Powered By Kitlog Pro v2.0
RUSH MCKELVEY RV-8
RV-8
All
Work Logs Found:
203
Category Work Time:
789 Hours
Date
Hours
Work Log Summary
Details
03-24-2011
1.00
FINISHED AIRPLANE
03-24-2011
1.00
ENGINE RUN 3
03-23-2011
4.00
AIR WORTHY PINK SLIP A LEGAL AIRPLANE
03-03-2011
2.00
Installe LED bulb for landing lights
02-24-2011
3.00
First Engine Start Brake and Taxi Test all Good
02-21-2011
4.00
Confi Port 1234 of the AFS PFD
02-14-2011
4.00
Install 496 XM antenna under Cowling
02-06-2011
2.00
Find and Repair Fuel Guage Problem Wire
02-05-2011
5.00
Weight Airplane 1092lbs empty weight
02-03-2011
3.50
Paint Flap Fairings and Wing root Fairings
02-02-2011
3.00
Install Front Floor Front Seat Ramp Front Seat
02-01-2011
3.00
Install Rear Floor Flap Protective Tape
01-30-2011
4.00
Install Flap Faring and Baggage Door Strut
Details
01-29-2011
2.50
In Stall 4AN413A Bolts in Both Wing Spars
01-27-2011
2.00
Rig and Install Right Flap Split Hinge Pins
01-25-2011
2.00
Install Right Aileron Flap and Rig
01-24-2011
2.50
Rig Left Aileron and Flap
01-22-2011
2.00
Install Left Aileron
01-19-2011
6.00
Torque Wing Bolts Per Vans Specs
01-18-2011
2.00
Install Right Wing Tip Wire NAV Strobe Landing Lig
01-17-2011
3.00
Install Left Wing Tip Wire Nav Strobe Landing
01-14-2011
6.00
Install Right Wing Final and Last time Drill Fuel
01-13-2011
4.00
Remove Right Wing Install Platenuts Wire Lights
01-12-2011
6.00
Install Final time Left Wing
01-03-2011
4.00
Removed Left Wing To Install Platenuts Wire Lights
12-30-2010
5.00
Fab Cut Sand RH LH Flaps
12-29-2010
4.00
Fab Drill Fuel Tank Attachment Brakets
12-28-2010
5.00
Measure Fab Drill Wing Root Fairings
12-26-2010
4.00
Level Set Drill Aft Spar bolts
12-21-2010
5.00
Install both wings for the first time
12-07-2010
5.00
INSTALL NEW RUDDER STOP
11-30-2010
4.00
ADJ RUDDER HITTING BACK OF HS BLEED BRAKES UP WI
11-29-2010
4.00
MOUNT VS RUDDER DAY 2 INSTALL RUDDER STOP
11-29-2010
6.00
MOUNT VS FAIRING AN WIRE TAIL NAV STROBE UP
11-28-2010
4.00
MOUNT VS RUDDER HS
11-24-2010
3.00
MOUNT HEAD RESET, TAIL , VS, HS, AN TORQUE AN3 BOL
11-23-2010
3.00
MOVED TOOLS TO HANGER
11-23-2010
3.00
MOUNT HEAD REST HS VS AN TORQUE AN3 BOLTS
11-17-2010
3.00
MOVED TOOLS AN SHOP FROM HOME BASEMENT TO HANGER
11-16-2010
2.00
MOVED AIRPLANE TO HANGER
11-15-2010
14.00
PAINT FUSELAGE AN COWL
11-10-2010
4.00
SAND PRIME AN GET READY FOR PAINT FUSELAGE
11-07-2010
4.50
SAND PRIME AN PAINT CANOPY
11-06-2010
3.00
SAND AN PRIME WINDSCREEN FOR PAINT
11-05-2010
4.50
SAND AN CLEAN FUSELAGE FOR PRIMER
10-24-2010
4.00
MOUNT VS HS RUDDER ELEVATORS
10-22-2010
6.00
PAINT BOTH WINGS
10-19-2010
4.00
SAND AND PAINT TAIL FAIRING AN FLAPS
10-18-2010
6.00
SAND AND CLEAN BOTH WINGS
10-11-2010
4.00
PAINT HS VS RUDDER BOTH EVELATORS
10-10-2010
8.00
PAINT HS VS RUDDER BOTH ELEVATORS
10-08-2010
6.00
PAINT WING TIPS AT BODY SHOP
10-06-2010
4.00
REINSTALL MAINFOLD PRESSURE HOSE TO PLASMA II
10-05-2010
1.00
CHECK TDC TO HOOK UP ELECT LEADS
10-04-2010
3.00
INSTALL MAIN LEADS TO COILS DRILL BAFFLE
10-01-2010
3.00
WIRE UP PLASMA II
09-28-2010
2.00
INSTALL FUEL LINE THROUGH BAFFLE UPPER
09-25-2010
5.00
INSTALL FUEL FLOW SENSOR
09-18-2010
3.50
FAB AN INSTALL CRANK CASE BREATHER TUBE
09-14-2010
4.00
INSTALL OIL COOLER LINES PER PLANS
09-10-2010
3.00
OIL COOLER WORK
09-08-2010
4.00
OIL COOLER BAFFLE INSTALLED
09-05-2010
1.00
MAKE CHT AN EGTS STAND OFFS
09-04-2010
4.00
WIRING EGTS AN CHTS
09-01-2010
3.00
WIRING CHT AN EGTS
08-28-2010
4.00
SNORKEL CUT DECK COOLING RAMP FILTER
08-27-2010
6.00
SNORKEL WORK SAND PAINT BLACK INSTALL
08-21-2010
6.00
SNORKEL CUT AN GLASS
08-20-2010
2.00
SNORKEL CUT AN FIT
08-19-2010
4.00
SNORKEL FIT
Details
08-17-2010
3.00
INSTALL BAFFLES FLEX MATERIAL
08-16-2010
4.00
BAFFLE RIVIT DRILL
08-12-2010
4.00
Trim baffles
08-10-2010
6.00
Trim top baffling so cowl will fit
Details
08-05-2010
8.00
More baffling work
Details
08-01-2010
6.00
BAFFLING BUILDING
Details
07-30-2010
6.00
FILLING AN SANDING WIND SCREEN
07-22-2010
6.00
CANOPY GLUED TOGETHER THEN POP APART
Details
07-20-2010
10.00
MAKE WEATHER STRIPE FOR CANOPEY AND WIND SCREEN
07-15-2010
4.00
INSTALL ELT BAGGAGE AREA
07-08-2010
8.00
ATTACHED REAR OF SKIRTS TOGETHER
07-04-2010
8.00
INSTALL SKIRTS TO CANAPY FRAME
Details
07-02-2010
6.00
GLUE WINDSCREEN TAP AND SREW TO ROLL OVER BAR
06-25-2010
4.00
UNTAPE CLEAN GLUE CANOPEY TO FRAME
06-24-2010
6.00
CANOPY TO FRAME FIT BIG CUT
06-22-2010
4.00
READY FOR THE BIG CUT
06-21-2010
4.00
CUT CANOPY 2 TIMES
06-18-2010
8.00
CUT CANOPY 8 TIMES
06-11-2010
2.00
CUT CANOPY 2 TIMES
06-01-2010
6.00
CUT CANOPY 6 TIMES
05-24-2010
8.00
FINISH INSTALLING COWL
04-27-2010
3.00
SAND AND DRILL ALL THE HOLES ON THE FUSE SIDE FOR
04-26-2010
3.00
SAND COWL SOME MORE AND DRILLED THE FIRST THREE HO
04-21-2010
2.00
DAY 2 OIL DOOR
04-19-2010
2.00
DAY 1 ON THE OIL DOOR
Details
04-18-2010
2.00
WIRE FLAP SENSOR TO FLAP ARM
04-17-2010
6.00
COWL DAY 3 FITTING AND SANDING
04-15-2010
6.00
COWL DAY 2 FITTING
04-14-2010
6.00
COWL DAY 1 FITTING
04-03-2010
6.00
INSTALL FRONT TOP SKIN
03-18-2010
4.00
INSTALL FRESH AIR DUCK TO PANEL
03-16-2010
3.00
RUN WIRE TO TRIM MOTORS
03-15-2010
10.00
WIRE AFT AND FRONT STICKS TO RELAY DECK
02-17-2010
3.00
INSTALL RH MAG ON OFF SWITCH
Details
02-16-2010
3.00
INSTALL CABIN HEAT CABLE CONTROL
02-15-2010
3.00
INSTALL MAP SENSOR
02-14-2010
6.00
INSTALL CABLE CONTROLS MIX RPM THROT
02-12-2010
2.00
INSTALL FIRE SLEEVE AROUND PUSH PULL CABLES
02-10-2010
4.00
WIRE ENGINE AND RH ELEC MAG
02-08-2010
3.00
WIRE ENGINE AND LH IMPULSE COUPLER
02-02-2010
6.00
WIRE PANEL
01-20-2010
2.00
INSTALL THROTTLE CABLE BRACKET
Details
01-20-2010
10.00
INSTALL STARTER CABLE
01-15-2010
8.00
WIRE PANEL
01-07-2010
1.00
MCKELVEY GIRLS AT WORK IN THE AIRPLANE SHOP
12-25-2009
6.00
MOUNT AND INSTALLED NEW IO 375 AEROSPORT POWER ENG
12-13-2009
2.00
INSTALL STEIN AIR PANEL
Details
12-12-2009
1.00
IO 375 AEROSPORT POWER ENGINE IS HERE
12-11-2009
3.00
RUN FUEL PUMP 16 GA WIRE PER MANUAL
12-10-2009
2.00
BAGGAGE DOOR BRAKE LINE TO PANEL
12-02-2009
13.00
MOUNT AND INSTALL GROVE GEAR
Details
11-26-2009
3.00
INSTALL HEATER CONTROL ON FIRWALL
11-25-2009
5.00
INSTALL MIX THROT PROP CABLES
11-21-2009
3.00
INSTALL REAR STICK GRIP
11-20-2009
2.00
INSTALL BATTERY AN STATER RELAYS
11-09-2009
4.00
LANDIND LIGHTS IN WING TIPS FAB AND FIT
11-04-2009
3.00
INSTALL STATIS PORTS AN RUN LINE
10-20-2009
3.00
HS TIPS INSTALLED AND SAND
10-11-2009
4.00
INSTALL LOWER HS GAP SKIN
10-05-2009
4.00
INSTALL TAIL AN FIT VS AN HS TIPS
09-30-2009
4.00
PUSH RODS INSTALL
09-21-2009
2.00
INSTALL FOWARD BAGG SKIN STRIPS
09-20-2009
2.00
INSTALL TAIL ASM DRILL ELEVATOR HORNS
09-15-2009
2.00
START FAB TOP BAGGAGED DOOR
09-10-2009
2.00
FAB AN INSTALLED CANP LATCH ASM
09-04-2009
2.00
TEST FIT CLASSIC AERO LEATHER SEATS
Details
08-27-2009
6.00
FAB AN INSTALL CANOPEY RAILS
08-04-2009
5.00
fab an install fuel lines to the pump and filter 3
07-24-2009
2.00
install fuel pump asm
07-18-2009
3.00
install brake lines to master cylinder
07-17-2009
3.00
install enegine mount
07-17-2009
3.00
fab and install battery tray on firewall
07-15-2009
2.00
finish kit is here inventory it
07-14-2009
4.00
mount an drill 9 holes for VS
07-02-2009
2.00
mount hs to fuse drill 8 holes
06-04-2009
7.00
base coat clear coat inside of fuselage
Details
06-02-2009
4.00
drill an fit top skin on
06-01-2009
1.50
dimple front top skin an cut baggage door out
05-20-2009
4.50
drill and pre install groove landing gear asm
05-03-2009
3.00
fab and fit the fuel vavle asm and some good help
04-06-2009
2.00
build and install lh console
04-02-2009
2.00
INSTALLED VENT SCOOPS ON WING AND FUSE
Details
04-01-2009
6.00
PAINT BASECOAT CLEARCOAT MIS PARTS FOR FUSE
Details
04-01-2009
1.00
MOVED MY FINISHED WINGS TO HANGER READY FOR PAINT
03-31-2009
2.00
INSTALLED RH FRT CONSOLE ASM
03-25-2009
3.00
INSTALLED REAR COVERS ONE OVER FLAP MOTOR ASM
03-20-2009
2.00
PREP AND PRIME REAR FUSE AREA
03-19-2009
3.00
BUILD AND INSTALLED FRT SEAT RAMP ASM
03-11-2009
2.00
INSTALLED RUDDER CABLES
03-10-2009
3.00
INSTALL RUDDER PEDAL ASM
03-08-2009
1.00
INSTALL REAR CONTROL MOUNT
03-07-2009
4.00
BUILD F-1 REAR SEAT BACK
Details
03-05-2009
2.00
PRIME MID SECTION
03-03-2009
2.00
PRIME FRONT FLOOR SECTION
02-28-2009
5.00
BUILD RUDDER PEDAL ASM
02-26-2009
3.00
INSTALL FLAP MOTOR ASM
02-25-2009
2.00
FLAP BLOCK INSTALLED
Details
02-19-2009
3.00
Installed Fuel Pickup and Sending Unit LH Wing
Details
02-17-2009
5.00
Installed RH wing Bottom Skin
Details
02-14-2009
5.00
Installed LH Wing Bottom Skin
Details
02-01-2009
4.00
Drill Floor For Nut Plates
Details
01-21-2009
3.00
Cut and Fit Wing Tip Lens
Details
01-20-2009
4.00
Build and Fit rear seat back
01-18-2009
4.00
Front Seat back
Details
01-15-2009
2.00
installing lower skin LH wing
Details
01-05-2009
5.00
both bottom skins for riveting and install
Details
01-04-2009
4.00
install nut plates for wing tips
01-03-2009
2.00
cut wing tips off to match ailerons
01-02-2009
1.00
had to fill wing tips with epoxy
Details
01-01-2009
4.00
install wing tip ribs RH and LH sides
12-27-2008
2.00
fit rh wing tip too high need to cut down even wit
12-26-2008
4.00
fit RH bottom skin match drill skin
12-26-2008
1.00
fit lh wing tip with Reid
12-22-2008
4.00
installed LH flap hinge, revit hinge and dimp, fi
12-21-2008
3.00
fit RH aileron and in stalled fit LH flap asm
12-20-2008
5.00
install tie down hooks and fit LH aileron on wing
12-18-2008
1.00
run pitot line drill hole for fitting
12-18-2008
2.00
install aileron fairing and prime parts today
12-16-2008
4.00
install lh aileron and rh aileron brackets
12-15-2008
2.00
install aileron brakets and hinges
12-14-2008
2.00
install aileron bracket hinges
12-13-2008
4.00
made aileron push rods from stick to aileron
12-09-2008
2.00
inventory RV 8 QB kit
11-22-2008
2.00
fit end caps on to elevator and to horizontal stab
08-07-2008
2.00
finish vertical stabilizer
08-07-2008
10.00
finish both elevators
08-06-2008
6.00
rudder rh elevator lh elevator finished up
08-06-2008
2.00
finish horizontal stabilizer end caps cut to fit
Details
08-05-2008
10.00
working on elevators
Details
08-05-2008
5.00
building horizontal stabilizer
Details
08-04-2008
5.00
finish horizonal stabilizer with good help Tate an
Details
07-15-2008
0.00
Empennage kit is here!!!
07-10-2008
1.00
Empennage kit ordered
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
203
789
Avionics
9
43
Empennage
9
45
Engine
35
136
Fuselage
102
427
Miscellaneous
10
18
Wings
38
120
Copyright © 2001-2024 Matronics. All Rights Reserved.