KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction
Work Logs Found: 106
Category Work Time: 391 Hours
 Date
Hours
Work Log Summary

Details

 05-24-2014
1.00
Left aileron
Details
     

 05-17-2014
1.00
Aileron hinge brackets
Details
       

 03-08-2014
1.50
Aileron hinge brackets
Details
       

 03-02-2014
3.00
Installed fuel tanks
Details
 

 02-16-2014
2.00
Riveted top skins on the left wing
Details
       

 09-21-2013
2.00
Bruce helping me rivet the top skins
Details
       

 09-18-2013
1.50
Began riveting top skin on the right wing
Details
     

 09-13-2013
1.00
Primed rear spar rivet holes
Details
       

 08-25-2013
1.00
Made and installed pitot tube line
Details
       

 08-25-2013
0.00
Made and installed pitot tube line
Details
       

 08-22-2013
1.00
Ran wiring conduit
Details
     

 08-17-2013
1.50
Riveted main ribs to main spar
Details
       

 07-02-2013
4.00
Landing lights
Details
       

 06-30-2013
4.00
Fuel tanks complete
Details
       

 05-14-2011
1.00
Tank work
Details
       

 04-16-2011
0.50
Tank work
Details
       

 04-02-2011
0.50
Tank work
Details
     

 03-12-2011
1.50
Tank work
Details
       

 02-19-2011
1.50
Tank work
Details
       

 01-08-2011
2.00
Tank work
Details
       

 12-11-2010
0.50
Tank work
Details
     

 11-20-2010
1.50
Tank work
Details
       

 11-06-2010
1.00
Tank work
Details
       

 10-02-2010
154.00
Tank work
Details
       

 10-01-2010
1.00
Dimpled the tank rivet holes
Details
       

 09-23-2010
0.50
Drilled tank drain flange to tank skins
Details
       

 09-22-2010
1.50
Drilled fuel tank flange
       

 09-20-2010
1.50
Drilled platenut rivest attach holes and countersu
Details
     

 09-19-2010
0.50
Drilled tank access plate screw holes
Details
     

 09-18-2010
2.00
Drilled T-405 and T-410 made access hole for both
Details
       

 09-16-2010
1.00
Finished cutting tank angle attach brackets
Details
     

 05-28-2010
1.50
Rough cut left and right tank attach brackets
Details
     

 05-24-2010
1.00
Enlarged left tank attach screw holes to #19
Details
     

 05-23-2010
2.00
Countersunk tank skin to baffle holes on both tank
Details
       

 05-22-2010
2.00
Drilled left fuel tank skin
Details
       

 05-16-2010
2.00
Drilled W-423 joint plates to fuel tank
Details
     

 05-15-2010
5.00
Drilled Z-Channel spar brackets
Details
       

 10-09-2009
1.00
Fabricated cradle and assembled fuel tanks
Details
       

 10-09-2009
1.00
Assembled fuel tanks
Details
       

 09-04-2009
1.50
Drilled joint plate to leading edge
Details
       

 08-14-2009
1.00
Clecoed and drilled leading edge skin to ribs
Details
       

 08-07-2009
4.00
Drilled main skin to skeleton
Details
       

 07-31-2009
1.00
Fabricated wing walk doubler
Details
       

 07-17-2009
2.00
Riveted Ribs to main and rear spar
Details
       

 07-11-2009
10.00
Primed ribs
Details
       

 06-27-2009
2.00
Drilled ribs to main and rear spar
Details
     

 06-20-2009
5.50
Wing ribs
Details
       

 03-14-2009
6.00
Rear spar assembly
Details
       

 02-14-2009
3.00
Fabricated tie down assembly and spacers
Details
       

 02-07-2009
1.50
Riveted Wing Tank Nutplates to main spar
Details

 01-30-2009
2.50
Right wing tank nutplate holes
Details
     

 01-24-2009
3.50
Left wing tank nutplate holes
Details
       

 01-03-2009
5.00
Empennage complete!
Details

 01-02-2009
5.00
Empennage complete!
Details

 11-23-2008
1.50
Riveted left and right elevator leading edges
Details

 11-15-2008
3.50
Riveted left elevator
Details

 11-09-2008
3.00
Riveted right elevator
Details

 11-08-2008
2.00
Disassembled elevator and dimpled counterbalance r
Details

 11-08-2008
3.00
Built trim tab
Details

 11-01-2008
1.50
Left and right elevator leading edge
Details

 10-25-2008
3.50
Built trim tab
Details

 10-18-2008
4.00
Riveted left elevator and bent tabs
Details

 10-12-2008
4.00
Riveted right elevator
Details

 10-11-2008
1.50
Right counterbalance skin and weight
Details

 11-22-2007
2.50
Right and left elevator horns
Details

 11-21-2007
2.00
Cut and drilled right elevator counterbalance
Details

 11-14-2007
2.00
Drilled right elevator ribs
Details

 11-13-2007
1.00
Drilled stiffeners to spars
Details

 11-12-2007
1.00
Bent elevator trailing edge
Details

 11-09-2007
1.50
Left elevator stiffener
Details

 11-08-2007
2.00
Riveted right elevator stiffeners
Details

 10-16-2007
1.50
Drilled left and right elevator stiffeners
Details

 10-06-2007
4.00
Cut right and left elevator stiffeners
Details

 05-28-2005
8.00
Completed Rudder
Details
     

 05-18-2005
2.00
Riveted right rudder skin stiffeners
Details
       

 05-17-2005
2.25
Primed rudder stiffeners
Details
       

 05-15-2005
4.00
Rudder stiffeners
Details
       

 05-14-2005
0.50
EAA Tech counselor visit
Details

 05-12-2005
2.50
Finished Vertical Stab
Details
       

 05-11-2005
1.00
Riveted VS skin to 707 rib and leading edge spar
Details
     

 05-10-2005
1.50
Riveted VS stiffener to VS rear spar
Details
     

 05-07-2005
2.50
Priming Vertical Stab
Details
       

 05-05-2005
2.00
Dimpled VS skin and skeleton
Details

 05-03-2005
1.00
Drilled VS skeleton to skin
Details
     

 05-01-2005
3.25
Vert stab lightening holes and drilled skeleton
Details
       

 04-30-2005
1.50
Prepared Vert Stab ribs
Details
       

 04-17-2005
4.50
Riveted right horizontal stab. HS stab complete!
Details
       

 04-16-2005
4.00
Riveted left side of horizontal stab
Details

 04-02-2005
1.50
Riveted right HS-707 nose rib to skin
Details

 04-01-2005
3.00
Bolted HS-411PP center bearing
Details
     

 03-27-2005
2.00
Riveted HS-609, HS-603, HS-412, and HS-413
Details

 03-26-2005
3.50
Primed horizontal stab skeleton
Details

 03-20-2005
3.00
Dimpled all part on horizonal stab
Details

 03-19-2005
4.00
Disassembled skin and skeleton and deburred
Details

 03-18-2005
1.50
Drilled outer holes on HS 710 and HS 714

 03-12-2005
4.50
HS 405 to 601 pp skin
Details

 03-11-2005
1.50
Drilled left side ribs
Details
       

 03-10-2005
3.00
Drilled right HS-405 ribs and nose ribs to spar
Details
       

 03-09-2005
2.00
Prepared horizontal spar ribs
Details
     

 03-08-2005
1.50
Bent Forward Spar
Details
     

 03-07-2005
1.50
Drilled, filed, and bent HS-710 and HS-714
Details
       

 03-06-2005
1.00
Riveted VA-146 bearing
Details
     

 03-05-2005
2.00
Horizontal Stab Rear Spar stiffeners and brackets
Details
       

 03-04-2005
1.00
Finished "breaking" edges rear spar stiffeners
Details
     

 03-03-2005
1.50
603PP Stiffener
Details
     

 03-01-2005
2.00
Inventory
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.