Radio Flyer Web Site
Work Logs Found: 812
Category Work Time: 3055 Hours
 Date
Hours
Work Log Summary

Details

 07-16-2009
1275.00
paint and interior installation
Details
       

 02-20-2009
0.70
final test flight completion of phase 1
Details

 02-19-2009
1.80
test flight
Details

 02-19-2009
1.00
test flight
Details

 02-19-2009
1.30
test flight
Details

 02-18-2009
1.80
test flight
Details

 02-18-2009
0.00
mechanical
Details

 02-17-2009
2.10
test flight
Details

 02-17-2009
1.80
test flight
Details

 02-17-2009
1.80
test flight
Details

 02-17-2009
0.60
Engine run #1
Details

 02-04-2009
0.90
Total Cruise
Details

 02-04-2009
0.00
recommendations
Details

 02-04-2009
0.80
flight testing
Details

 02-03-2009
0.60
flight testing
Details

 02-03-2009
1.10
flight test
Details

 02-03-2009
0.80
Corrective actions and flight test
Details

 02-02-2009
0.50
High speed taxi
Details

 02-02-2009
0.70
First gear retractio
Details

 02-01-2009
0.60
Taxi test
Details
       

 02-01-2009
1.00
Flight #3
Details
     

 02-01-2009
0.80
Flight #2
Details
       

 02-01-2009
1.00
First Flight
Details
       

 01-31-2009
6.00
Initial Inspection
Details
     

 01-31-2009
0.20
Engine run #1
Details
       

 01-16-2009
20.00
Aircraft receives airworthiness
Details

 12-20-2008
3.00
Remeasured for CG and weight and balance.
Details
     

 12-12-2008
2.50
Installed seatbelts.
Details
     

 12-12-2008
1.50
Fabricated control rod for flap indicator
Details
       

 12-11-2008
6.00
Install control cables
Details
       

 12-10-2008
1.50
Released landing light lenses. Cleaned up around e
Details

 12-10-2008
2.50
Fabricate and install cover plates for sides of in
Details
       

 12-10-2008
1.50
Cleaned up canopy air seal and rebounded in very o
Details

 12-09-2008
1.50
Removed right baggage floor flange for backseat
Details
     

 12-09-2008
1.70
Remove landing light lenses. Installed seal
Details
     

 12-09-2008
1.30
Bonded canopy air seal into place per chapter 9.
Details
     

 12-07-2008
0.30
This magnetometer swing past.
Details

 12-07-2008
3.00
Removed engine cowling found sparkplug
Details
     

 12-06-2008
3.00
Complete wiring GPS1 back in the system
Details

 12-06-2008
0.50
Attempted to swing magnetometer
Details

 12-05-2008
2.00
Modified GPS antenna mount for magnetometer
Details
       

 12-05-2008
2.00
Fabricated GPS antenna mount
Details
     

 12-04-2008
3.00
Peter from Garmin gave verbal permission to modify
Details
     

 12-01-2008
4.00
A technician from Garmin, Peter. Evaluated
Details

 11-30-2008
3.00
Completed flap rewiring.
Details

 11-30-2008
2.00
Changed main battery to gel cell
Details

 11-29-2008
4.00
Worked on flaps rewiring
Details
       

 11-28-2008
3.00
Complete reinstallation of landing gear microswitc
Details

 11-26-2008
5.00
Removed landing gear sequence valve assembly
Details

 11-12-2008
20.00
Two technicians from Aerotronics
Details

 11-11-2008
0.40
magnetometer swing #4
Details

 11-10-2008
0.40
magnetometer swing #3
Details

 11-09-2008
0.60
swing magnetometer #2
Details

 11-08-2008
0.40
Taxi around hangers
Details

 11-08-2008
0.30
Second engine start
Details

 11-08-2008
0.50
magnetometer swing
Details

 11-08-2008
0.20
First engine start.
Details

 11-07-2008
4.50
Installed all panels and set up for weight and bal
Details

 11-07-2008
2.00
Found interference in controls.
Details
     

 11-06-2008
5.00
Worked on miscellaneous items.
Details

 11-06-2008
2.00
Connect wing's ground to ground planes.
Details

 11-06-2008
2.50
Complete pito & static connections. Tested static
Details
     

 11-05-2008
5.00
Mounted propeller.
Details
     

 11-05-2008
1.50
Installed taxi and landing lights into the wings
Details
       

 11-05-2008
1.00
Fit assembly pito & static probe to wing
Details
     

 11-05-2008
0.50
Assembled backseat covers.
Details
     

 11-04-2008
2.50
Sand and trim air filter box
Details
       

 11-04-2008
3.50
Check will taxi and landing lights.
Details
     

 11-03-2008
3.00
Fabricate flap push tubes and installed.
Details

 11-03-2008
4.50
Complete wiring connections to panel
Details

 11-02-2008
3.00
Complete assembly of left wing and all connections
Details
     

 11-02-2008
6.00
Assemble right wing onto aircraft.
Details

 11-01-2008
5.00
Assembled left wing onto aircraft.
Details
     

 10-31-2008
3.00
Moving day. Moved aircraft and shop to Asheville a
Details
       

 10-31-2008
90.00
Ed carried out bodywork and priming of the fuselag
Details
       

 10-30-2008
6.00
Prepared shop for moving and aircraft.
Details

 10-30-2008
6.00
Assembled elevator. Connected controls and trim ta
Details

 10-29-2008
6.00
Assembled rudder onto aircraft.
Details

 10-28-2008
9.50
Completed assembly of wings.
Details
       

 10-27-2008
3.50
Work on assembling wing components
Details
       

 10-27-2008
4.00
Complete AOA vents. Installed speed brakes
Details
       

 10-27-2008
1.00
Assembled flap arms.
Details
     

 10-25-2008
2.00
Prepared and bonded 2 bids of carbon
Details
       

 10-24-2008
0.50
Sand carbon fiber on cowling and engine
Details
       

 10-24-2008
2.00
Sand carbon fiber on cowling and engine
Details
       

 10-24-2008
3.00
Install heat vent hosing on Indian side.
Details
       

 10-24-2008
3.50
Fabricate exhaust pipe mounts.
Details
       

 10-23-2008
3.00
Sand cowling filler
Details
       

 10-23-2008
1.00
Modified engine air filter housing
Details
       

 10-23-2008
3.00
Cleaned up shop for move.
Details

 10-23-2008
1.00
Bonded in left baggage window with Hylso 9360.
Details
       

 10-23-2008
1.00
Bonded 2 bids of carbon fiber to hinge pin opening
Details
       

 10-22-2008
3.00
Trim cowling nose
Details
       

 10-22-2008
1.00
Sanded instrument dust cover. Filled one hole.
Details
       

 10-22-2008
4.50
Completed final assembly of rudder
Details
       

 10-21-2008
4.50
Fit instrument dust cover
Details
       

 10-21-2008
6.50
Assembled rudder,
Details
       

 10-20-2008
5.50
Fit instrument dust cover
Details
       

 10-19-2008
3.00
Install canopy hinges with new gas springs
Details
       

 10-17-2008
5.00
Troubleshoot instrument panel.
Details
       

 10-17-2008
3.00
Align Main landing gear wheels
Details
       

 10-16-2008
4.00
Worked on diagnosing landing gear sequence valve
Details
       

 10-16-2008
3.00
Installed MFD & PFD turned on instruments
Details
       

 10-15-2008
3.00
Worked on troubleshooting landing gear.
Details
       

 10-15-2008
5.00
Worked on flaps commissioning.
Details
       

 10-14-2008
2.00
Wired CHT's & EGT's on left side of engine
Details
       

 10-14-2008
7.00
Put aircraft on Jack's. Worked on commissioning
Details
       

 10-13-2008
8.00
Complete battery wiring. Connected batteries.
Details
       

 10-10-2008
8.00
Worked on instrument panel final assembly and wiri
Details
       

 10-09-2008
9.50
Worked on connecting instrument panel
Details
       

 10-08-2008
4.00
Installed instrument shelf with panel
Details
       

 10-07-2008
4.00
Worked on final assembly of foot well area prepari
Details
       

 10-06-2008
4.50
Worked on final assembly of foot well area.
Details
       

 10-04-2008
6.50
Work on bonding in insulation to firewall and foot
Details
       

 10-03-2008
1.50
Mounted shoulder straps
Details
       

 10-03-2008
2.00
Install throttle quadrant.
Details
     

 10-03-2008
2.00
Cleanup and prepared to bond installation behind i
Details
       

 10-02-2008
6.50
Assembled components and baggage compartment
Details
       

 10-01-2008
0.70
Locate last air-conditioning vent in baggage compa
Details
       

 10-01-2008
5.30
Assembled air conditioning vents. Changed out land
Details
       

 09-30-2008
2.00
Assist Steve with masking off cockpit for touch up
Details
       

 09-29-2008
4.00
Reassembled canopy latching system.
Details
       

 09-29-2008
1.00
Final assembly of head set jacks,
Details
       

 09-27-2008
2.00
Removed paining masking from cockpit and re-mast p
Details
       

 09-27-2008
20.00
Ed and Steve completed preparing cockpit for final
Details
     

 09-19-2008
7.00
Ed primed fuselage and canopy.
Details
       

 09-19-2008
4.00
Balanced elevators and complete balancing ailerons
Details
       

 09-18-2008
5.00
Reassembled elevators and dialed in trim tabs sett
Details
       

 09-18-2008
8.00
Ed worked on sending canopy and filled
Details
       

 09-18-2008
2.00
Bond and mounted ailerons counterweights per chapt
Details
       

 09-17-2008
6.00
Ed was working on sending the fuselage.
Details
     

 09-17-2008
3.00
Balance ailerons per chapter 6-8
Details
       

 09-16-2008
1.50
Sand and primed elevator and rudder.
Details
       

 09-16-2008
4.00
Assembled ailerons and start the balancing process
Details
       

 09-15-2008
5.00
Sand moving surfaces filler
Details
       

 09-13-2008
4.00
Sand moving services,
Details
       

 09-13-2008
6.00
Sand and prep cockpit and primed.
Details
       

 09-12-2008
4.00
Sand moving surfaces, aileron, elevator, flaps
Details
       

 09-12-2008
0.70
Reinforced rudder trim faring
Details
     

 09-12-2008
0.70
Inspect cockpit paintwork and marked spots
Details
       

 09-04-2008
1.30
Sand center council filler and applied second coat
Details
       

 09-04-2008
1.50
Remove canopy and hardware.
Details
       

 09-04-2008
1.50
Prepared and filled third coat of filler to center
Details
       

 09-03-2008
3.00
Locate air conditioning vent in center console
Details
       

 09-03-2008
2.70
Fit and trim rudder pedal floorboards
Details
       

 09-01-2008
2.00
Worked on miscellaneous stuff.
Details
     

 09-01-2008
2.00
Sand cowling and canopy
Details
       

 09-01-2008
0.50
Sand carbon fiber bids on an elevator and aileron
Details
       

 09-01-2008
0.30
Cleaned up navigation antenna Alan wrench ports.
Details

 08-29-2008
0.50
Sand canopy and cowing and applied third coat of f
Details
       

 08-29-2008
1.00
Sand bonding's of static whip keepers on rudder, e
Details
     

 08-29-2008
1.50
Fabricate and locate navigation antenna allen wren
Details
     

 08-29-2008
1.00
Applied 2 bits of carbon fiber over static whip
Details
       

 08-28-2008
1.50
Sand filler on canopy and cowling.
Details
       

 08-28-2008
0.50
Fabricate and bond net antenna guide tube into cov
Details
     

 08-28-2008
2.00
Bond static whip keepers into rudder, aileron, ele
Details
       

 08-27-2008
3.00
Prepare canopy and top cowling by standing and cle
Details
       

 08-27-2008
2.50
Locate and drilled moving surfaces for static wick
Details
       

 08-26-2008
2.50
Remove the top cowing.
Details
       

 08-25-2008
0.50
Removed clamps and cleaned up canopy handles.
Details
       

 08-25-2008
1.40
Prepared and bonded cowling hinge pin keepers into
Details
       

 08-25-2008
1.30
Install latch in the exhilarating power door
Details
       

 08-25-2008
1.00
Install cam locks in cowing
Details
       

 08-25-2008
1.50
Fit lower cowling onto aircraft
Details
       

 08-24-2008
2.00
Remade canopy handle tooling and fabricated two ne
Details
     

 08-24-2008
1.00
Released handles from tooling and trim
Details
     

 08-24-2008
1.70
Fit and bonded canopy handles into place with flox
Details
       

 08-22-2008
0.50
Set up heat lamp on left side of canopy
Details
       

 08-22-2008
2.00
Received exhaust shields
Details
       

 08-22-2008
1.50
Cutout flange for auxiliary power door
Details
       

 08-22-2008
1.50
Bonded 2 bids of carbon fiber over auxiliary power
Details
       

 08-21-2008
1.00
Move aircraft whole cleaned up shopfloor installed
Details
       

 08-21-2008
0.50
Install flap sensor for AOA and flap location.
Details
       

 08-21-2008
1.30
Fit lower Cowling and locate auxiliary plug. Remov
Details
       

 08-21-2008
1.00
Fabricate back flange for auxiliary power door and
Details
       

 08-21-2008
1.00
Cleaned up wiring under armrests and pilot and cop
Details
       

 08-20-2008
0.70
ut holes for air conditioning vent outlets
Details
       

 08-20-2008
2.50
Fabricate flap sensors mounts for flap position an
Details
       

 08-19-2008
5.30
Cleanup and sand baggage compartment floor hatches
Details
       

 08-18-2008
3.50
Prepared hinge beds for baggage floor hatches
Details
       

 08-18-2008
1.50
Fit in install nut plates for aft baggage compartm
Details
       

 08-15-2008
1.70
Trim and fit seat back panels in baggage compartme
Details
       

 08-15-2008
2.50
Trim and fit baggage compartment floor board hatch
Details
       

 08-15-2008
0.50
Bonded outside mounting tabs for back seat panels
Details
     

 08-13-2008
2.00
rim baggage compartment floors. Fit and back panel
Details
       

 08-13-2008
2.00
Install bonding strap from tail to firewall.
Details
       

 08-13-2008
1.50
Cleaned up top aft tube mount tab by adding flux t
Details
       

 08-12-2008
1.00
insulate air-conditioning through wall fittings
Details
       

 08-12-2008
0.50
Install space served between pitch servo and auto
Details
     

 08-12-2008
1.70
Fit and trim baggage compartment floors
Details
       

 08-12-2008
1.50
Fabricate microswitch mount for canopy latch annou
Details
       

 08-12-2008
1.30
Complete intercom wiring harness and installed.
Details
       

 08-07-2008
2.00
Complete installation of oxygen fill line and fill
Details
       

 08-07-2008
2.70
Cleaned up wiring runs in tail section
Details
       

 08-06-2008
5.70
Route and install oxygen lines
Details
       

 08-06-2008
1.50
Install oxygen wiring harness into aircraft.
Details
       

 08-05-2008
0.70
Wired tie cables in the tail section.
Details
     

 08-05-2008
1.30
Install not plates and modify oxygen distribution
Details
       

 08-05-2008
3.50
Fabricate oxygen wiring harness with plug p-22-1
Details
       

 08-04-2008
2.50
Completed fabrication of GPS antenna wing tip moun
Details
       

 08-04-2008
2.50
Cleaned up man of antenna penetration on the left
Details
       

 08-01-2008
3.00
Install T-cast antennas and cables
Details
       

 07-31-2008
2.50
Fabricate number 2 com antenna ground plane
Details
       

 07-31-2008
2.00
Fabricate and run navigation antenna cable.
Details
     

 07-30-2008
3.50
Complete wiring mic and phone jacks to plug p-4
Details
       

 07-25-2008
1.50
Fabricates microphone wiring harness plug P-4.
Details
     

 07-24-2008
2.00
Locate and cut holes for oxygen distribution heads
Details
       

 07-24-2008
3.00
Clear of obstructions with throttle quadrant
Details
       

 07-23-2008
2.50
Worked on wire cleanup on engine. Looking good!
Details
       

 07-23-2008
2.00
Fabricate grounding cables and install on engine a
Details
       

 07-22-2008
2.00
Worked on bundling up engine wiring.
Details
       

 07-22-2008
3.00
Locate and install auxiliary power plug and wired.
Details
       

 07-22-2008
1.50
Cleanup engine wiring and mount closing loans.
Details
       

 07-21-2008
3.00
Trim and fit oxygen and mic jacks channel
Details
       

 07-21-2008
6.50
Fabricate PSI and engine PSI sensor plugs
Details
       

 07-21-2008
1.00
Fabricate and bond throttle quadrant cable support
Details
     

 07-18-2008
3.50
Locate control pin placements on quadrant
Details
       

 07-18-2008
2.00
Fabricates engine sniffle valve and installed.
Details
       

 07-17-2008
6.50
Installed throttle, mixture, pitch control cables.
Details
       

 07-16-2008
2.00
Worked on engine wiring
Details
       

 07-15-2008
5.50
Work on engine sensor wiring.
Details
       

 07-15-2008
1.00
Complete baffling gasket.
Details
       

 07-14-2008
6.50
Install fuel PSI sensor and drains lines. Install
Details
       

 07-11-2008
6.50
Work on sensor wiring to engine.
Details
       

 07-10-2008
1.50
Route and mount spark plug leads.
Details
       

 07-10-2008
4.00
Install and connect and in wiring mounts shunts.
Details
       

 07-09-2008
5.50
Work on engine assembly, fabricated viton
Details
       

 07-08-2008
1.50
Work on installing fuel lines and drains to the en
Details
     

 07-08-2008
4.00
Work on installing engine sensors, psi, cht's.
Details
       

 07-03-2008
4.00
Work on engine assembly
Details
       

 07-03-2008
3.00
Complete reassembly of engine baffling.
Details
       

 07-02-2008
7.50
Reassemble engine baffling.
Details
       

 06-30-2008
0.50
Released seatback flange and GPS antenna mounts fr
Details
       

 06-30-2008
2.70
Fabricate molds for seatback and GPS
Details
       

 06-30-2008
2.30
Cleaned up navigation antenna mount and cover plat
Details
       

 06-28-2008
0.70
Prepared and bonded oil door latch mounting plate
Details
       

 06-28-2008
0.50
Cleaned up navigation antenna cover
Details
     

 06-28-2008
0.70
Cleaned up baggage compartment cable cover mounts
Details
       

 06-28-2008
0.50
Bonded 1 bid of carbon fiber to oil door latch tub
Details
       

 06-26-2008
1.00
Worked on installing oil door latch.
Details
       

 06-26-2008
1.00
Cleaned up top cowling by standing.
Details
       

 06-26-2008
1.00
Cleaned up navigation antenna covered
Details
     

 06-25-2008
3.00
Fabricated cable cover for baggage compartment cei
Details
       

 06-25-2008
2.00
Fabricate oil door and mounting hinge
Details
       

 06-25-2008
2.00
Fabricate navigation antenna side backing plate
Details
     

 06-25-2008
0.70
Fabricate navigation antenna cover plate
Details
     

 06-25-2008
0.70
Cleanup top cowling hinge.
Details
       

 06-24-2008
2.00
Release top cowling. Re-bond right side of hinge
Details
       

 06-24-2008
2.00
Locate and mount number 2 com radio antenna.
Details
       

 06-24-2008
2.50
Fabricate navigation antenna mount
Details
     

 06-23-2008
2.00
Prepared and bonded top counting hinge
Details
       

 06-23-2008
1.50
Prepared and bond top hinge to aircraft for upper
Details
       

 06-23-2008
1.00
Fabricate oil lines for remote oil filter and inst
Details
       

 06-23-2008
2.50
Fabricate gas collator drain line
Details
       

 06-19-2008
2.50
Re-fabricate AC compressor baffle fits nicely.
Details
     

 06-19-2008
0.50
Install fuel pump shroud per chapter 26-20.
Details
       

 06-19-2008
3.00
Final inspection of engine baffling and adjust
Details
     

 06-18-2008
1.50
Remove cleco from cowling and cleaned up hinges.
Details
     

 06-18-2008
1.50
Install nut plates on nose wheel rails
Details
       

 06-18-2008
1.00
fit top and bottom cowing installed hinge pins
Details
     

 06-18-2008
2.00
Fabricate baffle for air conditioning compressor.
Details
       

 06-17-2008
1.00
Source V. belt for AC compressor and fit.
Details
     

 06-17-2008
3.00
Prepared and bonded upper cowling hinge mounts.
Details
       

 06-17-2008
0.50
Install mixture control bracket per chapter 26-24
Details
       

 06-17-2008
1.30
Complete fabrication of AC hose to compressor.
Details
       

 06-14-2008
1.50
Prepared and bonded lower cowing hinge mounts with
Details
       

 06-14-2008
0.70
Left firewall cowling hinge failed pull test
Details
     

 06-14-2008
3.50
Fit oil separator. Purchase parts needed.
Details
       

 06-13-2008
2.50
Prepared and bonded mounting hinges to lower cowli
Details
       

 06-13-2008
1.00
Locate oil separator and fabricate amount.
Details
       

 06-13-2008
2.00
Final fitting of cowling
Details
       

 06-12-2008
6.00
Work on fitting cowling top to bottom
Details
       

 06-11-2008
1.00
Mount propeller to engine.
Details
       

 06-11-2008
1.50
Fit bottom cowling to aircraft.
Details
       

 06-11-2008
1.00
Fabricate air conditioning compressor baffling.
Details
       

 06-10-2008
6.00
Worked on assembly of engine baffling modified
Details
     

 06-09-2008
6.50
Worked on assembly of engine baffling.
Details
       

 06-06-2008
2.50
Worked on engine baffling. Fitting and installing.
Details
       

 06-06-2008
0.40
Install label on center panel.
Details
     

 06-06-2008
1.00
Design bracket for auxiliary plug
Details

 06-05-2008
2.00
Wire landing gear hydraulic gear pump Annunciation
Details
       

 06-05-2008
2.50
Wire in ADI backup battery to charging system
Details
       

 06-04-2008
4.00
Completed wiring main battery circuitry.
Details
       

 06-03-2008
2.50
Prepared parts and installed main battery solenoid
Details
       

 06-03-2008
3.00
Fabricated ground bust for cabling in center Counc
Details
       

 05-31-2008
5.00
Scott and me, Removed engine and changed oil pans
Details
       

 05-30-2008
6.00
Worked on cleaning out wiring in center Council
Details
       

 05-29-2008
3.00
Worked on wiring.
Details
       

 05-29-2008
3.00
Sandblast new oil pan
Details
     

 05-28-2008
4.50
Cleaned up wiring runs
Details
       

 05-24-2008
5.50
Install throttle quadrant and fuel selector linkag
Details
       

 05-24-2008
5.00
Charlie fabricated plugs for forward of the firewa
Details
       

 05-24-2008
6.00
Both of us, pulled wires into wing roots
Details
       

 05-23-2008
0.50
Locate and Mount Main voltage regulato
Details
     

 05-23-2008
8.00
I assisted Charlie and did very as miscellaneous i
Details
       

 05-23-2008
10.00
Charlie worked on aircraft wiring.
Details
       

 05-22-2008
2.00
Moved nut plates from airframe to instrument
Details
       

 05-22-2008
1.00
Locate and bond ADC backup battery
Details
     

 05-22-2008
0.70
Fabricated bracket and mounts for canopy air seal
Details
     

 05-22-2008
11.50
Charlie worked on wiring.
Details
       

 05-22-2008
0.40
Change standby regulator nuts to nut plates.
Details
       

 05-21-2008
8.00
I worked on installing various components onto the
Details
       

 05-21-2008
2.00
Fabricated and installed through firewall power lu
Details
       

 05-21-2008
12.50
Charlie, fabricate cables and continued electrical
Details
       

 05-20-2008
1.00
Install firewall penetration for ELT's, EGT's, pro
Details
       

 05-20-2008
11.00
Charlie, Worked on instrument panel, firewall plug
Details
       

 05-20-2008
4.00
Assemble and locate remote oil filter system onto
Details
       

 05-19-2008
2.00
Removed navigation panel and shelf from aircraft.
Details
     

 05-19-2008
5.00
I worked on mounting firewall unions for avionics
Details
       

 05-19-2008
5.00
Charlie worked on new firewall plugs from instrume
Details
     

 05-09-2008
0.50
Released and cleaned up ADI battery box and head r
Details
       

 05-09-2008
0.50
Cleaned up and sand headsets Jack mounts.
Details
       

 05-08-2008
2.00
Various glasswork.
Details
       

 05-08-2008
1.00
Release parts. Fabricate top for AD
Details
       

 05-08-2008
1.50
Prepared and bond carbon fiber to headrest moun
Details
       

 05-07-2008
0.50
Set instrument panel in place.
Details
     

 05-07-2008
1.00
Prepared and bond front section of center console
Details
       

 05-07-2008
0.50
Fine mounting place for oxygen distribution units
Details
     

 05-07-2008
2.00
Fabricate mounds for headrests out of carbon fiber
Details
       

 05-07-2008
1.00
Fabricate battery box for backup ADI.
Details
       

 05-06-2008
0.50
Work on main battery mount
Details
     

 05-06-2008
1.00
Used heat lamps to help align
Details
     

 05-06-2008
3.00
Install canopy hinges Mount canopy.
Details
       

 05-03-2008
1.00
Set instrument panel in place and fit new dustcove
Details
       

 05-03-2008
5.00
Complete relocating wires firewall plug p-9-2
Details
       

 05-01-2008
1.00
Work on relocating wires from plug p-9-2.
Details
       

 05-01-2008
1.00
Wire in speed brakes.
Details
     

 05-01-2008
2.50
Continue working on relocating wires from plug p-9
Details
       

 04-30-2008
2.70
Frustrating day with wiring
Details
       

 04-29-2008
6.50
Work on fabricating wiring and plugs, p-1-1,p-1,p-
Details
       

 04-29-2008
0.50
Repair ELT plug and pot plug
Details
     

 04-28-2008
2.50
Install ELT and wiring harness
Details
       

 04-28-2008
3.50
Fabricate ELT wiring harness.
Details
       

 04-28-2008
1.00
Complete fitting air-conditioning compressor
Details
       

 04-24-2008
1.30
Wire air-conditioning system and aircraft to plug
Details
       

 04-24-2008
2.00
Pickup air-conditioning compressor mounts
Details
     

 04-24-2008
0.30
Mount xvision ballast in left wing.
Details

 04-24-2008
0.30
Mount speed brake control box.
Details
     

 04-24-2008
1.30
Fabricate it air-conditioning wiring harness
Details
       

 04-23-2008
1.00
Prepared and bond speed brake controller mounts
Details
       

 04-23-2008
0.50
Mount right xvision ballast
Details
     

 04-22-2008
1.00
Prepared and bonded X-vision ballasts
Details
       

 04-22-2008
1.30
Locate and install strobes ballast
Details
       

 04-22-2008
2.50
Fabricate a left landing light assembly
Details
       

 04-21-2008
1.00
Locate and mount GTP-59 probe in right naca vent.
Details
       

 04-21-2008
1.30
Install T-cast antenna cables and connect.
Details
     

 04-19-2008
1.50
Assembled copilot stick grip and installed.
Details
       

 04-19-2008
2.50
Assemble pilot stick grip and installed.
Details
       

 04-18-2008
4.00
Fabricate air-conditioning hoses
Details
       

 04-17-2008
3.00
Reassemble flight controls
Details
       

 04-16-2008
0.50
Prep and paint holes for AC condenser lines in the
Details
       

 04-16-2008
1.50
Install air conditioning condenser and through hau
Details
     

 04-16-2008
2.00
Fabricated air-conditioning hoses for high and low
Details
     

 04-16-2008
2.00
Fabricate and install air-conditioning dryer mount
Details
       

 04-15-2008
2.50
Fit air conditioning condenser and fabricate hoses
Details
       

 04-15-2008
1.50
Completed wiring in hydraulic pump
Details
     

 04-14-2008
4.50
Wire in landing gear hydraulic pump
Details
       

 04-14-2008
1.00
Fabricated bracket for landing gear airspeed safet
Details
       

 04-12-2008
4.00
Wire leaning gear micro switches into sequencer an
Details
       

 04-12-2008
3.00
Installed landing gear micro switches on right and
Details
       

 04-12-2008
0.50
Install auto trim sensor for pitch.
Details
     

 04-11-2008
1.00
Install landing gear relays and hydraulic pump.
Details
     

 04-11-2008
2.00
Fabricate micro switches Cabling for landing.
Details
       

 04-11-2008
3.00
Completed wiring flap motor
Details
       

 04-09-2008
3.50
Worked on fitting air-conditioning compressor moun
Details
     

 04-09-2008
0.50
Wire tied tale wire harness
Details
     

 04-09-2008
1.50
Remove flapped drive motor from aircraft
Details
     

 04-09-2008
0.50
Install auxiliary cover plate on engine
Details
     

 04-09-2008
0.50
Change engine cage upper right bolt to longer bolt
Details
     

 04-08-2008
3.00
Run Rudder taillight, strobe light, and servo cabl
Details
       

 04-08-2008
1.50
Run pitch serval cable and AHRS cables to location
Details
       

 04-08-2008
0.50
redrill baggage compartment bulkhead
Details
       

 04-08-2008
0.20
Prepared and bonded 4 bids of carbon fibe
Details
       

 04-08-2008
1.00
Install poly tubing for rudder tail lights and tri
Details
       

 04-07-2008
0.50
Relocates brake lines to parking brake valve.
Details
       

 04-07-2008
0.80
reinstall nose wheel gas strut and hydraulic cylin
Details
     

 04-07-2008
1.00
Reconfigure fuel pump fittings.
Details
       

 04-07-2008
1.50
Installed Poly-tube conduit
Details
     

 04-07-2008
0.40
Fill two holes in fuselage AC scoop on belly with
Details
     

 04-07-2008
1.30
Fabricate 2 hydraulic lines
Details
       

 04-07-2008
0.20
change out prop governor
Details
       

 03-29-2008
1.00
Installed instrument shelf with panel into aircraf
Details
       

 03-29-2008
1.00
Fabricate mounting plate
Details
     

 03-29-2008
20.00
Brock, Scott and me. Finished wire cleanup
Details
       

 03-28-2008
1.00
Removed peal ply from instrument shelf
Details
     

 03-28-2008
1.00
Reinstalled nose gear over center arm
Details
       

 03-28-2008
0.30
reinstalled heat valve
Details
       

 03-28-2008
0.50
Prepared and painted heat control valve.
Details

 03-28-2008
1.00
Have the nose wheel over center arm modified
Details
     

 03-28-2008
0.50
Completed the Faraday cage
Details
       

 03-28-2008
1.00
Change 45° fittings to straight fittings
Details
     

 03-28-2008
5.30
Brock, Mount equipment onto instrument tray
Details
     

 03-27-2008
4.00
Removed all components from instrument shelf
Details
       

 03-27-2008
1.00
Modified nose wheel hydraulic cylinder
Details
       

 03-27-2008
0.50
Modified heat valve by remove one outlet
Details
       

 03-27-2008
2.80
Fitted avionics shelf and adjusts mounting screws
Details
       

 03-27-2008
1.00
Brock sanded avionics shelf
Details
     

 03-26-2008
15.00
Worked on instrument panel shelf
Details
       

 03-26-2008
1.00
Replaced copilot left rudder cable.
Details
       

 03-26-2008
0.10
Pressure test on left wing tank past
Details

 03-26-2008
0.70
Brock, set up right wing for pressure tests
Details

 03-25-2008
2.00
Set up left wing for pressure
Details
     

 03-25-2008
4.00
Prepared and painted
Details
       

 03-25-2008
4.00
Install second alternator
Details
       

 03-25-2008
1.00
Fabricate conduit and bonded
Details

 03-25-2008
1.00
Clean residue glue off
Details
     

 03-25-2008
2.00
bond in drain tube for air-conditioning evaporator
Details
     

 03-23-2008
1.00
Moved aircraft and set engine
Details
       

 03-23-2008
1.00
Installed through firewalls
Details
     

 03-23-2008
1.00
Install gas collator
Details
       

 03-23-2008
3.00
Fabricate left nose gear door
Details
       

 03-22-2008
0.50
Release foam molds
Details
     

 03-22-2008
3.00
Fabricated nose gear right door
Details
       

 03-22-2008
2.50
Complete fabrication and installation
Details
       

 03-21-2008
1.50
Prepared in bonded
Details
       

 03-21-2008
0.50
Mixed foam for exhaust
Details
       

 03-21-2008
3.00
Fabricate & installed nose
Details
       

 03-21-2008
4.00
Assembled and installed nose
Details
       

 03-21-2008
1.00
Assemble and installed
Details
       

 03-20-2008
0.50
Sand and prepare bonded 4
Details
       

 03-20-2008
2.00
Prepared in bonded
Details
       

 03-20-2008
1.70
Fabricate Plexiglas sides
Details
       

 03-20-2008
0.50
Applied second coat of mold
Details
     

 03-19-2008
1.00
Prepared and bonded baggage
Details
       

 03-19-2008
3.00
Fabricated ground plane
Details
       

 03-19-2008
2.00
Fabricate ground plane
Details
     

 03-18-2008
1.30
Moved canopy latch spring
Details
     

 03-18-2008
0.30
Install oxygen bottle.
Details
     

 03-18-2008
1.50
Install hydraulic landing gear
Details
       

 03-18-2008
0.50
Fit air-conditioning evaporator.
Details
       

 03-18-2008
3.30
Fabricated ground planes
Details
       

 03-17-2008
0.70
Prepared and bonded 3 bids
Details
     

 03-17-2008
0.70
Installed elevator push rod
Details
     

 03-17-2008
0.50
Assembled flap actuator
Details

 03-16-2008
1.00
Install pitch servo
Details
     

 03-16-2008
1.30
Install magnetometer
Details
     

 03-16-2008
2.00
Fabricated oxygen bottle mounting
Details
     

 03-15-2008
0.50
installed correct bolt for engine mount
Details
     

 03-15-2008
1.00
Install parking brake valve
Details
       

 03-15-2008
3.50
ended rudder cables to firewall fasteners.
Details
       

 03-14-2008
1.50
remount rudder pedals
Details
       

 03-14-2008
0.50
release engine cage from firewall
Details
       

 03-14-2008
1.70
received instrument panel and unpacked
Details

 03-14-2008
0.50
pull parts for nose gear assembly.
Details
     

 03-14-2008
1.00
prepared and bonded flame blanket
Details
       

 03-14-2008
0.70
drilled and installed
Details
       

 03-13-2008
0.70
redrilled holes and firewall
Details
     

 03-13-2008
2.00
leveled aircraft and reconfirm firewall placement
Details
       

 03-13-2008
0.70
fabricated mounting bracket
Details
       

 03-13-2008
1.00
bonded shams and filled
Details
       

 03-12-2008
2.50
turned aircraft on side
Details
       

 03-12-2008
1.00
stood aircraft on main landing gear.
Details
       

 03-12-2008
0.70
install rudder petals into aircraft.
Details
       

 03-12-2008
0.70
install last to rudder cables
Details
       

 03-12-2008
0.70
fit condenser to AC scoop
Details
       

 03-11-2008
3.50
chase for parts
Details
       

 03-10-2008
1.00
rotated aircraft up side down
Details
       

 03-10-2008
2.00
rotate aircraft to the up position.
Details
     

 03-10-2008
1.00
prepared outside rudder cable tubes
Details
       

 03-09-2008
0.50
released peal ply from instrument shelf.
Details
       

 03-09-2008
1.00
install rudder cable poly tubing
Details
       

 03-09-2008
2.00
fit rudder puddles assemblies
Details
       

 03-09-2008
1.30
fabricate rudder pedals support tube brackets
Details
       

 03-08-2008
2.70
finish instrument shelf fitting
Details
       

 03-08-2008
2.00
fabricate instruments shelf
Details
       

 03-06-2008
0.50
sand filler on center consul
Details
       

 03-06-2008
2.00
prepared and fabricate copper screening
Details
       

 03-05-2008
1.50
sanded center console and cockpit
Details
       

 03-05-2008
1.50
released exhaust tunnels splashes
Details
       

 03-05-2008
0.50
reinstalled rotisserie
Details
     

 03-05-2008
1.00
prepared and paint
Details
       

 03-05-2008
0.50
cleaned up exhaust tunnels and fuselage firewall
Details

 03-04-2008
1.00
turn aircraft upside down.
Details
       

 03-04-2008
0.70
sand center console filler
Details
     

 03-04-2008
4.00
fabricated wax fillers for exhaust outlets.
Details
       

 03-04-2008
0.20

Details
       

 02-29-2008
1.50
released and the cleanup right window
Details
     

 02-29-2008
1.30
prepared right window hinges
Details
       

 02-29-2008
0.70
fabricated mounting plates for shoulder harness
Details
     

 02-28-2008
1.00
standard center console and right AC vent.
Details
     

 02-28-2008
0.30
sanded and cleanup right AC inlet
Details

 02-28-2008
2.50
prepared right rear window frame modification
Details
     

 02-28-2008
1.30
prepared AC inlet tube for right side.
Details
       

 02-28-2008
1.30
bonded 6 bids of carbon fiber to right AC vent
Details
       

 02-27-2008
0.50
sand left AC vent inlet.
Details
     

 02-27-2008
0.40
rotate aircraft to other side
Details
     

 02-27-2008
2.50
prepared and cut right AC vent
Details
       

 02-26-2008
3.00
sand AC vent and center console.
Details
       

 02-26-2008
2.00
prepared left AC vents
Details
       

 02-21-2008
2.00
remove throttle quadrant and fuel selector
Details
       

 02-21-2008
0.50
prepared and bonded 3 bids of e-glass
Details
       

 02-21-2008
2.00
cut in half 2 inch carbon fiber tube.
Details
       

 02-21-2008
1.50
cut 1 3/4 carbon fiber tube for Naca vents.
Details
       

 02-20-2008
0.70
tiedown hydraulic lines in left wheel well and rem
Details
       

 02-20-2008
0.30
rotate aircraft upside down
Details
     

 02-20-2008
0.40
rotate aircraft onto side
Details
     

 02-20-2008
0.70
released canapé lock
Details
     

 02-20-2008
0.70
Moved canopy latch spring
Details
     

 02-20-2008
1.70
Fabricated ground plane
Details
       

 02-20-2008
1.00
Fabricate ground plane
Details
       

 02-20-2008
1.00
drilled and tapped main wheel forks for brake line
Details
     

 02-20-2008
2.30
completed hydraulic connections made
Details
       

 02-20-2008
1.30
complete hydraulic line installation
Details
       

 02-20-2008
1.00
cleaned up and sanded bonding was in the tail sect
Details
     

 02-19-2008
2.00
finish fabricating cockpit lock mount
Details
       

 02-19-2008
2.50
fabricated magnetometer shelf
Details
       

 02-19-2008
1.00
fabricate aft bulkhead per chapter
Details
       

 02-19-2008
1.00
bonded in aft bulkhead
Details
     

 02-18-2008
2.50
prepared and bond center consul
Details
     

 02-18-2008
1.00
prepared and bond center consul
Details
       

 02-18-2008
1.00
level aircraft inspect rudder Bell crank support
Details
     

 02-18-2008
0.70
finished barricading hydraulic hose for gear dump
Details
       

 02-18-2008
0.50
fabricate and bond nut plate cable tubes.
Details
       

 02-18-2008
0.20
drilled hole for throttle quadrant
Details
     

 02-18-2008
1.50
assembled rudder bell crank assembly
Details
       

 02-16-2008
0.70
modified throttle cable bracket
Details
       

 02-16-2008
1.70
installed elevator controls per chapter 19-2,3
Details
     

 02-16-2008
3.00
finished installation of dump valves
Details
       

 02-16-2008
0.50
cut holes for wire runs
Details
       

 02-15-2008
3.00
worked on dear dump valves setup and installation
Details
       

 02-15-2008
2.00
install six 90° hydraulic fittings onto dumb valve
Details
       

 02-14-2008
0.50
tied down all hydraulic and fuel lines in cockpit
Details
       

 02-14-2008
1.00
reconfigure four-way valve fitting
Details
       

 02-14-2008
2.00
changed straight fittings to 45 fittings in left w
Details
       

 02-13-2008
0.70
uncrate engine and put on small palette.
Details
     

 02-13-2008
0.50
fabricated fuel line from selector valve to fuel p
Details
     

 02-13-2008
1.00
fabricated 2 fuel line feeds to fuel selector.
Details
       

 02-13-2008
1.50
complete installation of inner gear door hydraulic
Details
       

 02-12-2008
1.30
worked on hydraulic lines
Details
       

 02-12-2008
0.50
received engine
Details
     

 02-12-2008
2.70
install fittings in sequence manifold block
Details
       

 02-09-2008
0.30
rotate aircraft on side
Details
       

 02-09-2008
0.50
prepared and paint floor in cockpit
Details
       

 02-09-2008
3.00
fits flap torque tube
Details
       

 02-09-2008
1.00
clean up flox around sequence manifold mounts
Details
       

 02-08-2008
2.00
work done fitting throttle quadrant and fuel selec
Details
       

 02-08-2008
2.30
reinstalled gear doors
Details
       

 02-08-2008
1.00
refits landing gear doors
Details
     

 02-07-2008
2.00
right side, installed hydraulic fittings and hoses
Details
       

 02-07-2008
1.30
prepared and bonded tied down studs
Details
       

 02-07-2008
1.00
fabricated holes for fuel selector valve
Details
       

 02-07-2008
1.50
cut slots for throttle quadrant
Details
       

 02-05-2008
6.00
left side, fabricated two aluminum hydraulic lines
Details
       

 02-05-2008
1.00
determined required wires for wiring aircraft.
Details
     

 02-02-2008
1.50
prepared and painted ac scoop and belly
Details
       

 02-02-2008
1.50
installed center wing hydraulic bulkhead fittings
Details
       

 02-02-2008
1.00
installed center wing hydraulic bulkhead fittings
Details
       

 02-01-2008
0.70
sand inner flap hinge speed mods and filled
Details
       

 02-01-2008
3.50
sand and prepare cockpit floor for paint
Details
       

 02-01-2008
1.00
install ailerons idle arms
Details
       

 02-01-2008
0.70
fabricate eight spacers for ailerons idler arm
Details
       

 01-31-2008
0.50
sand inner flap hinge speed mods
Details
       

 01-31-2008
2.30
installed sequence gear up stops
Details
       

 01-30-2008
1.00
sand air-conditioning scoop and belly filler
Details
       

 01-30-2008
1.30
reinstalls rudder and elevator hinge plates to fus
Details
     

 01-30-2008
1.00
reassembled inner and outer gear doors
Details
       

 01-30-2008
1.00
reassembled in board flap attachment brackets
Details
       

 01-29-2008
2.00
installed right wheel assembly and break
Details
       

 01-29-2008
2.00
installed left wheel assembly and break
Details
       

 01-26-2008
1.50
shimmed gear over center link assembly
Details

 01-26-2008
0.50
installed main gear forks
Details
     

 01-26-2008
1.00
assembled right over center link assembly
Details
       

 01-26-2008
3.00
assembled left over center link assembly
Details
       

 01-25-2008
2.00
sand air-conditioning scoop filled area and belly
Details
       

 01-25-2008
3.50
installed main gear struts per chapter 3-14
Details
       

 01-25-2008
1.00
fabricated backing plates for
Details
       

 01-24-2008
1.50
worked on placement of air-conditioning evaporator
Details
       

 01-24-2008
1.00
sanded air-conditioning scoop tapes
Details
       

 01-24-2008
2.00
sanded aft canopy flange and forward cockpit area
Details
       

 01-24-2008
0.50
filled air-conditioning scoop joint with Hysol 960
Details
       

 01-23-2008
1.50
sanded bond joint on new air-conditioning scoop.
Details
       

 01-23-2008
2.00
reinforced aft canopy flange
Details
       

 01-23-2008
1.70
prepared and bonded 2 bids of carbon fiber
Details
       

 01-22-2008
1.70
sand filler on weighing navigation lights
Details
       

 01-22-2008
0.30
rotate fuselage
Details
     

 01-22-2008
1.50
grind and peeled off air-conditioning scoop.
Details
       

 01-22-2008
1.50
finished sanding fuselage bottom
Details
       

 01-22-2008
1.50
bonded new air-conditioning scoop to fuselage
Details
       

 01-21-2008
1.50
prepared and bonded left fuselage speed mod
Details
       

 01-19-2008
2.00
sand then released navigation light lenses
Details
       

 01-19-2008
1.50
prepared wing navigation light moldings
Details
       

 01-18-2008
1.30
remove foam tape from wing navigation light moldin
Details
       

 01-18-2008
0.50
propeller arrived
Details
     

 01-18-2008
0.50
modified other navigation light assembly
Details
       

 01-18-2008
1.00
mast of navigation light lenses
Details
     

 01-18-2008
3.00
fit right wing navigation light lens
Details
       

 01-18-2008
1.50
fit left wing navigation light lens
Details
       

 01-17-2008
2.30
start laying out valve bodies for sequencer
Details
       

 01-17-2008
1.80
sand winglets, wing navigation lights and NACA ven
Details
       

 01-17-2008
1.00
prepared wing fuel drain fairings for flox insi
Details
       

 01-17-2008
1.30
prepared and bonded wings flap hinge speed modific
Details
       

 01-16-2008
1.00
sand winglets and wing lights
Details
       

 01-16-2008
0.40
sand filler on servo fairings
Details
     

 01-16-2008
2.30
removed wings and finished sanding winglets
Details
       

 01-16-2008
0.60
filled wing lights, winglets, and servo fairings
Details
       

 01-16-2008
2.50
fabricated autopilot role and pitch brackets
Details
       

 01-15-2008
2.30
sand winglets and an opening for weighing light mo
Details
       

 01-15-2008
1.50
sand and fill serval fairings on moving services
Details
       

 01-15-2008
2.50
finish fabricating wingtip light molding
Details
       

 01-15-2008
1.50
final trim and shape of NACA vents
Details
       

 01-15-2008
0.30
fabricate carbon fiber tube for canopy lock assemb
Details
     

 01-12-2008
1.50
sanded winglet joints and applied carbon fiber
Details
       

 01-12-2008
1.30
prepared and bonded servo fairings
Details
       

 01-12-2008
3.50
prepared and bonded left and right winglets
Details
       

 01-11-2008
3.00
prepared and cut open left wing tip
Details
       

 01-11-2008
4.00
prep right wing tip for winglet
Details
       

 01-10-2008
1.30
sand NACA vents and applied second coat of filler
Details
       

 01-10-2008
2.50
prepared and cut hole in right wing tip
Details
       

 01-09-2008
0.50
sand left NACA vent
Details
       

 01-09-2008
1.00
sand and prepared left NACA vent
Details
       

 01-09-2008
2.00
install wings and level aircraft.
Details
     

 01-09-2008
0.50
filled right and left NACA vent
Details
       

 01-09-2008
2.50
fabricated and attached hardware to right landing
Details
       

 01-08-2008
2.30
sand NACA vents. Found problem
Details
       

 01-08-2008
1.30
prepared and cut whole for right landing light
Details
       

 01-08-2008
1.00
fit center console and fuel selector valve
Details
       

 01-06-2008
3.00
sprayed final color into wheel wells
Details
       

 01-06-2008
4.00
sand, prepared and mast off
Details
       

 01-05-2008
0.70
trim and sand carbon fiber on Jack inserts
Details
       

 01-05-2008
2.00
prep wheel wells and tail gaps for primer
Details
       

 01-04-2008
3.50
finish fabricating NACA vents
Details
       

 01-04-2008
2.50
fabricated and bonded carbon fiber conduit
Details
       

 01-04-2008
0.50
applied six bids a carbon fiber to Jack points
Details
       

 01-03-2008
1.00
trim and fit NACA vent wings
Details
       

 01-03-2008
1.70
sand tail gaps and fuselage
Details
       

 01-03-2008
0.50
remove rudder and elevator hinge plates
Details

 01-03-2008
1.30
prepared and paint primer on to topside of fuselag
Details
       

 01-03-2008
0.70
countersunk 3/8" female fittings into center wing
Details
       

 01-02-2008
6.50
sand gear bay's and bottom of fuselage
Details
       

 01-01-2008
0.70
remove landing gear doors
Details
       

 01-01-2008
3.00
complete hardware removal, prepared left gear bay
Details
       

 12-29-2007
2.00
worked on inter-gear doors fit
Details
       

 12-29-2007
1.00
assembled inside gear door hydraulic cylinder
Details
       

 12-27-2007
4.50
installed nut plates for inside main gear doors
Details
       

 12-20-2007
0.70
released and trim nacro wing vents
Details
       

 12-20-2007
1.00
prepared for installing insight gear doors to fuse
Details
       

 12-20-2007
1.50
prepared and bonded 3 bids of carbon fiber
Details
       

 12-20-2007
3.50
fabricated and installed hardware on inside to you
Details
       

 12-19-2007
1.50
sand filler on fuselage underbody
Details
       

 12-19-2007
1.50
inspected bond of receptacle supports
Details
       

 12-19-2007
1.50
fabricated mold for nacro vents
Details
       

 12-18-2007
2.50
sand fuselage underbody at all filler points.
Details
       

 12-18-2007
2.00
install outboard gear door attachments
Details
       

 12-18-2007
0.70
fabricate for receptacle supports
Details
     

 12-18-2007
1.00
applied filler on a fuselage underbody
Details
       

 12-15-2007
3.70
sand bottom of fuselage at all filler points
Details
       

 12-15-2007
1.00
prepare and bonded fuel drain fairing
Details
       

 12-15-2007
1.00
applied filler to bottom of fuselage
Details
       

 12-14-2007
1.50
sand landing gear doors and bays
Details
       

 12-14-2007
2.00
sand fuselage underside
Details
       

 12-14-2007
0.50
release landing gear doors
Details
       

 12-14-2007
2.30
filled around AC-scoop, landing gear doors and fla
Details
       

 12-13-2007
2.30
sand flap fillers and cavities
Details
       

 12-13-2007
1.50
sand and prepare AC scoop
Details
       

 12-13-2007
1.50
fill flange for a landing gear doors
Details
       

 12-12-2007
2.00
sand flaps gap fillers.
Details
       

 12-12-2007
2.00
prepared and bonded AC condenser scoop
Details
       

 12-12-2007
1.30
applied 1 bid of carbon fiber to flap gap fillers
Details
       

 12-11-2007
0.70
sand rudder tail light assembly
Details
       

 12-11-2007
2.50
removed canopy and turned over fuselage
Details
       

 12-11-2007
2.30
fabricated flaps gap fillers and bonded
Details
       

 12-08-2007
1.00
trim and sand taillight faring
Details
       

 12-08-2007
2.00
sand canopy and fuselage filler
Details
       

 12-08-2007
1.50
released canopy from fuselage
Details
       

 12-08-2007
0.70
prepared and installed rudder trim servo
Details
       

 12-08-2007
0.30
fill around rudder tail light assembly
Details
       

 12-07-2007
0.50
sand taillight assembly on rudder
Details
       

 12-07-2007
4.00
sand canopy and fuselage filler
Details
       

 12-07-2007
0.50
remove masking tape from rudder access panels
Details
     

 12-07-2007
1.50
apply second coat of filler around canopy
Details
       

 12-06-2007
2.00
prepared in bonded taillight to the rudder with fl
Details
       

 12-06-2007
1.00
filled canopy gap with foam tape
Details
       

 12-06-2007
1.30
filled canopy and fuselage joint with Hysol 960F
Details
       

 12-06-2007
1.50
filled around elevator access panel
Details
       

 12-06-2007
1.50
fabricated and installed elevator weldment access
Details
       

 12-05-2007
0.50
set up heat lamps and clamped left side of canopy
Details
       

 12-05-2007
1.50
sand canopy and flange worked on fitting
Details
     

 12-05-2007
1.00
sand and filled landing gear doors
Details
       

 12-05-2007
0.50
remove heat lamps from canopy left side.
Details
     

 12-05-2007
1.50
installed and adjusted canopy striker plates
Details
       

 12-04-2007
1.00
sand canopy handle filler and carbon firer bids
Details
       

 12-04-2007
1.50
sand canopy fuselage flange and installed canopy
Details
       

 12-04-2007
5.00
fabricated and installed canopy latch mechanism
Details
       

 12-01-2007
0.90
sand and prepare canopy latch collet and block
Details
       

 12-01-2007
0.50
released canopy handle from the filler
Details
     

 12-01-2007
1.50
filled area around canopy handle
Details
       

 11-30-2007
2.50
stand canopy frame
Details
       

 11-30-2007
1.30
installed canopy on alignment mechanism
Details
       

 11-30-2007
0.70
drill holes for canopy defrost
Details
     

 11-30-2007
1.50
assembled canopy handle and installed
Details
       

 11-30-2007
1.50
align bearing block
Details
       

 11-29-2007
4.50
more sanding! On fuselage speed mods
Details
       

 11-28-2007
2.30
sand filler on the left fuselage speed mod
Details
       

 11-28-2007
1.00
sand filler on right fuselage speed mod
Details
       

 11-28-2007
0.70
filled right and left fuselage speed mods
Details
       

 11-27-2007
1.50
stand right fuselage speed mod
Details
     

 11-27-2007
1.30
sand left fuselage speed mod
Details
       

 11-27-2007
0.70
removed wings
Details
     

 11-27-2007
0.50
removed canopy
Details
     

 11-27-2007
1.00
filled right and left fuselage speed mods
Details
       

 11-27-2007
0.70
filled holes in canopy
Details
       

 11-23-2007
1.00
sand right wing speed mod and fuselage
Details
       

 11-23-2007
1.30
Sand left-wing speed mod and fuselage
Details
       

 11-23-2007
2.00
applied 2 bids of carbon fiber to fuselage speed m
Details
       

 11-21-2007
2.00
sand and prepared wing speed mods for filler
Details
       

 11-21-2007
1.30
prepared and bonded right fuselage speed mod
Details
       

 11-21-2007
1.50
prepared and bonded left fuselage speed mod
Details
       

 11-21-2007
1.00
applied filler around wing speed mods
Details
       

 11-20-2007
1.00
sandy cockpit area for items installed for the pan
Details
       

 11-20-2007
1.30
prepared and installed right wing speed mod
Details
       

 11-20-2007
1.00
applied e-glass to installed panel parts
Details
       

 11-16-2007
6.00
final fit of dustcover and panel
Details
       

 11-15-2007
1.00
sand and fill dustcover!
Details
       

 11-15-2007
3.00
install panel and instrument shelf for measurement
Details
       

 11-13-2007
1.00
trim and sand dustcover
Details
       

 11-13-2007
3.00
trim and sand dust cover handholds
Details
       

 11-13-2007
2.00
sand and fill dustcover
Details
       

 11-13-2007
1.00
made representation of LRU's mounting box
Details
       

 11-12-2007
2.50
trim dustcover and fabricate rear edge
Details
       

 11-12-2007
1.30
fabricated 2 handholds
Details
       

 11-10-2007
1.30
trim seatback filler
Details
       

 11-10-2007
2.00
fit instrument dustcover
Details
       

 11-10-2007
1.50
filled panel joint
Details
       

 11-10-2007
1.30
fabricated mounting flange
Details
       

 11-10-2007
0.50
cut out instrument shelf template
Details
       

 11-09-2007
4.00
trim and fit panel corner supports
Details
       

 11-09-2007
3.00
installed hinge to center Council
Details
       

 11-09-2007
1.00
fabricated rudder tube extension.
Details
       

 11-08-2007
5.50
Starflight instrument panel and counsel
Details
       

 11-07-2007
0.50
removed weight and clecos
Details
     

 11-07-2007
2.30
prepared and installed left wing speed mod
Details
       

 11-07-2007
1.30
prepared and bonded 2 bids to right wing
Details
       

 11-07-2007
0.80
prepared and bond right flap trailing edge
Details
       

 11-07-2007
0.60
lowered and leveled aircraft
Details
       

 11-06-2007
1.50
prepared in installed right center wing skin
Details
       

 11-06-2007
1.00
completion of reinstallation of right flap
Details
       

 11-06-2007
1.00
bond left wing trailing edge
Details
       

 11-05-2007
1.70
worked on right flap
Details
       

 11-05-2007
1.50
sand and prepared juggles on left of center wing
Details
     

 11-05-2007
0.50
removed weights and Cletego from left-center warni
Details

 11-05-2007
0.50
removed outside flapped hinge arm
Details

 11-05-2007
0.50
measured flaps hinge placement.
Details
       

 11-02-2007
0.50
right flap fitting problem.
Details
       

 11-02-2007
2.70
paired and closed out left center wing.
Details
       

 11-02-2007
1.50
fit right aileron
Details
       

 11-02-2007
1.50
fit left aileron
Details
       

 11-01-2007
1.00
installed left flap
Details
       

 11-01-2007
0.50
installed ailerons
Details
     

 10-31-2007
1.00
sand flap drive mount and applied six bids
Details
     

 10-31-2007
3.00
prepared and installed right flap
Details
       

 10-30-2007
0.50
sand cockpit area
Details
     

 10-30-2007
1.00
mounted wings for fitting flaps and ailerons
Details
       

 10-30-2007
1.00
inventory hydraulic hose kit
Details

 10-30-2007
1.50
fabricate flap motor attachment plate
Details
       

 10-30-2007
0.50
bond seatbelt reinforcement
Details
     

 10-25-2007
4.00
sand cockpit area and fill vertical ribs
Details
       

 10-25-2007
1.00
sand baggage compartment and hydraulic pump mount
Details
     

 10-24-2007
1.50
prepped and installed hydraulic pump mount.
Details
       

 10-24-2007
1.00
modified part for hydraulic pump mount
Details
     

 10-24-2007
1.50
installed control tube access covers and fitted.
Details
       

 10-23-2007
1.50
fits floorboards and installed access panel
Details
       

 10-23-2007
1.30
complete fabrication of fuel selector valve mount
Details
       

 10-21-2007
1.50
sand seat back and winning center section leading
Details
     

 10-21-2007
0.50
sand filler on the tail section on top
Details
     

 10-21-2007
1.50
prep and install outboard seat supports
Details
       

 10-20-2007
0.50
inventory parts from Lancair
Details

 10-20-2007
0.60
attached three bids to front side of seatback
Details
     

 10-15-2007
1.00
sand tail section and rudder
Details
       

 10-15-2007
0.90
sand and prep seatback for reinforcement bids
Details
       

 10-15-2007
1.50
sand and prep leading edge center wing applied 2 b
Details
       

 10-15-2007
1.10
sand and prep aft closeout rid left side.
Details
       

 10-12-2007
2.00
sand and filled center section and rudder
Details
       

 10-12-2007
1.10
prepared and installed right closeout rib
Details
     

 10-12-2007
0.50
inventoried parts from Lancair
Details

 10-12-2007
1.50
cut openings to center wing section and applied to
Details
       

 10-08-2007
1.50
sand rudder and belly section
Details
       

 10-08-2007
2.00
first fit of landing gear doors
Details
       

 10-08-2007
1.00
filled belly section and rudder
Details
     

 10-07-2007
1.50
turned over fuselage to work on
Details
       

 10-07-2007
0.40
sand top of fuselage for filler
Details
     

 10-07-2007
0.30
mixed filler for top of fuselage
Details
     

 10-07-2007
0.50
installed two bids of tape aft center wing section
Details
     

 10-07-2007
0.50
filled rudder
Details
     

 10-05-2007
8.00
attached rudder and elevator
Details
       

 10-04-2007
4.50
fit trim tabs
Details
       

 10-02-2007
5.50
fit elevators and sand rudder
Details
       

 10-01-2007
2.50
sand rudder and closed out
Details
       

 09-29-2007
1.00
sanded tail and applied 2 bids
Details

 09-29-2007
1.50
sand rudder
Details

 09-29-2007
1.50
filled elevator
Details
     

 09-29-2007
1.00
applied two bids to a right elevator
Details

 09-28-2007
4.00
sand horizontal and vertical stabilizers
Details
       

 09-28-2007
0.50
filled horizontal stabilizer
Details
     

 09-26-2007
3.00
reset up measurements as described by factory
Details
     

 09-26-2007
1.00
filed and sanded horizontal stabilizer
Details

 09-26-2007
2.00
checked and adjust resin dispenser
Details

 09-25-2007
0.00
checked wing incidents
Details
       

 09-25-2007
3.00
checked horizontal incidents
Details
       

 09-21-2007
3.00
started verification of measurements.
Details
     

 09-21-2007
1.20
installed speed mods on horizontal stabilizer
Details
       

 09-18-2007
8.00
inventory the kit
Details
       

 09-16-2007
6.00
kit arrives and unpacked Perret
Details
       

 03-26-2004
0.00
fit center console
Details
     

 03-25-2004
0.00
installed canopy hinges
Details
       

 03-24-2004
0.00
fit and bond canopy glass
Details
       

 03-23-2004
0.00
fit and glued canopy stiffener
Details
       

 03-22-2004
0.00
closed vertical and cut rudder away
Details
     

 03-19-2004
0.00
bonds center section
Details
       

 03-18-2004
0.00
applied closeout bid tapes to horizontal and fit c
Details
       

 03-17-2004
0.00
close horizontal stabilizer and elevators
Details
       

 03-16-2004
0.00
pressure checked wing tanks
Details
     

 03-15-2004
0.00
close out wings