Date
|
Hours
|
Work Log Summary

|
Details

|
07-11-2018
|
0.00
|
Completed inspection, test flew.
|
|
  |
|
07-07-2018
|
0.00
|
Finished re-assembly.
|
|
  |
|
07-05-2018
|
0.00
|
Completed CI.
|
|
  |
|
07-04-2018
|
0.00
|
FWF CI completed, tightened sticks.
|
Details
|
  |
|
06-29-2018
|
0.00
|
Finished HS mods, reinstalled.
|
|
 |
|
06-28-2018
|
0.00
|
Accomplished HS bearing mod and finished HS improv
|
|
|
|
06-27-2018
|
0.00
|
Continued HS upgrade.
|
|
|
|
06-26-2018
|
0.00
|
Completed ADS-B install, began HS upgrade.
|
Details
|
|
|
06-25-2018
|
0.00
|
Finished nose wheel mod, worked on ADS-B install.
|
Details
|
|
|
06-23-2018
|
0.00
|
Completed AST mods, began nose wheel upgrade.
|
|
|
|
06-21-2018
|
0.00
|
Began CI and mods
|
Details
|
|
|
05-28-2018
|
0.00
|
Completed deburring and priming.
|
|
 |
|
05-22-2018
|
0.00
|
Inventoried upgrade parts and began deburring.
|
|
  |
|
07-01-2017
|
0.00
|
Condition Inspection 2017
|
Details
|
|
|
05-26-2017
|
0.00
|
Corrected excess play in AST linkage.
|
Details
|
 |
|
01-06-2016
|
0.00
|
Test flew carbs.
|
Details
|
  |
|
12-28-2015
|
0.00
|
Re-installed carbs.
|
Details
|
 |
|
12-06-2015
|
0.00
|
Removed carbs, sent to Lockwood.
|
Details
|
|
|
05-11-2015
|
0.00
|
Condition Inspection completed.
|
Details
|
  |
|
05-08-2015
|
0.00
|
Mods
|
Details
|
|
|
04-15-2015
|
0.00
|
Continued mods and inspection.
|
Details
|
  |
|
04-14-2015
|
0.00
|
Started mods and inspections.
|
Details
|
|
|
04-13-2015
|
0.00
|
Removed Jane's wings, set up hangar for dual work/
|
Details
|
 |
|
04-12-2015
|
0.00
|
Replaced tires and tubes.
|
|
  |
|
10-02-2014
|
0.00
|
Installed reg/rec in new location
|
Details
|
|
|
09-29-2014
|
0.00
|
Ducati reulator/rectifier failure.
|
Details
|
|
|
07-11-2014
|
0.00
|
Removed malfunctioning SL-40, sent to Garmin.
|
Details
|
 |
|
06-17-2014
|
0.00
|
Installed capacittor to dampen noise on fuel press
|
Details
|
  |
|
06-05-2014
|
0.00
|
Replace fuel pressure sensor.
|
Details
|
 |
|
05-30-2014
|
0.00
|
Noted low fuel pressure indications.
|
Details
|
  |
|
05-21-2014
|
0.00
|
Finished condition inspection.
|
Details
|
  |
|
05-15-2014
|
0.00
|
Continued with mods and inspection.
|
Details
|
 |
|
05-09-2014
|
0.00
|
Fuel tank mods and inspection.
|
Details
|
|
|
05-07-2014
|
0.00
|
Continued with mods and maintenance.
|
Details
|
|
|
05-03-2014
|
0.00
|
Tank and wheels.
|
Details
|
|
|
04-30-2014
|
0.00
|
Removed sight glass, added holes, fitted doublers.
|
|
|
|
04-29-2014
|
0.00
|
Opened tank, removed ProSeal.
|
|
|
|
04-28-2014
|
0.00
|
Removed wings, jacked plane, removed wheels & gas
|
|
|
|
04-24-2014
|
0.00
|
Did run-up tests.
|
|
  |
|
04-10-2014
|
0.00
|
Repaired and painted wheel pant damaged on ice.
|
|
  |
|
03-20-2014
|
0.00
|
Finalized Thermostasis installation.
|
Details
|
|
|
02-21-2014
|
0.00
|
Installed Thermostasis oil thermostat.
|
Details
|
|
|
02-14-2014
|
0.00
|
Installed canopy seal kit
|
Details
|
|
|
06-24-2013
|
0.00
|
Completed SB, installed FW stiffener.
|
Details
|
|
|
06-20-2013
|
0.00
|
Began SB for Cooler Mount Improvement
|
Details
|
|
|
04-10-2013
|
3.00
|
Finished, test flew.
|
Details
|
  |
|
04-09-2013
|
1.00
|
Finished wing mods.
|
Details
|
  |
|
04-08-2013
|
2.00
|
Wired wings.
|
Details
|
  |
|
04-05-2013
|
7.00
|
Installed bushings and muffler springs.
|
Details
|
|
|
04-04-2013
|
6.00
|
Worked on wing wiring mod.
|
Details
|
|
|
04-02-2013
|
0.50
|
Odds and ends.
|
Details
|
  |
|
04-01-2013
|
2.00
|
New plugs and weatherstripping.
|
Details
|
|
|
03-29-2013
|
2.00
|
Reassembled.
|
Details
|
 |
|
03-28-2013
|
6.00
|
Began re-assembly.
|
Details
|
 |
|
03-27-2013
|
3.00
|
Continued with inspection.
|
Details
|
 |
|
03-26-2013
|
4.00
|
Continued with inspection.
|
Details
|
|
|
03-25-2013
|
5.00
|
FInished PTT's, started inspection.
|
Details
|
|
|
03-21-2013
|
6.00
|
Wing connector, power plug, pump switch.
|
Details
|
|
|
03-20-2013
|
2.00
|
Continued on lighting upgrade.
|
Details
|
  |
|
03-19-2013
|
0.00
|
Last day of winter - a foot of snow.
|
|
  |
|
03-18-2013
|
5.00
|
Worked on lighting upgrade kit.
|
Details
|
|
|
03-15-2013
|
1.00
|
Sam serviced wheels and removed covers.
|
Details
|
|
|
03-14-2013
|
6.00
|
Finished MLG mod except for reassembly steps.
|
Details
|
|
|
03-13-2013
|
7.00
|
Installed doublers.
|
Details
|
|
|
03-12-2013
|
6.00
|
Began SB
|
Details
|
|
|
03-11-2013
|
1.00
|
Began condition inspection.
|
Details
|
  |
|
03-04-2013
|
1.00
|
Prepped and primed aluminum parts.
|
|
 |
|
03-02-2013
|
2.00
|
Deburred kit parts.
|
Details
|
|
|
12-10-2012
|
2.00
|
Inventoried SB and wing wiring kits.
|
Details
|
  |
|
11-28-2012
|
0.00
|
Got transponder recertified at NA Aviation.
|
|
  |
|
10-09-2012
|
3.00
|
Finished SB.
|
Details
|
 |
|
10-08-2012
|
2.00
|
Removed U-1202 brackets
|
Details
|
  |
|
10-03-2012
|
2.00
|
Began SB 12-09-26.
|
Details
|
|
|
09-27-2012
|
1.00
|
Changed oil and filter, took sample.
|
Details
|
  |
|
07-11-2012
|
4.00
|
Installed extra filter capacitor.
|
Details
|
|
|
06-21-2012
|
1.00
|
More work on audio levels.
|
Details
|
  |
|
06-18-2012
|
8.00
|
Worked on alternator whine.
|
Details
|
|
|
02-26-2012
|
0.00
|
Completed paperwork, fueled.
|
Details
|
  |
|
02-24-2012
|
0.00
|
Installed firewall shield, completed inspection.
|
|
  |
|
02-17-2012
|
0.00
|
Finished interior kit.
|
Details
|
|
|
02-16-2012
|
0.00
|
Installed lower cowl, started interior kit.
|
Details
|
|
|
02-15-2012
|
0.00
|
Continued reassembly.
|
Details
|
 |
|
02-14-2012
|
0.00
|
Worked on inspection.
|
Details
|
 |
|
02-13-2012
|
0.00
|
Finished mods, began inspection.
|
Details
|
 |
|
02-11-2012
|
0.00
|
Finished access panels, painted.
|
|
  |
|
02-10-2012
|
0.00
|
Made access panel mods.
|
Details
|
|
|
02-09-2012
|
0.00
|
Finished tank mod, updated avionics.
|
Details
|
  |
|
02-08-2012
|
0.00
|
Worked on mods.
|
Details
|
|
|
02-07-2012
|
0.00
|
More mods & upgrades.
|
Details
|
|
|
02-06-2012
|
0.00
|
Began inspection & modifications.
|
Details
|
|
|
12-09-2011
|
0.00
|
Installed replacement throttle springs.
|
Details
|
|
|
09-18-2011
|
0.00
|
Best Homebuilt, Simsbury Fly-in!
|
Details
|
|
|
09-14-2011
|
0.00
|
Finished cosmetics, waxed.
|
Details
|
|
|
09-10-2011
|
2.00
|
Enlarged spar slots, painted plexiglass backside.
|
Details
|
|
|
09-05-2011
|
8.00
|
Cosmetic touch-ups.
|
Details
|
|
|
06-25-2011
|
0.00
|
Installed baggage area tie-down strap.
|
Details
|
|
|
06-16-2011
|
1.00
|
Installed the new N numbers.
|
Details
|
|
|
06-14-2011
|
0.50
|
Installed placards
|
Details
|
 |
|
06-06-2011
|
3.00
|
Installed sunshade.
|
Details
|
|
|
06-04-2011
|
0.00
|
More tweaks, 25 hour inspection.
|
Details
|
 |
|
05-20-2011
|
0.50
|
Tested prop balance
|
Details
|
  |
|
05-18-2011
|
0.50
|
Installed cowl.
|
Details
|
  |
|
05-14-2011
|
0.50
|
Found/fixed "rattle."
|
Details
|
  |
|
05-12-2011
|
2.00
|
Reinstalled spinner, looked for rattle.
|
Details
|
  |
|
05-11-2011
|
2.00
|
Completed balancing of prop.
|
Details
|
|
|
05-10-2011
|
4.00
|
Continued work on balancing.
|
Details
|
  |
|
05-09-2011
|
2.00
|
Worked with Ed on balancing.
|
Details
|
  |
|
05-08-2011
|
0.50
|
Set up sensor mounts.
|
Details
|
|
|
05-07-2011
|
3.00
|
Tightened swivel, adjusted prop pitch.
|
Details
|
|
|
05-03-2011
|
0.00
|
Worked on nosewheel swivelling, tested.
|
Details
|
  |
|
05-01-2011
|
0.00
|
Tested prop vibration, nose wheel tension.
|
Details
|
  |
|
04-28-2011
|
2.00
|
Trimmed, reinstalled nose pant.
|
Details
|
  |
|
04-27-2011
|
2.00
|
Tested wheel pants, adjusted.
|
Details
|
|
|
04-26-2011
|
3.00
|
Installed all wheel pants.
|
Details
|
|
|
04-25-2011
|
1.00
|
Picked up wheel pants, started install.
|
Details
|
|
|
04-22-2011
|
5.00
|
Painted wheel pants.
|
Details
|
|
|
04-10-2011
|
0.00
|
Flew, checked prop.
|
Details
|
  |
|
04-09-2011
|
0.00
|
Finished test hours, took CJ for a ride.
|
Details
|
 |
|
04-08-2011
|
0.00
|
Reassembled baggage floor and other misc.
|
Details
|
|
|
04-06-2011
|
2.00
|
Reinstalled prop.
|
Details
|
|
|
03-18-2011
|
0.00
|
Sent prop to Sensenich, inspected weldments.
|
Details
|
|
|
03-17-2011
|
0.00
|
Got shipping info and a Safety Alert
|
Details
|
  |
|
03-16-2011
|
1.00
|
Found apparent bad prop hub.
|
Details
|
  |
|
03-15-2011
|
2.00
|
Flew test card 5, vibrations back.
|
Details
|
  |
|
03-11-2011
|
5.00
|
Re-synced carbs, adjusted latch, tuned autopilot.
|
Details
|
  |
|
03-10-2011
|
2.00
|
Recalibrated prop pitch using new appliance.
|
Details
|
|
|
03-09-2011
|
3.00
|
Reworked wing contacts, built level bracket.
|
Details
|
|
|
03-08-2011
|
2.00
|
Flew test card 4.
|
Details
|
  |
|
03-04-2011
|
5.00
|
Made adjustments, flew Card 2.
|
Details
|
|
|
03-03-2011
|
2.00
|
Replaced the FT-60 sensor.
|
Details
|
|
|
03-02-2011
|
0.00
|
Received replacement FT-60 sensor.
|
Details
|
  |
|
03-01-2011
|
0.00
|
Checked internal battery charge.
|
Details
|
  |
|
02-28-2011
|
1.00
|
Hooked up battery charger.
|
Details
|
  |
|
02-26-2011
|
1.00
|
Worked on avionics issues.
|
Details
|
  |
|
02-24-2011
|
3.00
|
Corrected yaw and roll trim, added weather strip.
|
Details
|
|
|
02-23-2011
|
2.00
|
Second flight, Card 1.
|
Details
|
|
|
02-22-2011
|
2.00
|
Air under the tires!
|
Details
|
|
|
02-20-2011
|
2.00
|
Checklist, tunnel cover, wind......
|
Details
|
  |
|
02-18-2011
|
2.00
|
Checked wheel alignment, confirmed bad FT-60.
|
Details
|
  |
|
02-17-2011
|
1.00
|
Taxi tests.
|
Details
|
|
|
01-27-2011
|
3.00
|
Carb sync, taxi tests.
|
Details
|
  |
|
01-26-2011
|
2.00
|
ELT fiasco.
|
Details
|
  |
|
01-25-2011
|
4.00
|
Corrected stick alignment and opening.
|
Details
|
|
|
01-24-2011
|
2.50
|
Made cooling baffles.
|
Details
|
|
|
01-21-2011
|
3.00
|
FAA inspection complete, A/W certificate issued!
|
Details
|
 |
|
01-20-2011
|
5.00
|
Added ground wire, prepped for inspection.
|
Details
|
|
|
01-19-2011
|
6.00
|
Weighed airplane, worked on fuel calibration.
|
Details
|
|
|
01-17-2011
|
2.00
|
Corrected EGT reversal.
|
Details
|
 |
|
01-15-2011
|
2.00
|
Audited checklists, organized remaining tasks list
|
Details
|
  |
|
01-14-2011
|
6.00
|
Drained fuel, installed cowling.
|
Details
|
|
|
01-13-2011
|
3.00
|
Tried for carb sync run, too cold.
|
Details
|
 |
|
01-12-2011
|
3.00
|
Sanded wheel pants - again.
|
Details
|
  |
|
01-11-2011
|
4.00
|
Final wing install, first engine run.
|
Details
|
|
|
01-08-2011
|
2.00
|
Filled pin holes - again.
|
Details
|
|
|
01-07-2011
|
7.00
|
Worked on the wing installation, made tapered pin.
|
Details
|
|
|
01-06-2011
|
3.00
|
Readied right wing for installation.
|
Details
|
 |
|
01-05-2011
|
2.00
|
Paperwork preview.
|
Details
|
  |
|
01-04-2011
|
0.00
|
Delivered Arrow to Graham in SC.
|
Details
|
|
|
12-29-2010
|
2.00
|
Ramp iced, no engine run, other small tasks.
|
Details
|
|
|
12-28-2010
|
6.00
|
Prepped for first engine runs.
|
Details
|
|
|
12-27-2010
|
2.00
|
Final? canopy trim, stabilator tests.
|
Details
|
|
|
12-23-2010
|
4.00
|
Finished tail fitting, other tasks.
|
Details
|
|
|
12-22-2010
|
6.00
|
Worked problem areas, installed preheater.
|
Details
|
|
|
12-21-2010
|
6.00
|
More final assembly work.
|
Details
|
|
|
12-20-2010
|
6.00
|
Miscellaneous assembly tasks.
|
Details
|
|
|
12-18-2010
|
0.00
|
Moved cowl to T hangar.
|
Details
|
  |
|
12-17-2010
|
0.00
|
Moved more parts to airport.
|
Details
|
  |
|
12-16-2010
|
5.00
|
Completed tail feather installation.
|
Details
|
|
|
12-15-2010
|
6.00
|
Worked on tail feathers.
|
Details
|
|
|
12-14-2010
|
3.00
|
Moved parts, prepped for stabilator install.
|
Details
|
  |
|
12-13-2010
|
3.00
|
Installed propeller and oil.
|
Details
|
 |
|
12-12-2010
|
6.50
|
Painting done except wheel pants.
|
Details
|
|
|
12-11-2010
|
8.00
|
Painted.
|
Details
|
|
|
12-10-2010
|
8.00
|
Installed access covers, primed parts.
|
Details
|
|
|
12-09-2010
|
2.00
|
Completed fuel system checks.
|
Details
|
|
|
12-08-2010
|
5.00
|
Completed retorquing engine capscrews.
|
Details
|
|
|
12-07-2010
|
2.00
|
Worked on wheel pants.
|
Details
|
  |
|
12-07-2010
|
1.50
|
Applied FWF updates.
|
Details
|
|
|
12-06-2010
|
3.00
|
Started work on engine related tasks.
|
Details
|
|
|
12-04-2010
|
0.00
|
Moved parts and supplies to FBO hangar.
|
Details
|
  |
|
12-03-2010
|
3.00
|
Moved fuselage to NY0 FBO hangar.
|
|
|
|
12-02-2010
|
3.00
|
Moved wings to T hangar at NY0.
|
|
|
|
12-01-2010
|
4.00
|
Prepped wheel pants.
|
Details
|
  |
|
11-28-2010
|
9.00
|
Finished fuselage painting.
|
Details
|
|
|
11-27-2010
|
7.00
|
Primed and painted white on fuselage.
|
Details
|
|
|
11-26-2010
|
14.00
|
Primed and painted wings.
|
Details
|
|
|
11-25-2010
|
6.00
|
Moved fuselage, began painting.
|
|
|
|
11-24-2010
|
3.00
|
Sanded and epoxied all fairings.
|
Details
|
 |
|
11-24-2010
|
5.00
|
Moved parts, prepped paint shop.
|
Details
|
|
|
11-23-2010
|
7.00
|
Continued on wheel pants.
|
Details
|
|
|
11-22-2010
|
2.00
|
Recieved Spruce shipment, worked left pant.
|
Details
|
|
|
11-21-2010
|
0.00
|
Moved wings to paint shop.
|
Details
|
|
|
11-20-2010
|
4.00
|
Finished nose leg fairing.
|
Details
|
|
|
11-19-2010
|
8.00
|
Worked on nose pant, fairing.
|
Details
|
|
|
11-18-2010
|
9.00
|
Worked the nose pant.
|
Details
|
|
|
11-17-2010
|
6.00
|
Continued work on wheel pants.
|
Details
|
|
|
11-16-2010
|
7.00
|
Worked on main gear wheel pants.
|
Details
|
 |
|
11-15-2010
|
2.00
|
Inventoried wheel pants kit.
|
Details
|
 |
|
11-15-2010
|
4.00
|
Bled brakes again, worked on PAP tasks.
|
Details
|
|
|
11-14-2010
|
0.00
|
Worked on trailer, built bleeder.
|
Details
|
 |
|
11-13-2010
|
0.00
|
Worked on trailer, visited paint shop.
|
Details
|
  |
|
11-12-2010
|
0.00
|
Picked up trailer, cleaned.
|
Details
|
  |
|
11-11-2010
|
5.00
|
Filled brake system. Observed air bubbles.
|
Details
|
|
|
11-10-2010
|
5.00
|
Finished roughing fuselage, ran pitot/static tests
|
Details
|
|
|
11-09-2010
|
4.00
|
Roughed the fuselage top and sides.
|
Details
|
|
|
11-08-2010
|
4.00
|
Worked on right wing and ASTprep.
|
Details
|
  |
|
11-06-2010
|
4.00
|
Final primed fiberglass parts.
|
Details
|
|
|
11-05-2010
|
3.00
|
Continued prep of left wing.
|
Details
|
  |
|
11-04-2010
|
6.00
|
Finished roughing right wing, started left.
|
Details
|
|
|
11-02-2010
|
4.00
|
Trimmed, prepped right wing top surface.
|
Details
|
|
|
11-01-2010
|
7.00
|
Worked on fiberglass and aluminum paint prep.
|
Details
|
|
|
10-29-2010
|
5.00
|
Worked aluminum and fibergass.
|
Details
|
  |
|
10-28-2010
|
4.50
|
Sanded fiberglass primer.
|
Details
|
 |
|
10-27-2010
|
5.50
|
Primed fiberglass.
|
Details
|
|
|
10-25-2010
|
2.00
|
Still working the fiberglass........
|
Details
|
|
|
10-24-2010
|
2.00
|
Sanded fiberglass parts.
|
Details
|
  |
|
10-23-2010
|
4.00
|
Inspected and worked fiberglass.
|
Details
|
|
|
10-22-2010
|
2.00
|
Installed placards.
|
Details
|
|
|
10-21-2010
|
2.50
|
Finished data cable, installed tunnel cover.
|
Details
|
|
|
10-20-2010
|
4.00
|
Installed seats, began work on data cable.
|
Details
|
|
|
10-19-2010
|
5.00
|
Worked on miscellaneous finish items.
|
Details
|
|
|
10-16-2010
|
5.00
|
Sanded final skim coat of epoxy.
|
Details
|
 |
|
10-15-2010
|
6.00
|
Coated fiberglass, installed pump noise filter.
|
Details
|
|
|
10-14-2010
|
4.00
|
Hooked up tail control surfaces, then disassembled
|
Details
|
|
|
10-02-2010
|
2.00
|
Drilled cone, checked clearances with trim.
|
Details
|
  |
|
10-01-2010
|
6.00
|
Finished tail cone fitting.
|
Details
|
|
|
09-23-2010
|
6.00
|
Worked on fitting the tail cone.
|
Details
|
|
|
09-22-2010
|
6.00
|
Finished the under-the-cowl work.
|
Details
|
|
|
09-21-2010
|
3.00
|
Installed oil cooler and hoses.
|
Details
|
|
|
09-20-2010
|
5.50
|
Hooked up engine controls, heat proofed cowl.
|
Details
|
|
|
09-19-2010
|
5.00
|
Worked on engine controls, odds & ends.
|
Details
|
|
|
09-18-2010
|
2.00
|
Installed soft start harness.
|
Details
|
|
|
08-30-2010
|
2.00
|
Cleaned shop, replaced pitot tubing.
|
Details
|
  |
|
08-20-2010
|
7.00
|
Cowling essentially finished!
|
Details
|
|
|
08-19-2010
|
3.00
|
Continued on the never-ending cowl work.
|
Details
|
  |
|
08-18-2010
|
6.50
|
Continued work on cooling duct & miscellaneous.
|
Details
|
|
|
08-16-2010
|
4.00
|
Continued work on cooling duct.
|
Details
|
|
|
08-15-2010
|
5.00
|
Worked on cooling duct.
|
Details
|
|
|
07-30-2010
|
0.00
|
Oshkosh Experiences
|
Details
|
  |
|
07-14-2010
|
0.50
|
Update Dynon Software
|
Details
|
  |
|
07-07-2010
|
6.00
|
Catching up odds and ends.
|
Details
|
  |
|
07-04-2010
|
1.00
|
Cut pipe, played with muffler position.
|
Details
|
|
|
07-03-2010
|
2.00
|
Mounted oil cooler, repositioned muffler.
|
Details
|
|
|
07-02-2010
|
8.00
|
Worked on oil and cooling systems.
|
Details
|
|
|
07-01-2010
|
7.00
|
Fabricated cooler box, mounted oil tank.
|
Details
|
|
|
06-30-2010
|
8.00
|
Cowling, exhaust, cooling.
|
Details
|
|
|
06-29-2010
|
8.00
|
Installed cowl hinges.
|
Details
|
 |
|
06-27-2010
|
2.00
|
Worked on cowl fit.
|
Details
|
|
|
06-26-2010
|
2.00
|
Worked on lower cowl fit.
|
Details
|
  |
|
06-25-2010
|
2.00
|
Retorqued engine bolts, worked on cowling.
|
Details
|
  |
|
06-24-2010
|
6.00
|
Re-gapped coils, started cowl fitting.
|
Details
|
|
|
06-21-2010
|
6.50
|
Finished the spinner.
|
Details
|
|
|
06-20-2010
|
0.00
|
Andrew, Kate, & Erin learn about homebuilding.
|
Details
|
|
|
06-19-2010
|
4.00
|
Mounted prop, worked fiberglass.
|
Details
|
 |
|
06-17-2010
|
7.00
|
Installed pitot tube and worked fiberglass.
|
Details
|
|
|
06-16-2010
|
5.50
|
FWF plumbing and wiring.
|
Details
|
|
|
05-31-2010
|
4.00
|
Hung the engine!
|
Details
|
|
|
05-30-2010
|
3.00
|
Installed drip trays, prepared to hang engine.
|
Details
|
|
|
05-29-2010
|
4.00
|
Installed shroud, assembled engine topside.
|
Details
|
|
|
05-27-2010
|
3.50
|
Completed cooling shroud, installed mount.
|
Details
|
|
|
05-26-2010
|
4.00
|
Epoxy coated fiberglass, began engine teardown.
|
Details
|
|
|
05-23-2010
|
2.00
|
Met with Rob, worked the fiberglass.
|
Details
|
  |
|
05-21-2010
|
2.00
|
Tested avionics and trim.
|
Details
|
  |
|
05-20-2010
|
6.00
|
Installed electrical components.
|
Details
|
|
|
05-19-2010
|
5.00
|
Finished cockpit light, checked battery fit.
|
Details
|
|
|
05-18-2010
|
3.00
|
Worked on cockpit light.
|
Details
|
|
|
05-15-2010
|
6.00
|
Finished left wingtip light.
|
Details
|
 |
|
05-14-2010
|
4.00
|
Finished right wing lighting, worked fiberglass.
|
Details
|
 |
|
05-13-2010
|
4.00
|
Worked fiberglass parts, finished FWF inventory.
|
Details
|
 |
|
05-12-2010
|
6.00
|
Worked fiberglass, started FWF inventory.
|
Details
|
|
|
05-11-2010
|
2.00
|
Continued on light kit.
|
Details
|
  |
|
05-10-2010
|
4.50
|
Worked on wing extensions and strobe/nav lights.
|
Details
|
|
|
05-09-2010
|
3.50
|
Worked on wingtip extensions.
|
Details
|
|
|
05-08-2010
|
2.00
|
Reversed flaperon bolt & finished LL lens mount.
|
Details
|
|
|
05-07-2010
|
5.00
|
Continued work on landing light.
|
Details
|
  |
|
05-05-2010
|
6.00
|
Discovered/recovered from big screw-up.
|
Details
|
|
|
05-04-2010
|
5.00
|
Worked on right wing lights.
|
Details
|
|
|
05-03-2010
|
3.00
|
Worked on the cowling fiberglass.
|
Details
|
|
|
04-21-2010
|
3.00
|
Picked up FWF kit.
|
Details
|
|
|
04-20-2010
|
5.00
|
Finished gas pipe, worked glass, started light kit
|
Details
|
|
|
04-18-2010
|
5.00
|
Flaperon controls, gas tank, baggage area.
|
Details
|
 |
|
04-14-2010
|
2.50
|
Cleaned fiberglass, inventoried lighting kit.
|
Details
|
|
|
04-11-2010
|
2.50
|
Installed wings, drilled flaperon torque tubes.
|
Details
|
|
|
04-10-2010
|
2.00
|
Attached flaperons to wings
|
Details
|
  |
|
04-08-2010
|
2.00
|
Finished rear window and side skins.
|
Details
|
|
|
04-06-2010
|
4.00
|
Reorganized for remaining pre-engine tasks.
|
Details
|
|
|
04-03-2010
|
2.00
|
Primed & painted parts.
|
Details
|
 |
|
04-02-2010
|
5.00
|
Finished the tail cone.
|
Details
|
|
|
03-31-2010
|
1.50
|
Worked on tailcone & cowl hinges.
|
Details
|
|
|
03-30-2010
|
5.50
|
Worked on cowl hinges and tail cone.
|
Details
|
 |
|
03-28-2010
|
2.50
|
Assembled oil door.
|
Details
|
|
|
03-21-2010
|
6.00
|
Worked on hinges and pins, cowling parts.
|
Details
|
|
|
03-20-2010
|
6.00
|
Finished prepping fiberglass pieces.
|
Details
|
|
|
03-17-2010
|
3.50
|
Worked cowling halves toward scribe lines.
|
Details
|
|
|
03-13-2010
|
2.00
|
Selected parts & cowling pieces, started prepping.
|
Details
|
|
|
03-13-2010
|
2.00
|
Finished avionics kit.
|
Details
|
 |
|
03-11-2010
|
9.00
|
Continued with avionics.
|
Details
|
|
|
03-10-2010
|
2.50
|
Installed antennas.
|
Details
|
|
|
03-09-2010
|
4.00
|
Avionics - EFIS, transponder, com radio.
|
Details
|
|
|
03-08-2010
|
3.00
|
Worked on instrument panel.
|
Details
|
|
|
03-06-2010
|
6.00
|
Began avionics kit.
|
Details
|
|
|
02-27-2010
|
4.00
|
Finished gear/brake install, worked on canopy.
|
Details
|
|
|
02-24-2010
|
4.00
|
Avionics part II, brakes, canopy.
|
Details
|
|
|
02-21-2010
|
7.00
|
Finished landing gear, worked on canopy.
|
Details
|
|
|
02-20-2010
|
3.00
|
Removed canopy, installed compass sensor.
|
Details
|
|
|
02-20-2010
|
4.00
|
Main landing gear install.
|
Details
|
|
|
02-19-2010
|
3.00
|
Prepped nosegear and compass for tomorrow.
|
Details
|
|
|
02-18-2010
|
1.50
|
Sanding, filling, avionics inventory.
|
Details
|
|
|
02-17-2010
|
5.50
|
More sanding & filling, parts prep.
|
Details
|
|
|
02-16-2010
|
3.50
|
More filling, parts prep.
|
Details
|
  |
|
02-15-2010
|
6.00
|
Sanding and more sanding.
|
Details
|
|
|
02-11-2010
|
6.00
|
Finished layup, assembled wheels.
|
Details
|
|
|
02-10-2010
|
6.50
|
Completed side fiberglass layups.
|
Details
|
|
|
02-08-2010
|
3.00
|
More sanding and patching.
|
Details
|
|
|
02-07-2010
|
2.50
|
Sanded foam blocks and plexiglass.
|
Details
|
|
|
02-05-2010
|
5.00
|
Cut out fiberglass, glued foam blocks.
|
Details
|
|
|
02-04-2010
|
3.50
|
Reworked canopy skirts.
|
Details
|
|
|
02-03-2010
|
3.50
|
Started on fiberglass fairing.
|
Details
|
 |
|
02-02-2010
|
0.00
|
Reworked guide blocks.
|
Details
|
  |
|
02-01-2010
|
5.00
|
Worked on canopy and latching mechanism.
|
Details
|
|
|
01-31-2010
|
4.00
|
Screwed bubble to frame.
|
Details
|
 |
|
01-30-2010
|
5.00
|
Drilled side skirts, finished all canopy holes.
|
Details
|
|
|
01-29-2010
|
6.50
|
Final (I hope) trimmed and finished the canopy.
|
Details
|
  |
|
01-28-2010
|
5.00
|
Canopy drilling - OMG!
|
Details
|
|
|
01-23-2010
|
6.00
|
Started canopy fitting process.
|
Details
|
|
|
01-09-2010
|
2.00
|
Corrected offset countersink, worked small parts.
|
Details
|
 |
|
01-08-2010
|
2.00
|
Drilled forward bow, fabbed the latch handles.
|
Details
|
|
|
01-07-2010
|
3.00
|
Marked bow, experimented with plexiglass.
|
Details
|
|
|
01-06-2010
|
3.00
|
Started canopy fitting.
|
Details
|
 |
|
01-05-2010
|
6.00
|
Temporarily installed aft window.
|
Details
|
|
|
01-04-2010
|
3.00
|
Prepped and primed canopy frame.
|
Details
|
|
|
01-01-2010
|
5.00
|
Worked on canopy frame.
|
Details
|
|
|
12-31-2009
|
2.00
|
Started canopy work.
|
Details
|
|
|
12-30-2009
|
3.00
|
Loose ends, airframe upright, started canopy.
|
Details
|
|
|
12-29-2009
|
5.00
|
Finished roughing in control cables
|
Details
|
|
|
12-28-2009
|
7.00
|
Completed wiring, started control cables.
|
Details
|
 |
|
12-22-2009
|
7.00
|
Riveted fuselage/empennage.
|
Details
|
 |
|
12-21-2009
|
4.00
|
Mated fuselage & empennage.
|
Details
|
|
|
12-20-2009
|
0.00
|
Planning
|
Details
|
  |
|
12-19-2009
|
4.00
|
Completed flap handle mechanism.
|
Details
|
 |
|
12-18-2009
|
7.00
|
Installed control linkages & AP servos.
|
Details
|
|
|
12-17-2009
|
2.00
|
Installed servo doubler.
|
Details
|
 |
|
12-16-2009
|
6.00
|
Worked on AP and flight controls.
|
Details
|
|
|
12-15-2009
|
3.00
|
Received the autopilot kit and started install.
|
Details
|
|
|
12-11-2009
|
3.00
|
Continued work on controls.
|
Details
|
|
|
12-10-2009
|
4.00
|
Prepped parts, started flap controls.
|
Details
|
|
|
12-09-2009
|
5.00
|
Finished wiring, started flight controls.
|
Details
|
|
|
12-08-2009
|
6.50
|
Installed sticks & pedals, finished most wiring.
|
Details
|
|
|
12-07-2009
|
5.50
|
Tank test, wiring, control sticks.
|
Details
|
|
|
12-03-2009
|
3.00
|
More wiring.
|
Details
|
|
|
12-01-2009
|
4.00
|
Finished tank - for now.
|
Details
|
|
|
11-30-2009
|
2.00
|
Spar pins & reed switch wiring.
|
Details
|
  |
|
11-29-2009
|
3.00
|
Worked on fuel tank.
|
Details
|
|
|
11-28-2009
|
7.00
|
Spar pins, reed switches, wiring, OAT probe.
|
Details
|
|
|
11-27-2009
|
6.00
|
More work on tank, went back to wiring.
|
Details
|
|
|
11-26-2009
|
3.00
|
Continued tank work.
|
Details
|
|
|
11-25-2009
|
3.00
|
Assembled/sealed about half of the tank.
|
Details
|
|
|
11-24-2009
|
3.00
|
Finished prepping for tank assembly.
|
Details
|
|
|
11-23-2009
|
3.00
|
Prep work on tank parts.
|
Details
|
 |
|
11-19-2009
|
5.00
|
Started wiring section.
|
Details
|
|
|
11-18-2009
|
5.00
|
Finished inventory, started tank.
|
Details
|
|
|
11-16-2009
|
6.50
|
Inventoried small parts.
|
Details
|
 |
|
11-14-2009
|
3.00
|
Started finish kit inventory, honored Jack.
|
Details
|
|
|
11-13-2009
|
1.00
|
Unloaded finish kit crate.
|
Details
|
|
|
11-13-2009
|
2.00
|
Finished instrument panels.
|
Details
|
 |
|
11-10-2009
|
0.00
|
My buddy Jack slipped the surly bonds.....
|
Details
|
 |
|
11-09-2009
|
5.50
|
Worked on instrument panels and map box.
|
Details
|
 |
|
11-08-2009
|
3.00
|
Continued prepping panel and map box parts.
|
Details
|
  |
|
11-07-2009
|
3.00
|
Finished upper forward skin.
|
Details
|
|
|
11-06-2009
|
5.00
|
Installed forward fuselage skin.
|
Details
|
|
|
11-05-2009
|
4.50
|
Completed the panel base assembly.
|
Details
|
|
|
11-04-2009
|
1.50
|
Corrected longeron misalignment problem.
|
Details
|
|
|
11-03-2009
|
2.00
|
Discovered longeron misalignment problems.
|
Details
|
|
|
11-02-2009
|
4.00
|
Worked on canopy ribs.
|
Details
|
|
|
10-30-2009
|
5.00
|
Installed upper firewall.
|
Details
|
|
|
10-29-2009
|
7.00
|
Built the upper firewall.
|
Details
|
|
|
10-28-2009
|
7.50
|
Finished roll bar and aft bulkhead structure.
|
Details
|
|
|
10-27-2009
|
4.00
|
Drilled and painted roll bar.
|
Details
|
  |
|
10-26-2009
|
6.00
|
Mounted side skins and roll bar.
|
Details
|
|
|
10-25-2009
|
2.50
|
Finished side skin prepping and painting.
|
Details
|
 |
|
10-24-2009
|
4.00
|
Drilled longerons.
|
Details
|
|
|
10-23-2009
|
6.00
|
Worked on frames and side skins.
|
Details
|
|
|
10-22-2009
|
3.00
|
Painted interior.
|
Details
|
|
|
10-20-2009
|
6.00
|
Trial fit rudder and masked interior.
|
Details
|
|
|
10-17-2009
|
4.50
|
Completed rudder/brake pedal assembly.
|
Details
|
|
|
10-16-2009
|
2.00
|
Began work on rudder/brake pedals.
|
Details
|
|
|
10-15-2009
|
3.00
|
Finished roll bar.
|
Details
|
  |
|
10-14-2009
|
1.00
|
Primed roll bar parts.
|
Details
|
  |
|
10-13-2009
|
4.00
|
Assembled and drilled roll bar.
|
Details
|
|
|
10-12-2009
|
6.00
|
Finished seat backs, started roll bar.
|
Details
|
|
|
10-11-2009
|
4.00
|
Finished prepping seat back parts.
|
Details
|
 |
|
10-08-2009
|
4.00
|
Tested interior paint, began seat backs.
|
Details
|
|
|
10-05-2009
|
2.00
|
Installed exhaust fan.
|
Details
|
|
|
10-04-2009
|
1.00
|
Rudder pedal powder coat problems.
|
Details
|
|
|
10-03-2009
|
5.00
|
Finished fuel system.
|
Details
|
|
|
10-02-2009
|
7.00
|
Continued work on fuel system - some problems.
|
Details
|
|
|
09-30-2009
|
3.00
|
Began work on the fuel system.
|
Details
|
|
|
09-29-2009
|
3.00
|
Finished prepping all Section 23 parts and stored.
|
Details
|
 |
|
09-28-2009
|
6.50
|
Temporarily installed side skins to fit longerons.
|
Details
|
|
|
09-27-2009
|
5.00
|
Dry fit fuselage members including longerons.
|
Details
|
|
|
09-26-2009
|
3.00
|
Reorganized workbench.
|
Details
|
 |
|
09-25-2009
|
5.00
|
Fabricated longerons.
|
Details
|
|
|
09-24-2009
|
2.00
|
Started longerons.
|
Details
|
  |
|
09-23-2009
|
0.00
|
Visit to the factory.
|
Details
|
|
|
09-08-2009
|
2.00
|
Finished Section 22.- Forward Lower Fuselage.
|
Details
|
|
|
09-06-2009
|
1.00
|
Mated two fuselage sections.
|
Details
|
|
|
09-03-2009
|
3.00
|
Continued on Forward Lower Fuselage.
|
Details
|
  |
|
09-02-2009
|
3.00
|
Finished Page 22-02.
|
Details
|
  |
|
09-01-2009
|
0.00
|
P-51 Mustang
|
Details
|
 |
|
08-31-2009
|
0.50
|
EAA 602 Meeting
|
Details
|
|
|
08-29-2009
|
1.00
|
Broke in two "Rosies", worked on Section 22.
|
Details
|
|
|
08-24-2009
|
1.00
|
Installed cooler stiffener.
|
Details
|
|
|
08-23-2009
|
6.00
|
Summer update & some progress!
|
Details
|
|
|
07-24-2009
|
6.00
|
Completed Section 21, center fuselage.
|
Details
|
 |
|
07-23-2009
|
4.00
|
Installed bulkhead and steps.
|
Details
|
 |
|
07-12-2009
|
1.00
|
Finished riveting bottom skin.
|
Details
|
  |
|
07-07-2009
|
1.00
|
Riveting bottom skin.
|
Details
|
  |
|
07-06-2009
|
2.00
|
Clecoed bottom skin.
|
Details
|
|
|
07-05-2009
|
3.00
|
Worked on bottom skin.
|
Details
|
|
|
07-04-2009
|
1.00
|
Installed corner skins with Nick & Lauren.
|
Details
|
|
|
07-03-2009
|
3.00
|
Installed fuselage corner skins.
|
Details
|
|
|
07-02-2009
|
5.00
|
Continued with assembly, flipped over.
|
Details
|
|
|
07-01-2009
|
4.00
|
Finished bulkhead, installed control column.
|
Details
|
|
|
06-30-2009
|
3.50
|
Continued assembling bulkhead.
|
Details
|
|
|
06-29-2009
|
1.00
|
Fabricated control column mounts.
|
|
 |
|
06-25-2009
|
1.00
|
Prepped bulkhead doublers.
|
Details
|
  |
|
06-24-2009
|
5.00
|
Prepped bulkhead and parts.
|
Details
|
 |
|
06-22-2009
|
5.00
|
Finished seat area and joined to center section.
|
Details
|
|
|
06-21-2009
|
4.00
|
Repaired mixer assembly, prepped parts.
|
Details
|
|
|
06-20-2009
|
7.00
|
Worked on seat frames.
|
Details
|
 |
|
06-18-2009
|
6.50
|
Finished baggage area, began seat area.
|
Details
|
|
|
06-15-2009
|
4.00
|
Continued work on baggage floor assembly.
|
Details
|
 |
|
06-13-2009
|
2.00
|
Riveted baggage floor, installed nutplates.
|
Details
|
  |
|
06-09-2009
|
3.50
|
Squeezed rivets, began baggage floor assembly.
|
Details
|
 |
|
06-08-2009
|
6.00
|
Prepped parts.
|
Details
|
 |
|
06-07-2009
|
3.50
|
Completed Section 20 except for final riveting.
|
Details
|
 |
|
06-06-2009
|
4.00
|
Building up Center Section Assembly.
|
Details
|
|
|
06-03-2009
|
2.00
|
Hung up on center assembly leaning.
|
Details
|
|
|
05-27-2009
|
1.00
|
Continued prepping parts.
|
Details
|
 |
|
05-26-2009
|
4.50
|
Prepped parts for Section 20.
|
Details
|
  |
|
05-20-2009
|
2.00
|
Finished flaperons.
|
Details
|
|
|
05-17-2009
|
1.50
|
Finished flaperons except for rivets.
|
Details
|
 |
|
05-15-2009
|
1.50
|
Fuselage kit inventory 100% comlete!
|
Details
|
 |
|
05-14-2009
|
8.00
|
Worked on fuselage kit inventory.
|
Details
|
|
|
05-10-2009
|
3.50
|
Finished right skeleton, started skins.
|
Details
|
|
|
05-09-2009
|
4.50
|
Worked on right flaperon.
|
Details
|
  |
|
05-08-2009
|
4.00
|
Almost finished left flaperon.
|
Details
|
 |
|
05-07-2009
|
8.00
|
Finished left flaperon skeleton.
|
Details
|
 |
|
05-06-2009
|
0.00
|
Picked up fuselage kit.
|
Details
|
|
|
05-05-2009
|
7.00
|
Bungled through flaperon work.
|
Details
|
|
|
05-04-2009
|
2.50
|
Fabricated flaperon brackets
|
Details
|
|
|
05-03-2009
|
1.00
|
Began fabricating flaperon brackets.
|
Details
|
  |
|
05-02-2009
|
5.50
|
Finished and stored right wing.
|
Details
|
|
|
05-01-2009
|
1.00
|
Continued assembling wingtip. Cleco/rivet pictures
|
Details
|
|
|
04-30-2009
|
0.00
|
Update on No Progress.
|
Details
|
  |
|
04-23-2009
|
5.00
|
Pulled rivets and worked on wingtip.
|
Details
|
|
|
04-21-2009
|
3.00
|
Continued working right wing skins.
|
Details
|
|
|
04-20-2009
|
6.00
|
Continued on right wing skins.
|
Details
|
|
|
04-17-2009
|
3.00
|
Finished bottom skins, flipped wing.
|
Details
|
 |
|
04-16-2009
|
1.50
|
More work on right wing skins.
|
Details
|
  |
|
04-15-2009
|
4.00
|
Continued work on right wing.
|
Details
|
  |
|
04-14-2009
|
2.00
|
Prepped and mounted first right wing skin.
|
Details
|
 |
|
04-13-2009
|
5.50
|
Assembled right wing skeleton.
|
Details
|
 |
|
04-11-2009
|
5.00
|
Finished and stowed left wing.
|
Details
|
|
|
04-10-2009
|
7.00
|
Closed up left wingtip.
|
Details
|
  |
|
04-09-2009
|
1.00
|
Prepped left wingtip parts.
|
Details
|
  |
|
04-08-2009
|
6.00
|
Finished skins, started wingtip.
|
Details
|
|
|
04-07-2009
|
3.00
|
Fitted and installed wing walk doubler.
|
Details
|
|
|
04-06-2009
|
2.00
|
Tool trouble, worked on wing skins.
|
Details
|
|
|
04-05-2009
|
2.00
|
Installed two top wing skins.
|
Details
|
 |
|
04-04-2009
|
7.00
|
Installed bottom skins on left wing.
|
Details
|
|
|
04-03-2009
|
8.00
|
Finished skeleton, started skins.
|
Details
|
|
|
04-02-2009
|
4.00
|
Had helpers, installed aft ribs and spar.
|
Details
|
|
|
04-01-2009
|
6.00
|
Completed left wing rib preparation.
|
Details
|
|
|
03-31-2009
|
1.00
|
Started final prep of ribs.
|
Details
|
|
|
03-30-2009
|
6.00
|
Deburred rib holes, test assembled wing skeleton.
|
Details
|
|
|
03-27-2009
|
2.00
|
Finished scalloped edge deburring, fluted.
|
Details
|
|
|
03-26-2009
|
6.00
|
Worked on ribs.
|
Details
|
|
|
03-25-2009
|
4.00
|
Finished rear spars, began working on ribs.
|
Details
|
|
|
03-23-2009
|
9.00
|
Finished prepping Section 14 parts.
|
Details
|
 |
|
03-22-2009
|
2.00
|
Deburred parts.
|
Details
|
  |
|
03-21-2009
|
3.50
|
Prepped parts.
|
Details
|
  |
|
03-20-2009
|
2.00
|
Worked on spar assembly.
|
Details
|
|
|
03-19-2009
|
2.00
|
Worked small spar parts.
|
Details
|
|
|
03-19-2009
|
5.00
|
Inventoried and stored parts.
|
Details
|
|
|
03-18-2009
|
2.00
|
Started unpacking & checking.
|
Details
|
|
|
03-18-2009
|
4.00
|
Picked up wing kit.
|
Details
|
|
|
03-12-2009
|
4.00
|
Prepared for wing construction.
|
Details
|
  |
|
03-11-2009
|
7.00
|
Built wing storage rack.
|
Details
|
|
|
03-10-2009
|
3.00
|
Completed empennage!
|
Details
|
  |
|
03-09-2009
|
4.00
|
Worked the VS and rudder tip fairings.
|
Details
|
|
|
03-07-2009
|
4.00
|
Cleaned garage storage spot.
|
Details
|
  |
|
03-06-2009
|
0.50
|
Re-organized and started fiberglass work.
|
Details
|
  |
|
03-03-2009
|
5.00
|
Finished & installed trim servo assembly.
|
Details
|
|
|
03-02-2009
|
7.00
|
Mounted major tail surfaces, worked on trim parts
|
Details
|
|
|
02-27-2009
|
2.50
|
Finished tailcone, mounted VS.
|
Details
|
 |
|
02-26-2009
|
6.00
|
Closed up tailcone.
|
Details
|
|
|
02-25-2009
|
0.00
|
On vacation 2/9 - 2/24
|
Details
|
  |
|
02-07-2009
|
3.50
|
Installed upper skin, ready to rivet.
|
Details
|
|
|
02-05-2009
|
3.00
|
One more skin.
|
Details
|
  |
|
02-04-2009
|
3.00
|
More skins, string, and wiring.
|
Details
|
 |
|
02-02-2009
|
2.50
|
Riveted bottom of fuselage.
|
Details
|
|
|
02-01-2009
|
3.00
|
Started tailcone build up.
|
Details
|
 |
|
01-31-2009
|
3.00
|
Made AST repairs, worked on tailcone.
|
Details
|
  |
|
01-30-2009
|
5.00
|
Started tailcone skin preparation.
|
Details
|
  |
|
01-29-2009
|
3.00
|
Finished tailcone skeleton parts.
|
Details
|
 |
|
01-28-2009
|
7.00
|
Completed aft bulkhead assembly.
|
Details
|
|
|
01-26-2009
|
5.00
|
Prepped ribs & small parts.
|
Details
|
 |
|
01-25-2009
|
2.00
|
Organized shop, started tailcone.
|
Details
|
|
|
01-24-2009
|
2.00
|
Finished stabilator.
|
Details
|
|
|
01-23-2009
|
4.50
|
Horizontal stabilator nearly complete.
|
Details
|
|
|
01-22-2009
|
4.00
|
Continued Work on HS
|
Details
|
|
|
01-21-2009
|
5.50
|
Continued Work on Stabilator
|
Details
|
  |
|
01-20-2009
|
2.50
|
Re-assembled HS Spar Assembly
|
Details
|
 |
|
01-19-2009
|
1.50
|
Disassembled HS Spar, Installed Brackets
|
Details
|
 |
|
01-17-2009
|
5.00
|
Continued on HS Spar Assembly
|
Details
|
|
|
01-16-2009
|
7.50
|
Worked on Horizontal Stabilator Spar
|
Details
|
  |
|
01-14-2009
|
6.00
|
Repaired, finished AST's., worked on HS parts.
|
Details
|
|
|
01-10-2009
|
4.00
|
Messed up control horns, began stabilator
|
Details
|
|
|
01-09-2009
|
6.50
|
Completed vertical stabilizer, worked on AST
|
Details
|
  |
|
01-08-2009
|
5.00
|
Finished rudder, worked VS
|
Details
|
 |
|
01-07-2009
|
5.50
|
Worked on rudder and AST
|
Details
|
|
|
01-06-2009
|
5.00
|
Worked on VS & Rudder
|
Details
|
  |
|
01-03-2009
|
3.00
|
Prepped VS skins
|
Details
|
  |
|
01-02-2009
|
3.00
|
Finished VS skeleton
|
Details
|
 |
|
01-01-2009
|
6.00
|
VS skeleton clecoed
|
Details
|
|
|
12-31-2008
|
3.00
|
Reworked brackets, worked on VS spar
|
Details
|
  |
|
12-29-2008
|
3.50
|
Fabricated rudder hinge brackets
|
Details
|
|
|
12-28-2008
|
3.00
|
Inventoried and stored sub-kits
|
Details
|
|
|
12-26-2008
|
2.00
|
Organized small parts
|
Details
|
 |
|
12-26-2008
|
2.50
|
Inventoried and stored large parts
|
Details
|
 |
|
12-25-2008
|
2.50
|
Organized small parts
|
Details
|
  |
|
12-24-2008
|
4.00
|
Unpack/Inventory/Organize
|
Details
|
|
|
12-23-2008
|
5.00
|
Picked up crate, read documentation
|
Details
|
|
|
12-10-2008
|
20.00
|
Prepared shop, tools, benches.
|
Details
|
 |