KitLog pro

Powered By Kitlog Pro v2.0

Dan "Mitch" Jimenez
Work Logs Found: 48
Category Work Time: 362 Hours
 Date
Hours
Work Log Summary

Details

 02-09-2008
6.50
Wing craddle with both wing sections
Details
       

 12-08-2007
12.00
Riveting the right wing
Details
       

 11-24-2007
11.00
Working together on the left wing
Details
       

 09-10-2007
2.00

       

 09-05-2007
3.00

       

 09-05-2007
2.00

       

 08-24-2007
8.00
Installing wing tip lights
Details
       

 07-30-2007
5.00
Right Flap clecoed
Details
     

 07-23-2007
6.00
Left flap construction
Details
       

 06-11-2007
5.00
Aunt Rita stripping the plastic off the rivet hole
Details
       

 05-21-2007
3.00
Wing Paint Priming
Details
       

 05-21-2007
8.20
Priming the wing parts
Details
       

 02-24-2007
4.00
Top side of right wing
Details
     

 02-24-2007
14.00
Match drilling the Right Wing
Details
       

 02-23-2007
6.00
Main spar and ribs
Details
       

 02-17-2007
6.00
Right flap clecoed
Details
     

 02-06-2007
6.00
Match Drilling Rt Aileron with my wife Mary Anne
Details
     

 02-01-2007
4.00
Left Aileron clecked and moving
Details
       

 11-24-2006
5.00
Right fuel tank
Details
       

 10-24-2006
4.00
Left Wing tank construction
Details
     

 10-09-2006
15.00
Tank stiffners installed with proseal
Details
       

 07-01-2006
5.00
Left wing clecoed with fuel tank
       

 04-30-2006
7.00
Left Wing Rear Spar
Details
       

 04-25-2006
3.00
Left Wing main Spar
Details
       

 04-24-2006
5.00
Left Wing Main Spar
Details
       

 04-14-2006
0.50
Wing Storage areas
Details
       

 04-14-2006
1.00
Inventory parts bags and garage set up
Details
       

 04-14-2006
1.00
Inventory check of wing items.
Details
       

 01-03-2006
8.50
Completed Empennage
Details
       

 12-14-2005
5.00
Horiz Stab
Details
       

 12-13-2005
12.00
Horiz Stab
Details
       

 11-02-2005
3.00
Rudder
Details
       

 10-24-2005
12.00
Horiz Stab
Details
       

 09-13-2005
5.00
Right Elevator
Details
       

 09-13-2005
19.00
Right Elevator
Details
       

 07-28-2005
40.00
Rudder
Details
       

 07-19-2005
26.50
Vertical Stab
Details
       

 07-18-2005
19.50
Left Elevator
Details
       

 07-04-2005
8.00
Rear Spar Assembly and match drilling
Details
     

 07-04-2005
42.00
Horizontal Stab
Details
       

 07-01-2005
3.00
RV-8 project arrives
Details
       

 06-01-2005
0.10
Work Area.
Details
       

 06-01-2005
0.10
Vehicles pulled out and almost ready to work.
Details
       

 06-01-2005
0.10
Open garage and wing gig area
Details
       

 06-01-2005
0.10
My home and project work place.
Details
       

 06-01-2005
0.10
Lowering the wing Jig,
Details
       

 06-01-2005
0.10
Jig Setup
Details
       

 06-01-2005
0.10
Air Conditioner and compressor
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.