KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
Work Logs Found: 636
Category Work Time: 2838 Hours
 Date
Hours
Work Log Summary

Details

 09-02-2019
0.00
Flight number 2
Details
     

 08-04-2019
0.00
Back-up EFIS install
Details
     

 07-17-2019
0.00
Remove SV-1000 screen
Details
       

 07-15-2019
0.00
FIRST FLIGHT, PART III
Details
     

 07-14-2019
0.00
FIRST FLIGHT, SUMMARY
Details

 07-14-2019
0.00
FIRST FLIGHT, PART II
Details
     

 07-13-2019
0.00
FIRST FLIGHT, PART I
Details
     

 06-24-2019
0.00
Elevator counterweight rework, III
Details
       

 06-17-2019
0.00
Elevator counterweight rework II
Details
       

 06-09-2019
20.00
Elevator counterweight rework I
Details
       

 06-02-2019
0.00
Hi speed taxi test: first flight (sorta kinda)
Details
     

 05-05-2019
0.00
ACK auxiliary batteries
Details
       

 02-02-2019
2.50
EAA 663 Advisor's reinspection
Details

 01-27-2019
1.00
Servo filter check
Details
     

 01-21-2019
1.00
A/W cert!
Details
     

 01-06-2019
10.00
Flap limit switch installed
Details
       

 01-01-2019
3.00
Flaps up limit switch
Details
       

 12-30-2018
2.50
Zero p IAS.AOA cal; attitude check
Details
       

 12-29-2018
2.00
Yet more miscellaneous jobs
Details

 12-28-2018
8.00
Static/pitot leaks resolved & misc jobs
Details
       

 12-08-2018
4.00
Temp probes and static leaks
Details

 12-02-2018
3.50
Taxi test; depanel da plane
Details
       

 11-25-2018
1.50
Flap reticule
Details
       

 11-01-2018
1.80
2nd engine ground run; compression checks
Details
       

 10-14-2018
2.00
Revised purge placard; cut down lock-out key
Details
       

 10-13-2018
3.70
Fuse box card; Alt air guard
Details
       

 09-30-2018
3.00
More follow-ups
Details

 09-29-2018
2.80
Follow up after 1st engine start
Details

 09-28-2018
0.00
FIRST ENGINE START! (part II)
Details
     

 09-28-2018
2.00
FIRST ENGINE START! (part I)
Details
       

 09-28-2018
0.00
FIRST ENGINE START (part III)
Details

 09-23-2018
2.00
New QB flap; awful pitot/static leaks confirmation
Details
       

 09-22-2018
1.50
Pitot/Static Leak test
Details
       

 09-16-2018
10.00
Several small jobs...
Details
       

 09-09-2018
2.50
Rebuilt aileron--complete
Details
       

 09-02-2018
5.00
Continue right aileron re-build
Details
       

 08-31-2018
8.30
Aileron rebuild
Details
       

 08-26-2018
2.50
Deskinned right aileron
Details
       

 08-25-2018
4.00
Gas, prop, new compressor
Details
       

 08-20-2018
0.00
19 August addendum
Details
       

 08-19-2018
3.00
Inclined fuel flow
Details
       

 08-11-2018
0.00
Jacks and jack points
Details
       

 07-29-2018
5.00
Flow meter issue: fixed; completed tank cals
Details

 07-28-2018
5.00
It flows...but the flowmeter doesn't...new headset
Details

 07-22-2018
7.30
Wet the tanks with avgas...alas no flow!
Details
       

 07-21-2018
6.00
Cowl, main cotters, flow test line
Details
       

 07-15-2018
6.00
Cowl hinge pin covers; fuel line leak check
Details
       

 07-14-2018
6.00
Nose fork helicoil; a test seating
Details
     

 07-07-2018
6.00
Weight and Balance
Details
       

 07-06-2018
10.00
Main leg fairings; ELT g-switch test; Inital weigh
Details
       

 07-04-2018
4.00
ADSB swap; ELT and Txpndr serial numbers
Details
       

 06-24-2018
6.00
Cowl nose job; main fairing brackets
Details
       

 06-23-2018
1.00
Cowling nose jobs continues
Details
       

 06-19-2018
0.50
Cowling nose job: add micro
Details

 06-17-2018
6.00
Cowl nose job; main wheel pants nutplates
Details
       

 06-16-2018
7.00
Cowl nose job; alt safety; cockpit placards
Details
       

 06-16-2018
0.00
Cockpit placards
Details
       

 06-10-2018
6.50
More misc jobs from the punch list
Details
       

 06-09-2018
4.00
Weapon of 'glas Destruction
Details
       

 06-03-2018
8.00
Oil recovery/Spike/Mains Fairing Seams
Details
       

 05-28-2018
11.00
Main gear fairings
Details
       

 05-27-2018
0.00
New Batt/Canopy Handle/Main Gear Fairings
Details
       

 05-20-2018
10.00
Wingtips/Nav-Strb installation
Details
       

 05-13-2018
8.00
Wingtips/Good as Dead Battery
Details
       

 05-06-2018
4.70
Pre-oil the engine
Details
       

 05-05-2018
5.30
Spinner, Emp Fairing, Winch
Details
       

 04-15-2018
7.50
Miscellaneous jobs, getting ready to weigh the a/c
Details

 04-08-2018
0.00
Continuation of 4/7/2018 entry
Details
       

 04-07-2018
7.00
Cockpit interior is COMPLETE.
Details
       

 04-01-2018
5.00
A more joyful joystick; seat pans
Details
     

 03-25-2018
0.00
Lost weekend
Details

 03-17-2018
3.50
Apply tail numbers; wingtip spanwise ribs
Details
       

 03-11-2018
3.50
Harness; aileron pushrod boots; elev channel cover
Details
     

 03-10-2018
5.70
Thin seat, data plate, Reg/AWC pocket, tips, harne
Details
       

 02-25-2018
2.30
Reclose wingtips; seat hinges
Details
       

 02-19-2018
0.00
Final cockpit placards; misc finish items
Details
       

 02-17-2018
9.00
Seat cushion test; Wing tips; Emp fairing
Details
       

 01-21-2018
5.00
Flap rods completed; port root fariing; battery dr
Details
       

 01-15-2018
0.00
Fixing a mistake
Details
       

 01-14-2018
13.80
Wings 'n things
Details
       

 01-07-2018
0.00
Installed flaps; replaced left wing gnd hardware
Details
       

 01-06-2018
5.80
Fuse fuel lines; AP wiring
Details
       

 01-01-2018
7.00
Aileron linkages complete; nav/strobe wiring
Details
       

 12-31-2017
8.50
Ailerons rigged, and other stuff
Details
       

 12-29-2017
0.00
Wing bolts all installed and torqued.
Details
       

 12-26-2017
40.00
Wings on, second and last time
Details

 12-25-2017
8.00
Split wing tips rejoined
Details
       

 12-16-2017
6.10
Undoing right tip overtrim; splitting left tip tra
Details
       

 12-10-2017
3.50
Left wingtip strips and nutplates; lens fit to rig
Details

 12-09-2017
6.00
Floxing reinforcement strips to the right wingtip
Details
       

 12-08-2017
6.00
Wing tip reinforcing strips
Details
       

 12-04-2017
0.00
Wingtip fit up; oil door
Details
     

 12-03-2017
4.20
Fit wingtips
Details
       

 12-02-2017
3.00
Nav/Strobe light mounts
Details

 11-26-2017
6.00
Final emp attach/balance; final rudder attach
Details

 11-25-2017
6.00
Wing root nutplates. Stnlss rod for elevator trim
Details

 11-24-2017
1.00
Secured elevator trim tab cable connection
Details
       

 11-23-2017
0.00
Wings unplugged (hung hangar lights too).
Details

 11-22-2017
2.00
Cut the sticks to length! (Consult, measure for l
Details
     

 11-18-2017
3.00
Flaps rigged (Emp fairing; battery minding)
Details

 11-11-2017
4.30
Flap rig preliminaries. (Also emp fairing; txpndr
Details

 11-04-2017
0.00
Emp fairing pics
Details
       

 10-29-2017
10.00
Potpourri: emp fairing, drain holes, aileron & fla
Details
     

 10-22-2017
12.30
Split emp fairing for better fit
Details
       

 10-01-2017
7.80
Emp fairing fitting--nutplates
Details

 09-24-2017
2.50
Fuel tank vent connections
Details

 09-17-2017
2.10
More small jobs
Details

 09-16-2017
3.80
Small jobs
Details

 09-04-2017
13.00
Wing root fairings; tank attach brackets
Details
       

 08-27-2017
0.00
Set incidence and drill rear spar
Details
       

 08-26-2017
0.00
Leveled dihedral, sweep and triangulation
Details
       

 08-24-2017
0.00
Initial sweep check
Details
       

 08-22-2017
3.10
Wings on!
Details
     

 08-05-2017
3.50
Fuel selector placard; new fuel lines
Details
     

 07-03-2017
5.50
Installed roll servo
Details
       

 06-30-2017
2.50
Tail position/strobe wire routing
Details
       

 06-18-2017
0.00
Skyview update; ADSB (1090) In and radio check
Details

 06-18-2017
0.00
Outfitting the hangar
Details
       

 06-18-2017
10.00
Nose wheel pant and fairing
Details
       

 06-18-2017
5.00
Horizontal and vertical stabs mounted to the airfr
Details
       

 04-28-2017
0.00
MOVING TO THE AIRPORT--Part III
Details
       

 04-28-2017
0.00
MOVING TO THE AIRPORT--Part II
Details
       

 04-28-2017
3.00
MOVE TO THE AIRPORT--Part I
Details
       

 04-16-2017
2.00
Towing attachment/bar
Details
       

 04-02-2017
8.00
Painted n.g. fork and mushrooms
Details
       

 03-27-2017
1.00
Registration paperwork
Details
     

 03-25-2017
0.00
Nose gear mod (part II)
Details
       

 03-25-2017
8.00
Nose gear mod (part I)
Details
       

 03-21-2017
0.00
Windshield fairing good enough
Details
       

 02-03-2017
0.00
More canopy pics from 3 Feb 17
Details
       

 02-03-2017
35.00
Canopy summary
Details
       

 11-18-2016
9.30
LAST SKIN IS ON
Details

 11-05-2016
4.00
Securing the main roll bar support tube
Details
       

 11-05-2016
2.50
First rivets in the top fwd skin!
Details
       

 10-15-2016
1.50
Stick grip switches
Details
       

 10-15-2016
1.50
Last flame resistant caulking on the firewall
Details

 10-09-2016
5.00
Cowl fill; PFD/EFIS removal; spare EMS leads
Details
       

 10-02-2016
4.00
Electrical documentation, EBUS voltage tap
Details
       

 08-16-2016
0.00
test
Details

 08-14-2016
0.00
Test
Details

 08-14-2016
0.00
test
Details

 08-06-2016
0.00
test test test
Details

 07-10-2016
6.00
Spring return for fuel purge valve.
Details
       

 07-07-2016
1.50
Tech Counselor visit
Details

 05-30-2016
6.00
Bowden cable threaded end
Details
       

 05-07-2016
80.00
It got BAFFLES
Details
       

 12-12-2015
0.00
Oil door latch
Details
       

 11-28-2015
0.00
Light-guided match drilling: cowl to half-hinges
Details
       

 09-12-2015
0.00
Leveling the upper cowl
Details
       

 08-02-2015
0.00
Baffles---oil cooler cutout
Details
       

 06-18-2015
0.00
Glareshield dimmer; terminal strip
Details
       

 06-07-2015
0.00
Flap switch thingy machining the RIGHT way
Details
       

 04-12-2015
0.00
Wiring the ADAHRS units
Details
       

 02-09-2015
0.00
RG400 cable fabrication
Details
     

 02-01-2015
0.00
Panel labels
Details
       

 01-12-2015
2.00
ELT/Static line routing
Details

 01-10-2015
8.00
TXPNDR wiring/GPS antenna doubler prep
Details

 01-04-2015
9.00
ELT GPS signal test, ELT & ADAHRS installed
Details

 01-03-2015
20.00
Antenna doublers
Details
     

 12-29-2014
6.00
Fabricated ELT/ADS-B shelf
Details
       

 12-28-2014
9.00
Designed ELT/ADS-B in shelf
Details

 12-27-2014
6.80
A/P pitch servo
Details
       

 12-26-2014
7.50
TXPNDR shelf
Details
       

 11-23-2014
0.00
Rear spinner bulkhead nutplates
Details
       

 11-15-2014
0.00
Visit to Catto Props
Details
       

 10-02-2014
0.00
Test fit of Dynon SV screens
Details
       

 06-08-2014
0.00
Ground straps
Details
       

 04-07-2014
6.50
Manifold Pressure sensor installation
Details
       

 03-30-2014
9.00
Hung exhaust, cntrl cable brackets
Details

 03-22-2014
8.50
Hung the engine, installed alternator
Details
       

 03-22-2014
0.00
Alternator installed
Details
     

 03-18-2014
1.00
Engine mount
Details

 03-16-2014
4.50
On the gear!
Details

 06-30-2013
0.20
Canopy side skirts
Details

 04-09-2013
0.00
START OF NONCONTEMPORAL ENTRIES!!!
Details

 04-08-2013
3.30
Sensor manifold installation
Details

 04-07-2013
8.00
FOT ground block installation
Details
       

 04-06-2013
8.00
Forest of tabs ground block, homemade.
Details
     

 03-24-2013
3.30
Secured aft conduits & static line anitchafe
Details

 03-18-2013
6.00
Finished turtledeck riveting and misc jobs
Details

 03-17-2013
8.00
Penultimate fuse skin riveted in place
Details

 03-16-2013
4.00
Brake lines, contactors, big fat battery wire
Details

 03-03-2013
1.00
Elevator trim servo wiring
Details

 03-02-2013
3.00
Install cbn heat cntl box; laminated Cu bus bar
Details
       

 02-16-2013
4.00
Battery box
Details

 02-02-2013
4.00
Drill firewall for cabin heat control box
Details

 01-09-2013
3.00
FWF kit ordered and received
Details

 12-15-2012
2.00
Elevator trim servo motor wiring
Details
       

 12-02-2012
6.00
Map box, ADAHRS shelf
Details

 11-30-2012
2.80
Engine mount final match drill to f/w
Details

 11-26-2012
3.30
Finishing the ADAHRS tray
Details

 11-25-2012
40.00
Ctrls, Avionics, Eng Mount, F775 riveting
Details
       

 11-18-2012
2.00
Solder-cup DB9 to elevator trim servo
Details

 11-17-2012
8.00
DB9 connector dwgs for electric trim
Details

 11-04-2012
8.00
Canopy frame alignment--missed it by _that_ much.
Details

 11-02-2012
3.00
Nose/main gear leg weldments; rudder links
Details

 10-28-2012
8.00
Canopy rails, rudder links, nose gear work
Details

 10-27-2012
8.00
Canopy rails on fuse sides and turtledeck.
Details

 10-26-2012
4.00
Canopy rails
Details

 10-21-2012
8.80
Install canopy bow and brace
Details

 10-17-2012
3.00
Eccentric bushing
Details
       

 10-16-2012
3.00
Canopy bow--oversized, off-center hole!
Details

 10-14-2012
3.00
Canopy roll bar
Details

 10-13-2012
24.00
Misc fuse work 30-Sep to 13-Oct 2012
Details

 09-29-2012
2.00
Lay in the rudder cables
Details

 09-10-2012
2.80
Fit horiz stab to the fuse
Details

 09-09-2012
6.00
Drill F-7106 skin to f/w; engine dolly.
Details

 09-03-2012
2.00
Stowing canopy, wheel pants, cowl
Details

 09-02-2012
4.00
Inventory--h/w
Details

 09-01-2012
3.00
Inventory--all but h/w
Details

 08-31-2012
2.00
Finish kit Day! Part I
Details

 08-31-2012
2.00
Finish Kit Day! Part II
Details

 08-31-2012
4.00
Engine Day!
Details
       

 08-27-2012
1.30
Elevator linkage inspection cover plates
Details

 08-19-2012
7.00
Attach plates for the VS; fwd top fuse skin
Details
     

 08-15-2012
1.90
Fitting VS to the fuse
Details
       

 08-12-2012
5.75
Brake lines; riveted sub panel/ribs into place.
Details

 08-11-2012
1.50
Installed fuel lines 2nd & last time maybe
Details

 08-06-2012
1.50
Installation of subpanel and fwd fuse ribs.
Details

 08-05-2012
1.70
Subpanel outboard sections, canopy deck riveting
Details

 08-04-2012
2.00
F-704 cap strips match drilled. Csk canopy decks
Details

 08-01-2012
4.00
Brake lines installed; started new fuel lines
Details
     

 07-30-2012
1.00
Removed misinstalled fuel lines
Details

 07-22-2012
3.00
Mate fuel lines & valve, brake line...and OOPSIE!
Details

 07-22-2012
2.00
Left tank fuel line
Details

 07-21-2012
8.00
Bolted LG wldmts for good. Began fuel/brake lines
Details

 07-15-2012
9.00
Fuel vent lines, fuel valve & brake resvr spcrs
Details

 07-10-2012
2.50
Fitting main LG weldment--finishing up RIGHT
Details

 07-09-2012
2.30
Fitting main LG weldment--LEFT
Details

 07-08-2012
2.00
Fitting main LG weldment--RIGHT
Details

 07-05-2012
8.70
Riveting; painting interior & other parts
Details

 07-01-2012
6.00
Priming, painting, riveting
Details
       

 06-30-2012
1.20
Vent line fittings.
Details
       

 06-29-2012
0.00
Ordered the finish kit!
Details

 06-28-2012
0.00
Ordered an engine!
Details

 06-25-2012
2.00
Right main gear taper pin
Details

 06-20-2012
1.80
Reamed left main for taper pin
Details

 06-17-2012
1.80
Drilled main lg to weldment
Details

 06-10-2012
8.00
Fuel line cover/cockpit heat diffuser
Details
       

 06-09-2012
8.00
Tunnel cover fabrication, fit, and rivet.
Details
       

 06-05-2012
3.10
Match drilled last bracket to top fwd fuse; NACA
Details

 06-04-2012
2.10
Match drilling fwd fuse angle brackets
Details

 06-03-2012
2.50
Fab and fit fwd top fuse parts into place w/clecoe
Details

 06-02-2012
8.00
Install NACA vents: cleco fwd fuse top parts in pl
Details

 06-01-2012
3.00
Vent line screen solution; NACA vents
Details

 05-28-2012
9.30
Flap parts painting/no load testing; fuel vent scr
Details

 05-26-2012
3.50
Primed flap parts
Details

 05-20-2012
4.00
Flap parts match drilled, deburr/dimple.
Details

 05-19-2012
1.70
Electric flap parts
Details

 05-15-2012
3.30
Seat pans riveted
Details

 05-14-2012
2.80
Baggage floor riveted
Details

 05-13-2012
0.50
Test fit the flap bar
Details
       

 05-13-2012
7.00
Baggage area prime; install floors/side covers
Details
       

 05-12-2012
2.00
Tie down ring storage nutplates.
Details
       

 05-12-2012
5.50
F-706 nutplates; F-905 armrest rivets
Details
       

 05-05-2012
1.00
Right seat pan hinges
Details

 04-28-2012
2.50
Baggage Covers; First Seating!!!
Details
       

 04-17-2012
2.00
Rear fuse top skins
Details

 04-15-2012
8.50
Aft fuse skins; aux rib and J-stringer repair
Details
       

 04-14-2012
5.50
Longeron gussets; aft top fuse skin match drill
Details

 04-13-2012
3.00
Emp deck rivets complete; F-656 gussets; F-786 sti
Details
     

 04-12-2012
0.00
Documenting fuse twist: zero-zero
Details
       

 04-11-2012
3.20
Empennage deck priming/riveting
Details
       

 04-10-2012
2.50
F-711D angle--one more time; F-6111 aux ribs fit
Details

 04-09-2012
1.60
Zeroed out the fuse twist; drilled aft deck
Details

 04-08-2012
5.30
F-721 canopy decks and F-757 gussets
Details

 04-07-2012
3.00
F-970 side skin to longeron riveting
Details

 04-06-2012
6.00
Fuse flipped, on cradle right side up!
Details
       

 04-01-2012
6.60
Finished fuse cradle and cntr/fwd fuse section riv
Details

 03-31-2012
4.70
External step installation. More riveting.
Details

 03-30-2012
6.50
Building fuse cradle
Details

 03-26-2012
3.30
F-970 starboard riveting; brake pedal cotter pins.
Details

 03-25-2012
1.00
Assemble rudder and brake pedals
Details

 03-24-2012
3.00
Rudder and brake pedal paint; rivet replacement
Details

 03-19-2012
2.00
Riveting F-970, port side
Details

 03-18-2012
6.50
Riveting F-970 skins
Details

 03-14-2012
2.30
Seat belt cable wear blocks
Details

 03-11-2012
5.80
A few fuse rivets; prime steps; rear baggage wall
Details

 03-10-2012
7.80
Fit steps to fuse sides
Details

 03-07-2012
2.50
Dimpled F-906, riveted baggage floor ribs to same
Details

 03-05-2012
3.30
Reassembling the fwd fuse continues...
Details

 03-04-2012
3.30
Reassembly of fwd fuselage continues...
Details

 03-03-2012
10.30
Fuse reassembly continues...
Details

 02-28-2012
3.00
Finish fwd fuse priming; begin fwd fuse reassy
Details

 02-28-2012
2.70


 02-27-2012
2.00
Priming fwd fuse parts
Details

 02-26-2012
2.80
F970 skins, w/F-904H pre-rivets, clecoed in place
Details

 02-25-2012
2.30
Rivet outboard seat ribs: two more dimples
Details

 02-24-2012
2.70


 02-21-2012
1.50
F-636 shoulder belt anchors
Details

 02-20-2012
7.50
Tools for neglected rear fuse dimples & riveting
Details

 02-19-2012
8.10
Longeron csking, spot prime: put'em back
Details

 02-18-2012
7.70
Deburr, dimple, smooth F-972 and F-970 skins
Details

 02-13-2012
2.30
Deburr, dimple, screw up, and repair F-972
Details

 02-12-2012
3.50
Disassembly for deburr, smooth, dimple, etc.
Details

 02-11-2012
6.80
Misc f/w deburr, cskng, drilling.
Details

 02-07-2012
1.50
Rudder block holes in F-719 & F6118
Details

 02-06-2012
2.90
Fwd fuse mbr deburring; rudder adj holes.
Details

 02-05-2012
8.70
Baggage comp blkhds/brake pedal, cyl fit up
Details

 02-04-2012
9.40
Lots of little jobs!
Details

 02-01-2012
3.50
Prime, rivet, drill pivot holes in brake pedals
Details

 01-31-2012
2.60
Brake pedal angle shaping
Details

 01-28-2012
2.70
Brake pedal part prep/drilling
Details

 01-24-2012
2.70
Center brake pedal bracket and bearing block
Details

 01-23-2012
3.60
Drilled rudder pedal bearing blocks to longerons
Details

 01-16-2012
2.00
Rudder pedal brackets & brace
Details

 01-14-2012
6.00
Tank reinforcement angle and spacer
Details

 01-08-2012
9.70
Fwd fuse member fabrication
Details

 01-07-2012
8.00
Stnlss drilling: 6 broken bits, cheap bit best!??
Details

 01-06-2012
2.50
Longerons match drilled to WD-602s
Details

 01-02-2012
10.20
Cleco/match drill F-970 skins; firewall set in pla
Details

 01-01-2012
3.00
Conical bends in F-970 left skin
Details
       

 01-01-2012
4.00
Assemble seat backs with -5.5 rivets
Details
       

 12-31-2011
4.50
Tail and center mated; external step holes drilled
Details
       

 12-30-2011
1.00
Mate tail cone and center section
Details

 12-29-2011
1.50
F-741A z brackets
Details

 12-28-2011
4.00
Baked painted parts; small jobs
Details

 12-27-2011
1.00
Finish interior paint on seat back components
Details

 12-26-2011
3.00
Priming/paint seat pans, seat backs
Details

 12-24-2011
2.80
Seat back parts priming prep
Details

 12-17-2011
8.00
Completed match drilling angle members for seat ba
Details
       

 12-11-2011
1.10
Seat back brace hinges
Details

 12-05-2011
2.30
Seat back horizontal angles
Details

 12-04-2011
1.60
Seat back brace lightening holes
Details

 12-03-2011
3.50
Fabricate members for seat backs
Details

 12-02-2011
1.75
F-707B angle bracket--tricky!
Details

 11-29-2011
2.40
Center Section and boogered rivets in tail cone
Details

 11-27-2011
4.20
Riveting fuse cntr section
Details

 10-31-2011
2.30
Aft fuse bottom and side skin--completed.
Details

 10-29-2011
2.80
Aft fuse riveting
Details

 10-12-2011
3.30
Cntr section riveting--better!
Details

 10-11-2011
2.50
Ctr section riveting continues...poorly!
Details

 10-10-2011
4.30
Seat rib/F-904B riveting
Details

 10-09-2011
5.20
Center section part deburr/dimple; begin riveting
Details

 10-07-2011
6.50
Aft fuse blkhd/bottom skin riveting
Details

 10-06-2011
9.10
Aft fuse skin prep / start aft fuse riveting
Details

 10-05-2011
7.80
Aft/ctr fuse skin drill/deburr/dimple/edge smooth
Details

 10-04-2011
7.50
Prime center section parts and aft fuse J-channel
Details

 10-03-2011
8.70
Aft fuse
Details

 10-02-2011
7.80
Fuse center section / Aft fuse J-channel
Details

 09-30-2011
8.00
Fuse Center Section
Details

 09-29-2011
3.90
Aft Fuse pre-riveting prep / Fuse Center Section
Details

 09-28-2011
3.80
Seat Rib Sub-Assy
Details

 09-27-2011
8.30
Seat Rib Sub-assy
Details

 09-26-2011
6.30
Seat Rib Sub-Assy
Details

 09-26-2011
3.00
Moving day for the Emp and Wings!
Details
       

 09-25-2011
6.30
Countersink aft tail skin; rudder stops
Details

 09-24-2011
5.00
Mount elevators, elevator locks
Details

 09-24-2011
1.50
Drilled aft fuselage assy
Details

 09-23-2011
9.00
Aircraft "carrier"
Details

 09-22-2011
3.20
Aircraft "carrier"
Details

 09-21-2011
4.30
Mounted left aileron; pitot mast plate riveting
Details

 09-19-2011
9.50
Left wing bottom skins; aileron tweak; elevator sp
Details

 09-18-2011
2.50
Tail cone initial assembly: complete J-channel
Details

 09-17-2011
4.30
Tail cone initial assembly; J-channel
Details

 09-16-2011
4.40
Install, align left aileron
Details

 09-15-2011
2.00
Install left aileron
Details

 09-14-2011
5.40
Pushrods; Right wing bottom inboard skin
Details
       

 09-13-2011
7.90
Primed aileron push-rods
Details

 09-12-2011
2.00
Prep left wing for bottom skin riveting
Details
       

 09-12-2011
6.10
Pitot/AOA tubing; finished right wing riveting
Details
       

 09-10-2011
0.00
More home-brew pitot photos
Details
       

 07-05-2011
40.00
Pitot tube
Details
       

 05-21-2011
3.70
Right wing outboard bottom skin
Details

 05-15-2011
2.00
Rivet right wing bottom inboard skin
Details

 05-14-2011
3.30
Right wing bottom skins
Details

 05-14-2011
1.30
Finished main longeron bends and twists
Details

 05-13-2011
2.80
Longeron preparation
Details

 05-10-2011
2.80
Longeron preparation
Details

 05-09-2011
1.90
Main longeron preparation
Details

 05-08-2011
9.00
Flap ribs prep, wash, prime, rivet.
Details

 05-07-2011
8.10
Fit F-706 and flap ribs to bottom skin
Details

 05-06-2011
3.00
Longeron template; flap plate/ ribs and bellcrank.
Details

 05-01-2011
6.80
Prime & rivet blkhds
Details

 04-30-2011
11.80
Finished riveting F-705; prep rest of the blkhds
Details

 04-29-2011
2.80
Riveting F-705 blkhd
Details

 04-28-2011
1.00
F-705 priming
Details

 04-24-2011
3.50
F-705 blkhd prep for priming
Details

 04-24-2011
2.00
Deepen the tie-down bracket tapped holes
Details

 04-22-2011
10.00
Center section/Bulkheads
Details

 04-17-2011
6.00
Completed firewall riveting
Details

 04-11-2011
1.00
Pitot tube mast
Details

 04-11-2011
1.50
Firewall stiffeners
Details

 04-10-2011
8.80
Priming: Firewall stiffeners and center section pa
Details

 04-09-2011
5.50
Pitot tube mast
Details

 04-07-2011
2.10
Pitot tube mast
Details

 04-06-2011
1.80
F-711 bulkhead
Details

 04-05-2011
2.40
F-712 & -711 bulkheads
Details

 04-04-2011
1.50
F-712 bulkhead
Details

 04-03-2011
9.30
F-705 bulkhead
Details

 04-02-2011
6.10
F-705 bulkhead
Details

 03-30-2011
1.00
Assembled material for F-705 bulkhead
Details

 03-27-2011
5.00
Right wing ready for close; AOA line for left wing
Details

 03-26-2011
4.50
Spar center section
Details

 03-25-2011
8.50
Spar center section
Details

 03-19-2011
7.00
Spar center section
Details

 03-17-2011
3.50
Spar center section
Details

 03-16-2011
0.10
Torq-sealed aileron bell-crank bolts
Details

 03-16-2011
1.70
Spar center section
Details

 03-15-2011
2.80
Spar center section
Details

 03-14-2011
2.00
Spar center section
Details

 03-13-2011
3.00
Spar center section
Details

 03-13-2011
4.00
Finish landing/taxi light wiring
Details
       

 03-11-2011
6.50
Dimpled f/w; countersunk f/w members
Details

 03-10-2011
2.50
Match drilled f/w members
Details

 03-06-2011
11.30
Parts stored; started firewall
Details
       

 03-05-2011
5.50
Finished Inventory--1 shortage
Details

 03-04-2011
10.80
Fuse Kit Arrived
Details
       

 02-27-2011
6.00
Wing wiring/aileron bellcrank bolts
Details
       

 02-26-2011
4.00
Wing wires LNDG/TAXI and Pitot
Details

 12-27-2010
0.00
Ordered fuse kit today!
Details

 12-11-2010
6.40
Homebrew pitot tube mast
Details
       

 01-06-2010
8.00
Wing cradle and a long interregnum
Details

 02-22-2009
3.30
Finished right wing top skins
Details

 02-17-2009
6.50
Right wing top skin and fairings
Details

 02-16-2009
4.50
Rivet right wing top skins
Details

 02-07-2009
0.50
Loctite flap rod-end bearings
Details

 01-10-2009
6.50
Finish right flap; fit right wing fairings
Details

 01-03-2009
6.30
Left flap TE, Start right flap
Details

 01-02-2009
4.00
Rivet left flap top and bottom skins
Details

 01-01-2009
7.00
Rivet flap top skins
Details

 12-31-2008
7.20
Finish L flap repair; rivet top skin to R flap
Details

 12-30-2008
7.00
Assemble flap skeletons
Details

 12-29-2008
5.20
Prime flap parts; prep right wing top skins
Details

 12-29-2008
4.30
Prep flap parts for primer
Details

 12-28-2008
8.80
Flaps: Csk trail edge AEX; debur/polish edges
Details

 12-27-2008
8.70
Csk Flap spars
Details

 09-21-2008
8.10
Deburr/dimple all flap components
Details

 09-06-2008
4.50
Flaps--completed match drilling
Details

 09-05-2008
3.30
Left flap nose skins, TE
Details
     

 09-02-2008
6.50
Flaps
Details
       

 05-29-2008
4.00
Left Wing Gap Fairings
Details
       

 05-26-2008
6.50
Left Wing: wiring conduit; gap fairings
Details

 05-25-2008
5.50
Riveting top wing skins
Details

 05-10-2008
3.00
Riveting top skons to left wing
Details
       

 04-26-2008
3.00
Left wing top skin rivets
Details

 03-02-2008
4.00
Level right wing
Details

 03-01-2008
4.80
Right tank: attached to leading edge
Details

 02-22-2008
1.30
Left tank: Washers for z-bracket oversize bolts
Details
       

 02-22-2008
2.00
Left tank: attached to LE
Details
       

 02-20-2008
3.50
Left tank: install floating nutplates (part II)
Details
       

 02-20-2008
3.50
Left tank: install floating nutplates (Part I)
Details
       

 12-02-2007
6.30
Right landing lens / left tank
Details

 11-24-2007
6.50
Left wing landing light lens
Details

 11-23-2007
8.16
Landing light lenses
Details
       

 11-11-2007
2.00
Landing light brackets
Details
       

 11-11-2007
2.00
"Move" light hole in right wing-II
Details
       

 11-11-2007
2.50
"Move" light hole in right wing-I
Details
       

 11-10-2007
4.30
Right aileron/Lndng-taxi lghts/Ovsz bolts
Details
       

 11-04-2007
4.00
Right aileron TE
Details

 11-03-2007
5.00
Right aileron / Design left tank repair
Details
     

 10-29-2007
3.00
Right aileron
Details

 10-28-2007
7.83
Right tank leak and fit test/right aileron
Details

 10-27-2007
2.75
Right tank
Details

 10-20-2007
0.00
Leak test / flap brackets
Details
       

 10-20-2007
7.00
Final spar csnks, mate left tank to spar
Details

 10-19-2007
3.33
Leak test left tank / finish flap angle fab
Details
       

 10-18-2007
1.50
Flap brackets
Details

 10-17-2007
5.00
Right tank coverplate / start fabbing flap compone
Details

 10-16-2007
5.00
Close right tank
Details

 10-15-2007
5.00
Order new rt aileron parts / aileron bellcranks
Details
     

 10-13-2007
12.50
Right aileron
Details
       

 10-11-2007
7.00
Fix left tank brackets / seal left aileron TE
Details
       

 10-10-2007
3.00
Close left tank...and a horrible discovery
Details
       

 10-09-2007
8.50
Close up left tank
Details
       

 10-08-2007
5.80
Left aileron
Details
       

 10-07-2007
5.75
Left aileron
Details
       

 10-06-2007
0.00
EAA Tech Counselor Visit #1
Details

 10-06-2007
10.50
Ailerons
Details
       

 10-05-2007
4.75
Prime aileron components
Details
       

 10-03-2007
3.00
Aileron components edge smoothing
Details

 07-29-2007
4.75
Aileron stiffeners
Details
       

 07-28-2007
5.00
Tanks, Ailerons
Details
       

 07-27-2007
5.50
Aileron/Flap table
Details
     

 07-17-2007
1.80
Ailerons
Details

 07-15-2007
7.00
Tanks
Details
       

 07-15-2007
1.50
Start the ailerons
Details
       

 07-14-2007
2.50
Tanks
Details

 07-14-2007
2.00
Aileron pushrods; flap brackets
Details
       

 07-13-2007
5.75
Tanks
Details

 07-13-2007
2.00
Aileron pushrods
Details

 07-10-2007
2.00
Tanks
Details

 07-08-2007
1.50
Tanks
Details

 07-07-2007
2.50
Aileron pushrods
Details

 07-04-2007
1.50
Aileron pushrods
Details

 07-03-2007
2.50
Tanks
Details
       

 07-03-2007
2.50
Tanks
Details
       

 07-01-2007
5.50
Tanks
Details

 06-30-2007
4.50
Tanks
Details
       

 06-30-2007
2.00
Tanks
Details

 06-30-2007
0.00
More pics from 6/30
       

 06-24-2007
2.80
Rough up more tank parts for Pro-seal; z-bracket n
Details

 06-23-2007
0.00
Still more pics from 6/23
Details
       

 06-23-2007
0.00
More pictures from 6/23
Details
       

 06-23-2007
7.90
Left leading edge; aileron brackets; flap bushings
Details
       

 06-23-2007
0.00
Just pictures from 6/23
Details
       

 06-18-2007
0.50
Rivet shaving on the main spar!
Details
       

 06-16-2007
6.70
Rivet left wing skeleton; start left LE
Details

 06-15-2007
2.40
Right leading edge; left skeleton
Details

 06-10-2007
1.67
Aileron brackets
Details

 06-09-2007
0.00
More photos from 9-Jun-07
       

 06-09-2007
8.30
Aileron brackets/left rib prime; left flap bracket
Details
       

 06-04-2007
9.80
Rivet right LE to main spar; aileron brackets
Details
     

 06-03-2007
4.00
Right wing skeleton, LE riveting
Details

 06-02-2007
10.25
Priming, assemble right wing skeleton
Details
       

 06-01-2007
2.10
More wing rib primer prep
Details

 05-28-2007
8.30
More wing skeleton primer prep
Details

 05-27-2007
7.50
Disassembled wing skeletons, prep for primer
Details

 05-26-2007
2.50
Right top outboard wing skin; smooth skin edges
Details

 05-25-2007
2.30
Right wing top inboard skin
Details

 05-20-2007
2.30
Right bottom wing skins
Details

 05-19-2007
6.50
Right tank/LE. Re-do left W-919
Details

 05-19-2007
0.00
Fuel pickup pictures
Details
       

 05-18-2007
6.50
Still more right tank work
Details

 05-14-2007
2.10
More right tank work
Details

 05-13-2007
7.75
Right tank work
Details

 05-12-2007
6.00
Right tank to spar; drill rt le and tank
Details

 05-08-2007
1.00
Right tank stiffeners
Details

 05-06-2007
7.50
Right leading edge; J-channel; flap brackets
Details
       

 05-05-2007
2.50
Right J channel stiffener; wing skin pics
Details
       

 04-29-2007
8.50
Left and right wing skins
Details

 04-28-2007
7.75
Left wing flap attach brackets; pitot tubing
Details
       

 04-22-2007
2.00
Left wing skins
Details

 04-20-2007
8.00
Fuel pickup tubes; left top wing skins
Details
       

 04-18-2007
1.00
Fuel pick up tubes
Details

 04-16-2007
7.30
Left leading edge; left bottom skins
Details

 04-15-2007
3.50
Left tank, left leading edge
Details
       

 04-13-2007
3.83
Left tank
Details

 04-07-2007
6.00
Left tank
Details

 04-02-2007
2.00
Left tank
Details

 04-01-2007
8.50
Left tank
Details

 03-31-2007
7.75
Left tank
Details

 03-30-2007
1.75
Left tank
Details

 03-25-2007
11.00
Left wind skins and left leading edge
Details

 03-24-2007
1.75
Left wing skins
Details

 03-23-2007
1.00
Left wing skin match drilling
Details

 03-20-2007
2.66
Wing skins
Details

 03-19-2007
2.83
Wing rib prep; assemble wing skeletons on stands
Details

 03-18-2007
3.25
Wing rib prep; aileron align tool
Details
       

 03-17-2007
6.50
Wing rib prep
Details

 03-16-2007
2.00
Wing rib prep
Details

 03-11-2007
12.50
Rear spars; aileron bellcranks assy
Details

 03-10-2007
8.50
Rear spars
Details

 03-05-2007
2.75
Rear spars
Details

 03-04-2007
6.50
Main spar nutplates / wing tie downs
Details

 03-03-2007
8.00
Wing stand/more nutplates
Details

 02-25-2007
8.00
Main spar tank attach nutplates
Details
       

 02-24-2007
8.00
HS Fiberglass tips; storage
Details
       

 02-18-2007
8.00
Shop rearrangement / wing stand
Details

 02-17-2007
8.00
Inventory, break down crates
Details

 02-14-2007
3.00
Wing Kit Arrives!
Details

 02-13-2007
2.00
Prep shop for Wing Kit arrival
Details

 02-11-2007
0.00
Fiberglass-more photos
Details
       

 02-11-2007
0.00
Fiberglass--yet still more photos!
       

 02-11-2007
0.00
Fiberglass--yet more photos
Details
       

 02-11-2007
3.00
Fiberglass
Details
       

 02-10-2007
4.00
Fiberglass
Details
       

 02-04-2007
2.50
Fiberglass
Details

 02-03-2007
2.25
Fiberglass
Details

 01-28-2007
2.50
Fiberglass
Details

 01-27-2007
4.00
Fiberglass
Details

 01-14-2007
7.25
Epoxy filler; elevator control horn holes
Details

 01-07-2007
5.00
T.E. riveted; fiberglass
Details

 01-01-2007
8.00
Fiberglass
Details

 12-31-2006
3.00
Misc rivets and rolled rudder leading edge
Details

 12-30-2006
6.00
Trailing edges Pro-sealed (trim ribs too)
Details

 12-29-2006
4.00
Elevators
Details

 12-28-2006
7.25
Left Elevator
Details

 12-27-2006
3.00
Left Elevator
Details
     

 12-26-2006
2.75
Left Elevator
Details
     

 12-25-2006
4.50
Right Elevator TE, start Right Elevator
Details

 12-24-2006
4.25
Right Elevator
Details
       

 12-23-2006
9.00
Horiz stab, Elevators
Details

 12-22-2006
4.00
Elevator, Horiz Stab
Details

 12-17-2006
3.00
Rudder
Details

 12-16-2006
3.00
Elevator top stiffeners and trim motor mounts
Details

 12-10-2006
6.50
Several misc jobs
Details

 12-09-2006
1.00
Trim tab
Details

 12-02-2006
2.50
Rudder
Details

 11-26-2006
4.50
Rudder
Details

 11-25-2006
6.00
Vertical Stabilizer
Details
     

 11-25-2006
3.00
Rudder
Details

 11-24-2006
6.00
Vertical stabilizer
Details

 11-23-2006
3.50
Horizontal stabilizer
Details
     

 11-22-2006
0.80
Horizontal stabilizer
Details

 11-21-2006
0.50
Horizontal Stabilizer
Details

 11-19-2006
1.20
Horizontal stabilizer
Details

 11-18-2006
5.75
Horizontal stabilizer
Details

 11-17-2006
1.50
Horizontal Stabilizer
Details

 11-14-2006
1.00
Horizontal Stabilizer
Details

 11-13-2006
3.00
Horizontal Stabilizer
Details
       

 11-12-2006
4.00
Horizontal stabilizer
Details

 11-11-2006
3.50
Horizontal stabilizer
Details

 11-06-2006
1.30
Horizontal stabilizer
Details

 11-05-2006
7.50
Horizontal stabilizer
Details

 11-04-2006
4.00
Trim tab and general emp parts
Details

 11-03-2006
0.50
Trim tab
Details

 10-31-2006
1.30
Trim tab
Details

 10-30-2006
3.00
Trim Tab
Details

 10-29-2006
7.50
Horiz Stab; Trim Tab
Details
       

 10-28-2006
7.00
Horizontal stabilizer; Left elevator trim spar
Details
       

 10-22-2006
10.00
Left elevator and start trim tab
Details

 10-21-2006
8.00
Right and left elevator
Details

 10-20-2006
2.50
Right elevator assy for drilling
Details

 10-16-2006
2.50
Elevator (left ctr wt, right elev full assy)
Details

 10-07-2006
2.00
Left Elevator Ctr Wt Assy
Details

 09-30-2006
6.00
Rudder and Elevator
Details

 09-24-2006
4.25
Elevator
Details

 09-10-2006
7.50
Left and Right Elevator
Details

 09-09-2006
1.50
Right elevator
Details

 09-05-2006
2.00
Rudder--csk trailing edge AEX
Details
       

 09-03-2006
8.75
Rudder drill/deburr/dimple
Details

 09-02-2006
4.25
Rudder
Details

 09-02-2006
4.00
Rudder
Details

 08-27-2006
2.50
Elevator stiffeners
Details

 08-26-2006
6.00
Rudder
Details
     

 08-20-2006
2.00
Lightening Holes VS-808PP
Details

 02-11-2006
0.80
Rudder skin stiffeners
Details

 02-08-2006
1.20
Rudder skin stiffeners
Details

 02-08-2006
0.10
Rudder skeleton
Details

 02-07-2006
2.50
Rudder skeleton
Details

 02-05-2006
8.00
Vert Stabilizer
Details

 02-04-2006
3.50
HS edge prep / Start VS
Details

 01-30-2006
2.50
HS-spars cskng; prep spar edges
Details

 01-29-2006
5.50
HS #40 dimples and began csking spars
Details

 01-28-2006
8.50
HS: Hole-ly preparation Batman!
Details

 01-15-2006
2.75
Horizontal stab
Details
       

 01-14-2006
8.00
Horizontal stab
Details
       

 01-13-2006
4.00
Horizontal stab: Front/Rear Spars
Details

 01-12-2006
0.00
Shop Shots
Details
       

 01-11-2006
2.00
Parts storage
Details
       

 01-07-2006
1.50
Hardware Inventory/Finished Practice Kit
Details

 01-06-2006
2.00
Inventory
Details

 01-05-2006
1.00
Inventory
Details

 01-03-2006
0.10
Empennage Kit Delivered
Details

 12-26-2005
0.10
Empennage Kit Ordered
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.