Greggs RV-4
Work Logs Found: 206
Category Work Time: 582 Hours
 Date
Hours
Work Log Summary

Details

 01-20-2017
2.00
Cockpit Rails, Roll Bar, and firewall
Details
       

 01-14-2017
3.50
Cockpit rails, Instrument panel, and fwd top skin
Details
       

 01-11-2017
1.50
Prepped and primed floorboard parts
Details
       

 01-10-2017
2.00
Deburred and dimpled floorboards and stiffeners
Details
       

 01-08-2017
3.00
Fabricated forward floorboards/steps
Details
       

 01-07-2017
5.00
Big Day! First day that we all got a chance to sit
Details
       

 01-04-2017
1.50
Worked on floorboards
Details
       

 01-03-2017
3.00
Worked on floorboards, and put fuselage back in cr
Details
       

 01-02-2017
2.00
Finished firewall work, worked on spar bulkhead an
Details
       

 01-01-2017
5.00
Worked on front seat, and F443 brackets
Details
       

 12-31-2016
1.00
Firewall work today.
Details
     

 12-26-2016
3.00
F451 Tunnels, and F461 ends
Details
       

 12-23-2016
2.00
Flipped the fuse upside down, did some riveting on
Details
       

 12-20-2016
1.00
Worked on Front Seat
Details
       

 12-11-2016
3.00
Fabricated Brake Pedals
Details
       

 02-11-2016
2.00
Reskinning Horizontal stab
Details
       

 02-07-2016
2.00
Riveted bellcrank, cut out instrument panel
Details
       

 02-06-2016
3.00
Drilled LH skin off of horizontal stab.
Details
       

 01-09-2016
4.00
F417, bellcrank, F419 aft deck plate, floorboards.
Details
       

 12-29-2015
4.00
419 deck plate work, canopy rails
Details
       

 12-28-2015
3.00
F419 deck plate initial fit, looked at canopy rail
Details
       

 12-27-2015
1.50
Test fit the stab, first look at F419 aft deck pla
Details
       

 12-23-2015
2.00
Built rolling cradle for the fuse, took it outside
Details
       

 12-20-2015
3.00
Big day! Fuselage is out of the jig!
Details
       

 12-13-2015
3.00
Riveting, nutplates, and hinges
Details
       

 12-12-2015
2.00
Side skin riveting
Details
       

 11-27-2015
2.00
Riveted F402 together, bottom skin work
Details
       

 11-21-2015
8.00
All forward skins are primed and ready to reinstal
Details
       

 11-19-2015
2.00
Finally riveting the ribs to the firewall and spar
Details
       

 11-17-2015
1.00
Working on the frward skins, and tunnel fairings
Details
       

 11-15-2015
4.50
Riveted aft fuse together!
Details
       

 10-31-2015
4.50
Misc. riveting, skin work
Details
     

 10-26-2015
1.50
Backriveted center longeron on aft side skins
Details
       

 10-21-2015
6.00
Drilling and shaping the four forward skins
Details
       

 10-19-2015
1.00
Initial fit/drilling of RH forward side skins.
Details
     

 10-17-2015
4.00
Finished drilling the F422 belly skin, and more
Details
       

 10-14-2015
2.00
Working my way back on the belly skin and splice.
Details
       

 10-07-2015
4.00
Reassembling primed fuse parts.
Details
       

 09-27-2015
3.00
MEK bath and prime for all the aft fuse parts
Details
     

 09-23-2015
3.00
Preparing aft fuse parts for prime.
Details
       

 09-22-2015
3.00
Angie surprised me with some solo work today!
Details
     

 09-21-2015
9.00
BIG DAY! Getting aft fuselage ready for rivets
Details
       

 09-20-2015
1.50
F409 Bulkhead new flexi-flange
Details
       

 09-13-2015
2.50
Worked on the F422 FWD belly skin
Details
     

 09-12-2015
6.00
Parts fabrication, and forward belly skin
Details
       

 09-10-2015
2.00
Fabricated seat belt tie-ins to the rear spar, and
Details
       

 09-09-2015
2.50
Repaired F411, Fabricated F405 parts
Details
       

 08-31-2015
1.50
Drilled floor ribs to rear spar bulkhead, and dril
Details
       

 08-22-2015
4.00
F405/406 fabrication
Details
       

 08-21-2015
2.00
Drilling Longerons to weldmounts, and floor ribs t
Details
       

 08-18-2015
1.50
Riveted rear spar carry-through
Details
       

 03-12-2015
1.50
Continued drilling aft fuselage skins
Details
       

 03-10-2015
4.00
Angie and I worked on the aft side skins today.
Details
       

 03-07-2015
3.00
Drilled 426 and 427 skins to the skeleton.
Details
       

 03-07-2015
3.00
Drilled 426 and 427 skins to the skeleton.
Details

 03-03-2015
2.50
Re-leveled firewall, and fabricated LWR/FWD longer
Details

 03-01-2015
2.50
Drilled bulkheads to longerons, started skins
Details
       

 02-27-2015
2.50
Worked on F411 and 412 area with tailwheel spring
Details
       

 02-25-2015
1.50
Centered and clamped longerons to jig.
Details
       

 02-21-2015
2.00
Worked on the seat ribs and F406 bulkhead
Details
       

 02-16-2015
1.50

     

 02-08-2015
5.00

       

 02-07-2015
5.00

       

 01-12-2015
1.50
Drilled upper firewall weldments to firewall and j
Details
       

 01-11-2015
3.00
Riveted firewall halves together and located weldm
Details
       

 01-10-2015
2.50
Quite a bit of work on bulkhead frames today
Details
       

 12-28-2014
3.00
Worked on left wingtip and moved wings to other sh
Details
     

 12-27-2014
4.00
Right wing access panel and wingtip work.
Details
       

 12-26-2014
6.00
RH wingtip, and access panel cover.
Details
       

 12-22-2014
6.00
Began assembling the fuselage jig
Details
     

 12-21-2014
7.00
Finished riveting lower outboard LH wing skin, fla
Details
       

 12-13-2014
2.50
First Fuselage Entry!! - Started on the Firewall
Details
       

 12-11-2014
1.50
Riveting final lower outboard skin
Details

 12-07-2014
1.00
After leak checking the left fuel tank...
Details
       

 11-23-2014
5.00
Riveted on lower inboard skin on LH wing.
Details
       

 11-09-2014
1.00
Three more pics of tank from yesterday, and wing a
Details
       

 11-08-2014
6.50
Nearly finished with LH tank!
Details
       

 10-28-2014
3.50
Finished the LH fuel tank!
Details
       

 10-26-2014
5.50
LH Tank work - lots of it.
Details
       

 10-22-2014
3.00
RH Wingtip work
Details
       

 10-12-2014
3.00
Riveted on outboard skin, and temp installed tank,
Details
       

 10-10-2014
2.00
Scuffed, primed, and began riveting outboard lower
Details
       

 10-05-2014
3.50
Riveted lower inboard skin on RH wing
Details
       

 10-02-2014
1.50
Finished fabricating the access cover ring.
Details
       

 10-01-2014
1.50
Right wing prep for lower skins
Details
     

 09-24-2014
10.00
Part 3 - A LOT of RH wing/flap work today!
Details
       

 09-24-2014
0.00
Part 1 - A LOT of RH wing/flap work today!
Details
       

 11-10-2013
2.50
Work on RH tank, and LH tank ribs
Details
       

 11-09-2013
2.50
RH Fuel Tank Parts
Details
       

 11-05-2013
1.50
RH wing and fuel tank
Details
       

 11-04-2013
1.50
Working on RH tank baffle and stiffeners
Details
       

 11-03-2013
2.50
Worked on RH fuel tank
Details
       

 10-29-2013
1.00
Finished riveting leading edge, and torqued bolts
Details
       

 10-27-2013
4.00
Completed leading edge assy/ put it on the wing
Details
       

 10-25-2013
1.00
Drilled other tank baffle, and worked on leading e
Details
       

 10-20-2013
3.50
Tank ribs, leading edge
Details
       

 10-15-2013
1.00
Ruined lower skin, went back to tank parts
Details
       

 10-14-2013
1.00
Finished drilling bottom skins to the skeleton
Details
       

 10-12-2013
2.00
Fluted all tank ribs, and prepped inboard rib for
Details
       

 10-05-2013
4.00
Drilled tank stiffeners, and bottom skins
Details
       

 10-03-2013
2.50
Fabricated tank skin stiffeners and Top W-425 guss
Details
       

 10-02-2013
1.50
New Parts arrived!!
Details
       

 09-29-2013
0.50
Worked on lower outboard skin.
Details
     

 09-21-2013
6.00
Lots of progress on the leading edge today!
Details
       

 09-14-2013
4.50
Drilled leading edge to skeleton, made W-423
Details
       

 09-10-2013
1.50
Drilled (pre-punched) the leading edge skin top ha
Details
       

 09-07-2013
2.50
Worked on leading edge skin, and main top skin
Details
       

 09-02-2013
4.00
Drilled RH top skin to skeleton
Details
       

 02-09-2013
3.00
Marked the top skin for drilling, drilled holes fo
Details
       

 02-03-2013
1.50
Deburred, primed, and prepped conduit holes
Details
       

 02-02-2013
4.00
Drilled holes for conduit, located top main skin
Details
       

 01-27-2013
1.00
Preparing W-423 splice plate and leading edge skin
Details
       

 01-06-2013
3.50
Riveted rear spar, leveled and squared right win i
Details
       

 01-05-2013
2.00
Rear spar prep, moved left wing to temp. rack
Details
       

 01-04-2013
1.50
Riveted nose rib angles on, located jigging holes.
Details
       

 01-02-2013
2.00
Installed tie down, fabricated new angle
Details
       

 01-01-2013
2.50
Assembling the RH wing skeleton with perm. hardwar
Details
       

 03-18-2012
1.50
Drilled top skin to left wing
Details
       

 03-04-2012
3.00
Started on access panel, and top skin
Details
       

 03-03-2012
2.00
Completed fabrication of reinforcement ring
Details
       

 02-26-2012
2.50
Fabricated reinforcement ring, made spacer, and re
Details
       

 02-25-2012
2.50
Installing the W-425 gussetts, and working on acce
Details
       

 02-19-2012
3.50
Drilled and clecoed the lower skins to the left wi
Details
       

 02-18-2012
2.00
Marking and drilling the bottom skins
Details
       

 02-17-2012
1.50
Aligned left wing in jig
Details
       

 02-12-2012
3.00
Ran pitot line, cut sheet for top wing skins, rive
Details
       

 02-11-2012
1.00
Working on end main rib, and pitot line
Details
       

 02-05-2012
3.00
Finished the RH aileron
Details
       

 02-03-2012
5.00
RH Aileron, RH Flap, Left wing bellcrank
Details
       

 01-29-2012
2.50
Started assembling RH aileron
Details
       

 01-28-2012
2.00
Primed parts from yesterday, and started assemblin
Details
       

 01-27-2012
2.50
DImpled aileron parts, and prepared everything for
Details
       

 01-22-2012
3.00
Started RH aileron
Details
       

 01-21-2012
1.00
Fabricating Aileron Bellcranks
Details
       

 01-16-2012
1.00
Final assembly
Details
       

 01-15-2012
2.00
Final assembly of aileron
Details
       

 01-14-2012
3.50
Completed skeleton assembly and primed everything
Details
       

 01-12-2012
1.50
Riveted on stiffeners, completed trailing edge ben
Details
       

 01-09-2012
0.50
Started riveting stiffeners to skin
Details
       

 01-08-2012
1.50
Scuffed and cleaned aileron components for priming
Details

 01-07-2012
2.50
Preparing for prime and final assembly
Details
       

 01-05-2012
2.50
Drilling LH aileron componenets to skins
Details
       

 01-02-2012
1.00
Continued on LH Aileron
Details
       

 01-01-2012
2.00
Started working on LH Aileron
Details
       

 04-10-2011
1.00
Reassembled right wing skeleton
Details
       

 04-09-2011
2.00
Primed skeleton parts for right wing
Details
       

 04-07-2011
4.00
Prepared wing parts for prime
Details
       

 03-26-2011
1.00
Built Aluminum Wing Jig/Stand
Details
       

 02-06-2011
2.50
Drilled main ribs to rear spar
Details
       

 02-01-2011
2.00
Continued on rear spar
Details
       

 01-30-2011
3.00
Building Right Rear spar
Details
       

 01-25-2011
0.50
More wing parts arrived!
Details
       

 01-10-2011
1.50
Marked flute locations
Details

 12-27-2010
1.00
Sorting pieces
Details
       

 04-04-2010
2.00
Wing Jig
Details
       

 04-04-2010
6.50
Cleaning / Scotchbriting Ribs
Details
       

 10-25-2008
2.00
Riveted on LH elevator tip
Details
     

 10-18-2008
3.00
Worked LH elevator tip
Details
       

 10-17-2008
1.00


 10-07-2008
4.00
Getting RH elevator ready to prime
Details
       

 10-06-2008
4.00


 10-05-2008
1.00


 10-04-2008
8.00


 10-03-2008
6.00
Made lead counterbalance weights and installed
Details
       

 09-28-2008
4.00


 09-17-2008
3.00
Finished riveting the LH elevator together.
Details
       

 09-16-2008
3.00
Almost finished with the LH elevator, short of the
Details
       

 09-14-2008
2.00


 09-13-2008
4.00


 09-12-2008
3.00


 09-11-2008
6.50
Getting ready to final asemble the LH elevator
Details
       

 09-10-2008
2.50
Continued on LH elevator
Details
       

 09-04-2008
4.50
Started LH elevator today
Details
       

 09-02-2008
2.00
Prepped and installed counter balance skin
Details
       

 08-31-2008
2.00
Finished with the elevator, except for counterbala
Details
     

 08-29-2008
3.00
Getting close on the RH elevator
Details
       

 08-28-2008
4.00
More drilling, deburring and prepping.
Details
       

 08-24-2008
5.50
Continued progress on RH elevator
Details
       

 08-23-2008
4.00
Continued on RH elevator, drilled elevator horn, t
Details
       

 08-22-2008
1.50
Drilled skeleton parts
Details
       

 08-21-2008
1.00
Marked out location for RH elevator skeleton
Details
       

 08-17-2008
4.00
Started on the right hand elevator today
Details
       

 06-01-2008
1.00
Drilled the top cap to the rudder
Details
       

 05-31-2008
1.00
Prepped rudder exterior for fiberglass
Details
     

 05-26-2008
1.50
Completed rudder except for fiberglass cap and bot
Details
       

 05-21-2008
2.00
Primed all rudder pieces, reassembled.
Details
       

 05-14-2008
2.50
Got rudder pieces ready to prime.
Details
       

 05-12-2008
2.50
Working on Rudder
Details
       

 01-18-2008
3.00
Completed vertical stab except for cap.
Details
       

 01-15-2008
3.00
Completed the VS skeleton
Details
       

 01-06-2008
5.00
Started fabricating the vs parts.
Details
       

 01-05-2008
1.00
Started on the vertical stab
Details
       

 12-19-2007
3.00
Completed Horizontal Stab less prep and primer.
Details
       

 12-16-2007
4.00
Riveted right skin on HS
Details
       

 12-15-2007
3.00
Drilled right HS skin to skelton
Details
       

 12-11-2007
2.00
Riveted the LH skin
Details
     

 12-04-2007
3.00
Still working on HS skins
Details
       

 12-02-2007
3.00
Starting to skin the horizontal stab.
Details
       

 11-25-2007
3.00
Primed the parts for the horizontal stab.
Details
       

 11-20-2007
2.00
Continuing skeleton, and forward spar splice plate
Details
       

 09-23-2007
3.00
Starting the skeleton for the horizontal
Details
       

 09-15-2007
2.00
Finished the rear spar for the horizontal.
Details
       

 05-13-2007
4.00
Locate bearing and elevator attach brackets
Details
       

 05-07-2007
4.00
Second entry for 5-7-07 to show more pics
Details
       

 05-07-2007
4.00
Drilling, priming and assembling of HS rear spar.
Details
       

 05-01-2007
5.00
Day 1! Arrival / Inventory
Details
     