
|
|
|
05-29-2010
|
4.50
|
Completed third rib in right fuel tank and more
|
Details
|
|
|
05-28-2010
|
3.00
|
Completed second rib in right tank
|
|
|
|
05-10-2010
|
2.00
|
Sealed and riveted first rib in right tank
|
|
|
|
05-08-2010
|
0.00
|
Fuselage large part storage
|
Details
|
|
|
04-27-2010
|
0.00
|
Inventory completed
|
Details
|
|
|
04-16-2010
|
0.00
|
|
Details
|
|
|
04-14-2010
|
0.00
|
Picked up Fuselage kit at ABF depot
|
Details
|
|
|
04-04-2010
|
3.00
|
Out board rib Right tank
|
Details
|
|
|
04-03-2010
|
3.00
|
Riveted and sealed fuel tank flange and drain
|
Details
|
|
|
04-02-2010
|
2.50
|
Riveted right tank stiffner
|
Details
|
|
|
03-31-2010
|
1.00
|
Dimpled the right fuel tank skin
|
|
|
|
03-30-2010
|
1.00
|
Right fuel tank skin
|
Details
|
|
|
03-29-2010
|
1.00
|
Deburr right fule tank skin
|
|
|
|
03-28-2010
|
3.25
|
Prepared right tank for sealing
|
Details
|
|
|
03-26-2010
|
2.50
|
Riveted last rib of left tank
|
Details
|
|
|
03-24-2010
|
4.00
|
Riveted inboard root rib
|
Details
|
|
|
03-23-2010
|
1.00
|
Bent fuel sender
|
Details
|
|
|
03-22-2010
|
1.50
|
Riveted fuel pick up tube assembly
|
Details
|
|
|
03-16-2010
|
1.00
|
Primed main spar flange
|
Details
|
|
|
03-14-2010
|
2.00
|
Formed vent line and fittings
|
Details
|
|
|
03-13-2010
|
4.00
|
Prosealed L2 rib
|
Details
|
|
|
03-11-2010
|
2.50
|
Prosealed L3 rib
|
|
|
|
03-08-2010
|
2.50
|
Prosealed another rib ( L4)
|
Details
|
|
|
03-06-2010
|
3.00
|
Prp sealed another rib
|
Details
|
|
|
02-28-2010
|
2.00
|
C'sink spar flange holes and drill out tie down ho
|
Details
|
|
|
02-27-2010
|
4.00
|
Dimple skins and match drill seals and brace
|
Details
|
|
|
02-26-2010
|
2.50
|
Dimpled wing skins
|
Details
|
|
|
02-24-2010
|
3.50
|
Access panel and bottom skin work
|
Details
|
|
|
02-21-2010
|
6.00
|
Continued priming parts
|
|
|
|
02-20-2010
|
4.00
|
Primed wing skins, gap seal and flap brace
|
Details
|
|
|
02-03-2010
|
2.00
|
Cut hole in wing skin for pitot mast
|
Details
|
|
|
02-02-2010
|
2.00
|
More deburring and smoothing
|
|
|
|
02-01-2010
|
2.50
|
Deburring wing skins
|
Details
|
|
|
01-31-2010
|
5.00
|
2nd proseal session
|
Details
|
|
|
01-30-2010
|
5.00
|
Prosealed drain, and fuel flange
|
Details
|
|
|
01-30-2010
|
0.00
|
More pictures of tank
|
|
|
|
01-22-2010
|
0.00
|
Ordered the fuselage!!!
|
Details
|
|
|
01-17-2010
|
5.00
|
Started sealing
|
Details
|
|
|
01-13-2010
|
1.50
|
Completed scuffing and dimpling the left fuel tank
|
Details
|
|
|
01-09-2010
|
4.50
|
Prep left fuel tank for sealing
|
Details
|
|
|
12-25-2009
|
0.00
|
Fuselage as a gift !!!!
|
Details
|
|
|
12-15-2009
|
1.00
|
Made clip for fuel vent linre - left fuel tank
|
Details
|
|
|
12-14-2009
|
5.50
|
Started final prep work on left fuel tank before p
|
Details
|
|
|
12-13-2009
|
5.50
|
Riveted right flap -both flaps completed
|
Details
|
|
|
12-12-2009
|
2.00
|
Started to assemble right flaps
|
|
|
|
12-05-2009
|
3.50
|
Alumipreped and primed flap parts
|
Details
|
|
|
11-29-2009
|
6.00
|
Worked on right flap
|
Details
|
|
|
11-28-2009
|
6.00
|
Started on right flap
|
Details
|
|
|
11-27-2009
|
2.00
|
Riveted left flap
|
Details
|
|
|
11-26-2009
|
7.00
|
Dimpled, assembled and started riveting left flap
|
Details
|
|
|
11-25-2009
|
3.00
|
Clean and prime left flap parts
|
Details
|
|
|
11-24-2009
|
4.00
|
Fabricated and drilled FL706A,B flap actuting part
|
Details
|
|
|
11-23-2009
|
4.00
|
Start to fabricate left flap
|
Details
|
|
|
11-22-2009
|
5.00
|
Riveted right aileron
|
Details
|
|
|
11-21-2009
|
2.00
|
Assemble and start riveting right aileron
|
Details
|
|
|
11-20-2009
|
7.00
|
Assembled and rvited left aileron
|
Details
|
|
|
11-15-2009
|
3.00
|
Prime aileron components
|
Details
|
|
|
11-15-2009
|
3.00
|
Preped and Prime L&R aileron parts
|
|
|
|
11-14-2009
|
7.00
|
Continued on LW aileron.
|
Details
|
|
|
11-13-2009
|
2.25
|
Worked on right aileron
|
Details
|
|
|
11-12-2009
|
1.50
|
Bent left aileron skin
|
Details
|
|
|
11-08-2009
|
3.50
|
Smooth and match drill nos and main ribs
|
Details
|
|
|
11-08-2009
|
0.00
|
Horse Park
|
Details
|
|
|
11-07-2009
|
3.00
|
Rivet aileron stiffners and spar reinforcement pla
|
Details
|
|
|
11-06-2009
|
4.00
|
Prime aileron parts
|
Details
|
|
|
11-03-2009
|
2.25
|
deburr spars and spar reinforcemnt plates
|
|
|
|
11-02-2009
|
3.00
|
Match drilledspar reinforcement plates and hinge b
|
Details
|
|
|
11-01-2009
|
1.25
|
Deburr stiffeners and skins
|
Details
|
|
|
10-29-2009
|
2.00
|
Aileron skins and stiffners
|
Details
|
|
|
10-26-2009
|
1.50
|
Left aileron stiffeners
|
Details
|
|
|
10-24-2009
|
3.25
|
More wing work
|
Details
|
|
|
10-23-2009
|
5.00
|
RW wing work
|
Details
|
|
|
10-22-2009
|
3.25
|
Leading edge work
|
Details
|
|
|
10-18-2009
|
5.75
|
Primed RW leading edge
|
Details
|
|
|
10-17-2009
|
0.75
|
Fuel cap and flange
|
Details
|
|
|
10-16-2009
|
2.00
|
Worked on leading edge joint plate
|
Details
|
|
|
10-15-2009
|
4.00
|
Dimple LW and checked leading edge to tank fit
|
Details
|
|
|
10-14-2009
|
2.00
|
Machine c'sink LW main spar
|
Details
|
|
|
10-13-2009
|
2.80
|
Machine c'sink holes for tank skin
|
Details
|
|
|
10-12-2009
|
2.00
|
Riveting leading edge
|
Details
|
|
|
10-11-2009
|
5.00
|
Fitted new W423 joint plate and fitted tank skin
|
Details
|
|
|
10-08-2009
|
1.50
|
Received inboard rib and joint plate
|
Details
|
|
|
10-07-2009
|
1.25
|
Riveted left wing leading edge
|
Details
|
|
|
10-06-2009
|
1.00
|
Riveted platenuts to W423 joint plate
|
Details
|
|
|
10-05-2009
|
1.00
|
Dimpled LWLE ribs and skin
|
Details
|
|
|
10-04-2009
|
2.50
|
Primed LWLE parts
|
|
|
|
10-03-2009
|
2.00
|
Deburred leading edge skin
|
Details
|
|
|
10-02-2009
|
3.00
|
Leading edge and fuel tank work
|
Details
|
|
|
10-01-2009
|
1.50
|
Leading edge and fuel tank work
|
Details
|
|
|
09-30-2009
|
3.75
|
Pulled tank skin over ribs and matched drilled LE
|
Details
|
|
|
09-20-2009
|
4.25
|
Worked on top skin and wing walk doubler
|
Details
|
|
|
09-19-2009
|
7.00
|
Riveted main ribs to rear spar
|
Details
|
|
|
09-18-2009
|
1.75
|
Riveting ribs of right wing to front spar
|
Details
|
|
|
09-13-2009
|
6.00
|
Primed 14 RW main ribs
|
Details
|
|
|
09-06-2009
|
1.50
|
Installing and drilling W408L rib to leading edge
|
Details
|
|
|
09-05-2009
|
3.00
|
Complete drilling LW skin to final size
|
Details
|
|
|
09-04-2009
|
2.50
|
Cleco bottom skin to left wing and drilled skin to
|
|
|
|
09-03-2009
|
3.00
|
Leveling LW on jig
|
Details
|
|
|
09-01-2009
|
2.00
|
Mounted LW to wing jig
|
Details
|
|
|
08-31-2009
|
3.00
|
Continued building wing jig
|
|
|
|
08-30-2009
|
2.25
|
Completed riveting ribs to front and rear spar
|
Details
|
|
|
08-29-2009
|
4.50
|
Riveted LW main ribs to front spar
|
Details
|
|
|
08-28-2009
|
5.00
|
Alodined and primed LW main ribs
|
Details
|
|
|
08-27-2009
|
2.50
|
Alumiprep LW main ribs
|
|
|
|
08-25-2009
|
0.50
|
Deburred holes for conduit in main ribs
|
|
|
|
08-24-2009
|
1.75
|
Clecoed RW leading edge ribs
|
Details
|
|
|
08-23-2009
|
7.00
|
Leading edge cradle, clecoed eading edge to skin
|
Details
|
|
|
08-22-2009
|
1.50
|
RW work
|
Details
|
|
|
08-21-2009
|
1.00
|
Aileron hinge work
|
Details
|
|
|
08-19-2009
|
3.00
|
Left wing work
|
Details
|
|
|
08-17-2009
|
3.50
|
Match drilled ribs and prepared aileron hinge brac
|
Details
|
|
|
08-15-2009
|
0.00
|
Steve and Sam are here to comment on my workmanshi
|
Details
|
|
|
08-14-2009
|
4.50
|
Finish deburring and straightening right wing ribs
|
Details
|
|
|
08-13-2009
|
1.50
|
More deburring
|
|
|
|
08-12-2009
|
4.00
|
Continue to deburr right wing ribs
|
Details
|
|
|
08-11-2009
|
2.00
|
Staighten 8 tank ribs right wing
|
|
|
|
08-10-2009
|
1.00
|
Straighten right wing LE ribs
|
|
|
|
08-09-2009
|
2.50
|
Deburr right wing ribs
|
Details
|
|
|
08-07-2009
|
4.00
|
Finishing the left wing ribs
|
Details
|
|
|
08-06-2009
|
1.50
|
Finish deburring left wing ribs, start to straight
|
Details
|
|
|
08-05-2009
|
2.00
|
And more deburring
|
|
|
|
07-16-2009
|
2.00
|
More deburring
|
Details
|
|
|
07-10-2009
|
0.75
|
More deburring of left wing ribs
|
Details
|
|
|
06-10-2009
|
3.00
|
Deburr and smooth edges of Left wing ribs
|
Details
|
|
|
06-08-2009
|
0.80
|
Start of deburring left wing ribs
|
Details
|
|
|
06-06-2009
|
4.50
|
Riveted doublers and reinforcement forks to rear s
|
|
|
|
06-05-2009
|
3.00
|
Primed rear spar parts and assembled tie down
|
|
|
|
05-29-2009
|
4.00
|
Drilled tie down and spacers
|
|
|
|
05-28-2009
|
3.00
|
Match drilled and deburred rear spar and doublers.
|
|
|
|
05-27-2009
|
1.00
|
Trimmed rear spar attach doublers
|
Details
|
|
|
05-26-2009
|
2.00
|
Made tie down spacers
|
Details
|
|
|
05-25-2009
|
3.50
|
Deburred rear spar and doublers
|
Details
|
|
|
05-24-2009
|
1.00
|
Completed all nut plates on both front spars
|
Details
|
|
|
05-17-2009
|
1.00
|
Corrected nut plates for access cover
|
Details
|
|
|
05-07-2009
|
2.00
|
Riveted nutplates on 2nd front spar
|
Details
|
|
|
04-30-2009
|
3.00
|
Riveted nutplates for tank skin attach
|
Details
|
|
|
04-29-2009
|
3.50
|
Continue with front spar
|
Details
|
|
|
04-28-2009
|
2.00
|
Front spar
|
Details
|
|
|
04-19-2009
|
6.00
|
Inventory of wing
|
Details
|
|
|
04-16-2009
|
0.00
|
The wings have arrived
|
Details
|
|
|
03-30-2009
|
1.00
|
Fine tuning leading edge bend
|
Details
|
|
|
03-29-2009
|
2.00
|
Curling leading edge of right elevator
|
Details
|
|
|
03-22-2009
|
0.50
|
Sanded and fit left elevator fiberglass tip
|
Details
|
|
|
03-21-2009
|
3.00
|
Bending leading edge
|
Details
|
|
|
03-20-2009
|
3.00
|
Finish riveting Trim Tab
|
Details
|
|
|
03-19-2009
|
3.20
|
Riveting Trim Tab
|
Details
|
|
|
03-16-2009
|
1.00
|
Fix rudder leading edge
|
Details
|
|
|
03-15-2009
|
2.50
|
Bending rudder leading edge
|
Details
|
|
|
03-14-2009
|
0.00
|
Riveting rudder
|
|
|
|
03-14-2009
|
2.50
|
Double flush riveting rudder
|
Details
|
|
|
03-12-2009
|
0.00
|
Trim tab
|
Details
|
|
|
03-12-2009
|
2.50
|
Bending tabs of Trim Tab
|
Details
|
|
|
03-10-2009
|
2.50
|
Glueing the rudder trailing edge
|
Details
|
|
|
03-10-2009
|
0.00
|
Glueing rudder trailing edge
|
Details
|
|
|
03-07-2009
|
0.00
|
Riveting left elevator Part 3
|
Details
|
|
|
03-07-2009
|
0.00
|
Riveting left elevator Part 2
|
Details
|
|
|
03-07-2009
|
8.00
|
Riveting left elevator Part 1
|
Details
|
|
|
03-06-2009
|
2.50
|
Bending elevator tab
|
Details
|
|
|
03-06-2009
|
0.00
|
Bending elevator tab
|
Details
|
|
|
03-01-2009
|
0.00
|
Winter Storm
|
Details
|
|
|
02-28-2009
|
3.00
|
Prepped and primed LE parts
|
Details
|
|
|
02-24-2009
|
2.50
|
Disassemble left elevator
|
Details
|
|
|
02-22-2009
|
1.50
|
Started to rivet elevator skin
|
Details
|
|
|
02-22-2009
|
0.00
|
More pictures
|
|
|
|
02-22-2009
|
0.00
|
Elevator ready to disassemble
|
|
|
|
02-22-2009
|
2.00
|
Bending left elevator trailing edge
|
Details
|
|
|
02-22-2009
|
0.00
|
A look back at Right elevator bending
|
Details
|
|
|
02-21-2009
|
1.50
|
Non Aviation style bucking bars !
|
Details
|
|
|
02-21-2009
|
4.00
|
Continued elevator construction
|
Details
|
|
|
02-21-2009
|
8.00
|
Assemble skeleton and prepare elevator for priming
|
Details
|
|
|
02-18-2009
|
2.00
|
Smoothed edges of skin
|
Details
|
|
|
02-17-2009
|
1.00
|
Started on left elevator
|
Details
|
|
|
02-16-2009
|
0.00
|
More pictures right elevator
|
|
|
|
02-16-2009
|
3.00
|
Finishing Right elevator
|
Details
|
|
|
02-15-2009
|
3.00
|
Rivet RS elevator skeloton
|
Details
|
|
|
02-15-2009
|
0.00
|
More pictures of RS elevator
|
Details
|
|
|
02-14-2009
|
2.00
|
New tools, alumiprep and prime
|
Details
|
|
|
02-13-2009
|
2.50
|
Drill deburr, and dimple skin and skeleton and wi
|
Details
|
|
|
02-12-2009
|
2.00
|
Bend trailing edge
|
Details
|
|
|
02-09-2009
|
1.50
|
Riveted stiffners to RS elevator
|
Details
|
|
|
02-09-2009
|
0.10
|
Checked priming results
|
Details
|
|
|
02-08-2009
|
2.00
|
Primed elevator skin and stiffners
|
Details
|
|
|
02-08-2009
|
1.50
|
Alimiprep RS elevator skin and stiffners
|
|
|
|
01-17-2009
|
2.00
|
Final rudder assembly continued
|
Details
|
|
|
01-17-2009
|
7.00
|
Assemble and rivet rudder
|
Details
|
|
|
01-11-2009
|
1.00
|
Preparing remaining rudder parts for priming
|
Details
|
|
|
01-11-2009
|
3.75
|
Finished drilling trailing edge
|
Details
|
|
|
01-10-2009
|
2.50
|
Received new rudder horn
|
Details
|
|
|
01-04-2009
|
3.00
|
Prime rudder parts
|
|
|
|
01-01-2009
|
2.00
|
Misc work
|
Details
|
|
|
12-31-2008
|
4.50
|
Riveted stiffners to skin
|
Details
|
|
|
12-30-2008
|
6.00
|
Prime rudder skins and stiffners
|
Details
|
|
|
12-29-2008
|
5.25
|
Back on Rudder
|
Details
|
|
|
12-28-2008
|
2.50
|
Right side elevator skeleton
|
Details
|
|
|
12-27-2008
|
5.25
|
More work on right elevator
|
Details
|
|
|
12-27-2008
|
3.00
|
Continue with RS elevator
|
Details
|
|
|
12-26-2008
|
3.00
|
Started on right side elevator
|
Details
|
|
|
12-23-2008
|
3.75
|
Continued with rudder assembly
|
Details
|
|
|
12-23-2008
|
3.00
|
Assembly of Rudder
|
|
|
|
12-22-2008
|
2.00
|
More edge work on rudder parts and another opps mo
|
Details
|
|
|
12-21-2008
|
1.00
|
Smothed edges of rudder part
|
Details
|
|
|
12-21-2008
|
2.00
|
Finishing the VS
|
Details
|
|
|
12-21-2008
|
4.20
|
Back on rudder
|
Details
|
|
|
12-20-2008
|
2.25
|
Riveted VS skin to skeleton
|
Details
|
|
|
12-19-2008
|
2.00
|
Started to rivet VS assembly together
|
Details
|
|
|
12-19-2008
|
1.00
|
Riveted ribs to front spar
|
Details
|
|
|
12-19-2008
|
5.50
|
Prime VS parts
|
Details
|
|
|
12-19-2008
|
0.30
|
Clecoed skin to skeleton
|
Details
|
|
|
12-18-2008
|
1.00
|
Match drilled stiffners to skin, then dimpled stif
|
Details
|
|
|
12-17-2008
|
1.00
|
Trimmed and smoothed edges of left side rudder sti
|
Details
|
|
|
12-17-2008
|
2.00
|
Completed all stiffners - ready for drilling
|
|
|
|
12-16-2008
|
2.00
|
Worked on Rudder stiffners
|
Details
|
|
|
12-16-2008
|
2.00
|
More rudder work
|
Details
|
|
|
12-15-2008
|
2.30
|
VS work
|
Details
|
|
|
12-15-2008
|
2.00
|
Started rudder
|
Details
|
|
|
12-14-2008
|
6.50
|
Completed HS .....for now
|
Details
|
|
|
12-13-2008
|
3.00
|
Riveted right side of HS
|
|
|
|
12-06-2008
|
5.50
|
Riveted LS of HS
|
Details
|
|
|
12-06-2008
|
0.01
|
More pictures of HS riveting
|
Details
|
|
|
12-05-2008
|
4.00
|
Prime HS parts
|
Details
|
|
|
12-03-2008
|
3.00
|
Riveting HS
|
Details
|
|
|
12-01-2008
|
2.50
|
Practiced riveting
|
Details
|
|
|
11-30-2008
|
1.00
|
Start to rivet HS
|
Details
|
|
|
11-29-2008
|
2.20
|
Preparing for priming
|
Details
|
|
|
11-29-2008
|
2.80
|
Finish Alodine HS parts
|
|
|
|
11-28-2008
|
4.00
|
Priming prep
|
Details
|
|
|
11-27-2008
|
3.00
|
Practice using Alodine 1201, and AKZO
|
|
|
|
11-26-2008
|
1.00
|
Alumiprep 33 left side HS
|
Details
|
|
|
11-25-2008
|
2.00
|
Trimmed rear spar
|
Details
|
|
|
11-11-2008
|
2.50
|
Continue smoothing edges of all HS parts
|
|
|
|
11-10-2008
|
1.75
|
Take HS appart to prepare for priming
|
Details
|
|
|
10-03-2008
|
1.00
|
Purchased tools for priming
|
|
|
|
10-02-2008
|
2.00
|
Wiring of larger compressor
|
Details
|
|
|
10-01-2008
|
1.50
|
Finish dimpling and re-assemble all parts
|
Details
|
|
|
09-30-2008
|
1.00
|
VS edge finishing
|
Details
|
|
|
09-29-2008
|
4.25
|
More VS work
|
Details
|
|
|
09-28-2008
|
4.50
|
VS work
|
Details
|
|
|
09-27-2008
|
6.50
|
Started VS
|
Details
|
|
|
09-25-2008
|
2.00
|
Completed dimpling and clecoed skin for test
|
|
|
|
09-24-2008
|
3.00
|
Deburr and dimple left HS
|
Details
|
|
|
09-23-2008
|
1.80
|
Dimpled right side HS skins
|
Details
|
|
|
09-22-2008
|
4.25
|
Dimpled HS
|
Details
|
|
|
09-21-2008
|
4.25
|
Left and right HS assembled and ready for deburr a
|
Details
|
|
|
09-20-2008
|
3.75
|
Assembly of right side HS
|
Details
|
|
|
09-20-2008
|
4.50
|
Assembly of left side HS
|
Details
|
|
|
09-19-2008
|
4.00
|
Assembled left side HS skeleton
|
Details
|
|
|
09-18-2008
|
1.80
|
Edge finishing of HS ribs
|
Details
|
|
|
09-17-2008
|
2.50
|
Smoothed, straightened, and fluted all left side
|
Details
|
|
|
09-16-2008
|
3.00
|
Front spar reinforcement angles
|
Details
|
|
|
09-15-2008
|
2.00
|
HS - Front spar
|
Details
|
|
|
09-05-2008
|
1.00
|
Sorted AN470, 426 rivets into containers
|
|
|
|
09-05-2008
|
2.00
|
Rear spar ass'y
|
Details
|
|
|
09-04-2008
|
8.00
|
Work Bench
|
Details
|
|
|
09-04-2008
|
0.00
|
Set up new buffer with scotch brite wheel
|
|
|
|
09-03-2008
|
0.00
|
Add T8 lights over work area
|
|
|
|
09-01-2008
|
1.60
|
Begin rear spar ass'y
|
|
|
|
06-06-2008
|
0.00
|
My wife Louise taking her first RV ride
|
Details
|
|
|
05-26-2007
|
0.00
|
My first ride in an RV
|
Details
|
|