Powered By Kitlog Pro v2.0
CH650 in the high desert
Zodiac 650
All
Work Logs Found:
32
Category Work Time:
111 Hours
Date
Hours
Work Log Summary
Details
06-25-2009
5.00
Wing Rib "L"'s and Setting Wing
Details
06-24-2009
7.00
Aiileron Bellcrank and Re-enforcement
Details
06-01-2009
1.00
Aileron Control Rod Hole
Details
05-31-2009
2.00
Rear Spar Layout
Details
05-26-2009
3.00
Aileron Trim Tab Stiffeners
Details
05-26-2009
2.00
Aileron Trim Access
Details
05-25-2009
4.00
Alieron trim tab skin cutting
Details
05-25-2009
3.00
Aileron Trim Tab Continued....
Details
05-22-2009
4.00
Aileron Construction
Details
05-21-2009
5.00
Flap Constuction
Details
05-18-2009
3.00
Elevator Hinge Installation
Details
05-16-2009
5.00
Elevator Trim Tab
Details
05-15-2009
3.00
Lower Elevator Control Horn
Details
05-14-2009
5.50
Upper Elevator Control Horn
Details
05-06-2009
6.00
Preliminary Elevator Construction
Details
05-05-2009
2.50
Elevator Hinge Installation
Details
05-03-2009
6.00
Completed Horizontal Stabilizer
Details
05-01-2009
5.00
Installing Horizontal Stabilizer Skin
Details
04-29-2009
6.00
Riveting Skeleton
Details
04-28-2009
8.00
Horizontal Stab skeleton
Details
02-18-2009
0.50
shipping options and payment
Details
02-12-2009
3.00
Disassembled core
Details
01-26-2009
1.50
corvair core
Details
01-25-2009
6.00
finished rudder
Details
01-24-2009
3.00
Rudder Constuction
Details
01-24-2009
3.00
installed rudder skins
Details
01-22-2009
2.00
Unpacked Rudder Kit, inventory, painted steel squa
Details
01-22-2009
0.20
Corvair case
Details
01-13-2009
5.00
Work Table
Details
01-12-2009
0.50
WW Corvair manual arrives
Details
01-11-2009
0.50
on being fortunate
Details
12-26-2008
0.10
ordered the rudder kit
Details
SITE NAVIGATION
Contact Builder
Zodiac 650 Home
Category
# Logs
# Hours
All
32
111
Empennage
15
64
Engine
5
6
Miscellaneous
1
0
Wings
10
36
Work Area
1
5
Copyright © 2001-2024 Matronics. All Rights Reserved.