Powered By Kitlog Pro v2.0
Keiths Web Site
RV-12
All
Work Logs Found:
565
Category Work Time:
1810 Hours
Date
Hours
Work Log Summary
Details
02-13-2011
0.00
Trailer
Details
01-07-2011
0.80
Second flight
Details
01-06-2011
0.00
Some first flight analysis
Details
01-05-2011
0.40
First Flight!
Details
01-03-2011
4.00
Final Inspection
Details
12-31-2010
2.00
Brake test
Details
12-30-2010
4.00
Finishing the cap bolts
Details
12-29-2010
4.00
Tackling the engine cap bolts
Details
12-22-2010
4.00
The bleeding brakes
Details
12-21-2010
4.00
Refit new master cylinder
Details
12-20-2010
0.00
Permit to Test
Details
11-25-2010
0.00
Hours to date
Details
11-23-2010
2.00
Master Cylinder arrived
Details
11-14-2010
6.00
Remainder of the inspection
Details
11-13-2010
6.00
Inspection
Details
11-11-2010
0.00
Yet more debugging
Details
11-09-2010
50.00
More debugging
Details
09-23-2010
8.00
Refitted interior trim for weighing
Details
09-22-2010
0.00
First engine run
Details
09-21-2010
0.00
Video recorder wiring
Details
09-20-2010
0.00
Potentiometers
Details
09-19-2010
0.00
Brake fluid
Details
09-18-2010
0.00
Buttoning stuff up
Details
09-17-2010
0.00
Testing the fuel system
Details
09-16-2010
100.00
Lots of final preparation work
Details
08-20-2010
6.00
Fixed spar pin wiring
Details
08-19-2010
8.00
Debug the spar pin circuit
Details
08-18-2010
8.00
Started inspection
Details
08-17-2010
9.00
More miscellaneous stuff
Details
08-16-2010
7.50
A melange of tasks
Details
08-13-2010
10.00
Fix the nav/strobe lights
Details
08-12-2010
10.00
Chief Engineer visit
Details
08-11-2010
4.00
Titivating
Details
08-11-2010
0.00
Some more painting pics
08-10-2010
10.00
Final fitting of the stabilitor
Details
08-09-2010
9.50
Install the prop
Details
08-06-2010
9.50
Fit oil lines
Details
08-06-2010
0.00
Cockpit engine controls
Details
08-05-2010
10.00
Fitting fluid lines
Details
08-04-2010
3.00
Fuselage painted
Details
08-04-2010
0.00
At the painters
08-04-2010
0.00
At the painters
07-22-2010
3.00
Inspection and loading onto a trailer
Details
07-22-2010
5.00
Fixing the rudder interference
Details
07-22-2010
4.00
Final prep for fuselage painting
Details
07-21-2010
2.00
That map box!
Details
07-21-2010
4.00
Finishing the cowling work
Details
07-20-2010
2.00
Tested trim with tailcone fairing in place
Details
07-20-2010
4.00
Fitting the rudder cables
Details
07-20-2010
5.00
Fit and test the stabilitor trim
Details
07-19-2010
7.00
Fibreglassing in the cooling duct
Details
07-18-2010
0.00
Water radiator and heater door
Details
07-18-2010
6.00
Trial fit of cooling duct
Details
07-16-2010
4.00
Fitting the water radiator
Details
07-16-2010
2.00
Cabling up the heater door
Details
07-15-2010
6.00
Cowl cooling duct
Details
07-14-2010
7.00
Engine work
Details
07-14-2010
2.00
Engine work
Details
07-13-2010
6.00
Engine compartment work
Details
07-12-2010
5.00
Trial fit of the exhaust assembly
Details
07-12-2010
3.00
More cowling work
Details
07-12-2010
1.00
Finishing the cowl work
Details
07-09-2010
5.50
Oil access door
Details
07-09-2010
4.00
Cowl bottom bracket
Details
07-08-2010
4.50
Sanding
Details
07-07-2010
9.00
Fitting the cowling
Details
07-06-2010
8.50
Spinner and cowling work
Details
07-05-2010
3.00
More prop work
Details
07-01-2010
3.00
Test fitting the prop
Details
07-01-2010
1.00
Centreing the spinner
Details
06-30-2010
3.00
Wiring the engine monitors
Details
06-30-2010
2.00
Installing the pitot tube
Details
06-30-2010
2.00
Engine wiring
Details
06-30-2010
1.00
Adding cooling shroud to the regulator
Details
06-29-2010
3.00
Modifying the top of the tail fin
Details
06-29-2010
1.00
Fitting the engine
Details
06-29-2010
1.00
Filing the penny washers
Details
06-29-2010
0.00
Birthday celebrations
Details
06-28-2010
1.00
Unloading the wings
Details
06-28-2010
2.00
Transporting the wings
Details
06-28-2010
3.00
Second trial fit of the tail feathers
Details
06-28-2010
2.00
Planning for fuselage paint
Details
06-24-2010
3.00
Masking the wings
Details
06-23-2010
5.00
Sealing up the shroud
Details
06-22-2010
2.00
Installing the engine mount
Details
06-21-2010
2.00
Test fitting the Cooling Shroud
Details
06-21-2010
2.00
Starting disassembly
Details
06-21-2010
2.00
Exposing the block
Details
06-21-2010
2.00
Doing the Trigger Coils
Details
06-18-2010
6.00
Wings to the painters
Details
06-17-2010
4.00
Canopy titivation
Details
06-16-2010
7.50
Odds and Sods
Details
06-15-2010
0.50
Wiring up firewall forward
Details
06-15-2010
0.50
More power hardware
Details
06-15-2010
1.00
Installing the power control units
Details
06-15-2010
1.00
Fix nutplate problem
Details
06-14-2010
5.00
Firewall forward wiring
Details
06-14-2010
3.00
Finish avionics wiring
Details
06-10-2010
5.00
More avionics boxes go in
Details
06-10-2010
5.00
Fitting the ELT
Details
06-09-2010
8.50
Installing the transponder and the radio
Details
06-08-2010
2.00
Work on the left front panel
Details
06-08-2010
2.00
Starting on the avionics
Details
06-08-2010
4.00
More sanding
Details
06-05-2010
0.00
At the airshow
Details
06-04-2010
0.00
Relocating the aircraft
Details
06-03-2010
5.00
Finished the right wing nav/strobe lights
Details
06-02-2010
5.00
Right wing lighting kit
Details
06-02-2010
5.00
Finished the landing light, almost
Details
06-01-2010
7.00
Finish lights on left wing
Details
05-31-2010
3.00
More fairing work
Details
05-31-2010
6.00
Install left wing lights
Details
05-26-2010
3.00
Yes more sanding
Details
05-25-2010
7.00
Guess what - more sanding
Details
05-24-2010
5.00
Different sanding
Details
05-23-2010
1.00
More sanding
Details
05-21-2010
3.50
More sanding...
Details
05-18-2010
4.00
Trimming the tailplane
Details
05-18-2010
4.00
More sanding
Details
05-18-2010
1.00
Check the tank again
Details
05-17-2010
3.00
Sanding...
Details
05-17-2010
4.00
Fit tailcone to rear fuselage
Details
05-16-2010
2.50
Trial fit of tailplane
Details
05-14-2010
2.00
More work on the tail fairing
Details
05-14-2010
3.00
More tail fairing work
Details
05-14-2010
3.00
More tail fairing work
Details
05-13-2010
3.00
More fibreglass work
Details
05-13-2010
4.00
Empennage fibreglass work
Details
05-12-2010
3.00
Preparing the fin and rudder caps
Details
05-12-2010
4.00
More fibreglass work
Details
05-11-2010
7.00
More fibreglass preparation
Details
05-10-2010
8.00
Preparing for fibreglass fairing
Details
05-07-2010
4.00
Prepare cowling parts
Details
05-07-2010
3.00
Canopy and cowling
Details
05-05-2010
9.00
Wing repair day
Details
05-04-2010
4.00
Started wing recovery
Details
05-03-2010
3.00
Filling rivets...
Details
04-30-2010
5.00
Yet more wing disassembly
Details
04-30-2010
3.00
Finish resealing the tank
Details
04-29-2010
6.00
Investigate tank leaks
Details
04-28-2010
6.00
Canopy sanding
Details
04-27-2010
6.00
More wing disassembly
Details
04-26-2010
6.00
Wing disassembly
Details
03-19-2010
6.00
Fitting the canopy
Details
03-18-2010
5.00
More canopy work
Details
03-18-2010
1.00
Canopy work
Details
03-17-2010
0.00
Babysitting
Details
03-16-2010
5.00
More canopy stuff, and some self-indulgence
Details
03-15-2010
8.00
Canopy handle, and other stuff
Details
03-12-2010
3.50
Drilling the canopy front and rear
Details
03-12-2010
4.00
Canopy skirts
Details
03-11-2010
4.00
Second fit of canopy
Details
03-10-2010
3.00
Priming the canopy frame
Details
03-10-2010
4.00
First fit of canopy
Details
03-09-2010
7.00
Starting on canopy frame
Details
03-08-2010
1.00
Reinstall the turtle deck
Details
03-08-2010
6.00
Complete flaperon controls
Details
03-07-2010
1.00
Second attempt to fit wings
Details
03-05-2010
4.00
Complete the wheel work
Details
03-05-2010
4.00
Brake tube work
Details
03-04-2010
6.00
Investigating the wing fit problem
Details
03-03-2010
0.50
The fuselage sees the light of day
Details
03-03-2010
1.00
Fitting the wheels
Details
03-03-2010
2.50
Disaster strikes!
Details
03-01-2010
8.50
Fitting the gear legs
Details
02-27-2010
8.00
More perishing rivet heads
Details
02-26-2010
6.00
Filling rivet holes
Details
02-25-2010
3.00
Priming the undercarriage bits
Details
02-24-2010
5.00
Prepare the main wheels
Details
02-24-2010
4.00
Prep parts for securing undercarriage
Details
02-23-2010
3.00
Drill roll-over bar for aft window screws
Details
02-22-2010
6.00
Installing the magnetometer
Details
02-22-2010
2.00
Clecoing the turtle deck
Details
02-22-2010
1.00
Autopilot wires
Details
02-20-2010
2.00
Fit the flaperons to the wings
Details
02-19-2010
0.00
Flying...
Details
02-18-2010
6.00
Connect forward and aft stabilitor cables
Details
02-17-2010
3.00
Wiring the stabilitor
Details
02-17-2010
5.50
Finished tank, started stabilitor cables
Details
02-16-2010
3.50
Still tanking
Details
02-16-2010
5.00
More work on the fuel tank
Details
02-15-2010
3.00
Prime and fit autopilot brackets
Details
02-15-2010
6.00
More gooping
Details
02-12-2010
2.00
Prep autopilot brackets
Details
02-11-2010
3.00
Install rudder cables
Details
02-11-2010
2.00
Inspection!
Details
02-11-2010
3.00
Complete the flap handle mechanism
Details
02-10-2010
8.00
Further work on the fuel tank
Details
02-09-2010
6.50
Start tank assembly
Details
02-09-2010
1.00
Rivet nutplates to the Res Sender Plate
Details
02-05-2010
2.00
More painting of tank bits
Details
02-04-2010
7.50
Prep and prime fuel tank parts
Details
02-03-2010
7.50
Painting the inspection covers
Details
02-02-2010
8.50
Prep and paint all inspection covers
Details
01-28-2010
2.00
Start assembly of flap mechanism
Details
01-28-2010
3.00
Attaching Flaperon Pushrod Assembly
Details
01-21-2010
1.00
Prepare control assemblies
Details
01-21-2010
3.50
Attaching the Flaperon Mixer Bellcrank
Details
01-21-2010
2.00
Attaching the Flap Handle Pushrod Assembly
Details
01-21-2010
2.00
Attach Rudder Pedal Assembly
Details
01-20-2010
5.00
Painting Panel and Flight Controls
Details
01-20-2010
3.00
More wiring stuff
Details
01-19-2010
6.00
More wire tidying
Details
01-19-2010
2.00
Fit Stick Grips
Details
01-15-2010
7.00
More prep work on Flight Controls
Details
01-14-2010
4.00
Prep parts for flight controls
Details
01-12-2010
2.00
Wiring the control sticks
Details
01-12-2010
1.00
Wire tidying
Details
01-12-2010
5.00
P 31-06 Steps 2-4
Details
01-11-2010
3.00
Wiring the Auxiliary Services
Details
01-11-2010
2.00
Headset Jacks
Details
01-11-2010
2.00
Complete Fuselage Side Covers
Details
01-10-2010
4.00
Painting miscellaneous parts
Details
01-09-2010
3.00
Further work on Optional Harness
Details
01-08-2010
3.00
Wiring Tunnel and Optional Harnesses
Details
01-07-2010
3.00
Test harness for the Dynon
Details
01-06-2010
2.00
CPU Cooling Fans
Details
01-06-2010
2.00
Assemble Spar Pins
Details
01-04-2010
3.00
Completed the rudder pedals
Details
01-03-2010
3.00
Started on the wiring
Details
12-22-2009
1.00
Preparing the Wing Pins
Details
12-22-2009
1.00
Preparing the Terminal Blocks
Details
12-22-2009
1.00
Modify a Grommet
Details
12-22-2009
1.00
Installing the Wire Run Conduit
Details
12-22-2009
1.00
Installing an Adel Clamp above the Fuel Flow Unit
Details
12-22-2009
2.00
Fabricating a Wireway
Details
12-22-2009
1.00
Drill compass holes
Details
12-21-2009
5.00
Drill backup instrument holes
Details
12-17-2009
2.00
Trial fit Instrument Panels
Details
12-16-2009
5.50
Upper Forward Fuselage Skin
Details
12-16-2009
2.00
Panel Attach Strips
Details
12-15-2009
2.00
Inventory
Details
12-15-2009
3.50
Demolish the packing crate
Details
12-15-2009
4.00
Assemble Forward Fuselage parts
Details
12-14-2009
1.00
The Avionics and Firewall Forward kits arrive
Details
12-14-2009
2.00
Panel Shelf work
Details
12-14-2009
2.00
More work on the Firewall Upper
Details
12-14-2009
1.50
Inventory
Details
12-14-2009
2.00
Forward Fuselage parts
Details
12-10-2009
2.00
Rivet Firewall Upper
Details
12-10-2009
2.00
More work on Firewall Upper
Details
12-10-2009
2.00
Grey paint on some items
Details
12-05-2009
3.50
Another dose of priming
Details
12-03-2009
4.00
More prep for forward fuselage parts
Details
12-03-2009
4.00
Complete prep work on forward fuselage parts
Details
12-02-2009
6.00
Prepare various Section 29 parts
Details
12-01-2009
3.00
Upper Firewall work
Details
12-01-2009
3.00
Reconfigure workbenches
Details
11-30-2009
1.50
Rivet Shoulder Strap Lugs
Details
11-30-2009
1.50
Rivet Shear Clips
Details
11-30-2009
4.00
Rivet Baggage Corner Skins and Tailcone
Details
11-04-2009
1.00
Mating fuselage and tailcone
Details
11-04-2009
1.00
Cleco fuselage and tailcone together
Details
11-03-2009
1.00
Install the Roll Bar Brace
Details
11-03-2009
9.00
Install the Baggage Bulkhead
Details
11-03-2009
3.00
Close tailcone
Details
11-03-2009
1.00
Attach Bulkhead Brace Angle
Details
11-02-2009
1.00
Rivet the Roll Bar
Details
11-02-2009
2.00
Install the aircon
Details
11-02-2009
6.00
Attach fuselage side skins
Details
11-01-2009
3.00
Finish painting rear fuselage bits
Details
10-31-2009
1.00
Yet more painting
Details
10-30-2009
1.00
More painting
Details
10-29-2009
7.00
More painting
Details
10-28-2009
3.00
Painting rear fuselage parts
Details
10-28-2009
2.00
Fit fuel return pipe
Details
10-27-2009
6.00
Prepare parts for rear fuselage
Details
10-27-2009
2.00
More painting
Details
10-26-2009
1.00
Showing off seatbacks
Details
10-26-2009
1.00
Riveting the Rollbar
Details
10-26-2009
1.00
Rivet superstructure components
Details
10-26-2009
1.00
Mid-Fuselage Brace Close-out
Details
10-26-2009
1.00
Gussets
Details
10-26-2009
1.00
Fit Arm Rests
Details
10-26-2009
1.00
Completed the main fuel line
Details
10-26-2009
1.00
Attach Mid-Fuselage Brace
Details
10-26-2009
1.00
Assembling the seat backs
Details
10-23-2009
4.00
Rollover hoop supports
Details
10-23-2009
3.00
Etch prime the rollover and bulkhead parts
Details
10-22-2009
7.00
More work on the rollover bar
Details
10-21-2009
1.50
Start the rollover bar
Details
10-21-2009
0.50
Spray booth recover
Details
10-21-2009
2.00
Plumbing of brake lines
Details
10-21-2009
2.00
Painting the seat parts
Details
10-21-2009
1.50
Lower Cowl Hinges
Details
10-21-2009
2.00
Fuel valve fitting
Details
10-20-2009
8.50
Prepare seat parts
Details
10-19-2009
2.00
Painting fuselage superstructure
Details
10-19-2009
5.50
Fabricate fuel return line
Details
10-19-2009
2.00
Assembling the rudder pedals
Details
10-16-2009
2.00
Yet more fuselage painting...
Details
10-16-2009
2.00
Plumbing the fuel sensor and gascolator
Details
10-16-2009
2.00
Plumbing the fuel pump
Details
10-16-2009
2.00
Plumbing the fuel cut-off valve
Details
10-15-2009
3.00
Preparing the "aircon"
Details
10-15-2009
6.00
More painting...
Details
10-14-2009
7.00
Prepare fuselage side skins
Details
10-13-2009
4.00
Trial fit fuselage superstructure
Details
10-13-2009
5.00
Trial fit fuselage sides
Details
10-12-2009
7.50
Longeron day 1
Details
10-09-2009
6.00
Repaint the fuselage centre section
Details
10-08-2009
3.00
Interior painting of fuselage centre section
Details
10-08-2009
3.00
Further assembly of forward fuselage
Details
10-07-2009
6.50
Painting the centre fuselage
Details
10-06-2009
7.50
More painting!
Details
10-05-2009
6.00
Priming the lower forward fuselage
Details
10-05-2009
2.50
Prepare parts for Forward Lower Fuselage
Details
10-02-2009
3.00
Riveting the Bottom Skin
Details
10-02-2009
4.00
Prepare forward fuselage components
Details
10-01-2009
1.00
Prepare for skinning the fuselage bottom
Details
10-01-2009
6.00
Attaching the Bottom Skin
Details
09-30-2009
8.50
Inspection of fuselage
Details
09-29-2009
3.00
Trial fitting the Bottom Skin
Details
09-29-2009
6.00
Prepare fuselage corner and bottom skins
Details
09-28-2009
7.00
Preparing and assembling step brackets
Details
09-28-2009
2.00
Fitting Step Floors
Details
09-28-2009
0.50
Completion of step section
Details
09-27-2009
2.50
Prepare brackets for steps
Details
09-25-2009
7.00
Control Column and Step Ribs
Details
09-25-2009
0.50
Bulkhead 45 elbow fuel line fitting
Details
09-24-2009
2.00
Further work on the seat bulkhead
Details
09-24-2009
2.00
Completion of bulkhead work
Details
09-24-2009
2.50
Adding parts to seat bulkhead
Details
09-23-2009
6.00
Rivet Seatback Hinges
Details
09-23-2009
3.00
Assemble the bulkhead "towers"
Details
09-22-2009
4.00
More priming
Details
09-19-2009
3.50
Prepare parts for forward fuselage floor
Details
09-17-2009
4.00
Prepare Seat Floors
Details
09-16-2009
1.00
Starting assembly of the seat rib structures
Details
09-16-2009
1.00
Riveting Flaperon Mixer Assembly
Details
09-16-2009
1.00
Rivet seat belt anchorages
Details
09-16-2009
1.00
Further seat rib assembly
Details
09-16-2009
0.00
Daft pictures
Details
09-16-2009
1.00
Assembling the Flaperon Mixer Assembly
Details
09-16-2009
1.00
Assembling seat structure
Details
09-15-2009
6.00
Prepare seat rib parts
Details
09-15-2009
2.50
Laminating plan updates
Details
09-14-2009
3.00
Test assembly of control brackets
Details
09-14-2009
2.00
Prepare seat belt attachments
Details
09-14-2009
1.00
F1204 Bulkhead Holes
Details
09-10-2009
1.00
Riveting the Rear Spar Receptacle Support
Details
09-10-2009
1.00
Nutplates and Bearing Brackets
Details
09-10-2009
2.00
Complete rear Baggage Rib Assemblies
Details
09-10-2009
3.00
Complete baggage ribs
Details
09-09-2009
2.00
Riveting the Centre Section Aft Bulkhead
Details
09-09-2009
1.00
Rivet the centre Baggage Ribs
Details
09-09-2009
0.50
Rivet Skin Stiffeners
Details
09-09-2009
0.50
Rivet Skin Attach Flanges
Details
09-09-2009
2.00
Rivet baggage floors
Details
09-09-2009
1.00
Nutplates and Retainer Blocks
Details
09-08-2009
2.00
Prepare parts for priming
Details
09-03-2009
5.00
Skin the second Flaperon
Details
09-02-2009
5.00
Skin the right Flaperon
Details
09-01-2009
5.50
More work on fuselage parts
Details
09-01-2009
1.00
Inspection!
Details
08-31-2009
5.00
Preparation of fuselage parts
Details
08-28-2009
4.00
Prepare the Centre Section Bulkheads
Details
08-28-2009
4.00
More work on the Centre Section Bulkheads
Details
08-27-2009
1.50
Reconfigure workbenches
Details
08-27-2009
3.00
Prime the flaperon skins
Details
08-27-2009
1.50
Getting ready for fuselage work
Details
08-26-2009
0.50
Work on Flaperon Counterweights
Details
08-26-2009
1.00
Store the tailplane
Details
08-26-2009
2.50
Prepare inboard flaperon skins
Details
08-26-2009
4.00
Assembly of flaperon skeletons
Details
08-25-2009
2.00
Attach brackets to flaperon spars
Details
08-25-2009
4.00
Assembling the Pitch Trim Servo
Details
08-25-2009
2.00
Assemble the Trim Servo linkage
Details
08-24-2009
3.00
Remake tailplane hinges
Details
08-24-2009
2.00
Remake left flaperon Actuation Bracket
Details
08-24-2009
1.00
Prepare and attach hinge pins
Details
08-24-2009
1.00
Fit the aft tailplane ribs
Details
08-24-2009
1.00
Fit hinges to the aft tailplane flanges
Details
08-21-2009
7.00
Further work to reorganise workshop
Details
08-20-2009
3.00
Start to reconfigure the workshop
Details
08-20-2009
7.00
Complete close-out of right wing
Details
08-19-2009
7.50
Skin top surface of right wing
Details
08-18-2009
4.00
Skinning the underside of the right wing
Details
08-17-2009
9.00
Prime skins for the second wing
Details
08-16-2009
1.00
Consideration on how to fix flaperon brackets
Details
08-15-2009
3.50
Finished wing skin preparation
Details
08-14-2009
7.00
Prepare right wing skins
Details
08-13-2009
3.00
The Wing-Tip Close-Out
Details
08-13-2009
1.00
P 17-06 Step 3
Details
08-13-2009
2.00
Attach close-out skin to wing tip
Details
08-12-2009
1.00
Work on wing tip
Details
08-12-2009
1.00
Wing Tip Forward Skin
Details
08-12-2009
3.00
Riveting the Wing Walk Doubler
Details
08-12-2009
1.00
Riveting the Wing Tip Aft Skin
Details
08-12-2009
3.00
Complete top skins
Details
08-12-2009
1.00
Attach wing tip ribs
Details
08-11-2009
3.00
Rivet the leading edge
Details
08-11-2009
2.00
Rivet the inboard top skin
Details
08-11-2009
1.00
Bending Tool fabrication
Details
08-11-2009
1.00
Attach hinge ribs
Details
08-10-2009
2.50
Skinning the underside of the left wing
Details
08-10-2009
4.00
Second and third bottom skins on first wing
Details
08-10-2009
1.50
Installing the Access Hatch
Details
08-10-2009
1.50
Finish tailplane (that's the intent anyway)
Details
08-09-2009
1.00
Get organised!
Details
08-07-2009
6.00
Rivet the tailplane
Details
08-07-2009
2.00
Rivet the rudder
Details
08-06-2009
3.00
Redo flaperon pivot brackets
Details
08-05-2009
3.50
Primed the left wing skins
Details
08-04-2009
8.00
Further prep on wing skins
Details
08-02-2009
0.00
Inspection delay
Details
07-31-2009
6.50
More wing skin prep
Details
07-30-2009
8.00
Preparation for wing skinning
Details
07-29-2009
5.50
Further prep on flaperons
Details
07-29-2009
2.00
Complete right wing skeleton
Details
07-28-2009
6.50
Prepare flaperon ribs
Details
07-27-2009
7.50
Prepare flaperon components
Details
07-23-2009
2.00
Wiring the stall warner
Details
07-23-2009
4.30
Complete assembly of port wing skeleton
Details
07-23-2009
0.30
Attach Left Stub Spar Assembly
Details
07-23-2009
2.00
Assemble stall warning assemblies
Details
07-22-2009
4.00
Start attaching nose ribs to port wing
Details
07-22-2009
5.00
Final preparation of the wing nose ribs
Details
07-21-2009
5.00
Prime, then attach main wing rib doublers
Details
07-21-2009
4.00
Assemble main ribs to wing spars
Details
07-20-2009
7.00
Complete preparation on wing main ribs
Details
07-17-2009
7.50
Preparing wing ribs
Details
07-16-2009
2.50
Rivet Stub Spar Assembly
Details
07-16-2009
1.00
Rivet Flaperon Hinge Brackets
Details
07-16-2009
2.00
Rivet Flaperon Hinge Assemblies
Details
07-16-2009
1.00
Attach parts to Rear Spar
Details
07-15-2009
8.00
Priming and, eventually, spar work
Details
07-14-2009
3.00
Prepare Wing Stub Spars
Details
07-14-2009
1.00
Prepare Spar Tip Attach Angle
Details
07-14-2009
1.00
Prepare Flaperon Brackets
Details
07-13-2009
3.00
Prepare Attach Angles and Rib Doublers
Details
07-13-2009
3.00
More spar preparation work
Details
07-13-2009
1.00
Inspect wing spars
Details
07-12-2009
2.00
Finish prep of top tailcone skin
Details
07-12-2009
7.50
Complete build of wing/fuselage stand
Details
07-10-2009
3.50
Riveting of tailcone
Details
07-10-2009
4.00
Cleco second upper tailcone skin
Details
07-09-2009
2.00
Left upper tailcone skin
Details
07-08-2009
1.00
Rivet hinge brackets to tailcone bulkhead
Details
07-08-2009
2.00
Pitot static plumbing and electric trim cable
Details
07-08-2009
0.50
Installing static ports
Details
07-08-2009
1.00
Complete riveting of rudder skeleton
Details
07-08-2009
2.50
Cleco rear bulkhead
Details
07-07-2009
2.50
Second attempt to rivet a rudder rib
Details
07-06-2009
7.00
Building a wing/rear fuselage stand
Details
07-02-2009
3.00
Riveting the lower side skins
Details
07-02-2009
2.00
Riveting the bottom tailcone skins
Details
07-02-2009
0.50
Redo some rivets
Details
07-02-2009
0.50
Prepare J-stiffeners
Details
07-02-2009
2.00
"Hook" frames onto the bottom panels
Details
07-01-2009
4.50
Prepare rear Fuselage Bulkhead and its Doubler
Details
06-30-2009
4.00
Prime tailcone skins
Details
06-30-2009
3.50
Prepare Tailcone Frames
Details
06-29-2009
3.00
Deoxidine tailcone skins
Details
06-19-2009
5.00
More work on tailcone skins
Details
06-18-2009
7.00
Started work on the tailcone skins
Details
06-16-2009
2.00
Started inventory of Finish Kit
Details
05-09-2009
2.00
Finish preparation on Tailplane Spars
Details
05-09-2009
1.00
Assembling the Tailplane Spar Box
Details
05-09-2009
3.00
Adding ribs to complete the tailplane skeleton
Details
05-08-2009
1.00
Redo tailplane spars
Details
05-08-2009
4.50
Preparing Horns and Counterbalance
Details
04-09-2009
0.50
Cutting the thread
Details
04-06-2009
1.00
Prepare various brackets
Details
04-06-2009
0.50
Prepare J-Stiffeners
Details
04-06-2009
1.00
Prepare Bulkhead Doubler
Details
04-06-2009
0.50
Fuselage Bulkhead work
Details
04-05-2009
3.00
Tail Skid fabrication
Details
04-05-2009
2.00
Flute and prepare fuselage frames
Details
04-04-2009
0.50
Tailplane spars
Details
04-04-2009
1.00
Tailplane ribs and spar caps
Details
04-04-2009
1.50
Rivet AST hinge
Details
04-04-2009
3.00
Countersink tailplane spars
Details
04-01-2009
6.00
Priming again
Details
03-28-2009
5.00
Ribs, skins, and hinges
Details
03-28-2009
1.00
Hinge stops
Details
03-27-2009
1.00
Tailplane rib clips
Details
03-27-2009
4.00
Rivet the vertical stabiliser
Details
03-22-2009
1.00
Stabilitor Spar
Details
03-22-2009
2.50
Preparing parts for stabilitor spar
Details
03-22-2009
1.00
AST Horns
Details
03-22-2009
2.00
Assembling the AST
Details
03-13-2009
0.50
Rudder skeletion assembly
Details
03-13-2009
4.00
Primed AST parts
Details
03-13-2009
2.00
Prepped AST control horns and and hinges
Details
03-13-2009
0.00
AST Priming
Details
03-13-2009
1.50
Assembling the rudder skeleton
Details
03-12-2009
2.00
Prepped the AST Control Horns
Details
03-02-2009
0.00
Saw Tim
Details
03-02-2009
0.00
Ordered Finish Kit
Details
03-01-2009
2.00
Check rudder hinge alignment
Details
02-28-2009
1.00
Trial assembly of VS
Details
02-27-2009
1.00
VS Skin Nutplates
Details
02-27-2009
1.00
Preparing VS skins for priming
Details
02-27-2009
3.00
Preparing and dimpling the VS skins
Details
02-27-2009
5.00
Painting VS and Rudder Skins
Details
02-27-2009
0.00
Big paint booth
Details
02-22-2009
4.00
Riveting VS Skeleton Together
Details
02-14-2009
0.50
Squeezing flush rivets
Details
02-13-2009
1.50
First squeezed rivets
Details
02-13-2009
0.50
First pop rivets
Details
02-13-2009
6.00
First attempt at spraying
Details
02-08-2009
8.00
Respirator
Details
01-18-2009
2.50
Prepare Anti Servo Tabs
Details
01-02-2009
5.00
Prepare Rivet Wedges
Details
12-30-2008
1.00
Vertical Stabiliser Skins
Details
12-30-2008
0.50
Radiused VS Ribs and Spars
Details
12-30-2008
0.50
Countersink VS-1203
Details
12-28-2008
1.00
Remade VS Hinge Brackets
Details
12-28-2008
1.50
Countersinking VS-1203 and VS-1212
Details
12-27-2008
1.00
Stored the Engine
Details
12-21-2008
8.00
Collected the Engine
Details
12-14-2008
6.00
Vertical Stabiliser Spar Preparation
Details
12-14-2008
1.00
Stabiliser Spar Hinge Brackets
Details
12-13-2008
3.00
Preparation of Parts
Details
12-07-2008
3.00
Preparation of Parts
Details
11-29-2008
1.00
Completed Empennage Inventory
Details
11-28-2008
3.00
Empennage Kit Arrives
Details
11-26-2008
1.00
Finished Preparing Ribs
Details
11-25-2008
2.00
Started Preparing Wing Ribs
Details
11-17-2008
5.00
Inventoried the Fuselage Kit
Details
11-16-2008
0.00
Covered Small Paint Booth
Details
11-12-2008
0.00
Ordered Empennage Kit
11-11-2008
0.00
Fuselage Kit Arrived at House
Details
09-01-2008
0.50
Wing Kit Crate Inspection
Details
09-01-2008
0.50
Storing the Wing Components
Details
09-01-2008
2.50
Inventory of Wing Kit
Details
08-29-2008
0.00
Wing Kit Collected from Coatbridge
Details
08-19-2008
0.00
Wing Kit Arrived in Glasgow
Details
07-28-2008
0.00
Ordered Fuselage Kit
Details
07-06-2008
0.00
Benches are ready
Details
06-02-2008
0.00
Avery Tool Kit
Details
05-02-2008
0.00
Shelving
Details
04-30-2008
2.00
Wing Plans Arrived
Details
04-30-2008
0.00
More Tools
Details
04-23-2008
0.00
Ordered Wing Plans
Details
04-20-2008
0.00
Time to Get Serious
Details
04-14-2008
0.00
Final Payment
Details
04-13-2008
0.00
A Screwdriver
Details
04-07-2008
0.00
Placed Order!
Details
04-05-2008
0.00
Last flight in WY
Details
03-24-2008
0.00
Compressor
Details
03-21-2008
0.00
Flying Trips
Details
03-20-2008
0.00
Ongoing Maintenance
Details
03-19-2008
0.00
Operation of the Aircraft
Details
03-18-2008
0.00
Production Acceptance Process
Details
03-18-2008
0.00
Firewall Forward
03-18-2008
0.00
Autopilot Option
03-17-2008
0.00
Painting Decisions
Details
03-16-2008
0.00
The Spats Option Kit
Details
03-15-2008
0.00
The Interior Trim Option Kit
Details
03-14-2008
0.00
The Autopilot Option Kit
Details
03-13-2008
0.00
The Lighting Option Kit
Details
03-12-2008
0.00
The Firewall-Forward Kit
Details
03-11-2008
0.00
The Avionics Sub-Kit
Details
03-10-2008
0.00
The Finishing Sub-Kit
Details
03-09-2008
0.00
The Fuselage Sub-Kit
Details
03-08-2008
0.00
The Wing Sub-Kit
Details
03-07-2008
0.00
The Empennage Sub-Kit
Details
03-06-2008
0.00
Tools Used
Details
03-05-2008
0.00
Where to build
Details
03-04-2008
0.00
Research Into What Plane To Buy
Details
03-03-2008
0.00
Deposit Received
Details
03-02-2008
0.00
Personal Stuff
Details
03-01-2008
0.00
Log Notes
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
573
1849
00. Construction Log
1
01. Personal
1
02. G-BLWY
3
03. Research
1
04. Workshop
20
40
05. Tools
1
06. Empennage
99
226
07. Wings
74
221
08. Fuselage
116
333
09. Finishing Kit
101
362
10. Avionics
15
37
11. Firewall Fwd
35
142
12. Lighting Kit
8
39
12. Panel
8
39
13. Autopilot
5
9
14. Interior Trim
1
15. Spats
1
16. Painting
47
177
17. Production Accep
23
212
18. Operation
2
19. Maintenance
1
20. Trips
1
Miscellaneous
9
12
Copyright © 2001-2024 Matronics. All Rights Reserved.