KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
Work Logs Found: 79
Category Work Time: 1117 Hours
 Date
Hours
Work Log Summary

Details

 12-03-2009
25.00
drwg development
Details

 11-17-2009
2.00
Clean tape off windows
Details

 11-16-2009
5.00
drawings
Details

 11-15-2009
6.00
Sensor initial placement
Details

 11-12-2009
4.00
Air induction system
Details

 11-10-2009
4.00
Drawings

 10-24-2009
10.00
fab fuel shut off levers

 10-24-2009
20.00
decide on dynon
Details

 10-17-2009
8.00
install engine controls

 10-10-2009
18.00
fab air induction system

 09-26-2009
14.00
air induction system
Details

 09-19-2009
12.00
plumb oil system

 09-12-2009
15.00
Plumb fuel system

 09-05-2009
12.00
fuel system
Details

 09-01-2009
3.00
Rig alerons

 08-30-2009
6.00
fit cowl

 08-28-2009
4.00
fit cowl

 08-22-2009
6.00
fit cowl

 08-17-2009
6.00
fit cowl

 08-12-2009
3.00
fit plenum air guides

 08-09-2009
6.00
fit wing joints

 08-03-2009
4.00
fit cowls

 07-22-2009
4.00
fit wing joints

 07-19-2009
8.00
fit wing joints

 07-19-2009
8.00
fit cowls

 07-16-2009
4.00
fit wing joints

 07-14-2009
6.00
fit wing joints

 07-07-2009
4.00
make fuel lines

 06-27-2009
8.00
mount fuel pump and filter

 06-20-2009
8.00
Install vents on sump and run fuel line to firewal

 06-15-2009
6.00
mount engine on airframe

 05-26-2009
4.00
upholstery of passenger seat

 05-19-2009
6.00
Add more accessories

 05-14-2009
4.00
upholstery work

 05-14-2009
4.00
upholster front seats

 05-12-2009
3.00
MIsc

 05-09-2009
4.00
finish on inside of pilot door for

 05-05-2009
6.00
mount fuel system

 04-23-2009
6.00
MIsc engine work

 04-21-2009
6.00
Install puhrods

 04-16-2009
4.00
Install valves

 04-14-2009
5.00
Install cylinders

 04-09-2009
3.00
install gears in accessory case

 04-07-2009
5.00
Install cam and close case

 04-02-2009
4.00
Install crank

 03-26-2009
5.00
Install rods on crank

 03-23-2009
1.00
crank back from ECI

 03-22-2009
3.00
connect brake lines

 03-21-2009
6.00
Install new spring in nosewheel mount

 03-18-2009
6.00
make farings

 03-15-2009
8.00
Make farings

 03-07-2009
7.00
make fairings

 02-27-2009
2.00
send crank for regrind

 02-24-2009
4.00
Work on rebuild

 02-21-2009
2.00
take rods back off and arrange to ship crank to EC
Details

 02-19-2009
3.00
Rods on crank
Details

 02-18-2009
3.00
Pick up crank
Details

 01-16-2009
3.00
Crankshaft
Details
     

 12-15-2008
4.00
Unpack engine
       

 11-22-2008
10.00
PIck up engine in Wisconsin
     

 10-20-2008
6.00
Speed barake install

 10-15-2008
5.00
aft aileron control assembly

 10-11-2008
45.00
paint bottom
       

 10-10-2008
25.00
mount doors

 01-01-2008
5.00
Align canard bulkhead
Details

 12-30-2007
30.00
connect elevator

 11-30-2007
20.00
rudder hinges

 11-25-2007
10.00
rudder horn and spring

 11-11-2007
250.00
Finish wing
       

 10-12-2007
25.00
Elevator higne

 08-22-2007
45.00
Pilot strake
Details
       

 06-11-2007
30.00
Attach alerons

 04-23-2007
100.00
passenger side strake
       

 04-23-2007
5.00
Nose gear
Details

 04-22-2007
100.00
Cut passenger side strake
Details
     

 04-04-2007
20.00
Strake
Details
       

 03-03-2007
4.00
seat hardpoints

 08-08-2006
11.00
Canard attachement reinforcement

 05-20-2006
1.00
Receive airframe from Florida










Copyright © 2001-2024 Matronics. All Rights Reserved.