KitLog pro

Powered By Kitlog Pro v2.0

RUSH MCKELVEY RV-8
Work Logs Found: 203
Category Work Time: 789 Hours
 Date
Hours
Work Log Summary

Details

 03-24-2011
1.00
FINISHED AIRPLANE
       

 03-24-2011
1.00
ENGINE RUN 3
       

 03-23-2011
4.00
AIR WORTHY PINK SLIP A LEGAL AIRPLANE
     

 03-03-2011
2.00
Installe LED bulb for landing lights
     

 02-24-2011
3.00
First Engine Start Brake and Taxi Test all Good
       

 02-21-2011
4.00
Confi Port 1234 of the AFS PFD
       

 02-14-2011
4.00
Install 496 XM antenna under Cowling

 02-06-2011
2.00
Find and Repair Fuel Guage Problem Wire

 02-05-2011
5.00
Weight Airplane 1092lbs empty weight
       

 02-03-2011
3.50
Paint Flap Fairings and Wing root Fairings

 02-02-2011
3.00
Install Front Floor Front Seat Ramp Front Seat

 02-01-2011
3.00
Install Rear Floor Flap Protective Tape

 01-30-2011
4.00
Install Flap Faring and Baggage Door Strut
Details
       

 01-29-2011
2.50
In Stall 4AN413A Bolts in Both Wing Spars

 01-27-2011
2.00
Rig and Install Right Flap Split Hinge Pins

 01-25-2011
2.00
Install Right Aileron Flap and Rig

 01-24-2011
2.50
Rig Left Aileron and Flap

 01-22-2011
2.00
Install Left Aileron

 01-19-2011
6.00
Torque Wing Bolts Per Vans Specs
       

 01-18-2011
2.00
Install Right Wing Tip Wire NAV Strobe Landing Lig

 01-17-2011
3.00
Install Left Wing Tip Wire Nav Strobe Landing

 01-14-2011
6.00
Install Right Wing Final and Last time Drill Fuel

 01-13-2011
4.00
Remove Right Wing Install Platenuts Wire Lights

 01-12-2011
6.00
Install Final time Left Wing

 01-03-2011
4.00
Removed Left Wing To Install Platenuts Wire Lights
       

 12-30-2010
5.00
Fab Cut Sand RH LH Flaps

 12-29-2010
4.00
Fab Drill Fuel Tank Attachment Brakets

 12-28-2010
5.00
Measure Fab Drill Wing Root Fairings
     

 12-26-2010
4.00
Level Set Drill Aft Spar bolts
       

 12-21-2010
5.00
Install both wings for the first time

 12-07-2010
5.00
INSTALL NEW RUDDER STOP

 11-30-2010
4.00
ADJ RUDDER HITTING BACK OF HS BLEED BRAKES UP WI

 11-29-2010
4.00
MOUNT VS RUDDER DAY 2 INSTALL RUDDER STOP

 11-29-2010
6.00
MOUNT VS FAIRING AN WIRE TAIL NAV STROBE UP

 11-28-2010
4.00
MOUNT VS RUDDER HS
     

 11-24-2010
3.00
MOUNT HEAD RESET, TAIL , VS, HS, AN TORQUE AN3 BOL

 11-23-2010
3.00
MOVED TOOLS TO HANGER

 11-23-2010
3.00
MOUNT HEAD REST HS VS AN TORQUE AN3 BOLTS

 11-17-2010
3.00
MOVED TOOLS AN SHOP FROM HOME BASEMENT TO HANGER

 11-16-2010
2.00
MOVED AIRPLANE TO HANGER
     

 11-15-2010
14.00
PAINT FUSELAGE AN COWL
       

 11-10-2010
4.00
SAND PRIME AN GET READY FOR PAINT FUSELAGE
       

 11-07-2010
4.50
SAND PRIME AN PAINT CANOPY
       

 11-06-2010
3.00
SAND AN PRIME WINDSCREEN FOR PAINT
     

 11-05-2010
4.50
SAND AN CLEAN FUSELAGE FOR PRIMER

 10-24-2010
4.00
MOUNT VS HS RUDDER ELEVATORS

 10-22-2010
6.00
PAINT BOTH WINGS

 10-19-2010
4.00
SAND AND PAINT TAIL FAIRING AN FLAPS

 10-18-2010
6.00
SAND AND CLEAN BOTH WINGS

 10-11-2010
4.00
PAINT HS VS RUDDER BOTH EVELATORS

 10-10-2010
8.00
PAINT HS VS RUDDER BOTH ELEVATORS

 10-08-2010
6.00
PAINT WING TIPS AT BODY SHOP
     

 10-06-2010
4.00
REINSTALL MAINFOLD PRESSURE HOSE TO PLASMA II

 10-05-2010
1.00
CHECK TDC TO HOOK UP ELECT LEADS

 10-04-2010
3.00
INSTALL MAIN LEADS TO COILS DRILL BAFFLE
     

 10-01-2010
3.00
WIRE UP PLASMA II
     

 09-28-2010
2.00
INSTALL FUEL LINE THROUGH BAFFLE UPPER

 09-25-2010
5.00
INSTALL FUEL FLOW SENSOR

 09-18-2010
3.50
FAB AN INSTALL CRANK CASE BREATHER TUBE

 09-14-2010
4.00
INSTALL OIL COOLER LINES PER PLANS

 09-10-2010
3.00
OIL COOLER WORK
       

 09-08-2010
4.00
OIL COOLER BAFFLE INSTALLED
     

 09-05-2010
1.00
MAKE CHT AN EGTS STAND OFFS

 09-04-2010
4.00
WIRING EGTS AN CHTS
     

 09-01-2010
3.00
WIRING CHT AN EGTS
     

 08-28-2010
4.00
SNORKEL CUT DECK COOLING RAMP FILTER
     

 08-27-2010
6.00
SNORKEL WORK SAND PAINT BLACK INSTALL
       

 08-21-2010
6.00
SNORKEL CUT AN GLASS
       

 08-20-2010
2.00
SNORKEL CUT AN FIT
     

 08-19-2010
4.00
SNORKEL FIT
Details
     

 08-17-2010
3.00
INSTALL BAFFLES FLEX MATERIAL
     

 08-16-2010
4.00
BAFFLE RIVIT DRILL
     

 08-12-2010
4.00
Trim baffles
     

 08-10-2010
6.00
Trim top baffling so cowl will fit
Details
     

 08-05-2010
8.00
More baffling work
Details
       

 08-01-2010
6.00
BAFFLING BUILDING
Details
     

 07-30-2010
6.00
FILLING AN SANDING WIND SCREEN
       

 07-22-2010
6.00
CANOPY GLUED TOGETHER THEN POP APART
Details
       

 07-20-2010
10.00
MAKE WEATHER STRIPE FOR CANOPEY AND WIND SCREEN
       

 07-15-2010
4.00
INSTALL ELT BAGGAGE AREA
     

 07-08-2010
8.00
ATTACHED REAR OF SKIRTS TOGETHER
     

 07-04-2010
8.00
INSTALL SKIRTS TO CANAPY FRAME
Details
       

 07-02-2010
6.00
GLUE WINDSCREEN TAP AND SREW TO ROLL OVER BAR
       

 06-25-2010
4.00
UNTAPE CLEAN GLUE CANOPEY TO FRAME
       

 06-24-2010
6.00
CANOPY TO FRAME FIT BIG CUT
       

 06-22-2010
4.00
READY FOR THE BIG CUT
     

 06-21-2010
4.00
CUT CANOPY 2 TIMES
     

 06-18-2010
8.00
CUT CANOPY 8 TIMES
       

 06-11-2010
2.00
CUT CANOPY 2 TIMES
     

 06-01-2010
6.00
CUT CANOPY 6 TIMES
       

 05-24-2010
8.00
FINISH INSTALLING COWL
       

 04-27-2010
3.00
SAND AND DRILL ALL THE HOLES ON THE FUSE SIDE FOR
     

 04-26-2010
3.00
SAND COWL SOME MORE AND DRILLED THE FIRST THREE HO
     

 04-21-2010
2.00
DAY 2 OIL DOOR
     

 04-19-2010
2.00
DAY 1 ON THE OIL DOOR
Details
     

 04-18-2010
2.00
WIRE FLAP SENSOR TO FLAP ARM

 04-17-2010
6.00
COWL DAY 3 FITTING AND SANDING
       

 04-15-2010
6.00
COWL DAY 2 FITTING
       

 04-14-2010
6.00
COWL DAY 1 FITTING
       

 04-03-2010
6.00
INSTALL FRONT TOP SKIN
       

 03-18-2010
4.00
INSTALL FRESH AIR DUCK TO PANEL

 03-16-2010
3.00
RUN WIRE TO TRIM MOTORS
     

 03-15-2010
10.00
WIRE AFT AND FRONT STICKS TO RELAY DECK
       

 02-17-2010
3.00
INSTALL RH MAG ON OFF SWITCH
Details

 02-16-2010
3.00
INSTALL CABIN HEAT CABLE CONTROL
     

 02-15-2010
3.00
INSTALL MAP SENSOR
     

 02-14-2010
6.00
INSTALL CABLE CONTROLS MIX RPM THROT
     

 02-12-2010
2.00
INSTALL FIRE SLEEVE AROUND PUSH PULL CABLES
     

 02-10-2010
4.00
WIRE ENGINE AND RH ELEC MAG
     

 02-08-2010
3.00
WIRE ENGINE AND LH IMPULSE COUPLER
       

 02-02-2010
6.00
WIRE PANEL
       

 01-20-2010
2.00
INSTALL THROTTLE CABLE BRACKET
Details
       

 01-20-2010
10.00
INSTALL STARTER CABLE
     

 01-15-2010
8.00
WIRE PANEL
       

 01-07-2010
1.00
MCKELVEY GIRLS AT WORK IN THE AIRPLANE SHOP
       

 12-25-2009
6.00
MOUNT AND INSTALLED NEW IO 375 AEROSPORT POWER ENG
       

 12-13-2009
2.00
INSTALL STEIN AIR PANEL
Details
       

 12-12-2009
1.00
IO 375 AEROSPORT POWER ENGINE IS HERE
       

 12-11-2009
3.00
RUN FUEL PUMP 16 GA WIRE PER MANUAL

 12-10-2009
2.00
BAGGAGE DOOR BRAKE LINE TO PANEL
       

 12-02-2009
13.00
MOUNT AND INSTALL GROVE GEAR
Details
       

 11-26-2009
3.00
INSTALL HEATER CONTROL ON FIRWALL

 11-25-2009
5.00
INSTALL MIX THROT PROP CABLES
     

 11-21-2009
3.00
INSTALL REAR STICK GRIP
       

 11-20-2009
2.00
INSTALL BATTERY AN STATER RELAYS
     

 11-09-2009
4.00
LANDIND LIGHTS IN WING TIPS FAB AND FIT

 11-04-2009
3.00
INSTALL STATIS PORTS AN RUN LINE
       

 10-20-2009
3.00
HS TIPS INSTALLED AND SAND
     

 10-11-2009
4.00
INSTALL LOWER HS GAP SKIN
       

 10-05-2009
4.00
INSTALL TAIL AN FIT VS AN HS TIPS
       

 09-30-2009
4.00
PUSH RODS INSTALL
       

 09-21-2009
2.00
INSTALL FOWARD BAGG SKIN STRIPS

 09-20-2009
2.00
INSTALL TAIL ASM DRILL ELEVATOR HORNS

 09-15-2009
2.00
START FAB TOP BAGGAGED DOOR

 09-10-2009
2.00
FAB AN INSTALLED CANP LATCH ASM

 09-04-2009
2.00
TEST FIT CLASSIC AERO LEATHER SEATS
Details
       

 08-27-2009
6.00
FAB AN INSTALL CANOPEY RAILS
     

 08-04-2009
5.00
fab an install fuel lines to the pump and filter 3

 07-24-2009
2.00
install fuel pump asm
     

 07-18-2009
3.00
install brake lines to master cylinder
     

 07-17-2009
3.00
install enegine mount
     

 07-17-2009
3.00
fab and install battery tray on firewall
     

 07-15-2009
2.00
finish kit is here inventory it

 07-14-2009
4.00
mount an drill 9 holes for VS
     

 07-02-2009
2.00
mount hs to fuse drill 8 holes
       

 06-04-2009
7.00
base coat clear coat inside of fuselage
Details
       

 06-02-2009
4.00
drill an fit top skin on
       

 06-01-2009
1.50
dimple front top skin an cut baggage door out

 05-20-2009
4.50
drill and pre install groove landing gear asm
       

 05-03-2009
3.00
fab and fit the fuel vavle asm and some good help
       

 04-06-2009
2.00
build and install lh console
       

 04-02-2009
2.00
INSTALLED VENT SCOOPS ON WING AND FUSE
Details
       

 04-01-2009
6.00
PAINT BASECOAT CLEARCOAT MIS PARTS FOR FUSE
Details

 04-01-2009
1.00
MOVED MY FINISHED WINGS TO HANGER READY FOR PAINT
       

 03-31-2009
2.00
INSTALLED RH FRT CONSOLE ASM

 03-25-2009
3.00
INSTALLED REAR COVERS ONE OVER FLAP MOTOR ASM

 03-20-2009
2.00
PREP AND PRIME REAR FUSE AREA

 03-19-2009
3.00
BUILD AND INSTALLED FRT SEAT RAMP ASM
     

 03-11-2009
2.00
INSTALLED RUDDER CABLES

 03-10-2009
3.00
INSTALL RUDDER PEDAL ASM

 03-08-2009
1.00
INSTALL REAR CONTROL MOUNT
     

 03-07-2009
4.00
BUILD F-1 REAR SEAT BACK
Details

 03-05-2009
2.00
PRIME MID SECTION

 03-03-2009
2.00
PRIME FRONT FLOOR SECTION

 02-28-2009
5.00
BUILD RUDDER PEDAL ASM
     

 02-26-2009
3.00
INSTALL FLAP MOTOR ASM
       

 02-25-2009
2.00
FLAP BLOCK INSTALLED
Details
     

 02-19-2009
3.00
Installed Fuel Pickup and Sending Unit LH Wing
Details
       

 02-17-2009
5.00
Installed RH wing Bottom Skin
Details

 02-14-2009
5.00
Installed LH Wing Bottom Skin
Details
     

 02-01-2009
4.00
Drill Floor For Nut Plates
Details
       

 01-21-2009
3.00
Cut and Fit Wing Tip Lens
Details
       

 01-20-2009
4.00
Build and Fit rear seat back
     

 01-18-2009
4.00
Front Seat back
Details
       

 01-15-2009
2.00
installing lower skin LH wing
Details
     

 01-05-2009
5.00
both bottom skins for riveting and install
Details
       

 01-04-2009
4.00
install nut plates for wing tips
     

 01-03-2009
2.00
cut wing tips off to match ailerons
     

 01-02-2009
1.00
had to fill wing tips with epoxy
Details

 01-01-2009
4.00
install wing tip ribs RH and LH sides
     

 12-27-2008
2.00
fit rh wing tip too high need to cut down even wit
     

 12-26-2008
4.00
fit RH bottom skin match drill skin
     

 12-26-2008
1.00
fit lh wing tip with Reid
     

 12-22-2008
4.00
installed LH flap hinge, revit hinge and dimp, fi
     

 12-21-2008
3.00
fit RH aileron and in stalled fit LH flap asm

 12-20-2008
5.00
install tie down hooks and fit LH aileron on wing
       

 12-18-2008
1.00
run pitot line drill hole for fitting
       

 12-18-2008
2.00
install aileron fairing and prime parts today
       

 12-16-2008
4.00
install lh aileron and rh aileron brackets
     

 12-15-2008
2.00
install aileron brakets and hinges
       

 12-14-2008
2.00
install aileron bracket hinges

 12-13-2008
4.00
made aileron push rods from stick to aileron
     

 12-09-2008
2.00
inventory RV 8 QB kit
     

 11-22-2008
2.00
fit end caps on to elevator and to horizontal stab
     

 08-07-2008
2.00
finish vertical stabilizer
     

 08-07-2008
10.00
finish both elevators
       

 08-06-2008
6.00
rudder rh elevator lh elevator finished up
     

 08-06-2008
2.00
finish horizontal stabilizer end caps cut to fit
Details
       

 08-05-2008
10.00
working on elevators
Details
       

 08-05-2008
5.00
building horizontal stabilizer
Details

 08-04-2008
5.00
finish horizonal stabilizer with good help Tate an
Details
       

 07-15-2008
0.00
Empennage kit is here!!!

 07-10-2008
1.00
Empennage kit ordered
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.