KitLog pro

Powered By Kitlog Pro v2.0

MARK'S WEB SITE
Work Logs Found: 255
Category Work Time: 769 Hours
 Date
Hours
Work Log Summary

Details

 02-12-2023
6.10
Wiring Harness Pass Through
Details
       

 02-11-2023
3.00
Relocate the Garmin Navigator Tray
Details
       

 02-10-2023
5.50
Engine Baffle Assembly
Details
       

 02-09-2023
4.50
Continue with baffle construction
Details
       

 02-08-2023
5.00
Assemble IO-360 Baffle Kit
Details
       

 02-03-2023
6.00
Backup Battery Brackets
Details
       

 02-02-2023
6.00
Lightspeed Plasma Ignition Brackets
Details
       

 01-28-2023
4.00
Garmin GDL 50R Brackets
Details
       

 01-24-2023
3.00
Relocate VP-X PRO Circuit Breaker Box
Details
       

 01-24-2023
6.00
Comm 2 remote mounting brackets
Details
       

 01-16-2023
4.00
Remote Transponder Tray Mounting
Details
       

 01-14-2023
3.00
Canopy Frame Fitting
Details
       

 01-12-2023
1.00
Fit Canopy Brace
Details
       

 01-11-2023
1.50
Canopy Slider Block Drill/Trim
Details
       

 09-06-2016
3.80
Cut Hole in Center Sub-Panel
Details
       

 09-02-2016
4.80
Garmin GTN750 Tray Installation
Details
       

 08-27-2016
7.00
Oil Cooler Mounting Brackets
Details
       

 07-14-2016
4.40
Complete Rear Slider Track Assembly
Details
       

 11-04-2015
2.50
Dynafocal Engine Mount Installation
Details
       

 10-01-2015
4.50
Riveting Sub-Panel Structure to Fuselage
Details
       

 09-30-2015
7.00
Assemble Forward Fuselage Sub-Panel Structure
Details
       

 09-18-2015
2.50
Fabricate ELT Antenna Doubler Plate
Details
       

 09-17-2015
2.50
ELT Mount and run Static Line
Details
       

 09-16-2015
2.50
Install GAP 26 Pitot/AOA Probe.
Details
       

 09-15-2015
3.50
Continue Riveting Left Wing Skin
Details
       

 09-14-2015
4.00
Riveting Left Wing Bottom Skin
Details
       

 09-09-2015
1.50
Finished Right Started Left Wing
Details
       

 09-06-2015
3.00
Continue Riveting Wing Skin
Details
       

 09-05-2015
6.00
Riveting Right Wing Skin
Details
       

 09-04-2015
1.50
Start Riveting Bottom Wing Skin
Details
     

 09-03-2015
3.00
Prime Wing Skin, Ribs and Bevel Edges
Details
       

 09-02-2015
1.00
GAP 26 Pitot Probe Tube Flaring
Details
       

 09-02-2015
1.50
Clean and Prime Right Wing Lower Skin
Details
       

 06-22-2015
1.50
Garmin GSA 28 Roll Servo Right Wing
Details
       

 06-22-2015
1.50
Garmin GAP 26 Pitot AOA Mast Mount
Details
       

 02-02-2015
2.00
Static Line Installation to Instrument Panel
Details
       

 12-12-2014
1.80
Rudder Cable Link Fabrication and Installation
Details
       

 12-12-2014
2.10
Installing Rudder Pedal Assembly
Details
       

 12-12-2014
2.00
Brake LIne Installation to Brake Pedals
Details
       

 12-10-2014
2.50
Garmin Pitch Servo Installation
Details
       

 12-08-2014
3.00
Rudder Cable Egress Fairings
Details
       

 12-08-2014
1.00
GMU 22 Magnetometer Mounting Plate
Details
       

 12-07-2014
2.50
Static Line Installation
Details
       

 12-06-2014
1.00
Rivet Servo Bracket
Details
       

 12-06-2014
1.50
Ray Allen Trim Pitch Servo
Details
       

 12-06-2014
2.00
Fabricate Static Line Clamps
Details
       

 12-02-2014
1.20
Static Port Installation
Details
       

 12-02-2014
4.20
Pitch Servo Bracket Installation
Details
       

 12-01-2014
2.50
Magnetometer Cable Installation
Details
       

 11-01-2014
2.50
Rivet Antenna Reinforcing Plates
Details
       

 10-26-2014
1.50
Install Battery Box and Contactor Bus Bar
Details
       

 10-26-2014
2.00
Fabricate ADS-B Antenna Reinforcing Plate
Details
       

 10-25-2014
4.00
Install Battery and Starter Contactors
Details
       

 10-20-2014
2.50
Mount Battery Box to Firewall
Details
       

 10-20-2014
1.50
Firewall Platenuts
Details
       

 10-20-2014
1.00
Battery Contactor Mockup
Details
       

 10-19-2014
2.50
CI-105 Transponder Antenna Plate
Details
       

 10-19-2014
2.50
Battery Box Riveting
Details
       

 10-18-2014
1.00
Installation of TG-10 Heater Vent
Details
       

 10-18-2014
3.00
Battery Box Fabrication
Details
       

 10-13-2014
4.00
Fabricate Battery Box
Details
       

 10-13-2014
1.00
Dimpled Belly Skin for VHF Antenna
Details
       

 10-06-2014
1.00
Static Ports
Details
     

 10-06-2014
3.50
Comant CI-122 VHF Antenna Installation
Details
       

 10-05-2014
0.50
Rivet Rudder Pedal Brace
Details
       

 10-05-2014
2.00
Naca Vent Installation
Details
       

 10-04-2014
3.50
Rivet Firewall Recess
Details
       

 10-04-2014
1.00
Install Fuel Vent Line Fittings
Details
       

 10-04-2014
0.50
Drilled Firewall Nose Gear Access Hole
Details
     

 10-02-2014
0.50
Transducer Manifold Installation
Details
       

 10-02-2014
3.00
Fuel Pump to Firewall Fuel Line
Details
       

 10-02-2014
0.50
Dimple Firewall Rivet Holes
Details

 10-01-2014
2.50
Fabricate and Install Fuel Line Doubler
Details
       

 10-01-2014
2.00
Elevator Horn Inspection Covers
Details
       

 09-27-2014
1.50
Sub-Panel Bend Line and Priming
Details
       

 09-27-2014
2.00
Elevator Horn Inspection Cover Installation
Details
     

 09-25-2014
4.00
Drill, Dimple and Rivet Wing Access PLates
Details
       

 09-24-2014
3.00
Install Heater Bypass Valve
Details
       

 09-23-2014
2.00
GMU 22 Magnetometer Mounting Plate
Details
       

 09-22-2014
3.00
Rivet Instrument Panel Angles to Canopy Deck
Details
       

 09-22-2014
1.00
Drill for Nutplates
Details

 09-21-2014
2.00
Dimpled Top Forward Skin
Details

 09-14-2014
7.00
Fit Forward Fusalage Ribs and Top Skin
Details
       

 09-13-2014
5.00
Center Forward Fusalage Rib
Details
       

 09-12-2014
1.50
Elevator Pushrods Primed
Details

 09-07-2014
6.00
Assemble Elevator Push Rods
Details
       

 09-05-2014
3.00
Fabricate Instrument Sub-Panel Brackets
Details
       

 08-27-2014
4.00
Fabricate fusalage Brake Lines
Details
       

 08-20-2014
6.10
Install Fuel Lines From Selector to Wings
Details
       

 08-19-2014
1.50
Brake LIne Fittings
Details
       

 06-30-2014
6.00
Rivet Aft Bulkheads and Tie Down Bar.
Details
       

 06-29-2014
2.20
Garmin Gap 26 Heated Pitot/AOA Wiring
Details
       

 06-25-2014
2.80
Install Roll Servo Wiring Harness Into Wing
Details
       

 06-19-2014
2.50
Roll Servo Jackscrew Backshell Installation
Details
     

 06-15-2014
2.00
Wiring Harness for Roll Servo
Details
     

 02-13-2014
4.00
Conduit Run from Wing Root to Wing Tip
Details
       

 02-02-2014
2.50
Dimple Lower Wing Skins/ Aileron Stops
Details
       

 02-01-2014
4.00
Aileron Servo Wiring, Pitot Probe Mast
Details
       

 01-30-2014
3.00
Wing Skin Cutout for Pitot Mast.
Details
       

 01-27-2014
2.50
Dimple Lower Wing Skin Ribs
Details

 01-26-2014
3.00
Install Pitot/AOA Regulator and Lines
Details
       

 01-25-2014
3.50
Pitot/AOA Bracket Installation
Details
       

 01-12-2014
3.50
Fit Pitot Tube Bracket to Left Wing
Details
       

 01-11-2014
5.50
Fit Right Wing Lower Skin and Pushrods
Details
       

 01-07-2014
4.00
Aileron Push Rod Installation
Details
       

 01-05-2014
1.50
Install Fuel Tank Attach Hardware to Fusalage
Details
       

 01-05-2014
3.50
Aileron Bellcrank and Servo Installation
Details
       

 01-04-2014
5.50
Aileron Bellcranks
Details
       

 01-02-2014
5.00
Install Lower Wing Platenuts
Details
       

 01-01-2014
2.20
Wing Removal
Details

 12-26-2013
2.00
Drill Fuel Tank Attach Bracket Hole
Details
       

 12-11-2013
2.00
Arrival of Engine
Details
       

 12-07-2013
3.00
Lower Fuselage Skin to Wing Skin Screws
Details
       

 12-04-2013
4.50
Fuel Tank Attach Bracket
Details
       

 12-03-2013
2.40
Fitting Fuel Tank Attach Bracket
Details
       

 11-22-2013
1.00
Ream Aft Spar Attach Holes
Details
       

 11-17-2013
5.20
Drilling Aft Wing Spar Attachment
Details
       

 11-16-2013
3.00
Dry Fit of Flaps to the Wings
Details
       

 11-15-2013
4.50
Wing Rigging
Details
       

 11-14-2013
4.50
Wing Sweep and Incidence Angle Setting
Details
       

 11-10-2013
5.50
Wings Temporarily Fitted to Fusalage
Details
       

 11-07-2013
4.50
Install Left Flap to Wing
Details
       

 11-04-2013
5.00
Install Right Flap to Wing
Details
       

 11-04-2013
1.50
Fix Ailerons at Neutral Position
Details
       

 11-03-2013
5.00
Initial Fit of Ailerons to Wing
Details
       

 11-02-2013
7.50
Rivet Flap Brace and Aileron Fairing to Spar
Details
       

 11-01-2013
4.50
Preparation of Flap Brace and Aileron Gap Fairing
Details
       

 10-31-2013
4.00
Rivet Aileron Bracket Assemblies to Rear Spar
Details
       

 10-27-2013
5.50
Rivet Aileron Hinge Brackets
Details
       

 10-26-2013
3.50
Prime Aileron Brackets
Details
       

 10-26-2013
2.50
Debur W-721 Flap Braces
Details
       

 10-25-2013
2.80
Aileron Brackets Preparation
Details

 10-17-2013
1.75
Riveted Brake Hose Bracket to Firewall
Details
       

 10-17-2013
1.50
Right Wing Rear Spar Trimming
Details
       

 10-14-2013
2.50
Trim Rear Wing Spar and mark Wing Root Fairing
Details
       

 10-11-2013
1.50
Enlarge Fuel Line Through Fusalage to 1"
Details
       

 09-29-2013
3.50
Fabricate Left Fuel Vent Line
Details
       

 09-28-2013
4.50
Fabricate Fusalage Fuel Vent Lines
Details

 09-27-2013
3.50
Fabricate Fuel Line on Pump Assembly
Details
       

 09-25-2013
1.50
Mount high pressure fuel pump.
Details
       

 09-12-2012
2.20
Fabricate Left and Right Fuel Tank Support Angle
Details

 09-08-2012
4.00
Fit Brake Master Cylinder
Details
       

 09-06-2012
5.00
Assemble Brake Pedal Brackets
Details
       

 09-05-2012
2.50
Fit Control Column and Control Stick Bases
Details
       

 09-02-2012
3.00
Backrest Brace and Flap Actuator Covers
Details

 09-01-2012
4.00
Assemble W-818 Aileron Pushrods
Details
     

 08-31-2012
6.00
Assemble W-716 and W-818 Pushrods
Details
       

 08-25-2012
1.20
Drill and Rivet the Seat Adjustment Supports
Details
       

 08-25-2012
1.20
Continue work on flap channel
Details
       

 08-22-2012
1.80
Finish Flap Actuator Channel
Details
       

 08-20-2012
3.60
Crotch Strap Bracket Installation
Details
       

 08-19-2012
4.00
Crotch Strap Attach Bracket Installation
Details
       

 08-18-2012
1.50
Make Flap Motor Attach Angle
Details
     

 08-16-2012
0.40
Make Flap Actuator Plate
Details
     

 08-15-2012
1.20
Fit and Drill the Flap Actuator Bearing Blocks
Details
     

 08-15-2012
2.50
Electric Flap Motor Installation
Details
       

 06-26-2012
2.00
Rivet Both Seat Back Assemblies
Details
       

 06-25-2012
2.00
Right Seat Back Primed and Painted
Details

 06-16-2012
3.00
Prime and Paint Seat Left Seat Back
Details

 06-16-2012
4.80
Fuel Valve Cover and Fuel Pump Mount
Details
       

 06-14-2012
3.20
Modify Center Floor for Fuel Pump Assembly
Details
       

 06-13-2012
5.10
Optional High Pressure Fuel Pump Fit
Details
       

 05-29-2012
2.10
Insert Center Cabin Floor and Heat Baffle to Fusal
Details
       

 05-28-2012
3.40
Fit Heat Baffle to Center Cabin Floor
Details
       

 05-27-2012
7.00
Fabricate Seat Back Braces
Details
       

 05-26-2012
1.00
Temporarily Installed Forward Seat Floors
Details

 05-26-2012
7.00
Build Both Seat Backs
Details
       

 05-25-2012
2.30
Install Platenuts for Stick Cutout Rings
Details

 05-24-2012
4.00
Made F-741A-L&R Tunnel Support Cover
Details
       

 05-22-2012
0.50
Fit F-748 Baggage Tunnel Cover
Details

 05-20-2012
3.80
Install Aft Seat Floor Assemblies
Details
       

 05-16-2012
3.60
Finish F-747-L&R Baggage Floors
Details
       

 05-15-2012
2.20
Rivet Aft Baggage Side Covers
Details
       

 05-06-2012
2.60
Prepare Forward Baggage Side Covers
Details

 12-14-2011
2.60
Riveting of External Step to Fusalage
Details
       

 11-25-2011
3.20
Trim and Fit F-6111 Ribs
Details
       

 11-12-2011
2.10
Fit, Prime and Paint Baggage Side Covers
Details
     

 11-11-2011
1.10
Elevator Trim Motor Assembly
Details
       

 11-06-2011
4.00
Landing Gear Weldment Installation
Details
       

 10-31-2011
3.50
Priming Fusalage Floor
Details
       

 10-23-2011
3.20
Fitting F-7112 Forward Top Skin
Details
       

 10-16-2011
6.10
Installing Landing Gear Mounts
Details
       

 10-15-2011
2.40
External Step UHMW Block Installation
Details
       

 10-10-2011
6.30
Installing WD-657 External Step
Details
       

 10-10-2011
3.50
Fabricate F-635 Bellcrank
Details
       

 09-21-2011
3.20
Mid Fusalage Side Rails and Canopy Deck Riveting
Details
       

 09-18-2011
1.20
Verfying Quick Build Steps
Details

 09-17-2011
2.80
Rudder Pedal Brace Fabrication
Details
       

 09-16-2011
3.40
Drill Rudder Pedal Tubes to Longerons
Details
       

 09-12-2011
3.20
Brake Pedal Fabrication
Details
       

 09-11-2011
4.10
Verifying QuickBuild Steps
Details

 09-10-2011
1.50
Verifying Quick Build steps
Details

 09-09-2011
2.10
Seat Adjustment Supports
Details
       

 09-08-2011
4.00
Start of Quick Build Fusalage
Details
       

 09-08-2011
3.10
Finishing Leading Edge Right Elevator
Details
     

 09-07-2011
4.50
Blind Rivet Leading Edge
Details
       

 09-06-2011
3.00
Roll Left Elevator Leading Edge
Details
       

 09-03-2011
2.40
Elevator Trim Tab Assembly and Hinge Installation
Details
       

 09-02-2011
2.20
Rivet Left Elevator Skin to Structure
Details
       

 09-01-2011
1.50
Riveting Left Elevator Structure
Details
       

 08-31-2011
3.20
Debur, Dimple and Prime Left Elevator
Details

 08-28-2011
1.70
Left Elevator Preparation for Trim Tab
Details

 08-13-2011
2.40
Left Elevator Trim Tab Preparation
Details
       

 10-04-2009
2.30
Left Elevator Tabs Bent
Details
       

 10-03-2009
1.00
Machine Countersink Counterweight
Details
       

 10-02-2009
1.50
Disassemble Left Elevator for Deburring
Details
       

 09-30-2009
3.10
Rivet Right Elevator Assembly
Details
       

 09-29-2009
2.50
Left Elevator Understructure Work
Details
       

 09-28-2009
4.60
Machine Countersink, Dimple, Prime Right Elevator
Details
       

 09-26-2009
3.20
Back Rivet Left Skin, Fold Skins, Match Drill Unde
Details
       

 09-25-2009
1.70
Folded Trailing Edge Jig
Details
       

 09-23-2009
1.80
Back Rivet Stiffeners to Right Elevator Skin
Details
       

 09-22-2009
2.00
Primed Elevator Skins and Stiffeners
Details
       

 09-21-2009
2.70
Clean, Alodine and Prime Stiffeners
Details
       

 09-20-2009
1.50
Attaching and drilling elevator counter weight
Details
       

 09-19-2009
3.60
Match drill and dimple elevator stiffeners
Details
       

 09-17-2009
1.20
Blind riveted rudder leading edge
Details
       

 09-09-2009
1.80
Forming Rudder Leading Edge
Details
       

 08-26-2009
1.20
Rivet Rudder Trailing Edge
Details
       

 08-25-2009
1.80
Deburred Elevator Stiffeners
Details
       

 08-24-2009
2.75
Rivet Rudder Skin to Skeleton
Details
       

 08-24-2009
3.40
Elevator stiffeners trimmed
Details
       

 08-22-2009
2.00
Attach rudder skins
Details
       

 08-21-2009
1.75
Riveting the Rudder
Details
       

 08-17-2009
2.75
Started right elevator
Details
       

 08-14-2009
3.50
Rudder brace and skeleton dimpled
Details
       

 08-13-2009
2.00
Back riveted stiffeners to rudder skin
Details
       

 08-09-2009
3.50
Rudder skins match drilled to skeleton
Details
       

 01-20-2009
3.30
Riveting Vertical Stabilizer Skin to Skeleton
Details
       

 01-19-2009
2.50
Riveting Vertical Stabilizer Spar and Ribs
Details
       

 01-14-2009
4.00
Primed Vertical Stabilizer parts and Rudder Work
Details
     

 01-13-2009
1.50
Building Rudder Skeleton
Details
       

 01-11-2009
4.30
Debur Rudder Stiffeners and Match Drill
Details
       

 01-10-2009
3.40
Trim Rudder Stiffeners
Details
       

 01-04-2009
2.10
Dimpled and Countersunk VS skin, spars and ribs
Details
       

 12-16-2008
4.30
VS ribs prepared and clecoed to VS spars.
Details
       

 12-13-2008
2.20
Vertical Stabilizer rear spar
Details
       

 12-13-2008
5.50
Riveted rear spar to Horizontal Stabilizer
Details
       

 12-07-2008
4.00
Riveted right horizontal stabilizer skin
Details
       

 12-06-2008
6.00
Riveting HS skin to forward spar and ribs
Details
       

 11-29-2008
2.00
Sprayed Zinc Chromate to HS skins inside
Details
       

 11-24-2008
2.20
Making my back riveting plate
Details
     

 11-23-2008
2.00
Dimpled Horizontal Skins
Details
       

 11-18-2008
6.10
Started riveting horizontal stabilizer
Details
       

 11-15-2008
5.00
Alodine and prime HS parts
Details
       

 11-14-2008
2.20
Debur and smooth edges on all HS parts
Details
       

 11-08-2008
6.20
Preparing ribs and drilling horizontal stabilizer
Details
       

 11-07-2008
1.20
Front spar bends and machine countersink
Details
     

 11-06-2008
2.00
HS-702 front spar modifications and bends
Details
       

 11-05-2008
3.60
Front spar work
Details
       

 11-03-2008
2.50
Riveted elevator bearing assembly
Details
       

 11-02-2008
2.20
Clecoed and drilled HS-609PP to HS-603PP
Details
       

 11-01-2008
3.10
HS-609PP reinforcement bars
Details
       

 10-25-2008
2.00
Inventory of empennage kit
Details
       

 10-20-2008
1.00
Picked up emennage kit at Van's Aircraft
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.