Date
|
Hours
|
Work Log Summary
|
Details
|
11-21-2014
|
3.00
|
Inspection & sign off
|
Details
|
|
|
10-19-2014
|
0.00
|
We're almost done!
|
Details
|
|
|
09-22-2014
|
2.00
|
swapped oil pressure and temperature sensors
|
Details
|
|
|
09-02-2014
|
2.10
|
start of break in run
|
Details
|
|
|
09-01-2014
|
0.50
|
Taxi test
|
Details
|
|
|
08-18-2014
|
0.50
|
re-installed starter
|
Details
|
|
|
08-13-2014
|
3.00
|
Installed nut plates for battery cage
|
Details
|
|
|
08-06-2014
|
2.10
|
Tested and removed starter
|
Details
|
|
|
08-04-2014
|
2.10
|
Replaced ELT
|
Details
|
|
|
08-02-2014
|
0.70
|
Patched old battery vent hole
|
Details
|
|
|
07-30-2014
|
3.50
|
Set aileron deflection and cable tension
|
Details
|
|
|
07-28-2014
|
0.40
|
Replaced snap ties in engine compartment
|
Details
|
|
|
07-28-2014
|
3.00
|
Repaired CDI control
|
Details
|
|
|
07-26-2014
|
2.30
|
Set rudder deflection & tensioned cables
|
Details
|
|
|
07-22-2014
|
3.50
|
Adjusted elevator deflection & cable tension
|
Details
|
|
|
07-19-2014
|
0.50
|
Evaulated rudder & elevator throw; started ELT rep
|
Details
|
|
|
07-19-2014
|
1.00
|
Added stiffner to stbd wing locker cover
|
Details
|
|
|
07-16-2014
|
3.00
|
Installed compass lighting
|
Details
|
|
|
07-15-2014
|
1.50
|
installed baffle, breather hose
|
Details
|
|
|
07-14-2014
|
1.50
|
Added engine breather hose, fabbed wiring protecto
|
Details
|
|
|
07-12-2014
|
2.80
|
Starter, baffles, cyl nuts
|
Details
|
|
|
07-08-2014
|
2.00
|
various engine updates
|
Details
|
|
|
06-27-2014
|
2.00
|
Finished primter removal, sealed maiform pressure
|
Details
|
|
|
06-26-2014
|
1.10
|
Second engine run
|
Details
|
|
|
06-25-2014
|
2.00
|
Clean up & add maifold pressure lead to CDI
|
Details
|
|
|
06-24-2014
|
2.10
|
Continued engine cleanup
|
Details
|
|
|
06-20-2014
|
2.10
|
Calibrated tach; first formal engine run
|
Details
|
|
|
06-16-2014
|
2.50
|
Reversed mixture control
|
Details
|
|
|
06-14-2014
|
40.00
|
Worked engine/ignition problems
|
Details
|
|
|
02-05-2014
|
2.00
|
Fabricated battery box
|
Details
|
|
|
01-29-2014
|
2.50
|
No fuel pressure
|
Details
|
|
|
01-20-2014
|
3.00
|
CDI problem
|
Details
|
|
|
11-12-2013
|
14.00
|
Engine problems
|
Details
|
|
|
10-01-2013
|
10.00
|
Worked fuel pump location
|
Details
|
|
|
08-24-2013
|
2.00
|
Re-installed oil pressure/temperature sensors
|
Details
|
|
|
08-16-2013
|
120.00
|
Created draft test procedure and data sheets
|
Details
|
|
|
07-31-2013
|
60.00
|
Created Draft flight manusl
|
Details
|
|
|
06-18-2013
|
0.10
|
Installed document holder
|
Details
|
|
|
06-18-2013
|
2.10
|
Created interior canoy handles
|
Details
|
|
|
06-15-2013
|
1.20
|
Installed shim under striker plates
|
Details
|
|
|
06-15-2013
|
1.80
|
Installed canopy guides
|
Details
|
|
|
06-06-2013
|
0.90
|
Installed aircraft data p[ate
|
Details
|
|
|
06-04-2013
|
4.20
|
Fixed fuel quantity indicators
|
Details
|
|
|
05-10-2013
|
0.30
|
Verified fuel pressure meter / primer functional
|
Details
|
|
|
05-09-2013
|
5.00
|
nose high/nose low fuel flow tests
|
Details
|
|
|
05-08-2013
|
4.00
|
Updated fuel flow tests
|
Details
|
|
|
04-16-2013
|
3.00
|
Troubleshot & repaired door latch
|
Details
|
|
|
04-16-2013
|
0.30
|
Installed missing engine bolts
|
Details
|
|
|
04-15-2013
|
2.10
|
Installed propeller
|
Details
|
|
|
04-10-2013
|
3.00
|
restored fuel pump system
|
Details
|
|
|
03-18-2013
|
10.00
|
ran fuel flow tests
|
Details
|
|
|
02-16-2013
|
10.10
|
Finished co-pilot seat
|
Details
|
|
|
02-04-2013
|
7.90
|
Installed new canopy
|
Details
|
|
|
02-01-2013
|
3.00
|
Continued turnbuckle cleanup
|
Details
|
|
|
01-26-2013
|
2.00
|
Cleaned up turnbuckle safeties
|
Details
|
|
|
01-25-2013
|
2.50
|
Provisions for rear position lamp
|
Details
|
|
|
01-22-2013
|
0.80
|
Starter
|
Details
|
|
|
01-22-2013
|
1.00
|
Compass lighting
|
Details
|
|
|
12-29-2012
|
20.00
|
Replaced battery
|
Details
|
|
|
12-27-2012
|
15.00
|
Worked on CDI
|
Details
|
|
|
12-13-2012
|
2.20
|
Preliminary weight and balance
|
Details
|
|
|
11-13-2012
|
10.50
|
Reinstalled canopy frame
|
Details
|
|
|
11-10-2012
|
2.10
|
Installed exhaust pipes
|
Details
|
|
|
11-09-2012
|
1.50
|
Initial prop mount
|
Details
|
|
|
10-20-2012
|
2.10
|
Adjusted aileron movement
|
Details
|
|
|
10-18-2012
|
2.90
|
Repaired damage to wings
|
Details
|
|
|
10-10-2012
|
2.10
|
Replaced master relay
|
Details
|
|
|
10-06-2012
|
2.90
|
Connected fuel line and fuel senders
|
Details
|
|
|
10-04-2012
|
6.70
|
Connected aileron control cables
|
Details
|
|
|
09-29-2012
|
11.10
|
Connected lights and pitot tube under port seat.
|
Details
|
|
|
09-24-2012
|
1.50
|
Replaced pilot tube
|
Details
|
|
|
09-22-2012
|
6.00
|
Installed remainng wing bolts
|
Details
|
|
|
09-19-2012
|
0.80
|
Applied "No Step" Decals to flaps
|
Details
|
|
|
09-18-2012
|
2.50
|
Connected flaps to flap motor
|
Details
|
|
|
09-12-2012
|
1.90
|
Installed rear spar attach bolts.
|
Details
|
|
|
09-08-2012
|
0.70
|
Installed elevator trim connector in waterproof fi
|
Details
|
|
|
09-07-2012
|
3.20
|
swapped port and stbd obstruction light assemblies
|
Details
|
|
|
08-31-2012
|
2.10
|
Installed elevator saddle
|
Details
|
|
|
08-24-2012
|
3.90
|
Installed elevator
|
Details
|
|
|
08-21-2012
|
4.30
|
Installed rudder
|
Details
|
|
|
08-18-2012
|
30.00
|
Installed NAS shear bolts
|
Details
|
|
|
07-07-2012
|
4.00
|
Attaching the wings
|
Details
|
|
|
07-05-2012
|
12.00
|
Moving aircraft
|
Details
|
|
|
07-04-2012
|
18.00
|
washed, prepped, and painted wings
|
Details
|
|
|
06-30-2012
|
15.00
|
Test mounted wings
|
Details
|
|
|
06-25-2012
|
4.50
|
Installed new canopy
|
Details
|
|
|
06-20-2012
|
2.40
|
Fabricated face plate for prop
|
Details
|
|
|
06-19-2012
|
1.90
|
Worked on fiberglassing cowling
|
Details
|
|
|
06-18-2012
|
2.00
|
Replaced master relay fuse
|
Details
|
|
|
06-18-2012
|
2.50
|
Mounted & wired fuel pumps
|
Details
|
|
|
06-16-2012
|
3.00
|
Worked on mating stbd wing to fuselage
|
Details
|
|
|
06-15-2012
|
2.60
|
Wing preparation
|
Details
|
|
|
06-15-2012
|
0.80
|
Uncrated and inspected prop
|
Details
|
|
|
06-13-2012
|
3.20
|
Prepared for wing installation
|
Details
|
|
|
06-12-2012
|
4.00
|
Worked on fuel manifold
|
Details
|
|
|
06-11-2012
|
3.20
|
Routed fuel line and passed through firewall
|
Details
|
|
|
05-17-2012
|
2.10
|
Began installation of seat surface.
|
Details
|
|
|
05-16-2012
|
1.70
|
Installed fropnt and side panels on seat
|
Details
|
|
|
05-16-2012
|
0.90
|
Attached velcro strips to canvas back and seat sli
|
Details
|
|
|
05-15-2012
|
1.10
|
More interior upholstry
|
Details
|
|
|
05-15-2012
|
0.75
|
Finished battery installation
|
Details
|
|
|
05-14-2012
|
1.20
|
Electrical system work
|
Details
|
|
|
05-14-2012
|
2.80
|
Began upholstry of interior
|
Details
|
|
|
05-14-2012
|
0.50
|
Began battery installation
|
Details
|
|
|
05-13-2012
|
1.70
|
Fit check of upholstry parts
|
Details
|
|
|
05-08-2012
|
1.10
|
Routed tach pickup
|
Details
|
|
|
05-08-2012
|
1.90
|
Installed another cylinder
|
Details
|
|
|
05-07-2012
|
1.80
|
Worked on finish interior
|
Details
|
|
|
05-07-2012
|
1.10
|
Prepared leads from CDI for battery connection
|
Details
|
|
|
05-06-2012
|
2.10
|
Started cutting pattern for seat covers
|
Details
|
|
|
05-05-2012
|
3.10
|
Installed Lightspeed control in aircraft
|
Details
|
|
|
05-04-2012
|
4.00
|
Updated Light Speed Control panel
|
Details
|
|
|
05-03-2012
|
2.10
|
Added mount for Lightspeed control
|
Details
|
|
|
04-26-2012
|
2.50
|
Fabricated control panel for Lightspeed unit
|
Details
|
|
|
04-25-2012
|
1.90
|
Installed input and output connectors on Lightspee
|
Details
|
|
|
04-23-2012
|
2.10
|
Installed coax from Lightspeed unit to ignition co
|
Details
|
|
|
04-20-2012
|
2.70
|
Built foam seat cushions on passenger side
|
Details
|
|
|
04-19-2012
|
0.90
|
Installed Throttle linkage
|
Details
|
|
|
04-19-2012
|
1.50
|
Completed Lightspeed Installation on mounting tray
|
Details
|
|
|
04-17-2012
|
5.00
|
Worked on upholstry
|
Details
|
|
|
04-16-2012
|
1.10
|
Mounted ignition coils on engine mount
|
Details
|
|
|
04-16-2012
|
3.00
|
Began cutting foam for seat cushions
|
Details
|
|
|
04-14-2012
|
3.50
|
Installed Lightspeed sensors
|
Details
|
|
|
04-13-2012
|
2.10
|
Lightspeed planning
|
Details
|
|
|
04-13-2012
|
2.70
|
fuel system planning
|
Details
|
|
|
04-12-2012
|
8.00
|
Began fabrication of the Lightspeed mount
|
Details
|
|
|
04-11-2012
|
4.00
|
Located installation position for Lightspeed units
|
Details
|
|
|
04-10-2012
|
8.00
|
Began installation of magneto replacements
|
Details
|
|
|
04-09-2012
|
2.90
|
Installed Carby fittings & heat control
|
Details
|
|
|
04-07-2012
|
1.20
|
Reworking cowl
|
Details
|
|
|
04-07-2012
|
0.50
|
Installed carby air box
|
Details
|
|
|
04-07-2012
|
1.20
|
Installated rings & first cylinder
|
Details
|
|
|
04-06-2012
|
0.40
|
Installed oil filter adapter
|
Details
|
|
|
04-05-2012
|
2.10
|
reworked oil tank & installed
|
Details
|
|
|
03-29-2012
|
6.00
|
Researched and ordered magnetos
|
Details
|
|
|
03-17-2012
|
2.50
|
Fabricated cover for vacuum pump hole
|
Details
|
|
|
03-17-2012
|
0.10
|
Checked comm radio transmit
|
Details
|
|
|
03-16-2012
|
5.20
|
Installed Misc engine parts
|
Details
|
|
|
03-16-2012
|
0.50
|
Fit check cowling
|
Details
|
|
|
03-13-2012
|
1.50
|
Replace carby manifold hw, routed mixture control
|
Details
|
|
|
03-13-2012
|
2.50
|
installed tach and hour meter
|
Details
|
|
|
03-12-2012
|
1.50
|
Replaced alternator circuit breaker
|
Details
|
|
|
03-12-2012
|
2.50
|
Checked comm radio and added switch
|
Details
|
|
|
03-09-2012
|
1.50
|
Remounted engine controls & routed through will
|
Details
|
|
|
03-07-2012
|
2.10
|
Installed carby assembly
|
Details
|
|
|
03-06-2012
|
5.20
|
Wired and mounted the comm transceiver
|
Details
|
|
|
03-05-2012
|
2.10
|
Installed alternator & tachometer drive assembly
|
Details
|
|
|
02-29-2012
|
6.10
|
Replaced audio wiring for comm receiver
|
Details
|
|
|
02-24-2012
|
0.80
|
Reinstalled 530163 flanges
|
Details
|
|
|
02-22-2012
|
2.50
|
Installed starter and engine ground
|
Details
|
|
|
02-20-2012
|
4.10
|
Installed crankcase
|
Details
|
|
|
02-16-2012
|
3.50
|
Checked starter for fit, mated crankcase
|
Details
|
|
|
02-14-2012
|
2.50
|
Updated seat drawings & cut seat backs
|
Details
|
|
|
02-14-2012
|
2.50
|
Fabricated and installed seat back clips
|
Details
|
|
|
02-11-2012
|
6.60
|
Begin engine re-construction
|
Details
|
|
|
02-09-2012
|
3.50
|
Started drawings of seat upholstry
|
Details
|
|
|
02-08-2012
|
2.50
|
Cleaned engine parts & installed piston rods
|
Details
|
|
|
02-07-2012
|
4.90
|
Fixed Illuminated switches & Fuel pump switch
|
Details
|
|
|
02-07-2012
|
4.40
|
Cleaned engine hardware & modified starter pinon
|
Details
|
|
|
02-04-2012
|
5.30
|
cleaned & painted rocker box covers
|
Details
|
|
|
01-31-2012
|
6.00
|
cleaned and painted rest of crankcase
|
Details
|
|
|
01-28-2012
|
6.50
|
cleaned and painted half of crankcase
|
Details
|
|
|
01-25-2012
|
4.00
|
Cleaned crankcase in degreaser bath.
|
Details
|
|
|
01-23-2012
|
2.50
|
Refurbished oil tank
|
Details
|
|
|
01-21-2012
|
6.00
|
Grit blasted parts
|
Details
|
|
|
01-17-2012
|
3.60
|
Removed Oil pump & split care
|
Details
|
|
|
01-16-2012
|
5.30
|
Removed mag and rear case accessories
|
Details
|
|
|
01-14-2012
|
3.00
|
Removed engine from aircraft
|
Details
|
|
|
01-13-2012
|
8.00
|
Crated and shipped cylinders
|
Details
|
|
|
12-29-2011
|
10.00
|
Began cleaning engine parts
|
Details
|
|
|
12-20-2011
|
2.50
|
Removed carby manifolds and pistons.
|
Details
|
|
|
12-15-2011
|
8.00
|
Removed cylinders
|
Details
|
|
|
12-01-2011
|
1.50
|
Built and installed intercylinder baffles
|
Details
|
|
|
11-28-2011
|
2.00
|
Added seals to side and rear baffles
|
Details
|
|
|
11-19-2011
|
6.00
|
Installed nut plates on side and rear baffles.
|
Details
|
|
|
11-05-2011
|
48.00
|
Started engine baffles
|
Details
|
|
|
09-26-2011
|
0.50
|
Installed mixture control in cockpit
|
|
|
|
09-26-2011
|
2.00
|
Fabricated transponder antenna cable
|
|
|
|
09-26-2011
|
1.50
|
Cut access to xpder antenna & installed cable
|
|
|
|
09-24-2011
|
8.00
|
Debugged comm wiring
|
Details
|
|
|
09-21-2011
|
10.00
|
Debug and run ground test
|
Details
|
|
|
09-16-2011
|
8.00
|
Shot clear coat on aircraft
|
Details
|
|
|
09-09-2011
|
6.00
|
Painted lower cowl
|
Details
|
|
|
09-02-2011
|
6.00
|
Primed and painted upper cowl
|
Details
|
|
|
08-19-2011
|
16.00
|
Added oil filler access door
|
Details
|
|
|
08-12-2011
|
80.00
|
Fine fit engine cowlings
|
Details
|
|
|
07-15-2011
|
8.10
|
Designed and fabbed cowling attachments
|
Details
|
|
|
07-09-2011
|
3.90
|
Prepared for installation of upper cowl
|
Details
|
|
|
07-06-2011
|
8.00
|
Installed lower cowl attachments
|
Details
|
|
|
07-02-2011
|
6.50
|
engine cowling preparation
|
Details
|
|
|
07-01-2011
|
1.00
|
Installed "N" number markings
|
Details
|
|
|
06-25-2011
|
1.00
|
Installed seat belts and shoulder harnesses
|
Details
|
|
|
06-25-2011
|
0.70
|
Installed compass lighting
|
Details
|
|
|
06-25-2011
|
1.10
|
Installed aileron fairleads at fuselage exits.
|
Details
|
|
|
06-23-2011
|
6.00
|
Installed light dimmer
|
Details
|
|
|
06-20-2011
|
0.50
|
Tested light dimmer
|
Details
|
|
|
06-20-2011
|
0.50
|
Put protective strip along top of instrument panel
|
Details
|
|
|
06-20-2011
|
0.30
|
Installed rubber strip on aouminum closeout
|
Details
|
|
|
06-20-2011
|
1.00
|
Forced canopy to conform to side closeout
|
Details
|
|
|
06-18-2011
|
2.50
|
Installed weather seal and experimental logo
|
Details
|
|
|
06-17-2011
|
2.90
|
Applied more paint, secured canopy hinge
|
Details
|
|
|
06-16-2011
|
1.50
|
Painted bottom; removed masking
|
Details
|
|
|
06-15-2011
|
3.10
|
Primed under fuselage, painted sides white
|
Details
|
|
|
06-13-2011
|
3.00
|
Cleanup, taping for primer on bottom and white on
|
Details
|
|
|
06-11-2011
|
1.75
|
painted upper half of fuselage red
|
Details
|
|
|
06-10-2011
|
2.50
|
Primed upper fuselage
|
Details
|
|
|
06-09-2011
|
2.00
|
Touched up cockpit trim
|
Details
|
|
|
06-08-2011
|
1.00
|
Add door handles
|
Details
|
|
|
06-04-2011
|
1.00
|
Installed stiffner in wing locker
|
Details
|
|
|
06-03-2011
|
0.30
|
Installed compass
|
Details
|
|
|
06-02-2011
|
0.50
|
Painted top of instrument panel
|
Details
|
|
|
06-01-2011
|
0.50
|
Rivet outside flashing
|
Details
|
|
|
06-01-2011
|
0.20
|
Install instrument light strips
|
Details
|
|
|
06-01-2011
|
5.30
|
Install canopy
|
Details
|
|
|
05-30-2011
|
0.50
|
Dimple outside flashing
|
Details
|
|
|
05-28-2011
|
2.10
|
Mount canopy rail
|
Details
|
|
|
05-27-2011
|
2.10
|
Corrected rear canopy frame installation
|
Details
|
|
|
05-26-2011
|
2.50
|
Built replacement 6C3s
|
Details
|
|
|
05-20-2011
|
4.00
|
Riveted top and nose skins back in place
|
Details
|
|
|
05-12-2011
|
3.00
|
Installed balance weight
|
Details
|
|
|
05-10-2011
|
2.00
|
Began reinstallation of nose skin
|
Details
|
|
|
05-04-2011
|
4.00
|
Finished installing modified nose ribs
|
Details
|
|
|
04-22-2011
|
3.90
|
Added stiffners to upper skin
|
Details
|
|
|
04-20-2011
|
0.70
|
Drilled upper skin mounting holes through 6ZU1-2
|
Details
|
|
|
04-17-2011
|
4.10
|
Prepared Extrusion angle and nose ribs for install
|
Details
|
|
|
04-15-2011
|
0.80
|
Bolt wing root doubler into position.
|
Details
|
|
|
04-14-2011
|
2.30
|
Prepare installation of wing root doubler
|
Details
|
|
|
04-09-2011
|
2.00
|
Drilled out AN3 rivets used to assemble spar
|
Details
|
|
|
04-08-2011
|
0.50
|
Removed nose ribs 1-3 for modification
|
Details
|
|
|
04-07-2011
|
1.10
|
Removed stbd wing nose skins and fuel tank
|
Details
|
|
|
04-05-2011
|
2.10
|
Rivet stiffners
|
Details
|
|
|
04-02-2011
|
0.90
|
Close aileron & install reinforcements
|
Details
|
|
|
04-01-2011
|
5.10
|
Install balance arm
|
Details
|
|
|
03-31-2011
|
0.50
|
Remove aileron rivets
|
Details
|
|
|
03-26-2011
|
2.50
|
Reinforce bellcrank
|
Details
|
|
|
03-25-2011
|
1.90
|
Cut wing stiffners and cleco in place
|
Details
|
|
|
03-23-2011
|
3.00
|
Riveted rear wing spar reinforcements
|
Details
|
|
|
03-22-2011
|
2.50
|
Positioned 6ZU1-7,8 and 6's
|
Details
|
|
|
03-22-2011
|
2.00
|
Drilled new rivet holes in 6ZU1
|
Details
|
|
|
03-21-2011
|
1.50
|
Finished removing upper skin rivets
|
Details
|
|
|
03-19-2011
|
2.50
|
Started stbd wing mod
|
Details
|
|
|
03-12-2011
|
10.00
|
Reinstalled wing skin and nose skin
|
Details
|
|
|
03-10-2011
|
0.50
|
Reinstalled port fuel tank
|
Details
|
|
|
03-10-2011
|
0.50
|
Reconnected aileron trim cable
|
Details
|
|
|
03-10-2011
|
0.50
|
Installed aileron and balance weights
|
Details
|
|
|
03-09-2011
|
1.30
|
Install Extrusion 6Z1-1
|
Details
|
|
|
03-05-2011
|
1.90
|
Cut and drilled upper port stiffners
|
Details
|
|
|
03-05-2011
|
0.40
|
Added mass balance protection to upper skin
|
Details
|
|
|
03-04-2011
|
4.00
|
rivet stiffners to bottom port wing skin
|
Details
|
|
|
02-17-2011
|
3.10
|
Added reinforcements to nose rib 1
|
Details
|
|
|
02-16-2011
|
7.30
|
Added reinforcements to nose ribs 2 and 3
|
Details
|
|
|
02-10-2011
|
1.70
|
Prepared installation of Wing Root Doubler
|
Details
|
|
|
02-08-2011
|
3.90
|
Prepared wing root doubler 6ZU1-1 for installation
|
Details
|
|
|
02-07-2011
|
1.20
|
Replaced rivets in port aileron
|
Details
|
|
|
02-07-2011
|
0.50
|
Balanced aileron
|
Details
|
|
|
02-04-2011
|
1.00
|
Checked aileron trim tab control
|
Details
|
|
|
01-31-2011
|
3.40
|
Mounted added ribs in aileron
|
Details
|
|
|
01-29-2011
|
1.90
|
Cut holes for balance arm
|
Details
|
|
|
01-28-2011
|
3.50
|
Drilled mounting holes in added ribs
|
Details
|
|
|
01-27-2011
|
1.10
|
Prepared various parts for installtion in port ail
|
Details
|
|
|
01-27-2011
|
1.30
|
Prepared stiffners for aileron
|
Details
|
|
|
01-26-2011
|
2.80
|
Riveted rear spar stiffners
|
Details
|
|
|
01-24-2011
|
1.50
|
Removed, cleaned. and primed 6ZU1-6,7, and 8
|
Details
|
|
|
01-24-2011
|
2.50
|
Made installation provisions for 6ZU1-7, and inboa
|
Details
|
|
|
01-22-2011
|
2.00
|
Prepared inboard 6ZU1-6 for installation
|
Details
|
|
|
01-22-2011
|
1.70
|
Prepare aileron hole doubler
|
Details
|
|
|
01-21-2011
|
2.50
|
Added skin stiffners
|
Details
|
|
|
01-20-2011
|
2.10
|
Replaced bellcrank mount
|
Details
|
|
|
01-19-2011
|
1.10
|
Removed first two nose ribs
|
Details
|
|
|
01-15-2011
|
3.70
|
Added provisions for extrusion 6ZU1-1
|
Details
|
|
|
01-14-2011
|
4.00
|
Removed port top front spar stiffner
|
Details
|
|
|
01-06-2011
|
1.00
|
Removed upper wing skin
|
Details
|
|
|
01-06-2011
|
2.10
|
Removed rivets from leading edge of port wing.
|
Details
|
|
|
01-05-2011
|
4.10
|
Removed upper port wing skin rivets
|
Details
|
|
|
10-18-2010
|
1.60
|
Shot clear coat on rudder
|
Details
|
|
|
10-16-2010
|
1.30
|
Painted color on rudder
|
Details
|
|
|
10-15-2010
|
1.50
|
Prepared and primed rudder
|
Details
|
|
|
10-12-2010
|
0.80
|
Touched up paint and shot top with clear coat
|
Details
|
|
|
10-11-2010
|
3.00
|
Added connectors for carry-on nav-com
|
Details
|
|
|
10-10-2010
|
2.10
|
Shot second color
|
Details
|
|
|
10-08-2010
|
3.10
|
Priming and painting!
|
Details
|
|
|
10-08-2010
|
0.70
|
Cleaned and mechanically installed magneto switch.
|
Details
|
|
|
10-07-2010
|
2.00
|
Cleaned, prepped, and primed top side of elevator
|
Details
|
|
|
10-05-2010
|
2.80
|
Did initial fit of lower engine cowling
|
Details
|
|
|
10-05-2010
|
1.00
|
Cut plug to sit behind prop flange to position cow
|
Details
|
|
|
10-04-2010
|
3.50
|
Installed disconnect in line with evevator trim
|
Details
|
|
|
10-04-2010
|
0.50
|
Drilled mounting holes for wet compass atop panel
|
Details
|
|
|
10-01-2010
|
2.50
|
Installed saddle 6B21-5
|
Details
|
|
|
09-28-2010
|
1.00
|
Riveted fwd top skin in place
|
Details
|
|
|
09-28-2010
|
0.80
|
Affixed accoustic material to back of firewall
|
Details
|
|
|
09-27-2010
|
2.30
|
Secured brake lines
|
Details
|
|
|
09-25-2010
|
2.90
|
Fabricated and installed avionics tray
|
Details
|
|
|
09-24-2010
|
1.10
|
Riveted support channel in place
|
Details
|
|
|
09-23-2010
|
2.00
|
Updated electrical drawings
|
Details
|
|
|
09-23-2010
|
2.10
|
Added and wired TB2
|
Details
|
|
|
09-22-2010
|
0.40
|
Connected pilot and static lines to asi and alt
|
Details
|
|
|
09-21-2010
|
2.50
|
Trial mount of engine
|
Details
|
|
|
09-15-2010
|
4.00
|
Routed and connected brake lines
|
Details
|
|
|
09-15-2010
|
4.00
|
Added access to top of instrument panel.
|
Details
|
|
|
09-14-2010
|
2.70
|
Moved stobe control to port side of aircraft
|
Details
|
|
|
09-11-2010
|
0.80
|
Temporary pilot seat installation and human factor
|
Details
|
|
|
09-11-2010
|
0.90
|
Installed lighting above instrument panel.
|
Details
|
|
|
09-10-2010
|
8.00
|
Installed fuel lines and tank sensor line to cente
|
Details
|
|
|
09-09-2010
|
2.50
|
Installed more wires behind panel
|
Details
|
|
|
09-08-2010
|
2.20
|
Painted interior canopy frame
|
Details
|
|
|
09-07-2010
|
2.10
|
Marked and installed airspeed indicator
|
Details
|
|
|
09-07-2010
|
1.00
|
Installed scat between air vent and eyeball outlet
|
Details
|
|
|
09-07-2010
|
0.30
|
Installed closeout in comm location
|
Details
|
|
|
08-29-2010
|
3.90
|
Installed remaining parts on center console
|
Details
|
|
|
08-26-2010
|
1.50
|
Installed ELT control in instrument panel
|
Details
|
|
|
08-26-2010
|
2.00
|
Corrected error in electrical location of ammeter
|
Details
|
|
|
08-25-2010
|
1.20
|
Mounted fresh air vents in panel
|
Details
|
|
|
08-25-2010
|
3.10
|
Added power and ground to selected instruments
|
Details
|
|
|
08-24-2010
|
1.80
|
Mounted Chief Aircraft instruments
|
Details
|
|
|
08-24-2010
|
3.10
|
Added terminal board 3 and avionics ground
|
Details
|
|
|
08-23-2010
|
0.40
|
Painted screw head for instrumetns
|
Details
|
|
|
08-23-2010
|
2.00
|
Ordered parts for instrument panel
|
Details
|
|
|
08-20-2010
|
4.00
|
Riveted control panel in place, began integrating
|
Details
|
|
|
08-19-2010
|
2.00
|
Drew schematic for audio panel
|
Details
|
|
|
08-17-2010
|
2.50
|
Installed strobe power supply
|
Details
|
|
|
08-16-2010
|
6.00
|
Installed TB1
|
Details
|
|
|
08-14-2010
|
6.00
|
Routed more wires in center console and revised wi
|
Details
|
|
|
08-13-2010
|
5.00
|
Cleaned up wiring in center console area
|
Details
|
|
|
08-06-2010
|
0.00
|
Reinstalled console, and routed wiring
|
Details
|
|
|
08-05-2010
|
0.50
|
Installed transponder antenna
|
Details
|
|
|
08-05-2010
|
0.50
|
Installed protective grommet in console panel
|
Details
|
|
|
08-05-2010
|
0.80
|
Installed ammeter shunt
|
Details
|
|
|
08-04-2010
|
1.50
|
Mounted gascolator
|
Details
|
|
|
07-27-2010
|
0.50
|
Installed inside canopy flashing
|
Details
|
|
|
07-24-2010
|
1.50
|
Install inside angle
|
Details
|
|
|
07-22-2010
|
1.70
|
Prepare outside falshing for installation
|
Details
|
|
|
07-20-2010
|
2.80
|
Cut inside flashing to fit
|
|
|
|
07-17-2010
|
1.50
|
Installed the rear canopy frame
|
Details
|
|
|
06-22-2010
|
2.90
|
Installed nut plates to fasten bottom fuselage acc
|
Details
|
|
|
06-21-2010
|
20.50
|
Fabricating the rear canopy frame
|
Details
|
|
|
06-08-2010
|
1.30
|
Route canopy lock cable
|
Details
|
|
|
06-08-2010
|
2.50
|
Position and install front canopy frame
|
Details
|
|
|
06-08-2010
|
0.60
|
Install canopy lock
|
Details
|
|
|
05-13-2010
|
0.80
|
Added engine mount
|
Details
|
|
|
05-13-2010
|
2.50
|
Added canopy mount arm
|
Details
|
|
|
05-05-2010
|
5.30
|
Added nutplates to mount center console
|
Details
|
|
|
05-04-2010
|
6.10
|
Added front top skin
|
Details
|
|
|
05-02-2010
|
4.20
|
Riveted rear top skins in place
|
Details
|
|
|
04-30-2010
|
3.10
|
Clecoed middle top skin in place
|
Details
|
|
|
04-29-2010
|
2.10
|
Added stiffners and provisions for ELT antenna; mo
|
Details
|
|
|
04-28-2010
|
0.80
|
Clecoed tube frames in place
|
Details
|
|
|
04-27-2010
|
2.30
|
Started installation of lower fuselage access door
|
Details
|
|
|
04-27-2010
|
5.30
|
Installed baggage floor
|
Details
|
|
|
04-26-2010
|
1.10
|
connected elevator controls
|
Details
|
|
|
04-26-2010
|
1.90
|
Built & installed ELT access panel
|
Details
|
|
|
04-24-2010
|
0.50
|
Lowered aircraft to floor
|
Details
|
|
|
04-24-2010
|
1.10
|
Installed wheels
|
Details
|
|
|
04-24-2010
|
2.00
|
Installed Axle and Tires on wheels.
|
Details
|
|
|
04-23-2010
|
2.50
|
Installed Main gear
|
Details
|
|
|
04-02-2010
|
2.00
|
Made cutouts in gear for mounting
|
Details
|
|
|
04-01-2010
|
2.50
|
Fit and clecoed support channel
|
Details
|
|
|
03-31-2010
|
0.70
|
Clecoed wiring bundles to side of fairings
|
Details
|
|
|
03-30-2010
|
1.00
|
Trimmed, cut, fit, clecoed Center Console
|
Details
|
|
|
03-30-2010
|
2.50
|
Cut, fit, & clecoed port side fairing
|
Details
|
|
|
03-29-2010
|
4.30
|
Cut & clecoed stbd side fairing
|
Details
|
|
|
03-29-2010
|
1.00
|
Clecoed wiring bundles inside arm rest
|
Details
|
|
|
03-28-2010
|
0.00
|
Added headset jacks
|
Details
|
|
|
03-26-2010
|
2.30
|
Routed elevator trim, elt contro, and comm coax
|
Details
|
|
|
03-26-2010
|
4.10
|
Added wiring from master relay to front of aircraf
|
Details
|
|
|
03-24-2010
|
2.50
|
Elevator cable rubs against rudder cable
|
Details
|
|
|
03-22-2010
|
1.50
|
moved right rudder cable fairlead
|
Details
|
|
|
03-22-2010
|
2.00
|
Installed joysticks and linkages
|
Details
|
|
|
03-22-2010
|
0.45
|
Corrected cable interferrence with side of console
|
Details
|
|
|
03-22-2010
|
0.40
|
Added extra fairlead in center console
|
Details
|
|
|
03-12-2010
|
2.10
|
Installed ELT
|
Details
|
|
|
03-11-2010
|
2.50
|
Installed rudder cables
|
Details
|
|
|
03-10-2010
|
1.00
|
Installed rudder pedal - nosewheel pushrods
|
Details
|
|
|
03-09-2010
|
3.90
|
Added seat modifications
|
Details
|
|
|
03-08-2010
|
0.30
|
Re-installed main gear attachments removed for mod
|
Details
|
|
|
03-06-2010
|
0.50
|
Rework of aileron control stop
|
Details
|
|
|
03-06-2010
|
3.50
|
Reinstalled fuselage parts
|
Details
|
|
|
03-06-2010
|
0.70
|
Installed "Z" angle stiffner
|
Details
|
|
|
03-05-2010
|
4.30
|
Installed bottom skin doubler 6ZU2-9
|
Details
|
|
|
03-04-2010
|
3.10
|
Installed center-spar fuselage connection mods
|
Details
|
|
|
03-02-2010
|
2.10
|
Fabbed and installed side doublers
|
Details
|
|
|
03-01-2010
|
2.10
|
rework center spar
|
|
|
|
03-01-2010
|
2.70
|
rework center spar
|
Details
|
|
|
02-22-2010
|
1.70
|
Installed replacement port attach plate
|
Details
|
|
|
02-22-2010
|
1.00
|
Installed flap motor
|
Details
|
|
|
02-21-2010
|
2.50
|
Installed replacement stbd attach plate
|
Details
|
|
|
02-20-2010
|
0.40
|
Add vent lines to battery box
|
Details
|
|
|
02-19-2010
|
3.50
|
Installed aileron stop
|
Details
|
|
|
02-18-2010
|
1.00
|
Riveted uprights in place
|
Details
|
|
|
02-18-2010
|
1.50
|
Riveted upper stiffner to front of center spar
|
Details
|
|
|
02-17-2010
|
0.70
|
riveted remaining part of aft center spar
|
Details
|
|
|
02-17-2010
|
1.50
|
Drilled rivet holes in added stiffner
|
Details
|
|
|
02-08-2010
|
1.50
|
began riveting rear center spar
|
Details
|
|
|
02-07-2010
|
2.50
|
Transferred hole for AN5 bolts to doublers
|
Details
|
|
|
02-06-2010
|
2.10
|
Mounted 6ZU2-4's on back of center spar
|
Details
|
|
|
02-06-2010
|
1.50
|
fabricated 6ZU2-4
|
Details
|
|
|
02-06-2010
|
3.00
|
Drilled doublers on back of center spar
|
Details
|
|
|
02-05-2010
|
2.00
|
Removed remaining caps from center spar
|
Details
|
|
|
02-05-2010
|
1.40
|
Drilled 6ZU2-7
|
Details
|
|
|
02-05-2010
|
1.50
|
Drilled 6ZU2-1
|
Details
|
|
|
02-04-2010
|
2.20
|
Installed port horizontal stabilizer tip
|
Details
|
|
|
02-01-2010
|
0.40
|
Routed elevator trim servo cable
|
Details
|
|
|
02-01-2010
|
0.40
|
Riveted elevator to horizontal stabilizer
|
Details
|
|
|
02-01-2010
|
2.10
|
Installed stbd elevator tip
|
Details
|
|
|
01-30-2010
|
1.30
|
installed lower rudder fairing
|
Details
|
|
|
01-29-2010
|
2.50
|
Install upper rudder bearing
|
Details
|
|
|
01-28-2010
|
0.75
|
Modified manual riveter
|
Details
|
|
|
01-24-2010
|
2.50
|
Installed nose gear on aircraft
|
Details
|
|
|
01-22-2010
|
0.70
|
Primed and painted landing gear leg
|
Details
|
|
|
01-22-2010
|
2.50
|
Attached nose gear leg to wheel fork
|
Details
|
|
|
01-21-2010
|
4.00
|
Fitted nose gear bottom bearing
|
Details
|
|
|
01-20-2010
|
3.70
|
Temporary installation of brakes
|
Details
|
|
|
01-20-2010
|
0.90
|
Replaced battery wiring
|
Details
|
|
|
01-19-2010
|
0.50
|
Reworked battery power installation
|
Details
|
|
|
01-19-2010
|
1.70
|
Initial preparation
|
Details
|
|
|
01-18-2010
|
0.20
|
Initial landing gear prep
|
Details
|
|
|
01-06-2010
|
1.00
|
Separate center spar for modification
|
Details
|
|
|
01-06-2010
|
1.40
|
Remove center spar
|
Details
|
|
|
01-03-2010
|
2.10
|
locate and drill horizontal stabilizer attachment
|
Details
|
|
|
01-03-2010
|
0.50
|
Deburr, clean, prime rear top skin
|
Details
|
|
|
01-03-2010
|
0.80
|
Cut rear top skin to mate with horizontal stabiliz
|
Details
|
|
|
12-31-2009
|
0.80
|
clean and prime stiffners, fwd aft skin
|
Details
|
|
|
12-30-2009
|
1.50
|
Install comm and gps antenna stiffners
|
Details
|
|
|
12-28-2009
|
1.50
|
Install fwd aft skin stringers
|
Details
|
|
|
12-26-2009
|
11.50
|
Install aft fwd skin
|
Details
|
|
|
12-25-2009
|
9.10
|
Install second tube frame
|
Details
|
|
|
12-23-2009
|
2.10
|
Rework elevator attachment to fuselage
|
Details
|
|
|
12-12-2009
|
5.30
|
Drilled and installed first tube frame
|
Details
|
|
|
12-12-2009
|
1.30
|
Design/document trim and flap control wiring
|
Details
|
|
|
12-10-2009
|
2.50
|
Drilled and clecoed top rear to fuselage side
|
Details
|
|
|
12-09-2009
|
1.70
|
installed rear top skin
|
Details
|
|
|
12-09-2009
|
2.10
|
drilled upper tail section
|
Details
|
|
|
12-08-2009
|
2.30
|
Installed Master power relay
|
Details
|
|
|
12-07-2009
|
2.30
|
Installed battery box
|
Details
|
|
|
12-06-2009
|
2.00
|
Completed design of battery box installation
|
Details
|
|
|
12-05-2009
|
2.00
|
Documented existing battery box planned for aircra
|
Details
|
|
|
12-05-2009
|
2.30
|
Designed battery box installation, cut initial pie
|
Details
|
|
|
12-03-2009
|
0.20
|
Removed dual control provisions
|
Details
|
|
|
12-02-2009
|
0.80
|
Removed pilot seat for Zenith modification
|
Details
|
|
|
11-19-2009
|
4.00
|
Cleaned up existing battery box
|
Details
|
|
|
11-03-2009
|
1.00
|
Riveted port fwd side skin in place
|
Details
|
|
|
11-03-2009
|
1.40
|
Riveted pilot's front seat panel and seat bottom i
|
Details
|
|
|
11-02-2009
|
6.00
|
Trim and hang forward side skins
|
Details
|
|
|
11-02-2009
|
0.90
|
Fab & Install lower elevator fairlead
|
Details
|
|
|
10-31-2009
|
2.20
|
Riveted seat back assembly in place
|
Details
|
|
|
10-31-2009
|
0.50
|
Riveted rudder cable fair leads in place
|
Details
|
|
|
10-31-2009
|
0.30
|
Reinstalled firewall assembly
|
Details
|
|
|
10-30-2009
|
1.20
|
Riveted rear frame channel in place
|
Details
|
|
|
10-30-2009
|
1.10
|
Riveted arm rest sides in place
|
Details
|
|
|
10-30-2009
|
0.60
|
Riveted 6B19-9 to 6B16-3 and rear seat panel
|
Details
|
|
|
10-30-2009
|
0.50
|
Riveted 6B16-5, 6B19-10, and 6B17-1 to rear seat p
|
Details
|
|
|
10-29-2009
|
2.50
|
Riveted rudder pedals and brakes in place.
|
Details
|
|
|
10-29-2009
|
0.60
|
Join front and rear floors with gear channel
|
Details
|
|
|
10-29-2009
|
1.60
|
Cut fairleads 6B23-2, -3, and -4
|
Details
|
|
|
10-28-2009
|
1.10
|
Riveted lower forward longerons in place
|
Details
|
|
|
10-28-2009
|
0.80
|
Riveted floor channels in place
|
Details
|
|
|
10-27-2009
|
19.70
|
Disassaembled parts in front area, deburred, clean
|
Details
|
|
|
10-18-2009
|
3.60
|
installed control connection on center spar.
|
Details
|
|
|
10-17-2009
|
0.00
|
Milestone
|
Details
|
|
|
10-17-2009
|
0.70
|
Installed closeout/brace at lower port end of pilo
|
Details
|
|
|
10-17-2009
|
2.50
|
Install upper fuselage longeron doublers
|
Details
|
|
|
10-16-2009
|
2.40
|
Install flap actuator mount
|
Details
|
|
|
10-15-2009
|
1.30
|
Install seat bottoms
|
Details
|
|
|
10-15-2009
|
1.35
|
Install outboard seat belt attach
|
Details
|
|
|
10-15-2009
|
0.70
|
Install arm rest cover
|
Details
|
|
|
10-14-2009
|
0.90
|
Inboard seat belt reinforcement
|
Details
|
|
|
10-13-2009
|
2.10
|
Lower engine mount
|
Details
|
|
|
10-12-2009
|
0.90
|
Installed rolled gussets
|
Details
|
|
|
10-12-2009
|
2.30
|
Installed gussets 6B15
|
Details
|
|
|
10-11-2009
|
3.20
|
Added vertical and side stiffners to forward fusel
|
Details
|
|
|
10-10-2009
|
2.70
|
Clecoed upper edges of 6B10-1 to lower edge of sid
|
Details
|
|
|
10-07-2009
|
2.00
|
Prepare to attach 6B10-2 to side skins
|
Details
|
|
|
10-05-2009
|
2.00
|
Install front seat panels
|
Details
|
|
|
10-04-2009
|
3.00
|
Fabricate front seat panel stiffners
|
Details
|
|
|
10-02-2009
|
2.00
|
Installed 6B17-6
|
Details
|
|
|
10-02-2009
|
0.50
|
Install aileron control horn
|
Details
|
|
|
10-01-2009
|
1.50
|
Installed 6B17-1 and 6B17-3
|
Details
|
|
|
09-30-2009
|
0.50
|
Drilled holes in bulkhead for aft skin
|
Details
|
|
|
09-26-2009
|
0.70
|
Secure back baggage floor to fwd bulkhead
|
Details
|
|
|
09-26-2009
|
0.90
|
Opened baggage side support rivets to A4
|
Details
|
|
|
09-26-2009
|
0.80
|
Make aft upper longeron splices
|
Details
|
|
|
09-26-2009
|
1.10
|
Attach forward baggage floor to baggage floor sup
|
Details
|
|
|
09-26-2009
|
0.90
|
Add fwd baggage floor closeouts
|
Details
|
|
|
09-25-2009
|
2.00
|
Replaced upright channels and installed upper chan
|
Details
|
|
|
09-25-2009
|
2.00
|
Attached baggage floor to upper channel
|
Details
|
|
|
09-25-2009
|
1.50
|
Attached baggage floor to fore-aft stiffners
|
Details
|
|
|
09-24-2009
|
2.00
|
Connected baggage side supports to baggage floors
|
Details
|
|
|
09-21-2009
|
2.00
|
Worked on baggage floor support installation
|
Details
|
|
|
09-19-2009
|
1.50
|
Preparation of baggage floor for installation
|
Details
|
|
|
09-19-2009
|
1.10
|
Catching up on lost rivets, part 2
|
Details
|
|
|
09-19-2009
|
1.20
|
Added fairlead to Middle bulkhead
|
Details
|
|
|
09-17-2009
|
1.50
|
Installed aft fuselage bulkhead and marked locatio
|
Details
|
|
|
09-17-2009
|
1.50
|
Clecoed remaining bulkheads in place
|
Details
|
|
|
09-17-2009
|
1.50
|
Added stiffners to bulkhead 6B12-2.
|
Details
|
|
|
09-15-2009
|
1.30
|
Catching up on lost rivets, part 1
|
Details
|
|
|
09-15-2009
|
2.20
|
Added stiffner to seat back, and center seat back
|
Details
|
|
|
09-14-2009
|
1.50
|
Opened holes around Gear attach, port and stbd
|
Details
|
|
|
09-14-2009
|
1.20
|
Install vertical channels
|
Details
|
|
|
09-14-2009
|
1.00
|
Drill 5/16" bolt holes in wing uprights
|
Details
|
|
|
09-12-2009
|
0.50
|
Open upper port longeron and gear upright holes to
|
Details
|
|
|
09-12-2009
|
1.50
|
install stbd wing attachment uprights
|
Details
|
|
|
09-12-2009
|
0.50
|
Install port gussets
|
Details
|
|
|
09-12-2009
|
1.00
|
Install lower gusset
|
Details
|
|
|
09-12-2009
|
0.50
|
fabricate and install wing jig port side
|
Details
|
|
|
09-12-2009
|
1.50
|
Drill additional holes in main gear mount
|
Details
|
|
|
09-11-2009
|
0.80
|
installed gear uprights
|
Details
|
|