KitLog pro

Powered By Kitlog Pro v2.0

Daves Web Site
Work Logs Found: 82
Category Work Time: 260 Hours
 Date
Hours
Work Log Summary

Details

 01-11-2011
4.00
Seat Back Attach Hardware
Details
       

 01-08-2011
1.50
Flap Bearing Blocks
Details
       

 12-14-2010
2.00
Pitot Tube Bracket
Details

 12-13-2010
0.00
Inventory
Details

 12-12-2010
4.00
Firewall Recess
Details
       

 12-11-2010
4.00
Brake Hose Bracket
Details
       

 12-10-2010
0.00
Starting on the Fuselage
Details
     

 11-28-2010
4.00
Wing Wiring Conduit
Details
       

 11-27-2010
1.00
Wing Wiring Conduit
Details
       

 11-15-2010
2.00
Landing Light - Right Wing (Part 2)
Details
       

 11-15-2010
2.00
Landing Light - Right Wing (Part 1)
Details
       

 11-14-2010
2.50
Landing Light - Left Wing (Part 2)
Details
       

 11-14-2010
2.50
Landing Light - Left Wing (Part 1)
Details
       

 11-03-2010
3.00
Riveted Flap Hinge
Details
       

 11-01-2010
4.00
Drilled Flap Hinge
Details
       

 10-31-2010
3.00
More Flap Brace
Details
       

 10-30-2010
1.50
Flap Brace
Details
       

 10-28-2010
3.00
Pitot Mast and Inspection Plates
Details
       

 10-27-2010
3.00
Pitot Mounting Mast
Details
       

 10-25-2010
4.00
Bottom Right Wing Skin
Details
       

 09-21-2010
5.00
More LH Bottom Wing Skin
Details
       

 09-18-2010
3.00
Bottom Left Wing Skin
Details
       

 03-08-2009
3.00
Left Aileron Flap Brace
Details
       

 03-06-2009
3.00
Primed Flap and Aileron Braces
Details
       

 02-22-2009
1.50
Riveted Alieron Brackets to the Wings
Details
       

 02-21-2009
2.00
Aileron Attach Brackets Cont.
Details
       

 02-10-2009
4.00
Aileron Attach Brackets
Details
       

 02-09-2009
3.00
Aileron Push Rods
Details
       

 02-08-2009
2.00
Started on the Wings
Details
       

 02-07-2009
1.00
Attached Rudder to Vertical Stabilizer
Details
       

 01-24-2009
4.00
Empennage Mostly Complete
Details
       

 01-14-2009
1.00
Riveted LH Elevator Leading Edge
Details
       

 01-13-2009
3.00
Rolled Elevator Leading Edges
Details
       

 01-12-2009
3.00
Finished Elevator Trim Tab
Details
       

 01-11-2009
3.00
Trim Tab Bend
Details
       

 01-11-2009
0.00
Additional Trim Tab Pictures
Details
       

 01-10-2009
3.00
Riveted Left Elevator
Details
       

 01-09-2009
3.00
Primed Left Elevator Substructure
Details
       

 01-08-2009
3.00
Bent Left Elevator Tabs
Details
       

 12-30-2008
6.00
Riveted RH Elevator and Deburred/Dimpled LH Elevat
Details
       

 12-29-2008
4.00
LH Elevator
Details
       

 12-28-2008
3.00
Riveted the RH Elevator Understructure
Details
       

 12-27-2008
3.00
Primed Right Elevator Parts
Details
       

 12-16-2008
6.00
Bent Elevator Trailing Edges
Details
       

 12-15-2008
5.00
Primed Elevator Skins/Stiffeners
Details
       

 12-14-2008
5.00
Elevator Skin Dimpling
Details
       

 12-13-2008
4.00
Finished Rudder
Details
       

 12-02-2008
0.00
Temporary Wheels for the Fuselage
Details
       

 12-02-2008
2.00
More Elevator Stiffeners
Details
       

 12-01-2008
3.00
Elevator Stiffeners
Details
       

 11-30-2008
3.00
Glued Rudder Trailing Edge & Riveted Rudder Skin
Details
       

 11-29-2008
2.00
Hard to Get to Rudder Horn Rivets
Details
       

 11-28-2008
5.00
Rudder Parts Primed, Beginning Assembly
Details
       

 11-27-2008
0.00
Quick Build Wings & Fuselage Kit Arrives
Details
       

 11-27-2008
0.00
Fuselage Kit Arrives, continued
Details
       

 11-18-2008
4.00
More Rudder Dimpling and Countersinking
Details
       

 11-17-2008
2.00
Dimpled Rudder Parts
Details
       

 11-16-2008
5.00
More Rudder Work
Details
       

 11-15-2008
5.00
Rudder Skins and Stiffeners
Details
       

 11-14-2008
7.00
Building the Rudder
Details
       

 11-13-2008
5.00
Finished 2nd Piece of Tail (Verticle Stabilizer)
Details
       

 11-12-2008
4.00
Built Wing Cradle
Details
       

 11-05-2008
3.00
Primed VS Parts
Details
       

 11-04-2008
4.00
Prepping the Verticle Stabilizer Parts
Details
       

 11-03-2008
5.00
Finished 1st Piece of Tail :)
Details
       

 11-02-2008
6.00
Riveting HS Skins
Details
       

 11-01-2008
4.00
Initial Riveting of the HS Understructure
Details
       

 10-31-2008
5.00
Priming the HS Parts
Details
       

 10-30-2008
5.00
Dimpling HS Skins and Understructure
Details
       

 10-19-2008
7.00
Taking the HS back apart
Details
       

 10-18-2008
7.00
HS Pre-assembly (skins to understructure)
Details
       

 10-17-2008
6.00
More VS Pre-assembly Work
Details
       

 10-17-2008
0.00
HS Replacement Part Arrives
Details
       

 10-16-2008
2.00
VS Initial Work (waiting for a HS part)
Details
       

 10-15-2008
3.00
Initial Assembly of HS Understructure
Details
     

 10-13-2008
4.00
HS Ribs
Details
       

 10-12-2008
2.00
HS Ribs
Details
       

 10-11-2008
7.00
HS Front Spar
Details
       

 10-10-2008
5.00
HS Rear Spar
Details
       

 10-02-2008
0.00
Empennage (French for Tail) Kit Arrives
Details
       

 09-25-2008
0.00
The Tools
Details
       

 09-25-2008
0.00
The Shop
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.