KitLog pro

Powered By Kitlog Pro v2.0

JIM'S WEB SITE
Work Logs Found: 248
Category Work Time: 786 Hours
 Date
Hours
Work Log Summary

Details

 03-13-2010
1.00
In flight photos.
Details
       

 03-06-2010
3.00
First Flight
Details
       

 03-04-2010
1.00
Airworthy Inspection by DAR
Details

 02-21-2010
1.00
Calibrated fuel system
Details

 02-10-2010
1.50
Completed Acceptance test.
Details
     

 02-06-2010
1.00
Weight & Balance
Details
       

 02-04-2010
1.50
Wing Walk material installed
Details

 02-03-2010
1.00
Put Wings back on.
Details
       

 01-21-2010
2.00
Installed Eng Cowling
Details
       

 01-20-2010
1.00
Finish strip around wing
Details

 01-19-2010
3.00
First Engine Run-up
Details
       

 01-16-2010
3.00
Installed Heat Reflector material on Cowling
Details
     

 01-15-2010
2.50
Interior install
Details
       

 01-14-2010
4.50
Purged Oil sytem
Details

 01-13-2010
1.50
Added Engine Coolant
Details

 01-12-2010
1.50
Picked up Wings from painter
Details
       

 01-11-2010
1.00
Checked on Wings at Painter
Details
       

 01-05-2010
2.00
Misc
Details

 01-04-2010
1.50
Painting the Wings
Details
     

 01-01-2010
1.00
Reinstalled Canopy
Details
       

 12-31-2009
1.50
Upper panel skin installed
Details

 12-30-2009
3.50
Bleed brakes
Details

 12-29-2009
1.00
Re installed the rudder after paint.
Details
       

 12-29-2009
2.50
Picked up Fuselage from painter
Details
       

 12-23-2009
1.00
Checked on Painter
Details
       

 12-17-2009
1.00
Paint status
Details
       

 12-16-2009
1.00
Checked on Painter
Details

 12-15-2009
2.00
Checked on Painter
Details
       

 12-11-2009
0.50
Checked on Painter
Details
       

 12-10-2009
1.00
Checked on Painter
Details
       

 12-08-2009
1.00
Paint
Details
       

 12-08-2009
0.50
Interior
Details

 12-03-2009
1.00
Checked on painter
Details
       

 11-23-2009
2.00
Paint
Details
       

 11-16-2009
2.50
Took to paint shop
Details
       

 11-12-2009
4.00
Rear Window
Details
       

 11-11-2009
3.00
Fuel Tank
Details
       

 11-10-2009
1.80
Fuel Tank install
Details

 11-09-2009
2.00
Fuel tank
Details

 11-08-2009
1.50
Fuel Tank leak test
Details
     

 11-06-2009
1.50
Paint scheme
Details

 11-05-2009
1.50
Misc
Details

 11-04-2009
1.00
misc panels
Details

 11-03-2009
1.00
Rudder cable tunnel cover
Details

 11-02-2009
3.30
Seat Belts
Details
       

 11-01-2009
3.00
Fuel Tank
Details
     

 10-31-2009
0.70
Fuel tank
Details

 10-30-2009
2.30
Fuel Tank
Details

 10-29-2009
4.50
Fuel Tank
Details

 10-27-2009
2.50
Throttle & Chock cables
Details

 10-22-2009
2.50
Trottle controls
Details
       

 10-20-2009
4.00
Fitted Wings and control tubes
Details
       

 10-19-2009
3.00
Cowling ductwork
Details
       

 10-18-2009
4.00
Oil cooling duct work
Details
       

 10-17-2009
1.50
Oil cooler
Details

 10-16-2009
4.50
Coolant system
Details
       

 10-15-2009
1.00
Coolant section
Details

 10-14-2009
2.50
Heater door control cable
Details

 10-13-2009
4.00
Coolant system
Details
       

 10-12-2009
6.00
Engine Exhaust system
Details
       

 10-11-2009
2.00
Finished up Prop and Spinner, started Exhaust
Details
       

 10-10-2009
2.70
Prop Spinner
Details

 10-09-2009
5.00
Installed Prop & Spinner
Details
       

 10-08-2009
6.00
Engine, connecting lines
Details

 10-07-2009
2.50
Engine install
Details
       

 10-06-2009
1.50
Engine
Details

 10-03-2009
2.00
Engine
Details
       

 10-02-2009
5.00
Engine
Details
       

 09-30-2009
3.50
Engine wires
Details

 09-29-2009
5.50
Engine firewall forward wiring.
Details
     

 09-28-2009
1.50
Review plans on engine kit
Details

 09-28-2009
3.50
Engine Kit arrived today (Inventory)
Details
       

 09-25-2009
0.50
Prop arrived today.
Details

 09-24-2009
2.00
Flaperons
Details

 09-22-2009
2.00
Fuel Tank
Details

 09-21-2009
3.50
Fuel Tank
Details
       

 09-15-2009
1.50
Canopy Latch revision
Details
     

 09-14-2009
4.50
ELT
Details

 09-10-2009
2.00
Avionics
Details

 09-09-2009
2.50
Installed ELT
Details
       

 09-08-2009
2.00
GPS mounting
Details
       

 09-07-2009
4.00
Avionics
Details
       

 09-06-2009
6.50
Avionics
Details
       

 08-31-2009
4.00
Tail Cone fiberglass fairing.
Details
       

 08-30-2009
2.50
Tail cone, fiberglass fairing
Details
     

 08-28-2009
5.00
Tail Cone fiberglass fairing
Details
       

 08-26-2009
2.50
Tail fiberglass parts
Details
       

 08-26-2009
1.00
Avionics kit arrived
Details

 08-24-2009
2.50
Cowling
Details
     

 08-21-2009
6.00
Canopy
Details
       

 08-20-2009
2.00
Installing Cowling
Details
       

 08-20-2009
3.50
Cowling
Details
     

 08-12-2009
5.50
Cowling
Details
       

 08-11-2009
1.50
Cowling
Details

 08-10-2009
1.50
Brake lines
Details
       

 08-09-2009
3.00
Nose wheel
Details
     

 08-07-2009
3.00
Mounted main wheels and nose gear.
Details
       

 08-05-2009
3.50
Main Landing Gear
Details
       

 08-04-2009
2.00
Tire Mounting
Details
     

 08-03-2009
2.00
Tire Mounting
Details
     

 07-22-2009
2.00
Attaching the canopy
Details
       

 07-10-2009
2.00
Triming Canopy
Details
       

 07-09-2009
1.00
Canopy
Details

 07-08-2009
1.00
Canopy sanding
Details

 07-07-2009
2.00
Sanding Canopy
Details

 07-06-2009
2.00
Canopy
Details
     

 07-05-2009
4.00
Canopy sanding
Details
     

 07-04-2009
3.00
Canopy
Details
       

 07-03-2009
6.00
Canopy
Details
     

 07-02-2009
4.00
Canopy
Details
       

 06-30-2009
4.00
Canopy
Details
       

 06-29-2009
3.00
Canopy
Details
     

 06-28-2009
4.50
Canopy
Details
       

 06-26-2009
2.50
Canopy
Details
       

 06-25-2009
3.00
Canopy
Details

 06-24-2009
5.10
Canopy
Details
       

 06-23-2009
4.00
Canopy
Details
       

 06-22-2009
4.00
Canopy
Details
     

 06-17-2009
2.00
Canopy
Details
       

 06-16-2009
2.00
Canopy
Details
     

 06-15-2009
3.50
Canopy
Details
       

 06-12-2009
3.00
Canopy
Details

 06-11-2009
3.50
Flight Controls
Details

 06-09-2009
3.50
Flight controls
Details
       

 06-08-2009
3.50
Flight controls
Details
       

 06-07-2009
3.50
Flight controls
Details
       

 06-06-2009
4.00
Flight controls
Details
       

 06-04-2009
6.00
Electrical
Details
       

 06-01-2009
3.00
Riveted turtle deck skins
Details
       

 05-31-2009
2.00
Turtle deck skins
Details

 05-30-2009
3.00
Riveted tail section on to fuselage
Details
     

 05-29-2009
2.50
Connected Tail section
Details
       

 05-27-2009
0.50
Seats arrived today
Details
     

 05-26-2009
5.00
Fuel Tank
Details
       

 05-25-2009
5.00
Flight controls
Details
       

 05-20-2009
4.00
Fuel Tank
Details
     

 05-19-2009
6.00
Fuel Tank
Details
       

 05-18-2009
5.50
Electrical
Details
       

 05-15-2009
1.00
Electrical
Details

 05-14-2009
7.00
Electrical
Details

 05-13-2009
5.00
Electrical
Details
       

 05-12-2009
2.00
Painted the Instrument Panel
Details

 05-12-2009
4.00
Electrical
Details
       

 05-11-2009
3.00
Electrical
Details

 05-09-2009
2.00
Fuselage wiring
Details
       

 05-08-2009
3.00
Fitted Wings to Fuselage
Details
       

 05-07-2009
2.00
Fuselage Pins
Details
       

 05-06-2009
2.00
Map Box/Panel
Details
       

 05-05-2009
6.00
Top panel skin
Details
       

 05-04-2009
4.00
Lower Panel shelf
Details
       

 05-03-2009
4.00
Upper fire wall
Details
       

 05-01-2009
2.50
Worked on upper fire wall
Details
       

 04-30-2009
4.00
Inventory finish kit
Details
       

 04-29-2009
2.50
organizing parts from inventory

 04-28-2009
2.50
Reviewed plans for Finish Kit
Details

 04-28-2009
2.20
Inventory Finish Kit
Details

 04-07-2009
3.00
Brake lines
Details
       

 04-03-2009
5.00
Rudder & brake pedals
Details
       

 04-02-2009
6.00
Roll Bar Assembly
Details
       

 04-01-2009
1.00
Roll Bar
Details
       

 03-31-2009
4.00
Roll Bar
Details
       

 03-30-2009
3.50
Roll Bar
Details
       

 03-28-2009
2.50
Roll Bar
Details
       

 03-27-2009
4.50
Roll Bar
Details

 03-26-2009
4.50
Finished Sec 23
Details
       

 03-25-2009
5.50
Mid Fuselage Skins
Details
       

 03-24-2009
4.00
Fuselage side skins
Details

 03-23-2009
6.00
Mid Fuselage
Details
       

 03-21-2009
2.50
Fuselage sides
Details
       

 03-20-2009
4.50
Fuel system
Details
       

 03-19-2009
6.00
Longerons
Details
       

 03-17-2009
5.50
Fuel Lines
Details
       

 03-16-2009
5.00
Fuel Lines
Details

 03-15-2009
5.70
Finished attaching Forward Lower Fuselage skins.
Details
       

 03-14-2009
4.40
Front lower fuselage
Details
       

 03-13-2009
4.00
Worked on front lower fuselage parts.
Details
       

 03-12-2009
3.00
Finished up Sec 21
Details

 03-10-2009
4.50
Step Floors
Details
       

 03-09-2009
4.50
Step attachment
Details
       

 03-08-2009
6.50
Riveted Bottom Skin.
Details
       

 03-07-2009
2.30
corner skins
Details

 03-06-2009
4.00
Step Ramp floors
Details
       

 03-05-2009
4.50
Bulkhead Assembly
Details
       

 03-03-2009
6.00
Worked on Seat Floor Assemblies.
Details
       

 03-02-2009
5.70
Working on seat rib assemblies.
Details
       

 03-01-2009
3.00
Flaperon Mixer Arm Assem.
Details
       

 02-28-2009
4.00
Worked on the mid fuselage and baggage floor.
Details
       

 02-27-2009
6.30
Worked on Mid fuselage
Details
       

 02-26-2009
6.70
Finished the Center section Bulkhead.
Details
       

 02-25-2009
3.00
Started Fuselage kit.
Details
       

 02-25-2009
2.00
Finished the Empennage kit
Details
       

 02-24-2009
5.00
TRIM/SERVO ASSEMBLY
Details
     

 02-23-2009
4.50
Installed Vertical Stab and Stabilator.
Details
       

 02-22-2009
5.50
Finished Tail cone skins
Details
       

 02-21-2009
4.75
Worked on Tail cone skins
Details
       

 02-20-2009
6.00
Worked on tail cone skins.
Details
       

 02-19-2009
5.80
Worked on empennage skins.
Details
       

 02-18-2009
5.75
Finished Stabilator
Details
       

 02-16-2009
7.40
Worked on Horizontal Stabilator.
Details
       

 02-15-2009
5.70
Started Horizontal Stabilator.
Details
       

 02-12-2009
3.40
Finished Anti Servo Trim
Details
       

 02-11-2009
3.50
Finished Rudder
Details
       

 02-10-2009
2.00
Finished Vertical Stab.
Details
       

 02-10-2009
2.00
Finished Riveting Vert. Stab. skin
Details
       

 02-08-2009
4.75
Worked on Vertical Stab.
Details
       

 02-07-2009
4.50
Started Vertical Stabilizer
Details
       

 02-01-2009
2.75
Inventory of Tail Kit
Details

 01-30-2009
3.50
Inventory of Fuselage crate.
Details
     

 01-29-2009
1.00
Tail & Fuselage kits arrived
Details

 12-19-2008
3.50
Finished skin on Right Flaperon.
Details
       

 12-16-2008
1.50
Deburred skins for Right Flaperon.
Details

 12-15-2008
4.00
Finished skin on Left Flaperon.
Details
       

 12-14-2008
4.50
Worked on Left Flaperons
Details
       

 12-13-2008
3.50
Made Actuation and pivot brackets.
Details
       

 12-12-2008
2.00
Started work on Flaperons
Details
 

 12-09-2008
2.50
Finished Rt wing tip.
Details
       

 12-08-2008
2.40
worked on right wing tip.
Details
     

 12-06-2008
3.40
Finished Riveting top skins on Right Wing.
Details
       

 12-05-2008
3.50
Riveting top skins on Right Wing.
Details
       

 12-04-2008
3.80
Finished bottom skins on right wing.
Details
       

 12-03-2008
3.00
Started Right Wing skin
Details
       

 12-02-2008
3.00
Finished Riveting wing tip
Details
       

 12-01-2008
4.00
Worked on Left Wing tip
Details
       

 11-30-2008
5.00
Finished Riveting skins on left wing.
Details
       

 11-28-2008
4.00
Riveting top Inboard skin
       

 11-27-2008
2.00
Finished Riveting bottom skin left wing.
Details
       

 11-26-2008
4.00
Riveted Outboard left skin
Details
       

 11-25-2008
3.50
Riveted Left inboard skin
Details
       

 11-24-2008
2.00
Counter sunk sub spar
Details
     

 11-20-2008
0.50
wired stall warning
Details

 11-19-2008
2.00
Worked on Wing Stand
Details
     

 11-19-2008
3.50
Stall Warning assembly.
Details
       

 11-18-2008
3.50
Wing Stand
Details
       

 11-17-2008
6.00
Finished Left wing ribs, start on Right wing.
Details
       

 11-16-2008
2.00
Installed ribs to spar
Details
       

 11-16-2008
4.00
Attached Ribs to Left Spar
Details
       

 11-15-2008
5.00
Worked on Nose Ribs
Details
       

 11-14-2008
2.00
worked on Nose Ribs
Details
       

 11-14-2008
4.00
Finished Rear Spar, Stub Spar, Hinge Brackets
Details
       

 11-13-2008
7.00
Rear Spar, Stub Spar, Hinge Brackets.
Details
       

 11-12-2008
5.00
Spar Assembly
Details
       

 11-11-2008
1.50
Wing Kit Inventory
Details
     

 11-10-2008
3.00
Plan Review of Wing Kit Plans
Details
       

 11-10-2008
0.50
2nd Wing crate arrived
Details
     

 11-06-2008
0.50
Wing Spar delievery
Details

 10-13-2008
0.20
Shop area
Details
       

 10-13-2008
5.00
built workbench
Details
       

 09-04-2008
1.00
Faxed order in for Wing Kit
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.