KitLog pro

Powered By Kitlog Pro v2.0

Lancair Legacy FG-6
Work Logs Found: 141
Category Work Time: 302 Hours
 Date
Hours
Work Log Summary

Details

 03-24-2006
3.00
Mounted the instrument panel
Details
       

 03-23-2006
2.00
Blocks cut down and bonded in
Details
       

 03-20-2006
2.00
Panel mounts pulled from Molds
Details
       

 03-17-2006
12.00
Final Panel layout and off to the metal shop
Details
     

 03-14-2006
2.00
Created some panel mount molds
Details
       

 03-07-2006
2.00
Rough fit of panel blank
Details
       

 02-28-2006
1.00
Installed rear elevator pushrod
Details
       

 02-28-2006
2.00
Elevator attachment notches
Details
     

 02-28-2006
1.00
Cockpit pushrods
Details
       

 02-28-2006
0.75
Centered the elevator idler
Details
     

 02-26-2006
3.00
Installing elevators (part 1)
Details
       

 02-26-2006
0.50
Engine control bracket (finished)
Details
       

 02-26-2006
2.00
Elevator installation (part 2)
Details
       

 02-23-2006
4.00
Rudder fitting
Details

 02-23-2006
2.00
Powder coat and engrave the engine controls bracke
Details

 02-23-2006
0.50
Installed Stick to idler elevator pushrod
Details
       

 02-23-2006
2.00
Installed elevator access panels
Details
       

 02-17-2006
2.00
Trimmed rudder for travel
Details
     

 02-17-2006
1.00
Slotted the aileron idler mounting holes
Details
       

 02-17-2006
2.00
Installed Rudder pushrod
Details
       

 02-17-2006
0.25
Added Pump drain
Details
     

 02-15-2006
3.00
Prep for Install
Details
     

 02-15-2006
0.50
Ground plane for Transponder
Details
     

 02-15-2006
1.50
Deburred all fuel lines
Details

 02-15-2006
1.50
Built the return line
Details
       

 02-15-2006
0.75
Aileron idler rework
Details
     

 02-15-2006
1.50
Added protection bids
Details
     

 02-09-2006
1.00
Comm Antenna ground plane
Details
       

 02-07-2006
4.00
Center Console (part 2)
Details
       

 02-04-2006
6.00
Throttle, Prop, Mixture mounting
Details
       

 02-01-2006
1.00
Fit the fuel selector indicator
Details
       

 01-31-2006
1.00
Installed seat back Bids
Details
       

 01-31-2006
1.50
Installed pilot seat bottom
Details
       

 01-31-2006
1.00
Installed co-pilot seat bottom
Details
       

 01-30-2006
1.00
Installed Roll Servo bracket
Details
       

 01-29-2006
1.00
Readied seat bottom supports
Details
     

 01-29-2006
3.00
Center console (part n+1)
Details
       

 01-26-2006
1.00
Center the fuel selector extension
Details
       

 01-26-2006
2.00
Bonded in flap motor attach point
Details
       

 01-25-2006
0.75
Prep work for Fuel selector indicator
Details
       

 01-25-2006
0.75
More Center console work (part n)
Details
       

 01-24-2006
1.00
Re-assembly of the flight controls
Details
     

 01-24-2006
1.50
Fit and level center console
Details
       

 01-24-2006
0.50
Final cutout on the forward wing access panels
Details
       

 01-24-2006
0.50
Drilled out the comm antenna nutplates
Details

 01-24-2006
1.50
Bottom seat supports fit
Details
       

 01-24-2006
1.00
Bonded in the Fuel pump bracket
Details
     

 01-24-2006
1.00
Bonded in Seatbelt doubler
Details
     

 01-22-2006
0.75
Re-attached counter balance screws
Details

 01-22-2006
1.00
Fit and temporarily mounted the fuel pump
Details

 01-22-2006
0.75
Finished rudder pedal access panels
Details

 01-20-2006
0.75
Riveted the floor boards
Details

 01-20-2006
1.50
Redo of Aileron counter weights
Details

 01-19-2006
3.00
Fit the fuel pump bracket
Details
       

 01-13-2006
2.00
Assembled Rudder pedals
Details
       

 01-10-2006
2.50
Painted pushrods
Details
       

 01-09-2006
2.50
Alodyne'd pushrods
Details

 01-08-2006
2.50
Prep'd Pushrods
Details

 12-19-2005
2.00
Rudder Pedal floors
Details
       

 12-17-2005
1.50
Mounted the Rudder Pedals
Details
       

 12-16-2005
4.00
Fit Floor boards
Details
     

 12-14-2005
2.00
Rudder Cables
Details
       

 12-14-2005
1.00
Re-inforced firewall feedthru's
Details
     

 12-14-2005
2.00
finalized the flaps connections
Details
       

 12-14-2005
2.00
Added Flap motor attach block
Details
       

 12-13-2005
2.00
Ready Center rudder cable install
Details
       

 12-13-2005
4.00
Installed Rudder Bellcrank & Cables
Details
       

 12-05-2005
2.00
Assembled Rudder Bellcrank
Details
       

 11-16-2005
2.00
Reassembly of Flaps
Details

 11-15-2005
2.00
Prep for Flaps bearing adjustment
Details

 11-15-2005
2.00
Flaps control
Details

 11-15-2005
2.00
Cut out Flap pushrod openings
Details

 11-13-2005
2.50
Inside fuel lines complete
Details
       

 11-12-2005
6.00
Inside Main Fuel lines
Details
       

 11-12-2005
1.00
Control sticks and inside aileron tubes
Details
       

 11-08-2005
1.50
Main fuel fittings
Details

 11-07-2005
0.50
Installed the fuel selector
Details
     

 11-07-2005
3.00
Installed the fuel bulkheads
Details
       

 11-01-2005
3.00
Installed the fuel selector mount
Details
       

 10-28-2005
2.00
Right - Canopy Latch Mechanism
Details
       

 10-28-2005
2.00
Left - Canopy Latch Mechanism
Details
       

 10-25-2005
2.00
RG Pivot Blocks removed
Details
       

 10-25-2005
1.00
Prep of the seat belt attach doubler
Details
       

 10-25-2005
2.00
Attached fuel selector to its mount
Details
       

 10-25-2005
3.00
Aileron Bellcranks replaced
Details
       

 09-22-2005
1.00
Released added for the Transponder Ant
Details
     

 09-22-2005
2.00
installed canopy latch arms
Details
       

 09-22-2005
3.00
Gear doors bonded in
Details
       

 09-22-2005
3.00
Gear door access panels added
Details
       

 09-22-2005
2.00
Center Console gets access panels
Details
       

 09-22-2005
2.00
Canopy is fit and cut
Details
       

 09-22-2005
0.15
Canopy Bubble readied
Details
     

 09-22-2005
2.00
Added canopy strakes
Details
       

 09-21-2005
2.00
Riveted Canopy Strakes
Details

 09-21-2005
1.00
Canopy opening mechanism
Details
       

 09-21-2005
2.00
Bonding of Canopy latch
Details
       

 09-21-2005
3.00
Added Canopy reinforcements
Details
       

 09-21-2005
2.00
Added canopy gudes for strakes
Details

 09-21-2005
1.00
Added bids over rear canopy re-inforcement
Details

 09-20-2005
0.25
Wing squeeze out
Details
       

 09-20-2005
0.25
Turned the Fuselage over for more work
Details
     

 09-20-2005
2.00
Sanding Canopy bonding
Details
       

 09-20-2005
2.00
Rough fit the gear doors
Details
       

 09-20-2005
1.00
Reference holes drilled for rudder separation
Details
     

 09-20-2005
2.00
Pressure test the wings
Details
       

 09-20-2005
2.00
Prep for Canopy Hinge
Details
       

 09-20-2005
2.00
Elevator trimming
Details

 09-20-2005
4.00
Canopy Hinge part 4
Details
     

 09-20-2005
1.00
Canopy Hinge part 3
Details
     

 09-20-2005
4.00
Canopy hinge part 2
Details
       

 09-20-2005
2.00
Added Flight control hinge bulkhead
Details
     

 09-19-2005
1.00
Transfered reference line
Details
       

 09-19-2005
2.00
Sanded various fiberglass interior parts
Details

 09-19-2005
3.00
Re-bonded Canopy halfs back together
Details

 09-19-2005
4.00
Fit basic canopy shell
Details

 09-19-2005
1.00
Created AHRS shelf
Details

 09-19-2005
3.00
Adjusted travel on Elevator
Details

 09-16-2005
2.00
Wings - Completed (almost)
Details
       

 09-16-2005
2.00
Rudder counterweight and bulkhead
Details
       

 09-16-2005
0.25
Inside of firewall
Details
       

 09-16-2005
1.00
Horizontal Stab slot cut
Details
     

 09-16-2005
8.00
Horizontal Stab fitting
Details
       

 09-16-2005
1.00
Fuselage showed up
Details
       

 09-16-2005
14.00
Firewall fast build
Details
       

 09-16-2005
4.00
Canopy prework
Details
       

 09-16-2005
2.00
Added elevator stop blocks
Details
       

 09-15-2005
2.00
Wing leading edge cleanup
Details

 09-15-2005
5.00
Block grind out (day one)
Details
       

 09-15-2005
3.00
Bids on Elevators
Details
     

 09-14-2005
1.50
Wing leading edge bids
Details
       

 09-14-2005
4.00
Horizontal Stab Closeout
Details
       

 09-14-2005
4.00
Elevator closeout
Details
       

 09-14-2005
1.50
Cleaned up the Ailerons
Details
     

 09-13-2005
1.00
Prep for Horiz Stab closeout
Details
     

 09-13-2005
3.00
Elevator width is set
Details
     

 09-13-2005
3.50
Close out of right wing
Details
       

 09-13-2005
2.00
Aileron Counter weights
Details
       

 09-12-2005
3.00
Prep and closeout of left wing
Details
       

 09-12-2005
3.00
Inventory parts associated with the kit
Details

 09-12-2005
1.50
Introduction to construction techniques
Details

 09-12-2005
2.00
Elevator Prep
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.